{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
                                                  UNITED STATES
                                      NUCLEAR REGULATORY COMMISSION
UNITED STATES  
                                                      REGION II
NUCLEAR REGULATORY COMMISSION  
                                    245 PEACHTREE CENTER AVENUE NE, SUITE 1200
REGION II  
                                            ATLANTA, GEORGIA 30303-1257
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                                  April 24, 2013
ATLANTA, GEORGIA 30303-1257  
      Mr. T. A. Lynch
      Vice President
Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this
      Southern Nuclear Operating Company, Inc.
transmittal document is decontrolled
      Joseph M. Farley Nuclear Plant
      P.O. Drawer 470, BIN B500
LIMITED INTERNAL
      Ashford, AL 36312
DISTRIBUTION PERMITTED
      SUBJECT:       JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER
                      SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
                      INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND
                      05000364/2013404)
April 24, 2013  
      Dear Mr. Lynch:
      The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Mr. T. A. Lynch  
      Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements
Vice President  
      specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26,
Southern Nuclear Operating Company, Inc.  
      2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII
Joseph M. Farley Nuclear Plant  
      office. The team will be composed of personnel from the NRC RII office and personnel from the
P.O. Drawer 470, BIN B500  
      NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be
Ashford, AL 36312  
      conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of
      Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed
SUBJECT:
      to evaluate and verify your ability to meet the interim milestone requirements of the NRCs
JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER  
      Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,
SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR  
      Protection of Digital Computer and Communication Systems and Networks.
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
      In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit
05000364/2013404)  
      a proposed cyber security plan (CSP) and implementation schedule for NRC review and
      approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute
Dear Mr. Lynch:  
      (NEI), the NRC provided their expectations for the proposed implementation schedule. On
      January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
      Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements  
      letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security
specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26,  
      Plan Implementation Schedule. The purpose of the letters attachment was to provide the
2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII  
      licensee with a generically written template to develop their proposed CSP implementation
office. The team will be composed of personnel from the NRC RII office and personnel from the  
      schedule. Utilization of the generic template required the licensee to make conforming changes
NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be  
      to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,
conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of  
      implementation schedule, and other applicable information for your facility provided the
Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed  
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this
to evaluate and verify your ability to meet the interim milestone requirements of the NRCs  
transmittal document is decontrolled
Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,  
LIMITED INTERNAL
Protection of Digital Computer and Communication Systems and Networks.  
DISTRIBUTION PERMITTED
In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit  
                  OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
a proposed cyber security plan (CSP) and implementation schedule for NRC review and  
approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute  
(NEI), the NRC provided their expectations for the proposed implementation schedule. On  
January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the  
Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by  
letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security  
Plan Implementation Schedule. The purpose of the letters attachment was to provide the  
licensee with a generically written template to develop their proposed CSP implementation  
schedule. Utilization of the generic template required the licensee to make conforming changes  
to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,  
implementation schedule, and other applicable information for your facility provided the  


