ML093010327: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                                  SAM NUNN ATLANTA FEDERAL CENTER
SAM NUNN ATLANTA FEDERAL CENTER
                                  61 FORSYTH STREET, SW, SUITE 23T85
61 FORSYTH STREET, SW, SUITE 23T85  
                                      ATLANTA, GEORGIA 30303-8931
ATLANTA, GEORGIA 30303-8931  
                                          October 28, 2009
Mr. Tom E. Tynan
October 28, 2009  
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
Mr. Tom E. Tynan  
7821 River Road
Vice President  
Waynesboro, GA 30830
Southern Nuclear Operating Company, Inc.  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
Vogtle Electric Generating Plant  
            OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
7821 River Road  
Dear Mr. Tynan:
Waynesboro, GA 30830  
In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations
Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were
OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301  
made for the administration of licensing examinations at Vogtle Electric Generating Plant. The
operating test is scheduled to be administered during the week of February 22, 2010. The
Dear Mr. Tynan:  
written examination is scheduled to be administered the week of March 1, 2010. The on-site
preparatory week is scheduled for the week of January 25, 2010.
In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations  
As agreed during the telephone conversation, your staff will prepare both the operating test and
Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,  
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were  
"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office
made for the administration of licensing examinations at Vogtle Electric Generating Plant. The  
will discuss with your staff any changes that might be necessary before the examinations are
operating test is scheduled to be administered during the week of February 22, 2010. The  
administered. Your staff has also agreed to make copies of all examination materials that are
written examination is scheduled to be administered the week of March 1, 2010. The on-site  
necessary for administering the examination.
preparatory week is scheduled for the week of January 25, 2010.  
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in
As agreed during the telephone conversation, your staff will prepare both the operating test and  
September 2009. The operating test, written examination, and the supporting reference
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,  
materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title
"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office  
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
will discuss with your staff any changes that might be necessary before the examinations are  
representative of the facility licensee shall approve the outline, examination, and test before
administered. Your staff has also agreed to make copies of all examination materials that are  
they are submitted to the NRC for review and approval. All materials shall be complete and
necessary for administering the examination.  
ready-to-use.
To meet the above schedule, it will be necessary for your staff to furnish the operating test  
outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in  
September 2009. The operating test, written examination, and the supporting reference  
materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title  
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
representative of the facility licensee shall approve the outline, examination, and test before  
they are submitted to the NRC for review and approval. All materials shall be complete and  
ready-to-use.  


SNC                                           2
SNC  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
2  
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
We request that any personal, proprietary, sensitive unclassified, or safeguards information in  
incomplete materials, may cause the examinations to be rescheduled.
your response be contained in a separate enclosure and appropriately marked. Any delay in  
In order to conduct the requested written examinations and operating tests, it will be necessary
receiving the required examination and reference materials, or the submittal of inadequate or  
for your staff to provide adequate space and accommodations in accordance with ES-402, and
incomplete materials, may cause the examinations to be rescheduled.  
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
In order to conduct the requested written examinations and operating tests, it will be necessary  
temperatures, and levels) generated during the dynamic operating tests until the examination
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
results are final.
to make the simulation facility available on the dates noted above. In accordance with ES-302,  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
your staff should retain the original simulator performance data (e.g., system pressures,  
effect while the written examinations and operating tests are being administered.
temperatures, and levels) generated during the dynamic operating tests until the examination  
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
results are final.  
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in  
received at least 30 days before the examination date, a postponement may be necessary.
effect while the written examinations and operating tests are being administered.  
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
This letter contains information collections that are subject to the Paperwork Reduction Act of
operator and senior reactor operator license applications, medical certifications, and waiver  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
requests (if any) at least 30 days before the first examination date. If the applications are not  
Management and Budget. The public reporting burden for this collection of information is
received at least 30 days before the examination date, a postponement may be necessary.
estimated to average 500 hours per response, including the time for reviewing instructions,
Signed applications certifying that all training has been completed should be submitted at least  
gathering and maintaining the data needed, writing the examinations, and completing and
14 days before the first examination date.  
reviewing the collection of information. Send comments on any aspect of this collection of
information, including suggestions for reducing the burden, to the Information and Records
This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of  
Management and Budget. The public reporting burden for this collection of information is  
estimated to average 500 hours per response, including the time for reviewing instructions,  
gathering and maintaining the data needed, writing the examinations, and completing and  
reviewing the collection of information. Send comments on any aspect of this collection of  
information, including suggestions for reducing the burden, to the Information and Records  
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-
Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-
0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,
0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,  
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management  
and Budget, Washington, DC 20503.
and Budget, Washington, DC 20503.  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
Room or from the Publicly Available Records (PARS) component of the NRCs document
enclosures will be available electronically for public inspection in the NRC Public Document  
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
Room or from the Publicly Available Records (PARS) component of the NRCs document  
rm.adams.html (the Public Electronic Reading Room).
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).  


