{{#Wiki_filter:une 18, 2018
{{#Wiki_filter:June 18, 2018


==SUBJECT:==
==SUBJECT:==
Line 44: Line 44:


Sincerely,
Sincerely,
/RA/
/RA/  
Kriss M. Kennedy Regional Administrator Docket Nos. 50-313; 50-368 License Nos. DPR-51; NPF-6 Enclosure:
 
Kriss M. Kennedy Regional Administrator  
 
Docket Nos.
 
50-313; 50-368 License Nos. DPR-51; NPF-6  
 
Enclosure:
Inspection Report 05000313/2018013 and 05000368/2018013 w/ Attachments:
Inspection Report 05000313/2018013 and 05000368/2018013 w/ Attachments:
1. List of Confirmatory Action Letter Items Closed and Discussed 2. List of Documents Reviewed 3. Confirmatory Action Letter Item Status
1. List of Confirmatory Action Letter Items Closed and Discussed 2. List of Documents Reviewed 3. Confirmatory Action Letter Item Status  


U.S. NUCLEAR REGULATORY COMMISSION
Enclosure U.S. NUCLEAR REGULATORY COMMISSION  


==Inspection Report==
==Inspection Report==
Docket Number(s): 05000313, 05000368 License Number(s): DPR-51, NPF-6 Report Number(s): 05000313/2018013, 05000368/2018013 Enterprise Identifier: I-2018-013-0003 Licensee: Entergy Operations, Inc.
Docket Number(s):
05000313, 05000368  
 
License Number(s):
DPR-51, NPF-6  
 
Report Number(s):
05000313/2018013, 05000368/2018013  
 
Enterprise Identifier: I-2018-013-0003  
 
Licensee:
Entergy Operations, Inc.  
 
Facility:
Arkansas Nuclear One, Units 1 and 2


Facility: Arkansas Nuclear One, Units 1 and 2 Location: Russellville, Arkansas Inspection Dates: April 2, 2018 to May 31, 2018 Inspectors: J. Dixon, Senior Project Engineer, (Team Leader)
Location:
E. Duncan, Region III, Branch Chief M. Keefe-Forsyth, Office of Nuclear Reactor Regulation, Safety Culture Specialist M. Tobin, Resident Inspector D. Willis, Office of Enforcement, Allegation Team Leader Approved By: N. OKeefe Branch Chief Division of Reactor Projects Enclosure
Russellville, Arkansas  
 
Inspection Dates:
April 2, 2018 to May 31, 2018  
 
Inspectors:
J. Dixon, Senior Project Engineer, (Team Leader)
E. Duncan, Region III, Branch Chief
M. Keefe-Forsyth, Office of Nuclear Reactor Regulation, Safety Culture
Specialist
M. Tobin, Resident Inspector
D. Willis, Office of Enforcement, Allegation Team Leader  
 
Approved By:
N. OKeefe
Branch Chief
Division of Reactor Projects  


=SUMMARY=
=SUMMARY=
IR 05000313/2018013; 05000368/2018013; 4/2/2018 - 5/31/2018; Arkansas Nuclear One,
IR 05000313/2018013; 05000368/2018013; 4/2/2018 - 5/31/2018; Arkansas Nuclear One,  


Units 1 and 2; Confirmatory Action Letter (CAL) Follow-up Inspection (IP 92702).
Units 1 and 2; Confirmatory Action Letter (CAL) Follow-up Inspection (IP 92702).
Line 126: Line 164:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==
{{a|4OA5}}
{{a|4OA5}}
==4OA5 Other Activities==
==4OA5 Other Activities==
===.1 Confirmatory Action Letter (CAL) Inspection Focus Area Closures (IP 92702)===
===.1 Confirmatory Action Letter (CAL) Inspection Focus Area Closures (IP 92702)===
Background On March 4, 2015, ANO Units 1 and 2 transitioned to the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process Action Matrix as a result of having two Yellow findings for each unit. In response, the NRC performed IP 95003, concluding the onsite portion of the inspection on February 26, 2016, and provided insights on ANOs performance weaknesses, their causes, and related safety culture issues. The 95003 team reviewed proposed corrective actions and identified the need for additional corrective actions to create prompt and sustained improvement. In a letter dated May 17, 2016, ANO Comprehensive Recovery Plan (ADAMS Accession No. ML16139A059), Entergy notified the NRC staff of its plan to perform specific actions to resolve the causes for declining performance at ANO, and provided a summary of that plan.
Background On March 4, 2015, ANO Units 1 and 2 transitioned to the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process Action Matrix as a result of having two Yellow findings for each unit. In response, the NRC performed IP 95003, concluding the onsite portion of the inspection on February 26, 2016, and provided insights on ANOs performance weaknesses, their causes, and related safety culture issues. The 95003 team reviewed proposed corrective actions and identified the need for additional corrective actions to create prompt and sustained improvement. In a letter dated May 17, 2016, ANO Comprehensive Recovery Plan (ADAMS Accession No. ML16139A059), Entergy notified the NRC staff of its plan to perform specific actions to resolve the causes for declining performance at ANO, and provided a summary of that plan.


The NRC reviewed Entergys CRP and concluded that Entergys planned corrective actions should correct significant performance deficiencies and result in sustained performance improvement at ANO. The CRP is comprised of 14 Area Action Plans that contain key improvement actions and scheduled completion dates. The NRC grouped the CRP actions into six inspection focus areas to support future inspection activities based on ANO performance concerns documented in NRC Inspection Report 05000313/2016007 and 05000368/2016007 (ADAMS Accession No. ML16161B279). The NRC issued the CAL on June 17, 2016 (ADAMS Accession No. ML16169A193) to confirm commitments made by Entergy concerning ANO, Units 1 and 2, in each of the six inspection focus areas.
The NRC reviewed Entergys CRP and concluded that Entergys planned corrective actions should correct significant performance deficiencies and result in sustained performance improvement at ANO. The CRP is comprised of 14 Area Action Plans that contain key improvement actions and scheduled completion dates. The NRC grouped the CRP actions into six inspection focus areas to support future inspection activities based on ANO performance concerns documented in NRC Inspection Report 05000313/2016007 and 05000368/2016007 (ADAMS Accession No. ML16161B279). The NRC issued the CAL on June 17, 2016 (ADAMS Accession No. ML16169A193) to confirm commitments made by Entergy concerning ANO, Units 1 and 2, in each of the six inspection focus areas.


a. Closure of CAL Inspection Focus Area: Human Performance Background In performing their root cause evaluations for the stator drop and flood protection issues, ANO identified multiple areas where human performance did not meet industry standards, such as procedural use and adherence, caused by poor leadership behaviors. In response, ANO implemented prompt actions to improve operator performance, but Entergys CRP included limited actions to address improving worker behaviors or increasing field presence of managers to set and enforce expectations.
a.
 
Closure of CAL Inspection Focus Area: Human Performance  
 
Background In performing their root cause evaluations for the stator drop and flood protection issues, ANO identified multiple areas where human performance did not meet industry standards, such as procedural use and adherence, caused by poor leadership behaviors. In response, ANO implemented prompt actions to improve operator performance, but Entergys CRP included limited actions to address improving worker behaviors or increasing field presence of managers to set and enforce expectations.


The Third Party Nuclear Safety Culture Assessment in 2015 identified that ANO personnel tolerated, and at times normalized, degraded conditions. In addition to using analyses to accept degraded conditions and reduced safety margins, ANO management adopted long-term or permanent compensatory measures. These compensatory actions distracted operators from their normal duties and challenged response actions during events. The true number of degraded conditions and compensatory measures was not apparent because they were dispersed in a variety of tracking processes or the actions were made permanent through analyses, or proceduralized actions.
The Third Party Nuclear Safety Culture Assessment in 2015 identified that ANO personnel tolerated, and at times normalized, degraded conditions. In addition to using analyses to accept degraded conditions and reduced safety margins, ANO management adopted long-term or permanent compensatory measures. These compensatory actions distracted operators from their normal duties and challenged response actions during events. The true number of degraded conditions and compensatory measures was not apparent because they were dispersed in a variety of tracking processes or the actions were made permanent through analyses, or proceduralized actions.


The 95003 inspection team concluded from observations in the control room, plant, and simulator that operator performance improvement actions were effective, and that actions to improve the quality and effectiveness of supervisory field observations appeared to be successful at the first- and second-line supervisor level. However, both ANO and the NRC identified concerns with procedure adherence as ANO had not evaluated the causes for problems in this area beyond determining that the quality of site-specific procedures and work instructions were below current industry standards and were not adequately human factored. The NRC team identified that workers attempted to informally resolve unclear guidance in procedures rather than stopping and notifying supervisors.
The 95003 inspection team concluded from observations in the control room, plant, and simulator that operator performance improvement actions were effective, and that actions to improve the quality and effectiveness of supervisory field observations appeared to be successful at the first-and second-line supervisor level. However, both ANO and the NRC identified concerns with procedure adherence as ANO had not evaluated the causes for problems in this area beyond determining that the quality of site-specific procedures and work instructions were below current industry standards and were not adequately human factored. The NRC team identified that workers attempted to informally resolve unclear guidance in procedures rather than stopping and notifying supervisors.


Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key desired behaviors and outcomes (DB&Os) to verify that the licensee achieved sustained improvement. Specifically, the following DB&Os where reviewed:
Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key desired behaviors and outcomes (DB&Os) to verify that the licensee achieved sustained improvement. Specifically, the following DB&Os where reviewed:
Line 153: Line 194:
* Organizational Capacity (OC) DB&O-1: Leaders ensure nuclear safety is the top consideration in making decisions on workforce resources. Leaders use appropriate information to make strategic decisions regarding workforce needs.
* Organizational Capacity (OC) DB&O-1: Leaders ensure nuclear safety is the top consideration in making decisions on workforce resources. Leaders use appropriate information to make strategic decisions regarding workforce needs.


The information includes data supporting organization capability, e.g., knowledge gaps, attrition projections and demographic makeup (age and years of service -
The information includes data supporting organization capability, e.g., knowledge gaps, attrition projections and demographic makeup (age and years of service - proficiency). This information is incorporated into an Integrated Strategic Workforce Plan (ISWP) that leaders use to ensure the organization has the necessary capacity and skills for safe and reliable plant operation. (Key Actions OC-1, OC-2, OC-3, and OC-4)
proficiency). This information is incorporated into an Integrated Strategic Workforce Plan (ISWP) that leaders use to ensure the organization has the necessary capacity and skills for safe and reliable plant operation. (Key Actions OC-1, OC-2, OC-3, and OC-4)
* Plant Health (PH) DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions. (Key Actions PH-1, PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)
* Plant Health (PH) DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions. (Key Actions PH-1, PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)
* Procedure and Work Instruction Quality (PQ) DB&O-1: Station procedures and work instructions are technically accurate, complete, and contain consistent human factoring and clarity to support predictable, repeatable, and successful work performance. (Key Actions PQ-1, PQ-2, PQ-3, PQ-5, PQ-6, PQ-7, PQ-8, PQ-9, and PQ-10)
* Procedure and Work Instruction Quality (PQ) DB&O-1: Station procedures and work instructions are technically accurate, complete, and contain consistent human factoring and clarity to support predictable, repeatable, and successful work performance. (Key Actions PQ-1, PQ-2, PQ-3, PQ-5, PQ-6, PQ-7, PQ-8, PQ-9, and PQ-10)
Line 181: Line 221:
The team concluded that there has been a steady improvement in human performance at the station. Examples include a declining number of consequential errors, a lower threshold for reporting problems, an increase in the number of equipment-related Site Integrated Planning Database entries (reflecting a higher confidence in the effectiveness of the process), and a more inclusive work force. Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address Human Performance inspection focus area were effective. Therefore, the Human Performance inspection focus area of the CAL is closed.
The team concluded that there has been a steady improvement in human performance at the station. Examples include a declining number of consequential errors, a lower threshold for reporting problems, an increase in the number of equipment-related Site Integrated Planning Database entries (reflecting a higher confidence in the effectiveness of the process), and a more inclusive work force. Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address Human Performance inspection focus area were effective. Therefore, the Human Performance inspection focus area of the CAL is closed.


b. Closure of CAL Inspection Focus Area: Equipment Reliability and Engineering Programs Background In 2007, Entergy implemented an alignment initiative across their fleet, which resulted in reduced staffing levels at ANO. The reduced resources available to do work at ANO created a number of challenges that slowly began to impact equipment reliability by reducing the amount of preventive maintenance performed and extending the time between maintenance activities. The loss of experienced staff made on-time completion of maintenance activities difficult, and the lack of effective action to maintain equipment reliability in an aging plant caused an increase in emergent work that disrupted scheduled maintenance. A cumbersome and poorly understood process for approving and funding equipment upgrades resulted in only the highest priority work being approved, and rescheduling or cancellation of lower priority work. ANO did not identify problems in the Site Integrated Planning Database process for approving and funding major projects. The 95003 inspection team noted that the CRP was updated to address this gap.
b.
 
Closure of CAL Inspection Focus Area: Equipment Reliability and Engineering Programs  
 
Background In 2007, Entergy implemented an alignment initiative across their fleet, which resulted in reduced staffing levels at ANO. The reduced resources available to do work at ANO created a number of challenges that slowly began to impact equipment reliability by reducing the amount of preventive maintenance performed and extending the time between maintenance activities. The loss of experienced staff made on-time completion of maintenance activities difficult, and the lack of effective action to maintain equipment reliability in an aging plant caused an increase in emergent work that disrupted scheduled maintenance. A cumbersome and poorly understood process for approving and funding equipment upgrades resulted in only the highest priority work being approved, and rescheduling or cancellation of lower priority work. ANO did not identify problems in the Site Integrated Planning Database process for approving and funding major projects. The 95003 inspection team noted that the CRP was updated to address this gap.


Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key DB&Os to verify that the licensee achieved and sustained improvement. Specifically, the following DB&Os were reviewed:
Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key DB&Os to verify that the licensee achieved and sustained improvement. Specifically, the following DB&Os were reviewed:
Line 190: Line 234:
* PH DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions.
* PH DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions.


            (Key Actions PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)
(Key Actions PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)
* Preventive Maintenance (PM) DB&O-6: The standards for PM Work Order quality result in high quality PM Work Orders. PM Work Order Feedback from Craft personnel is incorporated in a timely manner. (Key Actions PM-7, PM-9, PM-19, and supporting action PQ-9)
* Preventive Maintenance (PM) DB&O-6: The standards for PM Work Order quality result in high quality PM Work Orders. PM Work Order Feedback from Craft personnel is incorporated in a timely manner. (Key Actions PM-7, PM-9, PM-19, and supporting action PQ-9)
* PM DB&O-7: Weaknesses in PM strategies are consistently identified and resolved prior to PM implementation. (Key Actions PM-13, PM-19, and supporting actions PM-4 and PM-15)
* PM DB&O-7: Weaknesses in PM strategies are consistently identified and resolved prior to PM implementation. (Key Actions PM-13, PM-19, and supporting actions PM-4 and PM-15)
Line 207: Line 251:
* Key Action DB-4: Determine the appropriate level of staffing for safe and reliable operation of ANO given experience, training needs, knowledge management needs, projected attrition, and the workload of the current level of staffing.
* Key Action DB-4: Determine the appropriate level of staffing for safe and reliable operation of ANO given experience, training needs, knowledge management needs, projected attrition, and the workload of the current level of staffing.


        (CR-ANO-C-2015-02833, CA-47)
(CR-ANO-C-2015-02833, CA-47)
* Key Action DB-5: Implement a staffing plan developed in response to staffing issues. Include baseline organizational changes and staffing for Recovery efforts. (CR-ANO-C-2015-02831, CA-41)
* Key Action DB-5: Implement a staffing plan developed in response to staffing issues. Include baseline organizational changes and staffing for Recovery efforts. (CR-ANO-C-2015-02831, CA-41)
* Key Action DB-6: Implement a workforce planning process to include a long-term ANO Integrated Strategic Workforce Plan (ISWP) that will provide the necessary level of detail to ensure a sustained staffing plan that accounts for talent needs, knowledge management, and training. (CR-ANO-C-2015-02833, CA-48)
* Key Action DB-6: Implement a workforce planning process to include a long-term ANO Integrated Strategic Workforce Plan (ISWP) that will provide the necessary level of detail to ensure a sustained staffing plan that accounts for talent needs, knowledge management, and training. (CR-ANO-C-2015-02833, CA-48)  
 
The team reviewed People Health Committee meeting minutes that documented actual and projected hiring and attrition data, in both a monthly and cumulative manner, with a particular focus on the People Health Committee meeting results for February 15, 2018, that focused on engineering department staffing. The team also reviewed current organization charts to determine whether any staffing vacancies existed and, if so, whether plans were in place to fill those vacancies.
The team reviewed People Health Committee meeting minutes that documented actual and projected hiring and attrition data, in both a monthly and cumulative manner, with a particular focus on the People Health Committee meeting results for February 15, 2018, that focused on engineering department staffing. The team also reviewed current organization charts to determine whether any staffing vacancies existed and, if so, whether plans were in place to fill those vacancies.


Line 232: Line 277:
Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Equipment Reliability and Engineering Programs inspection focus area were effective in meeting the DB&Os. Therefore, the Equipment Reliability and Engineering Programs inspection focus area of the CAL is closed.
Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Equipment Reliability and Engineering Programs inspection focus area were effective in meeting the DB&Os. Therefore, the Equipment Reliability and Engineering Programs inspection focus area of the CAL is closed.


c. Closure of CAL Inspection Focus Area: Safety Culture Background ANO determined that the most significant causes for declining performance were ineffective change management with respect to resource reductions, and leadership behaviors that were not commensurate with a strong safety culture. When implementing resource reductions across its fleet in 2007 and 2013, Entergy did not consider the unique staffing needs for ANO created by having two units with different technologies.
c.
 
Closure of CAL Inspection Focus Area: Safety Culture  
 
Background ANO determined that the most significant causes for declining performance were ineffective change management with respect to resource reductions, and leadership behaviors that were not commensurate with a strong safety culture. When implementing resource reductions across its fleet in 2007 and 2013, Entergy did not consider the unique staffing needs for ANO created by having two units with different technologies.


ANO management did not reduce workloads through efficiencies or the elimination of unnecessary work, as was intended as part of the resource reduction initiatives.
ANO management did not reduce workloads through efficiencies or the elimination of unnecessary work, as was intended as part of the resource reduction initiatives.
Line 248: Line 297:
* CO DB&O-4: Controls are established for the Entergy change management processes including planning, execution, and effectiveness review. These controls are used to prevent unintended consequences during high-risk changes.
* CO DB&O-4: Controls are established for the Entergy change management processes including planning, execution, and effectiveness review. These controls are used to prevent unintended consequences during high-risk changes.


  (Key Action CO-5)
(Key Action CO-5)
* CO DB&O-6: Specific information is provided on ANO Safety Culture and regulatory perspective to the Entergy Operations senior management review board (Oversight Analysis Meeting (OAM) and Oversight Review Board (ORB)).
* CO DB&O-6: Specific information is provided on ANO Safety Culture and regulatory perspective to the Entergy Operations senior management review board (Oversight Analysis Meeting (OAM) and Oversight Review Board (ORB)).
This information is used for performance monitoring and comprehensive oversight decisions. This action is designated DBO-1. (Key Actions CO-1, CO-2)
This information is used for performance monitoring and comprehensive oversight decisions. This action is designated DBO-1. (Key Actions CO-1, CO-2)
Line 288: Line 337:
Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Safety Culture inspection focus area were effective. Therefore, the Safety Culture inspection focus area of the CAL is closed.
Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Safety Culture inspection focus area were effective. Therefore, the Safety Culture inspection focus area of the CAL is closed.


d. Closure of CAL Inspection Focus Area: Service Water System Self-Assessment Background On January 26, 1990, ANO committed to establishing a program to address biofouling in raw water cooling systems which included chlorination, inspection and cleaning, and periodic flow tests. This included conducting periodic flow tests of the safety-related heat exchangers cooled by the service water (SW) system and periodic flushes of normally stagnant SW system pipe sections. ANOs December 2015 assessment of their SW Program documented seven problems, and stated that the overall program health was good with respect to the primary goal of ensuring the systems ability to provide its required heat removal function. The report stated that the program had maintained flows above required limits, although problems were identified with improving low flow margins for some components, inadequate configuration control, inadequate alignment between governing documents, and implementation actions that need to be addressed. Specifically, the Unit 2 emergency diesel generator heat exchangers (2E-20/63/64A and B), shutdown cooling heat exchangers (2E-35A and B), and B control room chiller condenser (2VE-1B) had a longstanding trend of having low flow margins, although the flows have been maintained above the required flow.
d.
 
Closure of CAL Inspection Focus Area: Service Water System Self-Assessment  
 
Background On January 26, 1990, ANO committed to establishing a program to address biofouling in raw water cooling systems which included chlorination, inspection and cleaning, and periodic flow tests. This included conducting periodic flow tests of the safety-related heat exchangers cooled by the service water (SW) system and periodic flushes of normally stagnant SW system pipe sections. ANOs December 2015 assessment of their SW Program documented seven problems, and stated that the overall program health was good with respect to the primary goal of ensuring the systems ability to provide its required heat removal function. The report stated that the program had maintained flows above required limits, although problems were identified with improving low flow margins for some components, inadequate configuration control, inadequate alignment between governing documents, and implementation actions that need to be addressed. Specifically, the Unit 2 emergency diesel generator heat exchangers (2E-20/63/64A and B), shutdown cooling heat exchangers (2E-35A and B), and B control room chiller condenser (2VE-1B) had a longstanding trend of having low flow margins, although the flows have been maintained above the required flow.


The 95003 inspection team noted that the ANO SW Program assessment did not classify the long-term, low flow margin trends as problems because credit was given for the site processes to elevate awareness of the margin concern, the effectiveness of past actions to sustain acceptable flow, and the success of recently performed actions at improving flow margin. The NRC team concluded that ANO had been attempting to manage a problem that affected the entire SW system by reducing margins to keep the system within the minimum requirements. The team concluded that the assessment applied a systematic approach to review of the SW Program, but did not provide a realistic assessment of the effectiveness of the program in identifying and correcting longstanding degraded conditions. The NRC team concluded that ANO did not have an adequate assessment of system performance problems or a holistic plan to correct the problems and causes.
The 95003 inspection team noted that the ANO SW Program assessment did not classify the long-term, low flow margin trends as problems because credit was given for the site processes to elevate awareness of the margin concern, the effectiveness of past actions to sustain acceptable flow, and the success of recently performed actions at improving flow margin. The NRC team concluded that ANO had been attempting to manage a problem that affected the entire SW system by reducing margins to keep the system within the minimum requirements. The team concluded that the assessment applied a systematic approach to review of the SW Program, but did not provide a realistic assessment of the effectiveness of the program in identifying and correcting longstanding degraded conditions. The NRC team concluded that ANO did not have an adequate assessment of system performance problems or a holistic plan to correct the problems and causes.
Line 303: Line 356:
* Service Water DB&O: To ensure conditions adverse to quality are identified and resolved, ANO will conduct a focused self-assessment of Units 1 and 2 service water systems in accordance with station procedures and NRC Inspection Procedure 93810, Service Water System Operational Performance Inspection.
* Service Water DB&O: To ensure conditions adverse to quality are identified and resolved, ANO will conduct a focused self-assessment of Units 1 and 2 service water systems in accordance with station procedures and NRC Inspection Procedure 93810, Service Water System Operational Performance Inspection.


        (Key Action SW-01)
(Key Action SW-01)
To evaluate the licensees corrective action effectiveness, the team reviewed:
To evaluate the licensees corrective action effectiveness, the team reviewed:
* Service Water System Closure Readiness Evaluation
* Service Water System Closure Readiness Evaluation
* Comprehensive Recovery Plan Action Effectiveness for NRC closure for SW-01
* Comprehensive Recovery Plan Action Effectiveness for NRC closure for SW-01
* Comprehensive Recovery Plan Action Item Closure SW-01
* Comprehensive Recovery Plan Action Item Closure SW-01
* Service Water System Operational Performance Inspection Report (SWSOPI)
* Service Water System Operational Performance Inspection Report (SWSOPI)  
        (LO-ALO-2016-00078)
(LO-ALO-2016-00078)
* NUENERGY Innovative Solutions, Inc., Support of ANO 2016 Service Water Self-Assessment Activities Report (NUI-EOI-ANO SWS SA 2016-01)
* NUENERGY Innovative Solutions, Inc., Support of ANO 2016 Service Water Self-Assessment Activities Report (NUI-EOI-ANO SWS SA 2016-01)
* Design and Licensing Basis Area Action Plan Closure Report
* Design and Licensing Basis Area Action Plan Closure Report
Line 318: Line 371:


===.2 CAL Action Follow-up (IP 92702)===
===.2 CAL Action Follow-up (IP 92702)===
This section describes the scope, corrective action, and inspection of the remaining open CAL items.


This section describes the scope, corrective action, and inspection of the remaining open CAL items.
Actions to Address Equipment Reliability and Engineering Program Deficiencies DB-11 Perform one benchmark or one self-assessment between March 1, 2016, and March 1, 2020, for each of 24 engineering programs. (CR-ANO-C-2015-02833 CA-28, and CR-ANO-C-2016-00614 CA-8 and CA-22)


Actions to Address Equipment Reliability and Engineering Program Deficiencies DB-11 Perform one benchmark or one self-assessment between March 1, 2016, and March 1, 2020, for each of 24 engineering programs. (CR-ANO-C-2015-02833 CA-28, and CR-ANO-C-2016-00614 CA-8 and CA-22)
During the 95003 supplemental inspection, the NRC team found that the ANO snapshot assessments of engineering programs were conducted in a systematic manner, some used industry experts, and identified program deficiencies.
During the 95003 supplemental inspection, the NRC team found that the ANO snapshot assessments of engineering programs were conducted in a systematic manner, some used industry experts, and identified program deficiencies.


Line 344: Line 397:
* Diesel fire pump engine overhaul
* Diesel fire pump engine overhaul
* Radiation monitor reliability improvement
* Radiation monitor reliability improvement
* Unit 2 component cooling water (CCW) system performance improvements o   2P-33C CCW pump overhaul o   2P-33B CCW pump overhaul o   2E-28B CCW heat exchanger replacement
* Unit 2 component cooling water (CCW) system performance improvements o 2P-33C CCW pump overhaul o 2P-33B CCW pump overhaul o 2E-28B CCW heat exchanger replacement
* Service water and circulating water chemical treatment system upgrade
* Service water and circulating water chemical treatment system upgrade
* Unit 2 cooling tower crane replacement
* Unit 2 cooling tower crane replacement
Line 375: Line 428:
The items documented above are the final items from PH-12 that the NRC planned to review. Based on the samples in this and previous inspections, the team concluded that the licensee is resolving the equipment reliability issues listed. Therefore, this item is closed.
The items documented above are the final items from PH-12 that the NRC planned to review. Based on the samples in this and previous inspections, the team concluded that the licensee is resolving the equipment reliability issues listed. Therefore, this item is closed.


