{{#Wiki_filter:,- tRRE(;(,         U.S. NUCLEAR REGULATORY COMMISSION                                                                 November 1987 lop REGULATORY GUIDE
{{#Wiki_filter:,- tRRE(;(,  
                        OFFICE OF NUCLEAR REGULATORY RESEARCH
U.S. NUCLEAR REGULATORY COMMISSION  
                                                      REGULATORY GUIDE 1.156 (Task EE 4044)
November 1987 REGULATORY GUIDE
                      ENVIRONMENTAL QUALIFICATION OF CONNECTION ASSEMBLIES
lop OFFICE OF NUCLEAR REGULATORY RESEARCH
                                                FOR NUCLEAR POWER PLANTS
REGULATORY GUIDE 1.156 (Task EE 4044)
ENVIRONMENTAL QUALIFICATION OF CONNECTION ASSEMBLIES
FOR NUCLEAR POWER PLANTS


==A. INTRODUCTION==
==A. INTRODUCTION==
Criterion 1II, "Design Control," of Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants,"
to
10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," requires, among other things, that, where a test program is used to verify the adequacy of specific design features, it include suitable qualification testing of a prototype unit under the most adverse design conditions.
Section 50.49, "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants,"
of 10 CFR Part 50 requires that certain electric equipment important to safety be qualified for its application and specified performance. Section 50.49 also states require- ments for establishing environmental qualification methods
.nd qualification parameters.
This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regula- tions with regard to the environmental qualification of quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for service in nuclear power plants. The environmental qualifica- tion is to ensure that connection assemblies can perform their safety functions during and after a design basis event.
The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.
Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR
Part 50, which provides the regulatory basis for this guide.
The information collection requirements in 10 CFR Part 50
have been cleared under OMB Clearance No. 3150-0011.


==B. DISCUSSION==
==B. DISCUSSION==
Criterion 1II, "Design Control," of Appendix B, "Quality                IEEE Std 572-1985, "Qualification of Class I E Connec- Assurance Criteria for Nuclear Power Plants and Fuel                    tion Assemblies for Nuclear Power Generating Stations,"*
IEEE Std 572-1985, "Qualification of Class I E Connec- tion Assemblies for Nuclear Power Generating Stations,"*
Reprocessing Plants,"          to 10 CFR Part 50, "Domestic            published in September 1985, was prepared by Subcom- Licensing of Production and Utilization Facilities," requires,          mittee 2, "Qualification," of the Nuclear Power Engineering among other things, that, where a test program is used to              Committee of the Institute of Electrical and Electronics verify the adequacy of specific design features, it include            Engineers (IEEE) and was approved by the IEEE Standards suitable qualification testing of a prototype unit under the            Board on December 13, 1984 (and amended on September most adverse design conditions.                                        25, 1987). This standard describes basic procedures for qualifying connection assemblies (for example, quick- Section 50.49, "Environmental Qualification of Electric            disconnect connection assemblies and environmental seals Equipment Important to Safety for Nuclear Power Plants,"                in combination with cables as assemblies).
published in September 1985, was prepared by Subcom- mittee 2, "Qualification," of the Nuclear Power Engineering Committee of the Institute of Electrical and Electronics Engineers (IEEE) and was approved by the IEEE Standards Board on December 13, 1984 (and amended on September
of 10 CFR Part 50 requires that certain electric equipment important to safety be qualified for its application and                    Guidance on seismic qualification for this equipment is specified performance. Section 50.49 also states require-              suggested in Regulatory Guide 1.100, "Seismic Qualifica- ments for establishing environmental qualification methods              tion of Electric and Mechanical Equipment for Nuclear
25, 1987). This standard describes basic procedures for qualifying connection assemblies (for example, quick- disconnect connection assemblies and environmental seals in combination with cables as assemblies).
  .nd qualification parameters.                                        Power Plants" (Proposed Revision 2, Task EE 108-5).
Guidance on seismic qualification for this equipment is suggested in Regulatory Guide 1.100, "Seismic Qualifica- tion of Electric and Mechanical Equipment for Nuclear Power Plants" (Proposed Revision 2, Task EE 108-5).
    This regulatory guide describes a method acceptable to                Section 50.49 of 10 CFR Part 50 defines three categories the NRC staff for complying with the Commission's regula-              of electric equipment that are required to be environmentally tions with regard to the environmental qualification of                qualified: (1) safety-related equipment, (2) nonsafety-related quick-disconnect connection assemblies and environmental                equipment whose failure could adversely affect safety-related seals in combination with cables or wires as assemblies for            equipment, and (3) certain post-accident monitoring service in nuclear power plants. The environmental qualifica-          equipment. This regulatory guide provides an acceptable tion is to ensure that connection assemblies can perform                method of qualifying quick-disconnect connection assemblies their safety functions during and after a design basis event.          and environmental seals in combination with cables or wires as assemblies for all three categories of equipment.
Section 50.49 of 10 CFR Part 50 defines three categories of electric equipment that are required to be environmentally qualified: (1) safety-related equipment, (2) nonsafety-related equipment whose failure could adversely affect safety-related equipment, and  
(3) certain post-accident monitoring equipment. This regulatory guide provides an acceptable method of qualifying quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for all three categories of equipment.
 
