{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J78 of J134 ATTACHMENT     9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YE NEI U-III Seismic Walkdown Checklist (SWC)                   SWEL2-       014 Equipment ID No.       19-HO-179                 Equip. Class, Other (0)
{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J78 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YE NEI U-III Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.     RB             Floor El. 23'           Room, Area Drywell Manufacturer, Model, Etc. (optional but recommended)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 23' Room, Area Drywell Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YO NZ of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YOI NEý UO NIAZ
YO NZ
: 3. Is the anchorage free of corrosion that is more than mild surface             YOl NO] UL N/AZ oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the             YOl NE] UOE N/AZ anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
IEnter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YOI NEý UO NIAZ YOl NO] UL N/AZ YOl NE] UOE N/AZ IEnter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J79 of J134 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NF--] Ur--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J79 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NF--] Ur--
Seismic Walkdown Checklist (SWC)                   SWEL2-       014 Equipment ID No.         19-HO-179                 Equip. Class2 Other (0)
Seismic Walkdown Checklist (SWC)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
Equipment Description Spent Fuel Pool and cavity drains
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NDI U-- N/A[
: 5. Is the anchorage configuration consistent with plant documentation?
YEI NDI U--
N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NI-] UD-potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NI-] UD-potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YrI NEI uiD N/AO Robust manual valve.
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YM ND uD N/AD:]
Robust manual valve.
and masonry block walls not likely to collapse onto the equipment?
YrI NEI uiD N/AO
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y[-] NDI UD- N/A[
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 10. Based on the above seismic interaction evaluations, is equipment free       YM Nn UD of potentially adverse seismic interaction effects?
: 9. Do attached lines have adequate flexibility to avoid damage?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YM ND uD N/AD:]
Y[-] NDI UD-N/A[
YM Nn UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J80 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF-I   U--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J80 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF-I U--
Seismic Walkdown Checklist (SWC)                   SWEL2-       014 Equipment ID No.         19-HO-179                 Equip. Class3 Other (0)
Seismic Walkdown Checklist (SWC)
SWEL2- 014 Equipment ID No.
19-HO-179 Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YZ Nil     U[I adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-36 Evaluated by:     bAV             ,
Area walk-by is AWC-36 Evaluated by:
62           A,1'Y       Date:
bAV 62 A,1'Y Date:
                  -SEFF r-LB                         qu"::                     *':.14?31L 3 Enter the equipment class name from Appendix B: Classes of Equipment.
-SEFF r-LB qu"::
*':.14?31L 3 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J81 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-- UL--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J81 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-- UL--
Seismic Walkdown Checklist (SWC)                   SWEL2- 014 Equipment ID No.         19-HO-179                 Equip. Class4 Other (0)
Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Photographs Note:                                                             Note:
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs Note:
Note:
4 Enter the equipment class name from Appendix B: Classes of Equipment.
4 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J82 of J134 ATTACHMENT       9.6                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE Nr-] U-Seismic Walkdown Checklist (SWC)                   SWEL2-       014 Equipment ID No.         19-HO-179                 Equip. Classw   Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J82 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE Nr-] U-Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains I4 UtLW.                                                           Note:
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Classw Other (0)
Equipment Description Spent Fuel Pool and cavity drains I4 UtLW.
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
5 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J83 of J134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YO NF-- U-I Seismic Walkdown Checklist (SWC)                     SWEL2- 015 Equipment ID No.         pool cavity gates         Equip. Class, Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J83 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YO NF-- U-I Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.       RB             Floor El. 117           Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended)               Wide Gate, Dwq MIM1 12-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 117 Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended)
Wide Gate, Dwq MIM1 12-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YI- NN of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y-I Nil U[-] N/AN
YI-NN
: 3. Is the anchorage free of corrosion that is more than mild surface               YE] N] Ur-] N/A ]
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y[-] N[-] UP-] N/AZ anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Y-I Nil U[-] N/AN YE] N] Ur-] N/A ]
Y[-] N[-] UP-] N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J84 of J 134 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NEI   UL-1 Seismic Walkdown Checklist (SWC)                   SWEL2-       015 Equipment ID No.         pool cavity gates         Equip. Class2 Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J84 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NEI UL-1 Seismic Walkdown Checklist (SWC)
SWEL2-015 Equipment ID No.
pool cavity gates Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
Equipment Description Spent Fuel Pool and cavity drains
: 5. Is the anchorage configuration consistent with plant documentation?           YOI NI     UFI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
: 6. Based on the above anchorage evaluations, is the anchorage free of           YN NO Ur-1 potentially adverse seismic conditions?
YOI NI UFI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of YN NO Ur-1 potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YOI  NO U[-    N/A[
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YZ NEI    UIU N/A--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
Lamps well supported on rigid conduits.
Lamps well supported on rigid conduits.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y-- NEI UD- N/AE
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free         Y[  NEI Ur of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
YOI NO U[-
N/A[
YZ NEI UIU N/A--
Y-- NEI UD-N/AE Y[
NEI Ur 2 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J85 of J134 ATrACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN! NFI-     UI--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J85 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN! NFI-UI--
Seismic Walkdown Checklist (SWC)                   SWEL2-       015 Equipment ID No.         pool cavity gates         Equip. Class3 Other (0)
Seismic Walkdown Checklist (SWC)
SWEL2-015 Equipment ID No.
pool cavity gates Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YN NEI-   UMI adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN NEI-UMI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Gate inspected while removed for refueling. It was hanging on the East wall of the SFP,North of the cattle chute opening.
Gate inspected while removed for refueling. It was hanging on the East wall of the SFP, North of the cattle chute opening.
Area walk-by is A WC-38 Evaluated by:                                   J,ý"/ J.'-A
Area walk-by is A WC-38 Evaluated by:
                                                    -                  I         Date:A(,I Date~:  __  __  _3    _
Date:A(,I J,ý"/ J.'-A I
                    "EPF VA'%~s                 I 3 Enter the equipment class name from Appendix B: Classes of Equipment.
"EPF VA'%~s Date~:
_3 I
3 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J86 of J 134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N--]   U--i Seismic Walkdown Checklist (SWC)                   SWEL2- 015 Equipment ID No.         pool cavity gates         Equip. Class4 Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J86 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N--] U--i Seismic Walkdown Checklist (SWC)
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J87 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NR UED Seismic Walkdown Checklist (SWC)                   SWEL2- 015 Equipment ID No.         pool cavity gates         Equip. Class5 Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J87 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NR UED Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Note:                                                             Note:
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class5 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Note:
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
5 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J88 of J134 ATTACHMENT 9.6                                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NLI-- U--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J88 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NLI-- U--
Seismic Walkdown Checklist (SWC)                     SWEL2-       016 Equipment ID No.         pool cavity gates         Equip. Class, Other (0)
Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.       RB             Floor El. 117'           Room, Area Refuel Floor Manufacturer, Model, Etc. (optional but recommended)               Narrow Gate, Dwc MIM112-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 117' Room, Area Refuel Floor Manufacturer, Model, Etc. (optional but recommended)
Narrow Gate, Dwc MIM112-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one     Y[:I NO of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?               Y[-] NE] U[-J N/AE
Y[:I NO
: 3. Is the anchorage free of corrosion that is more than mild surface               YE] NEil uiJ N/AE oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE-] NE-] uEr] N/AN anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
1 Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y[-] NE] U[-J N/AE YE] NEil uiJ N/AE YE-] NE-] uEr] N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J89 of J134 ATTACHMENT       9.6                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE] UE]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J89 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE] UE]
Seismic Walkdown Checklist (SWC)                   SWEL2-       016 Equipment ID No.         gool cavity gates         Equip. Class2 Other (0)
Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
gool cavity gates Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
Equipment Description Spent Fuel Pool and cavity drains
: 5. Is the anchorage configuration consistent with plant documentation?       Y[I NE] UE] N/A[
: 5. Is the anchorage configuration consistent with plant documentation?
(Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
Y[I NE] UE] N/A[
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NEi     UE]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UE]
potentially adverse seismic conditions?
potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[:] NEi UE] N/AM
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE]I UE    N/AE]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
Lamps well supported on rigid conduits
Lamps well supported on rigid conduits
: 9. Do attached lines have adequate flexibility to avoid damage?               YEI NE] UE] N/AE
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free     Y[  NE] UEi of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
2 Enter the equipment class name from Appendix B: Classes of Equipment.
Y[:] NEi UE] N/AM YO NE]I UE N/AE]
YEI NE] UE] N/AE Y[
NE] UEi 2 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J90 of J134 ATRACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFI]     U-I Seismic Walkdown Checklist (SWC)                     SWEL2- 016 Equipment ID No.         pool cavity gates         Equip. Class3 Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J90 of J134 ATRACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFI] U-I Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[     NEI UI-adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could Y[
NEI UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Gate inspected while removed for refueling. It was hanging on the east wall of the SFP on the south side of the cattle chute opening.
Gate inspected while removed for refueling. It was hanging on the east wall of the SFP on the south side of the cattle chute opening.
Area walk-by is A WC-38.
Area walk-by is A WC-38.
Eva~uated 10it De           lSM-1                                                 Date:
Eva~uated 10it De lSM-1 fV.
fV.          kAL                                                DAM1       4-/Z~4,1 V
kAL Date:
3 Enter the equipment class name from Appendix B: Classes of Equipment.
DAM1 4-/Z~4,1 V
3 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J91 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YO Nni- UI-Seismic Walkdown Checklist (SWC)                   SWEL2-       016 Equipment ID No. pool cavity -gates               Equip. Class4 Other (0)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J91 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YO Nni-UI-Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No. pool cavity -gates Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J92 of J134 ATTACHMENT       9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ   Nr--] UI--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J92 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr--] UI--
Seismic Walkdown Checklist (SWC)                   SWEL2- 016 Equipment ID No.         pool cavity gates         Equip. Classs Other (0)
Seismic Walkdown Checklist (SWC)
Equipment Description Spent Fuel Pool and cavity drains Note:                                                             Note:
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Classs Other (0)
Equipment Description Spent Fuel Pool and cavity drains Note:
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
5 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J93 of J 134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ N--I   U-I Seismic Walkdown Checklist (SWC)                     SWELl-       083 Equipment ID No.         X55                       Equip. Class, Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J93 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ N--I U-I Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y3/Y31 Location: Bldg.     RW             Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-083 Equipment ID No.
X55 Equip. Class, Transformers (04)
Equipment Description Transformer to Y3/Y31 Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y-I NZ of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Refer to response to question #5.
Refer to response to question #5.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             Y;  Nn U-    N/A[D
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ Nn U-- N/AD-oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y] Nn UD N/A-anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
I Enter the equipment class name from Appendix B: Classes of Equipment.
Y-I NZ Y; Nn U-N/A[D YZ Nn U-- N/AD-Y] Nn UD N/A-I Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J94 of J 134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NFIl U[]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J94 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NFIl U[]
Seismic Walkdown Checklist (SWC)               SWELl-     083 Equipment ID No.     X55                   Equip. Class Transformers (04)
Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y3/Y31
SWELl-083 Equipment ID No.
: 5. Is the anchorage configuration consistent with plant documentation?         Yr] NE-] U-] N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
X55 Equip. Class Transformers (04)
Note: The transformerand its anchorageare different from what is shown in drawing E15A-8, Rev. EO. This is due to the replacementof the transformerper EC 0000016677, Rev. 0.
Equipment Description Transformer to Y3/Y31
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE NEl UL-potentially adverse seismic conditions?
: 5. Is the anchorage configuration consistent with plant documentation?
Yr] NE-] U-] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Note: The transformer and its anchorage are different from what is shown in drawing E15A-8, Rev. EO. This is due to the replacement of the transformer per EC 0000016677, Rev. 0.
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NEl UL-potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE ND UL- N/AD]
: 7. Are soft targets free from impact by nearby equipment or structures?
The Unistrut supportingconduits X1200 and A 3025 above X55 has two anchors with nuts that are not fully engaged. The engagement is greaterthan 75% in both cases, and this is judged to be adequate to develop the full strength of the anchor. Therefore, this is not considered a potentialseismic interaction. See attachedphoto.
The Unistrut supporting conduits X1200 and A 3025 above X55 has two anchors with nuts that are not fully engaged. The engagement is greater than 75% in both cases, and this is judged to be adequate to develop the full strength of the anchor. Therefore, this is not considered a potential seismic interaction. See attached photo.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NI-- Ur-] N/AD-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               YE N[:] Uil N/A[-]
: 9. Do attached lines have adequate flexibility to avoid damage?
: 10. Based on the above seismic interaction evaluations, is equipment free       YE N[-- Uil of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE ND UL-N/AD]
YE NI-- Ur-] N/AD-YE N[:] Uil N/A[-]
YE N[-- Uil