SNC                                           3
SNC  
Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies
3  
and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,
Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies  
(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:
and guidelines referenced in this letter. If you have any questions regarding the NRC's  
malcolm.widmann@nrc.gov).
examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,  
                                              Sincerely,
(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:  
                                              /RA/
malcolm.widmann@nrc.gov).  
                                              Malcolm T. Widmann, Chief
                                              Operations Branch
Sincerely,  
                                              Division of Reactor Safety
Docket Nos.: 50-424, 50-425
License Nos.: NPF-68, NPF-81
cc: (See Page 4)
/RA/  
Malcolm T. Widmann, Chief  
Operations Branch  
Division of Reactor Safety  
Docket Nos.: 50-424, 50-425  
License Nos.: NPF-68, NPF-81  
cc: (See Page 4)  




_________________________           X SUNSI REVIEW COMPLETE MTW
_________________________  
OFFICE           RII:DRS         RII:DRS
SIGNATURE         EXL /RA/       MTW /RA/
X   SUNSI REVIEW COMPLETE MTW  
NAME             ELea           MWidmann
OFFICE  
DATE                 10/28/2009     10/28/2009
RII:DRS  
E-MAIL COPY?       YES        NO  YES        NO YES     NO  YES     NO YES       NO YES       NO YES   NO
RII:DRS  
       
SNC                                      4
cc w/encl:                                Lee Foley
Angela Thornhill                          Manager of Contracts Generation
Managing Attorney and Compliance Officer   Oglethorpe Power Corporation
Southern Nuclear Operating Company, Inc.   Electronic Mail Distribution
SIGNATURE  
Electronic Mail Distribution
EXL /RA/  
                                          Mr. N. Holcomb
MTW /RA/  
N. J. Stringfellow                        Commissioner
Manager                                    Department of Natural Resources
Licensing                                  Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Dr. Carol Couch
                                          Director
NAME  
Jeffrey T. Gasser                          Environmental Protection
ELea  
Executive Vice President                  Department of Natural Resources
MWidmann  
Southern Nuclear Operating Company, Inc.   Electronic Mail Distribution
Electronic Mail Distribution
                                          Cynthia Sanders
L. Mike Stinson                            Program Manager
Vice President                            Radioactive Materials Program
Fleet Operations Support                  Department of Natural Resources
DATE  
Southern Nuclear Operating Company, Inc.  Electronic Mail Distribution
10/28/2009  
Electronic Mail Distribution
10/28/2009  
                                          Jim Sommerville
Michael A. MacFarlane                      (Acting) Chief
Southern Nuclear Operating Company, Inc.  Environmental Protection Division
40 Inverness Center Parkway                Department of Natural Resources
P.O. Box 1295                              Electronic Mail Distribution
Birmingham, AL 35201-1295
E-MAIL COPY?  
                                          Mr. Steven M. Jackson
     YES  
Paula Marino                              Senior Engineer - Power Supply
NO   YES  
Vice President                            Municipal Electric Authority of Georgia
NO   YES  
Engineering                                Electronic Mail Distribution
NO   YES  
Southern Nuclear Operating Company, Inc.
NO  YES
Electronic Mail Distribution              Mr. Reece McAlister
NO   YES
                                          Executive Secretary
NO   YES
Bob Masse                                  Georgia Public Service Commission
NO
Resident Manager                          Electronic Mail Distribution
Vogtle Electric Generating Plant
Oglethorpe Power Corporation              Office of the County Commissioner
Electronic Mail Distribution              Burke County Commission
                                          Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel        Arthur H. Domby, Esq.
Southern Nuclear Operating Company, Inc.  Troutman Sanders
Electronic Mail Distribution              Electronic Mail Distribution
Office of the Attorney General            (cc continued next page)
Electronic Mail Distribution


