ML19100A007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000348/2019013]]
| number = ML19100A007
| issue date = 04/10/2019
| title = Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000348/2019013; 05000364/201901
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Kharrl C
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| license number = NPF-002, NPF-008
| contact person =
| document report number = IR 2019013
| document type = Inspection Plan, Letter
| page count = 9
}}
See also: [[see also::IR 05000364/2019001]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                                NUCLEAR REGULATORY COMMISSION
                                                REGION II
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
                                      ATLANTA, GEORGIA 30303-1257
                                        April 10, 2019
Mr. Charles Kharrl
Southern Nuclear Operating Co., Inc.
Joseph M. Farley Nuclear Plant
7388 North State Highway 95
Columbia, AL 36319
SUBJECT:        JOSEPH M. FARLEY NUCLEAR PLANT - INFORMATION REQUEST FOR
                THE CYBER-SECURITY BASELINE SECURITY INSPECTION,
                NOTIFICATION TO PERFORM INSPECTION 05000348/2019013;
                05000364/2019013
Dear Mr. Kharrl:
On August 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
inspection in accordance with Inspection Procedure (IP) 71130.10P Cyber-Security,
Revision 0 at Farley Nuclear Plant, Units 1 and 2. The inspection will be performed to
evaluate and verify your ability to meet the Milestone 8 (i.e., full implementation) requirements
of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73,
Section 54,
Protection of Digital Computer and Communication Systems and Networks. The onsite portion
of the inspection will take place during the weeks of August 12, 2019, and August 26, 2019.
Experience has shown that baseline inspections are extremely resource intensive, both for the
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should
be made available via secure site (i.e., Sharepoint, Certrec) no later than June 10, 2019.
The inspection team will review this information and, by July 1, 2019, will request the
specific items that should be provided for review.
The second group of additional requested documents will assist the inspection team in the
evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture,
and the areas of the licensees CSP selected for the cyber-security inspection. This information
will be requested for review via secure site (i.e., Sharepoint, Certrec) before July 15, 2019.
The third group of requested documents consists of those items that the inspection team will
review, or need access to, during the inspection. Please have this information available by the
first day of the onsite inspection, August 12, 2019.
 
C. Kharrl                                            2
The fourth group of information is necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is David Strickland. We understand that our regulatory
contact for this inspection is Gene Surber of your organization. If there are any questions about
the inspection or the material requested, please contact the lead inspector at 404-997-4440 or
via e-mail at David.Strickland@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will not be available
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                  /RA/
                                                  Scott M. Shaeffer, Chief
                                                  Engineering Branch 2
                                                  Division of Reactor Safety
Docket Nos. 50-348; 50-364
License Nos. NPF-2; NPF-8
Enclosure:
Security Inspection Document Request
cc: See Page 3
 
C. Kharrl                      3
cc:
Cyneetha Evans
Site Security Manager
Joseph M. Farley Nuclear Plant
7388 North State Highway 95
Columbia, AL 36319
 
 
_ML        19100A007_    SUNSI REVIEW COMPLETE  FORM 665 ATTACHED
OFFICE            RII/DRS/EB2    RII/DRS/EB2
SIGNATURE              DWS5            SMS
NAME              D.STRICKLAND S.SHAEFFER
DATE                  4/ 9 /2019    4/ 10 / 2019
E-MAIL COPY?        YES    NO    YES      NO
Inspection Report:            05000348/2019013; 05000364/2019013
Inspection Dates:              Weeks of August 12, 2019, and August 26, 2019
Inspection Procedure:          IP 71130.10P, Cyber-Security, Revision 0
Reference:                    ML17156A215, Guidance Document for Development of the
                              Request for Information (RFI) and Notification Letter for
                              Full-Implementation of the Cyber-Security Inspection, Revision 0
NRC Inspectors:                David Strickland, Lead              Larry Jones
                              404-997-4440                        404-997-4837
                              David.Strickland@nrc.gov            Larry.Jones@nrc.gov
NRC Contractors:              Alan Konkal                          Alexander Prada
                              Alan.Konkal@nrc.gov                  Alexander.Prada@nrc.gov
I.    Information Requested for In-Office Preparation
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
      team with the general information necessary to select appropriate components and CSP
      elements to develop a site-specific inspection plan. The first RFI is used to identify the
      list of critical systems and critical digital assets (CSs/CDAs) plus operational and
      management (O&M) security control portions of the CSP to be chosen as the sample
      set required to be inspected by the cyber-security IP. The first RFIs requested
      information is specified below in Table RFI #1. The Table RFI #1 information is
      requested to be provided by, June 10, 2019 or sooner, to facilitate the selection of the
      specific items that will be reviewed during the onsite inspection weeks.
      The inspection team will examine the returned documentation from the first RFI and
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
      focused follow-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment list to your staff by July 1, 2019, which will identify
      the specific systems and equipment that will be utilized to evaluate the CSs/CDAs,
      defensive architecture, and the areas of the licensees CSP selected for the cyber-
      security inspection. We request that the additional information provided from the second
      RFI be made available by July 15, 2019. All requests for information shall follow the
      guidance document ML17156A215 referenced above.
                                                                                            Enclosure
 
                                              2
  The required Table RFI 1 information shall be provided via secure site (i.e., Sharepoint,
  Certrec) by June 10, 2019. The preferred file format for all lists is object character
  recognition (OCR) readable or a searchable Excel spreadsheet file. These files should
  be indexed and hyper-linked to facilitate ease of use. If you have any questions
  regarding this information, please call the inspection team leader as soon as possible.
                                          Table RFI #1
Section 3, Paragraph Number/Title:                                                    Items
  1  List All Identified Critical Systems and Critical Digital Assets                  All
      List CDA Facility and Site Ethernet - Transmission Control                        All
  2 Protocol/Internet Protocol (TCP/IP) based Local Area Networks (LANs)
      and identify those LANs that have non-CDAs on them
      List CDA facility and site non-ethernet TCP/IP based LANs including                All
  3 those industrial networks and identify LANs that have non-CDAs on
      them
  4  Network Topology Diagrams (be sure to include all NIDS and SIEMs                  All
        for EP networks and Security level 3 and 4 networks)
  8  List all network security boundary devices for EP networks and all                All
      network security boundary devices for levels 3 and 4
  9 List CDA wireless Industrial networks                                                All
  11 Network intrusion detection system documentation for Critical Systems              (11.a.1)
      that have CDAs associated with them                                              (11.a.)
  12 Security Information and Event Management (SIEM) documentation                    (12.a.1)
      for Critical systems that have CDAs associated with them                        (12.a.2)
  14 List EP and Security onsite and offsite digital communication systems                All
  25 Cyber-Security Assessment and Cyber-Security Incident Response                      All
      Teams
  28 Copy of Current Cyber Security Plan and copy of any 50.54(p)                        All
      analysis to support changes to the plan
In addition to the above information please provide the following:
    (1) Electronic copy of the UFSAR and technical specifications.
    (2) Name(s) and phone numbers for the regulatory and technical contacts.
    Based on this information, the inspection team will identify and select specific systems
    and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
    submit a list of specific systems and equipment to your staff by July 1, 2019 for the
    second RFI (i.e., RFI #2).
 
                                              3
II. Additional Information Requested to be Available Prior to Inspection.
    As stated in Section I above, the inspection team will examine the returned
    documentation requested from Table RFI #1 and submit the list of specific systems and
    equipment to your staff by July 1, 2019 for the second RFI (i.e., RFI #2). The second
    RFI will request additional information required to evaluate the CSs/CDAs, defensive
    architecture, and the areas of the licensees CSP selected for the cyber- security
    inspection. The additional information requested for the specific systems and
    equipment is identified in Table RFI #2. All requested information shall follow the
    guidance document ML17156A215 referenced above.
    The Table RFI 2 information shall be provided on secure site (i.e., Sharepoint or Certrec)
    by July 15, 2019. The preferred file format for all lists is object character recognition
    (OCR) readable or a searchable Excel spreadsheet file. These files should be indexed
    and hyper-linked to facilitate ease of use. If you have any questions regarding this
    information, please call the inspection team leader as soon as possible.
                                            Table RFI #2
    Section 3,
    Paragraph Number/Title:                                                                Items
        5 Plant Computer System Block Diagram (if Plant Computer System is                    All
          selected for inspection)
        6 Plant Security System Block Diagram (if Security Computer System is                All
          selected for inspection)
        7 Systems that are distributed Block Diagrams (for systems selected for              All
          inspection)
      10 Host-Based Intrusion Detection System Documentation (for CDAs for                (10.a.1)
            systems selected for inspection)                                              (10.a.2)
      13 List all Maintenance and Test Equipment (M&TE) used on CDAs for                    All
          systems selected for inspection
      15 Configuration Management                                                            All
      16 Supply Chain Management                                                          (16.a)
                                                                                          (16.b.1)
                                                                                          (16.b.6)
                                                                                          (16.b.5)
 
                                                  4
                                                Table RFI #2
      Section 3,
      Paragraph Number/Title:                                                            Items
      17 Portable Media and Mobile Device Control                                        All
      18 Software Management                                                              All
      20 Vendor Access and Monitoring                                                    All
      21 Work Control                                                                    All
      22 Device Access and Key Control                                                    All
      23 Password/Authenticator Policy                                                    All
      24 User Account/Credential Policy                                                  All
      26 Corrective Actions since last NRC inspection                                    All
      27 Cyber-Security Assessments for Selected Systems                                  All
III. Information Requested to be Available on First Day of Inspection
    For the specific systems and equipment identified in Section II above, provide the
    following RFI (i.e., Table 1ST Week Onsite) by August 12, 2019, the first day of the
    inspection. All requested information shall follow the guidance document ML17156A215
    referenced above.
    The preferred file format for all lists is object character recognition (OCR) readable or a
    searchable Excel spreadsheet file. These files should be indexed and hyper-linked to
    facilitate ease of use. If you have any questions regarding this information, please call
    the inspection team leader as soon as possible.
 
                                                  5
                                            Table 1st Week Onsite
        Section 3,
        Paragraph Number/Title:                                                          Items
          10 Host-Based Intrusion Detection System Documentation (for CDAs                (10.a.3)
              for systems selected for inspection)                                          thru
                                                                                        (10.a.12)
          11 Network Intrusion Detection System Documentation for Critical                (11.a.3)
              Systems that have CDAs associated with them                                  thru
                                                                                        (11.a.15)
          12 Security Information and Event Management (SIEM) Documentation              (12.a.3)
              for Critical Systems that have CDAs associated with them                      thru
                                                                                        (12.a.14)
          16 Supply Chain Management                                                      (16.b.2)
                                                                                          (6.b.3)
                                                                                          (16.b.4)
          19 Cyber-Security Event Notifications                                              All
        In addition to the above information please provide the following:
            (1) Copies of the following documents do not need to be solely available to the
                inspection team as long as the inspectors have easy and unrestrained access
                to them.
                a. Updated Final Safety Analysis Report, if not previously provided;
                b. Original FSAR Volumes;
                c. Original SER and Supplements;
                d. FSAR Question and Answers;
                e. Quality Assurance Plan;
                f. Technical Specifications, if not previously provided;
                g. Latest IPE/PRA Report; and
                h. Vendor Manuals, for applicable systems selected
            (2) Assessment and Corrective Actions:
                a. The most recent Cyber-Security Quality Assurance (QA) audit and/or
                    self-assessment; and
                b. The last 73.55(m) assessment performed; and
                c. Corrective action documents (e.g., condition reports, including status of
                    corrective actions) generate as a result of the most recent Cyber-Security
                    Quality Assurance (QA) audit and/or self-assessment.
IV.    Information Requested To Be Provided Throughout the Inspection
            (1) Copies of any corrective action documents generated as a result of the
                inspection teams questions or queries during the inspection.
            (2) Copies of the list of questions submitted by the inspection team members and
                the status/resolution of the information requested (provided daily during the
                inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team.
}}

Revision as of 05:16, 5 November 2019