IEEE Std 572-1985 contains references to other national standards.
 
Those standards that are referenced but not endorsed by NRC are expected to be used in a manner consistent with regulatory practice.


The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in                  IEEE Std 572-1985 contains references to other national the regulatory position.                                               standards. Those standards that are referenced but not endorsed by NRC are expected to be used in a manner Any information collection activities mentioned in this            consistent with regulatory practice.
*Copies may be purchased from the Institute of Electrical and Electronics Engineers Service Center,445 Hoes Lane, P.O. Box 1331, Piscataway, NJ 08855.


regulatory guide are contained as requirements in 10 CFR
USNRC
Part 50, which provides the regulatory basis for this guide.                  *Copies may be purchased from the Institute of Electrical and The information collection requirements in 10 CFR Part 50              Electronics Engineers Service Center,445 Hoes Lane, P.O. Box 1331, have been cleared under OMB Clearance No. 3150-0011.                    Piscataway, NJ 08855.
REGULATORY GUIDES
The guides are issued in the following ten broad divisions:
Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing


USNRC    REGULATORY GUIDES                            The guides are issued in the following ten broad divisions:
===1. Power Reactors ===
Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing              1. Power Reactors                 6. Products specific parts of the Commission's regulations, to delineate tech-     2. Research and Test Reactors     7. Transportation niques used by the staff in evaluating specific problems or postu-     3. Fuels and MaterialslFacilities 8. Occupational Health lated accidents, or to provide guidance to applicants. Regulatory       4. Environmental and Siting       9. Antitrust and Financial Review Guides are not substitutes for regulations, and compliance with         5. Materials and Plant Protection 10. General them is not required. Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the Issuance or continuance of a permit or       Copies of issued guides may be purchased from the Government license by the Commission.                                             Printing Office at the current GPO price. Information on current GPO prices may be obtained by contacting the Superintendent of This guide was issued after consideration of comments received from     Documents, U.S. Government Printing Office, Post Office Box the public. Comments and suggestions for improvements in these         37082, Washington, DC 20013-7082, telephone (202)275-2060 or guides are encouraged at all times, and guides will be revised, as     (202)275-2171.
6. Products specific parts of the Commission's regulations, to delineate tech-  
2. Research and Test Reactors  
7. Transportation niques used by the staff in evaluating specific problems or postu-  
3. Fuels and MaterialslFacilities  
8. Occupational Health lated accidents, or to provide guidance to applicant
 
====s. Regulatory ====
4. Environmental and Siting  
9. Antitrust and Financial Review Guides are not substitutes for regulations, and compliance with  
5. Materials and Plant Protection 10. General them is not required. Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the Issuance or continuance of a permit or Copies of issued guides may be purchased from the Government license by the Commission.
 
Printing Office at the current GPO price. Information on current GPO prices may be obtained by contacting the Superintendent of This guide was issued after consideration of comments received from Documents, U.S. Government Printing Office, Post Office Box the public. Comments and suggestions for improvements in these  
37082, Washington, DC 20013-7082, telephone (202)275-2060 or guides are encouraged at all times, and guides will be revised, as  
(202)275-2171.


appropriate, to accommodate comments and to reflect new informa- tion or experience.
appropriate, to accommodate comments and to reflect new informa- tion or experience.


Issued guides may also be purchased from the National Technical Written comments may be submitted to the Rules and Procedures           Information Service on a standing order basis. Details on this Branch,   DRR, ADM,       U.S.   Nuclear   Regulatory Commission,     service may be obtained by writing NTIS, 5285 Port Royal Road, Washington, DC 20555.                                                   Springfield, VA 22161.
Issued guides may also be purchased from the National Technical Written comments may be submitted to the Rules and Procedures Information Service on a standing order basis. Details on this Branch, DRR,  
ADM,  
U.S.
 