PH-13 The following list contains equipment reliability issues that are being evaluated by the Plant Health Committee for resolution commensurate with the potential impact on safe and reliable operation of the units by December 20, 2018. For items not resolved by the due date, the Plant Health Committee will provide the safety basis for the extension. (CR-ANO-C-2015-02832 CA-38, and CR-ANO-C-2015-03029 CA-34)
PH-13 The following list contains equipment reliability issues that are being evaluated by the Plant Health Committee for resolution commensurate with the potential impact on safe and reliable operation of the units by December 20, 2018. For items not resolved by the due date, the Plant Health Committee will provide the safety basis for the extension. (CR-ANO-C-2015-02832 CA-38, and CR-ANO-C-2015-03029 CA-34)  
 
CAL action PH-13 committed ANO to implement a list of specific equipment reliability improvements that did not have improvement plans that were fully developed or funded when the commitment was made. Since the CAL was written, ANO completed planning, scheduling, and budgeting activities for each of the actions listed below. The team reviewed the actions that were completed as samples to evaluate the effectiveness of the licensees corrective actions to the long-standing equipment issues.
CAL action PH-13 committed ANO to implement a list of specific equipment reliability improvements that did not have improvement plans that were fully developed or funded when the commitment was made. Since the CAL was written, ANO completed planning, scheduling, and budgeting activities for each of the actions listed below. The team reviewed the actions that were completed as samples to evaluate the effectiveness of the licensees corrective actions to the long-standing equipment issues.
* Resolution of Unit 1 emergency diesel generator exhaust stack thinning
* Resolution of Unit 1 emergency diesel generator exhaust stack thinning
Line 387: Line 441:
* Tornado/missile protection for emergency feedwater piping resolution
* Tornado/missile protection for emergency feedwater piping resolution
* Unit 1 reactor vessel head leak-off line replacement
* Unit 1 reactor vessel head leak-off line replacement
* Unit 1 and Unit 2 super particulate iodine and noble gas monitor replacement During the 95003 supplemental inspection, the NRC team identified weaknesses in the selection of the right work in the normal work planning process and the backlog reduction process. ANO had defined right work as the grouping of work activities, which best met the equipment reliability needs of the station by balancing the priority to correct degraded conditions against the capability of the station to complete the activity. The mechanical, electrical, and instrumentation and control maintenance coordinators for the online maintenance disciplines and the backlog project manager for the backlog reduction team select the right work. The NRC team noted that the process did not seek input from operations and engineering to help identify the right work activities. For normal online work, ANOs implementation resulted in a poor work bundling, excessive equipment unavailability, and delays in addressing difficult or complex tasks.
* Unit 1 and Unit 2 super particulate iodine and noble gas monitor replacement  
 
During the 95003 supplemental inspection, the NRC team identified weaknesses in the selection of the right work in the normal work planning process and the backlog reduction process. ANO had defined right work as the grouping of work activities, which best met the equipment reliability needs of the station by balancing the priority to correct degraded conditions against the capability of the station to complete the activity. The mechanical, electrical, and instrumentation and control maintenance coordinators for the online maintenance disciplines and the backlog project manager for the backlog reduction team select the right work. The NRC team noted that the process did not seek input from operations and engineering to help identify the right work activities. For normal online work, ANOs implementation resulted in a poor work bundling, excessive equipment unavailability, and delays in addressing difficult or complex tasks.


The team reviewed the licensees progress in resolving equipment reliability issues by evaluating the actions taken to address the following:
The team reviewed the licensees progress in resolving equipment reliability issues by evaluating the actions taken to address the following:
Line 396: Line 452:
PH-14 Track and audit the completion of the following equipment reliability issues related to the White Finding and the potential for additional unplanned plant trips.
PH-14 Track and audit the completion of the following equipment reliability issues related to the White Finding and the potential for additional unplanned plant trips.


      (CR-ANO-C-2015-02831 CA-31, CR-ANO-C-2015-02833 CA-44, and CR-ANO-C-2015-03029 CA-2, CA-3, CA-4, and CA-6)
(CR-ANO-C-2015-02831 CA-31, CR-ANO-C-2015-02833 CA-44, and CR-ANO-C-2015-03029 CA-2, CA-3, CA-4, and CA-6)  
 
Action PH-14 committed to complete corrective actions that were planned, scheduled, and funded at the time the commitment was made in order to address the causes and extent of condition/extent of cause from three scrams in Unit 2.
Action PH-14 committed to complete corrective actions that were planned, scheduled, and funded at the time the commitment was made in order to address the causes and extent of condition/extent of cause from three scrams in Unit 2.


Line 410: Line 467:
* Verify that all medium voltage connections have adequate fill and air gap.
* Verify that all medium voltage connections have adequate fill and air gap.


o   Issue work requests to inspect all ANO-1 and ANO-2 medium voltage connections for the existence of corona effects o   Issue work requests to re-tape all ANO-1 and ANO-2 medium voltage connections in accordance with OP-6030.110, and ensure adequate fill is installed.
o Issue work requests to inspect all ANO-1 and ANO-2 medium voltage connections for the existence of corona effects o Issue work requests to re-tape all ANO-1 and ANO-2 medium voltage connections in accordance with OP-6030.110, and ensure adequate fill is installed.


o   Either track completions of the resulting work orders listed above or close this corrective action to the associated work orders with concurrence by the Condition Review Group and/or Corrective Action Review Board, as required.
o Either track completions of the resulting work orders listed above or close this corrective action to the associated work orders with concurrence by the Condition Review Group and/or Corrective Action Review Board, as required.


The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has inspected and repaired this equipment as needed, and the team noted that the equipment has been operating with no major issues since these improvements.
The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has inspected and repaired this equipment as needed, and the team noted that the equipment has been operating with no major issues since these improvements.
Line 419: Line 476:


{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
===Exit Meeting Summary===
On May 31, 2018, the team presented the inspection results to Mr. R. Anderson, Site Vice President, and other members of the licensee staff at a public meeting. The licensee acknowledged the issues presented. The inspectors verified no proprietary information was retained or documented in this report.
LIST OF CONFIRMATORY ACTION LETTER ITEMS CLOSED AND DISCUSSED Closed Equipment Reliability and Engineering Program Deficiencies DB-11 (Section 4OA5.2)


===Exit Meeting Summary===
PH-12 (Section 4OA5.2)


On May 31, 2018, the team presented the inspection results to Mr. R. Anderson, Site Vice President, and other members of the licensee staff at a public meeting. The licensee acknowledged the issues presented. The inspectors verified no proprietary information was retained or documented in this report.
PH-13 (Section 4OA5.2)


LIST OF CONFIRMATORY ACTION LETTER ITEMS CLOSED AND DISCUSSED Closed Equipment Reliability and Engineering Program Deficiencies DB-11                      (Section 4OA5.2)
PH-14 (Section 4OA5.2)  
PH-12                      (Section 4OA5.2)
PH-13                      (Section 4OA5.2)
PH-14                       (Section 4OA5.2)


LIST OF  
LIST OF  
Line 435: Line 494:


Audits/Self Assessments
Audits/Self Assessments
Number             Title                                                     Revision/Date
Number
Corporate & Independent Oversight Area Action Plan       March 2018
Title
Revision/Date
Corporate & Independent Oversight Area Action Plan
Closure Report
Closure Report
Decision Making and Risk Management Area Action Plan     March 2018
March 2018
Decision Making and Risk Management Area Action Plan
Closure Report
Closure Report
Design and Licensing Basis Area Action Plan Closure       March 2018
March 2018
Design and Licensing Basis Area Action Plan Closure
Report
Report
Human Performance Closure Readiness Evaluation           0
March 2018
Leadership Fundamentals Area Action Plan Closure         March 2018
Human Performance Closure Readiness Evaluation  
 
Leadership Fundamentals Area Action Plan Closure
Report
Report
Nuclear Fundamentals Area Action Plan Closure Report     March 2018
March 2018
Nuclear Safety Culture Area Action Plan Closure Report   March 2018
Nuclear Fundamentals Area Action Plan Closure Report
Nuclear Safety Culture Closure Readiness Evaluation       0
March 2018
Organizational Capacity Area Action Plan Closure Report   March 2018
Nuclear Safety Culture Area Action Plan Closure Report
Plant Health Area Action Plan Closure Report             March 2018
March 2018
Preventive Maintenance Program Area Action Plan           March 2018
Nuclear Safety Culture Closure Readiness Evaluation  
 
Organizational Capacity Area Action Plan Closure Report
March 2018
Plant Health Area Action Plan Closure Report
March 2018
Preventive Maintenance Program Area Action Plan
Closure Report
Closure Report
Procedure and Work Instruction Quality Area Action Plan   March 2018
March 2018
Procedure and Work Instruction Quality Area Action Plan
Closure Report
Closure Report
Service Water System Closure Readiness Evaluation         0
March 2018
LO-ALO-2016-       Confirmatory Action Letter Key Improvement Action 6:     December
Service Water System Closure Readiness Evaluation
00078              Service Water System Operational Performance             2016
LO-ALO-2016-
00078
Confirmatory Action Letter Key Improvement Action 6:
Service Water System Operational Performance
Inspection (SWSOPI)
Inspection (SWSOPI)
LO-ALO-2018-       Confirmatory Action Letter (CAL) and Area Action Plan     February
December
00014              (AAP) Actions Effectiveness                               2018
2016
LO-ALO-2018-       Comprehensive Recovery Plan Procedure Reconciliation      March 2018
LO-ALO-2018-
00014
Confirmatory Action Letter (CAL) and Area Action Plan  
(AAP) Actions Effectiveness
February
2018
LO-ALO-2018-
00040
00040
NUI-EOI-ANO         Support of ANO 2016 Service Water System Self             December
Comprehensive Recovery Plan Procedure Reconciliation
SWS SA 2016-01      Assessment Activities                                     2016
March 2018
NUI-EOI-ANO
SWS SA 2016-01
Support of ANO 2016 Service Water System Self
Assessment Activities
December
2016
Condition Reports (CR-ANO-)
Condition Reports (CR-ANO-)
C-2015-02829       C-2015-02833     C-2015-04876       C-2016-00435       C-2016-00524
C-2015-02829
C-2016-00546       C-2016-00614     C-2016-01736       C-2017-00926       C-2017-02836
C-2015-02833
C-2018-00554       C-2018-01118     C-2018-01189       C-2018-01500       C-2018-01502
C-2015-04876
C-2018-01552 C-2018-01554       C-2018-01555     C-2018-01556         C-2018-01558
C-2016-00435
C-2018-01560 C-2018-01736       1-2015-02032     1-2016-04138         1-2016-04924
C-2016-00524
1-2016-05076 1-2016-05100       1-2016-05107     1-2018-00541         1-2018-01178
C-2016-00546
2-2016-00361 2-2016-00421       2-2016-00672     2-2016-00674         2-2016-03882
C-2016-00614
2-2016-04014 2-2016-04175       2-2018-00724
C-2016-01736
CR-HQN-2018- CR-HQN-2018-       CR-HQN-2018-     CR-HQN-2018-
C-2017-00926
00024        00298              00786            00803
C-2017-02836
C-2018-00554
C-2018-01118
C-2018-01189
C-2018-01500
C-2018-01502  
 
C-2018-01552
C-2018-01554
C-2018-01555
C-2018-01556
C-2018-01558
C-2018-01560
C-2018-01736
1-2015-02032
1-2016-04138
1-2016-04924
1-2016-05076
1-2016-05100
1-2016-05107
1-2018-00541
1-2018-01178
2-2016-00361
2-2016-00421
2-2016-00672
2-2016-00674
2-2016-03882
2-2016-04014
2-2016-04175
2-2018-00724  
 
CR-HQN-2018-
00024
CR-HQN-2018-
298
CR-HQN-2018-
00786
CR-HQN-2018-
00803  
 
Procedures
Procedures
Number       Title                                                       Revision
Number
COPD-024     Risk Assessment Guidelines                                   65
Title
EN-DC-115     Engineering Change Process                                   23
Revision
EN-DC-134     Design Verification                                         7
COPD-024
EN-DC-329     Engineering Programs Control and Oversight                   6
Risk Assessment Guidelines
EN-FAP-OM-016 Performance Management Process and Practices                 8
EN-DC-115
EN-LI-121     Trending and Performance Review Process                     24
Engineering Change Process
EN-OM-126     Management and Oversight of Supplemental Personnel           6
EN-DC-134
EN-QV-136     Nuclear Safety Culture Monitoring                           12
Design Verification
EN-WM-100     Work Request (WR) Generation, Screening, and                 13
EN-DC-329
Engineering Programs Control and Oversight
EN-FAP-OM-016 Performance Management Process and Practices
EN-LI-121
Trending and Performance Review Process
EN-OM-126
Management and Oversight of Supplemental Personnel
EN-QV-136
Nuclear Safety Culture Monitoring
EN-WM-100
Work Request (WR) Generation, Screening, and
Classification
Classification
EN-WM-104     On Line Risk Assessment                                     16
EN-WM-104
EN-WM-105     Planning                                                     20
On Line Risk Assessment
PI-001       Paired Observation Program                                   4
EN-WM-105
SEP-EPCO-     ANO Engineering Programs Control and Oversight              3
Planning
PI-001
Paired Observation Program
SEP-EPCO-
ANO-001
ANO-001
ANO Engineering Programs Control and Oversight
Miscellaneous
Miscellaneous
Number       Title                                                       Revision/Date
Number
1R27 Outage Meeting & Communication Schedule
Title
Revision/Date
1R27 Outage Meeting & Communication Schedule  
 
Action Plan to Address Unit 1 Scope and Selection Stability
Action Plan to Address Unit 1 Scope and Selection Stability
Red Performance Indicator
Red Performance Indicator  
ANO Employee Handbook
 
ANO People Health Committee - Engineering Minutes           February 15,
ANO Employee Handbook  
 
ANO People Health Committee - Engineering Minutes
February 15,
2018
2018
ANO Integrated Strategic Workforce Plan (ISWP)
ANO Integrated Strategic Workforce Plan (ISWP)  
 
Miscellaneous
Miscellaneous
Number         Title                                                   Revision/Date
Number
Average Functional Area Scores and Weighted Fleet Index
Title
Comprehensive Recovery Plan Metrics                     January -
Revision/Date
Average Functional Area Scores and Weighted Fleet Index  
 
Comprehensive Recovery Plan Metrics
January -
February
2018
Critical Preventive Maintenance Index - ANO Unit 1 and
Unit 2
February
February
2018
2018
Critical Preventive Maintenance Index - ANO Unit 1 and  February
Equipment Reliability Index - ANO Unit 1 and Unit 2
Unit 2                                                  2018
February
Equipment Reliability Index - ANO Unit 1 and Unit 2     February
2018
2018
High Energy Line Break (HELB) Design Basis Documents   0
High Energy Line Break (HELB) Design Basis Documents
Project Plan
Project Plan  
Main Control Room Deficiencies - ANO Unit 1 and Unit 2 March 2018
 
Nuclear Safety Culture Monitoring Panel Meeting Minutes Various
Main Control Room Deficiencies - ANO Unit 1 and Unit 2
Nuclear Safety Culture Observation Forms               February 1,
March 2018
Nuclear Safety Culture Monitoring Panel Meeting Minutes
Various
Nuclear Safety Culture Observation Forms
February 1,
2018 - March
2018 - March
30, 2018
30, 2018
OHI Survey Results                                     2016, 2017
OHI Survey Results
2016, 2017
Red Comprehensive Recovery Plan Indicators and
Red Comprehensive Recovery Plan Indicators and
Associated Action Plans
Associated Action Plans  
Site Scorecard - ANO Unit 1 and Unit 2
 
Synergy Survey Results                                 2016
Site Scorecard - ANO Unit 1 and Unit 2  
 
Synergy Survey Results
2016
Tracking Spreadsheet and Work Curves for Procedure
Tracking Spreadsheet and Work Curves for Procedure
Changes
Changes  
 
Weighted Functional Area Index
Weighted Functional Area Index
CALC-ANOC-     Arkansas Nuclear One Units 1 & 2 High Energy Line Break 1
CALC-ANOC-
CS-16-0004    (HELB) Program Revalidation (HELB Program Design Basis
CS-16-0004
Arkansas Nuclear One Units 1 & 2 High Energy Line Break  
(HELB) Program Revalidation (HELB Program Design Basis
Consolidation Report)
Consolidation Report)
Drawing A-7003 High Energy Line Break (HELB)                          various
Drawing A-7003
Sheets 1-16
Sheets 1-16
WO-ANO-       CV-3811 PM IAW OP-1412.001
High Energy Line Break (HELB)
various
WO-ANO-
2550018
2550018
WT-WTHQN-     Perform Effectiveness Review of Fleet Implementation of
CV-3811 PM IAW OP-1412.001
2017-00546    DNP SDP
WT-WTHQN-
2017-00546
Perform Effectiveness Review of Fleet Implementation of
DNP SDP  
 
CONFIRMATORY ACTION LETTER ITEM STATUS
CONFIRMATORY ACTION LETTER ITEM STATUS
Significant Performance Deficiencies
Significant Performance Deficiencies
Area
Area
Inspection Inspection Report
Action
Action                 Description                                              Status
Dates      Number(s)
Plan
Plan
CO-5     Develop and issue an Entergy           8/28/17 - 05000313/2017012,    Closed
Description
OC-5    change management procedure             9/1/17  05000368/2017012
Inspection
Dates
Inspection Report
Number(s)
Status
CO-5
OC-5
Develop and issue an Entergy
change management procedure
for planning, execution, and follow
for planning, execution, and follow
up of high risk changes. The
up of high risk changes. The
Line 554: Line 732:
management against industry
management against industry
practices.
practices.
DB-1    Establish metrics to monitor          8/28/17 - 05000313/2017012,   Closed
8/28/17 -
performance that would indicate         9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
DB-1
Establish metrics to monitor
performance that would indicate
that leadership focus on
that leadership focus on
minimizing risk and nuclear safety
minimizing risk and nuclear safety
Line 561: Line 745:
health of maintenance rule
health of maintenance rule
systems.
systems.
DB-2    Facilitate behavior change by          8/28/17 - 05000313/2017012,   Closed
8/28/17 -
rewarding performance that               9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
DB-2
Facilitate behavior change by
rewarding performance that
indicates leadership behaviors are
indicates leadership behaviors are
focused on minimizing risk and
focused on minimizing risk and
Line 569: Line 759:
goals into the supervisor and
goals into the supervisor and
above incentive plan.
above incentive plan.
DB-3     Provide training to Engineering,     10/31/16 - 05000313/2016008,    Closed
8/28/17 -
Operations, and Planners to             12/2/16  05000368/2016008
9/1/17
05000313/2017012,
05000368/2017012
Closed
DB-3
Provide training to Engineering,
Operations, and Planners to
increase the knowledge and skills
increase the knowledge and skills
regarding passive barriers and
regarding passive barriers and
other Design Basis Features.
other Design Basis Features.
DM-1     Establish a decision making tool     11/27/17 - 05000313/2017013,    Closed
10/31/16 -
for station personnel that includes     12/1/17  05000368/2017013
2/2/16
05000313/2016008,
05000368/2016008
Closed
DM-1
Establish a decision making tool
for station personnel that includes
expectations for use at ANO. The
expectations for use at ANO. The
intent of this action is to establish
intent of this action is to establish
Line 583: Line 785:
drive the decision that has the
drive the decision that has the
least risk.
least risk.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates      Number(s)
Plan
Plan
DM-6   Deliver risk recognition training     11/27/17 - 05000313/2017013, Closed
Description
and develop curriculum for all site     12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number(s)
Status
DM-6
Deliver risk recognition training
and develop curriculum for all site
personnel with unescorted
personnel with unescorted
access.
access.
DM-7  Develop and implement training        8/28/17 - 05000313/2017012, Closed
11/27/17 -
on procedures governing risk             9/1/17  05000368/2017012
2/1/17
05000313/2017013,
05000368/2017013
Closed
DM-7
Develop and implement training
on procedures governing risk
assessment for work
assessment for work
management SROs, work week
management SROs, work week
managers, shift managers, and
managers, shift managers, and
unit coordinators.
unit coordinators.
DM-8  Develop and implement a                8/28/17 - 05000313/2017012, Closed
8/28/17 -
familiarization (FAM) guide for the     9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
DM-8
Develop and implement a
familiarization (FAM) guide for the
function of work management
function of work management
SRO that will ensure clear
SRO that will ensure clear
understanding of job functions.
understanding of job functions.
DM-10 Revise procedure EN-WM-104,           5/22/17 - 05000313/2017011, Closed
8/28/17 -
On-Line Risk Assessment, to           5/26/17  05000368/2017011
9/1/17
05000313/2017012,
05000368/2017012
Closed
DM-10
Revise procedure EN-WM-104,
On-Line Risk Assessment, to
include guidance for classifying as
include guidance for classifying as
high risk those work activities
high risk those work activities
Line 611: Line 842:
and first-of-a-kind or first-in-a-
and first-of-a-kind or first-in-a-
while activities.
while activities.
DM-11  Revise project management            11/27/17 - 05000313/2017013, Closed
5/22/17 -
VO-19 procedures to ensure high               12/1/17  05000368/2017013
5/26/17
05000313/2017011,
05000368/2017011
Closed
DM-11
VO-19
Revise project management
procedures to ensure high
consequence risks are properly
consequence risks are properly
identified and eliminated/mitigated
identified and eliminated/mitigated
through a structured risk
through a structured risk
management process.
management process.
FP-1 Develop external flooding design     10/31/16 - 05000313/2016008, Closed
11/27/17 -
basis documentation so                 12/2/16  05000368/2016008
2/1/17
05000313/2017013,
05000368/2017013
Closed
FP-1
Develop external flooding design
basis documentation so
configuration control is defined
configuration control is defined
and maintained. Develop an
and maintained. Develop an
Line 632: Line 876:
to each flood protection feature
to each flood protection feature
and boundary.
and boundary.
10/31/16 -
2/2/16
05000313/2016008,
05000368/2016008
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                              Status
Dates      Number(s)
Plan
Plan
FP-2 Develop internal flooding design       10/31/16 - 05000313/2016008, Discussed,
Description
basis documentation so                   12/2/16  05000368/2016008  awaiting
Inspection
configuration control is defined                                     licensee
Dates
and maintained. Develop an                                             action
Inspection Report
Number(s)
Status
FP-2
Develop internal flooding design
basis documentation so
configuration control is defined
and maintained. Develop an
engineering report and flood
engineering report and flood
protection drawings similar to the
protection drawings similar to the
fire protection drawings to clearly
fire protection drawings to clearly
document the flooding design
document the flooding design
5/22/17 - 05000313/2017011,  Closed
basis and credited flood
basis and credited flood
5/26/17  05000368/2017011
protection features (credited
protection features (credited
internal flood protection features
internal flood protection features
Line 656: Line 909:
flood protection feature and
flood protection feature and
boundary.
boundary.
FP-3  Label external flood barriers in the  10/31/16 - 05000313/2016008,   Closed
10/31/16 -
plant to provide in-field awareness     12/2/16  05000368/2016008
2/2/16
05000313/2016008,
05000368/2016008
Discussed,
awaiting
licensee
action
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
FP-3
Label external flood barriers in the
plant to provide in-field awareness
of flood protection features.
of flood protection features.
FP-4 Establish an Engineering Barrier       8/28/17 - 05000313/2017012,  Closed
10/31/16 -
Program to include external and           9/1/17  05000368/2017012
2/2/16
05000313/2016008,
05000368/2016008
Closed
FP-4
Establish an Engineering Barrier
Program to include external and
internal flood protection in
internal flood protection in
accordance with the requirements
accordance with the requirements
Line 671: Line 944:
scope, frequency, testing criteria,
scope, frequency, testing criteria,
and acceptance criteria.
and acceptance criteria.
FP-5 Revise procedure EN-DC-329,             2/27/17 - 05000313/2017010,  Closed
8/28/17 -
Engineering Programs Control             3/3/17  05000368/2017010
9/1/17
05000313/2017012,
05000368/2017012
Closed
FP-5
Revise procedure EN-DC-329,
Engineering Programs Control
and Oversight, to include
and Oversight, to include
external and internal flood
external and internal flood
Line 684: Line 963:
incorporate external flood
incorporate external flood
considerations.
considerations.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates      Number(s)
Plan
Plan
FP-6 Validate that all external flood     10/31/16 - 05000313/2016008,  Closed
Description
gaps identified from the review of     12/2/16  05000368/2016008
Inspection
Dates
Inspection Report
Number(s)
Status
FP-6
Validate that all external flood
gaps identified from the review of
documentation for credible flood
documentation for credible flood
paths and the follow-up walk
paths and the follow-up walk
downs have been resolved.
downs have been resolved.
FP-7  Perform walk downs of all            10/31/16 - 05000313/2016008, Discussed,
10/31/16 -
credited internal flood protection     12/2/16  05000368/2016008  awaiting
2/2/16
features and document the results                                   licensee
05000313/2016008,
in an engineering report.                                             action
05000368/2016008
5/22/17 - 05000313/2017011,  Closed
Closed
5/26/17 05000368/2017011
FP-7
FP-8                                       11/27/17 - 05000313/2017013, Discussed,
Perform walk downs of all
Validate that all internal flood       12/1/17  05000368/2017013  awaiting
credited internal flood protection
gaps identified from the review of                                 licensee
features and document the results
documentation for credible flood                                     action
in an engineering report.
paths and the follow-up walk           2/12/18 - 05000313/2018012,  Closed
10/31/16 -
downs have been resolved.              2/16/18 05000368/2018012
2/2/16
FP-9 Establish the Program Notebook         5/22/17 - 05000313/2017011,  Closed
05000313/2016008,
and initial Program Health Report       5/26/17  05000368/2017011
05000368/2016008
Discussed,
awaiting
licensee
action
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
FP-8
Validate that all internal flood
gaps identified from the review of
documentation for credible flood
paths and the follow-up walk
downs have been resolved.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Discussed,
awaiting
licensee
action
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Closed
FP-9
Establish the Program Notebook
and initial Program Health Report
for flood protection in accordance
for flood protection in accordance
with procedure EN-DC-143,
with procedure EN-DC-143,
Line 718: Line 1,039:
color rating (Red or Yellow), and
color rating (Red or Yellow), and
action plan.
action plan.
FP-13 Develop and conduct initial and       10/31/16 - 05000313/2016008,  Closed
5/22/17 -
continuing training essential to       12/2/16  05000368/2016008
5/26/17
05000313/2017011,
05000368/2017011
Closed
FP-13
Develop and conduct initial and
continuing training essential to
understanding and maintaining
understanding and maintaining
the license basis for flood barrier
the license basis for flood barrier
Line 725: Line 1,052:
Engineering, and Work Planning
Engineering, and Work Planning
groups.
groups.
VO-1  Designate a Subject Matter            8/29/16 - 05000313/2016010,   Closed
10/31/16 -
Expert (SME) to oversee                 9/16/16  05000368/2016010
2/2/16
05000313/2016008,
05000368/2016008
Closed
VO-1
Designate a Subject Matter
Expert (SME) to oversee
implementation of the procedure
implementation of the procedure
for Management and Oversight of
for Management and Oversight of
Supplemental Personnel and
Supplemental Personnel and
contractor oversight for AN
contractor oversight for ANO.
: [[contact::O.
8/29/16 -
VO-4  Establish a Vendor Oversight          8/29/16 - 05000313/2016010]],   Closed
9/16/16
Team to drive continuous               9/16/16  05000368/2016010
05000313/2016010,
05000368/2016010
Closed  
 