                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
T. Lynch                                       2
T. Lynch  
implementation aspects, including the key intermediate milestone attributes and dates as well
2  
as the full implementation dates. The implementation aspects were described based in part on
letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
28, 2011 (ML11088021) and April 21, 2011 (ML111020258). By reference to NRC safety
implementation aspects, including the key intermediate milestone attributes and dates as well  
evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for
as the full implementation dates. The implementation aspects were described based in part on  
facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP
letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March  
would be implemented and maintained consistent with NRC requirements.
28, 2011 (ML11088021) and April 21, 2011 (ML111020258). By reference to NRC safety  
On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,
evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for  
NRC RII, our respective staffs confirmed arrangements for a three day information gathering
facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP  
onsite visit and a one-week onsite inspection. The subject TI inspection provides a
would be implemented and maintained consistent with NRC requirements.  
programmatic level review and verification of the licensees site-specific implementation of
Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for the Interim
Milestones 1 through 7 is as follows:
On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,  
    *   Information gathering visit: July 9 - 11, 2013
NRC RII, our respective staffs confirmed arrangements for a three day information gathering  
    *   Onsite inspection: July 22 - 26, 2013
onsite visit and a one-week onsite inspection. The subject TI inspection provides a  
The purpose of the information gathering visit is to: (1) obtain information and documentation
programmatic level review and verification of the licensees site-specific implementation of  
needed to support the TI inspection; (2) become familiar with the Farley Nuclear Plant Cyber
Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for the Interim  
Security Program and plant layout; and (3) arrange administrative details, such as office space,
Milestones 1 through 7 is as follows:
availability of knowledgeable office personnel and to ensure unescorted site access privileges.
In order to assure a productive TI inspection, we have enclosed a request for documents
*  
needed to ensure the inspectors are adequately prepared. These documents have been
Information gathering visit: July 9 - 11, 2013
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in
*  
planning for the TI inspection prior to the information gathering visit. It is requested that this
Onsite inspection: July 22 - 26, 2013  
information be provided to the lead inspector via mail no later than June 12, 2013. Group II lists
information and possible areas for discussion necessary to assist the inspectors during the
The purpose of the information gathering visit is to: (1) obtain information and documentation  
TI inspection. It is requested this information be available during the information gathering visit
needed to support the TI inspection; (2) become familiar with the Farley Nuclear Plant Cyber  
(July 9, 2013). Group III consists of those items that the inspectors will review, or need access
Security Program and plant layout; and (3) arrange administrative details, such as office space,  
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors
availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
in tracking questions and answers identified as a result of the TI inspection. It is requested that
this information be provided to the lead inspector as the information is generated during the
In order to assure a productive TI inspection, we have enclosed a request for documents  
TI inspection. It is important that all of these documents are up to date and complete in order to
needed to ensure the inspectors are adequately prepared. These documents have been  
minimize the number of additional documents requested during the preparation and/or the
divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in  
onsite portions of the TI inspection.
planning for the TI inspection prior to the information gathering visit. It is requested that this  
This letter does not contain new or amended information collection requirements subject to the
information be provided to the lead inspector via mail no later than June 12, 2013. Group II lists  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
information and possible areas for discussion necessary to assist the inspectors during the  
TI inspection. It is requested this information be available during the information gathering visit  
(July 9, 2013). Group III consists of those items that the inspectors will review, or need access  
to, during the TI inspection. Group III also lists the information necessary to aid the inspectors  
in tracking questions and answers identified as a result of the TI inspection. It is requested that  
this information be provided to the lead inspector as the information is generated during the  
TI inspection. It is important that all of these documents are up to date and complete in order to  
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the TI inspection.  
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, control number 3150-
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget control number.
displays a currently valid Office of Management and Budget control number.  
Your cooperation and support during this inspection will be appreciated. If you have questions
concerning this inspection, or the inspection team's information or logistical needs, please
Your cooperation and support during this inspection will be appreciated. If you have questions  
concerning this inspection, or the inspection team's information or logistical needs, please  
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.
                  OFFICIAL USE ONLY - SECURITY RELATED INFORMATION


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
T. Lynch                                       3
T. Lynch  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
3  
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
Public Electronic Reading Room). However, because of the security-related concerns
available electronically for public inspection in the NRC Public Document Room or from the  
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
Publicly Available Records (PARS) component of NRC's document system, ADAMS.  
enclosure will not be available for public inspection.
                                                Sincerely,
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the  
                                                /RA/
Public Electronic Reading Room). However, because of the security-related concerns  
                                                Michael F. King, Chief
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters  
                                                Engineering Branch 2
enclosure will not be available for public inspection.
                                                Division of Reactor Safety
Docket No.: 50-348, 50-364
Sincerely,  
License No.: NPF-2, NPF-8
Enclosure:
Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7
Inspection
(OFFICIAL USE ONLY)
cc: (See page 4)
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
/RA/  
Michael F. King, Chief  
Engineering Branch 2  
Division of Reactor Safety
Docket No.: 50-348, 50-364  
License No.: NPF-2, NPF-8  
Enclosure:  
Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7  
Inspection
(OFFICIAL USE ONLY)  
cc: (See page 4)  




_________________________             G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
_________________________  
OFFICE           RII:DRS       RII:DRS
SIGNATURE         RA             RA
G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED  
NAME             PATEL         KING
OFFICE  
DATE                 4/24/2013     4/ 24/2013   4/ /2013       4/ /2013     4/ /2013       4/ /2013   4/ /2013
RII:DRS  
E-MAIL COPY?       YES    NO   YES       NO  YES   NO     YES   NO    YES     NO     YES   NO  YES   NO
RII:DRS  
       
              OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
T. Lynch                                4
cc:
Keith Wooten
Project Manager
SIGNATURE  
Nuclear Fleet Security
RA  
Southern Nuclear Operating Company, Inc.
RA  
40 Iverness Center Parkway
Birmingham, AL 35242
David Burford
Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
NAME  
40 Iverness Center Parkway
PATEL  
Birmingham, AL 35242
KING  
L. B. Hogg
Nuclear Licensing
Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway
Birmingham, AL 35242
S. P. McGavin
DATE  
Security Manager
4/24/2013  
Joseph M. Farley Nuclear Plant
4/ 24/2013  
7388 North State Highway 95
4/   /2013  
Columbia, AL 36319
4/   /2013  
              OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
4/   /2013  
4/   /2013  
4/   /2013  
E-MAIL COPY?  
    YES  
NO      
  YES
NO      YES  
NO    
  YES  
NO     
  YES  
NO       YES  
NO    
   YES  
NO    