Nuclear Regulatory Commission, service may be obtained by writing NTIS, 5285 Port Royal Road, Washington, DC 20555.
 
Springfield, VA 22161.


==C. REGULATORY POSITION==
==C. REGULATORY POSITION==
Except in those cases in which the applicant or licensee proposes an acceptable alternative method for complying When used in conjunction with Regulatory Guide 1.89,           with specified portions of the Commission's regulations, the
When used in conjunction with Regulatory Guide 1.89,
"Environmental Qualification of Certain Electric Equip-           methods described herein will be used in the evaluation of ment Important to Safety for Nuclear Power Plants," the           the qualification of connection assemblies, within the scope procedures described by IEEE Std 572-1985 are acceptable           of this guide, for nuclear power plants as follows:
"Environmental Qualification of Certain Electric Equip- ment Important to Safety for Nuclear Power Plants," the procedures described by IEEE Std 572-1985 are acceptable to the NRC staff for satisfying the Commission's regula- tions pertaining to the environmental qualification of quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for service in nuclear power plants to ensure that the connec- tion assemblies can perform their safety functions.
to the NRC staff for satisfying the Commission's regula- tions pertaining to the environmental qualification of                 1. Plants for which the construction permit is issued quick-disconnect connection assemblies and environmental                 after November 30, 1987, seals in combination with cables or wires as assemblies for service in nuclear power plants to ensure that the connec- tion assemblies can perform their safety functions.                   2. Plants for which the operating license application is docketed 6 months or more after November 30,


==D. IMPLEMENTATION==
==D. IMPLEMENTATION==
1987, The purpose of this section is to provide information to applicants and licensees regarding the NRC staff's plans for         3. Plants for which the applicant or licensee voluntarily using this regulatory guide.                                              commits to the provisions of this guide.
The purpose of this section is to provide information to applicants and licensees regarding the NRC staff's plans for using this regulatory guide.
 
Except in those cases in which the applicant or licensee proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the methods described herein will be used in the evaluation of the qualification of connection assemblies, within the scope of this guide, for nuclear power plants as follows:
1. Plants for which the construction permit is issued after November 30, 1987,
2. Plants for which the operating license application is docketed
6 months or more after November 30,
1987,
3. Plants for which the applicant or licensee voluntarily commits to the provisions of this guide.


1.156-2
1.156-2


VALUE/IMPACT STATEMENT
VALUE/IMPACT STATEMENT
BACKGROUND                                                           VALUE/IMPACT ASSESSMENT
BACKGROUND
  Heretofore, no guidance specific to the qualification of           Value connection assemblies has been published by NRC.* In September 1985, IEEE issued IEEE Std 572-1985,                           The standard endorsed by this regulatory guide represents
VALUE/IMPACT ASSESSMENT
"Qualification of Class 1E Connection Assemblies for                 a national consensus on qualification methods to ensure the Nuclear Power Generating Stations," which provides                    reliability and function of connection assemblies used in specific guidance for the qualification of connection                nuclear power plants. It provides a standardized approach so assemblies for use in nuclear power plants. This regulatory          that industry and the NRC staff may have common under- guide endorses IEEE Std 572-1985 without exceptions.                  standing on connection assembly qualification and testing procedures, thus minimizing related engineering costs by the applicant and review costs for the staff.
Heretofore, no guidance specific to the qualification of connection assemblies has been published by NRC.*  
In September  
1985, IEEE issued IEEE  
Std  
572-1985,
"Qualification of Class 1E Connection Assemblies for Nuclear Power Generating Stations,"
which provides specific guidance for the qualification of connection assemblies for use in nuclear power plants. This regulatory guide endorses IEEE Std 572-1985 without exceptions.
 
This regulatory guide was issued for public comment in May 1987 as Task EE 404-4. No comments were received from the public, therefore, the guide is being issued with no changes as Regulatory Guide 1.156.
 
*Regulatory Guide 1.131, "Qualification Tests of Electric Cables, Field Splices, and Connections for Light-Water-Cooled Nuclear Power Plants,"
was issued for public comment in August
1977 but not published following public comment.
 
Value The standard endorsed by this regulatory guide represents a national consensus on qualification methods to ensure the reliability and function of connection assemblies used in nuclear power plants. It provides a standardized approach so that industry and the NRC staff may have common under- standing on connection assembly qualification and testing procedures, thus minimizing related engineering costs by the applicant and review costs for the staff.


