ML13007A129: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML13007A129
| number = ML13007A129
| issue date = 01/07/2013
| issue date = 01/07/2013
| title = Ltr 01/07/13 Kewaunee Power Station Make-Up Remedial Training Plan to Reinstate Operator License
| title = Make-Up Remedial Training Plan to Reinstate Operator License
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB

Revision as of 14:22, 17 November 2019

Make-Up Remedial Training Plan to Reinstate Operator License
ML13007A129
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/07/2013
From: Hironori Peterson
Operations Branch III
To: Heacock D
Dominion Energy Kewaunee
References
Download: ML13007A129 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION MAKE-UP/REMEDIAL TRAINING PLAN TO REINSTATE OPERATOR LICENSE

Dear Mr. Heacock:

The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Make-Up/Remedial Training Plan you have provided for Mr. Christopher M. Brandt to restore his reactor operator license to an active condition (Serial No.12-743). The NRC agrees that the provided training program is sufficient to restore Mr. Brandts operating license to an active status upon completion of the program. Please provide the written examination administration and operating test administration dates and pass/fail status to Ms. J. Kweiser of my staff upon completion of the examinations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Mr. D. McNeil if you have any questions concerning this license reinstatement.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServTM

January 7, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION MAKE-UP/REMEDIAL TRAINING PLAN TO REINSTATE OPERATOR LICENSE

Dear Mr. Heacock:

The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Make-Up/Remedial Training Plan you have provided for Mr. Christopher M. Brandt to restore his reactor operator license to an active condition (Serial No.12-743). The NRC agrees that the provided training program is sufficient to restore Mr.

Brandts operating license to an active status upon completion of the program. Please provide the written examination administration and operating test administration dates and pass/fail status to Ms. J. Kweiser of my staff upon completion of the examinations.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Mr. D. McNeil if you have any questions concerning this license reinstatement.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc: Distribution via ListServTM DISTRIBUTION:

See next page DOCUMENT NAME: Ltr 010713 Kewaunee Make-Up Remedial Training Plan.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII RIII RIII NAME DMcNeil:cs HPeterson DATE 01/02/13 01/07/13 OFFICIAL RECORD COPY

Letter to Mr. David A. Heacock from Mr. Hironori Peterson dated January 7, 2013.

SUBJECT:

KEWAUNEE POWER STATION MAKE-UP/REMEDIAL TRAINING PLAN TO REINSTATE OPERATOR LICENSE DISTRIBUTION:

Cayetano Santos RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak John McHale, NRR Janet Kweiser, DRS