{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106 | ||
==SUBJECT:== | ==SUBJECT:== | ||
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006) | MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006) | ||
==Dear Mr. Weber:== | ==Dear Mr. Weber:== | ||
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | ||
The enclosed inspection plan lists the inspections scheduled through December 31, 2014. | The enclosed inspection plan lists the inspections scheduled through December 31, 2014. | ||
Routine inspections performed by resident inspectors are not included in the inspection plan. | Routine inspections performed by resident inspectors are not included in the inspection plan. | ||
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. | ||
In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI) | |||
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled. | TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan. | Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | ||
==Enclosure:== | ==Enclosure:== | ||
D.C. Cook Inspection/Activity Plan cc w/encl: | D.C. Cook Inspection/Activity Plan cc w/encl: | ||
Distribution via ListServTM | |||
In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI) | |||
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled. | TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan. | Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
/RA/ | |||
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | ||
==Enclosure:== | ==Enclosure:== | ||
D.C. Cook Inspection/Activity Plan cc w/encl: | D.C. Cook Inspection/Activity Plan cc w/encl: | ||
See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available | Distribution via ListServTM DISTRIBUTION: | ||
See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME JBenjamin:rj DATE 08/29/13 OFFICIAL RECORD COPY | |||
Letter to L. Weber from J. Benjamin dated September 3, 2013 | Letter to L. Weber from J. Benjamin dated September 3, 2013 | ||
==SUBJECT:== | ==SUBJECT:== | ||
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006) | MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006) | ||
DISTRIBUTION: | DISTRIBUTION: | ||
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov | Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov | ||
Page 1 of 2 | Page 1 of 2 08/23/2013 13:54:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI PI&R | ||
- BIENNIAL PI&R INSPECTION 5 | |||
1, 2 IP Problem Identification and Resolution 71152B 08/26/2013 09/13/2013 BI ISI | |||
- INSERVICE INSPECTION - UNIT 2 4 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/25/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/07/2013 10/11/2013 1 | |||
IP Occupational ALARA Planning and Controls 71124.02 10/07/2013 10/11/2013 TI 182 | |||
- BURIED PIPING TI 182 1 | |||
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 12/02/2013 12/06/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radiation Monitoring Instrumentation 71124.05 12/09/2013 12/13/2013 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/06/2014 01/10/2014 BI OLRQ | |||
- BIENNIAL REQUAL PROGRAM INSPECTION 2 | |||
1, 2 IP Licensed Operator Requalification Program 7111111B 02/10/2014 02/14/2014 BI MODS | |||
- MODIFICATIONS/50.59 INSPECTION 3 | |||
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 03/03/2014 03/21/2014 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radiation Monitoring Instrumentation 71124.05 03/17/2014 03/21/2014 RENEWAL | |||
- LICENSE RENEWAL U1 6 | |||
1 IP Post-Approval Site Inspection for License Renewal 71003 04/28/2014 05/16/2014 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/05/2014 05/09/2014 BI EPR | |||
- EP ROUTINE INSPECTION / PI VERIFICATION 2 | |||
1 IP Alert and Notification System Testing 7111402 06/23/2014 06/27/2014 1 | |||
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/23/2014 06/27/2014 1 | |||
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/23/2014 06/27/2014 1 | |||
IP Performance Indicator Verification 71151 06/23/2014 06/27/2014 OL PREP | |||
- INITIAL EXAM - 08/2014 3 | |||
1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 06/30/2014 07/03/2014 OL EXAM | |||
- INIT EXAM FOR 07/2014 5 | |||
1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 07/21/2014 08/01/2014 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Page 2 of 2 | Page 2 of 2 08/23/2013 13:54:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI ISI | ||
- INSERVICE INSPECTION - UNIT 1 4 | |||
2 IP Inservice Inspection Activities - PWR 7111108P 09/30/2014 10/24/2014 BI RP | |||
- RADIATION PROTECTION BASELINE INSPECTION 1 | |||
1 IP Radiological Environmental Monitoring Program 71124.07 11/03/2014 11/07/2014 1 | |||
