{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION II
REGION II  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                    ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                              May 5, 2011
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT:       CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
        May 5, 2011  
              OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Dear Mr. Franke:
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety
inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public
Mr. Jon A. Franke  
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.
Vice President, Crystal River Nuclear Plant  
Experience has shown that this inspection is resource intensive both for the NRC inspectors
Crystal River Nuclear Plant (NA2C)  
and your staff. In order to minimize the impact to your on-site resources and to conduct a
15760 W. Power Line Street  
productive inspection, we have enclosed a request for documents needed for this inspection. It
Crystal River, FL 34428-6708  
is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
SUBJECT:  
the inspection. The lead inspector has requested that the subject informational material be
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION  
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003  
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
Dear Mr. Franke:  
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your
organization. If there are any questions about this inspection or the material requested, please
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety  
contact the lead inspector, George B. Kuzo at (404) 997-4658.
inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.    
enclosure will be available electronically for public inspection in the NRC Public Document
Experience has shown that this inspection is resource intensive both for the NRC inspectors  
and your staff. In order to minimize the impact to your on-site resources and to conduct a  
productive inspection, we have enclosed a request for documents needed for this inspection. It  
is important that all of these documents are up to date and complete in order to minimize the  
number of additional documents requested during the preparation and/or the onsite portions of  
the inspection. The lead inspector has requested that the subject informational material be  
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming  
inspection.  
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your  
organization. If there are any questions about this inspection or the material requested, please  
contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document  


FPC                                       2
FPC  
Room or from the Publicly Available Records (PARS) component of NRC's document system
2  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
rm/adams.html (the Public Electronic Reading Room).
Room or from the Publicly Available Records (PARS) component of NRC's document system  
                                          Sincerely,
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
                                          /RA/
rm/adams.html (the Public Electronic Reading Room).  
                                          Brian Bonser, Chief
                                          Plant Support Branch 1
Sincerely,  
                                          Division of Reactor Safety
Docket No.: 50-302
/RA/  
License No.: DPR-72
Enclosure:
Public Radiation Protection Inspection Document Request
Brian Bonser, Chief  
cc w/encl.: (See page 3)
Plant Support Branch 1  
Division of Reactor Safety  
Docket No.: 50-302  
License No.: DPR-72  
Enclosure:  
Public Radiation Protection Inspection Document Request  
cc w/encl.: (See page 3)  