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J95 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN Nn- U-Seismic Walkdown Checklist (SWC)               SWELl-     083 Equipment ID No. X55                       Equip. Class Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J95 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN Nn-U-Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y3/Y31 Other Adverse Conditions
SWELl-083 Equipment ID No. X55 Equip. Class Transformers (04)
: 11. Have you looked for and found no other seismic conditions that could       YM NEI UI-adversely affect the safety functions of the equipment?
Equipment Description Transformer to Y3/Y31 Other Adverse Conditions
Comments .(Additional pages may be added as necessary)
: 11. Have you looked for and found no other seismic conditions that could YM NEI UI-adversely affect the safety functions of the equipment?
SWEL 1-083 is on AWC-0 17.
Comments.(Additional pages may be added as necessary)
Follow up internalinspectionperformed on 4-29-13. All internalfasteners in place and appeartight.
SWEL 1-083 is on A WC-0 17.
No loose or missing items observed. No adverse seismic interactionsobserved.
Follow up internal inspection performed on 4-29-13. All internal fasteners in place and appear tight.
Evaluaed by-.:   W wj       D",40)     6 t,ivW. s'                           Date:            3 Jeff Kalb     &a           (                                       bqmJi V II     P Note: This follow-up internal inspection was performed during PNPS Refueling Outage 19. An Entergy shared resource, David Grimes from Vermont Yankee, performed duties of one SWE team member. Mr. Grimes SWE credentials were verified by review of Vermont Yankee's Phase 1 submittal report VY-RPT-12-00019 Rev.0 (Asset Suite EC40647) Pages 9 and H8.
No loose or missing items observed. No adverse seismic interactions observed.
Evaluaed by-.:
W wj D",40) 6 t, ivW. s' Jeff Kalb  
&a
(
Date:
3 bqmJi V II P
Note: This follow-up internal inspection was performed during PNPS Refueling Outage 19. An Entergy shared resource, David Grimes from Vermont Yankee, performed duties of one SWE team member. Mr. Grimes SWE credentials were verified by review of Vermont Yankee's Phase 1 submittal report VY-RPT-12-00019 Rev.0 (Asset Suite EC40647) Pages 9 and H8.
Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified via the Entergy Plateau qualification system as part of the pre-job brief for this walkdown.
Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified via the Entergy Plateau qualification system as part of the pre-job brief for this walkdown.
EN-DC-168 REV 0
EN-DC-168 REV 0


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J96 of J134 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF-] Ur Seismic Walkdown Checklist (SWC)         SWELl-     083 Equipment ID No. X55                   Equip. Class Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J96 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF-] Ur Seismic Walkdown Checklist (SWC)
Equipment Description Transformer to Y3/Y31 Photographs Note: Equipment tag                                   VAULW. t-JVCPICIII VICPVV U1 MJUIIJ111VIII
SWELl-083 Equipment ID No.
X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31 Photographs Note: Equipment tag VAULW.
t-JVCPICIII VICPVV U1 MJUIIJ111VIII


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J97 of J134 ATTACHMENT 9.6                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI UD--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J97 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI UD--
Seismic Walkdown Checklist (SWC)           SWELl-     083 Equipment ID No. X55                   Equip. Class Transformers (04)
Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No.
X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31 Note: Nut on Unistrut that is not fully engaged.
Equipment Description Transformer to Y3/Y31 Note: Nut on Unistrut that is not fully engaged.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J98 of J134 ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE N-i Ur--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J98 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE N-i Ur--
Seismic Walkdown Checklist (SWC)                   SWELl-       084 Equipment ID No.       X56                       Equip. Class' Transformers (04)
Seismic Walkdown Checklist (SWC)
Equipment Description Transformer to Y4/Y41 Location: Bldg. RW                 Floor El. 23             Room, Area CSR Manufacturer, Model, Etc. (optional but recommended)
SWELl- 084 Equipment ID No.
X56 Equip. Class' Transformers (04)
Equipment Description Transformer to Y4/Y41 Location: Bldg. RW Floor El. 23 Room, Area CSR Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YZ NO of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NI U[-I N/AR
YZ NO
: 3. Is the anchorage free of corrosion that is more than mild surface             YZ N[D] U-l N/AD oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the               Y] Nil U[-] N/A--
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NI U[-I N/AR YZ N[D] U-l N/AD Y] Nil U[-] N/A--
IEnter the equipment class name from Appendix B: Classes of Equipment.
IEnter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J99 of J 134 ATTACHMENT   9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE]     UE-Seismic Walkdown Checklist (SWC)               SWELl-     084 Equipment ID No.     X56                     Equip. Class Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J99 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] UE-Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41
Equipment Description Transformer to Y4/Y41
: 5. Is the anchorage configuration consistent with plant documentation?         YZ NEI UE] N/AE7 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
The anchorconfiguration matches drawings E15A3 E2, E15A-8 EO, E15A-7 and the SEWs package, detail 3/3. Two additionalbolts were noted for the connection of the panel to the channel. The design in calculation C15.0.3059 specifies 3/16" fillet welds, which also exists at the connection, therefore, the bolts are extra and the configurationis acceptable.
YZ NEI UE] N/AE7 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YZ NEI     UE]
The anchor configuration matches drawings E15A3 E2, E15A-8 EO, E15A-7 and the SEWs package, detail 3/3. Two additional bolts were noted for the connection of the panel to the channel. The design in calculation C15.0.3059 specifies 3/16" fillet welds, which also exists at the connection, therefore, the bolts are extra and the configuration is acceptable.
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]
potentially adverse seismic conditions?
potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN NE]I    UM  N/AE]
: 7. Are soft targets free from impact by nearby equipment or structures?
Unistrutsupporting conduit was noted to be within an inch of the top of the cabinet. This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panelis also touching the column! wall on the right side. This is acceptable, as the cabinet does not contain essentialrelays and is therefore not prone to chatter.
Unistrut supporting conduit was noted to be within an inch of the top of the cabinet. This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panel is also touching the column! wall on the right side. This is acceptable, as the cabinet does not contain essential relays and is therefore not prone to chatter.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NE]    U[-E N/AE--
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?
: 9. Do attached lines have adequate flexibility to avoid damage?               YN NEI    UE-  N/AE]
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free       YM NEI    UE]
YN NE]I UM N/AE]
of potentially adverse seismic interaction effects?
YE NE] U[-E N/AE--
YN NEI UE-N/AE]
YM NEI UE]


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J100 of J134 ATrACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE Nnl UrI Seismic Walkdown Checklist (SWC)               SWELl-     084 Equipment ID No.       X56                   Equip. Class Transformers(04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J100 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE Nnl UrI Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y4/Y41 Other Adverse Conditions
SWELl-084 Equipment ID No.
: 11. Have you looked for and found no other seismic conditions that could     YE NI-] Ur-I adversely affect the safety functions of the equipment?
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YE NI-] Ur-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-018.
Area walk-by is AWC-018.
Follow-up internalvisual inspection performed on 4/18/13. Maintenanceof the transformerwas in progressat the time of inspection (W0296640). Fourcables were intentionallyde-terminatedat this time, refer to photo below.
Follow-up internal visual inspection performed on 4/18/13. Maintenance of the transformer was in progress at the time of inspection (W0296640). Four cables were intentionally de-terminated at this time, refer to photo below.
All fasteners were in place with no signs of any being loose.
All fasteners were in place with no signs of any being loose.
No loose or missing items were identified.
No loose or missing items were identified.
No potentiallyadverse seismic interactionswere identified.
No potentially adverse seismic interactions were identified.
Evaluatedi by: QSWUaILw             Q~ 1191                                      Date: i   J     3.
Q~ 1191 Evaluatedi by: QSWUaILw Date: i J
3.
JeW Kalb
JeW Kalb


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J101 of J134 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE NIIJ U[I Seismic Walkdown Checklist (SWC)         SWELl-     084 Equipment ID No. X56                   Equip. Class Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J101 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE NIIJ U[I Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Photographs
Equipment Description Transformer to Y4/Y41 Photographs


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J102 of J134 ATTACHMENT   9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YM NFI- U[-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J102 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YM NFI-U[-]
Seismic Walkdown Checklist (SWC)         SWELl-     084 Equipment ID No. X56                 Equip. Class Transformers (04)
Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y4/Y41 Note: Cabinet anchorage
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Note: Cabinet anchorage


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J103 of J134 ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YZ Nr--] Ur-Seismic Walkdown Checklist (SWC)         SWELl-     084 Equipment ID No. X56                 Equip. Class Transformers (04)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J103 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YZ Nr--] Ur-Seismic Walkdown Checklist (SWC)
Equipment Description Transformerto Y4/Y41
SWELl-084 Equipment ID No.
                                                                                  *or
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41
*or


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J104 of J134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND- UD-1 Seismic Walkdown Checklist (SWC)                     SWELl-       095 Equipment ID No.         EPA1                     Equip. Class, Instrumentationand Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J104 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-UD-1 Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Location: Bldg. RW                   Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-095 Equipment ID No.
EPA1 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YM Ni-I of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE ND- U[-1 N/AD-1
YM Ni-I
: 3. Is the anchorage free of corrosion that is more than mild surface             Y] N[D U[-I N/AD-oxidation?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 4. Is the anchorage free of visible cracks in the concrete near the               YE Nn Ur       N/AEDI anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
I Enter the equipment class name from Appendix B: Classes of Equipment.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE ND-U[-1 N/AD-1 Y] N[D U[-I N/AD-YE Nn Ur N/AEDI I Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J105 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ   N-- UI-Seismic Walkdown Checklist (SWC)               SWELl-     095 Equipment ID No.     EPA I                   Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J105 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ N-- UI-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly
SWELl-095 Equipment ID No.
: 5. Is the anchorage configuration consistent with plant documentation?         YZ ND]     ULi N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
EPA I Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?
YZ ND] ULi N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
See SEWS package for EPA 1-6, dated 8/4/94.
: 6. Based on the above anchorage evaluations, is the anchorage free of         Y[   ND-- UD-potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[
ND-- UD-potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[  ND:  UD-] N/AD--
: 7. Are soft targets free from impact by nearby equipment or structures?
Panel D-7 is mounted above EPA I with its cover latch facing the floor, and was examined for an interactioninvolving the cover coming unlatched over EPA 1 during a seismic event. The cover appears to be adequatelylatched and the panel securely anchored,and does not present a seismic interaction concern. See attachedphoto.
Panel D-7 is mounted above EPA I with its cover latch facing the floor, and was examined for an interaction involving the cover coming unlatched over EPA 1 during a seismic event. The cover appears to be adequately latched and the panel securely anchored, and does not present a seismic interaction concern. See attached photo.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE ND- uD- N/AD-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               YE ND-- uD- N/AD-There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit runningfrom EPA I that is in close proximity to EPA2.
: 9. Do attached lines have adequate flexibility to avoid damage?
Both panels and the conduit are all anchored to the same wall, so this is notjudged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA I that is in close proximity to EPA2.
: 10. Based on the above seismic interaction evaluations, is equipment free       YE Nr-- Ur-of potentially adverse seismic interaction effects?
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[
ND:
UD-] N/AD--
YE ND-uD-N/AD-YE ND-- uD-N/AD-YE Nr-- Ur-


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J106 of J134 ATTACHMENT     9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE Nil U-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J106 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE Nil U-]
Seismic Walkdown Checklist (SWC)               SWELl-     095 Equipment ID No.     EPA 1                 Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Other Adverse Conditions
SWELl-095 Equipment ID No.
: 11. Have you looked for and found no other seismic conditions that could     Y[   NEI- UI-adversely affect the safety functions of the equipment?
EPA 1 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y[
NEI-UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWELl-095 is on AWC-017.
SWELl-095 is on AWC-017.
Follow-up internal visual inspection of panel performed on 12/12/12:
Follow-up internal visual inspection of panel performed on 12/12/12:
      -All internalfasteners in place and appeartight
-All internal fasteners in place and appear tight
      -No adverse conditions observed A loose label for 194.502A-005-10 was found on top of EPA 1. This was reported to Operations and an ESOMS request was initiated.
-No adverse conditions observed A loose label for 194.502A-005-10 was found on top of EPA 1. This was reported to Operations and an ESOMS request was initiated.
Evaluated bv
~.il ~ru Evaluated bv Date:
                    ~.il
i=/=/,
                    *o-              ~ru                                       Date:   i=/=/,
*o-kLL jV r
kLL                                                               I t 02 jV   r I j
I j
I t 02


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J107 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE-I UII-Seismic Walkdown Checklist (SWC)         SWELl-     095 Equipment IDNo. EPA I               Equip. Class Instrumentation and ControlPanels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J107 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE-I UII-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Equipment tag                                 Note: Overall view of panel
SWELl-095 Equipment ID No.
EPA I Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J108 of J134 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF-M Ur--]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J108 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF-M Ur--]
Seismic Walkdown Checklist (SWC)         SWELl-     095 Equipment ID No. EPA1                 Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Note: Cabinet internals
SWELl-095 Equipment ID No.
EPA1 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Cabinet internals


