ML19276E087: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 6: | Line 6: | ||
| number = ML19276E088 | | number = ML19276E088 | ||
| issue date = 02/23/1979 | | issue date = 02/23/1979 | ||
| title = | | title = LER 79-007/03L-0 on 790212:during Tests,Valves AO-5033A, CV-5065-10,15,16 & 17 Failed to Close within Specified Tolerance.Cause Undetermined,But Was Not Alignment Problem. Surveillance Increased from Quarterly to Monthly | ||
| author name = Fulton J | | author name = Fulton J | ||
| author affiliation = BOSTON EDISON CO. | | author affiliation = BOSTON EDISON CO. | ||
Latest revision as of 06:13, 23 January 2020
| Date released: 10/17/2019 | Download: ML19276E087 |
|---|---|
| ML19276E088 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/23/1979 |
| From: | Fulton J BOSTON EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML19276E088 (1) | |
| ML19276E085 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/23/1979 |
| From: | Mcguire P BOSTON EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| Download: ML19276E085 (1) | |