FPC                                 3
FPC  
cc w/encl:                           Daniel R. Westcott
3  
Kelvin Henderson                     Supervisor
General Manager                       Licensing & Regulatory Programs
cc w/encl:  
Nuclear Fleet Operations             Crystal River Nuclear Plant (NA1B)
Kelvin Henderson  
Progress Energy                       Electronic Mail Distribution
General Manager  
Electronic Mail Distribution
Nuclear Fleet Operations  
                                      Joseph W. Donahue
Progress Energy  
Brian C. McCabe                       Vice President
Electronic Mail Distribution  
Manager, Nuclear Oversight            Nuclear Oversight
Shearon Harris Nuclear Power Plant   Progress Energy
Brian C. McCabe  
Progress Energy                       Electronic Mail Distribution
Manager, Nuclear Oversight  
Electronic Mail Distribution
Shearon Harris Nuclear Power Plant  
                                      Jack E. Huegel
Progress Energy  
James W. Holt                         Manager, Nuclear Oversight
Electronic Mail Distribution  
Plant General Manager                 Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)   Electronic Mail Distribution
James W. Holt  
Electronic Mail Distribution
Plant General Manager  
                                      David T. Conley
Crystal River Nuclear Plant (NA2C)
Stephen J. Cahill                    Senior Counsel
Electronic Mail Distribution
Director - Engineering Nuclear       Legal Department
Crystal River Nuclear Plant (NA2C)   Progress Energy
Stephen J. Cahill
Electronic Mail Distribution         Electronic Mail Distribution
Director - Engineering Nuclear
R. Alexander Glenn                    Mark Rigsby
Crystal River Nuclear Plant (NA2C)  
General Counsel                      Manager, Support Services - Nuclear
Electronic Mail Distribution  
Progress Energy                      Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution         Electronic Mail Distribution
R. Alexander Glenn
Jeffrey R. Swartz                    Senior Resident Inspector
General Counsel
Director Site Operations              U.S. Nuclear Regulatory Commission
Progress Energy
Crystal River Nuclear Plant          Crystal River Nuclear Generating Plant
Electronic Mail Distribution  
Electronic Mail Distribution          U.S. NRC
                                      6745 N Tallahassee Rd
Jeffrey R. Swartz
Donna B. Alexander                    Crystal River, FL 34428
Director Site Operations
Manager, Nuclear Regulatory Affairs
Crystal River Nuclear Plant
(interim)                            Attorney General
Electronic Mail Distribution
Progress Energy                      Department of Legal Affairs
Electronic Mail Distribution          The Capitol PL-01
Donna B. Alexander
                                      Tallahassee, FL 32399-1050
Manager, Nuclear Regulatory Affairs
Thomas Sapporito
(interim)
Consulting Associate                  Bryan Koon
Progress Energy
(Public Correspondence Only)          Director
Electronic Mail Distribution
Post Office Box 8413                  Florida Division of Emergency Management
Jupiter, FL 33468                    Electronic Mail Distribution
Thomas Sapporito
William A. Passetti                  Chairman
Consulting Associate
Chief                                Board of County Commissioners
(Public Correspondence Only)
Florida Bureau of Radiation Control  Citrus County
Post Office Box 8413
Department of Health                  110 N. Apopka Avenue
Jupiter, FL  33468
Electronic Mail Distribution          Inverness, FL 36250
William A. Passetti
Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Daniel R. Westcott
Supervisor
Licensing & Regulatory Programs
Crystal River Nuclear Plant (NA1B)  
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy  
Electronic Mail Distribution  
Jack E. Huegel
Manager, Nuclear Oversight
Crystal River Nuclear Plant
Electronic Mail Distribution  
David T. Conley
Senior Counsel
Legal Department
Progress Energy
Electronic Mail Distribution
Mark Rigsby  
Manager, Support Services - Nuclear  
Crystal River Nuclear Plant (NA2C)  
Electronic Mail Distribution  
Senior Resident Inspector  
U.S. Nuclear Regulatory Commission  
Crystal River Nuclear Generating Plant  
U.S. NRC  
6745 N Tallahassee Rd  
Crystal River, FL   34428  
Attorney General  
Department of Legal Affairs  
The Capitol PL-01  
Tallahassee, FL   32399-1050  
Bryan Koon  
Director  
Florida Division of Emergency Management  
Electronic Mail Distribution  
Chairman  
Board of County Commissioners  
Citrus County  
110 N. Apopka Avenue  
Inverness, FL   36250  




  ML111250159                             X SUNSI REVIEW COMPLETE
  ML111250159
OFFICE             RII: DRS       RII:DRS
SIGNATURE          RA              RA
NAME              G. KUZO        B. BONSER
X SUNSI REVIEW COMPLETE  
DATE                  05/05/2011      05/05/2011
OFFICE  
E-MAIL COPY?        YES        NO YES        NO YES    NO  YES        NO YES      NO YES    NO    YES NO
RII: DRS  
       
RII:DRS  
                        PUBLIC RADIATION PROTECTION INSPECTION
                                    DOCUMENT REQUEST
SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003
INSPECTION DATES:              June 13 - 17, 2011
   
NRC INSPECTOR:                George B. Kuzo George.Kuzo@NRC.GOV                (404) 997-4658
   
PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-
SIGNATURE
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
RA
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
RA
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):    IP 71124.07    Radiological Environmental Monitoring Program
                                              Exposure Controls
Note: This is a broad list of the documents the lead NRC inspector will be interested in
reviewing and obtaining during the pre-inspection visit. The current version of these documents
is expected unless specified otherwise. Electronic media is preferred, if readily available. (The
NAME
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.
G. KUZO
CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in
B. BONSER
the document lists should contain enough information to be easily understood by someone
who has knowledge of the subject. During the inspection, the inspectors may request additional
documents.
                              GENERAL INFORMATION NEEDED
  Organization Charts and Contact Phone Numbers for:
    Radiation Protection
DATE
    Chemistry
05/05/2011
  Procedure for issuing Condition Report (CR) documents and assessing issues for risk
05/05/2011
    significance and follow-up actions.
  Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
   
    Radiation Protection.
   