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J109 of J134 ATTACHMENT       9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND--   UD Seismic Walkdown Checklist (SWC)                     SWELl-       096 Equipment ID No.       EPA2                     Equip. Class, Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J109 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND--
Equipment Description RPS Elec ProtectionAssembly Location: Bldg. RW                 Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
UD Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   YZ N[D of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YN ND U[i] N/Al]
YZ N[D
: 3. Is the anchorage free of corrosion that is more than mild surface             Y;  ND Ur-    N/AD--
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
oxidation?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the               YM ND UD N/AD-1 anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YN ND U[i] N/Al]
Y; ND Ur-N/AD--
YM ND UD N/AD-1
' Enter the equipment class name from Appendix B: Classes of Equipment.
' Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 110 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ ND1 UD-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 110 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ ND1 UD-]
Seismic Walkdown Checklist (SWC)               SWELl-     096 Equipment ID No.     EPA2                   Equip. Class Instrumentationand Control Panels (20)
Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?         YO ND] U[i N/AD-I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
YO ND] U[i N/AD-I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
See SEWS package for EPA 1-6, dated 8/4/94.
: 6. Based on the above anchorage evaluations, is the anchorage free of         Y[   ND-] UD-potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[
ND-] UD-potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE NDI    UD- N/AD--
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[  NDI UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[  ND UD-- N/AD-There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA 1 that is in close proximity to EPA2.
: 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA 1 that is in close proximity to EPA2.
Conduit B081 is also in close proximity to EPA2, approx. 1.5" away.
Conduit B081 is also in close proximity to EPA2, approx. 1.5" away.
The panels and the conduits are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
The panels and the conduits are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
: 10. Based on the above seismic interaction evaluations, is equipment free       YE ND UD of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE NDI UD-N/AD--
Y[
NDI UD-N/AD-Y[
ND UD-- N/AD-YE ND UD


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 11 of J1 34 ATTACHMENT   9.6                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI     ULI Seismic Walkdown Checklist (SWC)             SWELl-     096 Equipment ID No. EPA2                   Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 11 of J1 34 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI ULI Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Other Adverse Conditions
SWELl-096 Equipment ID No.
: 11. Have you looked for and found no other seismic conditions that could     YE N[:]   ULI adversely affect the safety functions of the equipment?
EPA2 Equip. Class Instrumentation and Control Panels (20)
Comments .(Additional pages may be added as necessary)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could YE N[:] ULI adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary)
SWEL 1-096 is on A WC-017.
SWEL 1-096 is on A WC-017.
Follow-up internal inspection of panel performed on 12/12/12:
Follow-up internal inspection of panel performed on 12/12/12:
      -All internalfasteners appearto be in place and tight.
-All internal fasteners appear to be in place and tight.
      -Small debris found in bottom comer of cabinet and removed by electrician((1) screw, (2) nuts and metal shavings)
-Small debris found in bottom comer of cabinet and removed by electrician ((1) screw, (2) nuts and metal shavings)
      -No adverse conditions observed Evaluated by:     2311 ~LJ/                                                   Date:   t   ,, 4_
-No adverse conditions observed Evaluated by:
2311 ~LJ/
Date:
t  
,, 4_
I2j1z1J?
I2j1z1J?
I     " j
I  
" j


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J112 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE NFIl ULI Seismic Walkdown Checklist (SWC)         SWELl-     096 Equipment IDNo. EPA2                 Equip. Class Instrumentation and ControlPanels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J112 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE NFIl ULI Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Equipment tag                                 Note: Overall view of equipment
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of equipment


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J113 of J134 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI   U[-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J113 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI U[-]
Seismic Walkdown Checklist (SWC)         SWELl-     096 Equipment ID No. EPA2                 Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Cabinet internals                             Note: Cabinet internalson door
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet internals on door


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J114 of J134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YZ Nr-]   UL-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J114 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YZ Nr-] UL-]
Seismic Walkdown Checklist (SWC)                     SWELl-       097 Equipment ID No.         EPA3                     Equip. Class, Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Location: Bldg. RW                   Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-097 Equipment ID No.
EPA3 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[  Nr-of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NE] U[-] N/AF-
Y[
: 3. Is the anchorage free of corrosion that is more than mild surface             YO NE] U[-- N/A oxidation?
Nr-
: 4. Is the anchorage free of visible cracks in the concrete near the               YZ NEi Ui       N/AD--
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
anchors?
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NE] U[-] N/AF-YO NE] U[-- N/A YZ NEi Ui N/AD--
I Enter the equipment class name from Appendix B: Classes of Equipment.
I Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J115 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YE ND- U[-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J115 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YE ND-U[-
Seismic Walkdown Checklist (SWC)               SWELl-     097 Equipment ID No.     EPA3                   Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?         YZ N[-] Ur-- N/Ar-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 5. Is the anchorage configuration consistent with plant documentation?
YZ N[-] Ur-- N/Ar-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
See SEWS package for EPA 1-6, dated 8/4/94.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE N[-] UD-potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YE N[-] UD-potentially adverse seismic conditions?
A small fraction of the lower washers and anchorbolts come below the tab. The amount is insignificant, and the bolts arejudged to securely anchorthe panel to the wall, so this is not considered an adverse condition. See attached photo.
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN ND U[D- N/AD:]
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE ND-]    uD-I N/AD-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SH 1, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SH 1, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NDI    UD-1 N/AD--
: 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit runningfrom EPA3 that is in close proximity to EPA4.
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
: 10. Based on the above seismic interaction evaluations, is equipment free       Y] NDI    UDl of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND U[D-N/AD:]
YE ND-] uD-I N/AD-YZ NDI UD-1 N/AD--
Y] NDI UDl


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J116 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE NFIl UFI-Seismic Walkdown Checklist (SWC)             SWELl-     097 Equipment ID No. EPA3                     Equip. Class Instrumentation and-ControlPanels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J116 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE NFIl UFI-Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and-Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE N[-I   U--
: 11. Have you looked for and found no other seismic conditions that could YE N[-I U--
adversely affect the safety functions of the equipment?
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWELI-097 is on AWC-017.
SWELI-097 is on AWC-017.
Follow-up internalinspection of panel performed on 1/9/13:
Follow-up internal inspection of panel performed on 1/9/13:
        -No loose or missing fasteners observed
-No loose or missing fasteners observed
        -No other adverse conditions observed Evaluated by:             Ž),X4j
-No other adverse conditions observed Evaluated by:  
                              .I   I                                         Date:
Ž),X4j  
T-C-Ff- ý,ýLB           SU k&                               bNTv .1 /)0)13
.I I
Date:
bNTv.1 /)0)13 T-C-Ff- ý,ýLB SU k&


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J117 of J134 A'TACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE N I Ur-L Seismic Walkdown Checklist (SWC)         SWELl-     097 Equipment ID No. EPA3                 Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J117 of J134 A'TACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE N I Ur-L Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Equipment tag                                 Note: Overall view of panel
SWELl- 097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J118 of J134 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YN ND UFIu Seismic Walkdown Checklist (SWC)         SWELl-     097 Equipment ID No. EPA3                 Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J118 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YN ND UFIu Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec Protection Assembly Note: Typical anchorbolt on bottom of panel.         num. lyplucll allullut UUil U11 1UP Ui Pallut.
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Typical anchor bolt on bottom of panel.
num. lyplucll allullut UUil U11 1UP Ui Pallut.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J119 of J134 ATrACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YE ND-- Ur-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J119 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YE ND-- Ur-]
Seismic Walkdown Checklist (SWC)         SWELl-     097 Equipment ID No. EPA3                 Equip. Class Instrumentationand ControlPanels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Note: Cabinet intemals                               Note: Cabinet intemals
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Cabinet intemals Note: Cabinet intemals


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J120 of J134 ATTACHMENT       9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF UD Seismic Walkdown Checklist (SWC)                   SWELl-       098 Equipment ID No.         EPA4                     Equip. Class, Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J120 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF UD Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec Protection Assembly Location: Bldg.     RW             Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-098 Equipment ID No.
EPA4 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[    NrI-of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YZ NEI      [--] N/AE]
Y[
: 3. Is the anchorage free of corrosion that is more than mild surface             Y[    NR UDl N/AD-oxidation?
NrI-
: 4. Is the anchorage free of visible cracks in the concrete near the             YZ N-- UI- N/AD anchors?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
I Enter the equipment class name from Appendix B: Classes of Equipment.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NEI
[--] N/AE]
Y[
NR UDl N/AD-YZ N-- UI-N/AD I Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J121 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE Nn U-Seismic Walkdown Checklist (SWC)               SWELl-     098 Equipment ID No.     EPA4                   Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J121 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE Nn U-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly
SWELl-098 Equipment ID No.
: 5. Is the anchorage configuration consistent with plant documentation?         YO NiD UrI N/AFD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?
YO NiD UrI N/AFD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
See SEWS package for EPA 1-6, dated 8/4/94.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE NEI UI--
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI--
potentially adverse seismic conditions?
potentially adverse seismic conditions?
A small fraction of the lower washers and anchorbolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchorthe panel to the wall, so this is not considered an adverse condition. See attachedphoto.
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[  ND-- U[I N/AD-
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEI    U-- N/Ai-and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[  ND-] UD- N/AD There is a short, rigid conduit runningbetween EPA3 and EPA4, as well as a conduit runningfrom EPA3 that is in close proximity to EPA4.
: 9. Do attached lines have adequate flexibility to avoid damage?
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interactionhazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[   NDI U[--
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[
ND-- U[I N/AD-YE NEI U-- N/Ai-Y[
ND-] UD-N/AD Y[
NDI U[--


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J122 of J134 ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFIl   UI--]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J122 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFIl UI--]
Seismic Walkdown Checklist (SWC)             SWELl-     098 Equipment ID No. EPA4                     Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Other Adverse Conditions
SWELl-098 Equipment ID No.
: 11. Have you looked for and found no other seismic conditions that could       Y] NEIl UF adversely affect the safety functions of the equipment?
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y] NEIl UF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWELI-098 is on AWC-017.
SWELI-098 is on AWC-017.
Follow-up internalinspection performed on 1/9/13:
Follow-up internal inspection performed on 1/9/13:
      -Observed one missing screw on upper left comer of circuitboard at back of panel. Circuit boardhas very low weight/mass and was adequatelysupported by the remaining5 screws. Not a seismic interaction hazard. Screw was replaced by ELAB mechanic that provided access to the panel.
-Observed one missing screw on upper left comer of circuit board at back of panel. Circuit board has very low weight/mass and was adequately supported by the remaining 5 screws. Not a seismic interaction hazard. Screw was replaced by ELAB mechanic that provided access to the panel.
      -No other loose or missing fasteners or adverse conditions observed.
-No other loose or missing fasteners or adverse conditions observed.
Evaluated by:   Dayj                       0,) )-rI                           Date:
Evaluated by: Dayj 0,) )-rI Date:
Sf r-r- kIii LK
Sf r-r- kIii LK ia LIA-t>W
                ~AF       k!*Lr~
~AF k!*Lr~
ia LIA-                                t>W Ar~     1/10/13
Ar~
1/10/13


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J123 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NFI-   UFi Seismic Walkdown Checklist (SWC)         SWELl-     098 Equipment ID No. EPA4                 Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J123 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NFI-UFi Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Equipment tag                                 Note: Overall view of panel showing anchorage
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel showing anchorage


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J124 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE ND-- UF]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J124 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE ND-- UF]
Seismic Walkdown Checklist (SWC)         SWELl-     098 Equipment ID No. EPA4                 Equip. Class Instrumentation and ControlPanels (20)
Seismic Walkdown Checklist (SWC)
Eauibment Description RPS Elec Protection Assembil Note: Typical anchorbolt on bottom of panel.         Note: Cabinet internals
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Eauibment Description RPS Elec Protection Assembil Note: Typical anchor bolt on bottom of panel.
Note: Cabinet internals


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J125 of J134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-- UI--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J125 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-- UI--
Seismic Walkdown Checklist (SWC)                     SWELl-       099 Equipment ID No.         EPA5                     Equip. Class, Instrumentationand Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Location: Bldg. RW                   Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-099 Equipment ID No.
EPA5 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y[-] NE of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?             YE ND- UD-1 N/AD-Two of four anchors are visible.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface             YE N[D] U[] N/ADý oxidation?
Two of four anchors are visible.
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Two of four anchors are visible.
Two of four anchors are visible.
: 4. Is the anchorage free of visible cracks in the concrete near the               YE N[l    lD-- N/AD-anchors?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Two of four anchors are visible.
Two of four anchors are visible.
1 Enter the equipment class name from Appendix B: Classes of Equipment.
Y[-] NE YE ND-UD-1 N/AD-YE N[D] U[] N/ADý YE N[l lD-- N/AD-1 Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J126 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[   NEI UF--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J126 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[
Seismic Walkdown Checklist (SWC)               SWELl- 099 Equipment ID No.     EPA5                   Equip. Class Instrumentationand Control Panels (20)
NEI UF--
Equipment Description RPS Elec ProtectionAssembly
Seismic Walkdown Checklist (SWC)
: 5. Is the anchorage configuration consistent with plant documentation?         Yrll N[-] UrI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
SWELl- 099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?
Yrll N[-] UrI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question # 1.
Refer to response to question # 1.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YM NEI     UI potentially adverse seismic conditions?
: 6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE* Nil ur-] N/A[-I YE ND urEI N/AD
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
YE NEI Ur1 N/A[-
: 9. Do attached lines have adequate flexibility to avoid damage?
: 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for furtherconfirmation.
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
YE NDI    U[I N/
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE* Nil ur-] N/A[-I YE ND urEI N/AD YE NEI Ur1 N/A[-
YE NDI U[I N/