IP Reactor Coolant System Activity 71151-BI01 11/03/2014 11/07/2014 1 | |||
IP Occupational Exposure Control Effectiveness 71151-OR01 11/03/2014 11/07/2014 1 | |||
IP RETS/ODCM Radiological Effluent 71151-PR01 11/03/2014 11/07/2014 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} | ||
Latest revision as of 05:48, 11 January 2025
| ML13246A227 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/03/2013 |
| From: | Jamie Benjamin Division Reactor Projects III |
| To: | Weber L Indiana Michigan Power Co, Nuclear Generation Group |
| References | |
| IR-13-006 | |
| Download: ML13246A227 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 3, 2013 Mr. Larry Weber Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)
Dear Mr. Weber:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of D.C. Cook Nuclear Power Plant, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at D.C. Cook Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
Distribution via ListServTM
In addition to the ROP baseline inspections, inspections are planned for Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal and Temporary Instruction (TI)
TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. In addition, team inspections involving IP 71152B, Biennial Problem Identification and Resolution, IP 71111.11B, Licensed Operator Requalification Program and Licensed Operator Performance, and IP 71111.17T, Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications are scheduled.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Jamie C. Benjamin, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
D.C. Cook Inspection/Activity Plan cc w/encl:
Distribution via ListServTM DISTRIBUTION:
See next page DOCUMENT NAME: DCCOOK MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-DRP E RIII-DRP RIII RIII NAME JBenjamin:rj DATE 08/29/13 OFFICIAL RECORD COPY
Letter to L. Weber from J. Benjamin dated September 3, 2013
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000315/2013006 AND 05000316/2013006)
DISTRIBUTION:
Vivian Campbell RidsNrrDorlLpl3-1 Resource RidsNrrPMDCCook Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
Page 1 of 2 08/23/2013 13:54:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI PI&R
- BIENNIAL PI&R INSPECTION 5
1, 2 IP Problem Identification and Resolution 71152B 08/26/2013 09/13/2013 BI ISI
- INSERVICE INSPECTION - UNIT 2 4
2 IP Inservice Inspection Activities - PWR 7111108P 10/07/2013 10/25/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/07/2013 10/11/2013 1
IP Occupational ALARA Planning and Controls 71124.02 10/07/2013 10/11/2013 TI 182
- BURIED PIPING TI 182 1
1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 12/02/2013 12/06/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiation Monitoring Instrumentation 71124.05 12/09/2013 12/13/2013 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/06/2014 01/10/2014 BI OLRQ
- BIENNIAL REQUAL PROGRAM INSPECTION 2
1, 2 IP Licensed Operator Requalification Program 7111111B 02/10/2014 02/14/2014 BI MODS
- MODIFICATIONS/50.59 INSPECTION 3
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 03/03/2014 03/21/2014 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiation Monitoring Instrumentation 71124.05 03/17/2014 03/21/2014 RENEWAL
- LICENSE RENEWAL U1 6
1 IP Post-Approval Site Inspection for License Renewal 71003 04/28/2014 05/16/2014 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 05/05/2014 05/09/2014 BI EPR
- EP ROUTINE INSPECTION / PI VERIFICATION 2
1 IP Alert and Notification System Testing 7111402 06/23/2014 06/27/2014 1
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/23/2014 06/27/2014 1
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/23/2014 06/27/2014 1
IP Performance Indicator Verification 71151 06/23/2014 06/27/2014 OL PREP
- INITIAL EXAM - 08/2014 3
1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 06/30/2014 07/03/2014 OL EXAM
- INIT EXAM FOR 07/2014 5
1 OL - INITIAL EXAM - 2014 APR/DEC - COOK W90305 07/21/2014 08/01/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/23/2013 13:54:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site D.C. Cook Inspection / Activity Plan 09/01/2013 - 12/31/2014 BI ISI
- INSERVICE INSPECTION - UNIT 1 4
2 IP Inservice Inspection Activities - PWR 7111108P 09/30/2014 10/24/2014 BI RP
- RADIATION PROTECTION BASELINE INSPECTION 1
1 IP Radiological Environmental Monitoring Program 71124.07 11/03/2014 11/07/2014 1
IP Reactor Coolant System Activity 71151-BI01 11/03/2014 11/07/2014 1
IP Occupational Exposure Control Effectiveness 71151-OR01 11/03/2014 11/07/2014 1
IP RETS/ODCM Radiological Effluent 71151-PR01 11/03/2014 11/07/2014 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.