SNC                                     5
SNC  
cc continued
4
Director
Consumers' Utility Counsel Division
cc w/encl:
Govenor's Office of Consumer Affairs
Angela Thornhill
2 M. L. King, Jr. Drive
Managing Attorney and Compliance Officer
Plaza Level East; Suite 356
Southern Nuclear Operating Company, Inc.
Atlanta, GA 30334-4600
Electronic Mail Distribution
Susan E. Jenkins
Director, Division of Waste Management
N. J. Stringfellow
Bureau of Land and Waste Management
Manager
S.C. Department of Health and
Licensing
Environmental Control
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Electronic Mail Distribution
Richard D. Brigdon
Plant Training and
Jeffrey T. Gasser
Emergency Preparedness Manager
Executive Vice President
Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc.  
Electronic Mail Distribution
Electronic Mail Distribution
L. Mike Stinson
Vice President
Fleet Operations Support
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Michael A. MacFarlane
Southern Nuclear Operating Company, Inc.  
40 Inverness Center Parkway
P.O. Box 1295
Birmingham, AL  35201-1295
Paula Marino
Vice President
Engineering
Southern Nuclear Operating Company, Inc.  
Electronic Mail Distribution
Bob Masse
Resident Manager
Vogtle Electric Generating Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Office of the Attorney General
Electronic Mail Distribution
Lee Foley
Manager of Contracts Generation
Oglethorpe Power Corporation
Electronic Mail Distribution
Mr. N. Holcomb
Commissioner
Department of Natural Resources
Electronic Mail Distribution
Dr. Carol Couch
Director
Environmental Protection
Department of Natural Resources
Electronic Mail Distribution
Cynthia Sanders
Program Manager
Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Jim Sommerville
(Acting) Chief
Environmental Protection Division
Department of Natural Resources
Electronic Mail Distribution
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution  
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
Office of the County Commissioner
Burke County Commission
Electronic Mail Distribution
Arthur H. Domby, Esq.  
Troutman Sanders
Electronic Mail Distribution  
(cc continued next page)


SNC                                     6
SNC  
Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009
5
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED
              OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301
cc continued
Distribution w/encl:
C. Evans, RII
Director
L. Slack, RII
Consumers' Utility Counsel Division
OE Mail
Govenor's Office of Consumer Affairs
RIDSNRRDIRS
2 M. L. King, Jr. Drive
PUBLIC
Plaza Level East; Suite 356
Atlanta, GA  30334-4600
Susan E. Jenkins
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution
Richard D. Brigdon
Plant Training and
Emergency Preparedness Manager
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
 
SNC
6  
Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009  
SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED  
OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301  
Distribution w/encl:  
C. Evans, RII
L. Slack, RII
OE Mail
RIDSNRRDIRS  
PUBLIC  
RidsNrrPMVogtle Resource
RidsNrrPMVogtle Resource
}}
}}

Latest revision as of 08:38, 14 January 2025

Notification of Licensed Operator Initial Examination 05000424/2010301 and 05000425/2010301
ML093010327
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/28/2009
From: Widmann M
Division of Reactor Safety II
To: Tynan T
Southern Nuclear Operating Co
References
50-424/10-301, 50-425/10-301
Download: ML093010327 (7)


See also: IR 05000424/2010301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