This regulatory guide was issued for public comment in May 1987 as Task EE 404-4. No comments were received                  Impact from the public, therefore, the guide is being issued with no changes as Regulatory Guide 1.156.                                        This regulatory guide does not impose any new ,osts or obligations on licensees or applicants. Thus, no adverse impact
Impact This regulatory guide does not impose any new ,osts or obligations on licensees or applicants. Thus, no adverse impact will result from the issuance of this guide. The guidance was developed through the national consensus standards process and reflects current NRC and industry practice.
      *Regulatory Guide 1.131, "Qualification Tests of Electric      will result from the issuance of this guide. The guidance was Cables, Field Splices, and Connections for Light-Water-Cooled Nuclear Power Plants," was issued for public comment in August        developed through the national consensus standards process
1977 but not published following public comment.                      and reflects current NRC and industry practice.


.U.S. G.F.O. 1987-202-29-2:602?8
.U.S. G.F.O. 1987-202-29-2:602?8
                                                              1.156-3
1.156-3


UNITED STATES                             FIRST CLASS MAIL
UNITED STATES
NUCLEAR REGULATORY COMMISSION                     POSTAGE Et FEES PAID
NUCLEAR REGULATORY COMMISSION
                                                          USNRC
WASHINGTON, D.C. 20555 OFFICIAL BUSINESS
    WASHINGTON, D.C. 20555 PERMIT No. G-67 OFFICIAL BUSINESS
PENALTY FOR PRIVATE USE, $300
    PENALTY FOR PRIVATE USE, $300
FIRST CLASS MAIL
                                  1
POSTAGE Et FEES PAID
                                    ~VCS
USNRC
                                          oc ý -ý}}
PERMIT No. G-67
1
~VCS
oc  
ý -ý}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 11:19, 11 January 2025

Environmental Qualification of Connection Assemblies for Nuclear Power Plants
ML13038A426
Person / Time
Issue date: 11/30/1987
From:
Office of Nuclear Regulatory Research
To:
References
Task EE 404-4 RG-1.156
Download: ML13038A426 (4)


,- tRRE(;(,

U.S. NUCLEAR REGULATORY COMMISSION

November 1987 REGULATORY GUIDE

lop OFFICE OF NUCLEAR REGULATORY RESEARCH

REGULATORY GUIDE 1.156 (Task EE 4044)

ENVIRONMENTAL QUALIFICATION OF CONNECTION ASSEMBLIES

FOR NUCLEAR POWER PLANTS

A. INTRODUCTION

Criterion 1II, "Design Control," of Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants,"

to

10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities," requires, among other things, that, where a test program is used to verify the adequacy of specific design features, it include suitable qualification testing of a prototype unit under the most adverse design conditions.

Section 50.49, "Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants,"

of 10 CFR Part 50 requires that certain electric equipment important to safety be qualified for its application and specified performance. Section 50.49 also states require- ments for establishing environmental qualification methods

.nd qualification parameters.

This regulatory guide describes a method acceptable to the NRC staff for complying with the Commission's regula- tions with regard to the environmental qualification of quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for service in nuclear power plants. The environmental qualifica- tion is to ensure that connection assemblies can perform their safety functions during and after a design basis event.

The Advisory Committee on Reactor Safeguards has been consulted concerning this guide and has concurred in the regulatory position.

Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 50, which provides the regulatory basis for this guide.

The information collection requirements in 10 CFR Part 50

have been cleared under OMB Clearance No. 3150-0011.

B. DISCUSSION

IEEE Std 572-1985, "Qualification of Class I E Connec- tion Assemblies for Nuclear Power Generating Stations,"*

published in September 1985, was prepared by Subcom- mittee 2, "Qualification," of the Nuclear Power Engineering Committee of the Institute of Electrical and Electronics Engineers (IEEE) and was approved by the IEEE Standards Board on December 13, 1984 (and amended on September

25, 1987). This standard describes basic procedures for qualifying connection assemblies (for example, quick- disconnect connection assemblies and environmental seals in combination with cables as assemblies).

Guidance on seismic qualification for this equipment is suggested in Regulatory Guide 1.100, "Seismic Qualifica- tion of Electric and Mechanical Equipment for Nuclear Power Plants" (Proposed Revision 2, Task EE 108-5).

Section 50.49 of 10 CFR Part 50 defines three categories of electric equipment that are required to be environmentally qualified: (1) safety-related equipment, (2) nonsafety-related equipment whose failure could adversely affect safety-related equipment, and

(3) certain post-accident monitoring equipment. This regulatory guide provides an acceptable method of qualifying quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for all three categories of equipment.

IEEE Std 572-1985 contains references to other national standards.

