ML15112B135: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:Duane Arnold Energy Center A
{{#Wiki_filter:Duane Arnold Energy Center A
Annual l Assessment A             tMMeeting ti Reactor Oversight Process - CY 2014 Nuclear Regulatory Commission - Region III Hiawatha, Iowa April 16, 2015 1
l A t M ti Annual Assessment Meeting Reactor Oversight Process - CY 2014 Nuclear Regulatory Commission - Region III Hiawatha, Iowa 1
April 16, 2015


Welcoming Remarks and
Welcoming Remarks and  


===Introductions===
===Introductions===
Greg Roach Acting Branch Chief, Division of Reactor Projects U S NRC Region III U.S.
Introductions Greg Roach Acting Branch Chief, Division of Acting Branch Chief, Division of Reactor Projects U S NRC Region III U.S. NRC Region III 2
2


Agenda g
Agenda g
* Introd Introduction ction
Introd ction
* National Nuclear Plant Performance Summary
* Introduction
* Duane Arnold Energy Center Plant Performance Results
* National Nuclear Plant Performance Summary Summary
* Duane Arnold Energy Center Plant Performance Results Performance Results
* NextEra Response and Remarks
* NextEra Response and Remarks
* NRC Closing Remarks
* NRC Closing Remarks
* Break
* NRC Closing Remarks
* NRC Available A il bl for f Public P bli Questions Q   ti 3
* Break NRC A il bl f
P bli Q
ti 3
* NRC Available for Public Questions


Our Mission
Our Mission
* To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment 4
* To license and regulate
* To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate ensure adequate protection of public health and safety, promote the common promote the common defense and security, and protect the 4
environment


National Plant Performance Summary Status as of 12/31/2014 Licensee Response           Column 1   80 Regulatory Response         Column 2   14 Degraded Cornerstone       Column 3   5 M lti l /R Multiple/Repetitive titi Deg. Cornerstone         Column 4   0 U
National Plant Performance Summary Status as of 12/31/2014 Status as of 12/31/2014 Licensee Response Column 1 80 Regulatory Response Column 2 14 Regulatory Response Column 2 14 Degraded Cornerstone Column 3 5
Unacceptable t bl               C l Column 5   0 IMC 0350 Oversight                     1 Total                                 100 5
M lti l /R titi Multiple/Repetitive Deg. Cornerstone Column 4 0
U t bl C l 5
0 Unacceptable Column 5 0
IMC 0350 Oversight 1
5 Total 100


Significance g               Threshold Performance Indicators
Significance Threshold g
: Only Baseline Inspection
Performance Indicators Performance Indicators Only Baseline Inspection Increases NRC oversight I
: Increases NRC oversight
NRC i ht Increases NRC oversight Increases NRC oversight Inspection Findings Very low safety issue Low to moderate safety issue Low to moderate safety issue Substantial safety issue High safety issue 6
: Increases I        NRC oversight i ht
:    Increases NRC oversight Inspection Findings
: Very low safety issue
: Low to moderate safety issue
: Substantial safety issue
:    High safety issue 6


Duane Arnold Energy Center Annual Assessment Summary January 1 - December 31  31, 2014
Duane Arnold Energy Center Annual Assessment Summary Annual Assessment Summary January 1 December 31 2014 January 1 - December 31, 2014
* NextEra operated Duane Arnold Energy Center (DAEC) in a manner that preserved public health and safety
* NextEra operated Duane Arnold Energy Center (DAEC) in a manner that preserved public health and safety
* All cornerstone objectives were met
* All cornerstone objectives were met
* Overall performance has improved
* Overall performance has improved
* A substantive cross-cutting issue on consistent i     process was identified id ifi d 7
* Overall performance has improved
* A substantive cross-cutting issue on i
id ifi d 7
consistent process was identified


Assessment Background           g
Assessment Background g
* DAEC was in the Degraded Cornerstone Column on January 1, 2014 due to two White findings id tifi d iin 2013 identified     2013.
* DAEC was in the Degraded Cornerstone Column on January 1, 2014 due to two White findings id tifi d i 2013 identified in 2013.
  - Inadequate maintenance instructions led to an oil leak in the A A Emergency Diesel Generator Lube Oil Heat Exchanger
- Inadequate maintenance instructions led to an oil leak in the A Emergency Diesel Generator Lube Oil Heat the A Emergency Diesel Generator Lube Oil Heat Exchanger
  - Failure to perform an operability determination for the unexpected Reactor Core Isolation Cooling System Speed Circuit indication 8
- Failure to perform an operability determination for the Failure to perform an operability determination for the unexpected Reactor Core Isolation Cooling System Speed Circuit indication 8