October 28, 2009

Mr. Tom E. Tynan

Vice President

Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant

7821 River Road

Waynesboro, GA 30830

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Dear Mr. Tynan:

In a telephone conversation on October 27, 2009, between Mr. George Gunn, Operations

Training Supervisor and Mr. Dan Scukanec, Lead Instructor, of your staff, and Mr. Edwin Lea,

Senior Operations Engineer, of the Nuclear Regulatory Commission (NRC), arrangements were

made for the administration of licensing examinations at Vogtle Electric Generating Plant. The

operating test is scheduled to be administered during the week of February 22, 2010. The

written examination is scheduled to be administered the week of March 1, 2010. The on-site

preparatory week is scheduled for the week of January 25, 2010.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. NRC regional office

will discuss with your staff any changes that might be necessary before the examinations are

administered. Your staff has also agreed to make copies of all examination materials that are

necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 9, 2009. Mr. Lea provided the written outline to members of your staff in

September 2009. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by January 8, 2010. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

SNC

2

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget. The public reporting burden for this collection of information is

estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, writing the examinations, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management

and Budget, Washington, DC 20503.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

SNC

3

Thank you for your cooperation in this matter. Mr. Scukanec has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567,

(Internet E-mail: edwin.lea @nrc.gov), or me at (404) 562-4550, (Internet E-mail:

malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-424, 50-425

License Nos.: NPF-68, NPF-81

cc: (See Page 4)

_________________________

X SUNSI REVIEW COMPLETE MTW

OFFICE

RII:DRS

RII:DRS

SIGNATURE

EXL /RA/

MTW /RA/

NAME

ELea

MWidmann

DATE

10/28/2009

10/28/2009

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

SNC

4

cc w/encl:

Angela Thornhill

Managing Attorney and Compliance Officer

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

N. J. Stringfellow

Manager

Licensing

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Jeffrey T. Gasser

Executive Vice President

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

L. Mike Stinson

Vice President

Fleet Operations Support

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Michael A. MacFarlane

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

P.O. Box 1295

Birmingham, AL 35201-1295

Paula Marino

Vice President

Engineering

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Bob Masse

Resident Manager

Vogtle Electric Generating Plant

Oglethorpe Power Corporation

Electronic Mail Distribution

Moanica Caston

Vice President and General Counsel

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

Office of the Attorney General

Electronic Mail Distribution

Lee Foley

Manager of Contracts Generation

Oglethorpe Power Corporation

Electronic Mail Distribution

Mr. N. Holcomb

Commissioner

Department of Natural Resources

Electronic Mail Distribution

Dr. Carol Couch

Director

Environmental Protection

Department of Natural Resources

Electronic Mail Distribution

Cynthia Sanders

Program Manager

Radioactive Materials Program

Department of Natural Resources

Electronic Mail Distribution

Jim Sommerville

(Acting) Chief

Environmental Protection Division

Department of Natural Resources

Electronic Mail Distribution

Mr. Steven M. Jackson

Senior Engineer - Power Supply

Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. Reece McAlister

Executive Secretary

Georgia Public Service Commission

Electronic Mail Distribution

Office of the County Commissioner

Burke County Commission

Electronic Mail Distribution

Arthur H. Domby, Esq.

Troutman Sanders

Electronic Mail Distribution

(cc continued next page)

SNC

5

cc continued

Director

Consumers' Utility Counsel Division

Govenor's Office of Consumer Affairs

2 M. L. King, Jr. Drive

Plaza Level East; Suite 356

Atlanta, GA 30334-4600

Susan E. Jenkins

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Richard D. Brigdon

Plant Training and

Emergency Preparedness Manager

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution

SNC

6

Letter to Tom E. Tynan from Malcolm T. Widmann dated October 28, 2009

SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000424/2010301 AND 05000425/2010301

Distribution w/encl:

C. Evans, RII

L. Slack, RII

OE Mail

RIDSNRRDIRS

PUBLIC

RidsNrrPMVogtle Resource