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J127 of J134 ATTACHMENT 9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF] U-Seismic Walkdown Checklist (SWC)             SWELl-     099 Equipment ID No. EPA5                   Equip. Class Instrumentationand Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J127 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF] U-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Other Adverse Conditions
SWELl-099 Equipment ID No.
: 11. Have you looked for and found no other seismic conditions that could     Y   NEil UiF adversely affect the safety functions of the equipment?
EPA5 Equip. Class Instrumentation and Control Panels (20)
Comments .(Additional pages may be added as necessary)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could Y
NEil UiF adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary)
SWELl-099 is on AWC-017.
SWELl-099 is on AWC-017.
Follow-up internalinspection performed on 4/2/13:
Follow-up internal inspection performed on 4/2/13:
      -All fasteners in place and appeartight
-All fasteners in place and appear tight
      -No loose items observed in panel
-No loose items observed in panel
      -No debris in bottom of panel Evaluated by:                               JJ JA                                Date:   t --  /
-No debris in bottom of panel Evaluated by:
JA JJ Date:
t  
/


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J128 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE Nr-] UL-Seismic Walkdown Checklist (SWC)         SWELl-     099 Equipment ID No. EPA5                 Equip. Class Instrumentation and ControlPanels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J128 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE Nr-] UL-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag                                 Note: EPA5 is on the right
SWELl-099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA5 is on the right


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J129 of J134 ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YM NF] U-I Seismic Walkdown Checklist (SWC)         SWELl-     099 Equipment IDNo. EPA5                 Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J129 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YM NF] U-I Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals                             Note: Cabinet intemals on door
SWELl-099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet intemals on door


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J130 of J134 ATTACHMENT 9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ NDI U--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J130 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND I U--
Seismic Walkdown Checklist (SWC)                     SWELl-       100 Equipment ID No.       EPA6                     Equip. Class, Instrumentationand Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Location: Bldg. RW                 Floor El. 23             Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
SWELl-100 Equipment ID No.
EPA6 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one   Y-    NE of the 50% of SWEL items requiring such verification)?
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?            YO NEI] UI'-  N/AD-Two of four anchors are visible.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
: 3. Is the anchorage free of corrosion that is more than mild surface            YE NDI    ULI N/AD oxidation?
Two of four anchors are visible.
Two of four anchors are visible.
: 4. Is the anchorage free of visible cracks in the concrete near the             YN ND-- U-- N/AD--
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
anchors?
Two of four anchors are visible.
There is a surface crack (<1/16') near the bottom left anchorthat is judged to be insignificant.
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?
There is a surface crack (<1/16') near the bottom left anchor that is judged to be insignificant.
Y-NE YO NEI] UI'-
N/AD-YE NDI ULI N/AD YN ND-- U-- N/AD--
' Enter the equipment class name from Appendix B: Classes of Equipment.
' Enter the equipment class name from Appendix B: Classes of Equipment.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J131 of J134 ATTACHMENT   9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF- U-Seismic Walkdown Checklist (SWC)               SWELl-     100 Equipment ID No.       EPA6                   Equip. Class Instrumentation and Control Panels (20)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J131 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF-U-Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly
SWELl-100 Equipment ID No.
: 5. Is the anchorage configuration consistent with plant documentation?         YE] NEI   Ui- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
: 5. Is the anchorage configuration consistent with plant documentation?
YE] NEI Ui-N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1.
Refer to response to question #1.
: 6. Based on the above anchorage evaluations, is the anchorage free of         Y[   NE] UE]
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[
NE] UE]
potentially adverse seismic conditions?
potentially adverse seismic conditions?
Interaction Effects
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YM NE] UE] N/AD-
: 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI    UE] N/AE]
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
: 9. Do attached lines have adequate flexibility to avoid damage?               YN NEI    U[] N/A[-]
: 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for furtherconfirmation.
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[    NEI UF--
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
of potentially adverse seismic interaction effects?
YM NE] UE] N/AD-YE NEI UE] N/AE]
YN NEI U[] N/A[-]
Y[
NEI UF--


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J132 of J134 ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N[R UR]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J132 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N[R UR]
Seismic Walkdown Checklist (SWC)                 SWELl-     100 Equipment ID No.     EPA6                     Equip. Class Instrumentationand Control Panels (20)
Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YN N[] U-I adversely affect the safety functions of the equipment?
: 11. Have you looked for and found no other seismic conditions that could YN N[] U-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
SWELl-100 is on AWC-017.
SWELl-100 is on AWC-017.
Follow up internalinspection performed on 4/2/13:
Follow up internal inspection performed on 4/2/13:
      -All fasteners in place and appeartight
-All fasteners in place and appear tight
      -No potential adverse seismic interactionsobserved
-No potential adverse seismic interactions observed
      -One small screw and two small washers found in the bottom of the panel. They did not appearto have fallen off, most likely left over from previous maintenance. These items were removed by electricalmaintenance escort.
-One small screw and two small washers found in the bottom of the panel. They did not appear to have fallen off, most likely left over from previous maintenance. These items were removed by electrical maintenance escort.
Evaluated by:   D6aVu)',n               ,,L)       L                             Date:   L -j- - 13
Evaluated by: D6aVu)',n  
                    -aF     VLRQk&t
,,L) L Date:
L -j- -13
-aF VLRQk&t


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J133 of J134 ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NEil   Ui--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J133 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NEil Ui--
Seismic Walkdown Checklist (SWC)         SWELl-     100 Equipment ID No. EPA6                 Equip. Class Instrumentationand Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec ProtectionAssembly Photographs Note: Equipment tag                                 Note: EPA6 is on the /eft.
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA6 is on the /eft.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J134 of J134 ATTACHMENT   9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NF     U[-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J134 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NF U[-
Seismic Walkdown Checklist (SWC)         SWELl-     100 Equipment ID No. EPA6                 Equip. Class Instrumentation and Control Panels (20)
Seismic Walkdown Checklist (SWC)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals                             Note:
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note:


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K1 of K27 Attachment K Form 9.7: Deferred Area Walk-By Checklists (AWCs)
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K1 of K27 Attachment K Form 9.7: Deferred Area Walk-By Checklists (AWCs)


                                                                                                                              ~1 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K2 of K27 ATrACHMENT 9.7                                                                                   AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NI         Ui-]
~1 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K2 of K27 ATrACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NI Ui-]
Area Walk-By Checklist (AWC)               AWC- 033 Location: Bldg. RB               Floor El. 74'             Room, Area, GeneralArea North SWEL Components: SWEL2-11, SWEL2-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area, General Area North SWEL Components: SWEL2-11, SWEL2-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         Y[    NDI  Ur-] N/AD1 potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of                         YO NEI U[:] N/AD-significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit                   Y[    N[-] UD1 N/AD--
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[
IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
NDI Ur-] N/AD1 YO NEI U[:] N/AD-Y[
N[-] UD1 N/AD--
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K3 of K27 ATTACHMENT 9.7                                                                     AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YO NR- UL-Area Walk-By Checklist (AWC)             AWC- 033 Location: Bldg. RB             Floor El. 74'           Room, Area GeneralArea North
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K3 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YO NR-UL-Area Walk-By Checklist (AWC)
: 4. Does it appear that the area is free of potentially adverse seismic       YE Ni[] U-- N/A--
AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area General Area North
: 4. Does it appear that the area is free of potentially adverse seismic YE Ni[] U-- N/A--
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Fluorescentlight fixture overhead east of HO-1 72 and 173 support chains offset by conduit. Conduit is well supportedbetween the two chains. Load to conduit is small and acceptable. Conduit R931 to 19-FS-4806 (FS is non-safety relatedper Q-list and Asset Suite) fuel pool gate leak detector.
Fluorescent light fixture overhead east of HO-1 72 and 173 support chains offset by conduit. Conduit is well supported between the two chains. Load to conduit is small and acceptable. Conduit R931 to 19-FS-4806 (FS is non-safety related per Q-list and Asset Suite) fuel pool gate leak detector.
: 5. Does it appear that the area is free of potentially adverse seismic       YE NF- U-I N/AD interactions that could cause flooding or spray in the area?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
: 6. Does it appear that the area is free of potentially adverse seismic       YE ND] Ur-  N/AFD interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse seismic       YE NFI Ur-  N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Numerous items located east of hoistway but all have wheels locked/
Numerous items located east of hoistway but all have wheels locked/
chocked or adequate standoff distance from equipment
chocked or adequate standoff distance from equipment YE NF-U-I N/AD YE ND] Ur-N/AFD YE NFI Ur-N/AD-


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K4 of K27 ATTACHMENT 9.7                                                                     AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NF]       uF]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K4 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NF] uF]
Area Walk-By Checklist (AWC)             AWC- 033 Location: Bldg. RB               Floor El. 74         Room, Area GeneralArea North
Area Walk-By Checklist (AWC)
: 8. Have you looked for and found no other seismic conditions that could     YE NE] U--
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North
: 8. Have you looked for and found no other seismic conditions that could YE NE] U--
adversely affect the safety functions of the equipment in the area?
adversely affect the safety functions of the equipment in the area?
Radiation shielding above and west of HO- 173 appears well attached and well labeled, acceptable.
Radiation shielding above and west of HO-173 appears well attached and well labeled, acceptable.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Some minorcracking observed in joints of masonry wall at southwest comer of hoistway approximately 12'-14' up, on the east face of the wall. CR-PNP-2013-1204 initiated,but this was determined by the SWE team to not representan adverse seismic condition based on the location and limited extent of cracking.
Some minor cracking observed in joints of masonry wall at southwest comer of hoistway approximately 12'-14' up, on the east face of the wall. CR-PNP-2013-1204 initiated, but this was determined by the SWE team to not represent an adverse seismic condition based on the location and limited extent of cracking.
        **Note that this area is bounded by the Snubber Cage on the west side-did not do walk-by of snubber shop area because it is separatedfrom the General Area by robust chain link cage. (see photo below)
**Note that this area is bounded by the Snubber Cage on the west side-did not do walk-by of snubber shop area because it is separated from the General Area by robust chain link cage. (see photo below)
Evaluated by:                                                                 Date:   2/27/12 tere        _2_z_7/_1
Evaluated by:
Date: 2/27/12 ter e
_2_z_7/_1


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K5 of K27 ATTACHMENT   9.7                                                         AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: Y9 NF Ur-Area Walk-By Checklist (AWC)         AWC- 033 Location: Bldg. RB         Floor El. 74     Room, Area GeneralArea North SWEL Components: SWEL2-11, SWEL2-12 Photographs Note: Cracking, CR initiated, refer to           Note: Overall view of area comments above
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K5 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: Y9 NF Ur-Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11, SWEL2-12 Photographs Note: Cracking, CR initiated, refer to comments above Note: Overall view of area


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K6 of K27 ATTACHMENT   9.7                                                       AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE N-- Ui-Area Walk-By Checklist (AWC)     AWC- 033 Location: Bldg. RB       Floor El. 74       Room, Area GeneralArea North SWEL Components: SWEL2-11. SWEL2-12 Note:                                           Note: Fluorescentlight chain offset by conduit, acceptable,see #4 above.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K6 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE N-- Ui-Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11. SWEL2-12 Note:
Note: Fluorescent light chain offset by conduit, acceptable, see #4 above.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K7 of K27 ATTACHMENT       9.7                                                                               AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NR U-Area Walk-By Checklist (AWC)               AWC- 034 Location: Bldg. RB               Floor El. 74'             Room, Areal SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K7 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NR U-Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Areal SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         Y[    N[l UEiD N/AD--
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         Y[    NDl U[-I N/A[:]
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
significant degraded conditions?
Y[
: 3. Based on a visual inspection from the floor, do the cable/conduit                     YE NDI u[-] N/AD--
N[l UEiD N/AD--
raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[
NDl U[-I N/A[:]
YE NDI u[-] N/AD--
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K8 of K27 ATTACHMENT 9.7                                                                       AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: Y[* ND- UD-Area Walk-By Checklist (AWC)             AWC- 034 Location: Bldg. RB               Floor El. 74'         Room, Area SFPHx
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K8 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: Y[* ND-UD-Area Walk-By Checklist (AWC)
: 4. Does it appear that the area is free of potentially adverse seismic       YE ND-] Ur-- N/A[-
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Area SFPHx
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic       YZ NEI    UD- N/AD-interactions that could cause flooding or spray in the area?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Fire protection line all socket welded and well supported.
Fire protection line all socket welded and well supported.
1" copper drain water line on south wall well supported.
1" copper drain water line on south wall well supported.
: 6. Does it appear that the area is free of potentially adverse seismic       YN NDI    UD1 N/AD-interactions that could cause a fire in the area?
YE ND-] Ur-- N/A[-
: 7. Does it appear that the area is free of potentially adverse seismic       Y[  NDJ UD N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YZ NEI UD-N/AD-
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YN NDI UD1 N/AD-Y[
NDJ UD N/ADl


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K9 of K27 ATTACHMENT 9.7                                                                         AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YZ NiL ULI--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K9 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YZ NiL ULI--
Area Walk-By Checklist (AWC)             AWC- 034 Location: Bldg. RB               Floor El. 74         Room, Area SFPHx
Area Walk-By Checklist (AWC)
: 8. Have you looked for and found no other seismic conditions that could         YZ NEI     Ur-adversely affect the safety functions of the equipment in the area?
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx
: 8. Have you looked for and found no other seismic conditions that could YZ NEI Ur-adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
      -CR-PNP-2013-1195initiatedfor loose nut on hanger P210A discharge. Bolt is in place, nut is 75%
-CR-PNP-2013-1195 initiated for loose nut on hanger P210A discharge. Bolt is in place, nut is 75%
engaged. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.
engaged. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.
      -Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp is not connected to anything (see photo below)
-Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp is not connected to anything (see photo below)
      -Rolling portable stairnear 19-HO-165 is free to roll but not nearsafety related equipment and has a relatively low weight!mass, therefore acceptable.
-Rolling portable stair near 19-HO-165 is free to roll but not near safety related equipment and has a relatively low weight!mass, therefore acceptable.
      -Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit, therefore conduit is secure and acceptable with one bolt.
-Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit, therefore conduit is secure and acceptable with one bolt.
      -Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below)
-Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below)
      -CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod, above! north of 19-HO- 166. The next support is approximately 3' downstream, 7' upstream. This condition was determined by SWE team to not representan adverse seismic interaction/concern.
-CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod, above! north of 19-HO-166. The next support is approximately 3' downstream, 7' upstream. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.
        -CR-PNP-2013-1205initiated for 1" copper instrument airline sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team to not representan adverse seismic interaction/concern.(see photos below)
-CR-PNP-2013-1205 initiated for 1" copper instrument air line sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. (see photos below)
Evaluated by: __       _    _    _    _  _    _    _    _      _  _    _Date:     ,Zj-.
Evaluated by: __
_Date:  
,Zj-.
DAIL, "
DAIL, "


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K10 of K27 ATTACHMENT   9.7                                                         AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NLi-- ULI---
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K10 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NLi--
Area Walk-By Checklist (AWC)     AWC- 034 Location: Bldg. RB       Floor El. 74       Room, Area SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Photographs Note: uverall area                             Note: CR initiated for clamp
ULI---
Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Photographs Note: uverall area Note: CR initiated for clamp


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page Kll of K27 ATTACHMENT   9.7                                                         AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE NRI- UD-7 Area Walk-By Checklist (AWC)       AWC- 034 Location: Bldg. RB       Floor El. 74       Room, Area SFPHx SWEL Components: SWEL2-03, 04, 05, 06, 07, 08, 13 Note: A-IC panel with one bolt holding cover     Note: Airline sagging
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page Kll of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE NRI-UD-7 Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03, 04, 05, 06, 07, 08, 13 Note: A-IC panel with one bolt holding cover Note: Airline sagging


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K12 of K27 ATTACHMENT     9.7                                                                               AREA WALK-BY CHECKLIST Sheet I of 3 Status: YZ NF U[-I Area Walk-By Checklist (AWC)               AWC- 035 Location: Bldg. RB                 Floor El. 23'           Room, Area, Main Steam Tunnel SWEL Components: SWEL1-001. 002, 003, 004 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K12 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 3 Status: YZ NF U[-I Area Walk-By Checklist (AWC)
AWC- 035 Location: Bldg. RB Floor El. 23' Room, Area, Main Steam Tunnel SWEL Components: SWEL1-001. 002, 003, 004 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ ND U-          N/AD potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of                         Y[    ND U[      N/A[D]
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YZ ND ulI        N/AD raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ ND U-N/AD Y[
IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
ND U[
N/A[D]
YZ ND ulI N/AD I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K13 of K27 ATTACHMENT   9.7                                                                   AREA WALK-BY CHECKLIST Sheet 2 of 3 Status: YZ NF ULII Area Walk-By Checklist (AWC)             AWC- 035 Location: Bldg. RB               Floor El. 23           Room, Area Main Steam Tunnel
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K13 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 3 Status: YZ NF ULII Area Walk-By Checklist (AWC)
: 4. Does it appear that the area is free of potentially adverse seismic       YN N[I  UE] N/AE]
AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic       YN NEI Ur-  N/AD-interactions that could cause flooding or spray in the area?
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Fire protection line all socket welded and well supported. 1" copper drain water line on south wall well supported.
Fire protection line all socket welded and well supported. 1" copper drain water line on south wall well supported.
: 6. Does it appear that the area is free of potentially adverse seismic       YZ NDI U-- N/AD-interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 7. Does it appear that the area is free of potentially adverse seismic       YN NED U[-I N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YN N[I UE] N/AE]
YN NEI Ur-N/AD-YZ NDI U-- N/AD-YN NED U[-I N/AD-


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K14 of K27 ATTACHMENT 9.7                                                                       AREA WALK-BY CHECKLIST Sheet 3 of 3 Status: YE N[-] URII Area Walk-By Checklist (AWC)             AWC- 035 Location: Bldg. RB             Floor El. 23           Room, Area Main Steam Tunnel
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K14 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 3 Status: YE N[-] URII Area Walk-By Checklist (AWC)
: 8. Have you looked for and found no other seismic conditions that could     Y[   NEI U[-]
AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel
: 8. Have you looked for and found no other seismic conditions that could Y[
NEI U[-]
adversely affect the safety functions of the equipment in the area?
adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
      -Multiple scaffolds in place for RF019 work: 13-117, 13-121, 13-129, 13-137, 13-156, all appropriately labeled and green tagged.
-Multiple scaffolds in place for RF019 work: 13-117, 13-121, 13-129, 13-137, 13-156, all appropriately labeled and green tagged.
      -Insulation intentionallyremoved for FW check valve work- laid down on scaffold and on floor. It will be reinstalledduring RFO, therefore acceptable.
-Insulation intentionally removed for FW check valve work-laid down on scaffold and on floor. It will be reinstalled during RFO, therefore acceptable.
      -No adverse conditions were found during the area walk-by, therefore no pictures are attached to this form. Refer to SWEL 1-001, -002, -003, -004 for pictures of SWEL items, if needed.
-No adverse conditions were found during the area walk-by, therefore no pictures are attached to this form. Refer to SWEL 1-001, -002, -003, -004 for pictures of SWEL items, if needed.
Evaluated by:   NI           & )             )         xL..4                 Date:   f 9 S)(F4 L                    V L                       bwyU -lq
Evaluated by: NI  
& )  
)
xL..4 Date:
f 9 S)(F V
4L L
bwyU -lq


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K15 of K27 ATTACHMENT 9.7                                                                                   AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NF Ur-I Area Walk-By Checklist (AWC)               AWC- 036 Location: Bldg. RB                 Floor El. 23'           Room, Area, Drywell SWEL Components: SWEL2-009, 010, 014 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K15 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NF Ur-I Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23' Room, Area, Drywell SWEL Components: SWEL2-009, 010, 014 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YE NE-] Ul--      N/AL]
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Refer to comments on sheet 3
Refer to comments on sheet 3
: 2. Does anchorage of equipment in the area appear to be free of                         YE NE-] uE] N/Ar-significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YE NE] ur] N/AF-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
IIf the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
YE NE-] Ul--
N/AL]
YE NE-] uE] N/Ar-YE NE] ur] N/AF-I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K16 of K27 ATTACHMENT   9.7                                                                     AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YE N[j- Ur Area Walk-By Checklist (AWC)             AWC- 036 Location: Bldg. RB               Floor El. 23           Room, Area Drywell
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K16 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YE N[j-Ur Area Walk-By Checklist (AWC)
: 4. Does it aooear that the area is free of notentiallv adverse seismic       YrI   NFl urF- N/AFl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell
No ceiling in this area. Lights are well supportedby rigid conduits.
: 4. Does it aooear that the area is free of notentiallv adverse seismic YrI NFl urF-N/AFl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic       Y[    N-- U-- N/AD-interactions that could cause flooding or spray in the area?
No ceiling in this area. Lights are well supported by rigid conduits.
In general,all equipment in Drywell is qualified for seismic loading.
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
: 6. Does it appear that the area is free of potentially adverse seismic       YZ NDI ulD N/AD-interactions that could cause a fire in the area?
In general, all equipment in Drywell is qualified for seismic loading.
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
Note that Drywell is inert during power operations.
Note that Drywell is inert during power operations.
: 7. Does it appear that the area is free of potentially adverse seismic       Y[    NDI UDl N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Significant maintenance activities in progressat time of walkdown.
Significant maintenance activities in progress at time of walkdown.
Drywell closeoutprocedure walkdown will ensure that all items are removed or secured prior to start up.
Drywell closeout procedure walkdown will ensure that all items are removed or secured prior to start up.
Y[
N-- U-- N/AD-YZ NDI ulD N/AD-Y[
NDI UDl N/AD-


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K17 of K27 ATTACHMENT 9.7                                                                     AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE     NEI- UF-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K17 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NEI-UF-]
Area Walk-By Checklist (AWC)             AWC- 036 Location: Bldg. RB             Floor El. 23           Room, Area Drywell
Area Walk-By Checklist (AWC)
: 8. Have you looked for and found no other seismic conditions that could   Y[   NEi   U--
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell
: 8. Have you looked for and found no other seismic conditions that could Y[
NEi U--
adversely affect the safety functions of the equipment in the area?
adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose rates at the time.
Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose rates at the time.
Evaluated by: Daytj       S     I       (&sect;3,9       LII                     Date:   I'2!3-h 3 7t --V                     aaL14-V___t ___-
Evaluated by: Daytj S
Im..       71
I
                                                                                        '3113
(&sect;3,9 LII Date:
I'2!3-h 3 7t --V a a L14-71 Im..  
'3113 V___t ___ -


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K18 of K27 ATTACHMENT 9.7                                                     AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NI- Ur--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K18 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NI-Ur--
Area Walk-By Checklist (AWC)     AWC- 036 Location: Bldg. RB       Floor El. 23       Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Photographs Note: Scao                                     Note:
Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Photographs Note: Scao Note:


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K19 of K27 ATTACHMENT 9.7                                                     AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: Y[E NEI ULI Area Walk-By Checklist (AWC)     AWC- 036 Location: Bldg. RB       Floor El. 23       Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Note:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K19 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: Y[E NEI ULI Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Note:


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K20 of K27 ATTACHMENT 9.7                                                                                     AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NnI U[-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K20 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NnI U[-
Area Walk-By Checklist (AWC)               AWC- 037 Location: Bldg. RB                 Floor El. 41             Room, Area, Drywell SWEL Components: SWELl -023, 034 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area, Drywell SWEL Components: SWELl -023, 034 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         YZ N[-] ul-      N/A[--
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
All equipment in this area is anchored to the structure by welds to Drywell liner plate or Bioshield wall plate.
All equipment in this area is anchored to the structureby welds to Drywell liner plate or Bioshield wall plate.
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of                         YZ NEI      UEI  N/A[--
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
significant degraded conditions?
YZ N[-] ul-N/A[--
: 3. Based on a visual inspection from the floor, do the cable/conduit                   Y[    NEI ui--    N/A[-I raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ NEI UEI N/A[--
Y[
NEI ui--
N/A[-I
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K21 of K27 ATTACHMENT   9.7                                                                   AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NI--   UI-Area Walk-By Checklist (AWC)             AWC- 037 Location: Bldg. RB             Floor El. 41           Room, Area Drywell
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K21 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NI-- UI-Area Walk-By Checklist (AWC)
: 4. Does it appear that the area is free of potentially adverse seismic       YN NEI U[:] N/AEZ spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No ceiling in this area. Lights are well supported by rigid conduits.
No ceiling in this area. Lights are well supported by rigid conduits.
: 5. Does it appear that the area is free of potentially adverse seismic       YN NEI UEZ N/AD--
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
interactions that could cause flooding or spray in the area?
In general, all equipment in Drywell is qualified for seismic loading.
In general,all equipment in Drywell is qualified for seismic loading.
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic       YE NDI  U[- N/AD-interactions that could cause a fire in the area?
Note that Drywell is inert during power operations.
Note that Drywell is inert during power operations.
: 7. Does it appear that the area is free of potentially adverse seismic       YN NDI  Ur-  N/AD-I interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Significantmaintenance activities in progress at time of walkdown.
Significant maintenance activities in progress at time of walkdown.
Drywell closeout inspection will ensure that all items are removed or secured priorto start up.
Drywell closeout inspection will ensure that all items are removed or secured prior to start up.
YN NEI U[:] N/AEZ YN NEI UEZ N/AD--
YE NDI U[-
N/AD-YN NDI Ur-N/AD-I