Those standards that are referenced but not endorsed by NRC are expected to be used in a manner consistent with regulatory practice.

  • Copies may be purchased from the Institute of Electrical and Electronics Engineers Service Center,445 Hoes Lane, P.O. Box 1331, Piscataway, NJ 08855.

USNRC

REGULATORY GUIDES

The guides are issued in the following ten broad divisions:

Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing

1. Power Reactors

6. Products specific parts of the Commission's regulations, to delineate tech-

2. Research and Test Reactors

7. Transportation niques used by the staff in evaluating specific problems or postu-

3. Fuels and MaterialslFacilities

8. Occupational Health lated accidents, or to provide guidance to applicant

s. Regulatory

4. Environmental and Siting

9. Antitrust and Financial Review Guides are not substitutes for regulations, and compliance with

5. Materials and Plant Protection 10. General them is not required. Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the Issuance or continuance of a permit or Copies of issued guides may be purchased from the Government license by the Commission.

Printing Office at the current GPO price. Information on current GPO prices may be obtained by contacting the Superintendent of This guide was issued after consideration of comments received from Documents, U.S. Government Printing Office, Post Office Box the public. Comments and suggestions for improvements in these

37082, Washington, DC 20013-7082, telephone (202)275-2060 or guides are encouraged at all times, and guides will be revised, as

(202)275-2171.

appropriate, to accommodate comments and to reflect new informa- tion or experience.

Issued guides may also be purchased from the National Technical Written comments may be submitted to the Rules and Procedures Information Service on a standing order basis. Details on this Branch, DRR,

ADM,

U.S.

Nuclear Regulatory Commission, service may be obtained by writing NTIS, 5285 Port Royal Road, Washington, DC 20555.

Springfield, VA 22161.

C. REGULATORY POSITION

When used in conjunction with Regulatory Guide 1.89,

"Environmental Qualification of Certain Electric Equip- ment Important to Safety for Nuclear Power Plants," the procedures described by IEEE Std 572-1985 are acceptable to the NRC staff for satisfying the Commission's regula- tions pertaining to the environmental qualification of quick-disconnect connection assemblies and environmental seals in combination with cables or wires as assemblies for service in nuclear power plants to ensure that the connec- tion assemblies can perform their safety functions.

D. IMPLEMENTATION

The purpose of this section is to provide information to applicants and licensees regarding the NRC staff's plans for using this regulatory guide.

Except in those cases in which the applicant or licensee proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the methods described herein will be used in the evaluation of the qualification of connection assemblies, within the scope of this guide, for nuclear power plants as follows:

1. Plants for which the construction permit is issued after November 30, 1987,

2. Plants for which the operating license application is docketed

6 months or more after November 30,

1987,

3. Plants for which the applicant or licensee voluntarily commits to the provisions of this guide.

1.156-2

VALUE/IMPACT STATEMENT

BACKGROUND

VALUE/IMPACT ASSESSMENT

Heretofore, no guidance specific to the qualification of connection assemblies has been published by NRC.*

In September

1985, IEEE issued IEEE Std 572-1985,

"Qualification of Class 1E Connection Assemblies for Nuclear Power Generating Stations,"

which provides specific guidance for the qualification of connection assemblies for use in nuclear power plants. This regulatory guide endorses IEEE Std 572-1985 without exceptions.

This regulatory guide was issued for public comment in May 1987 as Task EE 404-4. No comments were received from the public, therefore, the guide is being issued with no changes as Regulatory Guide 1.156.

  • Regulatory Guide 1.131, "Qualification Tests of Electric Cables, Field Splices, and Connections for Light-Water-Cooled Nuclear Power Plants,"

was issued for public comment in August

1977 but not published following public comment.

Value The standard endorsed by this regulatory guide represents a national consensus on qualification methods to ensure the reliability and function of connection assemblies used in nuclear power plants. It provides a standardized approach so that industry and the NRC staff may have common under- standing on connection assembly qualification and testing procedures, thus minimizing related engineering costs by the applicant and review costs for the staff.

Impact This regulatory guide does not impose any new ,osts or obligations on licensees or applicants. Thus, no adverse impact will result from the issuance of this guide. The guidance was developed through the national consensus standards process and reflects current NRC and industry practice.

.U.S. G.F.O. 1987-202-29-2:602?8

1.156-3

UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D.C. 20555 OFFICIAL BUSINESS

PENALTY FOR PRIVATE USE, $300

FIRST CLASS MAIL

POSTAGE Et FEES PAID

USNRC

PERMIT No. G-67

1

~VCS

oc

ý -ý