Assessment Background g
Assessment Background g
* A 95002 Supplemental Inspection was successfully completed in July 2014
* A 95002 Supplemental Inspection was successfully completed in July 2014 DAEC returned to the Licensee Response
* DAEC returned to the Licensee Response Column on August 29, 2014
* DAEC returned to the Licensee Response Column on August 29, 2014
* Torus coating delamination issue is being evaluated by y the NRC staff.
* Torus coating delamination issue is being evaluated by the NRC staff.
9
9 y


Other NRC Actions in 2015
Other NRC Actions in 2015
* Routine, Baseline Inspections
* Routine, Baseline Inspections
    - Triennial Fire Protection Program Inspection
- Triennial Fire Protection Program Inspection
    - Biennial Problem Identification and Resolution Inspection
- Biennial Problem Identification and Resolution Inspection
    - Initial Licensed Operators Examination
- Initial Licensed Operators Examination
    - Triennial Heat Sink Inspection
- Triennial Heat Sink Inspection
* Post-Fukushima Activities
* Post-Fukushima Activities S b t ti C
* Substantive S b t ti Cross-Cutting C     C tti     I Issue Assessment A            t 10
C tti I
A t
* Substantive Cross-Cutting Issue Assessment 10


Licensee Response and Remarks Thomas Vehec Vice President NextEra Energy Duane Arnold 11
Licensee Response and Remarks Thomas Vehec Vice President Vice President NextEra Energy Duane Arnold 11


Closing Remarks Patrick Louden Acting Deputy Regional Administrator NRC Region III 12
Closing Remarks Patrick Louden Acting Deputy Regional Administrator Acting Deputy Regional Administrator NRC Region III 12


Questions/Comments 13
Questions/Comments 13


Contacting   g the NRC
Contacting the NRC g
* Report R      t an emergency
R t
  - (301) 816-5100 (call collect)
* Report an emergency
* Report a safety concern
- (301) 816-5100 (call collect)
  - (800) 695-7403
* Report a safety concern  
  - Allegation@nrc.gov
- (800) 695-7403  
* General information or questions
- Allegation@nrc.gov
  - www.nrc.gov
* General information or questions General information or questions
  - Select What What We Do Do for Public Affairs 14
- www.nrc.gov
- Select What We Do for Public Affairs 14 Select What We Do for Public Affairs


NRC Representatives p
NRC Representatives p
* Viktoria Mitlyng, Senior Public Affairs Office
* Viktoria Mitlyng, Senior Public Affairs Office (630) 829 9662
    - (630) 829-9662 829 9662
- (630) 829-9662
* Prema Chandrathil, Public Affairs Officer
* Prema Chandrathil, Public Affairs Officer (630) 829 9663
    - (630) 829-9663 829 9663
- (630) 829-9663
* Lucas Haeg, Senior Resident Inspector
* Lucas Haeg, Senior Resident Inspector
* Jakob Steffes, Resident Inspector 15
* Jakob Steffes, Resident Inspector 15


Reference Sources
Reference Sources Reactor O ersight Process
* Reactor Oversight ersight Process
* Reactor Oversight Process
  - http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/
index.html
index.html Public Electronic Reading Room
* Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
  - http://www.nrc.gov/reading-rm.html
* NRC Information Digest
* NRC Information Digest
  - http://www.nrc.gov/reading-rm/doc-collections/
- http://www.nrc.gov/reading-rm/doc-collections/
nuregs/staff/sr1350
nuregs/staff/sr1350 nuregs/staff/sr1350 Public Document Room 800-397-4209 (Toll Free) 16 1 800 397 4209 (Toll Free)
* Public Document Room
  - 1 1-800-397-4209 800 397 4209 (Toll Free) 16


NRC Social Media Channels
NRC Social Media Channels
* Blog:   http://public-blog.nrc-gateway.gov/
* Blog:
* Flickr: http://www.flickr.com/photos/nrcgov/
http://public-blog.nrc-gateway.gov/
* T itt Twitter: htt //t itt http://twitter.com/#!/nrcgov
* Flickr:
                              /#!/
http://www.flickr.com/photos/nrcgov/
* YouTube: http://www.youtube.com/user/NRCgov
T itt htt
* RSS:     http://www nrc gov/public-http://www.nrc.gov/public-involve/listserver.html#rss 17}}
//t itt
/#!/
* Twitter:
http://twitter.com/#!/nrcgov
* YouTube:
http://www.youtube.com/user/NRCgov
* RSS:
http://www nrc gov/public-
* RSS:
http://www.nrc.gov/public-involve/listserver.html#rss 17}}

Latest revision as of 13:04, 10 January 2025

2014 Duane Arnold EOC Public Meeting Slides
ML15112B135
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/16/2015
From:
NRC/RGN-III
To:
References
Download: ML15112B135 (17)


Text

Duane Arnold Energy Center A

l A t M ti Annual Assessment Meeting Reactor Oversight Process - CY 2014 Nuclear Regulatory Commission - Region III Hiawatha, Iowa 1

April 16, 2015

Welcoming Remarks and

Introductions

Introductions Greg Roach Acting Branch Chief, Division of Acting Branch Chief, Division of Reactor Projects U S NRC Region III U.S. NRC Region III 2

Agenda g

Introd ction

  • Introduction
  • National Nuclear Plant Performance Summary Summary
  • Duane Arnold Energy Center Plant Performance Results Performance Results
  • NextEra Response and Remarks
  • NRC Closing Remarks
  • NRC Closing Remarks
  • Break NRC A il bl f

P bli Q

ti 3

  • NRC Available for Public Questions

Our Mission

  • To license and regulate
  • To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate ensure adequate protection of public health and safety, promote the common promote the common defense and security, and protect the 4

environment

National Plant Performance Summary Status as of 12/31/2014 Status as of 12/31/2014 Licensee Response Column 1 80 Regulatory Response Column 2 14 Regulatory Response Column 2 14 Degraded Cornerstone Column 3 5

M lti l /R titi Multiple/Repetitive Deg. Cornerstone Column 4 0

U t bl C l 5

0 Unacceptable Column 5 0

IMC 0350 Oversight 1

5 Total 100

Significance Threshold g

Performance Indicators Performance Indicators Only Baseline Inspection Increases NRC oversight I

NRC i ht Increases NRC oversight Increases NRC oversight Inspection Findings Very low safety issue Low to moderate safety issue Low to moderate safety issue Substantial safety issue High safety issue 6

Duane Arnold Energy Center Annual Assessment Summary Annual Assessment Summary January 1 December 31 2014 January 1 - December 31, 2014

  • NextEra operated Duane Arnold Energy Center (DAEC) in a manner that preserved public health and safety
  • All cornerstone objectives were met
  • Overall performance has improved
  • Overall performance has improved
  • A substantive cross-cutting issue on i

id ifi d 7

consistent process was identified

Assessment Background g

  • DAEC was in the Degraded Cornerstone Column on January 1, 2014 due to two White findings id tifi d i 2013 identified in 2013.

- Inadequate maintenance instructions led to an oil leak in the A Emergency Diesel Generator Lube Oil Heat the A Emergency Diesel Generator Lube Oil Heat Exchanger

- Failure to perform an operability determination for the Failure to perform an operability determination for the unexpected Reactor Core Isolation Cooling System Speed Circuit indication 8

Assessment Background g

  • A 95002 Supplemental Inspection was successfully completed in July 2014 DAEC returned to the Licensee Response
  • DAEC returned to the Licensee Response Column on August 29, 2014
  • Torus coating delamination issue is being evaluated by the NRC staff.

9 y

Other NRC Actions in 2015

  • Routine, Baseline Inspections

- Triennial Fire Protection Program Inspection

- Biennial Problem Identification and Resolution Inspection

- Initial Licensed Operators Examination

- Triennial Heat Sink Inspection

  • Post-Fukushima Activities S b t ti C

C tti I

A t

  • Substantive Cross-Cutting Issue Assessment 10

Licensee Response and Remarks Thomas Vehec Vice President Vice President NextEra Energy Duane Arnold 11

Closing Remarks Patrick Louden Acting Deputy Regional Administrator Acting Deputy Regional Administrator NRC Region III 12

Questions/Comments 13

Contacting the NRC g

R t

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs 14 Select What We Do for Public Affairs

NRC Representatives p

- (630) 829-9662

- (630) 829-9663

  • Lucas Haeg, Senior Resident Inspector

Reference Sources Reactor O ersight Process

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/

index.html Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html

  • NRC Information Digest

- http://www.nrc.gov/reading-rm/doc-collections/

nuregs/staff/sr1350 nuregs/staff/sr1350 Public Document Room 800-397-4209 (Toll Free) 16 1 800 397 4209 (Toll Free)

NRC Social Media Channels

  • Blog:

http://public-blog.nrc-gateway.gov/

  • Flickr:

http://www.flickr.com/photos/nrcgov/

T itt htt

//t itt

/#!/

  • Twitter:

http://twitter.com/#!/nrcgov

  • YouTube:

http://www.youtube.com/user/NRCgov

  • RSS:

http://www nrc gov/public-

  • RSS:

http://www.nrc.gov/public-involve/listserver.html#rss 17