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K22 of K27 ATTACHMENT 9.7                                                                     AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE! N-- U-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K22 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE! N--
Area Walk-By Checklist (AWC)             AWC- 037 Location: Bldg. RB             Floor El. 41             Room, Area Drywell
U-]
: 8. Have you looked for and found no other seismic conditions that could     YE Nni     Ur-]
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell
: 8. Have you looked for and found no other seismic conditions that could YE Nni Ur-]
adversely affect the safety functions of the equipment in the area?
adversely affect the safety functions of the equipment in the area?
Concrete shielding blocks were identified in the NIB Nozzle penetration of the Bioshield wall with no restraintsteel in place.
Concrete shielding blocks were identified in the NIB Nozzle penetration of the Bioshield wall with no restraint steel in place.
CR-PNP-2013-3008was initiatedfor this condition. It was determined that these blocks should have been removed per plant design change in previous outage. WO 349326 to remove blocks scheduled for 516/13 prior to restart. As of May 2 8th, this activity has been completed as confirmed by site personnel.
CR-PNP-2013-3008 was initiated for this condition. It was determined that these blocks should have been removed per plant design change in previous outage. WO 349326 to remove blocks scheduled for 516/13 prior to restart. As of May 2 8th, this activity has been completed as confirmed by site personnel.
Comments (Additional pages may be added as necessary)
Comments (Additional pages may be added as necessary)
Evaluated by:     )L   v&#xfd;&                 / ,-        )     h                 Date:
Evaluated by:  
I3tr-F- 6VA                       k&#xfd;                           bMi     4V. Ji
)L v&#xfd;&  
/  
)
h Date:
I3tr-F-6VA k&#xfd; bMi 4V. Ji


I Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K23 of K27 ATTACHMENT 9.7                                                       AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI1   U--
I Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K23 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI1 U--
Area Walk-By Checklist (AWC)       AWC- 037 Location: Bldg. RB         Floor El. 41       Room, Area Drywell SWEL Components: SWELl -023, 034 Photouraohs Note: Concrete shielding blocks                   Note:
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell SWEL Components: SWELl -023, 034 Photouraohs Note: Concrete shielding blocks Note:


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K24 of K27 ATTACHMENT       9.7                                                                               AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U[-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K24 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U[-
Area Walk-By Checklist (AWC)               AWC- 038 Location: Bldg. RB                 Floor El. 117             Room, Areal Refuel Floor SWEL Components: SWEL2-015. 016 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Area Walk-By Checklist (AWC)
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Areal Refuel Floor SWEL Components: SWEL2-015. 016 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                         Y[J NDI    U--  N/AD-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
: 2. Does anchorage of equipment in the area appear to be free of                         YE NDI UE N/AD significant degraded conditions?
: 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
: 3. Based on a visual inspection from the floor, do the cable/conduit                   YO NDI u[-] N/AD-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[J NDI U--
N/AD-YE NDI UE N/AD YO NDI u[-] N/AD-
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K25 of K27 ATTACHMENT   9.7                                                                   AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NI I U--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K25 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NI I U--
Area Walk-By Checklist (AWC)             AWC- 038 Location: Bldg. RB             Floor El. 117           Room, Area Refuel Floor
Area Walk-By Checklist (AWC)
: 4. Does it appear that the area is free of potentially adverse seismic       YE NEI  U[-] N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor
No ceiling in this area. Lights are well supportedby rigid conduits.
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
: 5. Does it appear that the area is free of potentially adverse seismic       YZ NDI U[-- N/AD interactions that could cause flooding or spray in the area?
No ceiling in this area. Lights are well supported by rigid conduits.
Fire Protectionpiping well supportedand socket welded joints.
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
: 6. Does it appear that the area is free of potentially adverse seismic       YZ NDl U-- N/AD--
Fire Protection piping well supported and socket welded joints.
interactions that could cause a fire in the area?
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
None observed. Note that gates are underwaterduring plant operationsand refueling.
None observed. Note that gates are underwater during plant operations and refueling.
: 7. Does it appear that the area is free of potentially adverse seismic       YO ND U[      N/AD interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Much equipment and material staged in the area due to ongoing refueling activities.
Much equipment and material staged in the area due to ongoing refueling activities.
The general area surroundingthe SFP is classified as a 'safe location' per PNPS Seismic Interaction HazardProcedure 1.17. 1.
The general area surrounding the SFP is classified as a 'safe location' per PNPS Seismic Interaction Hazard Procedure 1.17. 1.
YE NEI U[-] N/AD YZ NDI U[--
N/AD YZ NDl U-- N/AD--
YO ND U[
N/AD


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K26 of K27 ATTACHMENT 9.7                                                                       AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NiF U-II Area Walk-By Checklist (AWC)             AWC- 038 Location: Bldg. RB             Floor El. 117         Room, Area   Refuel Floor
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K26 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NiF U-II Area Walk-By Checklist (AWC)
: 8. Have you looked for and found no other seismic conditions that could       YZ NEI] U]
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor
: 8. Have you looked for and found no other seismic conditions that could YZ NEI] U]
adversely affect the safety functions of the equipment in the area?
adversely affect the safety functions of the equipment in the area?
The SFP inlet line siphon breakers were specifically viewed and photographedas part of this walk-by. They were found to be in place with no obvious seismic interaction concerns.
The SFP inlet line siphon breakers were specifically viewed and photographed as part of this walk-by. They were found to be in place with no obvious seismic interaction concerns.
Comments .(Additional pages may be added as necessary)
Comments.(Additional pages may be added as necessary)
Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity).
Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity).
Evaluaed bY - oJ                                                                   Date;
Evaluaed bY -
                ,-S~f&#xb6;Pf-~.                                                               _    __        _
oJ Date;
,-S~f&#xb6; Pf-~.  


Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K27 of K27 ATTACHMENT 9.7                                                       AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI] U-]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K27 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI] U-]
Area Walk-By Checklist (AWC)     AWC- 038 Location: Bldg. RB       Floor El. 117     Room, Area Refuel Floor SWEL Components: SWEL2-015. 016 PhotoaraDhs I
Area Walk-By Checklist (AWC)
Note:                                           Note: NE Siphon Break A}}
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor SWEL Components: SWEL2-015. 016 PhotoaraDhs I
Note:
Note: NE Siphon Break A}}

Latest revision as of 05:58, 11 January 2025

PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End
ML13232A129
Person / Time
Site: Pilgrim
Issue date: 06/17/2013
From: Maclay L
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
2.13.056 PNPS-CS-12-00001, Rev 1
Download: ML13232A129 (84)


Text

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J78 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YE NEI U-III Seismic Walkdown Checklist (SWC)

SWEL2-014 Equipment ID No.

19-HO-179 Equip. Class, Other (0)

Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.

RB Floor El. 23' Room, Area Drywell Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YO NZ

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YOI NEý UO NIAZ YOl NO] UL N/AZ YOl NE] UOE N/AZ IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J79 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NF--] Ur--

Seismic Walkdown Checklist (SWC)

SWEL2-014 Equipment ID No.

19-HO-179 Equip. Class2 Other (0)

Equipment Description Spent Fuel Pool and cavity drains

5. Is the anchorage configuration consistent with plant documentation?

YEI NDI U--

N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE NI-] UD-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Robust manual valve.

YrI NEI uiD N/AO

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YM ND uD N/AD:]

Y[-] NDI UD-N/A[

YM Nn UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J80 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF-I U--

Seismic Walkdown Checklist (SWC)

SWEL2- 014 Equipment ID No.

19-HO-179 Equip. Class3 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is AWC-36 Evaluated by:

bAV 62 A,1'Y Date:

-SEFF r-LB qu"::

  • ':.14?31L 3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J81 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-- UL--

Seismic Walkdown Checklist (SWC)

SWEL2-014 Equipment ID No.

19-HO-179 Equip. Class4 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Photographs Note:

Note:

4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J82 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE Nr-] U-Seismic Walkdown Checklist (SWC)

SWEL2-014 Equipment ID No.

19-HO-179 Equip. Classw Other (0)

Equipment Description Spent Fuel Pool and cavity drains I4 UtLW.

Note:

5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J83 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YO NF-- U-I Seismic Walkdown Checklist (SWC)

SWEL2- 015 Equipment ID No.

pool cavity gates Equip. Class, Other (0)

Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.

RB Floor El. 117 Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended)

Wide Gate, Dwq MIM1 12-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YI-NN

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y-I Nil U[-] N/AN YE] N] Ur-] N/A ]

Y[-] N[-] UP-] N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J84 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NEI UL-1 Seismic Walkdown Checklist (SWC)

SWEL2-015 Equipment ID No.

pool cavity gates Equip. Class2 Other (0)

Equipment Description Spent Fuel Pool and cavity drains

5. Is the anchorage configuration consistent with plant documentation?

YOI NI UFI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YN NO Ur-1 potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Lamps well supported on rigid conduits.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YOI NO U[-

N/A[

YZ NEI UIU N/A--

Y-- NEI UD-N/AE Y[

NEI Ur 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J85 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN! NFI-UI--

Seismic Walkdown Checklist (SWC)

SWEL2-015 Equipment ID No.

pool cavity gates Equip. Class3 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI-UMI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Gate inspected while removed for refueling. It was hanging on the East wall of the SFP, North of the cattle chute opening.

Area walk-by is A WC-38 Evaluated by:

Date:A(,I J,ý"/ J.'-A I

"EPF VA'%~s Date~:

_3 I

3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J86 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N--] U--i Seismic Walkdown Checklist (SWC)

SWEL2- 015 Equipment ID No.

pool cavity gates Equip. Class4 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J87 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NR UED Seismic Walkdown Checklist (SWC)

SWEL2- 015 Equipment ID No.

pool cavity gates Equip. Class5 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Note:

Note:

5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J88 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NLI-- U--

Seismic Walkdown Checklist (SWC)

SWEL2-016 Equipment ID No.

pool cavity gates Equip. Class, Other (0)

Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.

RB Floor El. 117' Room, Area Refuel Floor Manufacturer, Model, Etc. (optional but recommended)

Narrow Gate, Dwc MIM112-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[:I NO

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y[-] NE] U[-J N/AE YE] NEil uiJ N/AE YE-] NE-] uEr] N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J89 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE] UE]

Seismic Walkdown Checklist (SWC)

SWEL2-016 Equipment ID No.

gool cavity gates Equip. Class2 Other (0)

Equipment Description Spent Fuel Pool and cavity drains

5. Is the anchorage configuration consistent with plant documentation?

Y[I NE] UE] N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UE]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Lamps well supported on rigid conduits

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[:] NEi UE] N/AM YO NE]I UE N/AE]

YEI NE] UE] N/AE Y[

NE] UEi 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J90 of J134 ATRACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFI] U-I Seismic Walkdown Checklist (SWC)

SWEL2-016 Equipment ID No.

pool cavity gates Equip. Class3 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[

NEI UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Gate inspected while removed for refueling. It was hanging on the east wall of the SFP on the south side of the cattle chute opening.

Area walk-by is A WC-38.

Eva~uated 10it De lSM-1 fV.

kAL Date:

DAM1 4-/Z~4,1 V

3 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J91 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YO Nni-UI-Seismic Walkdown Checklist (SWC)

SWEL2-016 Equipment ID No. pool cavity -gates Equip. Class4 Other (0)

Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J92 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr--] UI--

Seismic Walkdown Checklist (SWC)

SWEL2-016 Equipment ID No.

pool cavity gates Equip. Classs Other (0)

Equipment Description Spent Fuel Pool and cavity drains Note:

Note:

5 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J93 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ N--I U-I Seismic Walkdown Checklist (SWC)

SWELl-083 Equipment ID No.

X55 Equip. Class, Transformers (04)

Equipment Description Transformer to Y3/Y31 Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Refer to response to question #5.

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

Y-I NZ Y; Nn U-N/A[D YZ Nn U-- N/AD-Y] Nn UD N/A-I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J94 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NFIl U[]

Seismic Walkdown Checklist (SWC)

SWELl-083 Equipment ID No.

X55 Equip. Class Transformers (04)

Equipment Description Transformer to Y3/Y31

5. Is the anchorage configuration consistent with plant documentation?

Yr] NE-] U-] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Note: The transformer and its anchorage are different from what is shown in drawing E15A-8, Rev. EO. This is due to the replacement of the transformer per EC 0000016677, Rev. 0.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEl UL-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

The Unistrut supporting conduits X1200 and A 3025 above X55 has two anchors with nuts that are not fully engaged. The engagement is greater than 75% in both cases, and this is judged to be adequate to develop the full strength of the anchor. Therefore, this is not considered a potential seismic interaction. See attached photo.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE ND UL-N/AD]

YE NI-- Ur-] N/AD-YE N[:] Uil N/A[-]

YE N[-- Uil

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J95 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN Nn-U-Seismic Walkdown Checklist (SWC)

SWELl-083 Equipment ID No. X55 Equip. Class Transformers (04)

Equipment Description Transformer to Y3/Y31 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YM NEI UI-adversely affect the safety functions of the equipment?

Comments.(Additional pages may be added as necessary)

SWEL 1-083 is on A WC-0 17.

Follow up internal inspection performed on 4-29-13. All internal fasteners in place and appear tight.

No loose or missing items observed. No adverse seismic interactions observed.

Evaluaed by-.:

W wj D",40) 6 t, ivW. s' Jeff Kalb

&a

(

Date:

3 bqmJi V II P

Note: This follow-up internal inspection was performed during PNPS Refueling Outage 19. An Entergy shared resource, David Grimes from Vermont Yankee, performed duties of one SWE team member. Mr. Grimes SWE credentials were verified by review of Vermont Yankee's Phase 1 submittal report VY-RPT-12-00019 Rev.0 (Asset Suite EC40647) Pages 9 and H8.

Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified via the Entergy Plateau qualification system as part of the pre-job brief for this walkdown.

EN-DC-168 REV 0

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J96 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF-] Ur Seismic Walkdown Checklist (SWC)

SWELl-083 Equipment ID No.

X55 Equip. Class Transformers (04)

Equipment Description Transformer to Y3/Y31 Photographs Note: Equipment tag VAULW.

t-JVCPICIII VICPVV U1 MJUIIJ111VIII

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J97 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI UD--

Seismic Walkdown Checklist (SWC)

SWELl-083 Equipment ID No.

X55 Equip. Class Transformers (04)

Equipment Description Transformer to Y3/Y31 Note: Nut on Unistrut that is not fully engaged.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J98 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE N-i Ur--

Seismic Walkdown Checklist (SWC)

SWELl- 084 Equipment ID No.

X56 Equip. Class' Transformers (04)

Equipment Description Transformer to Y4/Y41 Location: Bldg. RW Floor El. 23 Room, Area CSR Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ NO

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YZ NI U[-I N/AR YZ N[D] U-l N/AD Y] Nil U[-] N/A--

IEnter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J99 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] UE-Seismic Walkdown Checklist (SWC)

SWELl-084 Equipment ID No.

X56 Equip. Class Transformers (04)

Equipment Description Transformer to Y4/Y41

5. Is the anchorage configuration consistent with plant documentation?

YZ NEI UE] N/AE7 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchor configuration matches drawings E15A3 E2, E15A-8 EO, E15A-7 and the SEWs package, detail 3/3. Two additional bolts were noted for the connection of the panel to the channel. The design in calculation C15.0.3059 specifies 3/16" fillet welds, which also exists at the connection, therefore, the bolts are extra and the configuration is acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Unistrut supporting conduit was noted to be within an inch of the top of the cabinet. This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panel is also touching the column! wall on the right side. This is acceptable, as the cabinet does not contain essential relays and is therefore not prone to chatter.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN NE]I UM N/AE]

YE NE] U[-E N/AE--

YN NEI UE-N/AE]

YM NEI UE]

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J100 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE Nnl UrI Seismic Walkdown Checklist (SWC)

SWELl-084 Equipment ID No.

X56 Equip. Class Transformers (04)

Equipment Description Transformer to Y4/Y41 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NI-] Ur-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Area walk-by is AWC-018.

Follow-up internal visual inspection performed on 4/18/13. Maintenance of the transformer was in progress at the time of inspection (W0296640). Four cables were intentionally de-terminated at this time, refer to photo below.

All fasteners were in place with no signs of any being loose.

No loose or missing items were identified.

No potentially adverse seismic interactions were identified.

Q~ 1191 Evaluatedi by: QSWUaILw Date: i J

3.

JeW Kalb

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J101 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE NIIJ U[I Seismic Walkdown Checklist (SWC)

SWELl-084 Equipment ID No.

X56 Equip. Class Transformers (04)

Equipment Description Transformer to Y4/Y41 Photographs

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J102 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YM NFI-U[-]

Seismic Walkdown Checklist (SWC)

SWELl-084 Equipment ID No.

X56 Equip. Class Transformers (04)

Equipment Description Transformer to Y4/Y41 Note: Cabinet anchorage

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J103 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YZ Nr--] Ur-Seismic Walkdown Checklist (SWC)

SWELl-084 Equipment ID No.

X56 Equip. Class Transformers (04)

Equipment Description Transformer to Y4/Y41

  • or

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J104 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-UD-1 Seismic Walkdown Checklist (SWC)

SWELl-095 Equipment ID No.

EPA1 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YM Ni-I

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YE ND-U[-1 N/AD-1 Y] N[D U[-I N/AD-YE Nn Ur N/AEDI I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J105 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ N-- UI-Seismic Walkdown Checklist (SWC)

SWELl-095 Equipment ID No.

EPA I Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

YZ ND] ULi N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS package for EPA 1-6, dated 8/4/94.

6. Based on the above anchorage evaluations, is the anchorage free of Y[

ND-- UD-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?

Panel D-7 is mounted above EPA I with its cover latch facing the floor, and was examined for an interaction involving the cover coming unlatched over EPA 1 during a seismic event. The cover appears to be adequately latched and the panel securely anchored, and does not present a seismic interaction concern. See attached photo.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA I that is in close proximity to EPA2.

Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[

ND:

UD-] N/AD--

YE ND-uD-N/AD-YE ND-- uD-N/AD-YE Nr-- Ur-

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J106 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE Nil U-]

Seismic Walkdown Checklist (SWC)

SWELl-095 Equipment ID No.

EPA 1 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[

NEI-UI-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWELl-095 is on AWC-017.

Follow-up internal visual inspection of panel performed on 12/12/12:

-All internal fasteners in place and appear tight

-No adverse conditions observed A loose label for 194.502A-005-10 was found on top of EPA 1. This was reported to Operations and an ESOMS request was initiated.

~.il ~ru Evaluated bv Date:

i=/=/,

  • o-kLL jV r

I j

I t 02

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J107 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE-I UII-Seismic Walkdown Checklist (SWC)

SWELl-095 Equipment ID No.

EPA I Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J108 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF-M Ur--]

Seismic Walkdown Checklist (SWC)

SWELl-095 Equipment ID No.

EPA1 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Note: Cabinet internals

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J109 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND--

UD Seismic Walkdown Checklist (SWC)

SWELl-096 Equipment ID No.

EPA2 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YZ N[D

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YN ND U[i] N/Al]

Y; ND Ur-N/AD--

YM ND UD N/AD-1

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 110 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ ND1 UD-]

Seismic Walkdown Checklist (SWC)

SWELl-096 Equipment ID No.

EPA2 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

YO ND] U[i N/AD-I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS package for EPA 1-6, dated 8/4/94.

6. Based on the above anchorage evaluations, is the anchorage free of Y[

ND-] UD-potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA 1 that is in close proximity to EPA2.

Conduit B081 is also in close proximity to EPA2, approx. 1.5" away.

The panels and the conduits are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE NDI UD-N/AD--

Y[

NDI UD-N/AD-Y[

ND UD-- N/AD-YE ND UD

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 11 of J1 34 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI ULI Seismic Walkdown Checklist (SWC)

SWELl-096 Equipment ID No.

EPA2 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE N[:] ULI adversely affect the safety functions of the equipment?

Comments.(Additional pages may be added as necessary)

SWEL 1-096 is on A WC-017.

Follow-up internal inspection of panel performed on 12/12/12:

-All internal fasteners appear to be in place and tight.

-Small debris found in bottom comer of cabinet and removed by electrician ((1) screw, (2) nuts and metal shavings)

-No adverse conditions observed Evaluated by:

2311 ~LJ/

Date:

t

,, 4_

I2j1z1J?

I

" j

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J112 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE NFIl ULI Seismic Walkdown Checklist (SWC)

SWELl-096 Equipment ID No.

EPA2 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of equipment

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J113 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI U[-]

Seismic Walkdown Checklist (SWC)

SWELl-096 Equipment ID No.

EPA2 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet internals on door

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J114 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YZ Nr-] UL-]

Seismic Walkdown Checklist (SWC)

SWELl-097 Equipment ID No.

EPA3 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[

Nr-

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YZ NE] U[-] N/AF-YO NE] U[-- N/A YZ NEi Ui N/AD--

I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J115 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YE ND-U[-

Seismic Walkdown Checklist (SWC)

SWELl-097 Equipment ID No.

EPA3 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

YZ N[-] Ur-- N/Ar-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS package for EPA 1-6, dated 8/4/94.

6. Based on the above anchorage evaluations, is the anchorage free of YE N[-] UD-potentially adverse seismic conditions?

A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SH 1, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.

Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YN ND U[D-N/AD:]

YE ND-] uD-I N/AD-YZ NDI UD-1 N/AD--

Y] NDI UDl

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J116 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE NFIl UFI-Seismic Walkdown Checklist (SWC)

SWELl-097 Equipment ID No.

EPA3 Equip. Class Instrumentation and-Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE N[-I U--

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWELI-097 is on AWC-017.

Follow-up internal inspection of panel performed on 1/9/13:

-No loose or missing fasteners observed

-No other adverse conditions observed Evaluated by:

Ž),X4j

.I I

Date:

bNTv.1 /)0)13 T-C-Ff- ý,ýLB SU k&

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J117 of J134 A'TACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE N I Ur-L Seismic Walkdown Checklist (SWC)

SWELl- 097 Equipment ID No.

EPA3 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J118 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YN ND UFIu Seismic Walkdown Checklist (SWC)

SWELl-097 Equipment ID No.

EPA3 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Note: Typical anchor bolt on bottom of panel.

num. lyplucll allullut UUil U11 1UP Ui Pallut.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J119 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YE ND-- Ur-]

Seismic Walkdown Checklist (SWC)

SWELl-097 Equipment ID No.

EPA3 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Note: Cabinet intemals Note: Cabinet intemals

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J120 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF UD Seismic Walkdown Checklist (SWC)

SWELl-098 Equipment ID No.

EPA4 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y[

NrI-

2. Is the anchorage free of bent, broken, missing or loose hardware?
3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?

YZ NEI

[--] N/AE]

Y[

NR UDl N/AD-YZ N-- UI-N/AD I Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J121 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE Nn U-Seismic Walkdown Checklist (SWC)

SWELl-098 Equipment ID No.

EPA4 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

YO NiD UrI N/AFD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See SEWS package for EPA 1-6, dated 8/4/94.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI--

potentially adverse seismic conditions?

A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.

Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y[

ND-- U[I N/AD-YE NEI U-- N/Ai-Y[

ND-] UD-N/AD Y[

NDI U[--

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J122 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFIl UI--]

Seismic Walkdown Checklist (SWC)

SWELl-098 Equipment ID No.

EPA4 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y] NEIl UF adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWELI-098 is on AWC-017.

Follow-up internal inspection performed on 1/9/13:

-Observed one missing screw on upper left comer of circuit board at back of panel. Circuit board has very low weight/mass and was adequately supported by the remaining 5 screws. Not a seismic interaction hazard. Screw was replaced by ELAB mechanic that provided access to the panel.

-No other loose or missing fasteners or adverse conditions observed.

Evaluated by: Dayj 0,) )-rI Date:

Sf r-r- kIii LK ia LIA-t>W

~AF k!*Lr~

Ar~

1/10/13

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J123 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NFI-UFi Seismic Walkdown Checklist (SWC)

SWELl-098 Equipment ID No.

EPA4 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel showing anchorage

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J124 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE ND-- UF]

Seismic Walkdown Checklist (SWC)

SWELl-098 Equipment ID No.

EPA4 Equip. Class Instrumentation and Control Panels (20)

Eauibment Description RPS Elec Protection Assembil Note: Typical anchor bolt on bottom of panel.

Note: Cabinet internals

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J125 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-- UI--

Seismic Walkdown Checklist (SWC)

SWELl-099 Equipment ID No.

EPA5 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?

Two of four anchors are visible.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Two of four anchors are visible.

4. Is the anchorage free of visible cracks in the concrete near the anchors?

Two of four anchors are visible.

Y[-] NE YE ND-UD-1 N/AD-YE N[D] U[] N/ADý YE N[l lD-- N/AD-1 Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J126 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[

NEI UF--

Seismic Walkdown Checklist (SWC)

SWELl- 099 Equipment ID No.

EPA5 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

Yrll N[-] UrI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question # 1.

6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YE* Nil ur-] N/A[-I YE ND urEI N/AD YE NEI Ur1 N/A[-

YE NDI U[I N/

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J127 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF] U-Seismic Walkdown Checklist (SWC)

SWELl-099 Equipment ID No.

EPA5 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y

NEil UiF adversely affect the safety functions of the equipment?

Comments.(Additional pages may be added as necessary)

SWELl-099 is on AWC-017.

Follow-up internal inspection performed on 4/2/13:

-All fasteners in place and appear tight

-No loose items observed in panel

-No debris in bottom of panel Evaluated by:

JA JJ Date:

t

/

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J128 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE Nr-] UL-Seismic Walkdown Checklist (SWC)

SWELl-099 Equipment ID No.