  Current version/revision of the Offsite Dose Calculation Manual (ODCM).
   
Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)
   
     2008, CY 2009, and CY 2010.
E-MAIL COPY?
Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
     YES
    and CY 2010.
NO  YES
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
NO  YES
Site and corporate procedures associated with radiological environmental monitoring
NO  YES
    including:
NO  YES
      Collection, preparation, and analysis of environmental samples including air samples,
NO  YES
        TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
NO  YES
                                                                                        Enclosure
NO


                                              2
    Calibration and maintenance of air/water sampling equipment;
Enclosure
    Calibration and QC activities for sample counting instruments;
PUBLIC RADIATION PROTECTION INSPECTION
    Sampling and monitoring program to detect leaks from contaminated or potentially
DOCUMENT REQUEST 
      contaminated systems, structures, or components;
    Meteorological instrument calibration, operation, and routine surveillances;
AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information
  Request and do not need to be duplicated].
SITE: Crystal River Unit 3 (CR3) Report Number:  05000302/2011003
List of structures, systems, or components that contain or could contain licensed material for
  which there is a credible mechanism for the radioactive material to reach ground water.
Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.
Calibration and maintenance records for REMP air and composite water samplers since
  October 1, 2008.
Inter-laboratory comparison program results for the past two years (in-house or vendor
  laboratory).
Last two calibration /surveillance/maintenance records for the meteorological monitoring
  instruments since October 1, 2008.
List of CAP CR and audit documents generated since October 1, 2008, related to
INSPECTION DATES: 
  Radiological Environmental Monitoring Program and meteorological monitoring activities.
June 13 - 17, 2011
                                                                                      Enclosure
NRC INSPECTOR:
George B. Kuzo  George.Kuzo@NRC.GOV        (404) 997-4658
PRELIMINARY LICENSEE CONTACTS:  Radiation Controls - Bryan Akins at (352) 464-
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):  IP 71124.07
Radiological Environmental Monitoring Program
Exposure Controls
Note:  This is a broad list of the documents the lead NRC inspector will be interested in
reviewing and obtaining during the pre-inspection visit.  The current version of these documents
is expected unless specified otherwise.  Electronic media is preferred, if readily available.  (The
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.
CD-ROM.  Please provide 3 copies of each electronic device that is submitted.)  Information in
the document lists should contain enough information to be easily understood by someone
who has knowledge of the subject.  During the inspection, the inspectors may request additional
documents.
GENERAL INFORMATION NEEDED
  Organization Charts and Contact Phone Numbers for:
      Radiation Protection
      Chemistry
  Procedure for issuing Condition Report (CR) documents and assessing issues for risk 
    significance and follow-up actions.
  Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
    Radiation Protection.
  Current version/revision of the Offsite Dose Calculation Manual (ODCM).
  Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 
    2008, CY 2009, and CY 2010.
  Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
    and CY 2010.
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
  Site and corporate procedures associated with radiological environmental monitoring
    including: 
                    Collection, preparation, and analysis of environmental samples including air samples, 
                      TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
 
Enclosure
2
                    Calibration and maintenance of air/water sampling equipment;  
                    Calibration and QC activities for sample counting instruments;  
                    Sampling and monitoring program to detect leaks from contaminated or potentially
                      contaminated systems, structures, or components;  
                    Meteorological instrument calibration, operation, and routine surveillances;  
  AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information  
    Request and do not need to be duplicated].  
  List of structures, systems, or components that contain or could contain licensed material for
    which there is a credible mechanism for the radioactive material to reach ground water.  
  Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.  
  Calibration and maintenance records for REMP air and composite water samplers since
    October 1, 2008.  
  Inter-laboratory comparison program results for the past two years (in-house or vendor
    laboratory).  
  Last two calibration /surveillance/maintenance records for the meteorological monitoring
    instruments since October 1, 2008.  
  List of CAP CR and audit documents generated since October 1, 2008, related to
    Radiological Environmental Monitoring Program and meteorological monitoring activities.
}}
}}