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
                                                5
T. Lynch
Letter to T. A. Lynch from Michael F. King dated April 24, 2013
4
SUBJECT:       JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER
                SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
                INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND
cc:
                05000364/2013404)
Keith Wooten
Distribution:
Project Manager
RidsNrrPMFarley Resource
Nuclear Fleet Security
B. Westreich, NSIR (hard copy w/ encl)
Southern Nuclear Operating Company, Inc.
RIDSNRRDIRS
40 Iverness Center Parkway
Distribution W/O OUO:
Birmingham, AL  35242
David Burford
Manager
Nuclear Fleet Security
Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway
Birmingham, AL  35242
L. B. Hogg
Nuclear Licensing
Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway
Birmingham, AL  35242
S. P. McGavin
Security Manager
Joseph M. Farley Nuclear Plant
7388 North State Highway 95
Columbia, AL  36319
 
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
5  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
Letter to T. A. Lynch from Michael F. King dated April 24, 2013  
SUBJECT:
JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER  
SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR  
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
05000364/2013404)  
Distribution:  
RidsNrrPMFarley Resource  
B. Westreich, NSIR (hard copy w/ encl)  
RIDSNRRDIRS  
Distribution W/O OUO:  
PUBLIC
PUBLIC
                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
}}
}}

Latest revision as of 09:12, 11 January 2025

Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000348/2013404 and 05000364/2013404) (OUO Removed)
ML13120A191
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/24/2013
From: Mark King
NRC/RGN-II/DRS/EB2
To: Lynch T
Southern Nuclear Operating Co
References
IR-13-404
Download: ML13120A191 (6)


See also: IR 05000348/2013404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

April 24, 2013

Mr. T. A. Lynch

Vice President

Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant

P.O. Drawer 470, BIN B500

Ashford, AL 36312

SUBJECT:

JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND

05000364/2013404)

Dear Mr. Lynch:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26,

2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII

office. The team will be composed of personnel from the NRC RII office and personnel from the

NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be

conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of

Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed

to evaluate and verify your ability to meet the interim milestone requirements of the NRCs

Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks.

In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit

a proposed cyber security plan (CSP) and implementation schedule for NRC review and

approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute

(NEI), the NRC provided their expectations for the proposed implementation schedule. On

January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the

Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by

letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security

Plan Implementation Schedule. The purpose of the letters attachment was to provide the

licensee with a generically written template to develop their proposed CSP implementation

schedule. Utilization of the generic template required the licensee to make conforming changes

to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,

implementation schedule, and other applicable information for your facility provided the

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

2

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

implementation aspects, including the key intermediate milestone attributes and dates as well

as the full implementation dates. The implementation aspects were described based in part on

letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March

28, 2011 (ML11088021) and April 21, 2011 (ML111020258). By reference to NRC safety

evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for

facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP

would be implemented and maintained consistent with NRC requirements.

On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,

NRC RII, our respective staffs confirmed arrangements for a three day information gathering

onsite visit and a one-week onsite inspection. The subject TI inspection provides a

programmatic level review and verification of the licensees site-specific implementation of

Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for the Interim

Milestones 1 through 7 is as follows:

Information gathering visit: July 9 - 11, 2013

Onsite inspection: July 22 - 26, 2013

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Farley Nuclear Plant Cyber

Security Program and plant layout; and (3) arrange administrative details, such as office space,

availability of knowledgeable office personnel and to ensure unescorted site access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than June 12, 2013. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the

TI inspection. It is requested this information be available during the information gathering visit

(July 9, 2013). Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

TI inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

3

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-348, 50-364

License No.: NPF-2, NPF-8

Enclosure:

Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7

Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

_________________________

G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RA

RA

NAME

PATEL

KING

DATE

4/24/2013

4/ 24/2013

4/ /2013

4/ /2013

4/ /2013

4/ /2013

4/ /2013

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

4

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

cc:

Keith Wooten

Project Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

David Burford

Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

L. B. Hogg

Nuclear Licensing

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

Birmingham, AL 35242

S. P. McGavin

Security Manager

Joseph M. Farley Nuclear Plant

7388 North State Highway 95

Columbia, AL 36319

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

5

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to T. A. Lynch from Michael F. King dated April 24, 2013

SUBJECT:

JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND

05000364/2013404)

Distribution:

RidsNrrPMFarley Resource

B. Westreich, NSIR (hard copy w/ encl)

RIDSNRRDIRS

Distribution W/O OUO:

PUBLIC