EPA5 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA5 is on the right

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J129 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YM NF] U-I Seismic Walkdown Checklist (SWC)

SWELl-099 Equipment ID No.

EPA5 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet intemals on door

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J130 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND I U--

Seismic Walkdown Checklist (SWC)

SWELl-100 Equipment ID No.

EPA6 Equip. Class, Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.

2. Is the anchorage free of bent, broken, missing or loose hardware?

Two of four anchors are visible.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Two of four anchors are visible.

4. Is the anchorage free of visible cracks in the concrete near the anchors?

There is a surface crack (<1/16') near the bottom left anchor that is judged to be insignificant.

Y-NE YO NEI] UI'-

N/AD-YE NDI ULI N/AD YN ND-- U-- N/AD--

' Enter the equipment class name from Appendix B: Classes of Equipment.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J131 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF-U-Seismic Walkdown Checklist (SWC)

SWELl-100 Equipment ID No.

EPA6 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly

5. Is the anchorage configuration consistent with plant documentation?

YE] NEI Ui-N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Refer to response to question #1.

6. Based on the above anchorage evaluations, is the anchorage free of Y[

NE] UE]

potentially adverse seismic conditions?

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.

9. Do attached lines have adequate flexibility to avoid damage?

There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

YM NE] UE] N/AD-YE NEI UE] N/AE]

YN NEI U[] N/A[-]

Y[

NEI UF--

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J132 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N[R UR]

Seismic Walkdown Checklist (SWC)

SWELl-100 Equipment ID No.

EPA6 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN N[] U-I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

SWELl-100 is on AWC-017.

Follow up internal inspection performed on 4/2/13:

-All fasteners in place and appear tight

-No potential adverse seismic interactions observed

-One small screw and two small washers found in the bottom of the panel. They did not appear to have fallen off, most likely left over from previous maintenance. These items were removed by electrical maintenance escort.

Evaluated by: D6aVu)',n

,,L) L Date:

L -j- -13

-aF VLRQk&t

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J133 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NEil Ui--

Seismic Walkdown Checklist (SWC)

SWELl-100 Equipment ID No.

EPA6 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA6 is on the /eft.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J134 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NF U[-

Seismic Walkdown Checklist (SWC)

SWELl-100 Equipment ID No.

EPA6 Equip. Class Instrumentation and Control Panels (20)

Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note:

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K1 of K27 Attachment K Form 9.7: Deferred Area Walk-By Checklists (AWCs)

~1 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K2 of K27 ATrACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NI Ui-]

Area Walk-By Checklist (AWC)

AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area, General Area North SWEL Components: SWEL2-11, SWEL2-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Y[

NDI Ur-] N/AD1 YO NEI U[:] N/AD-Y[

N[-] UD1 N/AD--

I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K3 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YO NR-UL-Area Walk-By Checklist (AWC)

AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area General Area North

4. Does it appear that the area is free of potentially adverse seismic YE Ni[] U-- N/A--

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

Fluorescent light fixture overhead east of HO-1 72 and 173 support chains offset by conduit. Conduit is well supported between the two chains. Load to conduit is small and acceptable. Conduit R931 to 19-FS-4806 (FS is non-safety related per Q-list and Asset Suite) fuel pool gate leak detector.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Numerous items located east of hoistway but all have wheels locked/

chocked or adequate standoff distance from equipment YE NF-U-I N/AD YE ND] Ur-N/AFD YE NFI Ur-N/AD-

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K4 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NF] uF]

Area Walk-By Checklist (AWC)

AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North

8. Have you looked for and found no other seismic conditions that could YE NE] U--

adversely affect the safety functions of the equipment in the area?

Radiation shielding above and west of HO-173 appears well attached and well labeled, acceptable.

Comments (Additional pages may be added as necessary)

Some minor cracking observed in joints of masonry wall at southwest comer of hoistway approximately 12'-14' up, on the east face of the wall. CR-PNP-2013-1204 initiated, but this was determined by the SWE team to not represent an adverse seismic condition based on the location and limited extent of cracking.

    • Note that this area is bounded by the Snubber Cage on the west side-did not do walk-by of snubber shop area because it is separated from the General Area by robust chain link cage. (see photo below)

Evaluated by:

Date: 2/27/12 ter e

_2_z_7/_1

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K5 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: Y9 NF Ur-Area Walk-By Checklist (AWC)

AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11, SWEL2-12 Photographs Note: Cracking, CR initiated, refer to comments above Note: Overall view of area

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K6 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE N-- Ui-Area Walk-By Checklist (AWC)

AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11. SWEL2-12 Note:

Note: Fluorescent light chain offset by conduit, acceptable, see #4 above.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K7 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NR U-Area Walk-By Checklist (AWC)

AWC- 034 Location: Bldg. RB Floor El. 74' Room, Areal SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Y[

N[l UEiD N/AD--

Y[

NDl U[-I N/A[:]

YE NDI u[-] N/AD--

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K8 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: Y[* ND-UD-Area Walk-By Checklist (AWC)

AWC- 034 Location: Bldg. RB Floor El. 74' Room, Area SFPHx

4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

Fire protection line all socket welded and well supported.

1" copper drain water line on south wall well supported.

YE ND-] Ur-- N/A[-

YZ NEI UD-N/AD-

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

YN NDI UD1 N/AD-Y[

NDJ UD N/ADl

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K9 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YZ NiL ULI--

Area Walk-By Checklist (AWC)

AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx

8. Have you looked for and found no other seismic conditions that could YZ NEI Ur-adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary)

-CR-PNP-2013-1195 initiated for loose nut on hanger P210A discharge. Bolt is in place, nut is 75%

engaged. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.

-Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp is not connected to anything (see photo below)

-Rolling portable stair near 19-HO-165 is free to roll but not near safety related equipment and has a relatively low weight!mass, therefore acceptable.

-Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit, therefore conduit is secure and acceptable with one bolt.

-Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below)

-CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod, above! north of 19-HO-166. The next support is approximately 3' downstream, 7' upstream. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.

-CR-PNP-2013-1205 initiated for 1" copper instrument air line sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. (see photos below)

Evaluated by: __

_Date:

,Zj-.

DAIL, "

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K10 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NLi--

ULI---

Area Walk-By Checklist (AWC)

AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Photographs Note: uverall area Note: CR initiated for clamp

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page Kll of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE NRI-UD-7 Area Walk-By Checklist (AWC)

AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03, 04, 05, 06, 07, 08, 13 Note: A-IC panel with one bolt holding cover Note: Airline sagging

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K12 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 3 Status: YZ NF U[-I Area Walk-By Checklist (AWC)

AWC- 035 Location: Bldg. RB Floor El. 23' Room, Area, Main Steam Tunnel SWEL Components: SWEL1-001. 002, 003, 004 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

YZ ND U-N/AD Y[

ND U[

N/A[D]

YZ ND ulI N/AD I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K13 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 3 Status: YZ NF ULII Area Walk-By Checklist (AWC)

AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel

4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

Fire protection line all socket welded and well supported. 1" copper drain water line on south wall well supported.

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

YN N[I UE] N/AE]

YN NEI Ur-N/AD-YZ NDI U-- N/AD-YN NED U[-I N/AD-

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K14 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 3 Status: YE N[-] URII Area Walk-By Checklist (AWC)

AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel

8. Have you looked for and found no other seismic conditions that could Y[

NEI U[-]

adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary)

-Multiple scaffolds in place for RF019 work: 13-117,13-121, 13-129,13-137, 13-156, all appropriately labeled and green tagged.

-Insulation intentionally removed for FW check valve work-laid down on scaffold and on floor. It will be reinstalled during RFO, therefore acceptable.

-No adverse conditions were found during the area walk-by, therefore no pictures are attached to this form. Refer to SWEL 1-001, -002, -003, -004 for pictures of SWEL items, if needed.

Evaluated by: NI

& )

)

xL..4 Date:

f 9 S)(F V

4L L

bwyU -lq

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K15 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NF Ur-I Area Walk-By Checklist (AWC)

AWC- 036 Location: Bldg. RB Floor El. 23' Room, Area, Drywell SWEL Components: SWEL2-009, 010, 014 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Refer to comments on sheet 3

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

YE NE-] Ul--

N/AL]

YE NE-] uE] N/Ar-YE NE] ur] N/AF-I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K16 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YE N[j-Ur Area Walk-By Checklist (AWC)

AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell

4. Does it aooear that the area is free of notentiallv adverse seismic YrI NFl urF-N/AFl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No ceiling in this area. Lights are well supported by rigid conduits.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

In general, all equipment in Drywell is qualified for seismic loading.

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?

Note that Drywell is inert during power operations.

7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Significant maintenance activities in progress at time of walkdown.

Drywell closeout procedure walkdown will ensure that all items are removed or secured prior to start up.

Y[

N-- U-- N/AD-YZ NDI ulD N/AD-Y[

NDI UDl N/AD-

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K17 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NEI-UF-]

Area Walk-By Checklist (AWC)

AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell

8. Have you looked for and found no other seismic conditions that could Y[

NEi U--

adversely affect the safety functions of the equipment in the area?

Comments (Additional pages may be added as necessary)

Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose rates at the time.

Evaluated by: Daytj S

I

(§3,9 LII Date:

I'2!3-h 3 7t --V a a L14-71 Im..

'3113 V___t ___ -

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K18 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NI-Ur--

Area Walk-By Checklist (AWC)

AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Photographs Note: Scao Note:

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K19 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: Y[E NEI ULI Area Walk-By Checklist (AWC)

AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Note:

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K20 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NnI U[-

Area Walk-By Checklist (AWC)

AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area, Drywell SWEL Components: SWELl -023, 034 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

All equipment in this area is anchored to the structure by welds to Drywell liner plate or Bioshield wall plate.

2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

YZ N[-] ul-N/A[--

YZ NEI UEI N/A[--

Y[

NEI ui--

N/A[-I

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K21 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NI-- UI-Area Walk-By Checklist (AWC)

AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell

4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No ceiling in this area. Lights are well supported by rigid conduits.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

In general, all equipment in Drywell is qualified for seismic loading.

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?

Note that Drywell is inert during power operations.

7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Significant maintenance activities in progress at time of walkdown.

Drywell closeout inspection will ensure that all items are removed or secured prior to start up.

YN NEI U[:] N/AEZ YN NEI UEZ N/AD--

YE NDI U[-

N/AD-YN NDI Ur-N/AD-I

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K22 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE! N--

U-]

Area Walk-By Checklist (AWC)

AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell

8. Have you looked for and found no other seismic conditions that could YE Nni Ur-]

adversely affect the safety functions of the equipment in the area?

Concrete shielding blocks were identified in the NIB Nozzle penetration of the Bioshield wall with no restraint steel in place.

CR-PNP-2013-3008 was initiated for this condition. It was determined that these blocks should have been removed per plant design change in previous outage. WO 349326 to remove blocks scheduled for 516/13 prior to restart. As of May 2 8th, this activity has been completed as confirmed by site personnel.

Comments (Additional pages may be added as necessary)

Evaluated by:

)L vý&

/

)

h Date:

I3tr-F-6VA ký bMi 4V. Ji

I Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K23 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI1 U--

Area Walk-By Checklist (AWC)

AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell SWEL Components: SWELl -023, 034 Photouraohs Note: Concrete shielding blocks Note:

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K24 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U[-

Area Walk-By Checklist (AWC)

AWC- 038 Location: Bldg. RB Floor El. 117 Room, Areal Refuel Floor SWEL Components: SWEL2-015. 016 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Y[J NDI U--

N/AD-YE NDI UE N/AD YO NDI u[-] N/AD-

' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K25 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NI I U--

Area Walk-By Checklist (AWC)

AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor

4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

No ceiling in this area. Lights are well supported by rigid conduits.

5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?

Fire Protection piping well supported and socket welded joints.

6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?

None observed. Note that gates are underwater during plant operations and refueling.

7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Much equipment and material staged in the area due to ongoing refueling activities.

The general area surrounding the SFP is classified as a 'safe location' per PNPS Seismic Interaction Hazard Procedure 1.17. 1.

YE NEI U[-] N/AD YZ NDI U[--

N/AD YZ NDl U-- N/AD--

YO ND U[

N/AD

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K26 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NiF U-II Area Walk-By Checklist (AWC)

AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor

8. Have you looked for and found no other seismic conditions that could YZ NEI] U]

adversely affect the safety functions of the equipment in the area?

The SFP inlet line siphon breakers were specifically viewed and photographed as part of this walk-by. They were found to be in place with no obvious seismic interaction concerns.

Comments.(Additional pages may be added as necessary)

Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity).

Evaluaed bY -

oJ Date;

,-S~f¶ Pf-~.

Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K27 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI] U-]

Area Walk-By Checklist (AWC)

AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor SWEL Components: SWEL2-015. 016 PhotoaraDhs I

Note:

Note: NE Siphon Break A