| Line 29: | Line 29: | ||
: 2. EC 278862 | : 2. EC 278862 | ||
: 3. EC 280981 & 273976 (EC 280981 makes Temporary Modification EC 273976 permanent) | : 3. EC 280981 & 273976 (EC 280981 makes Temporary Modification EC 273976 permanent) | ||
ADAMS Accession Number ML16005A608 | ADAMS Accession Number ML16005A608 | ||
December 24, 2015 NRC Additional Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 BASELINE INSPECTION DATED October, 2015 (Hereafter Items referred to are from this NRC Letter). | December 24, 2015 NRC Additional Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 BASELINE INSPECTION DATED October, 2015 (Hereafter Items referred to are from this NRC Letter). | ||
Latest revision as of 05:46, 10 January 2025
| ML16005A608 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 12/24/2015 |
| From: | NRC/RGN-III |
| To: | |
| References | |
| Download: ML16005A608 (1) | |
Text
December 24, 2015 NRC Additional Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 BASELINE INSPECTION DATED October, 2015 (Hereafter Items referred to are from this NRC Letter).
NRC Additional Supplemental Information Requests for - Duane Arnold Energy Center
- 1. 50.59 Evaluation for EC 282231 - Need Design Change Package & revised calculations.
Licensee does not need to provide any computer code or printouts of results; primarily interested in the methodology, assumptions, and inputs.
- 2. Calculation CAL-E08-004 - Need Calculation Revision & any EC that was completed
- 3. Calculation CAL-E08-005 - Need Calculation Revision & any EC that was completed
- 4. Calculation CAL-E95-012 - Need Calculation Revision & any EC that was completed
- 5. Procedure AOP 317 - Need Procedure Change Package, including Procedure Revision
- 6. Procedure ARP 1C07A - Need Procedure Change Package, including Procedure Revision
- 8. UFSAR Change 2014-013 - Provide UFSAR Change Package Inspectors also request copies of the following Design Changes (not in original request)
- 1. EC 156026
- 2. EC 278862
- 3. EC 280981 & 273976 (EC 280981 makes Temporary Modification EC 273976 permanent)
ADAMS Accession Number ML16005A608
December 24, 2015 NRC Additional Supplement to NRC Letter - INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 BASELINE INSPECTION DATED October, 2015 (Hereafter Items referred to are from this NRC Letter).
NRC Additional Supplemental Information Requests for - Duane Arnold Energy Center
- 1. 50.59 Evaluation for EC 282231 - Need Design Change Package & revised calculations.
Licensee does not need to provide any computer code or printouts of results; primarily interested in the methodology, assumptions, and inputs.
- 2. Calculation CAL-E08-004 - Need Calculation Revision & any EC that was completed
- 3. Calculation CAL-E08-005 - Need Calculation Revision & any EC that was completed
- 4. Calculation CAL-E95-012 - Need Calculation Revision & any EC that was completed
- 5. Procedure AOP 317 - Need Procedure Change Package, including Procedure Revision
- 6. Procedure ARP 1C07A - Need Procedure Change Package, including Procedure Revision
- 8. UFSAR Change 2014-013 - Provide UFSAR Change Package Inspectors also request copies of the following Design Changes (not in original request)
- 1. EC 156026
- 2. EC 278862
- 3. EC 280981 & 273976 (EC 280981 makes Temporary Modification EC 273976 permanent)
ADAMS Accession Number ML16005A608