VO-4
Establish a Vendor Oversight
Team to drive continuous
improvement in Vendor Oversight.
improvement in Vendor Oversight.
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Closed
Area
Area
Inspection Inspection Report
Action
Action               Description                                          Status
Dates      Number(s)
Plan
Plan
VO-5 Develop and implement a process       5/22/17 - 05000313/2017011,  Closed
Description
for monitoring of supplemental         5/26/17  05000368/2017011
Inspection
Dates
Inspection Report
Number(s)
Status
VO-5
Develop and implement a process
for monitoring of supplemental
oversight plan compliance.
oversight plan compliance.
VO-6  Establish specific                    5/22/17 - 05000313/2017011,   Closed
5/22/17 -
templates/guidance/examples to         5/26/17  05000368/2017011
5/26/17
05000313/2017011,
05000368/2017011
Closed
VO-6
Establish specific
templates/guidance/examples to
support consistent development
support consistent development
of supplemental oversight plans.
of supplemental oversight plans.
VO-7 Develop and implement initial and     8/28/17 - 05000313/2017012, Discussed,
5/22/17 -
continuing training on the             9/1/17  05000368/2017012  awaiting
5/26/17
procedure for management and                                       licensee
05000313/2017011,
oversight of supplemental                                           action
05000368/2017011
personnel. Training is for site       2/12/18 - 05000313/2018012,  Closed
Closed
contract managers and project         2/16/18  05000368/2018012
VO-7
Develop and implement initial and
continuing training on the
procedure for management and
oversight of supplemental
personnel. Training is for site
contract managers and project
managers.
managers.
VO-8 Develop and implement a contract    11/27/17 - 05000313/2017013,   Closed
8/28/17 -
management familiarization guide      12/1/17  05000368/2017013
9/1/17
05000313/2017012,
05000368/2017012
Discussed,
awaiting
licensee
action
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Closed
VO-8
Develop and implement a contract
management familiarization guide
to include determination and
to include determination and
documentation of work scope, risk
documentation of work scope, risk
Line 766: Line 1,142:
industry events in the
industry events in the
familiarization guide.
familiarization guide.
VO-9  Perform an organizational            8/28/17 - 05000313/2017012,   Closed
11/27/17 -
capacity assessment for vendor         9/1/17  05000368/2017012
2/1/17
05000313/2017013,
05000368/2017013
Closed
VO-9
Perform an organizational
capacity assessment for vendor
oversight, including contract
oversight, including contract
management and administration,
management and administration,
Line 773: Line 1,155:
department-specific resource
department-specific resource
impacts.
impacts.
VO-10 Evaluate span of control with         2/27/17 - 05000313/2017010,  Closed
8/28/17 -
regard to responsible oversight of     3/3/17  05000368/2017010
9/1/17
05000313/2017012,
05000368/2017012
Closed
VO-10
Evaluate span of control with
regard to responsible oversight of
vendors, and place actions to
vendors, and place actions to
address identified weaknesses in
address identified weaknesses in
the Corrective Action Program.
the Corrective Action Program.
VO-11  Revise the Supplemental              5/22/17 - 05000313/2017011,   Closed
2/27/17 -
Personnel Expectations Brief           5/26/17  05000368/2017011
3/3/17
05000313/2017010,
05000368/2017010
Closed
VO-11
Revise the Supplemental
Personnel Expectations Brief
Checklist to include supplemental
Checklist to include supplemental
personnel receiving a site
personnel receiving a site
Line 787: Line 1,181:
employee handbook and
employee handbook and
expectations for use.
expectations for use.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                              Status
Dates      Number(s)
Plan
Plan
VO-14 Establish a fleet charter team or     2/27/17 - 05000313/2017010,  Closed
Description
ANO team to address                     3/3/17  05000368/2017010
Inspection
Dates
Inspection Report
Number(s)
Status
VO-14
Establish a fleet charter team or
ANO team to address
weaknesses in the procedures for
weaknesses in the procedures for
contractor oversight. Specifically,
contractor oversight. Specifically,
Line 802: Line 1,207:
actions as warranted to address
actions as warranted to address
any gaps identified.
any gaps identified.
VO-15 Review current processes in           10/31/16 - 05000313/2016008,  Closed
2/27/17 -
Engineering related to Vendor           12/2/16  05000368/2016008
3/3/17
05000313/2017010,
05000368/2017010
Closed
VO-15
Review current processes in
Engineering related to Vendor
Oversight Fundamental Problem.
Oversight Fundamental Problem.
Determine if additional actions are
Determine if additional actions are
Line 811: Line 1,222:
additional actions as warranted to
additional actions as warranted to
address any gaps identified.
address any gaps identified.
VO-18  Revise Project Management              8/29/16 - 05000313/2016010, Discussed,
10/31/16 -
procedures to ensure projects are       9/16/16  05000368/2016010  awaiting
2/2/16
organized and managed with (1)                                     licensee
05000313/2016008,
effective support by subject                                         action
05000368/2016008
experts and (2) effective vendor     11/27/17 - 05000313/2017013,   Closed
Closed
and technical oversight.                12/1/17  05000368/2017013
VO-18
VO-20 Issue a procedure for                 2/27/17 - 05000313/2017010, Discussed,
Revise Project Management
management and oversight of             3/3/17  05000368/2017010  awaiting
procedures to ensure projects are
supplemental personnel including                                   licensee
organized and managed with (1)
improvements to (1) defined                                           action
effective support by subject
responsibilities, (2) assessment of   8/28/17 - 05000313/2017012,  Closed
experts and (2) effective vendor
risk, and (3) vendor oversight           9/1/17  05000368/2017012
and technical oversight.
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Discussed,
awaiting
licensee
action
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
VO-20
Issue a procedure for
management and oversight of
supplemental personnel including
improvements to (1) defined
responsibilities, (2) assessment of
risk, and (3) vendor oversight
plans.
plans.
VO-21  Develop and implement recurring        5/22/17 - 05000313/2017011,   Closed
2/27/17 -
DM-9   training for project management         5/26/17  05000368/2017011
3/3/17
05000313/2017010,
05000368/2017010
Discussed,
awaiting
licensee
action
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
VO-21
DM-9
Develop and implement recurring
training for project management
personnel on risk recognition and
personnel on risk recognition and
conservative decision-making.
conservative decision-making.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Area
Area
Inspection  Inspection Report
Action
Action               Description                                                Status
Dates      Number(s)
Plan
Plan
VO-23   Revise EN-DC-114, Project               10/31/16 -  05000313/2016008,  Closed
Description
Management, to provide guidance           12/2/16  05000368/2016008
Inspection
Dates
Inspection Report
Number(s)
Status
VO-23  
 
Revise EN-DC-114, Project
Management, to provide guidance
in specifying contract language
in specifying contract language
which will ensure detailed
which will ensure detailed
Line 844: Line 1,302:
Handling Program, when specially
Handling Program, when specially
designed temporary lift assembles
designed temporary lift assembles
are to be used.
are to be used.  
VO-24   Revise EN-MA-119, to require a         10/31/16 -  05000313/2016008,  Closed
 
documented engineering                     12/2/16  05000368/2016008
10/31/16 -
2/2/16
05000313/2016008,
05000368/2016008
Closed
VO-24
Revise EN-MA-119, to require a
documented engineering
response to evaluation critical lifts
response to evaluation critical lifts
if using any specially designed
if using any specially designed
temporary lifting device, any lifting
temporary lifting device, any lifting
device that cannot be load tested       2/27/17 -  05000313/2017010,  Additional
device that cannot be load tested
per EN-MA-119 criteria, or any             3/3/17  05000368/2017010  information
per EN-MA-119 criteria, or any
lifting device without a certified                                       added
lifting device without a certified
load rating nameplate rating
load rating nameplate rating
affixed to it.
affixed to it.
10/31/16 -
2/2/16
05000313/2016008,
05000368/2016008
Closed
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Additional
information
added
Identifying, Assessing and Correcting Performance Deficiencies
Identifying, Assessing and Correcting Performance Deficiencies
Area
Area
Inspection  Inspection Report
Action
Action               Description                                                  Status
Dates        Number
Plan
Plan
CA-1 Establish Corrective Action                   5/22/17 - 05000313/2017011,    Closed
Description
Program (CAP) content in the ANO           5/26/17  05000368/2017011
Inspection
Dates
Inspection Report
Number
Status
CA-1
Establish Corrective Action
Program (CAP) content in the ANO
Employee Handbook to include
Employee Handbook to include
behaviors for prompt identification
behaviors for prompt identification
of conditions into CA
of conditions into CAP.
: [[contact::P.
5/22/17 -
CA-3 Conduct an organizational capacity          11/27/17 - 05000313/2017013]],   Closed
5/26/17
study to determine and correct             12/1/17  05000368/2017013
05000313/2017011,
05000368/2017011
Closed
CA-3
Conduct an organizational capacity
study to determine and correct
staffing and proficiency needs,
staffing and proficiency needs,
including needs to support CAP
including needs to support CAP
Line 875: Line 1,363:
to support ongoing monitoring and
to support ongoing monitoring and
adjustments.
adjustments.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
CA-4 Develop and implement initial and       5/22/17 - 05000313/2017011,  Closed
Description
continuing CAP training for station     5/26/17  05000368/2017011
Inspection
Dates
Inspection Report
Number
Status
CA-4
Develop and implement initial and
continuing CAP training for station
employees, ACE/RCE evaluators,
employees, ACE/RCE evaluators,
responsible managers (including
responsible managers (including
Line 888: Line 1,387:
and performance improvement
and performance improvement
personnel.
personnel.
CA-5 Train investigators, managers and       8/29/16 - 05000313/2016010,  Closed
5/22/17 -
Performance Improvement (PI)           9/16/16  05000368/2016010
5/26/17
05000313/2017011,
05000368/2017011
Closed
CA-5
Train investigators, managers and
Performance Improvement (PI)
Staff on proper causal techniques,
Staff on proper causal techniques,
manager oversight expectations
manager oversight expectations
Line 898: Line 1,403:
training requirements in these
training requirements in these
areas.
areas.
CA-6 Implement training, benchmarking,      5/22/17 - 05000313/2017011, Discussed,
8/29/16 -
*SII* process improvements, and               5/26/17  05000368/2017011  awaiting
9/16/16
monitoring/feedback to improve                                     licensee
05000313/2016010,
the rigor, attention to detail, and                                   action
05000368/2016010
overall quality of operability         8/28/17 - 05000313/2017012,  Closed
Closed
determinations and functionality         9/1/17  05000368/2017012
CA-6
*SII*
Implement training, benchmarking,
process improvements, and
monitoring/feedback to improve
the rigor, attention to detail, and
overall quality of operability
determinations and functionality
assessments.
assessments.
CA-7 Establish/refine key corrective        8/29/16 - 05000313/2016010, Discussed,
5/22/17 -
action program station and group-      9/16/16  05000368/2016010  awaiting
5/26/17
level performance indicators.                                      licensee
05000313/2017011,
05000368/2017011
Discussed,
awaiting
licensee
action
action
11/27/17 - 05000313/2017013,  Closed
8/28/17 -
2/1/17 05000368/2017013
9/1/17
CA-9  Revise the CARB process to            8/29/16 - 05000313/2016010, Discussed,
05000313/2017012,
require the Performance                9/16/16  05000368/2016010  awaiting
05000368/2017012
Improvement Manager to present                                         CA-7
Closed
the status of the condition                                         closure
CA-7
reporting process using                                           and further
Establish/refine key corrective
established metrics to the CARB.                                   inspection
action program station and group-
11/27/17 - 05000313/2017013,  Closed
level performance indicators.
2/1/17 05000368/2017013
8/29/16 -
CA-10 Improve the periodic performance     11/27/17 - 05000313/2017013,  Closed
9/16/16
reviews and oversight of corrective     12/1/17  05000368/2017013
05000313/2016010,
05000368/2016010
Discussed,
awaiting
licensee
action
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
CA-9
Revise the CARB process to
require the Performance
Improvement Manager to present
the status of the condition
reporting process using
established metrics to the CARB.
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Discussed,
awaiting
CA-7
closure
and further
inspection
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
CA-10
Improve the periodic performance
reviews and oversight of corrective
action program and operating
action program and operating
experience performance in
experience performance in
Line 926: Line 1,477:
Meetings and Aggregate
Meetings and Aggregate
Performance Review Meetings.
Performance Review Meetings.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
CA-11 Revise EN-LI-102 Corrective             8/29/16 - 05000313/2016010,  Closed
Description
Action Program to require a             9/16/16  05000368/2016010
Inspection
Dates
Inspection Report
Number
Status
CA-11
Revise EN-LI-102 Corrective
Action Program to require a
focused self-assessment every 2
focused self-assessment every 2
years focused primarily on whether
years focused primarily on whether
Line 938: Line 1,500:
corrective action program
corrective action program
implementation and oversight.
implementation and oversight.
CA-12 Develop metrics to evaluate and          8/29/16 - 05000313/2016010,   Closed
8/29/16 -
monitor the health of the operating     9/16/16  05000368/2016010
9/16/16
05000313/2016010,
05000368/2016010
Closed
CA-12
Develop metrics to evaluate and
monitor the health of the operating
experience program.
experience program.
CA-13 Establish an Operating Experience       5/22/17 - 05000313/2017011,  Closed
8/29/16 -
      (OE) mentor to review OE                 5/26/17  05000368/2017011
9/16/16
05000313/2016010,
05000368/2016010
Closed
CA-13
Establish an Operating Experience  
(OE) mentor to review OE
responses and provide critical
responses and provide critical
feedback.
feedback.
CA-14 For a period of one year, establish     8/28/17 - 05000313/2017012,  Closed
5/22/17 -
Corrective Action Review Board           9/1/17  05000368/2017012
5/26/17
      (CARB) oversight of selected
05000313/2017011,
05000368/2017011
Closed
CA-14
For a period of one year, establish
Corrective Action Review Board  
(CARB) oversight of selected
operating experience (OE)
operating experience (OE)
responses to verify program
responses to verify program
implementation meets CARB
implementation meets CARB
standards.
standards.
CA-15 Revise the Operating Experience          2/27/17 - 05000313/2017010,   Closed
8/28/17 -
      (OE) actions for selected                 3/3/17  05000368/2017010
9/1/17
05000313/2017012,
05000368/2017012
Closed
CA-15
Revise the Operating Experience
(OE) actions for selected
responses to require a pre-job brief
responses to require a pre-job brief
from the OE specialist. This brief
from the OE specialist. This brief
Line 961: Line 1,547:
procedure requirements for a
procedure requirements for a
satisfactory OE written response.
satisfactory OE written response.
CA-16 Train each Operating Experience          2/27/17 - 05000313/2017010, Discussed,
2/27/17 -
      (OE) point of contact on their           3/3/17  05000368/2017010  awaiting
3/3/17
responsibilities and skills needed                                   licensee
05000313/2017010,
to recognize the applicability of                                     action
05000368/2017010
OE, elevate OE, and use search         8/28/17 - 05000313/2017012,   Closed
Closed
tools to locate OE for evaluation.        9/1/17 05000368/2017012
CA-16
CA-17 Revise Operating Experience (OE)         2/27/17 - 05000313/2017010,  Closed
Train each Operating Experience
Program procedure to include an           3/3/17  05000368/2017010
(OE) point of contact on their
responsibilities and skills needed
to recognize the applicability of
OE, elevate OE, and use search
tools to locate OE for evaluation.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Discussed,
awaiting
licensee
action
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
CA-17
Revise Operating Experience (OE)
Program procedure to include an
annual review of the list of vendors
annual review of the list of vendors
providing safety-related
providing safety-related
products/services to ensure new
products/services to ensure new
suppliers are added.
suppliers are added.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
CO-2 Revise procedure EN-FAP-OM-             5/22/17 - 05000313/2017011,  Closed
Description
2, Management Review                 5/26/17  05000368/2017011
Inspection
Dates
Inspection Report
Number
Status
CO-2
Revise procedure EN-FAP-OM-
2, Management Review
Meetings, to prioritize review of
Meetings, to prioritize review of
Nuclear Safety Culture status and
Nuclear Safety Culture status and
Line 986: Line 1,603:
management review meeting
management review meeting
agenda.
agenda.
CO-3 Align ANO and fleet key                 8/29/16 - 05000313/2016010,  Closed
5/22/17 -
performance indicators with the         9/16/16  05000368/2016010
5/26/17
05000313/2017011,
05000368/2017011
Closed
CO-3
Align ANO and fleet key
performance indicators with the
industry and establish goals that
industry and establish goals that
are challenging and consistent with
are challenging and consistent with
industry practices.
industry practices.
DM-5 Benchmark a nuclear facility             2/27/17 - 05000313/2017010,  Closed
8/29/16 -
outside the Entergy fleet for its         3/3/17  05000368/2017010
9/16/16
05000313/2016010,
05000368/2016010
Closed
DM-5
Benchmark a nuclear facility
outside the Entergy fleet for its
ability to recognize risk.
ability to recognize risk.
Incorporate the learnings and
Incorporate the learnings and
develop a risk recognition training
develop a risk recognition training
plan to be delivered at AN
plan to be delivered at ANO.
: [[contact::O.
2/27/17 -
DM-12 Conduct benchmarking of a high           2/12/18 - 05000313/2018012]],  Closed
3/3/17
performing station in the area of       2/16/18  05000368/2018012
05000313/2017010,
05000368/2017010
Closed
DM-12 Conduct benchmarking of a high
performing station in the area of
operations focus with a plan based
operations focus with a plan based
on Principles for Effective
on Principles for Effective
Operational Decision Making.
Operational Decision Making.
DM-15 Perform a benchmark on a high            2/12/18 - 05000313/2018012,   Closed
2/12/18 -
performing station outside the           2/16/18  05000368/2018012
2/16/18
05000313/2018012,
05000368/2018012
Closed
DM-15 Perform a benchmark on a high
performing station outside the
Entergy Fleet on Operational
Entergy Fleet on Operational
Decision Making Instruction
Decision Making Instruction  
      (ODMI) development,
(ODMI) development,
implementation and effectiveness
implementation and effectiveness
reviews, and develop improvement
reviews, and develop improvement
actions based upon the results.
actions based upon the results.
DM-22 Benchmark outside the Entergy           11/27/17 - 05000313/2017013,  Closed
2/12/18 -
fleet to identify best practices in     12/1/17  05000368/2017013
2/16/18
05000313/2018012,
05000368/2018012
Closed
DM-22 Benchmark outside the Entergy
fleet to identify best practices in
the work management process.
the work management process.
DM-23 Have a group from another plant         2/27/17 - 05000313/2017010, Discussed,
11/27/17 -
perform a peer assist visit in work       3/3/17 05000368/2017010   awaiting
2/1/17
management.                                                          licensee
05000313/2017013,
05000368/2017013
Closed
DM-23 Have a group from another plant
perform a peer assist visit in work
management.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Discussed,
awaiting
licensee
action
action
11/27/17 - 05000313/2017013,  Closed
11/27/17 -
2/1/17 05000368/2017013
2/1/17
LF-11 Create trending and issue             11/27/17 - 05000313/2017013,  Closed
05000313/2017013,
performance review metrics to           12/1/17  05000368/2017013
05000368/2017013
Closed
LF-11
Create trending and issue
performance review metrics to
improve the review of leader
improve the review of leader
behaviors and performance
behaviors and performance
results.
results.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
OC-6 Create a simple tool to analyze           8/29/16 - 05000313/2016010, Discussed,
Description
LF-14 externally identified performance          9/16/16 05000368/2016010   awaiting
Inspection
issues both individually and in                                        further
Dates
aggregate to present actionable                                      inspection
Inspection Report
data to the Aggregate                  11/27/17 - 05000313/2017013,   Closed
Number
Performance Review Meeting                12/1/17  05000368/2017013
Status
      (APRM).
OC-6
PH-9 Conduct a benchmark of the Plant         2/27/17 - 05000313/2017010,  Closed
LF-14
Health Committee and Plant                 3/3/17  05000368/2017010
Create a simple tool to analyze
externally identified performance
issues both individually and in
aggregate to present actionable
data to the Aggregate
Performance Review Meeting
(APRM).
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Discussed,
awaiting
further
inspection
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
PH-9
Conduct a benchmark of the Plant
Health Committee and Plant
Health Working Group at a
Health Working Group at a
recognized industry leader in
recognized industry leader in
Line 1,048: Line 1,733:
establishing a Plant Health
establishing a Plant Health
Working Group.
Working Group.
PM-6 The Event Report Review Board             8/28/17 - 05000313/2017012,  Closed
2/27/17 -
will review all formal operating           9/1/17  05000368/2017012
3/3/17
05000313/2017010,
05000368/2017010
Closed
PM-6
The Event Report Review Board
will review all formal operating
experience (OE) evaluations for 12
experience (OE) evaluations for 12
months and initiate corrective
months and initiate corrective
action for any that do not meet
action for any that do not meet
management standards for quality.
management standards for quality.
PM-9 Develop metrics for the number of         2/27/17 - 05000313/2017010,  Closed
8/28/17 -
open craft work order feedback             3/3/17  05000368/2017010
9/1/17
05000313/2017012,
05000368/2017012
Closed
PM-9
Develop metrics for the number of
open craft work order feedback
requests.
requests.
PM-10 Reestablish the Preventive                5/22/17 - 05000313/2017011,   Closed
2/27/17 -
Maintenance (PM) Program health           5/26/17  05000368/2017011
3/3/17
05000313/2017010,
05000368/2017010
Closed
PM-10
Reestablish the Preventive
Maintenance (PM) Program health
report for a period of at least 12
report for a period of at least 12
months.
months.
TR-2 Define and incorporate guidance in       8/28/17 - 05000313/2017012,  Closed
5/22/17 -
the condition report (CR) screening       9/1/17  05000368/2017012
5/26/17
05000313/2017011,
05000368/2017011
Closed
TR-2
Define and incorporate guidance in
the condition report (CR) screening
and review process to prompt
and review process to prompt
discussion and/or action for
discussion and/or action for
conditions potentially warranting a
conditions potentially warranting a
training solution.
training solution.
TR-3 Define and incorporate practical          8/29/16 - 05000313/2016010,   Closed
8/28/17 -
guidance in Procedure EN-LI-121,         9/16/16  05000368/2016010
9/1/17
05000313/2017012,
05000368/2017012
Closed
TR-3
Define and incorporate practical
guidance in Procedure EN-LI-121,
Trending and Performance
Trending and Performance
Review, to support consideration
Review, to support consideration
Line 1,074: Line 1,789:
for organizational performance
for organizational performance
issues.
issues.
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
TR-4 Training Manager provide                 11/27/17 - 05000313/2017013, Closed
Description
presentation(s) to managers and           12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
TR-4
Training Manager provide
presentation(s) to managers and
Department Performance
Department Performance
Improvement Coordinators on the
Improvement Coordinators on the
Line 1,086: Line 1,812:
organizational performance
organizational performance
improvement.
improvement.
TR-5 Factor training needs into              11/27/17 - 05000313/2017013, Closed
11/27/17 -
resources for key departments,           12/1/17  05000368/2017013
2/1/17
05000313/2017013,
05000368/2017013
Closed
TR-5
Factor training needs into
resources for key departments,
including the training department,
including the training department,
to ensure that resources support
to ensure that resources support
Line 1,095: Line 1,827:
training beyond that necessary for
training beyond that necessary for
accredited programs.
accredited programs.
VO-16 Benchmark an industry leader              8/28/17 - 05000313/2017012, Closed
11/27/17 -
outside the Entergy fleet to capture       9/1/17  05000368/2017012
2/1/17
05000313/2017013,
05000368/2017013
Closed
VO-16
Benchmark an industry leader
outside the Entergy fleet to capture
best practices in vendor oversight.
best practices in vendor oversight.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
Human Performance
Human Performance
Area
Area
Inspection  Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
DB-9 Experienced mentors will be             11/27/17 - 05000313/2017013, Closed
Description
assigned to the component and             12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
DB-9
Experienced mentors will be
assigned to the component and
programs areas from July 1, 2016,
programs areas from July 1, 2016,
through July 1, 2017. This
through July 1, 2017. This
Line 1,115: Line 1,864:
knowledge and proficiency in these
knowledge and proficiency in these
areas.
areas.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
DB-17 An engineering standard will be         2/12/18 - 05000313/2018012, Closed
Description
produced to provide sustainable,         2/16/18  05000368/2018012
Inspection
Dates
Inspection Report
Number
Status
DB-17
An engineering standard will be
produced to provide sustainable,
consistent guidance to station
consistent guidance to station
engineers in the performance of
engineers in the performance of
Line 1,133: Line 1,893:
are clearly articulated to the
are clearly articulated to the
workforce.
workforce.
DB-18 Re-baseline expectations for             5/22/17 - 05000313/2017011, Closed
2/12/18 -
supporting information for NRC           5/26/17  05000368/2017011
2/16/18
05000313/2018012,
05000368/2018012
Closed
DB-18
Re-baseline expectations for
supporting information for NRC
license amendment requests or
license amendment requests or
relief requests based on past
relief requests based on past
requests for additional information.
requests for additional information.
DB-19 Provide Regulatory Assurance            5/22/17 - 05000313/2017011, Closed
5/22/17 -
departmental training on                 5/26/17  05000368/2017011
5/26/17
05000313/2017011,
05000368/2017011
Closed
DB-19
Provide Regulatory Assurance
departmental training on
development of NRC license
development of NRC license
amendment requests.
amendment requests.
DM-13 Assign a mentor from outside the       11/27/17 - 05000313/2017013, Closed
5/22/17 -
Entergy fleet to coach and mentor       12/1/17  05000368/2017013
5/26/17
05000313/2017011,
05000368/2017011
Closed
DM-13 Assign a mentor from outside the
Entergy fleet to coach and mentor
each shift manager, emphasizing
each shift manager, emphasizing
the aspect of leadership in
the aspect of leadership in
operational focus.
operational focus.
DM-14 Assign a mentor to review all           2/12/18 - 05000313/2018012, Closed
11/27/17 -
Operational Decision Making             2/16/18  05000368/2018012
2/1/17
05000313/2017013,
05000368/2017013
Closed
DM-14 Assign a mentor to review all
Operational Decision Making
Instructions until proficiency is
Instructions until proficiency is
demonstrated.
demonstrated.
DM-16 Develop and implement training for      2/12/18 - 05000313/2018012, Closed
2/12/18 -
key personnel on ODMI                   2/16/18  05000368/2018012
2/16/18
05000313/2018012,
05000368/2018012
Closed
DM-16 Develop and implement training for
key personnel on ODMI
development, implementation, and
development, implementation, and
effectiveness reviews.
effectiveness reviews.
DM-17 Develop roles and responsibilities       8/28/17 - 05000313/2017012, Closed
2/12/18 -
for the quorum line participants in       9/1/17  05000368/2017012
2/16/18
05000313/2018012,
05000368/2018012
Closed
DM-17 Develop roles and responsibilities
for the quorum line participants in
the work management process.
the work management process.
LF-1 Conduct leadership assessments          2/27/17 - 05000313/2017010, Closed
8/28/17 -
for the senior leadership team,           3/3/17  05000368/2017010
9/1/17
05000313/2017012,
05000368/2017012
Closed
LF-1
Conduct leadership assessments
for the senior leadership team,
managers and superintendents
managers and superintendents
and establish individual
and establish individual
Line 1,165: Line 1,963:
closing identified gaps in leader
closing identified gaps in leader
behaviors.
behaviors.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
LF-2 Establish and roll out an ANO           11/27/17 - 05000313/2017013, Closed
Description
employee handbook with attributes       12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
LF-2
Establish and roll out an ANO
employee handbook with attributes
and behaviors supporting nuclear
and behaviors supporting nuclear
safety and long term strategic
safety and long term strategic
Line 1,178: Line 1,987:
reinforce key values and
reinforce key values and
behaviors.
behaviors.
LF-3 Provide supervisory training on         2/12/18 - 05000313/2018012, Closed
11/27/17 -
constructive conversation skills.        2/16/18 05000368/2018012
2/1/17
LF-4 As an interim action, establish         8/29/16 - 05000313/2016010, Closed
05000313/2017013,
weekly leadership alignment             9/16/16  05000368/2016010
05000368/2017013
Closed
LF-3
Provide supervisory training on
constructive conversation skills.
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Closed
LF-4
As an interim action, establish
weekly leadership alignment
meetings for supervisors and
meetings for supervisors and
above to reinforce actions and
above to reinforce actions and
behaviors needed to achieve
behaviors needed to achieve
recovery objectives.
recovery objectives.
LF-6 Benchmark an external                    2/27/17 - 05000313/2017010, Closed
8/29/16 -
organization for leadership               3/3/17  05000368/2017010
9/16/16
05000313/2016010,
05000368/2016010
Closed
LF-6
Benchmark an external
organization for leadership
fundamentals and develop
fundamentals and develop
improvement actions as warranted
improvement actions as warranted
based upon the results.
based upon the results.
LF-8 As an interim measure, establish         8/29/16 - 05000313/2016010, Closed
2/27/17 -
and implement external coaching         9/16/16  05000368/2016010
3/3/17
05000313/2017010,
05000368/2017010
Closed
LF-8
As an interim measure, establish
and implement external coaching
for a sample of department and
for a sample of department and
station performance review
station performance review
meetings in the Trending and
meetings in the Trending and
Performance Review process.
Performance Review process.
LF-10 Establish and implement a paired        8/29/16 - 05000313/2016010, Closed
8/29/16 -
NF-10 observation program. This is a           9/16/16  05000368/2016010
9/16/16
05000313/2016010,
05000368/2016010
Closed
LF-10
NF-10
Establish and implement a paired
observation program. This is a
coach the coach program to
coach the coach program to
improve the quality of interactions
improve the quality of interactions
between supervisors and those
between supervisors and those
they supervise.
they supervise.
NF-1 Implement a What It Looks Like           8/28/17 - 05000313/2017012, Closed
8/29/16 -
sheet for nuclear professional           9/1/17  05000368/2017012
9/16/16
05000313/2016010,
05000368/2016010
Closed
NF-1
Implement a What It Looks Like
sheet for nuclear professional
behaviors based on objectives in
behaviors based on objectives in
Performance Objectives and
Performance Objectives and
Criteria. Include a continued
Criteria. Include a continued
focus on the following four
focus on the following four
performance issues:
performance issues:  
      * Procedure use and adherence
* Procedure use and adherence  
      * Challenging assumptions and
* Challenging assumptions and
decision making
decision making  
      * Conservative bias and risk
* Conservative bias and risk
recognition
recognition  
      * Low threshold for reporting
* Low threshold for reporting
issues.
issues.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
NF-3 Develop content for the Employee           8/28/17 - 05000313/2017012, Closed
Description
Handbook that addresses                     9/1/17  05000368/2017012
Inspection
Dates
Inspection Report
Number
Status
NF-3
Develop content for the Employee
Handbook that addresses
procedure use and adherence.
procedure use and adherence.
NF-5 Develop content for the ANO                8/28/17 - 05000313/2017012, Closed
8/28/17 -
supervisor training that addresses         9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
NF-5
Develop content for the ANO
supervisor training that addresses
procedure use and adherence.
procedure use and adherence.
NF-6 Revise procedure EN-OM-126,               5/22/17 - 05000313/2017011, Closed
8/28/17 -
Management and Oversight of               5/26/17  05000368/2017011
9/1/17
05000313/2017012,
05000368/2017012
Closed
NF-6
Revise procedure EN-OM-126,
Management and Oversight of
Supplemental Personnel, to
Supplemental Personnel, to
ensure that supplemental
ensure that supplemental
employees receive the Site
employees receive the Site
Handbook.
Handbook.
NF-9 Develop and implement a field            11/27/17 - 05000313/2017013, Closed
5/22/17 -
SC-8 presence initiative that promotes         12/1/17  05000368/2017013
5/26/17
05000313/2017011,
05000368/2017011
Closed
NF-9
SC-8
Develop and implement a field
presence initiative that promotes
and measures leader field
and measures leader field
presence. The objective is to drive
presence. The objective is to drive
Line 1,241: Line 2,117:
leaders to engage with employees
leaders to engage with employees
and reinforce high standards.
and reinforce high standards.
OC-1 Perform organizational capacity            8/28/17 - 05000313/2017012, Closed
11/27/17 -
assessments to determine staffing           9/1/17  05000368/2017012
2/1/17
05000313/2017013,
05000368/2017013
Closed
OC-1
Perform organizational capacity
assessments to determine staffing
requirements for 16 key
requirements for 16 key
departments based on experience,
departments based on experience,
Line 1,250: Line 2,132:
and reassignments and the needs
and reassignments and the needs
for a site with two dissimilar units.
for a site with two dissimilar units.
OC-2 Authorize the hiring of Entergy            8/28/17 - 05000313/2017012, Closed
8/28/17 -
personnel and/or contractor                 9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
OC-2
Authorize the hiring of Entergy
personnel and/or contractor
positions identified as immediate
positions identified as immediate
staffing requirements by the ANO
staffing requirements by the ANO
Line 1,257: Line 2,145:
during organizational capacity
during organizational capacity
assessment reviews.
assessment reviews.
OC-3 Establish and implement an ANO            8/28/17 - 05000313/2017012, Closed
8/28/17 -
Integrated Strategic Workforce             9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
OC-3
Establish and implement an ANO
Integrated Strategic Workforce
Plan that provides a strategic long-
Plan that provides a strategic long-
term perspective of future staffing
term perspective of future staffing
Line 1,269: Line 2,163:
quarterly by the ANO People
quarterly by the ANO People
Health Committee.
Health Committee.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
OC-4 Establish and implement an ANO         11/27/17 - 05000313/2017013,  Closed
Description
People Health Committee to place         12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
OC-4
Establish and implement an ANO
People Health Committee to place
priority on staffing and retention
priority on staffing and retention
issues that are impacting ANO
issues that are impacting ANO
employees or could impact nuclear
employees or could impact nuclear
safety.
safety.
PM-13 Perform a resource allocation            8/28/17 - 05000313/2017012,   Closed
11/27/17 -
study of the Preventive                   9/1/17  05000368/2017012
2/1/17
05000313/2017013,
05000368/2017013
Closed
PM-13 Perform a resource allocation
study of the Preventive
Maintenance (PM) Program that
Maintenance (PM) Program that
identifies positions needed to
identifies positions needed to
maintain a continuously improving
maintain a continuously improving
PM Program.
PM Program.
PM-14 Address gaps in the Preventive           2/12/18 - 05000313/2018012,  Closed
8/28/17 -
Maintenance Program baseline             2/16/18  05000368/2018012
9/1/17
05000313/2017012,
05000368/2017012
Closed
PM-14 Address gaps in the Preventive
Maintenance Program baseline
staffing level based on the current
staffing level based on the current
levels of experience in the
levels of experience in the
departments and at the site.
departments and at the site.
PM-19 Revise the Preventive                  11/27/17 - 05000313/2017013,   Closed
2/12/18 -
Maintenance (PM) procedure to           12/1/17  05000368/2017013
2/16/18
05000313/2018012,
05000368/2018012
Closed
PM-19 Revise the Preventive
Maintenance (PM) procedure to
require that craft work order
require that craft work order
feedback is monitored and
feedback is monitored and
Line 1,298: Line 2,218:
model work order placed into
model work order placed into
plan status.
plan status.
PQ-1 Develop and implement a site            2/27/17 - 05000313/2017010,   Closed
11/27/17 -
procedure writers guide based on         3/3/17  05000368/2017010
2/1/17
05000313/2017013,
05000368/2017013
Closed
PQ-1
Develop and implement a site
procedure writers guide based on
applicable industry standards.
applicable industry standards.
PQ-2 Develop and implement a work            2/27/17 - 05000313/2017010,   Closed
2/27/17 -
order instruction guide based on         3/3/17  05000368/2017010
3/3/17
05000313/2017010,
05000368/2017010
Closed
PQ-2
Develop and implement a work
order instruction guide based on
applicable industry standards.
applicable industry standards.
PQ-3 Perform scoping reviews to assess       8/29/16 - 05000313/2016010,  Closed
2/27/17 -
extent of procedure and work             9/16/16  05000368/2016010
3/3/17
05000313/2017010,
05000368/2017010
Closed
PQ-3
Perform scoping reviews to assess
extent of procedure and work
instruction quality issues.
instruction quality issues.
PQ-4 Conduct a Procedure                     2/27/17 - 05000313/2017010, Discussed,
8/29/16 -
Professionals Association                3/3/17 05000368/2017010   awaiting
9/16/16
certification course for selected                                    licensee
05000313/2016010,
plant personnel.                                                      action
05000368/2016010
11/27/17 - 05000313/2017013,  Closed
Closed
2/1/17 05000368/2017013
PQ-4
PQ-5 Risk rank station procedures as         8/29/16 - 05000313/2016010,  Closed
Conduct a Procedure
safety significant, important, or       9/16/16  05000368/2016010
Professionals Association
certification course for selected
plant personnel.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Discussed,
awaiting
licensee
action
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
PQ-5
Risk rank station procedures as
safety significant, important, or
normal to facilitate procedure
normal to facilitate procedure
upgrade project scoping.
upgrade project scoping.
PQ-6 Upgrade safety significant           5/22/17 - 05000313/2017011,  Closed
8/29/16 -
procedures.                              5/26/17 05000368/2017011
9/16/16
PQ-7 Upgrade procedures classified as       8/28/17 - 05000313/2017012,  Closed
05000313/2016010,
important.                              9/1/17 05000368/2017012
05000368/2016010
Closed
PQ-6
Upgrade safety significant
procedures.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
PQ-7
Upgrade procedures classified as
important.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
 
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
PQ-8 Upgrade procedures classified as       2/12/18 - 05000313/2018012,  Closed
Description
normal.                              2/16/18 05000368/2018012
Inspection
PQ-9 Upgrade Critical 1-4 Model Work         2/12/18 - 05000313/2018012,  Closed
Dates
Orders with a frequency of greater     2/16/18  05000368/2018012
Inspection Report
Number
Status
PQ-8
Upgrade procedures classified as
normal.
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Closed
PQ-9
Upgrade Critical 1-4 Model Work
Orders with a frequency of greater
than or equal to 2 years or 2
than or equal to 2 years or 2
refueling outages.
refueling outages.
PQ-10 Review and correct station             5/22/17 - 05000313/2017011,  Closed
2/12/18 -
procedures with respect to gaps in     5/26/17  05000368/2017011
2/16/18
05000313/2018012,
05000368/2018012
Closed
PQ-10
Review and correct station
procedures with respect to gaps in
use of notes and cautions, and
use of notes and cautions, and
ensure needed corrections are
ensure needed corrections are
entered into the appropriate station
entered into the appropriate station
processes for completion.
processes for completion.
PQ-11 Establish a periodic review and        5/22/17 - 05000313/2017011,   Closed
5/22/17 -
validation of station procedures.       5/26/17  05000368/2017011
5/26/17
05000313/2017011,
05000368/2017011
Closed
PQ-11
Establish a periodic review and
validation of station procedures.
This will also support a systematic
This will also support a systematic
approach to revising the station
approach to revising the station
Line 1,345: Line 2,342:
actions to the standards contained
actions to the standards contained
in the new writers guide.
in the new writers guide.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Equipment Reliability and Engineering Programs
Equipment Reliability and Engineering Programs
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
DB-10 Resolve standards performance           2/12/18 - 05000313/2018012,  Closed
Description
deficiencies from the engineering       2/16/18  05000368/2018012
Inspection
Dates
Inspection Report
Number
Status
DB-10
Resolve standards performance
deficiencies from the engineering
program assessments completed
program assessments completed
during the Preventive Maintenance
during the Preventive Maintenance  
        (PM) Program extent of condition
(PM) Program extent of condition
review.
review.
DB-11 Perform one benchmark or one            2/12/18 - 05000313/2018012, Discussed,
2/12/18 -
self-assessment between March 1,       2/16/18  05000368/2018012  awaiting
2/16/18
2016, and March 1, 2020, for each                                   licensee
05000313/2018012,
of 24 engineering programs.                                           action
05000368/2018012
4/2/18 - 05000313/2018013,  Closed
Closed
5/31/18 05000368/2018013
DB-11
Perform one benchmark or one
self-assessment between March 1,
2016, and March 1, 2020, for each
of 24 engineering programs.
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Discussed,
awaiting
licensee
action
4/2/18 -
5/31/18
05000313/2018013,
05000368/2018013
Closed
 
Area
Area
Inspection  Inspection Report
Action
Action             Description                                                Status
Dates        Number
Plan
Plan
DB-12 Training and industry exposure will       11/27/17 - 05000313/2017013,  Closed
Description
be used to build the knowledge,             12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
DB-12
Training and industry exposure will
be used to build the knowledge,
proficiency and standards within
proficiency and standards within
the program and component areas
the program and component areas
Line 1,378: Line 2,409:
in their program area between
in their program area between
March 1, 2016 and March 1, 2020.
March 1, 2016 and March 1, 2020.
DM-18 Develop and implement work                  2/12/18 - 05000313/2018012,   Closed
11/27/17 -
management training for senior             2/16/18  05000368/2018012
2/1/17
05000313/2017013,
05000368/2017013
Closed
DM-18 Develop and implement work
management training for senior
managers, managers, and each of
managers, managers, and each of
the identified work management
the identified work management
positions with respect to their roles
positions with respect to their roles
and responsibilities.
and responsibilities.
DM-20 Develop and implement a supply             8/29/16 - 05000313/2016010, Discussed,
2/12/18 -
vs. demand model and metrics to             9/16/16  05000368/2016010  awaiting
2/16/18
determine and monitor resource                                         licensee
05000313/2018012,
needs to meet workload demand.                                           action
05000368/2018012
The metrics will be used to               2/12/18 - 05000313/2018012,  Closed
Closed
measure resource demand and                 2/16/18  05000368/2018012
DM-20 Develop and implement a supply
vs. demand model and metrics to
determine and monitor resource
needs to meet workload demand.
The metrics will be used to
measure resource demand and
supply so that scheduled work has
supply so that scheduled work has
the correct resources assigned to
the correct resources assigned to
complete the work scope.
complete the work scope.
PH-1 For open Site Integrated Plant             5/22/17 - 05000313/2017011,  Closed
8/29/16 -
Database (SIPD) items, ensure               5/26/17  05000368/2017011
9/16/16
05000313/2016010,
05000368/2016010
Discussed,
awaiting
licensee
action
2/12/18 -
2/16/18
05000313/2018012,
05000368/2018012
Closed
PH-1
For open Site Integrated Plant
Database (SIPD) items, ensure
management sponsors and project
management sponsors and project
managers are assigned to verify
managers are assigned to verify
Line 1,402: Line 2,457:
and completeness of existing SIPD
and completeness of existing SIPD
records.
records.
PH-2 Perform a review of the Site                5/22/17 - 05000313/2017011,   Closed
5/22/17 -
Integrated Plant Database (SIPD)           5/26/17  05000368/2017011
5/26/17
05000313/2017011,
05000368/2017011
Closed
PH-2
Perform a review of the Site
Integrated Plant Database (SIPD)
database from 2007 to present to
database from 2007 to present to
identify PM or equipment reliability
identify PM or equipment reliability
Line 1,410: Line 2,471:
cancelled without mitigation
cancelled without mitigation
strategies.
strategies.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
PH-3 Review and update the current             11/27/17 - 05000313/2017013, Closed
Description
Aging/Obsolescence List, Critical         12/1/17  05000368/2017013
Inspection
Dates
Inspection Report
Number
Status
PH-3
Review and update the current
Aging/Obsolescence List, Critical
Spares List, and Equipment
Spares List, and Equipment
Reliability Issues List to identify
Reliability Issues List to identify
Line 1,422: Line 2,494:
the 2017 and 2018 business
the 2017 and 2018 business
cycles.
cycles.
PH-4 Review and update the current site        11/27/17 - 05000313/2017013, Closed
11/27/17 -
Unit Commitment List to identify           12/1/17  05000368/2017013
2/1/17
05000313/2017013,
05000368/2017013
Closed
PH-4
Review and update the current site
Unit Commitment List to identify
operations and maintenance and
operations and maintenance and
capital projects which are required
capital projects which are required
to be resolved by completion of
to be resolved by completion of
refueling outages 1R27 and 2R26.
refueling outages 1R27 and 2R26.
PH-5 Develop and implement a                  11/27/17 - 05000313/2017013, Closed
11/27/17 -
comprehensive site plan for               12/1/17  05000368/2017013
2/1/17
05000313/2017013,
05000368/2017013
Closed
PH-5
Develop and implement a
comprehensive site plan for
equipment reliability that identifies
equipment reliability that identifies
the implementing resources
the implementing resources  
      (people, materials, funding, and
(people, materials, funding, and
time) needed to support on-line
time) needed to support on-line
and outage Unit Commitment List
and outage Unit Commitment List
items that require resolution by
items that require resolution by
completion of 1R27 and 2R26.
completion of 1R27 and 2R26.
PH-6 Obtain an independent third party        11/27/17 - 05000313/2017013, Closed
11/27/17 -
review of the selection of Site           12/1/17  05000368/2017013
2/1/17
Integrated Planning Database
05000313/2017013,
      (SIPD) items that are targeted on
05000368/2017013
Closed
PH-6
Obtain an independent third party
review of the selection of Site
Integrated Planning Database  
(SIPD) items that are targeted on
the comprehensive site plan for
the comprehensive site plan for
equipment reliability to ensure the
equipment reliability to ensure the
Line 1,449: Line 2,539:
degraded equipment and design
degraded equipment and design
margins.
margins.
PH-10 Develop educational materials for          5/22/17 - 05000313/2017011, Closed
11/27/17 -
the plant heath process including         5/26/17  05000368/2017011
2/1/17
05000313/2017013,
05000368/2017013
Closed
PH-10
Develop educational materials for
the plant heath process including
SIPD processing. Include a
SIPD processing. Include a
detailed flowchart, workbook, and
detailed flowchart, workbook, and
Line 1,460: Line 2,556:
workbook completed by personnel
workbook completed by personnel
following the presentation.
following the presentation.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                                Status
Dates        Number
Plan
Plan
PH-11 Develop a job familiarization guide       2/27/17 - 05000313/2017010,  Closed
Description
for Plant Health Working Group             3/3/17  05000368/2017010
Inspection
Dates
Inspection Report
Number
Status
PH-11
Develop a job familiarization guide
for Plant Health Working Group
and Plant Health Committee
and Plant Health Committee
members and alternates. Have all
members and alternates. Have all
members and alternates complete
members and alternates complete
the guide.
the guide.
PH-12 The following list contains               8/25/17 - 05000313/2017012,  Additional
2/27/17 -
equipment reliability issues in           9/1/17  05000368/2017012  information
3/3/17
systems or components necessary                                         added
05000313/2017010,
for the safe and reliable operation     11/27/17 - 05000313/2017013,  Additional
05000368/2017010
of the unit(s) that will be resolved     12/1/17  05000368/2017013  information
Closed
over the next two unit operating                                       added
PH-12
cycles. The intent of this action is     4/2/18 -  05000313/2018013,  Closed
The following list contains
to demonstrate improved                   5/31/18  05000368/2018013
equipment reliability issues in
systems or components necessary
for the safe and reliable operation
of the unit(s) that will be resolved
over the next two unit operating
cycles. The intent of this action is
to demonstrate improved
equipment reliability by resolving
equipment reliability by resolving
long-standing equipment issues.
long-standing equipment issues.
PH-13 The following list contains              2/12/18 - 05000313/2018012, Additional
8/25/17 -
equipment reliability issues that        2/16/18  05000368/2018012  information
9/1/17
are being evaluated by the Plant                                        added
05000313/2017012,
Health Committee for resolution          4/2/18 - 05000313/2018013,   Closed
05000368/2017012
commensurate with the potential           5/31/18  05000368/2018013
Additional
information
added
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Additional
information
added
4/2/18 -
5/31/18
05000313/2018013,
05000368/2018013
Closed
PH-13
The following list contains
equipment reliability issues that
are being evaluated by the Plant
Health Committee for resolution
commensurate with the potential
impact on safe and reliable
impact on safe and reliable
operation of the units by December
operation of the units by December
Line 1,492: Line 2,625:
Committee will provide the safety
Committee will provide the safety
basis for the extension.
basis for the extension.
PH-14 Review and update the current site        4/2/18 - 05000313/2018013,   Closed
2/12/18 -
Unit Commitment List to identify         5/31/18  05000368/2018013
2/16/18
05000313/2018012,
05000368/2018012
Additional
information
added
4/2/18 -
5/31/18
05000313/2018013,
05000368/2018013
Closed
PH-14
Review and update the current site
Unit Commitment List to identify
operations and maintenance and
operations and maintenance and
capital projects which are required
capital projects which are required
to be resolved by completion of
to be resolved by completion of
refueling outages 1R27 and 2R26.
refueling outages 1R27 and 2R26.
PM-1 Create a site specific procedure for     10/31/16 - 05000313/2016008,  Closed
4/2/18 -
component classification that will       12/2/16  05000368/2016008
5/31/18
05000313/2018013,
05000368/2018013
Closed
PM-1
Create a site specific procedure for
component classification that will
ensure appropriate classification of
ensure appropriate classification of
equipment for PM based upon risk
equipment for PM based upon risk
and safety.
and safety.
PM-2 Create a site-specific PM program         2/27/17 - 05000313/2017010,  Closed
10/31/16 -
procedure that includes lessons           3/3/17  05000368/2017010
2/2/16
05000313/2016008,
05000368/2016008
Closed
PM-2
Create a site-specific PM program
procedure that includes lessons
learned from the PM FPA root
learned from the PM FPA root
cause related to critical input to PM
cause related to critical input to PM
changes.
changes.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Closed
Area
Area
Inspection Inspection Report
Action
Action               Description                                              Status
Dates        Number
Plan
Plan
PM-4 Transfer responsibility for PM             2/27/17 - 05000313/2017010, Closed
Description
evaluations of all maintenance rule         3/3/17  05000368/2017010
Inspection
Dates
Inspection Report
Number
Status
PM-4
Transfer responsibility for PM
evaluations of all maintenance rule
components and critical system
components and critical system
redundancy components to
redundancy components to
Line 1,520: Line 2,689:
appropriate expertise is brought to
appropriate expertise is brought to
bear on these evaluations.
bear on these evaluations.
PM-5 The Preventive Maintenance (PM)             8/28/17 - 05000313/2017012, Closed
2/27/17 -
Oversight Group will review all PM           9/1/17  05000368/2017012
3/3/17
05000313/2017010,
05000368/2017010
Closed
PM-5
The Preventive Maintenance (PM)
Oversight Group will review all PM
change requests for a minimum of
change requests for a minimum of
months and initiate corrective
months and initiate corrective
action for any that do not meet
action for any that do not meet
management standards for quality.
management standards for quality.
PM-7 The Planning Quality Review                 2/12/18 - 05000313/2018012, Closed
8/28/17 -
Team will perform an enhanced               2/16/18  05000368/2018012
9/1/17
05000313/2017012,
05000368/2017012
Closed
PM-7
The Planning Quality Review
Team will perform an enhanced
review of critical work orders for a
review of critical work orders for a
minimum of 12 months and
minimum of 12 months and
feedback the results to the
feedback the results to the
planning staff.
planning staff.
PM-11 Implement a new qualification card         2/27/17 - 05000313/2017010, Closed
2/12/18 -
for maintenance personnel who               3/3/17  05000368/2017010
2/16/18
05000313/2018012,
05000368/2018012
Closed
PM-11 Implement a new qualification card
for maintenance personnel who
perform PM evaluations.
perform PM evaluations.
PM-12 Implement training for all                  8/28/17 - 05000313/2017012, Closed
2/27/17 -
personnel who are qualified to               9/1/17  05000368/2017012
3/3/17
establish Preventive Maintenance
05000313/2017010,
      (PM) requirements.
05000368/2017010
PM-15 Review a sample of component               2/12/18 - 05000313/2018012, Closed
Closed
criticality classifications to validate     2/16/18  05000368/2018012
PM-12 Implement training for all
personnel who are qualified to
establish Preventive Maintenance  
(PM) requirements.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
PM-15 Review a sample of component
criticality classifications to validate
that the stations risk significant
that the stations risk significant
equipment is classified correctly.
equipment is classified correctly.
PM-18 Develop mitigation strategies to           8/28/17 - 05000313/2017012, Closed
2/12/18 -
address cancelled projects in the           9/1/17  05000368/2017012
2/16/18
Site Integrated Planning Database
05000313/2018012,
      (SIPD) including embedded sub
05000368/2018012
Closed
PM-18 Develop mitigation strategies to
address cancelled projects in the
Site Integrated Planning Database  
(SIPD) including embedded sub
component projects.
component projects.
8/28/17 -
9/1/17
05000313/2017012,
05000368/2017012
Closed
Safety Culture
Safety Culture
Area
Area
Inspection  Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
CO-1 Revise procedure EN-FAP-OM-               5/22/17 - 05000313/2017011, Closed
Description
011, Corporate Oversight Model,       5/26/17  05000368/2017011
Inspection
Dates
Inspection Report
Number
Status
CO-1
Revise procedure EN-FAP-OM-
011, Corporate Oversight Model,
to include station nuclear safety
to include station nuclear safety
culture output from the Nuclear
culture output from the Nuclear
Safety Culture Monitoring Panel
Safety Culture Monitoring Panel  
        (NSCMP) as inputs to the
(NSCMP) as inputs to the
Oversight Analysis Meeting and
Oversight Analysis Meeting and
Oversight Review Board.
Oversight Review Board.
CO-4 Revise procedures that govern            2/27/17 - 05000313/2017010, Closed
5/22/17 -
Nuclear Oversight Performance             3/3/17  05000368/2017010
5/26/17
05000313/2017011,
05000368/2017011
Closed
CO-4
Revise procedures that govern
Nuclear Oversight Performance
Assessments to include NSC trend
Assessments to include NSC trend
codes. Apply relevant safety
codes. Apply relevant safety
Line 1,571: Line 2,789:
a perspective on NSC and include
a perspective on NSC and include
in established reporting process.
in established reporting process.
DM-2 Establish a decision making                8/29/16 - 05000313/2016010, Closed
2/27/17 -
nuclear safety culture observation       9/16/16  05000368/2016010
3/3/17
05000313/2017010,
05000368/2017010
Closed
DM-2
Establish a decision making
nuclear safety culture observation
form to include the top leader
form to include the top leader
behaviors to be demonstrated and
behaviors to be demonstrated and
Line 1,580: Line 2,804:
prudent choices over those that
prudent choices over those that
are simply allowable.
are simply allowable.
DM-3 Establish decision making and risk       11/27/17 - 05000313/2017013, Closed
8/29/16 -
management content in the ANO           12/1/17  05000368/2017013
9/16/16
05000313/2016010,
05000368/2016010
Closed
DM-3
Establish decision making and risk
management content in the ANO
Employee Handbook to include
Employee Handbook to include
behaviors for making effective
behaviors for making effective
Line 1,590: Line 2,820:
demonstrating, and reinforcing
demonstrating, and reinforcing
appropriate behaviors.
appropriate behaviors.
LF-5 Provide supervisory training on          5/22/17 - 05000313/2017011, Closed
11/27/17 -
  *SII* nuclear safety culture (NSC) and         5/26/17  05000368/2017011
2/1/17
05000313/2017013,
05000368/2017013
Closed
LF-5
*SII*
Provide supervisory training on
nuclear safety culture (NSC) and
safety conscious work
safety conscious work
environment.
environment.
NF-4 Develop content for the NSC               2/27/17 - 05000313/2017010, Closed
5/22/17 -
observation process that                 3/3/17  05000368/2017010
5/26/17
05000313/2017011,
05000368/2017011
Closed
NF-4
Develop content for the NSC
observation process that
addresses procedure use and
addresses procedure use and
adherence.
adherence.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Closed
Area
Area
Inspection  Inspection Report
Action
Action             Description                                              Status
Dates        Number
Plan
Plan
PM-20 Track Leadership Fundamentals           2/27/17 - 05000313/2017010, Discussed,
Description
RCE CR-ANO-C-2015-02829 CA-               3/3/17  05000368/2017010  awaiting
Inspection
2. Improve the performance                                         licensee
Dates
review process for leadership                                         action
Inspection Report
fundamentals supportive of long       11/27/17 - 05000313/2017013,   Closed
Number
term strategic improvement.              12/1/17 05000368/2017013
Status
SC-2 Revise procedure EN-QV-136,             2/27/17 - 05000313/2017010,  Closed
PM-20
Nuclear Safety Culture                   3/3/17  05000368/2017010
Track Leadership Fundamentals
RCE CR-ANO-C-2015-02829 CA-
2. Improve the performance
review process for leadership
fundamentals supportive of long
term strategic improvement.
2/27/17 -
3/3/17
05000313/2017010,
05000368/2017010
Discussed,
awaiting
licensee
action
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
SC-2
Revise procedure EN-QV-136,
Nuclear Safety Culture
Monitoring, to define the roles and
Monitoring, to define the roles and
responsibilities of the ANO NSC
responsibilities of the ANO NSC
Manager.
Manager.
SC-3 Revise procedure EN-QV-136,             2/27/17 - 05000313/2017010,  Closed
2/27/17 -
Nuclear Safety Culture                   3/3/17  05000368/2017010
3/3/17
05000313/2017010,
05000368/2017010
Closed
SC-3
Revise procedure EN-QV-136,
Nuclear Safety Culture
Monitoring, to add NSC monitor
Monitoring, to add NSC monitor
orientation training for Nuclear
orientation training for Nuclear
Safety Culture Monitoring Panel
Safety Culture Monitoring Panel  
      (NSCMP) and Safety Culture
(NSCMP) and Safety Culture
Leadership Team members.
Leadership Team members.
SC-4  Conduct a structured off-site          2/27/17 - 05000313/2017010,   Closed
2/27/17 -
meeting among the ANO Senior             3/3/17  05000368/2017010
3/3/17
05000313/2017010,
05000368/2017010
Closed
SC-4
Conduct a structured off-site
meeting among the ANO Senior
Leadership Team to align on what
Leadership Team to align on what
a strategic commitment to safety
a strategic commitment to safety
Line 1,628: Line 2,908:
behaviors that will demonstrate
behaviors that will demonstrate
that commitment.
that commitment.
SC-5  Create an ANO Employee                11/27/17 - 05000313/2017013,   Closed
2/27/17 -
Handbook that includes nuclear           12/1/17  05000368/2017013
3/3/17
05000313/2017010,
05000368/2017010
Closed
SC-5
Create an ANO Employee
Handbook that includes nuclear
safety culture, safety conscious
safety culture, safety conscious
work environment, and corrective
work environment, and corrective
Line 1,640: Line 2,926:
reinforcing, and demonstrating
reinforcing, and demonstrating
NSC and CAP expectations.
NSC and CAP expectations.
SC-6  Conduct meetings facilitated by        11/27/17 - 05000313/2017013,   Closed
11/27/17 -
members of site management to           12/1/17  05000368/2017013
2/1/17
05000313/2017013,
05000368/2017013
Closed
SC-6
Conduct meetings facilitated by
members of site management to
familiarize personnel with the
familiarize personnel with the
contents of the ANO Employee
contents of the ANO Employee
Handbook and expectations for its
Handbook and expectations for its
use.
use.
11/27/17 -
2/1/17
05000313/2017013,
05000368/2017013
Closed
Area
Area
Inspection Inspection Report
Action
Action             Description                                            Status
Dates        Number
Plan
Plan
SC-7 Establish a small group meeting         2/27/17 - 05000313/2017010,  Closed
Description
schedule to facilitate face-to-face     3/3/17  05000368/2017010
Inspection
Dates
Inspection Report
Number
Status
SC-7
Establish a small group meeting
schedule to facilitate face-to-face
interaction between ANO senior
interaction between ANO senior
leadership and station employees.
leadership and station employees.
Line 1,668: Line 2,971:
participate in other communication
participate in other communication
forums.
forums.
SC-9 Develop and provide training to        2/12/18 - 05000313/2018012,   Closed
2/27/17 -
NF-7 ANO leaders, including                   2/16/18  05000368/2018012
3/3/17
05000313/2017010,
05000368/2017010
Closed
SC-9
NF-7
Develop and provide training to
ANO leaders, including
supervisory training on nuclear
supervisory training on nuclear
safety culture and safety conscious
safety culture and safety conscious
Line 1,676: Line 2,986:
foster a strong nuclear safety
foster a strong nuclear safety
culture within their organizations.
culture within their organizations.
SC-10 Develop and present training to        8/28/17 - 05000313/2017012,   Closed
2/12/18 -
NF-8 ANO workforce to include case             9/1/17  05000368/2017012
2/16/18
05000313/2018012,
05000368/2018012
Closed
SC-10
NF-8
Develop and present training to
ANO workforce to include case
studies that illustrate the right
studies that illustrate the right
picture of nuclear safety culture.
picture of nuclear safety culture.
Line 1,683: Line 3,000:
engaged and thinking individual
engaged and thinking individual
nuclear worker.
nuclear worker.
SC-11 Implement priority group specific      8/28/17 - 05000313/2017012,   Closed
8/28/17 -
action plans to address safety           9/1/17  05000368/2017012
9/1/17
05000313/2017012,
05000368/2017012
Closed
SC-11
Implement priority group specific
action plans to address safety
culture issues.
culture issues.
SC-14 Establish and implement a Nuclear     8/29/16 - 05000313/2016010, Discussed,
8/28/17 -
LF-9  Safety Culture Observations            9/16/16 05000368/2016010   awaiting
9/1/17
CA-2  process including elements of                                      licensee
05000313/2017012,
leader behaviors, nuclear safety                                      action
05000368/2017012
Closed
SC-14
LF-9
CA-2
Establish and implement a Nuclear
Safety Culture Observations
process including elements of
leader behaviors, nuclear safety
8/29/16 -
9/16/16
05000313/2016010,
05000368/2016010
Discussed,
awaiting
licensee
action  
 
Area
Area
Inspection  Inspection Report
Action
Action               Description                                              Status
Dates        Number
Plan
Plan
culture, and safety conscious work       2/27/17 - 05000313/2017010,  Closed
Description
environment. The observer                 3/3/17  05000368/2017010
Inspection
Dates
Inspection Report
Number
Status
culture, and safety conscious work
environment. The observer
monitors leader performance on a
monitors leader performance on a
daily basis and provides feedback
daily basis and provides feedback
to correct adverse trends in
to correct adverse trends in
behaviors.
behaviors.
SC-15   Raise the priority and visibility of     5/22/17 - 05000313/2017011,  Closed
2/27/17 -
nuclear safety culture (NSC) at the       5/26/17  05000368/2017011
3/3/17
05000313/2017010,
05000368/2017010
Closed
SC-15
Raise the priority and visibility of
nuclear safety culture (NSC) at the
fleet level by revising the
fleet level by revising the
Corporate Oversight Model to
Corporate Oversight Model to
Line 1,711: Line 3,061:
meetings and oversight review
meetings and oversight review
boards.
boards.
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed
Service Water System Self-Assessment
Service Water System Self-Assessment
Inspection Inspection Report
Description
Description                                                  Status
Inspection
Dates        Number
Dates
10/31/16 - 05000313/2016008, Discussed
Inspection Report
Service Water System Operational                  12/2/16  05000368/2016008
Number
Performance Inspection                            5/22/17 - 05000313/2017011,  Closed
Status
5/26/17 05000368/2017011
Service Water System Operational
Performance Inspection
10/31/16 -
2/2/16
05000313/2016008,
05000368/2016008
Discussed
5/22/17 -
5/26/17
05000313/2017011,
05000368/2017011
Closed


ML18165A206
ML18165A206
SUNSI Review           ADAMS:           Non-Publicly Available       Non-Sensitive   Keyword:
SUNSI Review
By: JDixon/rdr         Yes No       Publicly Available           Sensitive       NRC-002
ADAMS:
OFFICE           RIV/DRP       RIV/DRP       RIII/DRP     NRR/DIRS/IRAB         OE/AT     RIV/ACES
Non-Publicly Available
NAME               JDixon         MTobin       EDuncan       MKeefe-Forsyth         DWillis   MVasquez
Non-Sensitive
SIGNATURE           /RA/         /RA/         /RA/             /RA-E/           /RA-E/       /RA/
Keyword:
DATE             5/10/2018     5/9/2018       5/9/18         5/11/2018         5/11/2018     5/22/18
By: JDixon/rdr
OFFICE           RIV/DRP:BC   RIV/DNMS:D     RIV/DRP:D       RIV/DRS:D       RIV/ORA:RA
Yes No
NAME             NOKeefe       TPruett       AVegel         MShaffer         KKennedy
Publicly Available
SIGNATURE           /RA/         /RA/         /RA/             /RA/             /RA/
Sensitive
DATE               5/19/18       5/29/18       5/23/18         5/24/18           6/18/18
NRC-002
OFFICE
RIV/DRP
RIV/DRP
RIII/DRP
NRR/DIRS/IRAB
OE/AT
RIV/ACES
NAME
JDixon
MTobin
EDuncan
MKeefe-Forsyth
DWillis
MVasquez
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA-E/  
/RA-E/  
/RA/
DATE
5/10/2018
5/9/2018
5/9/18
5/11/2018
5/11/2018
5/22/18
OFFICE
RIV/DRP:BC
RIV/DNMS:D
RIV/DRP:D
RIV/DRS:D
RIV/ORA:RA
NAME
NOKeefe
TPruett
AVegel
MShaffer
KKennedy
SIGNATURE  
/RA/  
/RA/  
/RA/  
/RA/  
/RA/
DATE
5/19/18
5/29/18
5/23/18
5/24/18
6/18/18
}}
}}

Latest revision as of 18:22, 5 January 2025

NRC Confirmatory Action Letter (EA-16-124) Follow-Up Inspection Report 05000313/2018013 and 05000368/2018013 and Assessment Follow-Up Letter
ML18165A206
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/18/2018
From: Kennedy K
Region 4 Administrator
To: Richard Anderson
Entergy Operations
O'Keefe C
References
EA-14-008, EA-14-088, EA-16-124, ML16169A193, ML18078B153, ML18092A005 IR 2018013
Download: ML18165A206 (60)


Text

June 18, 2018

SUBJECT:

ARKANSAS NUCLEAR ONE - NRC CONFIRMATORY ACTION LETTER (EA-16-124) FOLLOW-UP INSPECTION REPORT 05000313/2018013 AND 05000368/2018013 AND ASSESSMENT FOLLOW-UP LETTER

Dear Mr. Anderson:

On May 31, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Arkansas Nuclear One (ANO) facility, Units 1 and 2. The team discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

During this inspection, the inspection team reviewed the last of the specific actions from the ANO Comprehensive Recovery Plan to which you committed via a Confirmatory Action Letter (CAL) dated June 17, 2016, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16169A193) (EA-16-124). This letter presents the results of that inspection, closes the CAL, and updates the NRCs assessment of performance at ANO, Units 1 and 2.

The NRC team did not identify any findings or violations of more than minor significance.

On March 2, 2015, ANO, Units 1 and 2, were placed into the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process (ROP) Action Matrix.

This action was based on having one Yellow finding in the Initiating Events Cornerstone and one Yellow finding in the Mitigating Systems Cornerstone in each unit.

Between August 2016 and May 2018, the NRC conducted eight CAL follow-up inspections to review Entergys progress in completing 161 CAL actions to address performance issues at ANO. You reported completing the CAL inspection focus areas in letters dated February 6, 2018, (ADAMS Accession No. ML18040A918) and March 19, 2018, (ADAMS Accession No. ML18078B153). The NRC closed the Significant Performance Deficiencies and the Identification, Assessment, and Correction of Performance Deficiencies areas in Inspection Report 05000313/2018012 and 05000368/2018012 (ADAMS Accession No. ML18092A005).

During this inspection, the NRC completed the final closeout review of your CAL actions. Specifically, this report closes the CAL areas for Human Performance, Equipment Reliability and Engineering Programs, Safety Culture, and Service Water System Self-Assessment. The NRC has determined that all of Entergys committed actions to improve the safety performance at ANO have been completed and should sustain performance improvement. Therefore, the ANO CAL is closed.

As a result of closing the Yellow findings and the CAL, the NRC has updated its assessment of ANO, Units 1 and 2. Based on a review of current performance indicators and inspection results, the NRC determined the performance at ANO, Units 1 and 2 to be in the Licensee Response Column (Column 1) of the Reactor Oversight Process Action Matrix as of the date of this letter.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Kriss M. Kennedy Regional Administrator

Docket Nos.

50-313; 50-368 License Nos. DPR-51; NPF-6

Enclosure:

Inspection Report 05000313/2018013 and 05000368/2018013 w/ Attachments:

1. List of Confirmatory Action Letter Items Closed and Discussed 2. List of Documents Reviewed 3. Confirmatory Action Letter Item Status

Enclosure U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Number(s):

05000313, 05000368

License Number(s):

DPR-51, NPF-6

Report Number(s):

05000313/2018013, 05000368/2018013

Enterprise Identifier: I-2018-013-0003

Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2

Location:

Russellville, Arkansas

Inspection Dates:

April 2, 2018 to May 31, 2018

Inspectors:

J. Dixon, Senior Project Engineer, (Team Leader)

E. Duncan, Region III, Branch Chief

M. Keefe-Forsyth, Office of Nuclear Reactor Regulation, Safety Culture

Specialist

M. Tobin, Resident Inspector

D. Willis, Office of Enforcement, Allegation Team Leader

Approved By:

N. OKeefe

Branch Chief

Division of Reactor Projects

SUMMARY

IR 05000313/2018013; 05000368/2018013; 4/2/2018 - 5/31/2018; Arkansas Nuclear One,

Units 1 and 2; Confirmatory Action Letter (CAL) Follow-up Inspection (IP 92702).

The inspection activities described in this report were performed between April 2 and May 31, 2018, by a team from the NRCs Region III and IV offices, the Office of Nuclear Reactor Regulation, the Office of Enforcement, and a resident inspector at Arkansas Nuclear One. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, dated July 2016.

On June 17, 2016, the NRC issued a Confirmatory Action Letter (CAL) (ADAMS Accession No. ML16169A193) (EA-16-124) confirming actions that Entergy committed to take in the Arkansas Nuclear One (ANO) Comprehensive Recovery Plan (CRP).

On March 19, 2018, the licensee notified the NRC that actions to improve performance in the four remaining inspection focus areas from the CAL were complete and effective, and requested an inspection of these areas for possible closure (ADAMS Accession No. ML18078B153).

During this inspection, the team reviewed and closed the last four specific actions from the CAL, and also reviewed the Human Performance, Equipment Reliability and Engineering Programs,

Safety Culture, and Service Water System inspection focus areas. The team concluded that, individually and collectively, the licensees actions were effective in achieving the CRP objectives. Therefore, all actions and inspection focus areas from the ANO CAL are closed.

Below is a summary of the NRCs basis for closing each of the inspection focus areas in the CAL.

Improvements to Address Significant Performance Deficiencies To address the root and contributing causes for the Yellow findings for the stator drop and the flooding events, including plant deficiencies and problems with vendor oversight, change management, conservative decision-making, and risk management, Entergy implemented 39 actions in addition to those already completed at the time the CAL was issued. With respect to the Yellow inspection finding associated with the drop of the Unit 1 main generator stator on March 31, 2013, the NRC concluded that the corrective actions improved the licensees implementation of the oversight of contractors and vendors. Decision-making, risk recognition, and the ability to manage risk were also improved, as well as increasing the technical rigor used to assess vendor work products. Many of these corrective actions were demonstrated to be effective during the replacement of both shutdown cooling heat exchangers in Unit 2 in 2017.

This project involved many of the complex challenges that were present during the stator replacement project, including special lifts, and our inspections noted significantly improved planning, oversight, technical rigor, testing, and risk management actions.

Actions taken to address the Yellow flood protection inspection finding to reconstitute and document the design basis for plant features intended to protect vital plant equipment from the damage caused by flooding, tornado missiles, and other external events were effective in identifying and correcting deficiencies and establishing appropriate configuration control mechanisms. Preventive maintenance and testing strategies were also improved to verify effective flood sealing.

On March 29, 2018, the NRC determined that all Significant Performance Deficiency actions were complete and effective, and concluded that ANOs actions met the objectives of Inspection Procedure 95002 and the associated objectives stated in the ANO CRP. Therefore, the Yellow finding involving the failure to approve the design and to load test a temporary lift assembly (EA-14-008), the Yellow finding involving the failure to maintain required flood mitigation design features (EA-14-088), and the Significant Performance Deficiency inspection focus area of the CAL were closed in NRC Inspection Report 05000313/2018012 and 05000368/2018012.

Improvements to Corrective Action Program To address improvement in the implementation and oversight of the corrective action program, self-assessment, performance monitoring, quality of problem evaluations, and use of operating experience, Entergy implemented 34 actions. The NRC determined that actions to improve training, defining roles and responsibilities, and management oversight of corrective action program functions resulted in improved identification, evaluation, and corrective actions for performance deficiencies. Problems are evaluated and assumptions are validated prior to making decisions. ANO reduced its reliance on compensatory measures and engineering evaluations for degraded conditions by correcting problems and restoring plant safety margins.

Corrective actions are timely and backlogs have been reduced. Improved self-assessment and performance monitoring practices have identified and addressed declining performance trends.

Operating experience issues are being identified and addressed at a low threshold.

On March 29, 2018, the NRC determined that all corrective action program actions were complete and effective in achieving the stated objectives. Therefore, the Identification,

Assessment, and Correction of Performance Deficiencies inspection focus area of the CAL was closed in NRC Inspection Report 05000313/2018012 and 05000368/2018012 (ADAMS Accession No. ML18092A005).

Improvements in Human Performance To improve human performance, leadership behaviors, organizational capacity, procedure quality, standards, and accountability, Entergy implemented 40 actions. The ability to complete work across all site departments improved, in part, through hiring and training efforts. ANO implemented a new process to anticipate and address organizational capacity challenges in staffing, training, and expertise that closed existing gaps. Additionally, ANO implemented actions to reduce reliance on vendors and the training department increased its capacity and facilities in order to support departmental training needs.

The NRC noted that there were changes in the station leadership team composition and capabilities. Leadership assessments, individual development plans, and training and coaching enhanced leader behaviors in the areas that caused the safety culture at ANO to degrade.

Station leaders improved their ability to observe and assess performance and address shortfalls. Decision-making has been proactive, strategic, conservative, and includes seeking input from workers. Increased field presence for leaders improved their understanding of work conditions. This has facilitated recognizing and addressing problems with work processes, work instruction quality, teamwork, standards, and accountability. Procedure writers and work planners were trained to implement industry procedure quality standards, and station procedures and work instructions are being upgraded to improve technical content, clarity, and human factoring that are appropriate for the existing experience levels of the users.

The human error rate was reduced by reinforcing procedure use and adherence standards and improving procedure quality. Operator performance was improved and challenges during events were reduced by removing distractions and fixing degraded equipment, as well as by raising teamwork, standards, and accountability through high-impact training and increased oversight.

The NRC determined that all Human Performance improvement actions were complete and effective in achieving the associated objectives stated in the ANO CRP. Therefore, the Human Performance inspection focus area of the CAL is closed.

Improvements to Equipment Reliability and Engineering Programs To improve implementation of processes and programs that ensure key plant equipment remains available, reliable, and capable of meeting the plant design and licensing bases, including resolving specific equipment conditions, Entergy implemented 25 actions. ANO improved the organizational capacity in engineering through targeted hiring, training, and development plans for engineers. This included staffing all engineering programs with trained and qualified program owners and backups. The quality of engineering programs and plant systems are being effectively monitored through the Program Health and Plant Health processes. Industry best practices for system health were implemented, including using a multidiscipline Plant Health Committee to review performance trends and develop improvement plans, including those that address equipment aging and obsolescence issues, as well as procurement of strategic spare components.

The NRC reviewed the results of numerous equipment reliability improvement projects and noted that each project was effective in improving the reliability of key plant equipment or restoring lost safety margins. ANO reevaluated the equipment classification of the components and systems most important to safety and stable plant operation, increasing many of the importance rankings using the latest industry standards. ANO implemented a process for reviewing preventive maintenance strategies and vendor recommendations during the work planning process, using plant operating and maintenance experience to make timely adjustments to the scope and frequency of the work. A new Component Maintenance Optimization group was also created to place maintenance support engineers and predictive maintenance personnel within the Maintenance department to provide technical expertise to support work in progress and preventive maintenance planning.

The NRC determined that all Equipment Reliability and Engineering Program improvement actions were complete and effective in achieving the associated objectives stated in the ANO CRP. Therefore, the Equipment Reliability and Engineering Program inspection focus area of the CAL is closed.

Improvements in Safety Culture To improve nuclear safety culture values and behaviors to ensure commitment by leaders and individuals to emphasize safety over competing goals, Entergy implemented 22 actions.

Entergy increased the staffing and funding resources available to ANO to support the workload and improve the safety culture at the station. Efforts to build trust and demonstrate conservative decision-making, improve equipment reliability, reduce work backlogs, and raise standards demonstrated leaderships commitment to improving safety and performance at ANO. Union leadership and individual contributors have become engaged, taking ownership of organizational challenges through committees and working groups to identify and address process and teamwork issues. Workers have been trained on plant risk and how their job tasks relate to plant safety; allowing workers across the station to identify and report challenges that could affect safety. Training on the corrective action program, including roles and responsibilities, have improved worker understanding of the processes available to correct problems, leading to better problem reporting and suggestions to improve processes.

Safety culture surveys conducted throughout the time that ANO was in Column 4 have demonstrated an improving trend. The NRC performed safety culture focus group discussions in August 2017, and during this current inspection, and noted more positive responses.

Performance indicators also demonstrated improved outcomes in areas supported by positive safety culture behaviors.

The NRC determined that all Safety Culture improvement actions were complete and effective in achieving the associated objectives stated in the ANO CRP. Therefore, the Safety Culture inspection focus area of the CAL is closed.

Actions to Assess the Service Water System To ensure conditions adverse to quality are identified and resolved, Entergy committed to conduct a focused self-assessment of the Units 1 and 2 service water systems in accordance with station procedures and NRC Inspection Procedure 93810, Service Water System Operational Performance Inspection. The NRC concluded that ANO performed a thorough assessment of the condition of the service water system on both units. The resulting project plan to fund improvements to the technology used to monitor corrosion and pitting in system components, improve water chemistry control to minimize corrosion, and the replacement of piping and large components has restored system operating margins and addressed aging issues.

The NRC determined that the service water system self-assessment and the resulting project plan to address system problems were complete and effective in achieving the associated objectives stated in the ANO CRP. Therefore, the Service Water System Self-Assessment inspection focus area of the CAL is closed.

No findings were identified.

REPORT DETAILS

OTHER ACTIVITIES

4OA5 Other Activities

.1 Confirmatory Action Letter (CAL) Inspection Focus Area Closures (IP 92702)

Background On March 4, 2015, ANO Units 1 and 2 transitioned to the Multiple/Repetitive Degraded Cornerstone Column (Column 4) of the NRCs Reactor Oversight Process Action Matrix as a result of having two Yellow findings for each unit. In response, the NRC performed IP 95003, concluding the onsite portion of the inspection on February 26, 2016, and provided insights on ANOs performance weaknesses, their causes, and related safety culture issues. The 95003 team reviewed proposed corrective actions and identified the need for additional corrective actions to create prompt and sustained improvement. In a letter dated May 17, 2016, ANO Comprehensive Recovery Plan (ADAMS Accession No. ML16139A059), Entergy notified the NRC staff of its plan to perform specific actions to resolve the causes for declining performance at ANO, and provided a summary of that plan.

The NRC reviewed Entergys CRP and concluded that Entergys planned corrective actions should correct significant performance deficiencies and result in sustained performance improvement at ANO. The CRP is comprised of 14 Area Action Plans that contain key improvement actions and scheduled completion dates. The NRC grouped the CRP actions into six inspection focus areas to support future inspection activities based on ANO performance concerns documented in NRC Inspection Report 05000313/2016007 and 05000368/2016007 (ADAMS Accession No. ML16161B279). The NRC issued the CAL on June 17, 2016 (ADAMS Accession No. ML16169A193) to confirm commitments made by Entergy concerning ANO, Units 1 and 2, in each of the six inspection focus areas.

a.

Closure of CAL Inspection Focus Area: Human Performance

Background In performing their root cause evaluations for the stator drop and flood protection issues, ANO identified multiple areas where human performance did not meet industry standards, such as procedural use and adherence, caused by poor leadership behaviors. In response, ANO implemented prompt actions to improve operator performance, but Entergys CRP included limited actions to address improving worker behaviors or increasing field presence of managers to set and enforce expectations.

The Third Party Nuclear Safety Culture Assessment in 2015 identified that ANO personnel tolerated, and at times normalized, degraded conditions. In addition to using analyses to accept degraded conditions and reduced safety margins, ANO management adopted long-term or permanent compensatory measures. These compensatory actions distracted operators from their normal duties and challenged response actions during events. The true number of degraded conditions and compensatory measures was not apparent because they were dispersed in a variety of tracking processes or the actions were made permanent through analyses, or proceduralized actions.

The 95003 inspection team concluded from observations in the control room, plant, and simulator that operator performance improvement actions were effective, and that actions to improve the quality and effectiveness of supervisory field observations appeared to be successful at the first-and second-line supervisor level. However, both ANO and the NRC identified concerns with procedure adherence as ANO had not evaluated the causes for problems in this area beyond determining that the quality of site-specific procedures and work instructions were below current industry standards and were not adequately human factored. The NRC team identified that workers attempted to informally resolve unclear guidance in procedures rather than stopping and notifying supervisors.

Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key desired behaviors and outcomes (DB&Os) to verify that the licensee achieved sustained improvement. Specifically, the following DB&Os where reviewed:

  • Corrective Action Program (CA) DB&O-2: Workers identify conditions adverse to quality promptly and in accordance with station procedure and expectations.

Workers apply a low threshold for reporting problems. (Key Actions CA-1, CA-4)

  • Decision Making and Risk Management (DM) DB&O-2: Senior leaders demonstrate accountability and a bias for action to correct deficiencies and challenges to safe and reliable operation for the long term. Responsible managers present accurate information and thorough solutions that minimize threats to plant performance and safety. (Key Action DM-2)
  • Leadership Fundamentals (LF) DB&O-1: Leaders communicate and build trust in the organization. (Key Actions LF-1, LF-3, LF-4, LF-5, LF-6, LF-7, and LF-9)
  • LF DB&O-4: ANO leaders are identifying and addressing individual and organizational performance issues. (Key Actions LF-1, LF-3, LF-5, LF-9, and LF-13)
  • Nuclear Fundamentals (NF) DB&O-5: Workers apply a questioning attitude and stop when unsure. Individuals challenge assumptions and offer opposing views when they think something is not correct. Concerns are fully satisfied before work continues. (Key Actions NF-1, NF-6, NF-7, and NF-9)
  • NF DB&O-7: Workers and leaders are observant of conditions in the plant and ensure that issues, problems, degraded conditions, and near misses are promptly reported and documented in the corrective action program at a low threshold. (Key Actions NF-1, NF-6, NF-7, and NF-9)
  • NF DB&O-8: Workers understand what it means to be thinking and engaged and practice the foundational behaviors (criteria) defined by the industry for the Nuclear Professional. (Key Actions NF-1, NF-2, NF-6, NF-7, NF-8, and NF-9)
  • NF DB&O-10: Application of fundamental behaviors is reflected in low rates of human performance errors and rework. (Key Actions NF-1, NF-3, NF-5, NF-7, NF-8, NF-9, and NF-10)
  • Organizational Capacity (OC) DB&O-1: Leaders ensure nuclear safety is the top consideration in making decisions on workforce resources. Leaders use appropriate information to make strategic decisions regarding workforce needs.

The information includes data supporting organization capability, e.g., knowledge gaps, attrition projections and demographic makeup (age and years of service - proficiency). This information is incorporated into an Integrated Strategic Workforce Plan (ISWP) that leaders use to ensure the organization has the necessary capacity and skills for safe and reliable plant operation. (Key Actions OC-1, OC-2, OC-3, and OC-4)

  • Plant Health (PH) DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions. (Key Actions PH-1, PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)
  • Procedure and Work Instruction Quality (PQ) DB&O-1: Station procedures and work instructions are technically accurate, complete, and contain consistent human factoring and clarity to support predictable, repeatable, and successful work performance. (Key Actions PQ-1, PQ-2, PQ-3, PQ-5, PQ-6, PQ-7, PQ-8, PQ-9, and PQ-10)
  • PQ DB&O-4: Procedure Improvement and Work Order Feedback backlogs are minimized to ensure quality, up-to-date work documents are available. (Key Action PQ-11, supporting actions include PM-07 and PM-09: monitored by metrics)
  • Safety Culture (SC) DB&O-2: Leaders model correct behaviors, especially when resolving apparent conflicts between nuclear safety and production. (Key Actions SC-1, SC-4, SC-8, SC-9, and SC-14)

To evaluate the licensees corrective action effectiveness, the team reviewed:

  • Confirmatory Action Letter and Area Action Plan Actions Effectiveness (LO-ALO-2018-00014)
  • Human Performance Closure Readiness Evaluation
  • Leadership Fundamentals Area Action Plan Closure Report
  • Nuclear Fundamentals Area Action Plan Closure Report
  • Procedure and Work Instruction Quality Area Action Plan Closure Report
  • Entergy fleet procedures to verify CAL commitments were translated from ANO recovery procedures
  • Station and CRP metrics
  • Interviewed a cross section of station managers, employees, and contractors The team evaluated the corrective actions and effectiveness criteria established by the licensee in aggregate for the reviewed DB&Os. The team noted that the licensee took multiple actions to address human performance not meeting industry standards in areas such as: procedural use and adherence; improving worker behaviors; increasing field presence of supervisors and managers; setting and enforcing expectations; personnel tolerating, and at times normalizing, degraded conditions; and management adopting long-term or permanent compensatory measures.

As a result of the teams review of the corrective actions and discussions with station employees and contractors, the team concluded the licensee has steadily improved human performance at the station. The team determined that the licensees actions to address procedural use and adherence, create a procedure writers guide, and improve the quality of procedures and work orders to the new standard has reduced the number of procedure errors. The team also determined that the licensees paired observation and behavior based safety observation programs have been accepted by the work force as a positive tool to hold each other accountable, maintain a questioning attitude, and stop and seek clarification when they encounter unclear guidance. The team was able to confirm this improving trend by discussions with station employees and contractors, and reviewing specific metrics such as, Online Risk (Actual vs Planned), Consequential Error Rate, Open Preventive Maintenance Change Requests, Open Craft Feedback Requests, Rework, and Procedure and Work Instruction Backlog.

The team determined that the licensees actions to address improving worker behavior by establishing a paired observation program, implementing a behavior based safety program, implementing weekly leadership alignment meetings for supervisors and above to reinforce the expected actions and behaviors, and implementing a Connection to the Core campaign, as examples, has resulted in a more engaged work force. The team also determined that the licensees behavior based safety observation program and the Connection to the Core campaign have been accepted by the work force as a way for workers to hold each other and management accountable for maintaining a low reporting threshold and understanding how their specific work activity can affect plant safety. The team was able to confirm this improving trend by discussions with station employees and contractors, and reviewing specific metrics such as, Consequential Error Rate, Observation Program Health Index, Recordable Injury Rate, Nuclear Safety Culture Monitoring Index, Technical Conscience Index, and Rework.

The team determined that the licensees actions to improve field presence of supervisors and managers and use this as a mechanism to set and enforce expectations has resulted in improved communications and trust between workers and the leadership team. The licensee established a field presence initiative that promotes and measures leader field presence, 1X1 meetings (pronounced as one by one meeting, where a manager coaches a supervisor) that promote alignment and reinforce leader behaviors, and benchmarking an external organization to identify and adopt best practices in the Leadership Fundamentals area. The team determined that the licensee improved communications through implementation of a new Nuclear Excellence Model that reinforced trust and teamwork, adding new field presence performance indicators for supervisors and managers to monitor results, and establishing an Employee Communication Advisory Team. The Employee Communication Advisory Team consists of management and individual contributors from cross-functional groups that make recommendations to improve the effectiveness of site/fleet communications. The team was able to confirm this improving trend through discussions with station employees and contractors, reviewing specific metrics such as, 1X1 Meeting Effectiveness, Observation Program Health Index, Field Presence, and validating that the weekly protected time meetings are being implemented to share the messages from the Leadership and Alignment meetings with their workers.

The team determined that the licensees actions to address tolerating/normalizing degraded conditions and adopting long-term or permanent compensatory measures have resulted in station employees having a lower threshold for reporting problems. The licensee achieved these results by providing training on the Corrective Action Program, implementing a Comprehensive Site Plan for Equipment Reliability, resolving long-standing equipment issues, assigning mentors from outside of the Entergy Fleet to each shift manager, and improving the Site Integrated Planning Database process for equipment related entries. The team determined that the licensees actions resulted in workers focusing on procedure use and adherence, challenging assumptions and decision making, and improving risk recognition. The team was able to confirm these outcomes through discussions with station employees and contractors, and by reviewing specific metrics such as, Equipment Reliability Index, Deficiency Induced Fire Impairments, Age of Red and Yellow Systems, Operator Aggregate Index Non-Outage, Engineering Program Health, Critical Equipment Failures, Rework - Nuclear Fundamentals, Condition Report Backlog, Maintenance Backlog, and CAP Line Ownership and Engagement Index.

The team also determined that the licensees actions to increase the number of employees, improve mentoring and training availability, improve industry participation, and availability of training from vendors have had a positive impact on communications, trust, and culture among large sections of the work force. The team also determined that the licensees actions to address risk have been effective by observing risk recognition, prioritization, mitigation, and discussion at all levels of the organization during observations of work.

The team concluded that there has been a steady improvement in human performance at the station. Examples include a declining number of consequential errors, a lower threshold for reporting problems, an increase in the number of equipment-related Site Integrated Planning Database entries (reflecting a higher confidence in the effectiveness of the process), and a more inclusive work force. Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address Human Performance inspection focus area were effective. Therefore, the Human Performance inspection focus area of the CAL is closed.

b.

Closure of CAL Inspection Focus Area: Equipment Reliability and Engineering Programs

Background In 2007, Entergy implemented an alignment initiative across their fleet, which resulted in reduced staffing levels at ANO. The reduced resources available to do work at ANO created a number of challenges that slowly began to impact equipment reliability by reducing the amount of preventive maintenance performed and extending the time between maintenance activities. The loss of experienced staff made on-time completion of maintenance activities difficult, and the lack of effective action to maintain equipment reliability in an aging plant caused an increase in emergent work that disrupted scheduled maintenance. A cumbersome and poorly understood process for approving and funding equipment upgrades resulted in only the highest priority work being approved, and rescheduling or cancellation of lower priority work. ANO did not identify problems in the Site Integrated Planning Database process for approving and funding major projects. The 95003 inspection team noted that the CRP was updated to address this gap.

Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the key DB&Os to verify that the licensee achieved and sustained improvement. Specifically, the following DB&Os were reviewed:

  • Design and Licensing Basis (DB) DB&O-2: Engineering staffing levels are adequate to sustain improved plant operations, maintain high levels of equipment performance, and support excellence in Engineering Program implementation.

Changes to staffing levels, workload, skills, proficiency, or knowledge level will be addressed with nuclear safety as the overriding priority. Engineering backlogs are maintained such that latent risks are minimized. (Key Actions DB-4, DB-5, and DB-6)

  • DM DB&O-2: Senior leaders demonstrate accountability and a bias for action to correct deficiencies and challenges to safe and reliable operation for the long term. Responsible managers present accurate information and thorough solutions that minimize threats to plant performance and safety. (Key Action DM-2)
  • PH DB&O-2: Plant Health Working Group and Plant Health Committee members make conservative decisions on plant health issues with a primary emphasis on nuclear safety risk. The Plant Health Process supports nuclear safety by minimizing long-standing equipment issues. Equipment problems and vulnerabilities are addressed using well thought out, permanent solutions.

(Key Actions PH-5, PH-6, PH-9, PH-11, PH-12, PH-13, and PH-14)

  • Preventive Maintenance (PM) DB&O-6: The standards for PM Work Order quality result in high quality PM Work Orders. PM Work Order Feedback from Craft personnel is incorporated in a timely manner. (Key Actions PM-7, PM-9, PM-19, and supporting action PQ-9)
  • PM DB&O-7: Weaknesses in PM strategies are consistently identified and resolved prior to PM implementation. (Key Actions PM-13, PM-19, and supporting actions PM-4 and PM-15)
  • PM DB&O-8: Operating experience, vendor recommendations, internal technical expertise, and craftsmanship are applied through the PM program to minimize consequential equipment failures. (Key Actions PM-2, PM-4, PM-6, PM-13, and supporting action PQ-09)

To evaluate the licensees corrective action effectiveness, the team reviewed:

  • Confirmatory Action Letter and Area Action Plan Actions Effectiveness (LO-ALO-2018-00014)
  • Decision Making and Risk Management Area Action Plan Closure Report
  • Design and Licensing Basis Area Action Plan Closure Report
  • Equipment Reliability and Engineering Programs Closure Readiness Evaluation
  • Plant Health Area Action Plan Closure Report
  • Preventive Maintenance Program Area Action Plan Closure Report
  • Station and CRP metrics, as well as other relevant performance monitoring data
  • Interviewed a cross section of station managers, employees, and contractors The team evaluated the corrective actions and effectiveness criteria established by the licensee in aggregate for the reviewed DB&Os. The team noted that the licensee took multiple actions to address equipment reliability and engineering programs. The team reviewed corrective actions to address longstanding equipment performance trends, classification, and inclusion of plant components in key programs, loss of engineering experience, understaffing for engineering programs, and training and qualification for engineers to ensure deficiencies identified during the IP 95003 inspection were appropriately addressed.

The team performed a detailed review of the following key actions:

  • Key Action DB-4: Determine the appropriate level of staffing for safe and reliable operation of ANO given experience, training needs, knowledge management needs, projected attrition, and the workload of the current level of staffing.

(CR-ANO-C-2015-02833, CA-47)

  • Key Action DB-5: Implement a staffing plan developed in response to staffing issues. Include baseline organizational changes and staffing for Recovery efforts. (CR-ANO-C-2015-02831, CA-41)
  • Key Action DB-6: Implement a workforce planning process to include a long-term ANO Integrated Strategic Workforce Plan (ISWP) that will provide the necessary level of detail to ensure a sustained staffing plan that accounts for talent needs, knowledge management, and training. (CR-ANO-C-2015-02833, CA-48)

The team reviewed People Health Committee meeting minutes that documented actual and projected hiring and attrition data, in both a monthly and cumulative manner, with a particular focus on the People Health Committee meeting results for February 15, 2018, that focused on engineering department staffing. The team also reviewed current organization charts to determine whether any staffing vacancies existed and, if so, whether plans were in place to fill those vacancies.

The team also reviewed performance indicators and metric data associated with engineering. In particular, engineering backlogs such as design and system engineering and programs condition report backlogs, configuration management workload backlogs, engineering change backlogs, paid and nonpaid overtime, and staffing were reviewed.

The results of these reviews reflected an increase in staffing levels that supported the current workload without the need for frequent overtime. For the areas reviewed, where engineering-related performance did not meet station goals, such as Engineering Change Delivery, the team verified that the licensee was implementing an action plan to improve performance.

The team identified one area that was assessed as an opportunity for further enhancement associated with Key Action DM-2: Establish a decision making Nuclear Safety Culture Observation form to include the top Leader Behaviors to be demonstrated and reinforced at ANO meetings. The form should include decision-making practices that emphasize prudent choices over those that are simply allowable. The team reviewed approximately 100 recent Nuclear Safety Culture Observation forms to assess whether top behaviors by leaders, including those related to decision-making, were being demonstrated. The team identified that the forms have wide variability in the level of detail provided, which limited the overall usefulness of the data. However, the team determined through interviews that the Nuclear Safety Culture Observer function was being implemented as an effective improvement tool. The licensee entered the need to provide instruction on transferring data from the observation form into the observation database into their corrective action program as Condition Report CR-ANO-C-2018-01500.

A bias for action in addressing equipment reliability issues was evidenced in the performance indicators and metric data that was reviewed by the team. In particular, performance improvement metrics in areas affected by decision-making with a bias to action, such as equipment reliability, the length of time that systems are not performing at optimum levels, and critical equipment failures demonstrated improvement and met or exceeded licensee goals in most cases. In cases where the performance had not yet achieved the goal, the performance trend was observed by the team to be in a positive direction as a result of the licensee implementing an action plan.

The team also reviewed performance indicators and metric data associated with Plant Health. In particular, the team reviewed critical equipment failures, equipment reliability index, and the length of time that systems were not performing at optimum levels. The team also reviewed the most recent System Health IQ report, which assessed the overall health of all of the safety-related and nonsafety-related systems that supported plant operation. The team determined that the health of the systems had improved, system health fully supported safe plant operation, and that performance was sustainable based on the consistency in performance over time.

The team also reviewed performance indicators and metric data associated with preventive maintenance. In particular, the team reviewed procedure and work instruction backlogs, procedure and work instruction workoff curves, maintenance backlogs, open craft feedback requests, and open preventive maintenance change requests. The team determined that the preventive maintenance indicators continued to improve to performance levels that exceeded licensee performance goals.

The results of the teams interviews reflected very positive worker opinions regarding the changes implemented at ANO. In particular, the interviews identified that a bias for action to address problems had developed in the organization at both the site and corporate level. Decisions to perform new work identified during refueling outages that caused those outages to be extended beyond their original completion dates were frequently identified as evidence of this new bias for action and to make decisions focused on long-term plant reliability.

The interviews also consistently reflected an increase in the staffing levels in the engineering department with an associated decrease in workload, despite the additional engineering work required to support plant recovery activities. The hiring of both experienced personnel and recent college graduates was viewed positively by the organization, and the hiring of a dedicated recruiter to help identify prospective candidates to fill vacancies at the site improved the process.

The team noted that the process for incorporating feedback into work orders lacked a clear mechanism for making prompt changes. In particular, there was no formal process to make high priority work order changes. This type of process exists for changes to procedures. Procedure EN-WM-105, Planning, step 5.9, Planning Feedback, Substep [3] only required that preventive maintenance work order feedback be monitored and incorporated within 90 days or that the feedback be evaluated and the preventive maintenance model work order be placed in a plan status within 90 days with a hold pending incorporation of the feedback. The licensee entered the lack of procedural clarity to incorporating feedback to work orders prior to field implementation into their corrective action program as Condition Report CR-ANO-C-2018-01552.

Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Equipment Reliability and Engineering Programs inspection focus area were effective in meeting the DB&Os. Therefore, the Equipment Reliability and Engineering Programs inspection focus area of the CAL is closed.

c.

Closure of CAL Inspection Focus Area: Safety Culture

Background ANO determined that the most significant causes for declining performance were ineffective change management with respect to resource reductions, and leadership behaviors that were not commensurate with a strong safety culture. When implementing resource reductions across its fleet in 2007 and 2013, Entergy did not consider the unique staffing needs for ANO created by having two units with different technologies.

ANO management did not reduce workloads through efficiencies or the elimination of unnecessary work, as was intended as part of the resource reduction initiatives.

Leaders attempted to prioritize work with the available resources, but were unable to address expanding work backlogs. An unexpected increase in attrition between 2012 and 2014 caused a loss in experienced personnel, a reduced capacity to accomplish work, and an increase in the need for training and supervision. While the 95003 inspection team determined that workers were willing to raise safety concerns, the workers were not confident that management would address more routine problems.

ANO leaders missed an opportunity to engage the workforce early in the recovery process to help identify, assess, and develop corrective actions for declining performance. As a result, the NRC teams independent safety culture evaluation noted limited improvement in safety culture since the completion of ANOs independent Third Party Nuclear Safety Culture Assessment in 2015.

ANO had not initially assessed the training function, even though safety culture assessments identified training as a problem area. Workers reported that training did not have sufficient priority, impacting their ability to perform their current roles and the ability to achieve higher level qualifications. In response, ANO conducted an evaluation and identified that training needed to be used as a tool to correct problems and improve performance and created a Training to Improve Organizational Performance Area Action Plan.

ANO had not created a specific improvement plan to address the findings of the safety culture assessments, choosing to address selected safety culture attributes that were associated with root cause evaluations rather than treating the findings in the context of a separate problem area. By not performing a cause evaluation for safety culture, ANO management missed the opportunity to address the full scope of safety culture weaknesses. To address this issue, ANO performed two cause evaluations, developed the Safety Culture Area Action Plan, and assigned a full-time Safety Culture Manager.

Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the inspection focus area, the NRC team reviewed the focus area for key DB&Os to verify that the licensee showed sustained improvement. Specifically, the following DB&Os where reviewed:

  • Corporate and Independent Oversight (CO) DB&O-1: Specific information is provided on ANO Safety Culture and regulatory perspective to the Entergy Operations senior management review board (Oversight Analysis Meeting and Oversight Review Board). This information is used for performance monitoring and comprehensive oversight decisions. (Key Actions CO-1, CO-2, and CO-4)
  • CO DB&O-4: Controls are established for the Entergy change management processes including planning, execution, and effectiveness review. These controls are used to prevent unintended consequences during high-risk changes.

(Key Action CO-5)

  • CO DB&O-6: Specific information is provided on ANO Safety Culture and regulatory perspective to the Entergy Operations senior management review board (Oversight Analysis Meeting (OAM) and Oversight Review Board (ORB)).

This information is used for performance monitoring and comprehensive oversight decisions. This action is designated DBO-1. (Key Actions CO-1, CO-2)

  • DM DB&O-3: Senior leaders create an environment that encourages the raising of concerns and questions, and is conducive to robust interaction and problem resolution. (Key Actions DM-2 and DM-3)
  • LF DB&O-1: Leaders communicate and build trust in the organization. (Key Actions LF-1, LF-3, LF-4, LF-5, LF-6, LF-7, and LF-9)
  • LF DB&O-4: ANO leaders are identifying and addressing individual and organizational performance issues. (Key Actions LF-1, LF-3, LF-5, LF-9, and LF-13)
  • LF DB&O-5: ANO leaders drive excellence in processes and procedures through the Department Performance Improvement Meetings (DPRMs) and Aggregate Performance Improvement Meetings (APRMs). (Key Actions: LF-8, LF-11, LF-12 and LF-14)
  • NF DB&O-8: Workers understand what it means to be thinking and engaged and practice the foundational behaviors (criteria) defined by the industry for the Nuclear Professional. (Key actions NF-1, NF-2, NF-6, NF-7, NF-8, and NF-9)
  • NF DB&O-10: Application of fundamental behaviors is reflected in low rates of human performance errors and rework. (Key actions NF-1, NF-2, NF-3, NF-5, NF-6, NF-7, NF-9, and NF-11)
  • OC DB&O-1: Leaders ensure nuclear safety is the top consideration in making decisions on workforce resources. Leaders use appropriate information to make strategic decisions regarding workforce needs. The information includes data supporting organization capability, e.g., knowledge gaps, attrition projections and demographic makeup (age and years of service - proficiency). This information is incorporated into an Integrated Strategic Workforce Plan (ISWP) that leaders use to ensure the organization has the necessary capacity and skills for safe and reliable plant operation. (Key Actions OC-1, OC-2, OC-3, and OC-4)
  • Safety Culture (SC) DB&O-1: All individuals take personal responsibility and are accountable for displaying core values and behaviors that support a healthy Nuclear Safety Culture at ANO. (Key Actions SC-5, SC-6, SC-7, SC-10, and SC-19)
  • SC DB&O-3: Leaders create an environment where upward communication/feedback is sought out, valued, and rewarded. Leaders create communication opportunities, encourage the free flow of information, and respond to individuals in an open, honest, and no-defensive manner. Trust, respect and a sense of teamwork permeate the ANO organization. (Key Actions SC-7, SC-8, SC-9, and SC-11)
  • SC DB&O-8: Nuclear safety is constantly scrutinized through a variety of monitoring tools, including effective use of the Nuclear Safety Culture Monitoring Panel and Corporate Oversight. (Key Actions SC-1, SC-2, SC-3, SC-14 and SC-15)
  • Training to Improve Organizational Performance (TR) DB&O-3: Resources in key departments, including the training department, are sufficient to support training for organizational performance improvement. (Key Action TR-5)

To evaluate the licensees corrective action effectiveness, the team reviewed:

  • Confirmatory Action Letter and Area Action Plan Actions Effectiveness (LO-ALO-2018-00014)
  • Nuclear Safety Culture Area Action Plan Closure Report
  • Nuclear Safety Culture Monitoring Panel Meeting Minutes
  • Nuclear Safety Culture Closure Readiness Evaluation
  • Station and CRP metrics, as well as other relevant performance monitoring data
  • Synergy and Organizational Health Index (OHI) Survey Results and Data
  • Interviewed a cross section of station management and employees To evaluate the licensees corrective action effectiveness, the team conducted seven focus group discussions with ANO personnel, including maintenance, operations, planning, and engineering. Focus group discussions and interviews were conducted using questions related to the areas of leadership, personal accountability, questioning attitude, problem identification and resolution, change management, decision making, effective communications, and continual learning. Additional insights were gathered by reviewing documents related to ANOs safety culture, including safety culture assessment reports, the Nuclear Safety Closure Readiness Evaluation, OHI survey results and corrective actions associated with the most recent OHI survey, and Nuclear Safety Culture Monitoring Panel meeting minutes. The team evaluated the Nuclear Safety Culture Monitoring Panel to verify their effectiveness in continuously monitoring the safety culture at ANO. In addition, the team evaluated the corrective actions and effectiveness criteria established by the licensee in aggregate for the reviewed DB&Os.

Based on focus group discussions, the team determined that most personnel believed that ANO management places an appropriate level of emphasis on safety. In addition, personnel stated that they are free to stop work and resolve issues concerning safety with management support. Most personnel feel that safety standards have been raised to an appropriate level at the site. The team determined that because the work management process was not identified to be a significant contributor to declining safety performance during the NRCs 95003 inspection, certain isolated organizations within the work management process received less attention in the area of safety culture improvement than other work groups. This has resulted in challenges with interdepartmental coordination.

Most personnel interviewed in the focus groups agreed that staffing levels had increased; however, some individuals felt that more personnel are still needed in some work groups. Those individuals stated that ANO had communicated to them that they would continue to hire more personnel. The team determined that ANO had increased staffing at the site using the Nuclear Strategic Plan. The Nuclear Strategic Plan for ANO indicated that ANO would hire additional staff in the future to meet the needs of the organization. In addition, most personnel interviewed stated that they were receiving the necessary amount of training in order to qualify and perform their jobs safely. Most personnel stated that the use of mentors was a positive mechanism to transfer knowledge from the senior personnel to the junior personnel.

Most personnel interviewed stated that the Behavior Based Safety program (peer-to-peer coaching) was an effective method to help each other maintain high safety standards. The team determined that this process was effective in supporting leaders in reinforcing fundamental behaviors and fostering worker ownership and engagement in licensee performance.

Through a review of the licensees 2017 OHI survey combined with the results of the teams focus group discussions and interviews, the team identified that ANO did not identify a potential priority group following the most recent safety culture survey. A priority group is a work group whose safety culture survey results were sufficiently more negative than the general population to warrant additional evaluation and possible development of an action plan to address the underlying causes for those negative responses. While reviewing Safety Culture DB&O-8, which states, Nuclear safety is constantly scrutinized through a variety of monitoring tools, the team reviewed the process that Entergy used to evaluate the safety culture of the station, which had changed to use the OHI Survey. The team identified that Entergy had previously relied upon multiple external monitoring tools to identify potential priority groups and provide information and possible causes from the survey results. Previous monitoring tools appropriately included qualitative assessment tools, such as interviews and focus groups, to identify causal factors for significant negative response trends. However, the Entergy change management process did not identify that the OHI survey did not include qualitative evaluation tools. The team concluded that the Entergy program had adequate steps to address priority groups when they are recognized, but did not have steps to make a determination whether any work groups should be classified as a priority group. The team noted that the ANO Safety Culture Monitoring Panel reviewed the OHI survey results and had been developing an action plan, but did not specifically consider whether any work groups should be considered for treatment as priority groups.

The team concluded that this was because the Entergy program did not require a qualitative evaluation be performed for significant negative response trends. In response to this concern, ANO wrote Condition Reports CR-ANO-C-2018-01736 and CR-HQN-2018-00803 and Learning Organization Report LO-ALO-2018-00029 (Corrective Action 28). Entergy stated that they would take the following actions and provide the results to the NRC for review. Changes to this plan may not be made without a review by the Nuclear Safety Culture Monitoring Panel.

(1) Revise the Entergy program to address identifying potential priority groups and if safety culture concerns are identified, conduct qualitative analysis of the survey results to determine appropriate actions to address those concerns. The results of the analysis and any planned actions will be tracked via Learning Organization Report actions and presented in an applicable management forum;
(2) Perform interviews and focus group discussions with a representative sample of site personnel for significant results identified from the 2017 OHI survey and ensure appropriate corrective actions have been developed; and
(3) Perform interviews and focus group discussions with a representative sample of site personnel, if necessary, after receiving the results of the upcoming 2018 OHI survey.

The team concluded that these actions were appropriate to establish an adequate understanding of the causes for negative responses to the OHI survey results, to ensure that priority groups would be appropriately identified, and to develop appropriate corrective actions.

Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address the Safety Culture inspection focus area were effective. Therefore, the Safety Culture inspection focus area of the CAL is closed.

d.

Closure of CAL Inspection Focus Area: Service Water System Self-Assessment

Background On January 26, 1990, ANO committed to establishing a program to address biofouling in raw water cooling systems which included chlorination, inspection and cleaning, and periodic flow tests. This included conducting periodic flow tests of the safety-related heat exchangers cooled by the service water (SW) system and periodic flushes of normally stagnant SW system pipe sections. ANOs December 2015 assessment of their SW Program documented seven problems, and stated that the overall program health was good with respect to the primary goal of ensuring the systems ability to provide its required heat removal function. The report stated that the program had maintained flows above required limits, although problems were identified with improving low flow margins for some components, inadequate configuration control, inadequate alignment between governing documents, and implementation actions that need to be addressed. Specifically, the Unit 2 emergency diesel generator heat exchangers (2E-20/63/64A and B), shutdown cooling heat exchangers (2E-35A and B), and B control room chiller condenser (2VE-1B) had a longstanding trend of having low flow margins, although the flows have been maintained above the required flow.

The 95003 inspection team noted that the ANO SW Program assessment did not classify the long-term, low flow margin trends as problems because credit was given for the site processes to elevate awareness of the margin concern, the effectiveness of past actions to sustain acceptable flow, and the success of recently performed actions at improving flow margin. The NRC team concluded that ANO had been attempting to manage a problem that affected the entire SW system by reducing margins to keep the system within the minimum requirements. The team concluded that the assessment applied a systematic approach to review of the SW Program, but did not provide a realistic assessment of the effectiveness of the program in identifying and correcting longstanding degraded conditions. The NRC team concluded that ANO did not have an adequate assessment of system performance problems or a holistic plan to correct the problems and causes.

As part of the 95003 Inspection Report 05000313/2016007 and 05000368/2016007 (ADAMS Accession No. ML16161B279), the NRC issued ANO four Green, non-cited violations and documented one licensee-identified finding involving the service water system.

The licensees progress in implementing the Service Water System Self-Assessment, Action SW-1, was reviewed in NRC Inspection Report 05000313/2016008 and 05000368/2016008 (ADAMS Accession No. ML17059D000) to assess how the focused self-assessment was being performed while the assessment was in progress. The NRC closed SW-1 in NRC Inspection Report 05000313/2017011 and 05000368/2017011 (ADAMS Accession No. ML17195A478). During this inspection, the team reviewed the focused self-assessment report Service Water System Operational Performance Inspection, and NUENERGY Report NUI-EOI-ANO SWS SA 2016-01; the Service Water System Improvement Plan; Condition Reports; and the CRP Action Effectiveness Summary for SW-1. The team compared the recommendations and problems identified in the self-assessment to the actions in the Service Water System Improvement Plan to verify that the actions needed to address material condition challenges and equipment reliability were included in the plan and were scheduled for completion in an appropriate timeframe based on the current conditions and safety significance. The team also verified that issues were entered into the corrective action program for resolution.

The team concluded that the focused self-assessment was completed in a manner that was consistent with the guidance in NRC Inspection Procedure 93810. The team interviewed the Unit 1 and 2 service water system engineers, the service water system self-assessment team leader, the Microbiological-Influenced Corrosion Program engineer, the Inservice Inspection Program engineer, the heat exchanger engineer, and the Design and Programs Engineering manager to discuss the material history of the system, degradation mechanisms, and previous actions to address those challenges.

These discussions focused on the licensees understanding of pitting corrosion, piping occlusion, flow degradation, and component functionality. The team concluded that the licensee identified all issues of concern in the corrective action program and understood the degradation mechanisms for service water system piping and components, which involved a combination of microbiologically-influenced corrosion and galvanic corrosion.

Scope of Review Since August 29, 2016, the NRC has performed quarterly CAL inspections of individual action items and found the items to be complete and effective. The complete list of individual action items along with descriptions and relevant inspection reports is provided in Attachment 3. To ensure the licensee adequately addressed the CAL inspection focus area, the NRC team reviewed the focus area for the key DB&O to verify that the licensee showed sustained improvement. Specifically, the following DB&O was reviewed:

(Key Action SW-01)

To evaluate the licensees corrective action effectiveness, the team reviewed:

  • Comprehensive Recovery Plan Action Effectiveness for NRC closure for SW-01
  • Comprehensive Recovery Plan Action Item Closure SW-01
  • Service Water System Operational Performance Inspection Report (SWSOPI)

(LO-ALO-2016-00078)

  • NUENERGY Innovative Solutions, Inc., Support of ANO 2016 Service Water Self-Assessment Activities Report (NUI-EOI-ANO SWS SA 2016-01)
  • Design and Licensing Basis Area Action Plan Closure Report
  • Confirmatory Action Letter and Area Action Plan Actions Effectiveness (LO-ALO-2018-00014)
  • Interviewed engineers, program owners, supervisors, and managers with a connection to service water The team evaluated the corrective actions and effectiveness criteria established by the licensee in aggregate for the reviewed DB&O. The team verified that the licensee was following the Service Water Improvement Plan to address the material condition challenges and equipment reliability in an appropriate timeframe based on the current conditions and safety significance. The team noted that the licensee replaced the chemical treatment system for both units and several hundred feet of service water piping in both units, and continues to replace piping and perform testing. In addition, the team noted that the licensee has become more proactive in finding, addressing, and evaluating pipe pitting. The licensee accomplished this by addressing all the currently existing through-wall leaks and adopting improved nondestructive testing methods and water treatment. The licensee also prioritized the nondestructive testing and the replacement of piping and major components based on the risk significance. In particular, the team noted strong ownership by all the engineers, program owners, supervisors, and managers interviewed.

Based on the actions taken by the licensee, data evaluated by the team, and observations performed on site, the team concluded that the actions taken to address Service Water Self-Assessment were effective. Therefore, the Service Water Self-Assessment inspection focus area of the CAL is closed.

.2 CAL Action Follow-up (IP 92702)

This section describes the scope, corrective action, and inspection of the remaining open CAL items.

Actions to Address Equipment Reliability and Engineering Program Deficiencies DB-11 Perform one benchmark or one self-assessment between March 1, 2016, and March 1, 2020, for each of 24 engineering programs. (CR-ANO-C-2015-02833 CA-28, and CR-ANO-C-2016-00614 CA-8 and CA-22)

During the 95003 supplemental inspection, the NRC team found that the ANO snapshot assessments of engineering programs were conducted in a systematic manner, some used industry experts, and identified program deficiencies.

However, the NRC team concluded that ANOs snapshot assessments were not fully effective in assessing whether some programs addressed longstanding equipment performance trends or whether plant components were appropriately included in programs. In response to the NRC teams observations, ANO initiated actions (CR-ANO-C-2016-00614) to conduct benchmarking of engineering programs and assign experienced mentors to program owners.

During the NRCs first review of DB-11 in Inspection Report 05000313/2018012 and 05000368/2018012 (ADAMS Accession No. ML18092A005), the team identified missing design bases calculations and licensing documents related to the High Energy Line Break (HELB/MELB) program. The licensee had failed to initiate condition reports or corrective actions for missing design bases calculations or licensing documents identified in CALC-ANOC-CS-16-00004, HELB Program Design Basis Consolidation Report, Table 9-1. The team concluded that DB-11 would be held open to review the licensees corrective action plan to locate or reconstitute the missing design information.

For this inspection, the team reviewed corrective actions associated with this concern to evaluate the licensee's corrective action effectiveness. As a result of the NRCs first review, the licensee re-evaluated the high energy line break program to determine the appropriate resolution of the design documents that could not be readily retrieved. The licensee developed a High Energy Line Break Design Basis Documents Project Plan, documented in Condition Report CR-ANO-C-2015-02833 (CA-27 and CA-28) with specific actions assigned to each of the 12 affected plant areas to either locate or create the required documentation (CAs 122-133). In addition, the Project Plan also required updating the design drawings for these areas to ensure that if modifications were performed before the required documentation was identified that additional actions were required to create the required calculations.

At the time of this inspection, the licensee believed they located the required documentation for at least three of the remaining 12 areas. The licensee is continuing to search for the documents, have discussions with the vendor, and has hired an investigator to assist in locating documents for the remaining areas.

The team reviewed the Project Plan, procedures, calculations, corrective action documents, and interviewed station personnel to determine that the High Energy Line Break Design Basis Documents Project Plan was adequate to ensure design basis reconciliation for high energy line break locations.

Based on the actions taken by the licensee, information evaluated by the team, and observations performed on site, the team concluded that the actions taken to address DB-11 were effective. Therefore, DB-11 is closed.

PH-12 The following list contains equipment reliability issues in systems or components necessary for the safe and reliable operation of the unit(s) that will be resolved over the next two unit operating cycles. The intent of this action is to demonstrate improved equipment reliability by resolving long-standing equipment issues. (CR-ANO-C-2014-00259 CA-130, CR-ANO-C-2015-02832 CA-33 through CA-35, CR-ANO-C-2015-03029 CA-13, CR-ANO-2-2013-02242 CA-50, and CR-ANO-2-2015-02879 CA-24)

  • Unit 1 reactor building coatings margin improvement
  • Unit 1 NI-501 detector replacement
  • Unit 2 instrument air compressor replacement
  • Fire suppression system reliability improvement
  • Diesel fire pump engine overhaul
  • Radiation monitor reliability improvement
  • Unit 2 component cooling water (CCW) system performance improvements o 2P-33C CCW pump overhaul o 2P-33B CCW pump overhaul o 2E-28B CCW heat exchanger replacement
  • Service water and circulating water chemical treatment system upgrade
  • Unit 2 condensate pump 2P-2A rebuild
  • Unit 1 letdown heat exchanger replacement
  • Unit 1 reactor vessel head O-ring leakage resolution
  • SU2 transformer inspections
  • SU3 transformer inspections
  • Complete design of Unit 1 integrated control system reverse engineered modules
  • Implement single point vulnerability mitigation and elimination efforts The licensees Collective Evaluation identified weaknesses with the organizations ability to identify, prioritize, fund, and implement modifications and other capital improvements required to address equipment issues in a timely manner. Multiple aspects of this process were determined to have challenges.

The licensee committed to complete multiple actions to improve equipment reliability related to items in the Site Integrated Plant Database process. Actions PH-1 through PH-11 in the Plant Health Area Action Plan caused the licensee to identify the equipment reliability problems and improve the processes for prioritizing, planning and funding the projects, while PH-12 through PH-14 committed to implement specific improvement projects. CAL action PH-12 committed ANO to implement a list of specific equipment reliability improvements that had plans developed that were scheduled to be completed between early 2016 and late 2018. The NRC reviewed a sample of risk significant items from the above list to evaluate the effectiveness of the licensees corrective actions to the long-standing equipment issues. The NRC has reviewed items over the last 2 years and reviewed the final seven items of interest in this current inspection.

The team reviewed the licensees progress in resolving equipment reliability issues by evaluating the actions taken to address the following:

  • Unit 2 shutdown cooling heat exchanger replacement The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has replaced this equipment, and the team noted that the equipment has been operating with no major issues since these replacements. This item is closed.
  • Fire suppression system reliability improvement The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has improved the reliability of the fire suppression system, and the team noted that the equipment has been operating with no major issues since these improvements. The team noted that there was one work order that was cancelled inappropriately, but an extent of condition review conducted by the licensee revealed that there were no further work orders cancelled inappropriately. This item is closed.
  • Service water and circulating water chemical treatment system upgrade The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has replaced this equipment in both units and added alternate injection points to ensure the chemical protection was available during outages. The team noted that the equipment has been operating with no major issues since these replacements. This item is closed.
  • Decay heat check valves DH-17 and DH-18 replacement The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has replaced these check valves with valves of a different design intended to minimize back-leakage through the check valves.

The team reviewed the post-maintenance testing of the valves prior to being declared operable. This item is closed.

  • Startup Transformer 2 inspections The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has inspected this equipment, and the team noted that the equipment has been operating with no major issues since these inspections. This item is closed.
  • Complete design of Unit 1 integrated control system reverse engineered modules The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. This item is intended to address an obsolescence issue before it becomes a reliability problem because the manufacture no longer supplies spare parts for the system. The licensee selected 13 of the 23 modules to be reverse-engineered and have new modules manufactured. Six of the remaining modules were partially reverse-engineered and had components replaced on existing boards. The remainder of the boards were not reverse engineered due to having a sufficient spare stock or because they had no components subject to time degradation. The components that were not reverse-engineered were scheduled to be refurbished to restore each module to the standards in SPEC-16-00001-MULTI, Electronic Assembly Refurbishment/Repair.

The licensee has replaced or has plans to refurbish this equipment, and the team noted that the equipment has been operating with no major issues.

This item is closed.

  • Implement single point vulnerability (SPV) mitigation and elimination efforts The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. This was a proactive action to identify components that have the potential to create plant transients if they fail while in service, and was not intended to correct existing reliability problems. The licensee has implemented these mitigation and elimination efforts. This item is closed.

The items documented above are the final items from PH-12 that the NRC planned to review. Based on the samples in this and previous inspections, the team concluded that the licensee is resolving the equipment reliability issues listed. Therefore, this item is closed.

PH-13 The following list contains equipment reliability issues that are being evaluated by the Plant Health Committee for resolution commensurate with the potential impact on safe and reliable operation of the units by December 20, 2018. For items not resolved by the due date, the Plant Health Committee will provide the safety basis for the extension. (CR-ANO-C-2015-02832 CA-38, and CR-ANO-C-2015-03029 CA-34)

CAL action PH-13 committed ANO to implement a list of specific equipment reliability improvements that did not have improvement plans that were fully developed or funded when the commitment was made. Since the CAL was written, ANO completed planning, scheduling, and budgeting activities for each of the actions listed below. The team reviewed the actions that were completed as samples to evaluate the effectiveness of the licensees corrective actions to the long-standing equipment issues.

  • Unit 2 spent fuel pool cooling system performance improvement
  • Correct back-leakage into the Unit 1 boric acid system
  • Unit 2 emergency feedwater Terry turbine governor replacement
  • Unit 1 high pressure injection pump P-36B motor refurbishment
  • Tornado/missile protection for emergency feedwater piping resolution
  • Unit 1 reactor vessel head leak-off line replacement
  • Unit 1 and Unit 2 super particulate iodine and noble gas monitor replacement

During the 95003 supplemental inspection, the NRC team identified weaknesses in the selection of the right work in the normal work planning process and the backlog reduction process. ANO had defined right work as the grouping of work activities, which best met the equipment reliability needs of the station by balancing the priority to correct degraded conditions against the capability of the station to complete the activity. The mechanical, electrical, and instrumentation and control maintenance coordinators for the online maintenance disciplines and the backlog project manager for the backlog reduction team select the right work. The NRC team noted that the process did not seek input from operations and engineering to help identify the right work activities. For normal online work, ANOs implementation resulted in a poor work bundling, excessive equipment unavailability, and delays in addressing difficult or complex tasks.

The team reviewed the licensees progress in resolving equipment reliability issues by evaluating the actions taken to address the following:

  • Unit 1 and Unit 2 Super Particulate Iodine and Noble Gaseous Monitor (SPINGS) replacement The team noted that the licensee has placed one of the SPINGS in service successfully in Unit 1, with the other three Unit 1 SPINGS planned to be fully operable by the end of May 2018. Unit 2 SPINGS are planned to be fully operable by the end of the 2018 fall refueling outage. The team noted that the installed SPING has been operating with no major issues since being replaced.

This item was the final item the NRC planned to review from PH-13. Therefore, this item is closed.

PH-14 Track and audit the completion of the following equipment reliability issues related to the White Finding and the potential for additional unplanned plant trips.

(CR-ANO-C-2015-02831 CA-31, CR-ANO-C-2015-02833 CA-44, and CR-ANO-C-2015-03029 CA-2, CA-3, CA-4, and CA-6)

Action PH-14 committed to complete corrective actions that were planned, scheduled, and funded at the time the commitment was made in order to address the causes and extent of condition/extent of cause from three scrams in Unit 2.

The team reviewed the licensees progress in resolving equipment reliability issues by evaluating the actions taken to address the following:

  • Audit completion of repair of 161 kV Russellville East Transmission Line Lightning Protection System.
  • Audit completion of Entergy Transmission inspection of static line grounds on Transmission lines that end in ANO switchyard and insure the acceptance criteria per Entergy Transmission Standards. Includes
(1) Pleasant Hill (500 kV),
(2) Fort Smith (500 kV),
(3) Mabelvale (500 kV), and
(4) Pleasant Hill (161 kV).
  • Replace damaged Unit 2 Unit Auxiliary Transformer 6900 V and 4160 V buses and ducting.
  • Audit completion of Startup Transformer 3 non-segmented bus inspections, to include visual confirmation of filler material under taped, bolted connections.
  • Verify that all medium voltage connections have adequate fill and air gap.

o Issue work requests to inspect all ANO-1 and ANO-2 medium voltage connections for the existence of corona effects o Issue work requests to re-tape all ANO-1 and ANO-2 medium voltage connections in accordance with OP-6030.110, and ensure adequate fill is installed.

o Either track completions of the resulting work orders listed above or close this corrective action to the associated work orders with concurrence by the Condition Review Group and/or Corrective Action Review Board, as required.

The team reviewed the system health reports and work orders and interviewed plant personnel regarding the specific equipment reliability issues. The licensee has inspected and repaired this equipment as needed, and the team noted that the equipment has been operating with no major issues since these improvements.

The items documented above are the final items in PH-14. These actions have been reviewed, and inspectors have verified that the licensee has resolved the equipment reliability issues listed. Therefore, this item is closed.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On May 31, 2018, the team presented the inspection results to Mr. R. Anderson, Site Vice President, and other members of the licensee staff at a public meeting. The licensee acknowledged the issues presented. The inspectors verified no proprietary information was retained or documented in this report.

LIST OF CONFIRMATORY ACTION LETTER ITEMS CLOSED AND DISCUSSED Closed Equipment Reliability and Engineering Program Deficiencies DB-11 (Section 4OA5.2)

PH-12 (Section 4OA5.2)

PH-13 (Section 4OA5.2)

PH-14 (Section 4OA5.2)

LIST OF

DOCUMENTS REVIEWED

Audits/Self Assessments

Number

Title

Revision/Date

Corporate & Independent Oversight Area Action Plan

Closure Report

March 2018

Decision Making and Risk Management Area Action Plan

Closure Report

March 2018

Design and Licensing Basis Area Action Plan Closure

Report

March 2018

Human Performance Closure Readiness Evaluation

Leadership Fundamentals Area Action Plan Closure

Report

March 2018

Nuclear Fundamentals Area Action Plan Closure Report

March 2018

Nuclear Safety Culture Area Action Plan Closure Report

March 2018

Nuclear Safety Culture Closure Readiness Evaluation

Organizational Capacity Area Action Plan Closure Report

March 2018

Plant Health Area Action Plan Closure Report

March 2018

Preventive Maintenance Program Area Action Plan

Closure Report

March 2018

Procedure and Work Instruction Quality Area Action Plan

Closure Report

March 2018

Service Water System Closure Readiness Evaluation

LO-ALO-2016-

00078

Confirmatory Action Letter Key Improvement Action 6:

Service Water System Operational Performance

Inspection (SWSOPI)

December

2016

LO-ALO-2018-

00014

Confirmatory Action Letter (CAL) and Area Action Plan

(AAP) Actions Effectiveness

February

2018

LO-ALO-2018-

00040

Comprehensive Recovery Plan Procedure Reconciliation

March 2018

NUI-EOI-ANO

SWS SA 2016-01

Support of ANO 2016 Service Water System Self

Assessment Activities

December

2016

Condition Reports (CR-ANO-)

C-2015-02829

C-2015-02833

C-2015-04876

C-2016-00435

C-2016-00524

C-2016-00546

C-2016-00614

C-2016-01736

C-2017-00926

C-2017-02836

C-2018-00554

C-2018-01118

C-2018-01189

C-2018-01500

C-2018-01502

C-2018-01552

C-2018-01554

C-2018-01555

C-2018-01556

C-2018-01558

C-2018-01560

C-2018-01736

1-2015-02032

1-2016-04138

1-2016-04924

1-2016-05076

1-2016-05100

1-2016-05107

1-2018-00541

1-2018-01178

2-2016-00361

2-2016-00421

2-2016-00672

2-2016-00674

2-2016-03882

2-2016-04014

2-2016-04175

2-2018-00724

CR-HQN-2018-

00024

CR-HQN-2018-

298

CR-HQN-2018-

00786

CR-HQN-2018-

00803

Procedures

Number

Title

Revision

COPD-024

Risk Assessment Guidelines

EN-DC-115

Engineering Change Process

EN-DC-134

Design Verification

EN-DC-329

Engineering Programs Control and Oversight

EN-FAP-OM-016 Performance Management Process and Practices

EN-LI-121

Trending and Performance Review Process

EN-OM-126

Management and Oversight of Supplemental Personnel

EN-QV-136

Nuclear Safety Culture Monitoring

EN-WM-100

Work Request (WR) Generation, Screening, and

Classification

EN-WM-104

On Line Risk Assessment

EN-WM-105

Planning

PI-001

Paired Observation Program

SEP-EPCO-

ANO-001

ANO Engineering Programs Control and Oversight

Miscellaneous

Number

Title

Revision/Date

1R27 Outage Meeting & Communication Schedule

Action Plan to Address Unit 1 Scope and Selection Stability

Red Performance Indicator

ANO Employee Handbook

ANO People Health Committee - Engineering Minutes

February 15,

2018

ANO Integrated Strategic Workforce Plan (ISWP)

Miscellaneous

Number

Title

Revision/Date

Average Functional Area Scores and Weighted Fleet Index

Comprehensive Recovery Plan Metrics

January -

February

2018

Critical Preventive Maintenance Index - ANO Unit 1 and

Unit 2

February

2018

Equipment Reliability Index - ANO Unit 1 and Unit 2

February

2018

High Energy Line Break (HELB) Design Basis Documents

Project Plan

Main Control Room Deficiencies - ANO Unit 1 and Unit 2

March 2018

Nuclear Safety Culture Monitoring Panel Meeting Minutes

Various

Nuclear Safety Culture Observation Forms

February 1,

2018 - March

30, 2018

OHI Survey Results

2016, 2017

Red Comprehensive Recovery Plan Indicators and

Associated Action Plans

Site Scorecard - ANO Unit 1 and Unit 2

Synergy Survey Results

2016

Tracking Spreadsheet and Work Curves for Procedure

Changes

Weighted Functional Area Index

CALC-ANOC-

CS-16-0004

Arkansas Nuclear One Units 1 & 2 High Energy Line Break

(HELB) Program Revalidation (HELB Program Design Basis

Consolidation Report)

Drawing A-7003

Sheets 1-16

High Energy Line Break (HELB)

various

WO-ANO-

2550018

CV-3811 PM IAW OP-1412.001

WT-WTHQN-

2017-00546

Perform Effectiveness Review of Fleet Implementation of

DNP SDP

CONFIRMATORY ACTION LETTER ITEM STATUS

Significant Performance Deficiencies

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

CO-5

OC-5

Develop and issue an Entergy

change management procedure

for planning, execution, and follow

up of high risk changes. The

procedure will include specific

expectations for reviewing the

effectiveness of high risk

changes. Perform a snapshot

benchmarking to check the

approach for change

management against industry

practices.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

DB-1

Establish metrics to monitor

performance that would indicate

that leadership focus on

minimizing risk and nuclear safety

results in improvement to the

health of maintenance rule

systems.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

DB-2

Facilitate behavior change by

rewarding performance that

indicates leadership behaviors are

focused on minimizing risk and

nuclear safety by incorporating

maintenance rule monitoring

goals into the supervisor and

above incentive plan.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

DB-3

Provide training to Engineering,

Operations, and Planners to

increase the knowledge and skills

regarding passive barriers and

other Design Basis Features.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

DM-1

Establish a decision making tool

for station personnel that includes

expectations for use at ANO. The

intent of this action is to establish

a minimum risk option behavior

that drives the decision maker to

develop multiple solutions and

drive the decision that has the

least risk.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

DM-6

Deliver risk recognition training

and develop curriculum for all site

personnel with unescorted

access.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

DM-7

Develop and implement training

on procedures governing risk

assessment for work

management SROs, work week

managers, shift managers, and

unit coordinators.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

DM-8

Develop and implement a

familiarization (FAM) guide for the

function of work management

SRO that will ensure clear

understanding of job functions.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

DM-10

Revise procedure EN-WM-104,

On-Line Risk Assessment, to

include guidance for classifying as

high risk those work activities

involving a credible risk concern

with unacceptable consequences

and first-of-a-kind or first-in-a-

while activities.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

DM-11

VO-19

Revise project management

procedures to ensure high

consequence risks are properly

identified and eliminated/mitigated

through a structured risk

management process.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

FP-1

Develop external flooding design

basis documentation so

configuration control is defined

and maintained. Develop an

engineering report and flood

protection drawings similar to fire

protection drawings to clearly

document the flooding design

basis and credited flood

protection features (credited

external flood protection features

and credited operator actions),

and assign unique equipment ID

to each flood protection feature

and boundary.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

FP-2

Develop internal flooding design

basis documentation so

configuration control is defined

and maintained. Develop an

engineering report and flood

protection drawings similar to the

fire protection drawings to clearly

document the flooding design

basis and credited flood

protection features (credited

internal flood protection features

and credited operator actions).

Update the Flooding Upper Level

Document (ULD). Assign unique

equipment identification to each

flood protection feature and

boundary.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Discussed,

awaiting

licensee

action

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

FP-3

Label external flood barriers in the

plant to provide in-field awareness

of flood protection features.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

FP-4

Establish an Engineering Barrier

Program to include external and

internal flood protection in

accordance with the requirements

of procedure EN-DC-329,

Engineering Programs Control

and Oversight. Assign program

owner and backup. Establish

PMs for external and internal

flood protection features including

scope, frequency, testing criteria,

and acceptance criteria.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

FP-5

Revise procedure EN-DC-329,

Engineering Programs Control

and Oversight, to include

external and internal flood

protection in the Engineering

Program List. Revise the flooding

programmatic aspects of

procedure EN-DC-150, Condition

Monitoring of Maintenance Rule

Structures. Revise EN-DC-136,

Temporary Modifications, to

incorporate external flood

considerations.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

FP-6

Validate that all external flood

gaps identified from the review of

documentation for credible flood

paths and the follow-up walk

downs have been resolved.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

FP-7

Perform walk downs of all

credited internal flood protection

features and document the results

in an engineering report.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Discussed,

awaiting

licensee

action

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

FP-8

Validate that all internal flood

gaps identified from the review of

documentation for credible flood

paths and the follow-up walk

downs have been resolved.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Discussed,

awaiting

licensee

action

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

FP-9

Establish the Program Notebook

and initial Program Health Report

for flood protection in accordance

with procedure EN-DC-143,

Engineering Health Reports, to

identify, communicate, prioritize

and drive resolution of issues that

challenge an effective flood

protection strategy including

performance indicators, initial

color rating (Red or Yellow), and

action plan.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

FP-13

Develop and conduct initial and

continuing training essential to

understanding and maintaining

the license basis for flood barrier

features. Address Operations,

Engineering, and Work Planning

groups.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

VO-1

Designate a Subject Matter

Expert (SME) to oversee

implementation of the procedure

for Management and Oversight of

Supplemental Personnel and

contractor oversight for ANO.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

VO-4

Establish a Vendor Oversight

Team to drive continuous

improvement in Vendor Oversight.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

VO-5

Develop and implement a process

for monitoring of supplemental

oversight plan compliance.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

VO-6

Establish specific

templates/guidance/examples to

support consistent development

of supplemental oversight plans.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

VO-7

Develop and implement initial and

continuing training on the

procedure for management and

oversight of supplemental

personnel. Training is for site

contract managers and project

managers.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Discussed,

awaiting

licensee

action

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

VO-8

Develop and implement a contract

management familiarization guide

to include determination and

documentation of work scope, risk

assessment, incentives and

penalties, and performance

monitoring. Include review of

operating experience, such as the

contractual aspects of the stator

lift rig failure and other related

industry events in the

familiarization guide.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

VO-9

Perform an organizational

capacity assessment for vendor

oversight, including contract

management and administration,

critical procurements, and

department-specific resource

impacts.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

VO-10

Evaluate span of control with

regard to responsible oversight of

vendors, and place actions to

address identified weaknesses in

the Corrective Action Program.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

VO-11

Revise the Supplemental

Personnel Expectations Brief

Checklist to include supplemental

personnel receiving a site

employee handbook and a

discussion by responsible

management on the site

employee handbook and

expectations for use.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

VO-14

Establish a fleet charter team or

ANO team to address

weaknesses in the procedures for

contractor oversight. Specifically,

identify gaps in the procedures to

align with industry guide AP-930,

Supplemental Personnel Process

Description. Assign additional

actions as warranted to address

any gaps identified.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

VO-15

Review current processes in

Engineering related to Vendor

Oversight Fundamental Problem.

Determine if additional actions are

required to address less formal

interfaces with suppliers of

contract services. Assign

additional actions as warranted to

address any gaps identified.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

VO-18

Revise Project Management

procedures to ensure projects are

organized and managed with (1)

effective support by subject

experts and (2) effective vendor

and technical oversight.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

licensee

action

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

VO-20

Issue a procedure for

management and oversight of

supplemental personnel including

improvements to (1) defined

responsibilities, (2) assessment of

risk, and (3) vendor oversight

plans.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Discussed,

awaiting

licensee

action

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

VO-21

DM-9

Develop and implement recurring

training for project management

personnel on risk recognition and

conservative decision-making.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number(s)

Status

VO-23

Revise EN-DC-114, Project

Management, to provide guidance

in specifying contract language

which will ensure detailed

engineering calculations, quality

requirements and standards are

provided for internal and third

party review, in accordance with

revised EN-MA-119, Material

Handling Program, when specially

designed temporary lift assembles

are to be used.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

VO-24

Revise EN-MA-119, to require a

documented engineering

response to evaluation critical lifts

if using any specially designed

temporary lifting device, any lifting

device that cannot be load tested

per EN-MA-119 criteria, or any

lifting device without a certified

load rating nameplate rating

affixed to it.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Additional

information

added

Identifying, Assessing and Correcting Performance Deficiencies

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

CA-1

Establish Corrective Action

Program (CAP) content in the ANO

Employee Handbook to include

behaviors for prompt identification

of conditions into CAP.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

CA-3

Conduct an organizational capacity

study to determine and correct

staffing and proficiency needs,

including needs to support CAP

implementation. Establish a

People Health Committee (APHC)

to support ongoing monitoring and

adjustments.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

CA-4

Develop and implement initial and

continuing CAP training for station

employees, ACE/RCE evaluators,

responsible managers (including

CARB and CRG), DPICs, OE

specialists and points of contact,

and performance improvement

personnel.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

CA-5

Train investigators, managers and

Performance Improvement (PI)

Staff on proper causal techniques,

manager oversight expectations

and engagement, and conducting

quality reviews of completed cause

evaluations and corrective actions.

Establish initial and refresher

training requirements in these

areas.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

CA-6

  • SII*

Implement training, benchmarking,

process improvements, and

monitoring/feedback to improve

the rigor, attention to detail, and

overall quality of operability

determinations and functionality

assessments.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Discussed,

awaiting

licensee

action

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

CA-7

Establish/refine key corrective

action program station and group-

level performance indicators.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

licensee

action

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

CA-9

Revise the CARB process to

require the Performance

Improvement Manager to present

the status of the condition

reporting process using

established metrics to the CARB.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

CA-7

closure

and further

inspection

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

CA-10

Improve the periodic performance

reviews and oversight of corrective

action program and operating

experience performance in

Department Performance Review

Meetings and Aggregate

Performance Review Meetings.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

CA-11

Revise EN-LI-102 Corrective

Action Program to require a

focused self-assessment every 2

years focused primarily on whether

staffing levels support effective

corrective action program

implementation and oversight.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

CA-12

Develop metrics to evaluate and

monitor the health of the operating

experience program.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

CA-13

Establish an Operating Experience

(OE) mentor to review OE

responses and provide critical

feedback.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

CA-14

For a period of one year, establish

Corrective Action Review Board

(CARB) oversight of selected

operating experience (OE)

responses to verify program

implementation meets CARB

standards.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

CA-15

Revise the Operating Experience

(OE) actions for selected

responses to require a pre-job brief

from the OE specialist. This brief

should include examples of missed

opportunities from past OE

responses and a review of the

procedure requirements for a

satisfactory OE written response.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

CA-16

Train each Operating Experience

(OE) point of contact on their

responsibilities and skills needed

to recognize the applicability of

OE, elevate OE, and use search

tools to locate OE for evaluation.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Discussed,

awaiting

licensee

action

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

CA-17

Revise Operating Experience (OE)

Program procedure to include an

annual review of the list of vendors

providing safety-related

products/services to ensure new

suppliers are added.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

CO-2

Revise procedure EN-FAP-OM-

2, Management Review

Meetings, to prioritize review of

Nuclear Safety Culture status and

regulatory performance to the

operational excellence

management review meeting

agenda.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

CO-3

Align ANO and fleet key

performance indicators with the

industry and establish goals that

are challenging and consistent with

industry practices.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

DM-5

Benchmark a nuclear facility

outside the Entergy fleet for its

ability to recognize risk.

Incorporate the learnings and

develop a risk recognition training

plan to be delivered at ANO.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

DM-12 Conduct benchmarking of a high

performing station in the area of

operations focus with a plan based

on Principles for Effective

Operational Decision Making.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DM-15 Perform a benchmark on a high

performing station outside the

Entergy Fleet on Operational

Decision Making Instruction

(ODMI) development,

implementation and effectiveness

reviews, and develop improvement

actions based upon the results.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DM-22 Benchmark outside the Entergy

fleet to identify best practices in

the work management process.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

DM-23 Have a group from another plant

perform a peer assist visit in work

management.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Discussed,

awaiting

licensee

action

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

LF-11

Create trending and issue

performance review metrics to

improve the review of leader

behaviors and performance

results.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

OC-6

LF-14

Create a simple tool to analyze

externally identified performance

issues both individually and in

aggregate to present actionable

data to the Aggregate

Performance Review Meeting

(APRM).

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

further

inspection

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PH-9

Conduct a benchmark of the Plant

Health Committee and Plant

Health Working Group at a

recognized industry leader in

identifying and addressing

equipment reliability issues. The

intent of this action is to validate

the action plan for improving our

Plant Health Committee and

establishing a Plant Health

Working Group.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PM-6

The Event Report Review Board

will review all formal operating

experience (OE) evaluations for 12

months and initiate corrective

action for any that do not meet

management standards for quality.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

PM-9

Develop metrics for the number of

open craft work order feedback

requests.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PM-10

Reestablish the Preventive

Maintenance (PM) Program health

report for a period of at least 12

months.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

TR-2

Define and incorporate guidance in

the condition report (CR) screening

and review process to prompt

discussion and/or action for

conditions potentially warranting a

training solution.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

TR-3

Define and incorporate practical

guidance in Procedure EN-LI-121,

Trending and Performance

Review, to support consideration

of training as a potential solution

for organizational performance

issues.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

TR-4

Training Manager provide

presentation(s) to managers and

Department Performance

Improvement Coordinators on the

use of training to support

organizational performance

improvement.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

TR-5

Factor training needs into

resources for key departments,

including the training department,

to ensure that resources support

training for organizational

performance improvement. This

action refers to staffing to support

training beyond that necessary for

accredited programs.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

VO-16

Benchmark an industry leader

outside the Entergy fleet to capture

best practices in vendor oversight.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

Human Performance

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

DB-9

Experienced mentors will be

assigned to the component and

programs areas from July 1, 2016,

through July 1, 2017. This

mentoring effort will focus on

behaviors, qualification, and

standards of the ANO component

and programs areas to ensure full

compliance and to build the

knowledge and proficiency in these

areas.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

DB-17

An engineering standard will be

produced to provide sustainable,

consistent guidance to station

engineers in the performance of

their duties. This standard will

incorporate best practices for

developing engineering products

beyond simple procedural

compliance and ensure that

standards and expectations for

performance of engineering duties

are clearly articulated to the

workforce.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DB-18

Re-baseline expectations for

supporting information for NRC

license amendment requests or

relief requests based on past

requests for additional information.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

DB-19

Provide Regulatory Assurance

departmental training on

development of NRC license

amendment requests.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

DM-13 Assign a mentor from outside the

Entergy fleet to coach and mentor

each shift manager, emphasizing

the aspect of leadership in

operational focus.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

DM-14 Assign a mentor to review all

Operational Decision Making

Instructions until proficiency is

demonstrated.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DM-16 Develop and implement training for

key personnel on ODMI

development, implementation, and

effectiveness reviews.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DM-17 Develop roles and responsibilities

for the quorum line participants in

the work management process.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

LF-1

Conduct leadership assessments

for the senior leadership team,

managers and superintendents

and establish individual

development plans to support

closing identified gaps in leader

behaviors.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

LF-2

Establish and roll out an ANO

employee handbook with attributes

and behaviors supporting nuclear

safety and long term strategic

improvement. The purpose of the

handbook is to communicate and

reinforce key values and

behaviors.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

LF-3

Provide supervisory training on

constructive conversation skills.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

LF-4

As an interim action, establish

weekly leadership alignment

meetings for supervisors and

above to reinforce actions and

behaviors needed to achieve

recovery objectives.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

LF-6

Benchmark an external

organization for leadership

fundamentals and develop

improvement actions as warranted

based upon the results.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

LF-8

As an interim measure, establish

and implement external coaching

for a sample of department and

station performance review

meetings in the Trending and

Performance Review process.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

LF-10

NF-10

Establish and implement a paired

observation program. This is a

coach the coach program to

improve the quality of interactions

between supervisors and those

they supervise.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

NF-1

Implement a What It Looks Like

sheet for nuclear professional

behaviors based on objectives in

Performance Objectives and

Criteria. Include a continued

focus on the following four

performance issues:

  • Procedure use and adherence
  • Challenging assumptions and

decision making

  • Conservative bias and risk

recognition

  • Low threshold for reporting

issues.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

NF-3

Develop content for the Employee

Handbook that addresses

procedure use and adherence.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

NF-5

Develop content for the ANO

supervisor training that addresses

procedure use and adherence.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

NF-6

Revise procedure EN-OM-126,

Management and Oversight of

Supplemental Personnel, to

ensure that supplemental

employees receive the Site

Handbook.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

NF-9

SC-8

Develop and implement a field

presence initiative that promotes

and measures leader field

presence. The objective is to drive

and verify field presence by

leaders to engage with employees

and reinforce high standards.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

OC-1

Perform organizational capacity

assessments to determine staffing

requirements for 16 key

departments based on experience,

training needs, knowledge

management needs, timing of

expected retirements, resignations

and reassignments and the needs

for a site with two dissimilar units.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

OC-2

Authorize the hiring of Entergy

personnel and/or contractor

positions identified as immediate

staffing requirements by the ANO

People Health Committee (APHC)

during organizational capacity

assessment reviews.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

OC-3

Establish and implement an ANO

Integrated Strategic Workforce

Plan that provides a strategic long-

term perspective of future staffing

needs with a focus on ensuring

staffing is sufficient to support

nuclear safety. The workforce

planning process will look into the

future at least five-years, be

updated annually, and reviewed

quarterly by the ANO People

Health Committee.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

OC-4

Establish and implement an ANO

People Health Committee to place

priority on staffing and retention

issues that are impacting ANO

employees or could impact nuclear

safety.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PM-13 Perform a resource allocation

study of the Preventive

Maintenance (PM) Program that

identifies positions needed to

maintain a continuously improving

PM Program.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

PM-14 Address gaps in the Preventive

Maintenance Program baseline

staffing level based on the current

levels of experience in the

departments and at the site.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PM-19 Revise the Preventive

Maintenance (PM) procedure to

require that craft work order

feedback is monitored and

incorporated within 90 days or

model work order placed into

plan status.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PQ-1

Develop and implement a site

procedure writers guide based on

applicable industry standards.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PQ-2

Develop and implement a work

order instruction guide based on

applicable industry standards.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PQ-3

Perform scoping reviews to assess

extent of procedure and work

instruction quality issues.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

PQ-4

Conduct a Procedure

Professionals Association

certification course for selected

plant personnel.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Discussed,

awaiting

licensee

action

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PQ-5

Risk rank station procedures as

safety significant, important, or

normal to facilitate procedure

upgrade project scoping.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

PQ-6

Upgrade safety significant

procedures.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

PQ-7

Upgrade procedures classified as

important.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

PQ-8

Upgrade procedures classified as

normal.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PQ-9

Upgrade Critical 1-4 Model Work

Orders with a frequency of greater

than or equal to 2 years or 2

refueling outages.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PQ-10

Review and correct station

procedures with respect to gaps in

use of notes and cautions, and

ensure needed corrections are

entered into the appropriate station

processes for completion.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

PQ-11

Establish a periodic review and

validation of station procedures.

This will also support a systematic

approach to revising the station

procedures not included in other

actions to the standards contained

in the new writers guide.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Equipment Reliability and Engineering Programs

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

DB-10

Resolve standards performance

deficiencies from the engineering

program assessments completed

during the Preventive Maintenance

(PM) Program extent of condition

review.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DB-11

Perform one benchmark or one

self-assessment between March 1,

2016, and March 1, 2020, for each

of 24 engineering programs.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Discussed,

awaiting

licensee

action

4/2/18 -

5/31/18

05000313/2018013,

05000368/2018013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

DB-12

Training and industry exposure will

be used to build the knowledge,

proficiency and standards within

the program and component areas

as the owners of each program

listed in DB-11 will participate in at

least one industry meeting or

specialized training course focused

in their program area between

March 1, 2016 and March 1, 2020.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

DM-18 Develop and implement work

management training for senior

managers, managers, and each of

the identified work management

positions with respect to their roles

and responsibilities.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

DM-20 Develop and implement a supply

vs. demand model and metrics to

determine and monitor resource

needs to meet workload demand.

The metrics will be used to

measure resource demand and

supply so that scheduled work has

the correct resources assigned to

complete the work scope.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

licensee

action

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PH-1

For open Site Integrated Plant

Database (SIPD) items, ensure

management sponsors and project

managers are assigned to verify

database content is updated. This

action supports effective decision

making by ensuring the accuracy

and completeness of existing SIPD

records.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

PH-2

Perform a review of the Site

Integrated Plant Database (SIPD)

database from 2007 to present to

identify PM or equipment reliability

projects related to critical

equipment that have been

cancelled without mitigation

strategies.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

PH-3

Review and update the current

Aging/Obsolescence List, Critical

Spares List, and Equipment

Reliability Issues List to identify

items that should be included in

the 2017 and 2018 business

cycles.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PH-4

Review and update the current site

Unit Commitment List to identify

operations and maintenance and

capital projects which are required

to be resolved by completion of

refueling outages 1R27 and 2R26.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PH-5

Develop and implement a

comprehensive site plan for

equipment reliability that identifies

the implementing resources

(people, materials, funding, and

time) needed to support on-line

and outage Unit Commitment List

items that require resolution by

completion of 1R27 and 2R26.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PH-6

Obtain an independent third party

review of the selection of Site

Integrated Planning Database

(SIPD) items that are targeted on

the comprehensive site plan for

equipment reliability to ensure the

decisions for inclusion and

exclusion are aligned with industry

standards and expectations

associated with timely resolution of

degraded equipment and design

margins.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

PH-10

Develop educational materials for

the plant heath process including

SIPD processing. Include a

detailed flowchart, workbook, and

detailed presentation materials.

Deliver the presentation to system,

component, and program

engineers and to selected

supervisory personnel. Have the

workbook completed by personnel

following the presentation.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

PH-11

Develop a job familiarization guide

for Plant Health Working Group

and Plant Health Committee

members and alternates. Have all

members and alternates complete

the guide.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PH-12

The following list contains

equipment reliability issues in

systems or components necessary

for the safe and reliable operation

of the unit(s) that will be resolved

over the next two unit operating

cycles. The intent of this action is

to demonstrate improved

equipment reliability by resolving

long-standing equipment issues.

8/25/17 -

9/1/17

05000313/2017012,

05000368/2017012

Additional

information

added

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Additional

information

added

4/2/18 -

5/31/18

05000313/2018013,

05000368/2018013

Closed

PH-13

The following list contains

equipment reliability issues that

are being evaluated by the Plant

Health Committee for resolution

commensurate with the potential

impact on safe and reliable

operation of the units by December

20, 2018. For items not resolved

by the due date, the Plant Health

Committee will provide the safety

basis for the extension.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Additional

information

added

4/2/18 -

5/31/18

05000313/2018013,

05000368/2018013

Closed

PH-14

Review and update the current site

Unit Commitment List to identify

operations and maintenance and

capital projects which are required

to be resolved by completion of

refueling outages 1R27 and 2R26.

4/2/18 -

5/31/18

05000313/2018013,

05000368/2018013

Closed

PM-1

Create a site specific procedure for

component classification that will

ensure appropriate classification of

equipment for PM based upon risk

and safety.

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Closed

PM-2

Create a site-specific PM program

procedure that includes lessons

learned from the PM FPA root

cause related to critical input to PM

changes.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

PM-4

Transfer responsibility for PM

evaluations of all maintenance rule

components and critical system

redundancy components to

engineering to ensure that

appropriate expertise is brought to

bear on these evaluations.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PM-5

The Preventive Maintenance (PM)

Oversight Group will review all PM

change requests for a minimum of

months and initiate corrective

action for any that do not meet

management standards for quality.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

PM-7

The Planning Quality Review

Team will perform an enhanced

review of critical work orders for a

minimum of 12 months and

feedback the results to the

planning staff.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PM-11 Implement a new qualification card

for maintenance personnel who

perform PM evaluations.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

PM-12 Implement training for all

personnel who are qualified to

establish Preventive Maintenance

(PM) requirements.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

PM-15 Review a sample of component

criticality classifications to validate

that the stations risk significant

equipment is classified correctly.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

PM-18 Develop mitigation strategies to

address cancelled projects in the

Site Integrated Planning Database

(SIPD) including embedded sub

component projects.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

Safety Culture

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

CO-1

Revise procedure EN-FAP-OM-

011, Corporate Oversight Model,

to include station nuclear safety

culture output from the Nuclear

Safety Culture Monitoring Panel

(NSCMP) as inputs to the

Oversight Analysis Meeting and

Oversight Review Board.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

CO-4

Revise procedures that govern

Nuclear Oversight Performance

Assessments to include NSC trend

codes. Apply relevant safety

culture trend code(s) during the

trending process. Based on report

frequency, roll up codes to provide

a perspective on NSC and include

in established reporting process.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

DM-2

Establish a decision making

nuclear safety culture observation

form to include the top leader

behaviors to be demonstrated and

reinforced at ANO meetings. The

form should include decision

making practices that emphasize

prudent choices over those that

are simply allowable.

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Closed

DM-3

Establish decision making and risk

management content in the ANO

Employee Handbook to include

behaviors for making effective

decisions and appropriately

managing risk with the expectation

for employees and leaders to use

the book in communicating,

demonstrating, and reinforcing

appropriate behaviors.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

LF-5

  • SII*

Provide supervisory training on

nuclear safety culture (NSC) and

safety conscious work

environment.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

NF-4

Develop content for the NSC

observation process that

addresses procedure use and

adherence.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

PM-20

Track Leadership Fundamentals

RCE CR-ANO-C-2015-02829 CA-

2. Improve the performance

review process for leadership

fundamentals supportive of long

term strategic improvement.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Discussed,

awaiting

licensee

action

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

SC-2

Revise procedure EN-QV-136,

Nuclear Safety Culture

Monitoring, to define the roles and

responsibilities of the ANO NSC

Manager.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

SC-3

Revise procedure EN-QV-136,

Nuclear Safety Culture

Monitoring, to add NSC monitor

orientation training for Nuclear

Safety Culture Monitoring Panel

(NSCMP) and Safety Culture

Leadership Team members.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

SC-4

Conduct a structured off-site

meeting among the ANO Senior

Leadership Team to align on what

a strategic commitment to safety

looks like at ANO and the leader

behaviors that will demonstrate

that commitment.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

SC-5

Create an ANO Employee

Handbook that includes nuclear

safety culture, safety conscious

work environment, and corrective

action program (CAP) standards

and expectations, and provide

orientation and expectations to

ANO personnel on the contents

and use of this handbook as a

daily tool for communicating,

reinforcing, and demonstrating

NSC and CAP expectations.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

SC-6

Conduct meetings facilitated by

members of site management to

familiarize personnel with the

contents of the ANO Employee

Handbook and expectations for its

use.

11/27/17 -

2/1/17

05000313/2017013,

05000368/2017013

Closed

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

SC-7

Establish a small group meeting

schedule to facilitate face-to-face

interaction between ANO senior

leadership and station employees.

This activity should span a

minimum period through the end of

2016 and include the following

attributes: 1) purpose is open

dialogue on safety performance

with emphasis on employee

questions and feedback; and 2)

schedule should be coordinated to

facilitate broad exposure, with

emphasis on workers on shift

rotation who cant routinely

participate in other communication

forums.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

SC-9

NF-7

Develop and provide training to

ANO leaders, including

supervisory training on nuclear

safety culture and safety conscious

work environment, constructive

conversation skills, and how to

foster a strong nuclear safety

culture within their organizations.

2/12/18 -

2/16/18

05000313/2018012,

05000368/2018012

Closed

SC-10

NF-8

Develop and present training to

ANO workforce to include case

studies that illustrate the right

picture of nuclear safety culture.

Include what it means to be an

engaged and thinking individual

nuclear worker.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

SC-11

Implement priority group specific

action plans to address safety

culture issues.

8/28/17 -

9/1/17

05000313/2017012,

05000368/2017012

Closed

SC-14

LF-9

CA-2

Establish and implement a Nuclear

Safety Culture Observations

process including elements of

leader behaviors, nuclear safety

8/29/16 -

9/16/16

05000313/2016010,

05000368/2016010

Discussed,

awaiting

licensee

action

Area

Action

Plan

Description

Inspection

Dates

Inspection Report

Number

Status

culture, and safety conscious work

environment. The observer

monitors leader performance on a

daily basis and provides feedback

to correct adverse trends in

behaviors.

2/27/17 -

3/3/17

05000313/2017010,

05000368/2017010

Closed

SC-15

Raise the priority and visibility of

nuclear safety culture (NSC) at the

fleet level by revising the

Corporate Oversight Model to

include station NSC output from

the Nuclear Safety Culture

Monitoring Panel (NSCMP) as

input to fleet oversight analysis

meetings and oversight review

boards.

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

Service Water System Self-Assessment

Description

Inspection

Dates

Inspection Report

Number

Status

Service Water System Operational

Performance Inspection

10/31/16 -

2/2/16

05000313/2016008,

05000368/2016008

Discussed

5/22/17 -

5/26/17

05000313/2017011,

05000368/2017011

Closed

ML18165A206

SUNSI Review

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

By: JDixon/rdr

Yes No

Publicly Available

Sensitive

NRC-002

OFFICE

RIV/DRP

RIV/DRP

RIII/DRP

NRR/DIRS/IRAB

OE/AT

RIV/ACES

NAME

JDixon

MTobin

EDuncan

MKeefe-Forsyth

DWillis

MVasquez

SIGNATURE

/RA/

/RA/

/RA/

/RA-E/

/RA-E/

/RA/

DATE

5/10/2018

5/9/2018

5/9/18

5/11/2018

5/11/2018

5/22/18

OFFICE

RIV/DRP:BC

RIV/DNMS:D

RIV/DRP:D

RIV/DRS:D

RIV/ORA:RA

NAME

NOKeefe

TPruett

AVegel

MShaffer

KKennedy

SIGNATURE

/RA/

/RA/

/RA/

/RA/

/RA/

DATE

5/19/18

5/29/18

5/23/18

5/24/18

6/18/18