Latest revision as of 06:32, 13 January 2025

Notice of Inspection and Request for Information 05000302/2011003
ML111250159
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/05/2011
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
FirstEnergy Nuclear Operating Co, Florida Power & Light Co
References
IR-11-003
Download: ML111250159 (6)


See also: IR 05000302/2011003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 5, 2011

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION

OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003

Dear Mr. Franke:

During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety

inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public

Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to conduct a

productive inspection, we have enclosed a request for documents needed for this inspection. It

is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. The lead inspector has requested that the subject informational material be

made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, George B. Kuzo at (404) 997-4658.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

FPC

2

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No.: 50-302

License No.: DPR-72

Enclosure:

Public Radiation Protection Inspection Document Request

cc w/encl.: (See page 3)

FPC

3

cc w/encl:

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Oversight

Shearon Harris Nuclear Power Plant

Progress Energy

Electronic Mail Distribution

James W. Holt

Plant General Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Stephen J. Cahill

Director - Engineering Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn

General Counsel

Progress Energy

Electronic Mail Distribution

Jeffrey R. Swartz

Director Site Operations

Crystal River Nuclear Plant

Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy

Electronic Mail Distribution

Thomas Sapporito

Consulting Associate

(Public Correspondence Only)

Post Office Box 8413

Jupiter, FL 33468

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Daniel R. Westcott

Supervisor

Licensing & Regulatory Programs

Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

Electronic Mail Distribution

Jack E. Huegel

Manager, Nuclear Oversight

Crystal River Nuclear Plant

Electronic Mail Distribution

David T. Conley

Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

Mark Rigsby

Manager, Support Services - Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Crystal River Nuclear Generating Plant

U.S. NRC

6745 N Tallahassee Rd

Crystal River, FL 34428

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

Bryan Koon

Director

Florida Division of Emergency Management

Electronic Mail Distribution

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

ML111250159

X SUNSI REVIEW COMPLETE

OFFICE

RII: DRS

RII:DRS

SIGNATURE

RA

RA

NAME

G. KUZO

B. BONSER

DATE

05/05/2011

05/05/2011

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

PUBLIC RADIATION PROTECTION INSPECTION

DOCUMENT REQUEST

SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003

INSPECTION DATES:

June 13 - 17, 2011

NRC INSPECTOR:

George B. Kuzo George.Kuzo@NRC.GOV (404) 997-4658

PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-

7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee

Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.

3141; and Licensing - D. Herrin at (352) 563-4633.

Inspection Procedure (IP): IP 71124.07

Radiological Environmental Monitoring Program

Exposure Controls

Note: This is a broad list of the documents the lead NRC inspector will be interested in

reviewing and obtaining during the pre-inspection visit. The current version of these documents

is expected unless specified otherwise. Electronic media is preferred, if readily available. (The

preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.

CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in

the document lists should contain enough information to be easily understood by someone

who has knowledge of the subject. During the inspection, the inspectors may request additional

documents.

GENERAL INFORMATION NEEDED

Organization Charts and Contact Phone Numbers for:

Radiation Protection

Chemistry

Procedure for issuing Condition Report (CR) documents and assessing issues for risk

significance and follow-up actions.

Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12

Radiation Protection.

Current version/revision of the Offsite Dose Calculation Manual (ODCM).

Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)

2008, CY 2009, and CY 2010.

Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,

and CY 2010.

RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]

Site and corporate procedures associated with radiological environmental monitoring

including:

Collection, preparation, and analysis of environmental samples including air samples,

TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;

Enclosure

2

Calibration and maintenance of air/water sampling equipment;

Calibration and QC activities for sample counting instruments;

Sampling and monitoring program to detect leaks from contaminated or potentially

contaminated systems, structures, or components;

Meteorological instrument calibration, operation, and routine surveillances;

AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information

Request and do not need to be duplicated].

List of structures, systems, or components that contain or could contain licensed material for

which there is a credible mechanism for the radioactive material to reach ground water.

Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.

Calibration and maintenance records for REMP air and composite water samplers since

October 1, 2008.

Inter-laboratory comparison program results for the past two years (in-house or vendor

laboratory).

Last two calibration /surveillance/maintenance records for the meteorological monitoring

instruments since October 1, 2008.

List of CAP CR and audit documents generated since October 1, 2008, related to

Radiological Environmental Monitoring Program and meteorological monitoring activities.