ML120650596: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Page 1 of 1 | {{#Wiki_filter:Inspection / Activity Plan Page 1 of 1 03/05/2012 08:39:58 Report 22 03/01/2012 - 06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer TI-177 | ||
- TI-177 GAS INTRUSION 3 | |||
1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/26/2012 03/30/2012 SUM TFPI | |||
- TRIENNIAL FIRE PROTECTION INSPECTION 5 | |||
PSB1-RP | 1 IP Fire Protection [Triennial] | ||
This report shows only on-site and announced inspection procedures. | 7111105T 04/24/2012 04/26/2012 1 | ||
IP Fire Protection [Triennial] | |||
7111105T 05/07/2012 05/11/2012 1 | |||
IP Fire Protection [Triennial] | |||
7111105T 05/21/2012 05/25/2012 NRR | |||
- NFPA 805 AUDIT BY NRR 17 1 | |||
IP Fire Protection-NFPA 805 Transition Period [Triennial] | |||
7111105P 06/04/2012 06/08/2012 PSB1-RP | |||
- PUBLIC RADIATION SAFETY BASELINE 3 | |||
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/27/2012 08/31/2012 1 | |||
IP Radiological Environmental Monitoring Program 71124.07 08/27/2012 08/31/2012 1 | |||
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/27/2012 08/31/2012 1 | |||
IP Performance Indicator Verification 71151 08/27/2012 08/31/2012 PSB1EP | |||
- EMERGENCY PREPAREDNESS INSPECTION 2 | |||
1 IP Alert and Notification System Testing 7111402 09/10/2012 09/14/2012 1 | |||
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/10/2012 09/14/2012 1 | |||
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/10/2012 09/14/2012 1 | |||
IP Performance Indicator Verification 71151 09/10/2012 09/14/2012 PI&R | |||
- PROBLEM IDENTIFICATION AND RESOLUTION 5 | |||
1 IP Problem Identification and Resolution 71152B 09/10/2012 09/14/2012 1 | |||
IP Problem Identification and Resolution 71152B 09/24/2012 09/28/2012 PSB1-RP | |||
- RADIOLOGICAL HAZARD ASSESSMENT 2 | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2012 10/19/2012 EB3 ISI | |||
- SUM ISI AND RPVH EXAMS 2 | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/22/2012 10/26/2012 TI-182 | |||
- TI-182 BURIED PIPING/TANK - PHASE 1 1 | |||
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/11/2013 03/15/2013 MODS | |||
- PERM MODS 50.59 INSPECTION 4 | |||
1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/01/2013 04/05/2013 1 | |||
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/15/2013 04/19/2013 HS | |||
- TRIENNIAL HEAT SINK PERFORMANCE 1 | |||
1 IP Heat Sink Performance 7111107T 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Enclosure}} | |||
Latest revision as of 03:38, 12 January 2025
| ML120650596 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/05/2012 |
| From: | NRC/RGN-II |
| To: | South Carolina Electric & Gas Co |
| Shared Package | |
| ML120650581 | List: |
| References | |
| IR-11-007 | |
| Download: ML120650596 (1) | |
Text
Inspection / Activity Plan Page 1 of 1 03/05/2012 08:39:58 Report 22 03/01/2012 - 06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Summer TI-177
- TI-177 GAS INTRUSION 3
1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/26/2012 03/30/2012 SUM TFPI
- TRIENNIAL FIRE PROTECTION INSPECTION 5
1 IP Fire Protection [Triennial]
7111105T 04/24/2012 04/26/2012 1
IP Fire Protection [Triennial]
7111105T 05/07/2012 05/11/2012 1
IP Fire Protection [Triennial]
7111105T 05/21/2012 05/25/2012 NRR
IP Fire Protection-NFPA 805 Transition Period [Triennial]
7111105P 06/04/2012 06/08/2012 PSB1-RP
- PUBLIC RADIATION SAFETY BASELINE 3
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/27/2012 08/31/2012 1
IP Radiological Environmental Monitoring Program 71124.07 08/27/2012 08/31/2012 1
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/27/2012 08/31/2012 1
IP Performance Indicator Verification 71151 08/27/2012 08/31/2012 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 2
1 IP Alert and Notification System Testing 7111402 09/10/2012 09/14/2012 1
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/10/2012 09/14/2012 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/10/2012 09/14/2012 1
IP Performance Indicator Verification 71151 09/10/2012 09/14/2012 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1 IP Problem Identification and Resolution 71152B 09/10/2012 09/14/2012 1
IP Problem Identification and Resolution 71152B 09/24/2012 09/28/2012 PSB1-RP
- RADIOLOGICAL HAZARD ASSESSMENT 2
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2012 10/19/2012 EB3 ISI
- SUM ISI AND RPVH EXAMS 2
1 IP Inservice Inspection Activities - PWR 7111108P 10/22/2012 10/26/2012 TI-182
- TI-182 BURIED PIPING/TANK - PHASE 1 1
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/11/2013 03/15/2013 MODS
- PERM MODS 50.59 INSPECTION 4
1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/01/2013 04/05/2013 1
IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/15/2013 04/19/2013 HS
- TRIENNIAL HEAT SINK PERFORMANCE 1
1 IP Heat Sink Performance 7111107T 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure