IR 05000327/2017406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:March 16, 2017


==REGION II==
==SUBJECT:==
245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 16, 2017 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801 SUBJECT: SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406
SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406


==Dear Mr. Shea:==
==Dear Mr. Shea:==
Line 38: Line 38:


Sincerely,
Sincerely,
/RA/
/RA/  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Enclosure:
 
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  
 
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79  
 
Enclosure:
Inspection Report 05000327/2017406 and 05000328/2017406 w/Attachment:
Inspection Report 05000327/2017406 and 05000328/2017406 w/Attachment:
Supplemental Information (OUO)
Supplemental Information (OUO)  
 
cc: (See page 3) cc:
cc: (See page 3) cc:
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801 Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000 Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000 Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000 Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Mr. Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200 ___ ____ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE PJB4 DWS5 AJB3 SMS NAME P. Braaten D. Strickland A. Blamey S. Shaeffer DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801  
 
Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000  
 
Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000  
 
Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000  
 
Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801  
 
Mr. Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200  
 
___ ____  
 
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS  
 
SIGNATURE PJB4 DWS5 AJB3 SMS  
 
NAME P. Braaten D. Strickland A. Blamey S. Shaeffer  
 
DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017  
 
E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 11:14, 9 January 2025

Cyber Security Follow-Up Inspection Report 05000327/2017406 and 05000328/2017406 (Letter Only)
ML17081A426
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/16/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: James Shea
Tennessee Valley Authority
References
IR 2017406
Download: ML17081A426 (4)


Text

March 16, 2017

SUBJECT:

SEQUOYAH NUCLEAR PLANT - CYBER SECURITY FOLLOW-UP INSPECTION REPORT 05000327/2017406 AND 05000328/2017406

Dear Mr. Shea:

On February 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Sequoyah Nuclear Plant, Units 1 and 2 and discussed the results of this inspection with Mr. Michael Durr and other members of your staff. The results of this inspection are documented in the enclosed report.

No NRC-identified or self-revealing findings were identified during this inspection.

However, inspectors documented a licensee-identified violation which was determined to be of very low security significance. The NRC is treating this violation as a non-cited violation (NCV)

consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II, the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Sequoyah Nuclear Plant.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

Inspection Report 05000327/2017406 and 05000328/2017406 w/Attachment:

Supplemental Information (OUO)

cc: (See page 3) cc:

Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801

Mr. P. P. Pratt Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 POB 2A-SQN Soddy Daisy, TN 37384-2000

Mr. D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 OPS 4A-SQN Soddy Daisy, TN 37384-2000

Mr. F. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801

Mr. Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-200

___ ____

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRP RII:DRS

SIGNATURE PJB4 DWS5 AJB3 SMS

NAME P. Braaten D. Strickland A. Blamey S. Shaeffer

DATE 3/15/2017 3/15/2017 3/15/2017 3/16/2017

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO