ML17212A063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:
{{#Wiki_filter:MILLSTONE POWER STATION UNIT 3 FINAL SAFETY ANALYSIS REPORT
{{#Wiki_filter:MILLSTONE POWER STATION UNIT 3 FINAL SAFETY ANALYSIS REPORT


Revision 29 (2016 - 2017 Reporting Period)
1 of 2 Revision Summary Revision 29 (2016 - 2017 Reporting Period)
Revision                                   Document Elements Affected Revision                Change Activity                                                                                        Summary Description of Changes Release Date                                    (Sections, Tables, Figures) 29       4/7/16       Administrative   As identified in the 2016 NRC Submittal List of Changed             Administrative (FSAR content not affected). Change indicator(s) and Pages and submitted Summary of Change.                              change identification(s) present in the 2016 NRC Submittal were rem in preparation for the 2017 Annual Report. This forms the base line fo changes incorporated under the Revision 29 series. Revision level of t authoring files are unchanged. This supports Revision/Change traceab 29.1     09/29/16     MP3-UCR-2014-014 Table 10.4-4                                                         Reflects updated discussion on TDAFW pump overspeed values. (DC MP3-14-01107) 29.1     09/29/16     MP3-UCR-2015-008 Section 5.2.5.1.3, 5.4.1.2.2, 5.4.1.3.1, 5.4.1.3.4, 5.4.1.3.7,       Reflects replacement of RCP B & C seals (3R17). (DC: MP3-5.4.1.3.10, 5.4.1.3.11, 5.4. 7.2.1, Table 5.4-1, Figure 5.4-1,       14-01022)
Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)
Sections 9.2.2.1.3, 9.2.8.2, 9.3.4.2.1, 9.3.4.2.5, Table 9.3-6 29.1     09/29/16     MP3-UCR-2015-023 Section 9.1.2                                                       Type Update UCR associated with LAR (LBDCR 15-MP3-009). (L Ltr 15-410, CR580759) 29.1     09/29/16     MP3-UCR-2015-030 Sections 7.3.1.1.5, 10.4.9.5                                         TDAFW control transfer switch position (DC: MP3-15-01124) 29.1     09/29/16     MP3-UCR-2015-033 Section 8.3.1.1.6                                                   SBO Diesel Autostart (DC: MP3-15-01099) 29.1     09/29/16     MP3-UCR-2016-001 Section 9.5.4.4                                                     Change to the fuel oil sampling wording to remove ambiguity.
Summary Description of Changes 29 4/7/16 Administrative As identified in the 2016 NRC Submittal List of Changed Pages and submitted Summary of Change.
(CA3018205) 29.1     09/29/16     MP3-UCR-2016-003 Sections 4.2.2, 4.2.2.2.2, 4.2.2.3.3, 4.4.2.2.7, 15.0.3.2, 15.4.2.2, M3C18 reload project (EVAL-ENG-RSE-M3C18, Rev. 0) 15.6.1.2 29.1     09/29/16     MP3-UCR-2016-007 Section 9.2.8                                                       Change section 9.2.8 to correct the amount of flow able to be supplied the boric acid blender by the Primary Grade Water pumps. (CR 10287 CA 3025491) 1 of 2
Administrative (FSAR content not affected). Change indicator(s) and page change identification(s) present in the 2016 NRC Submittal were removed in preparation for the 2017 Annual Report. This forms the base line for changes incorporated under the Revision 29 series. Revision level of the authoring files are unchanged. This supports Revision/Change traceability.
29.1 09/29/16 MP3-UCR-2014-014 Table 10.4-4 Reflects updated discussion on TDAFW pump overspeed values. (DC:
MP3-14-01107) 29.1 09/29/16 MP3-UCR-2015-008 Section 5.2.5.1.3, 5.4.1.2.2, 5.4.1.3.1, 5.4.1.3.4, 5.4.1.3.7, 5.4.1.3.10, 5.4.1.3.11, 5.4. 7.2.1, Table 5.4-1, Figure 5.4-1, Sections 9.2.2.1.3, 9.2.8.2, 9.3.4.2.1, 9.3.4.2.5, Table 9.3-6 Reflects replacement of RCP B & C seals (3R17). (DC: MP3-14-01022) 29.1 09/29/16 MP3-UCR-2015-023 Section 9.1.2 Type Update UCR associated with LAR (LBDCR 15-MP3-009). (Lic Ltr 15-410, CR580759) 29.1 09/29/16 MP3-UCR-2015-030 Sections 7.3.1.1.5, 10.4.9.5 TDAFW control transfer switch position (DC: MP3-15-01124) 29.1 09/29/16 MP3-UCR-2015-033 Section 8.3.1.1.6 SBO Diesel Autostart (DC: MP3-15-01099) 29.1 09/29/16 MP3-UCR-2016-001 Section 9.5.4.4 Change to the fuel oil sampling wording to remove ambiguity.
(CA3018205) 29.1 09/29/16 MP3-UCR-2016-003 Sections 4.2.2, 4.2.2.2.2, 4.2.2.3.3, 4.4.2.2.7, 15.0.3.2, 15.4.2.2, 15.6.1.2 M3C18 reload project (EVAL-ENG-RSE-M3C18, Rev. 0) 29.1 09/29/16 MP3-UCR-2016-007 Section 9.2.8 Change section 9.2.8 to correct the amount of flow able to be supplied to the boric acid blender by the Primary Grade Water pumps. (CR 1028775/
CA 3025491)


Revision                                  Document Elements Affected Revision              Change Activity                                                                              Summary Description of Changes Release Date                                    (Sections, Tables, Figures) 29.1     09/29/16     MP3-UCR-2016-009 Section 5.3.1.6                                         Remove capsule withdrawal schedule from page 5.3-6 and incorporat edits to final paragraph of section 5.3.1.6. (NRC Safety Evaluation by dated March 17, 2016 serial # 16-131) 29.1     09/29/16     MP3-UCR-2016-010 Section 10.4.8.1, Table 10.1-1                           Change to the Steam Generator blowdown system venturi volumetric to differential pressure relationship (DC: MP3-10-01139) 29.1     09/29/16     MP3-UCR-2016-012 Section 5.3.1.6                                         Update Capsule withdrawal schedule on page 5.3-6. (TRM Change 16 MP3-007) 29.1     09/29/16     MP3-UCR-2016-014 Chapter 8 List of Figures; Sections 8.1.3; 8.2.1; 8.2.2; Unit 3 SLOD Removal (LBDCR 15-MP3-006)
2 of 2 29.1 09/29/16 MP3-UCR-2016-009 Section 5.3.1.6 Remove capsule withdrawal schedule from page 5.3-6 and incorporate edits to final paragraph of section 5.3.1.6. (NRC Safety Evaluation by {{letter dated|date=March 17, 2016|text=letter dated March 17, 2016}} serial # 16-131) 29.1 09/29/16 MP3-UCR-2016-010 Section 10.4.8.1, Table 10.1-1 Change to the Steam Generator blowdown system venturi volumetric flow to differential pressure relationship (DC: MP3-10-01139) 29.1 09/29/16 MP3-UCR-2016-012 Section 5.3.1.6 Update Capsule withdrawal schedule on page 5.3-6. (TRM Change 16-MP3-007) 29.1 09/29/16 MP3-UCR-2016-014 Chapter 8 List of Figures; Sections 8.1.3; 8.2.1; 8.2.2; Figure 8.2-1; Figure 8.2-2 Unit 3 SLOD Removal (LBDCR 15-MP3-006) 29.2 12/22/16 MP3-UCR-2013-016 Table 6.2-63, Table 9.4-3, Table 9.4-8 Implementation of an open phase protection system which protects important to safety equipment from the potentially detrimental effects of an open phase event.
Figure 8.2-1; Figure 8.2-2 29.2     12/22/16     MP3-UCR-2013-016 Table 6.2-63, Table 9.4-3, Table 9.4-8                   Implementation of an open phase protection system which protects important to safety equipment from the potentially detrimental effects open phase event.
29.2 12/22/16 MP3-UCR-2015-009 2.1.2.5 Updating the SAR to extend the Heavy Haul Road to Unit 3 Fuel Building 29.2 12/22/16 MP3-UCR-2016-005 9.1.2, Figure 15.0-31 FSAR Section 9.1.4.2.6 is added to the FSAR to describe the dry storage option of Unit 3 spent fuel at the ISFSI.
29.2     12/22/16     MP3-UCR-2015-009 2.1.2.5                                                 Updating the SAR to extend the Heavy Haul Road to Unit 3 Fuel Buil 29.2     12/22/16     MP3-UCR-2016-005 9.1.2, Figure 15.0-31                                   FSAR Section 9.1.4.2.6 is added to the FSAR to describe the dry stora option of Unit 3 spent fuel at the ISFSI.
29.2 12/22/16 MP3-UCR-2016-013 FPER, Section 5.5 Analysis 56 Loading, closure and transfer activities for the transfer of spent fuel from the Unit 3 SFP to the site ISFSI utilizing the NUHOMS Dry Shielded Canister (DSC) and Transfer Cask (TC).
29.2     12/22/16     MP3-UCR-2016-013 FPER, Section 5.5 Analysis 56                           Loading, closure and transfer activities for the transfer of spent fuel fr the Unit 3 SFP to the site ISFSI utilizing the NUHOMS Dry Shielde Canister (DSC) and Transfer Cask (TC).
29.2 12/22/16 MP3-UCR-2016-020 19.2.1.20 MP3 HVK Chiller Service Water Thermal Performance Testing Elimination 29.2 12/22/16 MP3-UCR-2016-021 8.1.3 Eversource 348 line teleprotection.
29.2     12/22/16     MP3-UCR-2016-020 19.2.1.20                                               MP3 HVK Chiller Service Water Thermal Performance Testing Elimination 29.2     12/22/16     MP3-UCR-2016-021 8.1.3                                                   Eversource 348 line teleprotection.
29.3 03/30/17 MP3-UCR-2015-018 Table 9.2-5 Reflects replacement of CCP HX E1B. MP3-14-01187 29.3 03/30/17 MP3-UCR-2016-018 2.4.7, 2.4.11.6, 10.4.5.2 Reference to and discussion regarding the recirculation tempering line is removed from these sections. MP3-16-01042 Revision 29 (2016 - 2017 Reporting Period)
29.3     03/30/17     MP3-UCR-2015-018 Table 9.2-5                                             Reflects replacement of CCP HX E1B. MP3-14-01187 29.3     03/30/17     MP3-UCR-2016-018 2.4.7, 2.4.11.6, 10.4.5.2                               Reference to and discussion regarding the recirculation tempering line removed from these sections. MP3-16-01042 2 of 2
Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)
Summary Description of Changes


tion  Title CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION GENERAL PLANT DESCRIPTION COMPARISON TABLES IDENTIFICATION OF AGENTS AND CONTRACTORS REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION GENERAL REFERENCES (HISTORICAL)
MPS-3 FSAR LOES 1 of 14 LIST OF EFFECTIVE SECTIONS Section Title CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
DRAWINGS AND OTHER DETAILED INFORMATION CONFORMANCE TO NRC REGULATORY GUIDES N      NSSS CONFORMANCE TO NRC REGULATORY GUIDES STANDARD REVIEW PLAN DOCUMENTATION OF DIFFERENCES TMI ACTION ITEMS MATERIAL INCORPORATED BY REFERENCE CHAPTER 2 - SITE CHARACTERISTICS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES GEOGRAPHY AND DEMOGRAPHY NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES METEOROLOGY LOES 1 of 14


HYDROLOGIC ENGINEERING GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING 1       BASIC GEOLOGICAL AND SEISMIC INFORMATION 2       VIBRATORY GROUND MOTION 3       SURFACE FAULTING 4       STABILITY OF SUBSURFACE MATERIALS AND FOUNDATIONS 5       STABILITY OF SLOPES 6       EMBANKMENTS AND DAMS PENDIX 2.5A - AGE OF TILL AT MILLSTONE POINT PENDIX 2.5B - PETROGRAPHIC REPORTS, FINAL GRADE PENDIX 2.5C - MINERALOGICAL ANALYSIS OF MILLSTONE FAULT GOUGE SAMPLES PENDIX 2.5D - POTASSIUM - ARGON AGE DETERMINATION PENDIX 2.5E - SEPARATION OF < 2 FRACTION AND CLAY ANALYSIS OF SAMPLES B, C, D (ESF BUILDING) AND P-1 AND P-2 (PUMPHOUSE)
==1.1 INTRODUCTION==
PENDIX 2.5F - DYNAMIC SOIL TESTING ON BEACH SANDS PENDIX 2.5G - CONSOLIDATED UNDRAINED TESTS ON BEACH SANDS PENDIX 2.5H - SEISMIC VELOCITY MEASUREMENTS PENDIX 2.5I - DIRECT SHEAR TESTS ON NATURAL ROCK JOINTS PENDIX 2.5J - BORING LOGS PENDIX 2.5K - SEISMIC SURVEY PENDIX 2.5L - SEISMIC AND BATHYMETRIC SURVEY PENDIX 2.5M - LABORATORY TEST PROGRAM FOR PROPOSED ADDITIONAL STRUCTURAL BACKFILL SOURCES CHAPTER 3 - DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS TABLE OF CONTENTS LOES 2 of 14
1.2 GENERAL PLANT DESCRIPTION 1.3 COMPARISON TABLES 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.6 GENERAL REFERENCES (HISTORICAL) 1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8N NSSS CONFORMANCE TO NRC REGULATORY GUIDES 1.9 STANDARD REVIEW PLAN DOCUMENTATION OF DIFFERENCES 1.10 TMI ACTION ITEMS 1.11 MATERIAL INCORPORATED BY REFERENCE CHAPTER 2 - SITE CHARACTERISTICS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 2.1 GEOGRAPHY AND DEMOGRAPHY 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.3 METEOROLOGY


LIST OF TABLES LIST OF FIGURES CONFORMANCE WITH NRC GENERAL DESIGN CRITERIA CLASSIFICATION OF STRUCTURES, SYSTEMS, AND COMPONENTS WIND AND TORNADO LOADINGS WATER LEVEL (FLOOD) DESIGN MISSILE PROTECTION PROTECTION AGAINST DYNAMIC EFFECTS ASSOCIATED WITH THE POSTULATED RUPTURES OF PIPING SEISMIC DESIGN B.1    SEISMIC INPUT N      SEISMIC DESIGN 4       SEISMIC INSTRUMENTATION DESIGN OF CATEGORY I STRUCTURES MECHANICAL SYSTEMS AND COMPONENTS B       BALANCE OF PLANT (BOP) SCOPE N      NUCLEAR STEAM SUPPLY SYSTEM (NSSS) SCOPE 6      INSERVICE TESTING OF PUMPS AND VALVES SEISMIC QUALIFICATION OF SEISMIC CATEGORY I INSTRUMENTATION AND ELECTRICAL EQUIPMENT ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL EQUIPMENT PENDIX 3A - COMPUTER PROGRAMS FOR DYNAMIC AND STATIC ANALYSIS OF SEISMIC CATEGORY I STRUCTURES, EQUIPMENT, AND COMPONENTS PART I - STRUCTURES PART II - EQUIP & COMPONENTS PART III - PIPING SYSTEMS LOES 3 of 14
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 2 of 14 2.4 HYDROLOGIC ENGINEERING 2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING 2.5.1 BASIC GEOLOGICAL AND SEISMIC INFORMATION 2.5.2 VIBRATORY GROUND MOTION 2.5.3 SURFACE FAULTING 2.5.4 STABILITY OF SUBSURFACE MATERIALS AND FOUNDATIONS 2.5.5 STABILITY OF SLOPES 2.5.6 EMBANKMENTS AND DAMS APPENDIX 2.5A - AGE OF TILL AT MILLSTONE POINT APPENDIX 2.5B - PETROGRAPHIC REPORTS, FINAL GRADE APPENDIX 2.5C - MINERALOGICAL ANALYSIS OF MILLSTONE FAULT GOUGE SAMPLES APPENDIX 2.5D - POTASSIUM - ARGON AGE DETERMINATION APPENDIX 2.5E - SEPARATION OF < 2 FRACTION AND CLAY ANALYSIS OF SAMPLES B, C, D (ESF BUILDING) AND P-1 AND P-2 (PUMPHOUSE)
APPENDIX 2.5F - DYNAMIC SOIL TESTING ON BEACH SANDS APPENDIX 2.5G - CONSOLIDATED UNDRAINED TESTS ON BEACH SANDS APPENDIX 2.5H - SEISMIC VELOCITY MEASUREMENTS APPENDIX 2.5I - DIRECT SHEAR TESTS ON NATURAL ROCK JOINTS APPENDIX 2.5J - BORING LOGS APPENDIX 2.5K - SEISMIC SURVEY APPENDIX 2.5L - SEISMIC AND BATHYMETRIC SURVEY APPENDIX 2.5M - LABORATORY TEST PROGRAM FOR PROPOSED ADDITIONAL STRUCTURAL BACKFILL SOURCES CHAPTER 3 - DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS TABLE OF CONTENTS


PENDIX 3B - ENVIRONMENTAL DESIGN CONDITIONS CHAPTER 4 - REACTOR TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 3 of 14 LIST OF TABLES LIST OF FIGURES 3.1 CONFORMANCE WITH NRC GENERAL DESIGN CRITERIA 3.2 CLASSIFICATION OF STRUCTURES, SYSTEMS, AND COMPONENTS 3.3 WIND AND TORNADO LOADINGS 3.4 WATER LEVEL (FLOOD) DESIGN 3.5 MISSILE PROTECTION 3.6 PROTECTION AGAINST DYNAMIC EFFECTS ASSOCIATED WITH THE POSTULATED RUPTURES OF PIPING 3.7 SEISMIC DESIGN 3.7B.1 SEISMIC INPUT 3.7N SEISMIC DESIGN 3.7.4 SEISMIC INSTRUMENTATION 3.8 DESIGN OF CATEGORY I STRUCTURES 3.9 MECHANICAL SYSTEMS AND COMPONENTS 3.9B BALANCE OF PLANT (BOP) SCOPE 3.9N NUCLEAR STEAM SUPPLY SYSTEM (NSSS) SCOPE 3.9.6 INSERVICE TESTING OF PUMPS AND VALVES 3.10 SEISMIC QUALIFICATION OF SEISMIC CATEGORY I INSTRUMENTATION AND ELECTRICAL EQUIPMENT 3.11 ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL EQUIPMENT APPENDIX 3A - COMPUTER PROGRAMS FOR DYNAMIC AND STATIC ANALYSIS OF SEISMIC CATEGORY I STRUCTURES, EQUIPMENT, AND COMPONENTS PART I - STRUCTURES PART II - EQUIP & COMPONENTS PART III - PIPING SYSTEMS
 
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 4 of 14 APPENDIX 3B - ENVIRONMENTAL DESIGN CONDITIONS CHAPTER 4 - REACTOR TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 4.1


==SUMMARY==
==SUMMARY==
DESCRIPTION FUEL SYSTEM DESIGN NUCLEAR DESIGN THERMAL AND HYDRAULIC DESIGN REACTOR MATERIALS FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS CHAPTER 5 - REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
DESCRIPTION 4.2 FUEL SYSTEM DESIGN 4.3 NUCLEAR DESIGN 4.4 THERMAL AND HYDRAULIC DESIGN 4.5 REACTOR MATERIALS 4.6 FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS CHAPTER 5 - REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 5.1


==SUMMARY==
==SUMMARY==
DESCRIPTION INTEGRITY OF REACTOR COOLANT PRESSURE BOUNDARY REACTOR VESSEL COMPONENT AND SUBSYSTEM DESIGN CHAPTER 6 - ENGINEERED SAFETY FEATURES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION ENGINEERED SAFETY FEATURE MATERIALS CONTAINMENT SYSTEMS LOES 4 of 14
DESCRIPTION 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE BOUNDARY 5.3 REACTOR VESSEL 5.4 COMPONENT AND SUBSYSTEM DESIGN CHAPTER 6 - ENGINEERED SAFETY FEATURES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
 
==6.0 INTRODUCTION==
6.1 ENGINEERED SAFETY FEATURE MATERIALS 6.2 CONTAINMENT SYSTEMS
 
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 5 of 14 6.3 EMERGENCY CORE COOLING SYSTEM 6.4 HABITABILITY SYSTEMS 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.6 INSERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS CHAPTER 7 - INSTRUMENTS AND CONTROLS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES


EMERGENCY CORE COOLING SYSTEM HABITABILITY SYSTEMS FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS INSERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS CHAPTER 7 - INSTRUMENTS AND CONTROLS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION REACTOR TRIP SYSTEM ENGINEERED SAFETY FEATURES SYSTEM SYSTEMS REQUIRED FOR SAFE SHUTDOWN SAFETY RELATED DISPLAY INSTRUMENTATION PENDIX 7.5AMILLSTONE UNIT 3 DEVIATIONS TO REGULATORY GUIDE 1.97 REVISION 2 TABLE OF CONTENTS DEVIATION 1 DEVIATION 2 DEVIATION 3 DEVIATION 4 DEVIATION 5 DEVIATION 6 DEVIATION 7 DEVIATION 8 DEVIATION 9 DEVIATION 10 DEVIATION 11 DEVIATION 12 DEVIATION 13 DEVIATION 14 LOES 5 of 14
==7.1 INTRODUCTION==
7.2 REACTOR TRIP SYSTEM 7.3 ENGINEERED SAFETY FEATURES SYSTEM 7.4 SYSTEMS REQUIRED FOR SAFE SHUTDOWN 7.5 SAFETY RELATED DISPLAY INSTRUMENTATION APPENDIX 7.5AMILLSTONE UNIT 3 DEVIATIONS TO REGULATORY GUIDE 1.97 REVISION 2 TABLE OF CONTENTS DEVIATION 1 DEVIATION 2 DEVIATION 3 DEVIATION 4 DEVIATION 5 DEVIATION 6 DEVIATION 7 DEVIATION 8 DEVIATION 9 DEVIATION 10 DEVIATION 11 DEVIATION 12 DEVIATION 13 DEVIATION 14  


DEVIATION 15 DEVIATION 16 DEVIATION 17 DEVIATION 18 DEVIATION 19 DEVIATION 20 DEVIATION 21 DEVIATION 22 DEVIATION 23 DEVIATION 24 DEVIATION 25 DEVIATION 26 DEVIATION 27 DEVIATION 28 DEVIATION 29 DEVIATION 30 DEVIATION 31 DEVIATION 32 DEVIATION 33 DEVIATION 34 ALL OTHER SYSTEMS REQUIRED FOR SAFETY CONTROL SYSTEMS NOT REQUIRED FOR SAFETY ANTICIPATED TRANSIENTS WITHOUT SCRAM MITIGATION SYSTEM ACTUATION CIRCUITRY (ATWS) (AMSAC)
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
CHAPTER 8 - ELECTRIC POWER TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION LOES 6 of 14
LOES 6 of 14 DEVIATION 15 DEVIATION 16 DEVIATION 17 DEVIATION 18 DEVIATION 19 DEVIATION 20 DEVIATION 21 DEVIATION 22 DEVIATION 23 DEVIATION 24 DEVIATION 25 DEVIATION 26 DEVIATION 27 DEVIATION 28 DEVIATION 29 DEVIATION 30 DEVIATION 31 DEVIATION 32 DEVIATION 33 DEVIATION 34 7.6 ALL OTHER SYSTEMS REQUIRED FOR SAFETY 7.7 CONTROL SYSTEMS NOT REQUIRED FOR SAFETY 7.8 ANTICIPATED TRANSIENTS WITHOUT SCRAM MITIGATION SYSTEM ACTUATION CIRCUITRY (ATWS) (AMSAC)
CHAPTER 8 - ELECTRIC POWER TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES


OFFSITE POWER SYSTEM ONSITE POWER SYSTEMS CHAPTER 9 - AUXILIARY SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES FUEL STORAGE AND HANDLING WATER SYSTEMS PROCESS AUXILIARIES AIR-CONDITIONING, HEATING, COOLING, AND VENTILATION SYSTEMS OTHER AUXILIARY SYSTEMS CHAPTER 10 - STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
==8.1 INTRODUCTION==
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 7 of 14 8.2 OFFSITE POWER SYSTEM 8.3 ONSITE POWER SYSTEMS CHAPTER 9 - AUXILIARY SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 9.1 FUEL STORAGE AND HANDLING 9.2 WATER SYSTEMS 9.3 PROCESS AUXILIARIES 9.4 AIR-CONDITIONING, HEATING, COOLING, AND VENTILATION SYSTEMS 9.5 OTHER AUXILIARY SYSTEMS CHAPTER 10 - STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 10.1


==SUMMARY==
==SUMMARY==
DESCRIPTION TURBINE-GENERATOR MAIN STEAM SYSTEM OTHER FEATURES OF MAIN STEAM AND POWER CONVERSION SYSTEM CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES BACKGROUND SOURCE TERMS 2 LIQUID WASTE MANAGEMENT SYSTEMS GASEOUS WASTE MANAGEMENT SYSTEMS SOLID WASTE MANAGEMENT LOES 7 of 14
DESCRIPTION 10.2 TURBINE-GENERATOR 10.3 MAIN STEAM SYSTEM 10.4 OTHER FEATURES OF MAIN STEAM AND POWER CONVERSION SYSTEM CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
 
==11.0 BACKGROUND==
11.1 SOURCE TERMS 11.2 LIQUID WASTE MANAGEMENT SYSTEMS 11.3 GASEOUS WASTE MANAGEMENT SYSTEMS 11.4 SOLID WASTE MANAGEMENT
 
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 8 of 14 11.5 PROCESS, EFFLUENT, AND AIRBORNE RADIATION MONITORING SYSTEMS APPENDIX 11A PART I PART II PART III CHAPTER 12 - RADIATION PROTECTION TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
 
==12.0 INTRODUCTION==
12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS IS REASONABLY ACHIEVABLE (ALARA) 12.2 RADIATION SOURCES 12.3 RADIATION PROTECTION DESIGN FEATURES 12.4 DOSE ASSESSMENT 12.5 HEALTH PHYSICS PROGRAM CHAPTER 13 - CONDUCT OF OPERATIONS TABLE OF CONTENTS LIST OF FIGURES 13.1 ORGANIZATIONAL STRUCTURE 13.2 TRAINING PROGRAMS 13.3 EMERGENCY PLANNING 13.4 REVIEW AND AUDIT 13.5 PLANT PROCEDURES 13.6 PHYSICAL SECURITY PLANS CHAPTER 14 - INITIAL TEST PROGRAM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES
 
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 9 of 14 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS 14.2 SPECIFIC INFORMATION TO BE INCLUDED IN FINAL SAFETY ANALYSIS REPORT CHAPTER 15 - ACCIDENT ANALYSES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES


PROCESS, EFFLUENT, AND AIRBORNE RADIATION MONITORING SYSTEMS PENDIX 11A PART I PART II PART III CHAPTER 12 - RADIATION PROTECTION TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS IS REASONABLY ACHIEVABLE (ALARA)
==15.0 INTRODUCTION==
RADIATION SOURCES RADIATION PROTECTION DESIGN FEATURES DOSE ASSESSMENT HEALTH PHYSICS PROGRAM CHAPTER 13 - CONDUCT OF OPERATIONS TABLE OF CONTENTS LIST OF FIGURES ORGANIZATIONAL STRUCTURE TRAINING PROGRAMS EMERGENCY PLANNING REVIEW AND AUDIT PLANT PROCEDURES PHYSICAL SECURITY PLANS CHAPTER 14 - INITIAL TEST PROGRAM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LOES 8 of 14
15.1 INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.2 DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.3 DECREASE IN REACTOR COOLANT SYSTEM FLOW RATE 15.4 REACTIVITY AND POWER DISTRIBUTION ANOMALIES 15.5 INCREASE IN REACTOR COOLANT INVENTORY 15.6 DECREASE IN REACTOR COOLANT INVENTORY 15.7 RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT 15.8 ANTICIPATED TRANSIENTS WITHOUT SCRAM APPENDIX 15A - DOSE METHODOLOGY APPENDIX 15B - DELETED by FSARCR PKG FSC 02-MP3-017 CHAPTER 16 - TECHNICAL SPECIFICATIONS TABLE OF CONTENTS 16.1 MILLSTONE UNIT 3 TECHNICAL SPECIFICATIONS CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD) TOPICAL REPORT


SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS SPECIFIC INFORMATION TO BE INCLUDED IN FINAL SAFETY ANALYSIS REPORT CHAPTER 15 - ACCIDENT ANALYSES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM DECREASE IN REACTOR COOLANT SYSTEM FLOW RATE REACTIVITY AND POWER DISTRIBUTION ANOMALIES INCREASE IN REACTOR COOLANT INVENTORY DECREASE IN REACTOR COOLANT INVENTORY RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT ANTICIPATED TRANSIENTS WITHOUT SCRAM PENDIX 15A - DOSE METHODOLOGY PENDIX 15B - DELETED by FSARCR PKG FSC 02-MP3-017 CHAPTER 16 - TECHNICAL SPECIFICATIONS TABLE OF CONTENTS MILLSTONE UNIT 3 TECHNICAL SPECIFICATIONS CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD) TOPICAL REPORT LOES 9 of 14
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 10 of 14 CHAPTER 18 - HUMAN FACTORS ENGINEERING TABLE OF CONTENTS 18.1 HUMAN FACTORS CONTROL ROOM DESIGN REVIEW 18.2 SAFETY PARAMETER DISPLAY SYSTEM (SPDS)
CHAPTER 19 - LICENSE RENEWAL TABLE OF CONTENTS


CHAPTER 18 - HUMAN FACTORS ENGINEERING TABLE OF CONTENTS HUMAN FACTORS CONTROL ROOM DESIGN REVIEW SAFETY PARAMETER DISPLAY SYSTEM (SPDS)
==19.0 INTRODUCTION==
CHAPTER 19 - LICENSE RENEWAL TABLE OF CONTENTS INTRODUCTION AGING MANAGEMENT PROGRAMS THAT MANAGE THE EFFECTS OF AGEING ON STRUCTURES AND COMPONENTS WITHIN THE SCOPE OF LICENSE RENEWAL TIME-LIMITED AGING ANALYSIS TLAA SUPPORT PROGRAMS EXEMPTIONS LICENSE RENEWAL COMMITMENTS FIRE PROTECTION EVALUATION REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES INTRODUCTION HISTORICAL BACKGROUND ADMINISTRATION PLANT DESIGN FEATURES FIRE HAZARD ANALYSIS ALYSIS FOR FIRE AREAS ANALYSIS 1 ANALYSIS 2 ANALYSIS 3.
19.1 AGING MANAGEMENT 19.2 PROGRAMS THAT MANAGE THE EFFECTS OF AGEING ON STRUCTURES AND COMPONENTS WITHIN THE SCOPE OF LICENSE RENEWAL 19.3 TIME-LIMITED AGING ANALYSIS 19.4 TLAA SUPPORT PROGRAMS 19.5 EXEMPTIONS 19.6 LICENSE RENEWAL COMMITMENTS FIRE PROTECTION EVALUATION REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 1
ANALYSIS 4 LOES 10 of 14
INTRODUCTION 2
HISTORICAL BACKGROUND 3
ADMINISTRATION 4
PLANT DESIGN FEATURES 5
FIRE HAZARD ANALYSIS ANALYSIS FOR FIRE AREAS ANALYSIS 1 ANALYSIS 2 ANALYSIS 3.
ANALYSIS 4


ANALYSIS 5 ANALYSIS 6 ANALYSIS 7 ANALYSIS 8 ANALYSIS 9 ANALYSIS 10 ANALYSIS 11 ANALYSIS 12 ANALYSIS 13 ANALYSIS 14 ANALYSIS 15 ANALYSIS 16 ANALYSIS 17 ANALYSIS 18 ANALYSIS 19 ANALYSIS 20 ANALYSIS 21 ANALYSIS 22 ANALYSIS 23 ANALYSIS 24 ANALYSIS 25 ANALYSIS 26 ANALYSIS 27.
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
ANALYSIS 28 ANALYSIS 29 ANALYSIS 30 ANALYSIS 31 ANALYSIS 32 ANALYSIS 33 ANALYSIS 34 ANALYSIS 35 LOES 11 of 14
LOES 11 of 14 ANALYSIS 5 ANALYSIS 6 ANALYSIS 7 ANALYSIS 8 ANALYSIS 9 ANALYSIS 10 ANALYSIS 11 ANALYSIS 12 ANALYSIS 13 ANALYSIS 14 ANALYSIS 15 ANALYSIS 16 ANALYSIS 17 ANALYSIS 18 ANALYSIS 19 ANALYSIS 20 ANALYSIS 21 ANALYSIS 22 ANALYSIS 23 ANALYSIS 24 ANALYSIS 25 ANALYSIS 26 ANALYSIS 27.
ANALYSIS 28 ANALYSIS 29 ANALYSIS 30 ANALYSIS 31 ANALYSIS 32 ANALYSIS 33 ANALYSIS 34 ANALYSIS 35


ANALYSIS 36 ANALYSIS 37 ANALYSIS 38 ANALYSIS 39 ANALYSIS 40 ANALYSIS 41 ANALYSIS 42 ANALYSIS 43 ANALYSIS 44 ANALYSIS 45 ANALYSIS 46 ANALYSIS 47 ANALYSIS 48 ANALYSIS 49 ANALYSIS 50 ANALYSIS 51 ANALYSIS 52 ANALYSIS 53 ANALYSIS 54 ANALYSIS 55 ANALYSIS 56 ANALYSIS 57 ANALYSIS 58 ANALYSIS 59A ANALYSIS 59B ANALYSIS 59C ANALYSIS 59D ANALYSIS 59E ANALYSIS 59F ANALYSIS 59G ANALYSIS 59H LOES 12 of 14
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 12 of 14 ANALYSIS 36 ANALYSIS 37 ANALYSIS 38 ANALYSIS 39 ANALYSIS 40 ANALYSIS 41 ANALYSIS 42 ANALYSIS 43 ANALYSIS 44 ANALYSIS 45 ANALYSIS 46 ANALYSIS 47 ANALYSIS 48 ANALYSIS 49 ANALYSIS 50 ANALYSIS 51 ANALYSIS 52 ANALYSIS 53 ANALYSIS 54 ANALYSIS 55 ANALYSIS 56 ANALYSIS 57 ANALYSIS 58 ANALYSIS 59A ANALYSIS 59B ANALYSIS 59C ANALYSIS 59D ANALYSIS 59E ANALYSIS 59F ANALYSIS 59G ANALYSIS 59H


ANALYSIS 59I ANALYSIS 60 ANALYSIS 61 ANALYSIS 62 ANALYSIS 63 ANALYSIS 64 ANALYSIS 65 ANALYSIS 66 ANALYSIS 67 ANALYSIS 68 ANALYSIS 69 ANALYSIS 70 ANALYSIS 71 ANALYSIS 72.
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
ANALYSIS 73 ANALYSIS 74 ANALYSIS 75 ANALYSIS 76 ANALYSIS 77 ANALYSIS 78 ANALYSIS 79 ANALYSIS 80 ANALYSIS 81 ANALYSIS 82 ANALYSIS 83 ANALYSIS 84 ANALYSIS 85 ANALYSIS 86 ANALYSIS 87 ANALYSIS 88 ANALYSIS 89 LOES 13 of 14
LOES 13 of 14 ANALYSIS 59I ANALYSIS 60 ANALYSIS 61 ANALYSIS 62 ANALYSIS 63 ANALYSIS 64 ANALYSIS 65 ANALYSIS 66 ANALYSIS 67 ANALYSIS 68 ANALYSIS 69 ANALYSIS 70 ANALYSIS 71 ANALYSIS 72.
ANALYSIS 73 ANALYSIS 74 ANALYSIS 75 ANALYSIS 76 ANALYSIS 77 ANALYSIS 78 ANALYSIS 79 ANALYSIS 80 ANALYSIS 81 ANALYSIS 82 ANALYSIS 83 ANALYSIS 84 ANALYSIS 85 ANALYSIS 86 ANALYSIS 87 ANALYSIS 88 ANALYSIS 89


ANALYSIS 90 ANALYSIS 91 ANALYSIS 92 ANALYSIS 93 ANALYSIS 94 ANALYSIS 95 ANALYSIS 96 ANALYSIS 97 ANALYSIS 98 ANALYSIS 99 ANALYSIS 100 SAFE SHUTDOWN EVALUATION SUPPORT SYSTEMS RESOLUTION OF SAFE SHUTDOWN EVALUATION PROBLEM AREAS OPERATOR ACTIONS REQUIRED FOLLOWING A FIRE CONCLUSIONS PENDIX A -  
MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)
LOES 14 of 14 ANALYSIS 90 ANALYSIS 91 ANALYSIS 92 ANALYSIS 93 ANALYSIS 94 ANALYSIS 95 ANALYSIS 96 ANALYSIS 97 ANALYSIS 98 ANALYSIS 99 ANALYSIS 100 6
SAFE SHUTDOWN EVALUATION 7
SUPPORT SYSTEMS 8
RESOLUTION OF SAFE SHUTDOWN EVALUATION PROBLEM AREAS 9
OPERATOR ACTIONS REQUIRED FOLLOWING A FIRE 10 CONCLUSIONS APPENDIX A -  


==SUMMARY==
==SUMMARY==
OF COMPLIANCE WITH BRANCH TECHNICAL POSITION APCSB 9.5-1, APPENDIX A (JULY 1, 1976)
OF COMPLIANCE WITH BRANCH TECHNICAL POSITION APCSB 9.5-1, APPENDIX A (JULY 1, 1976)
PENDIX B - COMPARISON OF MILLSTONE 3 PLANT DESIGN TO BRANCH TECHNICAL POSITION CMEB 9.5-1 GUIDELINES (NUREG 0800, JULY 1981)
APPENDIX B - COMPARISON OF MILLSTONE 3 PLANT DESIGN TO BRANCH TECHNICAL POSITION CMEB 9.5-1 GUIDELINES (NUREG 0800, JULY 1981)
PENDIX C -  
APPENDIX C -  


==SUMMARY==
==SUMMARY==
OF COMPARISON WITH 10 CFR 50, APPENDIX R LOES 14 of 14
OF COMPARISON WITH 10 CFR 50, APPENDIX R


mber Title CHAPTER 1 1       Design Comparison 2       Comparison Of Engineered Safety Features 3       Comparison Of Containment Concepts 4       Comparison Of Containment Atmosphere Pressure Sensor Parameters 5       Comparison Of Reactor Coolant Pump Bus Protection 6       Comparison Of Engineered Safety Feature Actuation Signals 7       Comparison Of Emergency Generator And Steam Generator Auxiliary Feedwater Pump Start Signals 8       Comparison Of Process And Effluent Radiation Monitoring Systems 9       Comparison Of Area Radiation Monitoring Systems 10       Comparison Of Airborne Radiation Monitoring Systems 11       Comparison Of Electrical System Parameters 12       Comparison Of Radioactive Liquid Waste Systems 13       Comparison Of Radioactive Gaseous Waste Systems 14       Comparison Of Radioactive Solid Waste Systems 15       Comparison Of Other Reactor Plant Systems 16       Comparison Of Final And Preliminary Information 1       Topical Reports as General References (Historical) 1       Electrical, Instrumentation, And Control Reference Documentation 2       Piping And Instrumentation Diagrams 3       Omitted 4       Special Reports And Programs 1       NRC Regulatory Guides N-1     NRC Regulatory Guides LOET 1 of 38
MPS-3 FSAR LOET 1 of 38 LIST OF EFFECTIVE TABLES Number Title CHAPTER 1 1.3-1 Design Comparison 1.3-2 Comparison Of Engineered Safety Features 1.3-3 Comparison Of Containment Concepts 1.3-4 Comparison Of Containment Atmosphere Pressure Sensor Parameters 1.3-5 Comparison Of Reactor Coolant Pump Bus Protection 1.3-6 Comparison Of Engineered Safety Feature Actuation Signals 1.3-7 Comparison Of Emergency Generator And Steam Generator Auxiliary Feedwater Pump Start Signals 1.3-8 Comparison Of Process And Effluent Radiation Monitoring Systems 1.3-9 Comparison Of Area Radiation Monitoring Systems 1.3-10 Comparison Of Airborne Radiation Monitoring Systems 1.3-11 Comparison Of Electrical System Parameters 1.3-12 Comparison Of Radioactive Liquid Waste Systems 1.3-13 Comparison Of Radioactive Gaseous Waste Systems 1.3-14 Comparison Of Radioactive Solid Waste Systems 1.3-15 Comparison Of Other Reactor Plant Systems 1.3-16 Comparison Of Final And Preliminary Information 1.6-1 Topical Reports as General References (Historical) 1.7-1 Electrical, Instrumentation, And Control Reference Documentation 1.7-2 Piping And Instrumentation Diagrams 1.7-3 Omitted 1.7-4 Special Reports And Programs 1.8-1 NRC Regulatory Guides 1.8N-1 NRC Regulatory Guides


le  Title 1       Summary Of Differences From SRP 2       SRP Differences And Justifications
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-1     TMI Action Items CHAPTER 2 1       1990 Population and Population Densities Cities and Towns Within 10 Miles of Millstone 2       Population Growth 1960-1990 3       Population Distribution 1985 (0-20 km) 4       Population Distribution Within 10 Miles of Millstone 1990 Census 5       Population Distribution Within 10 Miles of Millstone 2000 Projected 6       Population Distribution Within 10 Miles of Millstone 2010 Projected 7       Population Distribution Within 10 Miles of Millstone 2020 Projected 8       Population Distribution Within 10 Miles of Millstone 2030 Projected 9       Population Distribution 1985 (0-80 km) 10     Population Distribution Within 50 Miles of Millstone 1990 Census 11     Population Distribution Within 50 Miles of Millstone 2000 Projected 12     Population Distribution Within 50 Miles of Millstone 2010 Projected 13     Population Distribution Within 50 Miles of Millstone 2020 Projected 14     Population Distribution Within 50 Miles of Millstone 2030 Projected 15     Transient Population Within 10 Miles of Millstone 1991-1992 School Enrollment 16     Transient Population Within 10 Miles of Millstone (Employment)
Table Title LOET 2 of 38 1.9-1 Summary Of Differences From SRP 1.9-2 SRP Differences And Justifications 1.10-1 TMI Action Items CHAPTER 2 2.1-1 1990 Population and Population Densities Cities and Towns Within 10 Miles of Millstone 2.1-2 Population Growth 1960-1990 2.1-3 Population Distribution 1985 (0-20 km) 2.1-4 Population Distribution Within 10 Miles of Millstone 1990 Census 2.1-5 Population Distribution Within 10 Miles of Millstone 2000 Projected 2.1-6 Population Distribution Within 10 Miles of Millstone 2010 Projected 2.1-7 Population Distribution Within 10 Miles of Millstone 2020 Projected 2.1-8 Population Distribution Within 10 Miles of Millstone 2030 Projected 2.1-9 Population Distribution 1985 (0-80 km) 2.1-10 Population Distribution Within 50 Miles of Millstone 1990 Census 2.1-11 Population Distribution Within 50 Miles of Millstone 2000 Projected 2.1-12 Population Distribution Within 50 Miles of Millstone 2010 Projected 2.1-13 Population Distribution Within 50 Miles of Millstone 2020 Projected 2.1-14 Population Distribution Within 50 Miles of Millstone 2030 Projected 2.1-15 Transient Population Within 10 Miles of Millstone 1991-1992 School Enrollment 2.1-16 Transient Population Within 10 Miles of Millstone (Employment)
LOET 2 of 38


le Title 17     Transient Population Within 10 Miles of Millstone State Parks and Forests (With Documented Attendance) 18     Low Population Zone Permanent Population Distributions 19     Low Population Zone School Enrollment and Employment 20     Metropolitan Areas Within 50 Miles of Millstone 1990 Census Population 21     Population Centers Within 50 Miles of Millstone 22     Population Density 1985 (0-20 km) 23     Population Density 1985 (0-80 km) 24     Population Density Within 10 Miles of Millstone 1990 (People per Square Mile) 25     Population Density Within 10 Miles of Millstone 2030 (People per Square Mile) 26     Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 27     Population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 28     Cumulative Population Density 1985 29     Cumulative Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 30     Cumulative population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 1     Description of Facilities 2     List of Hazardous Materials Potentially Capable of Producing Significant Missiles 3     Summary of Exposure Distance Calculation 4     Aggregate Probability of Explosion or Violent Rupture Capable of Missile Generation 5     Types of Tank Car Missiles 6     Tank Car Fragment Range (Feet) at 10-Degree Launch Angle LOET 3 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 3 of 38 2.1-17 Transient Population Within 10 Miles of Millstone State Parks and Forests (With Documented Attendance) 2.1-18 Low Population Zone Permanent Population Distributions 2.1-19 Low Population Zone School Enrollment and Employment 2.1-20 Metropolitan Areas Within 50 Miles of Millstone 1990 Census Population 2.1-21 Population Centers Within 50 Miles of Millstone 2.1-22 Population Density 1985 (0-20 km) 2.1-23 Population Density 1985 (0-80 km) 2.1-24 Population Density Within 10 Miles of Millstone 1990 (People per Square Mile) 2.1-25 Population Density Within 10 Miles of Millstone 2030 (People per Square Mile) 2.1-26 Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 2.1-27 Population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 2.1-28 Cumulative Population Density 1985 2.1-29 Cumulative Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 2.1-30 Cumulative population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 2.2-1 Description of Facilities 2.2-2 List of Hazardous Materials Potentially Capable of Producing Significant Missiles 2.2-3 Summary of Exposure Distance Calculation 2.2-4 Aggregate Probability of Explosion or Violent Rupture Capable of Missile Generation 2.2-5 Types of Tank Car Missiles 2.2-6 Tank Car Fragment Range (Feet) at 10-Degree Launch Angle


le Title 7     Estimated Ignition Probabilities 8     Probability of an Unconfined Vapor Cloud Explosion 1     Monthly, Seasonal, and annual averages and Extremes of temperatures at Bridgeport, Conn. (1901-1981) 2     Mean Number of Days with Selected Temperature Conditions at Bridgeport, Conn. (1966-1981) 3     Monthly, Seasonal, and Annual Averages and Extremes of Relative Humidity at Bridgeport, Conn. (1949-1981) 4     Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 5     Occurrence of Bridgeport Wind Persistence Episodes Within the Same 22.5-Degree Sector (1949-1965) 6     Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 7     Monthly, Seasonal, and Annual Wind Speed Extremes at Bridgeport, Conn. (1961-1990) 8     Mean Number of Days of Thunderstorm Occurrence at Bridgeport, Conn. (1951-1981) 9     Monthly, Seasonal, and Annual Averages and Extremes of Precipitation at Bridgeport, Conn. (1901-June 1982) 10     Estimated Precipitation Extremes for Periods up to 24 Hours and Recurrence Intervals Up to 100 Years 11     Monthly, Seasonal, and Annual Averages and Extremes of Snowfall at Bridgeport, Conn. (1893-June 1990) 12     Monthly, Seasonal, and Annual Averages of Freezing Rain and Drizzle at Bridgeport, Conn. (1949-1980) 13     Average Monthly, Seasonal, and Annual Hours and Frequencies (percent) of Various Fog Conditions (1949-1980) at Bridgeport, Connecticut 14     Monthly and Annual Wind Direction and Speed Distributions for Surface Winds, at Bridgeport, Conn. (1949-1980) 15     Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone (1974-1981)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
LOET 4 of 38
Table Title LOET 4 of 38 2.2-7 Estimated Ignition Probabilities 2.2-8 Probability of an Unconfined Vapor Cloud Explosion 2.3-1 Monthly, Seasonal, and annual averages and Extremes of temperatures at Bridgeport, Conn. (1901-1981) 2.3-2 Mean Number of Days with Selected Temperature Conditions at Bridgeport, Conn. (1966-1981) 2.3-3 Monthly, Seasonal, and Annual Averages and Extremes of Relative Humidity at Bridgeport, Conn. (1949-1981) 2.3-4 Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 2.3-5 Occurrence of Bridgeport Wind Persistence Episodes Within the Same 22.5-Degree Sector (1949-1965) 2.3-6 Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 2.3-7 Monthly, Seasonal, and Annual Wind Speed Extremes at Bridgeport, Conn. (1961-1990) 2.3-8 Mean Number of Days of Thunderstorm Occurrence at Bridgeport, Conn. (1951-1981) 2.3-9 Monthly, Seasonal, and Annual Averages and Extremes of Precipitation at Bridgeport, Conn. (1901-June 1982) 2.3-10 Estimated Precipitation Extremes for Periods up to 24 Hours and Recurrence Intervals Up to 100 Years 2.3-11 Monthly, Seasonal, and Annual Averages and Extremes of Snowfall at Bridgeport, Conn. (1893-June 1990) 2.3-12 Monthly, Seasonal, and Annual Averages of Freezing Rain and Drizzle at Bridgeport, Conn. (1949-1980) 2.3-13 Average Monthly, Seasonal, and Annual Hours and Frequencies (percent) of Various Fog Conditions (1949-1980) at Bridgeport, Connecticut 2.3-14 Monthly and Annual Wind Direction and Speed Distributions for Surface Winds, at Bridgeport, Conn. (1949-1980) 2.3-15 Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone (1974-1981)


le Title 16     Comparison of Wind Direction Frequency Distribution by Quadrant at Bridgeport, Conn. and Millstone 17     Comparison of Average Wind Speed by Quadrant at Bridgeport, Conn. and Millstone 18     Occurrence of Wind Persistence Episodes Within the Same 22.5-Degree Sector at Millstone (1974-1981) 19     Millstone Climatological Summary (1974-1992) 20     Comparison of Monthly and Annual Average Dry-Bulb and Dewpoint Temperature Averages at Bridgeport, Conn. and Millstone 21     Comparison of Monthly and Annual Average Relative Humidity Averages at Bridgeport and Millstone 22     Mean Number of Days with Heavy Fog at Bridgeport, Conn. and Block Island, Rhode Island (1951-1981) 23     Wind Direction/Stability Class/Visibility Joint Frequency Distribution at Millstone 24     Persistence of Poor Visibility ( 1 Mile) Conditions at Millstone (Hours) (1974-1981) 25     Bridgeport Pasquill Stability Class Distribution (1949-1980) 26     Millstone Stability Class Distribution Using Delta-T for Stability Determination 27     Millstone Stability Class Distribution Using Sigma Theta for Stability Determination 28     Comparison of Pasquill Stability Class Distribution at Bridgeport, Conn. and Millstone 29     Persistence of Stable Conditions (E, F, and G Stabilities) at Millstone (1974-1981) 30     Seasonal and Annual Atmospheric Mixing Depths at Millstone 31     On-site Meteorological Tower Measurements 32     Millstone Meteorological Tower Instrumentation 33     Monthly Summary of Data Recovery Rates/
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Meterological System LOET 5 of 38
Table Title LOET 5 of 38 2.3-16 Comparison of Wind Direction Frequency Distribution by Quadrant at Bridgeport, Conn. and Millstone 2.3-17 Comparison of Average Wind Speed by Quadrant at Bridgeport, Conn. and Millstone 2.3-18 Occurrence of Wind Persistence Episodes Within the Same 22.5-Degree Sector at Millstone (1974-1981) 2.3-19 Millstone Climatological Summary (1974-1992) 2.3-20 Comparison of Monthly and Annual Average Dry-Bulb and Dewpoint Temperature Averages at Bridgeport, Conn. and Millstone 2.3-21 Comparison of Monthly and Annual Average Relative Humidity Averages at Bridgeport and Millstone 2.3-22 Mean Number of Days with Heavy Fog at Bridgeport, Conn. and Block Island, Rhode Island (1951-1981) 2.3-23 Wind Direction/Stability Class/Visibility Joint Frequency Distribution at Millstone 2.3-24 Persistence of Poor Visibility ( 1 Mile) Conditions at Millstone (Hours) (1974-1981) 2.3-25 Bridgeport Pasquill Stability Class Distribution (1949-1980) 2.3-26 Millstone Stability Class Distribution Using Delta-T for Stability Determination 2.3-27 Millstone Stability Class Distribution Using Sigma Theta for Stability Determination 2.3-28 Comparison of Pasquill Stability Class Distribution at Bridgeport, Conn. and Millstone 2.3-29 Persistence of Stable Conditions (E, F, and G Stabilities) at Millstone (1974-1981) 2.3-30 Seasonal and Annual Atmospheric Mixing Depths at Millstone 2.3-31 On-site Meteorological Tower Measurements 2.3-32 Millstone Meteorological Tower Instrumentation 2.3-33 Monthly Summary of Data Recovery Rates/
Meterological System


le  Title 34     Distances from Release Points to Receptors 1       Connecticut Public Water Supplies within 20 Miles of Millstone 3 2       Maximum Wave Heights Generated by Slow, Medium, and High Speed storms (Deep-Water Fetch) 3       Maximum Shallow Water Waves (After Refraction)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Slow Speed Probable Maximum Hurricane 4       Maximum Shallow Water Waves (After Refraction)
Table Title LOET 6 of 38 2.3-34 Distances from Release Points to Receptors 2.4-1 Connecticut Public Water Supplies within 20 Miles of Millstone 3 2.4-2 Maximum Wave Heights Generated by Slow, Medium, and High Speed storms (Deep-Water Fetch) 2.4-3 Maximum Shallow Water Waves (After Refraction)
Medium Speed Probable Maximum Hurricane 5       Maximum Shallow Water Waves (After Refraction)
Slow Speed Probable Maximum Hurricane 2.4-4 Maximum Shallow Water Waves (After Refraction)
High Speed Probable Maximum Hurricane 6       Lowest Tides at New London, Connecticut 1938-1974 7       Circulating Water System and Service Water System Heat Loads 8       Dilution Factors and Travel Time 9       Category I Structures-Roof Survey 10     Input Data to Program HEC-2 Water Surface Computations 11     Computed Water Surface Elevations at Safety-Related Structures 12     Roof Area and Ponding Level Due to PMP Category I Structures 13     Overflow Length of the Parapet Wall on the Roof Used in PMP Analysis-Category I Structures 1-1     Rock Formations of the Coastal Plain off Southern New England 1-2     Rock Formations of Western Connecticut 1-3     Rock Formations of Eastern Connecticut and Western Rhode Island 1-4     Rock Formations of Central Rhode Island (and not Included in Previous Descriptions) 1-5     Rock Formations in Northern and Eastern Rhode Island and Southern Massachusetts LOET 6 of 38
Medium Speed Probable Maximum Hurricane 2.4-5 Maximum Shallow Water Waves (After Refraction)
High Speed Probable Maximum Hurricane 2.4-6 Lowest Tides at New London, Connecticut 1938-1974 2.4-7 Circulating Water System and Service Water System Heat Loads 2.4-8 Dilution Factors and Travel Time 2.4-9 Category I Structures-Roof Survey 2.4-10 Input Data to Program HEC-2 Water Surface Computations 2.4-11 Computed Water Surface Elevations at Safety-Related Structures 2.4-12 Roof Area and Ponding Level Due to PMP Category I Structures 2.4-13 Overflow Length of the Parapet Wall on the Roof Used in PMP Analysis-Category I Structures 2.5.1-1 Rock Formations of the Coastal Plain off Southern New England 2.5.1-2 Rock Formations of Western Connecticut 2.5.1-3 Rock Formations of Eastern Connecticut and Western Rhode Island 2.5.1-4 Rock Formations of Central Rhode Island (and not Included in Previous Descriptions) 2.5.1-5 Rock Formations in Northern and Eastern Rhode Island and Southern Massachusetts


le  Title 1-6     Rock Formations of Central Massachusetts 1-7     Rock Units of Clinton-Newbury Fault System, Eastern Massachusetts, and New Hampshire 1-8     Descriptions of Lineaments from LANDSAT Photographs (shown on Figure 2.5.1-10) 2-1     Modified Mercalli (MM) Intensity Scale of 1931 2-2     List of Operating Seismic Stations 2-3     Chronological Catalog of Earthquake Activity within 200 Miles of the Site 2-4     List of Earthquakes within the 50-Mile Radius 3-1     List of Faults 3-2     List of Samples 3-3     List of K/Ar Age Determinations of Fault Gouge 4-1     List of Joints-Final Grade Floors of Structures 4-2     List of Foliations-Final Grade Floors of Structures 4-3     List of Slickensides-Final Grade Floors of Structures 4-4     List of Joints-Final Grade Containment and Engineered Safety Features Building Walls 4-5     List of Foliations-Final Grade Containment and Engineered Safety Features Building Walls 4-6     List of Slickensides-Final Grade Containment and Engineered Safety Features Building Walls 4-7     List of Joints-Final Grade Walls of Structures 4-8     List of Foliations-Final Grade Walls of Structures 4-9     List of Slickensides-Final Grade Walls of Structures 4-10     Rock Compression Test Results 4-11     Direct Shear Test Results From Joint and Foliating Surfaces 4-12     Summary of Static Soil Properties for Beach Sands 4-13     Natural Water Contents of Split Spoon Samples 4-14     Foundation Data for Major Structures LOET 7 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 7 of 38 2.5.1-6 Rock Formations of Central Massachusetts 2.5.1-7 Rock Units of Clinton-Newbury Fault System, Eastern Massachusetts, and New Hampshire 2.5.1-8 Descriptions of Lineaments from LANDSAT Photographs (shown on Figure 2.5.1-10) 2.5.2-1 Modified Mercalli (MM) Intensity Scale of 1931 2.5.2-2 List of Operating Seismic Stations 2.5.2-3 Chronological Catalog of Earthquake Activity within 200 Miles of the Site 2.5.2-4 List of Earthquakes within the 50-Mile Radius 2.5.3-1 List of Faults 2.5.3-2 List of Samples 2.5.3-3 List of K/Ar Age Determinations of Fault Gouge 2.5.4-1 List of Joints-Final Grade Floors of Structures 2.5.4-2 List of Foliations-Final Grade Floors of Structures 2.5.4-3 List of Slickensides-Final Grade Floors of Structures 2.5.4-4 List of Joints-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-5 List of Foliations-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-6 List of Slickensides-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-7 List of Joints-Final Grade Walls of Structures 2.5.4-8 List of Foliations-Final Grade Walls of Structures 2.5.4-9 List of Slickensides-Final Grade Walls of Structures 2.5.4-10 Rock Compression Test Results 2.5.4-11 Direct Shear Test Results From Joint and Foliating Surfaces 2.5.4-12 Summary of Static Soil Properties for Beach Sands 2.5.4-13 Natural Water Contents of Split Spoon Samples 2.5.4-14 Foundation Data for Major Structures


le    Title 4-15     List of Approximate Boring Locations, Ground Elevations, and Groundwater Elevations 4-16     Summary of Water Pressure Test Data 4-17     Groundwater Observations 4-18     Factors of Safety Against Liquefaction of Beach Sands 4-19     In-Place Density Test Results on Category I Structural Backfill Beneath the Service Water Intake Pipe Encasement 4-20     In-Place Density Test Results at Control and Emergency Generator Enclosure Buildings 4-21A     Emergency Generator Enclosure-Free Field Soil Properties from SHAKE Analysis 4-21B     Emergency Generator Enclosure-Soil Properties with Structure Effects from SHAKE Analysis 4-22     Control Building SHAKE Free Field Soil Properties Input 4-23     Bearing Capacity of Major Structures 4-24     Results of Two-Dimensional Liquefaction Analysis of Beach Area Sands CHAPTER 3 1         List Of QA Category I and Seismic Category I Structures, Systems, and Components 2         Safety Classes 2 and 3 Instrument Tubing Requirements 3         Instrument Tubing Examination and Testing Program 4         Comparison of Proposed Tubing Examination and Testing with ASME III Requirements 1         Structural Panels Subject to Tornado Pressure Drop 1         Safety Related Structures, Systems, and Components Outside Containment Required for Safe Reactor Shutdown 2         Safety Related Structures, Systems, and Components Inside Containment Required for Safe Reactor Shutdown LOET 8 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 8 of 38 2.5.4-15 List of Approximate Boring Locations, Ground Elevations, and Groundwater Elevations 2.5.4-16 Summary of Water Pressure Test Data 2.5.4-17 Groundwater Observations 2.5.4-18 Factors of Safety Against Liquefaction of Beach Sands 2.5.4-19 In-Place Density Test Results on Category I Structural Backfill Beneath the Service Water Intake Pipe Encasement 2.5.4-20 In-Place Density Test Results at Control and Emergency Generator Enclosure Buildings 2.5.4-21A Emergency Generator Enclosure-Free Field Soil Properties from SHAKE Analysis 2.5.4-21B Emergency Generator Enclosure-Soil Properties with Structure Effects from SHAKE Analysis 2.5.4-22 Control Building SHAKE Free Field Soil Properties Input 2.5.4-23 Bearing Capacity of Major Structures 2.5.4-24 Results of Two-Dimensional Liquefaction Analysis of Beach Area Sands CHAPTER 3 3.2-1 List Of QA Category I and Seismic Category I Structures, Systems, and Components 3.2-2 Safety Classes 2 and 3 Instrument Tubing Requirements 3.2-3 Instrument Tubing Examination and Testing Program 3.2-4 Comparison of Proposed Tubing Examination and Testing with ASME III Requirements 3.3-1 Structural Panels Subject to Tornado Pressure Drop 3.5-1 Safety Related Structures, Systems, and Components Outside Containment Required for Safe Reactor Shutdown 3.5-2 Safety Related Structures, Systems, and Components Inside Containment Required for Safe Reactor Shutdown


le Title 3     Summary of Control Rod Drive Mechanism Missile Analysis 4     Valve-Missile Characteristics 5     Piping Temperature Element Assembly-Missile Characteristics 6     Characteristics of Other Missiles Postulated within Reactor Containment 7     Turbine-Target Distances and Impact Areas 8     Deleted by change PKG FSC 02-MP3-13 9     Deleted by change PKG FSC 02-MP3-13 10     Deleted by change PKG FSC 02-MP3-13 11     Deleted by change PKG FSC 02-MP3-13 12     Deleted by change PKG FSC 02-MP3-13 13     Postulated Tornado-Generated External Missiles 14     Barrier Deflection and Ductility Ratios for Tornado-Borne Missiles Plus 360 Mph Tornado Wind 15     Barrier Deflection and Ductility Ratio for a Beam-Column Plus 360 Mph Tornado Wind 1     High-Energy Systems Remote from Essential Structures, Systems, and Components 2     High-Energy Systems in Proximity to Essential Structures, Systems, and Components 3     Moderate-Energy Systems in Remote from Essential Structures, Systems, and Components 4     Moderate-Energy Systems Proximate to Essential Structures, Systems, and Components 5     Essential Structures, Systems, and Components Required for Safe Reactor Shutdown 6     Postulated Breaks Main Steam System 7     Pipe Whip Effects Main Steam System 8     Jet Impingement Effects-Main Steam System 9     Postulated Breaks Main Feedwater System LOET 9 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 9 of 38 3.5-3 Summary of Control Rod Drive Mechanism Missile Analysis 3.5-4 Valve-Missile Characteristics 3.5-5 Piping Temperature Element Assembly-Missile Characteristics 3.5-6 Characteristics of Other Missiles Postulated within Reactor Containment 3.5-7 Turbine-Target Distances and Impact Areas 3.5-8 Deleted by change PKG FSC 02-MP3-13 3.5-9 Deleted by change PKG FSC 02-MP3-13 3.5-10 Deleted by change PKG FSC 02-MP3-13 3.5-11 Deleted by change PKG FSC 02-MP3-13 3.5-12 Deleted by change PKG FSC 02-MP3-13 3.5-13 Postulated Tornado-Generated External Missiles 3.5-14 Barrier Deflection and Ductility Ratios for Tornado-Borne Missiles Plus 360 Mph Tornado Wind 3.5-15 Barrier Deflection and Ductility Ratio for a Beam-Column Plus 360 Mph Tornado Wind 3.6-1 High-Energy Systems Remote from Essential Structures, Systems, and Components 3.6-2 High-Energy Systems in Proximity to Essential Structures, Systems, and Components 3.6-3 Moderate-Energy Systems in Remote from Essential Structures, Systems, and Components 3.6-4 Moderate-Energy Systems Proximate to Essential Structures, Systems, and Components 3.6-5 Essential Structures, Systems, and Components Required for Safe Reactor Shutdown 3.6-6 Postulated Breaks Main Steam System 3.6-7 Pipe Whip Effects Main Steam System 3.6-8 Jet Impingement Effects-Main Steam System 3.6-9 Postulated Breaks Main Feedwater System


le Title 10     Pipe Whip Effects-Main Feedwater System 11     Jet Impingement Effects-Main Steam System 12     Postulated Breaks-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping. Letdown Line, and Normal Charging 13     Pipe Whip Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping, Letdown and Normal Charging 14     JET Impingement Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Drain Piping, Loop Fill Piping, Letdown Line, and Normal Charging 15     Postulated Breaks-Reactor Coolant System-Pressurizer Cubicle Piping 16     Pipe Whip Effects-Reactor Coolant System Pressurizer Cubicle Piping 17     Jet Impingement Effects-Reactor Coolant System-Pressurizer Cubicle Piping 18     Postulated Pipe Breaks-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 19     Pipe Whip Effects-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 20     Jet Impingement Effects-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 21     Postulated Breaks-Chemical Volume Control System-Normal Charging 22     Pipe Whip Effects-Chemical Volume Control System-Normal Charging 23     Jet Impingement Effects-Chemical Volume Control System-Normal Charging LOET 10 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 10 of 38 3.6-10 Pipe Whip Effects-Main Feedwater System 3.6-11 Jet Impingement Effects-Main Steam System 3.6-12 Postulated Breaks-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping. Letdown Line, and Normal Charging 3.6-13 Pipe Whip Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping, Letdown and Normal Charging 3.6-14 JET Impingement Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Drain Piping, Loop Fill Piping, Letdown Line, and Normal Charging 3.6-15 Postulated Breaks-Reactor Coolant System-Pressurizer Cubicle Piping 3.6-16 Pipe Whip Effects-Reactor Coolant System Pressurizer Cubicle Piping 3.6-17 Jet Impingement Effects-Reactor Coolant System-Pressurizer Cubicle Piping 3.6-18 Postulated Pipe Breaks-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-19 Pipe Whip Effects-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-20 Jet Impingement Effects-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-21 Postulated Breaks-Chemical Volume Control System-Normal Charging 3.6-22 Pipe Whip Effects-Chemical Volume Control System-Normal Charging 3.6-23 Jet Impingement Effects-Chemical Volume Control System-Normal Charging


le  Title 24     Postulated Breaks-Chemical Volume Control System-Letdown Line 25     Pipe Whip Effects-Chemical Volume Control System-Letdown Line 26     Jet Impingement Effects-Chemical and Volume Control System-Letdown Line Piping 27     Postulated Breaks-Seal Water Injection System 28     Pipe Whip Effects-Chemical Volume Control System-Seal Water Injection Line 29     Jet Impingement Effects-Chemical Volume Control System-Seal Water Injecti0n Line 30     Postulated Breaks-Steam Generator Blowdown System 31     Pipe Whip Effects-Steam Generator Blowdown System 32     Jet Impingement Effects-Steam Generator Blowdown System 33     Energy Absorbing Capacity of a 4-inch Sch. 80 Pipe 34     Postulated Breaks Auxiliary Feedwater System 35     Pipe Whip Effects Auxiliary Feedwater System 36     Jet Impingement Effects Auxiliary Feedwater Systems 1       Seismic Instrumentation B-1     Damping Factors B-2     Methods of Seismic Analysis Used for Seismic Category I Structures B-3     Containment and Internal Structures Significant Modal Frequencies and Participation Factors Uncracked Model B-4     Containment and Internal Structures Significant Modal Frequencies and Participation Factors Cracked Model B-5     Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Uncracked Model B-6     Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Cracked Model LOET 11 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 11 of 38 3.6-24 Postulated Breaks-Chemical Volume Control System-Letdown Line 3.6-25 Pipe Whip Effects-Chemical Volume Control System-Letdown Line 3.6-26 Jet Impingement Effects-Chemical and Volume Control System-Letdown Line Piping 3.6-27 Postulated Breaks-Seal Water Injection System 3.6-28 Pipe Whip Effects-Chemical Volume Control System-Seal Water Injection Line 3.6-29 Jet Impingement Effects-Chemical Volume Control System-Seal Water Injecti0n Line 3.6-30 Postulated Breaks-Steam Generator Blowdown System 3.6-31 Pipe Whip Effects-Steam Generator Blowdown System 3.6-32 Jet Impingement Effects-Steam Generator Blowdown System 3.6-33 Energy Absorbing Capacity of a 4-inch Sch. 80 Pipe 3.6-34 Postulated Breaks Auxiliary Feedwater System 3.6-35 Pipe Whip Effects Auxiliary Feedwater System 3.6-36 Jet Impingement Effects Auxiliary Feedwater Systems 3.7-1 Seismic Instrumentation 3.7B-1 Damping Factors 3.7B-2 Methods of Seismic Analysis Used for Seismic Category I Structures 3.7B-3 Containment and Internal Structures Significant Modal Frequencies and Participation Factors Uncracked Model 3.7B-4 Containment and Internal Structures Significant Modal Frequencies and Participation Factors Cracked Model 3.7B-5 Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Uncracked Model 3.7B-6 Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Cracked Model


le  Title B-7     Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Uncracked Model, Response Spectrum Analysis B-8     Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Cracked Model, Response Spectrum Analysis B-9     Containment and Internal Structures Degrees of Freedom B-10     Containment and Internal Structure Enveloped Accelerations and Displacements Horizontal-motion B-11     Containment and Internal Structure Enveloped Accelerations and Displacements Vertical-Motion B-12     Main Steam Valve Building Significant Modal Frequencies and Participation Factors B-13     Main Steam Valve Building Significant Mode Shapes (Eigenvectors)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
B-14     Main Steam Valve Building CSM Accelerations for Safe Shutdown Earthquake from Response Spectrum Analysis B-15     Main Steam Valve Building CSM Displacements for Safe Shutdown Earthquake from Response Spectrum Analysis B-16     Main Steam Valve Building ABS of Safe Shutdown Earthquake Responses B-17     Main Steam Valve Building Degrees of Freedom B-18     Emergency Generator Enclosure Accelerations and Displacements Horizontal-motion B-19     Emergency Generator Enclosure Accelerations and Displacements Vertical - Motion B-20     Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Uncracked Properties)
Table Title LOET 12 of 38 3.7B-7 Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Uncracked Model, Response Spectrum Analysis 3.7B-8 Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Cracked Model, Response Spectrum Analysis 3.7B-9 Containment and Internal Structures Degrees of Freedom 3.7B-10 Containment and Internal Structure Enveloped Accelerations and Displacements Horizontal-motion 3.7B-11 Containment and Internal Structure Enveloped Accelerations and Displacements Vertical-Motion 3.7B-12 Main Steam Valve Building Significant Modal Frequencies and Participation Factors 3.7B-13 Main Steam Valve Building Significant Mode Shapes (Eigenvectors) 3.7B-14 Main Steam Valve Building CSM Accelerations for Safe Shutdown Earthquake from Response Spectrum Analysis 3.7B-15 Main Steam Valve Building CSM Displacements for Safe Shutdown Earthquake from Response Spectrum Analysis 3.7B-16 Main Steam Valve Building ABS of Safe Shutdown Earthquake Responses 3.7B-17 Main Steam Valve Building Degrees of Freedom 3.7B-18 Emergency Generator Enclosure Accelerations and Displacements Horizontal-motion 3.7B-19 Emergency Generator Enclosure Accelerations and Displacements Vertical - Motion 3.7B-20 Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Uncracked Properties)
LOET 12 of 38


le  Title B-21     Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Cracked Properties)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
B-22     Comparison of Response Spectra and Time History Analysis Results Main Steam Valve Building SSE Accelerations B-23     1 G Flat Response B-24     Modal Density, n B-25     Amplified Response Dynamic Factor Study B-26     Piping System Seismic Design and Analysis Criteria N-1     Damping Values Used for Seismic Analysis for Westinghouse Supplied Equipment 1       Loading Conditions - Liner Plate and Access Openings 2       Loading Conditions, Penetration 3       Loads and Loading Combinations 4       Load Combinations for ASME III Class 2 Penetrations except Quench, Recirculation, and Safety Injection Piping 5       Load Combinations for ASME III Class 2 Penetrations for the Quench Spray, Recirculation Spray, and Safety Injection Systems 6       Load Combinations for ASME III Class MC Sleeved Penetrations 7       Nomenclature for Tables 3.8-4 through 3.8-6 B-1     List of Input Documents Describing Design Transient for Fatigue Analysis of RCP and Associated Class 1 Piping B-2     List of MNPS-3 Documents Describing Components Requiring Inelastic Analysis B-3     Preoperational Tests B-4     Omitted B-5     Stress Limits for ASME Section III Class 1 (NB)
Table Title LOET 13 of 38 3.7B-21 Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Cracked Properties) 3.7B-22 Comparison of Response Spectra and Time History Analysis Results Main Steam Valve Building SSE Accelerations 3.7B-23 1 G Flat Response 3.7B-24 Modal Density, n 3.7B-25 Amplified Response Dynamic Factor Study 3.7B-26 Piping System Seismic Design and Analysis Criteria 3.7N-1 Damping Values Used for Seismic Analysis for Westinghouse Supplied Equipment 3.8-1 Loading Conditions - Liner Plate and Access Openings 3.8-2 Loading Conditions, Penetration 3.8-3 Loads and Loading Combinations 3.8-4 Load Combinations for ASME III Class 2 Penetrations except Quench, Recirculation, and Safety Injection Piping 3.8-5 Load Combinations for ASME III Class 2 Penetrations for the Quench Spray, Recirculation Spray, and Safety Injection Systems 3.8-6 Load Combinations for ASME III Class MC Sleeved Penetrations 3.8-7 Nomenclature for Tables 3.8-4 through 3.8-6 3.9B-1 List of Input Documents Describing Design Transient for Fatigue Analysis of RCP and Associated Class 1 Piping 3.9B-2 List of MNPS-3 Documents Describing Components Requiring Inelastic Analysis 3.9B-3 Preoperational Tests 3.9B-4 Omitted 3.9B-5 Stress Limits for ASME Section III Class 1 (NB)
Seismic Category I Components (Elastic Analysis)
Seismic Category I Components (Elastic Analysis)
LOET 13 of 38


le    Title B-6       Comparison of Class 1 Requirements Regulatory Guide 1.48 vs Tables 3.9b-5 and 3.9b-10 B-7       Stress Limits for ASME Section III Class 2 and 3 Components (Elastic Analysis)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
B-8       Comparison of Classes 2 and 3 Requirements Regulatory Guide 1.48 vs Table 3.9B-7 B-9       Stress Limits for ASME Section III Class 1, 2, and 3 Component Supports B-9 A     Load Combinations for ASME Section III Class 1, 2, and 3 Component Supports B-10       ASME III Class 1 Stress and Fatigue Analysis Requirements per NB3650 B-11     ASME III Class 2 and 3 Stress Analysis Requirements per NC3650 and ND3650 B-12     Loadings Applicable to Piping Systems B-13     Active Pumps and Valves B-14     Omitted B-15     Postulated Primary Loop Breaks B-16     Steam Generator and Reactor Coolant Pump Support Snubber Embedment Loads (KIPS)
Table Title LOET 14 of 38 3.9B-6 Comparison of Class 1 Requirements Regulatory Guide 1.48 vs Tables 3.9b-5 and 3.9b-10 3.9B-7 Stress Limits for ASME Section III Class 2 and 3 Components (Elastic Analysis) 3.9B-8 Comparison of Classes 2 and 3 Requirements Regulatory Guide 1.48 vs Table 3.9B-7 3.9B-9 Stress Limits for ASME Section III Class 1, 2, and 3 Component Supports 3.9B-9 A Load Combinations for ASME Section III Class 1, 2, and 3 Component Supports 3.9B-10 ASME III Class 1 Stress and Fatigue Analysis Requirements per NB3650 3.9B-11 ASME III Class 2 and 3 Stress Analysis Requirements per NC3650 and ND3650 3.9B-12 Loadings Applicable to Piping Systems 3.9B-13 Active Pumps and Valves 3.9B-14 Omitted 3.9B-15 Postulated Primary Loop Breaks 3.9B-16 Steam Generator and Reactor Coolant Pump Support Snubber Embedment Loads (KIPS) 3.9B-17 Steam Generator and Reactor Coolant Pump Support Column Embedment Loads (KIPS) 3.9B-18 Factors of Safety for Primary Members of Steam Generators and Reactor Coolant Pump Supports 3.9B-19 Minimum Design Margins for Pressurizer Support 3.9B-20 Design Margins for the Primary Members of the Pressurizer Safety Valve Support 3.9B-21 Design Margins for Primary Members of Reactor Pressure Vessel Support 3.9B-22 Design Margins for Primary Loop Bumper Support Structure 3.9N-1 Summary of Reactor Coolant System Design Transients
B-17     Steam Generator and Reactor Coolant Pump Support Column Embedment Loads (KIPS)
B-18     Factors of Safety for Primary Members of Steam Generators and Reactor Coolant Pump Supports B-19     Minimum Design Margins for Pressurizer Support B-20     Design Margins for the Primary Members of the Pressurizer Safety Valve Support B-21     Design Margins for Primary Members of Reactor Pressure Vessel Support B-22     Design Margins for Primary Loop Bumper Support Structure N-1       Summary of Reactor Coolant System Design Transients LOET 14 of 38


le    Title N-2       Loading Combinations for Reactor Coolant System Components N-3       Allowable Stresses for Reactor Coolant System Components N-4       Design Loading Combinations for ASME Code Class 2 and 3 Components and Supports N-5       Stress Criteria for Safety Code Class 2 and Class 3 Tanks N-6       Stress Criteria for ASME Code Class 2 Tanks N-7       Stress Criteria for ASME Code Class 2 and Class 3 Inactive Pumps N-8       Stress Criteria for Safety Related ASME Code Class 2 and Class 3 Active and Inactive Valves N-9       Stress Criteria for ASME Code Class 2 and 3 Piping N-10       Design Criteria for Active Pumps N-11       Active Pumps N-12       Active Valves N-13       Maximum Deflections Allowed for Reactor Internal Support Structures 0N-1       Seismic Category I Instrumentation and Electrical Equipment in Westinghouse NSSS Scope of Supply N-1       Safety-Related Equipment in Westinghouse NSSS Scope of Supply
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
.1.2-1     Thin-Wall Cylinder, Pertinent Parameters 1.2-2     Exact and Computer Stresses for Thin-wall Cylinder 1.4-1     Infinitely Long Solid Cylinder, Pertinent Parameters 1.5-1     Input Thermal Parameter Functions for TAC2D Sample Problem 1.6-1     Peak Acceleration and Displacement 1.6-2     Horizontal Amplified Response Spectra 1.10-1     Pertinent Parameters of a Cylindrical Shell 1.10-2     Summary of Results LOET 15 of 38
Table Title LOET 15 of 38 3.9N-2 Loading Combinations for Reactor Coolant System Components 3.9N-3 Allowable Stresses for Reactor Coolant System Components 3.9N-4 Design Loading Combinations for ASME Code Class 2 and 3 Components and Supports 3.9N-5 Stress Criteria for Safety Code Class 2 and Class 3 Tanks 3.9N-6 Stress Criteria for ASME Code Class 2 Tanks 3.9N-7 Stress Criteria for ASME Code Class 2 and Class 3 Inactive Pumps 3.9N-8 Stress Criteria for Safety Related ASME Code Class 2 and Class 3 Active and Inactive Valves 3.9N-9 Stress Criteria for ASME Code Class 2 and 3 Piping 3.9N-10 Design Criteria for Active Pumps 3.9N-11 Active Pumps 3.9N-12 Active Valves 3.9N-13 Maximum Deflections Allowed for Reactor Internal Support Structures 3.10N-1 Seismic Category I Instrumentation and Electrical Equipment in Westinghouse NSSS Scope of Supply 3.11N-1 Safety-Related Equipment in Westinghouse NSSS Scope of Supply 3.A.1.2-1 Thin-Wall Cylinder, Pertinent Parameters 3A.1.2-2 Exact and Computer Stresses for Thin-wall Cylinder 3A.1.4-1 Infinitely Long Solid Cylinder, Pertinent Parameters 3A.1.5-1 Input Thermal Parameter Functions for TAC2D Sample Problem 3A.1.6-1 Peak Acceleration and Displacement 3A.1.6-2 Horizontal Amplified Response Spectra 3A.1.10-1 Pertinent Parameters of a Cylindrical Shell 3A.1.10-2 Summary of Results


le    Title 1.11-1     Test Problem Data 1.11-2     A Comparison of Hand and Computer Program Results 2.1-1     Infinitely Long Solid Cylinder, Pertinent Parameters 2.4-1     Comparison of Results of SLOSH vs AEC Analysis 2.6-1     Comparison of Experimental Data with Analytical Data Using LIMITA 3 3-1       Comparison of Support Reaction Due to Thermal, Anchor Movement, and External Force Loading 3-2       Comparison of Deflections and Rotations Due to Thermal, Anchor Movement, and External Force Loading 3-3       Comparison of Stress Due To Thermal, Anchor Movement, and External Force Loading 3-4       Comparison of Internal Forces Due To Deadweight Analysis 3-5       Comparison of Deflections and Rotation Due to Deadweight Analysis 3-6       Comparison of Stresses Due to Deadweight Analysis 3-7       Comparison of Natural Frequencies 3-8       Comparison of Natural frequencies 3-9       Comparison of Class 1 Pipe Stress Analysis 3-10       Individual Pair Usage Factor for Point No. 30 3-11       Comparison of PITRUST With Franklin Institute Program CYLNOZ and Hand Calculation 3-12       Comparison of PITRUST With Reference 8 Results 3-13       Comparison of PILUG Computer Program Output With Hand Calculations 3-14       Summary of Comparison of SAVAL Computer Output With Hand Calculation As-Designed Condition 3-15       Summary of Comparison of SAVAL Computer Output With Hand Calculation Reinforced Condition (1 1/4 Pad) 3-16       Nodal Force Comparison LOET 16 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 16 of 38 3A.1.11-1 Test Problem Data 3A.1.11-2 A Comparison of Hand and Computer Program Results 3A.2.1-1 Infinitely Long Solid Cylinder, Pertinent Parameters 3A.2.4-1 Comparison of Results of SLOSH vs AEC Analysis 3A.2.6-1 Comparison of Experimental Data with Analytical Data Using LIMITA 3 3A.3-1 Comparison of Support Reaction Due to Thermal, Anchor Movement, and External Force Loading 3A.3-2 Comparison of Deflections and Rotations Due to Thermal, Anchor Movement, and External Force Loading 3A.3-3 Comparison of Stress Due To Thermal, Anchor Movement, and External Force Loading 3A.3-4 Comparison of Internal Forces Due To Deadweight Analysis 3A.3-5 Comparison of Deflections and Rotation Due to Deadweight Analysis 3A.3-6 Comparison of Stresses Due to Deadweight Analysis 3A.3-7 Comparison of Natural Frequencies 3A.3-8 Comparison of Natural frequencies 3A.3-9 Comparison of Class 1 Pipe Stress Analysis 3A.3-10 Individual Pair Usage Factor for Point No. 30 3A.3-11 Comparison of PITRUST With Franklin Institute Program CYLNOZ and Hand Calculation 3A.3-12 Comparison of PITRUST With Reference 8 Results 3A.3-13 Comparison of PILUG Computer Program Output With Hand Calculations 3A.3-14 Summary of Comparison of SAVAL Computer Output With Hand Calculation As-Designed Condition 3A.3-15 Summary of Comparison of SAVAL Computer Output With Hand Calculation Reinforced Condition (1 1/4 Pad) 3A.3-16 Nodal Force Comparison


le  Title 3-17     Input Data for WATHAM 3-18     Comparison of NODAL Force Calculation At Time = 2.34 Seconds 3-19     Comparison of PITRIFE Computer Program Output With STRUDL-II Output 3-20     Comparison of PITRIFE Computer Program Output With Hand Calculations 3-21     BENDCORD Program--Verification Problem 3-22     Pipe 1, Segment 1 Force Versus Time for Run Number S2807011 CHAPTER 4 1       Reactor Design Parameter Table 2       Analytical Techniques In Core Design 3       Design Loading Conditions For Reactor Core Components 1       Fuel Assembly Component Stresses 1       Reactor Core Description (First Cycle) 2       Nuclear Design Parameters (First Cycle) 3       Typical Reactivity Requirements For Rod Cluster Control Assemblies 4       Omitted 5       Axial Stability Index Pressurized Water Reactor Core With A 12-Foot Height 6       Typical Neutron Flux Levels (n/cm2-sec) At Full Power 7       Typical Comparison Of Measured And Calculated Doppler Defects 8       Omitted 9       Omitted 10       Typical Comparison Of Measured And Calculated AG-IN-CD Rod Worth 11       Typical Comparison Of Measured And Calculated Moderator Coefficients At HZP, BOL LOET 17 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 17 of 38 3A.3-17 Input Data for WATHAM 3A.3-18 Comparison of NODAL Force Calculation At Time = 2.34 Seconds 3A.3-19 Comparison of PITRIFE Computer Program Output With STRUDL-II Output 3A.3-20 Comparison of PITRIFE Computer Program Output With Hand Calculations 3A.3-21 BENDCORD Program--Verification Problem 3A.3-22 Pipe 1, Segment 1 Force Versus Time for Run Number S2807011 CHAPTER 4 4.1-1 Reactor Design Parameter Table 4.1-2 Analytical Techniques In Core Design 4.1-3 Design Loading Conditions For Reactor Core Components 4.2-1 Fuel Assembly Component Stresses 4.3-1 Reactor Core Description (First Cycle) 4.3-2 Nuclear Design Parameters (First Cycle) 4.3-3 Typical Reactivity Requirements For Rod Cluster Control Assemblies 4.3-4 Omitted 4.3-5 Axial Stability Index Pressurized Water Reactor Core With A 12-Foot Height 4.3-6 Typical Neutron Flux Levels (n/cm2-sec) At Full Power 4.3-7 Typical Comparison Of Measured And Calculated Doppler Defects 4.3-8 Omitted 4.3-9 Omitted 4.3-10 Typical Comparison Of Measured And Calculated AG-IN-CD Rod Worth 4.3-11 Typical Comparison Of Measured And Calculated Moderator Coefficients At HZP, BOL


le Title 1     Thermal And Hydraulic Design Parameters 2     Void Fractions At Nominal Reactor Conditions With Design Hot Channel Factors 3     Radiation Levels From HJTC Probe (R/Hr)
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
CHAPTER 5 1     System Design and Operating Parameters 1     Applicable Code Addenda for Class 1 Reactor Coolant System Components 2     Primary and Auxiliary Components Material Specifications 3     Reactor Vessels Internal Material Specifications 4     Reactor Coolant Water Chemistry Specification 5     Safety Valve Support Bracket Loads 6     Relief Valves Referenced to Code Case N-242 7     Millstone Unit No. 3 RTPTS Values (&deg;F) 1     Reactor Vessel Non-Destructive Examination 2     Reactor Vessel Fracture Toughness Properties 3     Reactor Vessel Beltline Region Material Chemical Composition (WT PERCENT) 4     Adjusted Referenced Temperature (ART) Values (&deg;F) 5     Reactor Vessel Closure Head Bolting Material Properties 6     Reactor Vessel Design Parameters 1     Reactor Coolant Pump Design Parameters 2     Reactor Coolant Pump Non-Destructive Examination Program 3     Steam Generator Design Data 4     Steam Generator Nondestructive Examination Program 5     Reactor Coolant Piping Design Parameters 6     Reactor Coolant Piping Quality Assurance Program LOET 18 of 38
Table Title LOET 18 of 38 4.4-1 Thermal And Hydraulic Design Parameters 4.4-2 Void Fractions At Nominal Reactor Conditions With Design Hot Channel Factors 4.4-3 Radiation Levels From HJTC Probe (R/Hr)
CHAPTER 5 5.1-1 System Design and Operating Parameters 5.2-1 Applicable Code Addenda for Class 1 Reactor Coolant System Components 5.2-2 Primary and Auxiliary Components Material Specifications 5.2-3 Reactor Vessels Internal Material Specifications 5.2-4 Reactor Coolant Water Chemistry Specification 5.2-5 Safety Valve Support Bracket Loads 5.2-6 Relief Valves Referenced to Code Case N-242 5.2-7 Millstone Unit No. 3 RTPTS Values (&deg;F) 5.3-1 Reactor Vessel Non-Destructive Examination 5.3-2 Reactor Vessel Fracture Toughness Properties 5.3-3 Reactor Vessel Beltline Region Material Chemical Composition (WT PERCENT) 5.3-4 Adjusted Referenced Temperature (ART) Values (&deg;F) 5.3-5 Reactor Vessel Closure Head Bolting Material Properties 5.3-6 Reactor Vessel Design Parameters 5.4-1 Reactor Coolant Pump Design Parameters 5.4-2 Reactor Coolant Pump Non-Destructive Examination Program 5.4-3 Steam Generator Design Data 5.4-4 Steam Generator Nondestructive Examination Program 5.4-5 Reactor Coolant Piping Design Parameters 5.4-6 Reactor Coolant Piping Quality Assurance Program


le Title 7     Design Bases for Residual Heat Removal System Operation 8     Residual Heat Removal System Component Data 9     Residual Heat Removal System-Cold Shutdown Operations-Failure Modes and Effects Analysis 10     Pressurizer Design Data 11     Reactor Coolant System Design Pressure Settings 12     Pressurizer Quality Assurance Program 13     Pressure Relief Tank Design Data 14     Relief Valve Discharge to the Pressurizer Relief Tank 15     Reactor Coolant System Design Parameters 16     Non-Destructive Examination Program Reactor Coolant System Valves 17     Pressurizer Valves Design Parameters 18     Equipment Supports, Loading Combinations, and Design Allowable Stresses 19     Reactor Vessel Head Vent System Equipment Design Parameters CHAPTER 6 1     Typical Materials Employed for Components of ESF Systems 2       Parameters for Ultimate Sump pH Calculation 3     Painted Surface Area Inside Containment 4     Other Organic Materials Used Inside Containment 1     Containment Peak Pressure and Temperature Results Following a Main Steam Line Break Inside Containment 2     Passive Heat Sinks 3     Containment Design Evaluation Parameters 4     LOCA Peak Pressure Results 5     LOCA Peak Pressure - DEHL Break - Initial Condition Sensitivity 6     LOCA Sequence of Events-Containment Peak Pressure LOET 19 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 19 of 38 5.4-7 Design Bases for Residual Heat Removal System Operation 5.4-8 Residual Heat Removal System Component Data 5.4-9 Residual Heat Removal System-Cold Shutdown Operations-Failure Modes and Effects Analysis 5.4-10 Pressurizer Design Data 5.4-11 Reactor Coolant System Design Pressure Settings 5.4-12 Pressurizer Quality Assurance Program 5.4-13 Pressure Relief Tank Design Data 5.4-14 Relief Valve Discharge to the Pressurizer Relief Tank 5.4-15 Reactor Coolant System Design Parameters 5.4-16 Non-Destructive Examination Program Reactor Coolant System Valves 5.4-17 Pressurizer Valves Design Parameters 5.4-18 Equipment Supports, Loading Combinations, and Design Allowable Stresses 5.4-19 Reactor Vessel Head Vent System Equipment Design Parameters CHAPTER 6 6.1-1 Typical Materials Employed for Components of ESF Systems 6.1-2 Parameters for Ultimate Sump pH Calculation 6.1-3 Painted Surface Area Inside Containment 6.1-4 Other Organic Materials Used Inside Containment 6.2-1 Containment Peak Pressure and Temperature Results Following a Main Steam Line Break Inside Containment 6.2-2 Passive Heat Sinks 6.2-3 Containment Design Evaluation Parameters 6.2-4 LOCA Peak Pressure Results 6.2-5 LOCA Peak Pressure - DEHL Break - Initial Condition Sensitivity 6.2-6 LOCA Sequence of Events-Containment Peak Pressure  


le  Title 6A       LOCA Peak Temperature Results 6B       LOCA Sequence of Events-Containment Peak Temperature 6C       LOCA-Containment Depressurization Results-DEPS Break 6D       LOCA Sequence of Events-Containment Depressurization 6E       LOCA-Containment Sump Water Temperature at RSS Pump Start 6F       LOCA-Accident Chronology for Pump Suction Double Ended Rupture-Limiting Case for Containment Sump Temperature 6G       Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 0% Power-Limiting Case for Containment Pressure 6H       Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 102% Power-Limiting Case for Containment Temperature 7       System Parameters Initial Conditions for LOCA Mass and Energy Release Analysis A      LOCA Mass and Energy Analysis Core Decay Heat Fraction 8       Double Ended Hot Leg Break Blowdown Mass and Energy Releases 9       Double Ended Pump Suction Break with Minimum ECCS Flows Blowdown Mass and Energy Release 10       Double Ended Pump Suction Break with Maximum ECCS Flows Blowdown Mass and Energy Release 11       Double Ended Cold Leg Break with Minimum ECCS Flow Blowdown Mass and Energy Releases 2-12         Deleted by PACKAGE FSC MP3-UCR-2013-008 13       3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Blowdown Mass and Energy Releases 14       Double Ended Hot Leg Minimum ECCS Flows Reflood Mass and Energy Releases 15       Double Ended Pump Suction Break with Minimum ECCS Flows Refloods Mass and Energy Releases 16       Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Mass and Energy Releases LOET 20 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 20 of 38 6.2-6A LOCA Peak Temperature Results 6.2-6B LOCA Sequence of Events-Containment Peak Temperature 6.2-6C LOCA-Containment Depressurization Results-DEPS Break 6.2-6D LOCA Sequence of Events-Containment Depressurization 6.2-6E LOCA-Containment Sump Water Temperature at RSS Pump Start 6.2-6F LOCA-Accident Chronology for Pump Suction Double Ended Rupture-Limiting Case for Containment Sump Temperature 6.2-6G Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 0% Power-Limiting Case for Containment Pressure 6.2-6H Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 102% Power-Limiting Case for Containment Temperature 6.2-7 System Parameters Initial Conditions for LOCA Mass and Energy Release Analysis 6.27A LOCA Mass and Energy Analysis Core Decay Heat Fraction 6.2-8 Double Ended Hot Leg Break Blowdown Mass and Energy Releases 6.2-9 Double Ended Pump Suction Break with Minimum ECCS Flows Blowdown Mass and Energy Release 6.2-10 Double Ended Pump Suction Break with Maximum ECCS Flows Blowdown Mass and Energy Release 6.2-11 Double Ended Cold Leg Break with Minimum ECCS Flow Blowdown Mass and Energy Releases 6.2-12 Deleted by PACKAGE FSC MP3-UCR-2013-008 6.2-13 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Blowdown Mass and Energy Releases 6.2-14 Double Ended Hot Leg Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-15 Double Ended Pump Suction Break with Minimum ECCS Flows Refloods Mass and Energy Releases 6.2-16 Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Mass and Energy Releases


le    Title 17       Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Mass and Energy Releases 2-18         Deleted by PACKAGE FSC MP3-UCR-2013-008 .................................
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
19       3.0 ft2 Suction Split Break with Minimum ECCS Flows Reflood Mass and Energy Releases 20       Double Ended Hot Leg Break with Minimum ECCS Flows Reflood Principal Parameters 21       Double Ended Pump Suction Break with Minimum ECCS Flows Reflood Principal Parameters 21A       Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Principal Parameters 21B       Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Principal Parameters 2-21C         Deleted by PACKAGE FSC MP3-UCR-2013-008 .................................
Table Title LOET 21 of 38 6.2-17 Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-18 Deleted by PACKAGE FSC MP3-UCR-2013-008.................................
21D       3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Reflood Principal Parameters 21E       Double Ended Hot Leg Break with Minimum ECCS Flows Mass Balance 21F       Double Ended Hot Leg Break with Minimum ECCS Flows Energy Balance 21G       Double Ended Pump Suction Break with Minimum ECCS Flows Mass Balance 21H       Double Ended Pump Suction Break with Minimum ECCS Flows Energy Balance 21I       Double Ended Pump Suction Break with Maximum ECCS Flows Mass Balance 21J       Double Ended Pump Suction Break with Maximum ECCS Flows Energy Balance 21K       Double Ended Cold Leg Break with Minimum ECCS Flows Mass Balance 21L       Double Ended Cold Leg Break with Minimum ECCS Flows Energy Balance 2-21M         Deleted by PACKAGE FSC MP3-UCR-2013-008 .................................
6.2-19 3.0 ft2 Suction Split Break with Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-20 Double Ended Hot Leg Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21 Double Ended Pump Suction Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21A Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Principal Parameters 6.2-21B Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21C Deleted by PACKAGE FSC MP3-UCR-2013-008.................................
2-21N         Deleted by PACKAGE FSC MP3-UCR-2013-008 .................................
6.2-21D 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21E Double Ended Hot Leg Break with Minimum ECCS Flows Mass Balance 6.2-21F Double Ended Hot Leg Break with Minimum ECCS Flows Energy Balance 6.2-21G Double Ended Pump Suction Break with Minimum ECCS Flows Mass Balance 6.2-21H Double Ended Pump Suction Break with Minimum ECCS Flows Energy Balance 6.2-21I Double Ended Pump Suction Break with Maximum ECCS Flows Mass Balance 6.2-21J Double Ended Pump Suction Break with Maximum ECCS Flows Energy Balance 6.2-21K Double Ended Cold Leg Break with Minimum ECCS Flows Mass Balance 6.2-21L Double Ended Cold Leg Break with Minimum ECCS Flows Energy Balance 6.2-21M Deleted by PACKAGE FSC MP3-UCR-2013-008.................................
LOET 21 of 38
6.2-21N Deleted by PACKAGE FSC MP3-UCR-2013-008.................................


le  Title 21O     3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Energy Balance 21P     3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Mass Balance 22       Deleted by Change PKG FSC 07-MP3-038 23       Main Steam Line Break Mass and Energy Releases Inside Containment-Initial Conditions Assumptions 24       Deleted by Change PKG FSC 07-MP3-038 25       Deleted by Change PKG FSC 07-MP3-038 26       Steam Generator Cubicle Peak Differential Pressures Feedwater Break Line 27       THREED Input for Analysis at Pressurizer Cubicle 28       THREED Input for Analysis Of Steam Generator Cubicle A 29       Deleted by PKG FSC MP3-UCR-2009-006 30       Deleted by PKG FSC MP3-UCR-2009-006 31       Mass and Energy Release Rates for a Spray Line DER in the Pressurizer Cubicle 32       Deleted by Change PKG FSC 07-MP3-038 32A     Mass and Energy Release Rates for a Surge Line DER in the Pressurizer Cubicle 33       Pressurizer Cubicle Peak Differential Pressures 34       Deleted by PKG FSC MP3-UCR-2009-006 35       Mass and Energy Release Rates for a Double Ended Guillotine Break of the Pressurizer Surge Line (Used for a 196.6-Square Inch Hot Leg LDR in the Steam Generator Cubicle) 36       Deleted by PKG FSC MP3-UCR-2009-006 36A     Mass and Energy Release Rates for a Feedwater Line SES in the Steam Generator Line 36 B     Deleted by PKG FSC MP3-UCR-2009-006 37       Deleted by PKG FSC MP3-UCR-2009-006 LOET 22 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 22 of 38 6.2-21O 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Energy Balance 6.2-21P 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Mass Balance 6.2-22 Deleted by Change PKG FSC 07-MP3-038 6.2-23 Main Steam Line Break Mass and Energy Releases Inside Containment-Initial Conditions Assumptions 6.2-24 Deleted by Change PKG FSC 07-MP3-038 6.2-25 Deleted by Change PKG FSC 07-MP3-038 6.2-26 Steam Generator Cubicle Peak Differential Pressures Feedwater Break Line 6.2-27 THREED Input for Analysis at Pressurizer Cubicle 6.2-28 THREED Input for Analysis Of Steam Generator Cubicle A 6.2-29 Deleted by PKG FSC MP3-UCR-2009-006 6.2-30 Deleted by PKG FSC MP3-UCR-2009-006 6.2-31 Mass and Energy Release Rates for a Spray Line DER in the Pressurizer Cubicle 6.2-32 Deleted by Change PKG FSC 07-MP3-038 6.2-32A Mass and Energy Release Rates for a Surge Line DER in the Pressurizer Cubicle 6.2-33 Pressurizer Cubicle Peak Differential Pressures 6.2-34 Deleted by PKG FSC MP3-UCR-2009-006 6.2-35 Mass and Energy Release Rates for a Double Ended Guillotine Break of the Pressurizer Surge Line (Used for a 196.6-Square Inch Hot Leg LDR in the Steam Generator Cubicle) 6.2-36 Deleted by PKG FSC MP3-UCR-2009-006 6.2-36A Mass and Energy Release Rates for a Feedwater Line SES in the Steam Generator Line 6.2-36 B Deleted by PKG FSC MP3-UCR-2009-006 6.2-37 Deleted by PKG FSC MP3-UCR-2009-006


le  Title 37 A     Deleted by PKG FSC MP3-UCR-2009-006 37 B     Deleted by PKG FSC MP3-UCR-2009-006 38       Steam Generator Cubicle Peak Differential Pressures, Pressurizer Surge Line LDR 39       Steam Generator Cubicle Peak Differential Pressures, Residual Heat Removal Line LDR 40       Deleted by PKG FSC MP3-UCR-2009-006 41       Deleted by PKG FSC MP3-UCR-2009-006 42       Deleted by PKG FSC MP3-UCR-2009-006 43       Subcompartment Design and Maximum Calculated Differential Pressures 44       Omitted 45       Deleted by Change PKG FSC 07-MP3-038 46       Deleted by Change PKG FSC 07-MP3-038 47       Deleted by Change PKG FSC 07-MP3-038 48       Deleted by Change PKG FSC 07-MP3-038 49       Deleted by Change PKG FSC 07-MP3-038 50       Deleted by Change PKG FSC 07-MP3-038 51       Deleted by Change PKG FSC 07-MP3-038 52       Deleted by Change PKG FSC 07-MP3-038 53       Deleted by Change PKG FSC 07-MP3-038 54       Deleted by Change PKG FSC 07-MP3-038 55       Deleted by Change PKG FSC 07-MP3-038 56       Deleted by Change PKG FSC 07-MP3-038 57       Deleted by Change PKG FSC 07-MP3-038 58       Deleted by Change PKG FSC 07-MP3-038 59       Balance of Plant Parameters Used in Steam Line Break Mass and Energy Release Calculation 60       Parameters for ECCS Containment Backpressure Analysis 61       Containment Heat Removal Systems Component Data LOET 23 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 23 of 38 6.2-37 A Deleted by PKG FSC MP3-UCR-2009-006 6.2-37 B Deleted by PKG FSC MP3-UCR-2009-006 6.2-38 Steam Generator Cubicle Peak Differential Pressures, Pressurizer Surge Line LDR 6.2-39 Steam Generator Cubicle Peak Differential Pressures, Residual Heat Removal Line LDR 6.2-40 Deleted by PKG FSC MP3-UCR-2009-006 6.2-41 Deleted by PKG FSC MP3-UCR-2009-006 6.2-42 Deleted by PKG FSC MP3-UCR-2009-006 6.2-43 Subcompartment Design and Maximum Calculated Differential Pressures 6.2-44 Omitted 6.2-45 Deleted by Change PKG FSC 07-MP3-038 6.2-46 Deleted by Change PKG FSC 07-MP3-038 6.2-47 Deleted by Change PKG FSC 07-MP3-038 6.2-48 Deleted by Change PKG FSC 07-MP3-038 6.2-49 Deleted by Change PKG FSC 07-MP3-038 6.2-50 Deleted by Change PKG FSC 07-MP3-038 6.2-51 Deleted by Change PKG FSC 07-MP3-038 6.2-52 Deleted by Change PKG FSC 07-MP3-038 6.2-53 Deleted by Change PKG FSC 07-MP3-038 6.2-54 Deleted by Change PKG FSC 07-MP3-038 6.2-55 Deleted by Change PKG FSC 07-MP3-038 6.2-56 Deleted by Change PKG FSC 07-MP3-038 6.2-57 Deleted by Change PKG FSC 07-MP3-038 6.2-58 Deleted by Change PKG FSC 07-MP3-038 6.2-59 Balance of Plant Parameters Used in Steam Line Break Mass and Energy Release Calculation 6.2-60 Parameters for ECCS Containment Backpressure Analysis 6.2-61 Containment Heat Removal Systems Component Data


le Title 62     Containment Heat Removal Systems-Consequences of Components Malfunctions 63     Supplementary Leak Collection and Release System Principal Component and Design Parameters 64     Containment Enclosure Building Design Parameters 65     Containment Penetration 66     Omitted 67     Hydrogen Recombiner System Design Parameters 68     Deleted by change PKG FSC 05-MP3-010 69     Deleted by change PKG FSC 05-MP3-010 70     System Alignment for Type A Tests 71     Pipe Insulation Inside Containment (8 Inches and Larger) 72     DECLG Mass and Energy Releases for the Limiting Transient 73     Deleted by Change PKG FSC 07-MP3-038 74     Deleted by Change PKG FSC 07-MP3-038 75     Deleted by Change PKG FSC 02-MP3-017 76     Deleted by Change PKG FSC 02-MP3-017 77     Passive Heat Sink Data for Minimum Post LOCA Containment Pressure Analysis 78     Input Data for Minimum Containment Pressure Analysis 1     Emergency Core Cooling System Component Parameters 2     Emergency Core Cooling System Relief Valve Data 3     Motor Operated Isolation Valves in the Emergency Core Cooling System 4     Materials Employed for Emergency Core Cooling System Components 5     Single Active Failure Analysis for Emergency Core Cooling System Components 6     Emergency Core Cooling System Recirculation Piping Passive Failure Analysis LOET 24 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 24 of 38 6.2-62 Containment Heat Removal Systems-Consequences of Components Malfunctions 6.2-63 Supplementary Leak Collection and Release System Principal Component and Design Parameters 6.2-64 Containment Enclosure Building Design Parameters 6.2-65 Containment Penetration 6.2-66 Omitted 6.2-67 Hydrogen Recombiner System Design Parameters 6.2-68 Deleted by change PKG FSC 05-MP3-010 6.2-69 Deleted by change PKG FSC 05-MP3-010 6.2-70 System Alignment for Type A Tests 6.2-71 Pipe Insulation Inside Containment (8 Inches and Larger) 6.2-72 DECLG Mass and Energy Releases for the Limiting Transient 6.2-73 Deleted by Change PKG FSC 07-MP3-038 6.2-74 Deleted by Change PKG FSC 07-MP3-038 6.2-75 Deleted by Change PKG FSC 02-MP3-017 6.2-76 Deleted by Change PKG FSC 02-MP3-017 6.2-77 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure Analysis 6.2-78 Input Data for Minimum Containment Pressure Analysis 6.3-1 Emergency Core Cooling System Component Parameters 6.3-2 Emergency Core Cooling System Relief Valve Data 6.3-3 Motor Operated Isolation Valves in the Emergency Core Cooling System 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-5 Single Active Failure Analysis for Emergency Core Cooling System Components 6.3-6 Emergency Core Cooling System Recirculation Piping Passive Failure Analysis


le Title 7     Switchover Procedure 8     Emergency Core Cooling System Shared Functions Evaluation 9     Normal Operating Status of Emergency Core Cooling System Components for Core Cooling 10     Failure Mode and Effects Analysis-Emergency Core Cooling System-Active Components 11     Net Positive Suction Head for Emergency Core Cooling System Pumps 1     Control Room Component Performance Characteristics for Habitability Systems 1     Comparison of ESF Filter Systems with Respect to Regulatory Guide 1.52, Rev. 2 Positions 1     Inservice Inspection Program Class 2 & 3 Systems CHAPTER 7 1     Listing of Applicable Criteria 1     List of Reactor Trips 2     Protection System Interlocks 3     Reactor Trip System Instrumentation 4     Reactor Trip Correlation 1     Interlocks for Engineered Safety Features Actuation System 2     Engineered Safety Features Actuation System Instrumentation 3     Safety Injection Signal 4     Containment Isolation Phase A 5     Steam Line Isolation 6     Feedwater Isolation 7     Control Building Isolation 8     Containment Depressurization Actuation 9     Containment Isolation Phase B LOET 25 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 25 of 38 6.3-7 Switchover Procedure 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-9 Normal Operating Status of Emergency Core Cooling System Components for Core Cooling 6.3-10 Failure Mode and Effects Analysis-Emergency Core Cooling System-Active Components 6.3-11 Net Positive Suction Head for Emergency Core Cooling System Pumps 6.4-1 Control Room Component Performance Characteristics for Habitability Systems 6.5-1 Comparison of ESF Filter Systems with Respect to Regulatory Guide 1.52, Rev. 2 Positions 6.6-1 Inservice Inspection Program Class 2 & 3 Systems CHAPTER 7 7.1-1 Listing of Applicable Criteria 7.2-1 List of Reactor Trips 7.2-2 Protection System Interlocks 7.2-3 Reactor Trip System Instrumentation 7.2-4 Reactor Trip Correlation 7.3-1 Interlocks for Engineered Safety Features Actuation System 7.3-2 Engineered Safety Features Actuation System Instrumentation 7.3-3 Safety Injection Signal 7.3-4 Containment Isolation Phase A 7.3-5 Steam Line Isolation 7.3-6 Feedwater Isolation 7.3-7 Control Building Isolation 7.3-8 Containment Depressurization Actuation 7.3-9 Containment Isolation Phase B


le Title 10     Instrumentation and Control Systems for Engineered Safety Features and Essential Auxiliary Supporting Systems 1     Instruments and Controls Outside Control Room for Cold Shutdown 1     Accident Monitoring Instrumentation List 1       Attachment 1 Accident Monitoring Instrumentation List 1     Plant Control System Interlocks CHAPTER 8 1     Class IE System Load Identification and Function 2     Acceptance Criteria for Electric Power 1     Omitted 2     Cable in Trays 3     Nonsafety-Related Equipment Connected to Safety-Related Buses 4     125V DC Safety Related Bus Loading 5     Omitted 6     Electrical Equipment not Requiring Internal Cable Separation CHAPTER 9 1     Fuel Pool Cooling and Purification System Principal Component Design Characteristics 2     Performance Characteristics of the Fuel Pool Cooling System (One Fuel Pool Cooler Operating) 1     Service Water System Flow Requirements 2     Service Water System Heat Transfer Requirements 3     Automatic Operation of Service Water System Valves 4     Consequence of Component Failure 5     Reactor Plant Component Cooling System Major Component Design Data LOET 26 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 26 of 38 7.3-10 Instrumentation and Control Systems for Engineered Safety Features and Essential Auxiliary Supporting Systems 7.4-1 Instruments and Controls Outside Control Room for Cold Shutdown 7.5-1 Accident Monitoring Instrumentation List 7.5-1 Attachment 1 Accident Monitoring Instrumentation List 7.7-1 Plant Control System Interlocks CHAPTER 8 8.1-1 Class IE System Load Identification and Function 8.1-2 Acceptance Criteria for Electric Power 8.3-1 Omitted 8.3-2 Cable in Trays 8.3-3 Nonsafety-Related Equipment Connected to Safety-Related Buses 8.3-4 125V DC Safety Related Bus Loading 8.3-5 Omitted 8.3-6 Electrical Equipment not Requiring Internal Cable Separation CHAPTER 9 9.1-1 Fuel Pool Cooling and Purification System Principal Component Design Characteristics 9.1-2 Performance Characteristics of the Fuel Pool Cooling System (One Fuel Pool Cooler Operating) 9.2-1 Service Water System Flow Requirements 9.2-2 Service Water System Heat Transfer Requirements 9.2-3 Automatic Operation of Service Water System Valves 9.2-4 Consequence of Component Failure 9.2-5 Reactor Plant Component Cooling System Major Component Design Data


le Title 6     Consequences of Component Failures Reactor Plant Component Cooling Water System 7     Chilled Water System Heat Load and Flow Rates 8     Chilled Water System Major Component Design Data 9     Neutron Shield Tank Cooling System Component Data Summary 10     Charging Pumps Cooling System Component Data Summary 11     Consequences of Component Failures, Charging Pumps Cooling Subsystem 12     Safety Injection Pumps Cooling System Component Data Summary 13     Consequences of Component Failure-Safety Injection Pumps Cooling Subsystem 14     Condensate Demineralizer Component Cooling Water System (3CCD) Design Data 15     Design Data for Major Components in the Water Treating System 16     Primary Grade Water System Major Component Design Data 17     Primary Grade Water Chemistry Specifications 1     Sampling Points-Reactor Plant 2     Sampling Points-Turbine Plant 3     Post-Accident Sampling System Principal Components Design and Parameters 4     Chemical and Volume Control System Design Parameters 5     Principal Component Data Summary 6     Failure Mode and Effects Analysis Chemical and Volume Control System Active Components-Normal Plant Operation and Safe Shutdown 7     Boron Recovery System Principal Component Design and Performance Characteristics LOET 27 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 27 of 38 9.2-6 Consequences of Component Failures Reactor Plant Component Cooling Water System 9.2-7 Chilled Water System Heat Load and Flow Rates 9.2-8 Chilled Water System Major Component Design Data 9.2-9 Neutron Shield Tank Cooling System Component Data Summary 9.2-10 Charging Pumps Cooling System Component Data Summary 9.2-11 Consequences of Component Failures, Charging Pumps Cooling Subsystem 9.2-12 Safety Injection Pumps Cooling System Component Data Summary 9.2-13 Consequences of Component Failure-Safety Injection Pumps Cooling Subsystem 9.2-14 Condensate Demineralizer Component Cooling Water System (3CCD) Design Data 9.2-15 Design Data for Major Components in the Water Treating System 9.2-16 Primary Grade Water System Major Component Design Data 9.2-17 Primary Grade Water Chemistry Specifications 9.3-1 Sampling Points-Reactor Plant 9.3-2 Sampling Points-Turbine Plant 9.3-3 Post-Accident Sampling System Principal Components Design and Parameters 9.3-4 Chemical and Volume Control System Design Parameters 9.3-5 Principal Component Data Summary 9.3-6 Failure Mode and Effects Analysis Chemical and Volume Control System Active Components-Normal Plant Operation and Safe Shutdown 9.3-7 Boron Recovery System Principal Component Design and Performance Characteristics


le Title 8     Assumptions Used in Activity Discharge Calculations 9     Boron Recovery System Failure Analysis 1     Indoor Design Temperatures for Control Building 2     Control Building Component Performance Characteristics for Air Conditioning, Heating, Cooling, and Ventilation Systems 3     Design Data for Major Components in Fuel Building Ventilation System 4     Auxiliary Building Ventilation System Principal Components and Design Parameters 5     Turbine Building Ventilation System Principal Components and Approximate Parameters 6     Engineered Safety Features Building Principal Components with Approximate Design Parameters 7     Engineered Safety Features Building Ventilation Systems Consequences of Component Failures 8     Containment Air Filtration Subsystem Principal Components Design and Approximate Parameters 9     Containment Air Recirculation System Principal Components Design and Approximate Parameters 10     Containment Air Recirculation System Operation Modes and Approximate Design Conditions of Air Recirculation Fan Coolers 11     Containment Purge Air Subsystem Principal Components and Approximate Parameters 12     CRDM Cooling System Principal Components and Approximate Parameters 13     Waste Disposal Building Heating and Ventilation System 1     Compliance with Fire Protection Technical Requirements 2     Emergency Diesel Generator Cooling Water System Leakage Summary Per Diesel LOET 28 of 38
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
Table Title LOET 28 of 38 9.3-8 Assumptions Used in Activity Discharge Calculations 9.3-9 Boron Recovery System Failure Analysis 9.4-1 Indoor Design Temperatures for Control Building 9.4-2 Control Building Component Performance Characteristics for Air Conditioning, Heating, Cooling, and Ventilation Systems 9.4-3 Design Data for Major Components in Fuel Building Ventilation System 9.4-4 Auxiliary Building Ventilation System Principal Components and Design Parameters 9.4-5 Turbine Building Ventilation System Principal Components and Approximate Parameters 9.4-6 Engineered Safety Features Building Principal Components with Approximate Design Parameters 9.4-7 Engineered Safety Features Building Ventilation Systems Consequences of Component Failures 9.4-8 Containment Air Filtration Subsystem Principal Components Design and Approximate Parameters 9.4-9 Containment Air Recirculation System Principal Components Design and Approximate Parameters 9.4-10 Containment Air Recirculation System Operation Modes and Approximate Design Conditions of Air Recirculation Fan Coolers 9.4-11 Containment Purge Air Subsystem Principal Components and Approximate Parameters 9.4-12 CRDM Cooling System Principal Components and Approximate Parameters 9.4-13 Waste Disposal Building Heating and Ventilation System 9.5-1 Compliance with Fire Protection Technical Requirements 9.5-2 Emergency Diesel Generator Cooling Water System Leakage Summary Per Diesel


le  Title 3       Design Data for Motor Components in Emergency Generator Cooling Water Systems 4       Design Data for the Major Components of Emergency Generator-Diesel Lubricating Oil System 5       Gaseous Hydrogen Storage Tubes 6       Equipment Supplied by the Nitrogen System 7       Nitrogen System Major Component Design Data 8       Design Data for Major Components in the Containment Vacuum System 9       Emergency Generator Auxiliary System Component Characteristics 10     Cooling Water System Leakages CHAPTER 10
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-1     Steam and Power Conversion System Principle Design and Performance Characteristics
Table Title LOET 29 of 38 9.5-3 Design Data for Motor Components in Emergency Generator Cooling Water Systems 9.5-4 Design Data for the Major Components of Emergency Generator-Diesel Lubricating Oil System 9.5-5 Gaseous Hydrogen Storage Tubes 9.5-6 Equipment Supplied by the Nitrogen System 9.5-7 Nitrogen System Major Component Design Data 9.5-8 Design Data for Major Components in the Containment Vacuum System 9.5-9 Emergency Generator Auxiliary System Component Characteristics 9.5-10 Cooling Water System Leakages CHAPTER 10 10.1-1 Steam and Power Conversion System Principle Design and Performance Characteristics 10.3-1 Materials of Main Steam and Feedwater Valves and Piping 10.3-2 Materials of Main Steam Safety Valves 10.3-3 Materials of Main Steam Pressure Relieving Valves 10.3-4 Materials of Main Steam/Feedwater Valves 10.4-1 Circulating Water and Associated Systems Design and Performance Characteristics 10.4-2 Design Data Condensate Polishing System 10.4-3 Condensate and Feedwater System Equipment Design parameters 10.4-4 Equipment Design Parameters 10.4-5 Omitted 10.4-6 Condenser: Physical Characteristics and Performance Requirements 10.4-7 Deleted by PKG FSC MP3-UCR-2010-012 CHAPTER 11
-1     Materials of Main Steam and Feedwater Valves and Piping
-2     Materials of Main Steam Safety Valves
-3     Materials of Main Steam Pressure Relieving Valves
-4     Materials of Main Steam/Feedwater Valves
-1     Circulating Water and Associated Systems Design and Performance Characteristics
-2     Design Data Condensate Polishing System
-3     Condensate and Feedwater System Equipment Design parameters
-4     Equipment Design Parameters
-5     Omitted
-6     Condenser: Physical Characteristics and Performance Requirements
-7     Deleted by PKG FSC MP3-UCR-2010-012 CHAPTER 11 LOET 29 of 38


le  Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-1       Iodine and Noble Gas Inventory in Reactor Core-Original License Basis (HISTORICAL)
Table Title LOET 30 of 38 11.1-1 Iodine and Noble Gas Inventory in Reactor Core-Original License Basis (HISTORICAL) 11.1-2 (HISTORICAL) Reactor Coolant Equilibrium Concentrations-Original License Basis (HISTORICAL) 11.1-2A Design Reactor Coolant Equilibrium Concentrations at 3723 MWt 11.1-3 Parameters Used in the Calculation of Reactor Coolant, Secondary Side Liquid, and Secondary Side Steam Fission and Activation Product Activity-Original License Basis (HISTORICAL) 11.1-3A Parameters Used in the Calculation of Design Reactor Coolant Fission and Activation Product Activity 11.1-4 Tritium Production 11.1-5 Reactor Coolant N-16 Activity 11.1-6 Secondary Side Liquid Equilibrium Concentrations-Original License Basis (HISTORICAL) 11.1-7 Secondary Side Steam Equilibrium (HISTORICAL)
-2     (HISTORICAL) Reactor Coolant Equilibrium Concentrations-Original License Basis (HISTORICAL)
Concentrations-Original License Basis 11.2-1 Liquid Waste Management System Daily Input Flows 11.2-2 Liquid Waste Management System Design Data 11.2-3 Tank Overflow Protection 11.2-4 (HISTORICAL) Expected Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/ml) Following Treatment-Original License Basis 11.2-5 Expected Annual Radioactive Liquid Releases Prior to Dilution in the Circulating Water Discharge System and Prior to Inclusion of Anticipated Operational Occurrences (HISTORICAL) 11.2-6 Expected Annual Radioactive Liquid Releases After Dilution in the Circulating Water Discharge System and Inclusion of Anticipated Operational Occurrences (HISTORICAL) 11.2-7 Design Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/gm) Following Treatment
-2A     Design Reactor Coolant Equilibrium Concentrations at 3723 MWt
-3     Parameters Used in the Calculation of Reactor Coolant, Secondary Side Liquid, and Secondary Side Steam Fission and Activation Product Activity-Original License Basis (HISTORICAL)
-3A     Parameters Used in the Calculation of Design Reactor Coolant Fission and Activation Product Activity
-4     Tritium Production
-5     Reactor Coolant N-16 Activity
-6     Secondary Side Liquid Equilibrium Concentrations-Original License Basis (HISTORICAL)
-7       Secondary Side Steam Equilibrium (HISTORICAL)
Concentrations-Original License Basis
-1     Liquid Waste Management System Daily Input Flows 2-2     Liquid Waste Management System Design Data
-3     Tank Overflow Protection
-4     (HISTORICAL) Expected Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/ml) Following Treatment-Original License Basis
-5     Expected Annual Radioactive Liquid Releases Prior to Dilution in the Circulating Water Discharge System and Prior to Inclusion of Anticipated Operational Occurrences (HISTORICAL)
-6     Expected Annual Radioactive Liquid Releases After Dilution in the Circulating Water Discharge System and Inclusion of Anticipated Operational Occurrences (HISTORICAL)
-7     Design Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/gm) Following Treatment LOET 30 of 38


le  Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-8     Design Annual Radioactive Liquid Releases Prior to Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System
Table Title LOET 31 of 38 11.2-8 Design Annual Radioactive Liquid Releases Prior to Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System 11.2-9 Design Annual Radioactive Liquid Releases Following Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System 11.2-10 Fraction of MPC Released-Design Case (HISTORICAL) 11.2-11 Assumptions Used for the Radioactive Liquid Waste System Failure (Release to Atmosphere) and for the Liquid Containing Tank Failure 11.2-12 Boron Recovery Tank Concentrations (Ci/cc) 11.2-13 Activity Released to Atmosphere from a Radioactive Liquid Containing Tank Failure (Boron Recovery Tank 11.2.14 Radioactive Concentrations in Groundwater Entering Niantic Bay Following a Rupture of Boron Recovery Tank 11.3-1 Total Expected Radioactive Gaseous Released to Atmosphere from Millstone 3 (HISTORICAL) 11.3-2 Radioactive Gaseous Source Term Parameters (HISTORICAL) 11.3-3 Radioactive Gaseous Waste System 11.3-4 Codes and Standards 11.3-5 Expected Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL) 11.3-6 Expected Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL) 11.3-7 Expected Radioactive Gaseous Releases to Atmosphere via Turbine Building (HISTORICAL) 11.3-8 Design Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL) 11.3-9 Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL) 11.3-10 Design Radioactive Gaseous Releases to Atmosphere via Turbine Building Roof (HISTORICAL)
-9     Design Annual Radioactive Liquid Releases Following Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System
-10     Fraction of MPC Released-Design Case (HISTORICAL)
-11     Assumptions Used for the Radioactive Liquid Waste System Failure (Release to Atmosphere) and for the Liquid Containing Tank Failure
-12     Boron Recovery Tank Concentrations (Ci/cc)
-13     Activity Released to Atmosphere from a Radioactive Liquid Containing Tank Failure (Boron Recovery Tank
.14     Radioactive Concentrations in Groundwater Entering Niantic Bay Following a Rupture of Boron Recovery Tank
-1     Total Expected Radioactive Gaseous Released to Atmosphere from Millstone 3 (HISTORICAL)
-2     Radioactive Gaseous Source Term Parameters (HISTORICAL) 3-3     Radioactive Gaseous Waste System
-4     Codes and Standards
-5     Expected Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL)
-6     Expected Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL)
-7     Expected Radioactive Gaseous Releases to Atmosphere via Turbine Building (HISTORICAL)
-8     Design Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL)
-9     Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL)
-10     Design Radioactive Gaseous Releases to Atmosphere via Turbine Building Roof (HISTORICAL)
LOET 31 of 38


le  Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-11     Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 (HISTORICAL)
Table Title LOET 32 of 38 11.3-11 Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 (HISTORICAL) 11.3-12 Assumptions Used for the Process Gas Charcoal Bed Adsorber Bypass Analysis 11.3-13 Radioisotope Releases from the Process Gas Charcoal Bed Adsorber and Associated Piping 11.4-1 Volume of Spent Resin Generated Annually 11.4-2 Radioactive Solid Waste System Component Data 11.4-3 Omitted 11.4-4 Radioactive Solid Waste Annual Shipments 11.5-1 Gaseous Monitors 11.5-2 Liquid Process Monitors 11.5-3 Radiological Samples Taken at Reactor Plant Sample Sink 11A-1 Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents 11A-2 Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents 11A-3 Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents 11A-4 Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents 11A-5 Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents 11A-6 Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents 11A-7 Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents 11A-8 Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents 11A-9 Omitted 11A-10 Omitted 11A-11 Omitted
-12     Assumptions Used for the Process Gas Charcoal Bed Adsorber Bypass Analysis
-13     Radioisotope Releases from the Process Gas Charcoal Bed Adsorber and Associated Piping
-1     Volume of Spent Resin Generated Annually
-2     Radioactive Solid Waste System Component Data
-3     Omitted
-4     Radioactive Solid Waste Annual Shipments
-1     Gaseous Monitors
-2     Liquid Process Monitors
-3     Radiological Samples Taken at Reactor Plant Sample Sink
-1     Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents
-2     Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents
-3     Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents
-4     Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents
-5     Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents
-6     Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents
-7     Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents
-8     Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents
-9     Omitted
-10     Omitted
-11     Omitted LOET 32 of 38


le    Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-12     Omitted
Table Title LOET 33 of 38 11A-12 Omitted 11A-13 Annual Doses to Maximum Individual in the Adult Group from Liquid Effluents 11A-14 Annual Doses to Maximum Individual in the Teen Group from Liquid Effluents 11A-15 Annual Doses to Maximum Individual in the Child Group from Liquid Effluents 11A-16 Comparison of Maximum Calculated Doses from Millstone 3 Nuclear Plant with Appendix I Design Objectives 11A-17 Calculated Population Dose 11A.2-1 Dilution Factors, Travel Times from the Site, and Population Served 11A.2-2 Parameters and Assumptions Used in Equations for Estimating Doses to Humans 11A.2-3 Meterological Data 11A.2-4 Parameters and Assumptions Used in Estimating Doses to Biota 11A.3-1 Base Case Annual Population Doses Due to Liquid Effluents 11A.3-2 Base Case Annual Population Doses Due to Gaseous Effluents CHAPTER 12 12.2-1 Parameters Used in Calculation of Design Radiation Source Inventories (HISTORICAL) 12.2-2 Radioactive Sources in Containment Building (HISTORICAL) 12.2-3 Radioactive Sources in the Auxiliary Building (HISTORICAL) 12.2-4 Radioactive Sources in the Waste Disposal Building (HISTORICAL) 12.2-5 Radioactive Sources in the Fuel Building (HISTORICAL) 12.2-5 A Other Radioactive Sources (HISTORICAL)
-13     Annual Doses to Maximum Individual in the Adult Group from Liquid Effluents
-14     Annual Doses to Maximum Individual in the Teen Group from Liquid Effluents
-15     Annual Doses to Maximum Individual in the Child Group from Liquid Effluents
-16     Comparison of Maximum Calculated Doses from Millstone 3 Nuclear Plant with Appendix I Design Objectives
-17     Calculated Population Dose
.2-1     Dilution Factors, Travel Times from the Site, and Population Served
.2-2     Parameters and Assumptions Used in Equations for Estimating Doses to Humans
.2-3     Meterological Data
.2-4     Parameters and Assumptions Used in Estimating Doses to Biota
.3-1     Base Case Annual Population Doses Due to Liquid Effluents
.3-2     Base Case Annual Population Doses Due to Gaseous Effluents CHAPTER 12
-1       Parameters Used in Calculation of Design Radiation Source Inventories (HISTORICAL)
-2       Radioactive Sources in Containment Building (HISTORICAL)
-3       Radioactive Sources in the Auxiliary Building (HISTORICAL) 2-4       Radioactive Sources in the Waste Disposal Building (HISTORICAL)
-5       Radioactive Sources in the Fuel Building (HISTORICAL) 2-5 A     Other Radioactive Sources (HISTORICAL)
LOET 33 of 38


le  Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-6     Inventory of an Average Fuel Assembly after 650 Days of Operation at 3,636 MWt at Shutdown and 100 Hours after Shutdown (Ci) (HISTORICAL)
Table Title LOET 34 of 38 12.2-6 Inventory of an Average Fuel Assembly after 650 Days of Operation at 3,636 MWt at Shutdown and 100 Hours after Shutdown (Ci) (HISTORICAL) 12.2-7 Source Intensity in the Most Radioactive Fuel Assembly after 650 Days of Operation at 3636 Mwt (HISTORICAL) 12.2-8 Radionuclide Concentrations in the Spent Fuel Pool from Refueling 100 Hours after Shutdown (HISTORICAL) 12.2-9 Radiation Sources Reactor Coolant Nitrogen-16 Activity (HISTORICAL) 12.2-10 Assumptions Used in the Calculation of Airborne Concentrations (HISTORICAL) 12.2-11 Airborne Concentrations Inside Major Buildings (&#xb5;ci/cc) (HISTORICAL) 12.3-1 Radiation Zones 12.3-2 Radiation Monitoring System - Area Radiation Detector Location 12.3-3 Operator Activity Locations and Time Durations 12.3-4 Activity Initiation Time 12.5-1 Deleted by change PKG FSC 04-MP3-040 12.5-2 Deleted by change PKG FSC 04-MP3-040 CHAPTER 14 14.2-1 Preoperational/Acceptance Test Program Test Descriptions 14.2-2 Startup Test Descriptions 14.2-3 Preoperational/Acceptance/Startup Tests Acceptance Criteria Sources CHAPTER 15 15.0-1 Nuclear Steam Supply System Power Ratings 15.0-2 Summary of Initial Conditions and Computer Codes Used
-7     Source Intensity in the Most Radioactive Fuel Assembly after 650 Days of Operation at 3636 Mwt (HISTORICAL)
-8     Radionuclide Concentrations in the Spent Fuel Pool from Refueling 100 Hours after Shutdown (HISTORICAL)
-9     Radiation Sources Reactor Coolant Nitrogen-16 Activity (HISTORICAL)
-10     Assumptions Used in the Calculation of Airborne Concentrations (HISTORICAL)
-11     Airborne Concentrations Inside Major Buildings (&#xb5;ci/cc) (HISTORICAL)
-1     Radiation Zones
-2     Radiation Monitoring System - Area Radiation Detector Location
-3     Operator Activity Locations and Time Durations
-4     Activity Initiation Time
-1     Deleted by change PKG FSC 04-MP3-040
-2     Deleted by change PKG FSC 04-MP3-040 CHAPTER 14
-1     Preoperational/Acceptance Test Program Test Descriptions
-2     Startup Test Descriptions
-3     Preoperational/Acceptance/Startup Tests Acceptance Criteria Sources CHAPTER 15
-1     Nuclear Steam Supply System Power Ratings
-2     Summary of Initial Conditions and Computer Codes Used LOET 34 of 38


le    Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-3       Nominal Values of Pertinent Plant Parameters Utilized in the Accident Analysis
Table Title LOET 35 of 38 15.0-3 Nominal Values of Pertinent Plant Parameters Utilized in the Accident Analysis 15.0-4 Trip Point and Time Delays to Trip Assumed in Accident Analysis 15.0-5 Deleted by PKG FSC 07-MP2-049 15.0-6 Plant Systems and Equipment Required for the Mitigation of Transient and Accident Conditions 15.0-7 Fission Product Inventory in Reactor Core 15.0-8 Potential Doses Due to Accidents 15.0-9 Typical Power-Temperature Distribution for Full Core 15.0-10 Technical Specification Coolant Concentrations 15.0-11 Atmospheric Dispersion Data Used for Design Basis Accident Analysis 15.0-12 Reactor Coolant Iodine Concentrations Assuming Pre-Accident Iodine Spike 15.0-13 Iodine Release Rates in Reactor Coolant Due to Concurrent Iodine Spike 15.1-1 Time Sequence of Events For Incidents Which Cause an Increase in Heat Removal by the Secondary System 15.1-2 Equipment Required Following A Rupture of a Main Steam Line 15.1-3 Assumptions Used in Main Steam Line Break Analysis 15.1-4 Deleted by change PKG FSC 04-MP3-017 15.2-1 Time Sequence for Events for Incidents Which Cause a Decrease in Heat Removal by the Secondary System 15.2-2 Natural Circulation Flow 15.3-1 Time Sequence of Events for Incidents Which Result in a Decrease in Reactor Coolant System Flow 15.3-1 A Time Sequence of Events for Under Frequency Event 15.3-2 Summary of Results for Locked Rotor Transients 15.3-3 Assumptions Used in Locked Rotor Analysis
-4       Trip Point and Time Delays to Trip Assumed in Accident Analysis
-5       Deleted by PKG FSC 07-MP2-049
-6       Plant Systems and Equipment Required for the Mitigation of Transient and Accident Conditions
-7       Fission Product Inventory in Reactor Core
-8       Potential Doses Due to Accidents
-9       Typical Power-Temperature Distribution for Full Core
-10     Technical Specification Coolant Concentrations
-11     Atmospheric Dispersion Data Used for Design Basis Accident Analysis
-12     Reactor Coolant Iodine Concentrations Assuming Pre-Accident Iodine Spike
-13     Iodine Release Rates in Reactor Coolant Due to Concurrent Iodine Spike
-1       Time Sequence of Events For Incidents Which Cause an Increase in Heat Removal by the Secondary System
-2       Equipment Required Following A Rupture of a Main Steam Line
-3       Assumptions Used in Main Steam Line Break Analysis
-4       Deleted by change PKG FSC 04-MP3-017
-1       Time Sequence for Events for Incidents Which Cause a Decrease in Heat Removal by the Secondary System
-2       Natural Circulation Flow
-1       Time Sequence of Events for Incidents Which Result in a Decrease in Reactor Coolant System Flow
-1 A     Time Sequence of Events for Under Frequency Event
-2       Summary of Results for Locked Rotor Transients
-3       Assumptions Used in Locked Rotor Analysis LOET 35 of 38


le  Title
MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)
-1     Time Sequence of Events For Incidents Which Cause Reactivity and Power Distribution Anomalies
Table Title LOET 36 of 38 15.4-1 Time Sequence of Events For Incidents Which Cause Reactivity and Power Distribution Anomalies 15.4-2 Minimum Calculated DNBR for a Typical Case of Rod Cluster Control Assembly Misalignment 15.4-3 Parameters Used in the Analysis of the Rod Cluster Control Assembly Ejection Accident 15.4-4 Parameters Used in Rod Ejection Accident Analysis 15.4-5 Integrated Break Flow (lbm) in Containment 15.4-6 Deleted by change PKG FSC 04-MP3-017 15.5-1 Time Sequence of Events-CVCS Malfunction that Increases Reactor Coolant Inventory 15.6-1 Time Sequence of Events for Inadvertent Opening of a Pressurizer Safety Valve 15.6-2 Assumptions Used in Analysis of Failure of Small Lines Carrying Primary Coolant Outside Containment 15.6-3 Plant Operating Range Allowed by the Best Estimate Large Break LOCA Analysis 15.6-4 Large Break LOCA Containment Data Used for Calculation of Containment Pressure 15.6-5 Best Estimate Large Break LOCA Results 15.6-6 Total Minimum Injected Safety Injection Flow Used in Best Estimate large Break LOCA Analysis 15.6-7 Large Break LOCA Containment Data Used for Calculation of Containment Pressure 15.6-8 Peak Clad Temperature including All Penalties and benefits, Best Estimate large Break LOCA (BE LBLOCA) 15.6-9 Assumptions Used for the Radiological Consequences of a LOCA Analysis 15.6-10 Deleted by change PKG FSC 04-MP3-017 15.6-11 Deleted by change PKG FSC 07-MP3-054 15.6-12 Assumptions Used for the Control Room Habitability Analysis 15.6-13 Deleted by change PKG FSC 04-MP3-017
-2     Minimum Calculated DNBR for a Typical Case of Rod Cluster Control Assembly Misalignment 4-3     Parameters Used in the Analysis of the Rod Cluster Control Assembly Ejection Accident
-4     Parameters Used in Rod Ejection Accident Analysis
-5     Integrated Break Flow (lbm) in Containment
-6     Deleted by change PKG FSC 04-MP3-017
-1     Time Sequence of Events-CVCS Malfunction that Increases Reactor Coolant Inventory
-1     Time Sequence of Events for Inadvertent Opening of a Pressurizer Safety Valve
-2     Assumptions Used in Analysis of Failure of Small Lines Carrying Primary Coolant Outside Containment
-3     Plant Operating Range Allowed by the Best Estimate Large Break LOCA Analysis
-4     Large Break LOCA Containment Data Used for Calculation of Containment Pressure
-5     Best Estimate Large Break LOCA Results 6-6     Total Minimum Injected Safety Injection Flow Used in Best Estimate large Break LOCA Analysis
-7     Large Break LOCA Containment Data Used for Calculation of Containment Pressure
-8     Peak Clad Temperature including All Penalties and benefits, Best Estimate large Break LOCA (BE LBLOCA)
-9     Assumptions Used for the Radiological Consequences of a LOCA Analysis
-10     Deleted by change PKG FSC 04-MP3-017
-11     Deleted by change PKG FSC 07-MP3-054
-12     Assumptions Used for the Control Room Habitability Analysis
-13     Deleted by change PKG FSC 04-MP3-017 LOET 36 of 38


-15   Input Parameters Used in the ECCS Analysis (Small Break)
MPS-3 FSAR LOET 37 of 38 15.6-14 Time Sequence of Events for Incidents Which Cause a Decrease in Reactor Coolant Inventory (Small Break) 15.6-15 Input Parameters Used in the ECCS Analysis (Small Break) 15.6-16 Small Break LOCA Results Fuel Cladding Data 15.6-17 Small Break LOCA Safety Injection Flow Rate for 1.5 inch to 6 inch Breaks 15.6-18 Small Break LOCA Safety Injection Flow Rate for 8.75 inch Break Before Switchover 15.6-19 Omitted 15.6-20 Omitted 15.6-21 Deleted 15.6-22 Deleted 15.6.3-1 Operator Action Times for Design Basis SGTR Analysis 15.6.3-2 SGTR Analysis Sequence of Events 15.6.3-3 SGTR Mass Releases Total Mass Flow (Pounds) 15.6.3-4 SGTR Analysis Parameters Used in Evaluating Radiological Consequences 15.6.3-5 Deleted by Change PKG FSC 07-MP3-054 15.6.3-6 SGTR Analysis Iodine Spike Appearance Rates 15.6.3-7 Deleted by change PKG FSC 04-MP3-017 15.6.3-8 Deleted by change PKG FSC 04-MP3-017 15.6.3-9 Deleted by change PKG FSC 04-MP3-017 15.6.3-10 Deleted by change PKG FSC 04-MP3-017 15.7-1 Omitted 15.7-2 Table Relocated to Table 11.3-13 by change PKG FSC 04-MP3-017 15.7-3 Table Relocated to Table 11.3-12 by change PKG FSC 04-MP3-017 15.7-4 Table Relocated to Table 11.2-12 by change PKG FSC 04-MP3-017 15.7-5 Table Relocated to Table 11.2-11 by change PKG FSC 04-MP3-017 15.7-6 Table Relocated to Table 11.2-13 by change PKG FSC 04-MP3-017 15.7-7 Table Relocated to Table 11.2-14 by change PKG FSC 04-MP3-017
-16   Small Break LOCA Results Fuel Cladding Data
-17   Small Break LOCA Safety Injection Flow Rate for 1.5 inch to 6 inch Breaks
-18   Small Break LOCA Safety Injection Flow Rate for 8.75 inch Break Before Switchover
-19   Omitted
-20   Omitted
-21   Deleted
-22   Deleted
.3-1 Operator Action Times for Design Basis SGTR Analysis
.3-2 SGTR Analysis Sequence of Events
.3-3 SGTR Mass Releases Total Mass Flow (Pounds)
.3-4 SGTR Analysis Parameters Used in Evaluating Radiological Consequences
.3-5 Deleted by Change PKG FSC 07-MP3-054
.3-6 SGTR Analysis Iodine Spike Appearance Rates
.3-7 Deleted by change PKG FSC 04-MP3-017
.3-8 Deleted by change PKG FSC 04-MP3-017
.3-9 Deleted by change PKG FSC 04-MP3-017
.3-10 Deleted by change PKG FSC 04-MP3-017
-1   Omitted
-2   Table Relocated to Table 11.3-13 by change PKG FSC 04-MP3-017
-3   Table Relocated to Table 11.3-12 by change PKG FSC 04-MP3-017
-4   Table Relocated to Table 11.2-12 by change PKG FSC 04-MP3-017
-5   Table Relocated to Table 11.2-11 by change PKG FSC 04-MP3-017
-6   Table Relocated to Table 11.2-13 by change PKG FSC 04-MP3-017
-7   Table Relocated to Table 11.2-14 by change PKG FSC 04-MP3-017 LOET 37 of 38


-9     Deleted by change PKG FSC 04-MP3-017
MPS-3 FSAR LOET 38 of 38 15.7-8 Parameters for Postulated Fuel Handling Accident 15.7-9 Deleted by change PKG FSC 04-MP3-017 15.7-10 Deleted by change PKG FSC 07-MP3-056 15.7-11 Deleted by change PKG FSC 04-MP3-017 15B Tables Deleted by change PKG FSC 02-MP3-017 CHAPTER 19 19.6-1 License Renewal Commitments FPER FPER 4-1 Sprinkler/Waterspray Protected Areas FPER 4-2 CO2 Protected Areas FPER 9-1 Plant Functions which Could be Affected by a Fire in Different Fire Areas and Options Available to Complete Function (Table has been Deleted)
-10     Deleted by change PKG FSC 07-MP3-056
-11     Deleted by change PKG FSC 04-MP3-017 Tables Deleted by change PKG FSC 02-MP3-017 CHAPTER 19
-1     License Renewal Commitments FPER R 4-1   Sprinkler/Waterspray Protected Areas R 4-2   CO2 Protected Areas R 9-1   Plant Functions which Could be Affected by a Fire in Different Fire Areas and Options Available to Complete Function (Table has been Deleted)
LOET 38 of 38


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                               Drawing FIGURE LABEL         DATE / Revision [ ]                                         TITLE                 SHEET Number                                                                                                Number 1.2-2     FIGURE 1.2-2     [27.2]                     PLOT PLAN                                     25212-10002 (a) N/A 1.2-3     FIGURE 1.2-3 SH-1 [27.2]                     PIPING & INSTRUMENTATION DIAGRAM LEGEND       25212-26900 (a) 1 OF 3 1.2-3     FIGURE 1.2-3 SH-2 [27.2]                     PIPING & INSTRUMENTATION DIAGRAM LEGEND       25212-26900 (a) 2 OF 3 1.2-3     FIGURE 1.2-3 SH-3 [27.2]                     PIPING & INSTRUMENTATION DIAGRAM LEGEND       25212-26900 (a) 3 OF 3 2.1-1     FIGURE 2.1-1     MAY 1993                   GENERAL SITE LOCATION                         N/A             N/A 2.1-2     FIGURE 2.1-2     MAY 1993                   GENERAL VICINITY                             N/A             N/A 2.1-3     FIGURE 2.1-3     [17.5]                     SITE LAYOUT                                   N/A             N/A 2.1-4     FIGURE 2.1-4     [17.5]                     SITE PLAN                                     N/A             N/A 2.1-5     FIGURE 2.1-5     MAY 1993                   TOWNS WITHIN 10 MILES                         N/A             N/A 2.1-6     FIGURE 2.1-6     MAY 1993                   1985 POPULATION DISTRIBUTION 0-20 KILOMETER   N/A             N/A 2.1-7     FIGURE 2.1-7     MAY 1993                   POPULATION SECTORS FOR 0-10 MILES             N/A             N/A 2.1-8     FIGURE 2.1-8     MAY 1993                   COUNTIES WITHIN 50 MILES                     N/A             N/A 2.1-9     FIGURE 2.1-9     MAY 1993                   1985 POPULATION DISTRIBUTION 0-80 KILOMETER   N/A             N/A 2.1-10   FIGURE 2.1-10     MAY 1993                   POPULATION SECTORS FOR 0-50 MILES             N/A             N/A 2.1-11   FIGURE 2.1-11     MAY 1993                   ROADS AND FACILITIES IN THE LPZ               N/A             N/A Page 1 of 83
MPS-3 FSAR Page 1 of 83 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 1.2-2 FIGURE 1.2-2
[27.2]
PLOT PLAN 25212-10002 (a) N/A 1.2-3 FIGURE 1.2-3 SH-1
[27.2]
PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 1 OF 3 1.2-3 FIGURE 1.2-3 SH-2
[27.2]
PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 2 OF 3 1.2-3 FIGURE 1.2-3 SH-3
[27.2]
PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 3 OF 3 2.1-1 FIGURE 2.1-1 MAY 1993 GENERAL SITE LOCATION N/A N/A 2.1-2 FIGURE 2.1-2 MAY 1993 GENERAL VICINITY N/A N/A 2.1-3 FIGURE 2.1-3
[17.5]
SITE LAYOUT N/A N/A 2.1-4 FIGURE 2.1-4
[17.5]
SITE PLAN N/A N/A 2.1-5 FIGURE 2.1-5 MAY 1993 TOWNS WITHIN 10 MILES N/A N/A 2.1-6 FIGURE 2.1-6 MAY 1993 1985 POPULATION DISTRIBUTION 0-20 KILOMETER N/A N/A 2.1-7 FIGURE 2.1-7 MAY 1993 POPULATION SECTORS FOR 0-10 MILES N/A N/A 2.1-8 FIGURE 2.1-8 MAY 1993 COUNTIES WITHIN 50 MILES N/A N/A 2.1-9 FIGURE 2.1-9 MAY 1993 1985 POPULATION DISTRIBUTION 0-80 KILOMETER N/A N/A 2.1-10 FIGURE 2.1-10 MAY 1993 POPULATION SECTORS FOR 0-50 MILES N/A N/A 2.1-11 FIGURE 2.1-11 MAY 1993 ROADS AND FACILITIES IN THE LPZ N/A N/A


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                    Drawing FIGURE LABEL                  DATE / Revision [ ]                                        TITLE                          SHEET Number                                                                                                                      Number 2.1-12   FIGURE 2.1-12               MAY 1993                   LPZ POPULATION SECTORS                                   N/A       N/A 2.2-1     FIGURE 2.2-1               APRIL 1997                 MAJOR INDUSTRIAL, TRANSPORTATION AND MILITARY FACILITIES N/A       N/A 2.2-2     FIGURE 2.2-2               MAY 1993                   INSTRUMENT LANDING PATTERNS AT TRUMBULL AIRPORT           N/A       N/A 2.2-3     FIGURE 2.2-3               NONE                       AIR LANES ADJACENT TO MILLSTONE POINT                     N/A       N/A 2.2-4     FIGURE 2.2-4               MAY 1993                   NEW LONDON COUNTY - STATE HIGHWAYS AND TOWN ROADS         N/A       N/A 2.2-5     FIGURE 2.2-5               AMENDMENT 10 OCTOBER 1984 PROPANE CONCENTRATION OUTSIDE AND INSIDE THE CONTROL ROOM N/A       N/A 2.3-1     FIGURE 2.3-1               APRIL 1992                 TOPOGRAPHY IN THE VICINITY OF MILLSTONE POINT             N/A       N/A 2.3-2     FIGURE 2.3-2               NONE                       TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE             N/A       N/A 2.3-3     FIGURE 2.3-3               NONE                       TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE             N/A       N/A 2.3-4     FIGURE 2.3-4 (Sheet 1 of 2) NONE                       TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE             N/A       1 OF 2 2.3-4     FIGURE 2.3-4 (Sheet 2 of 2) NONE                       TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE             N/A       2 OF 2 2.3-5     FIGURE 2.3-5 (Sheet 1 of 2) NONE                       TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE           N/A       1 OF 2 2.3-5     FIGURE 2.3-5 (Sheet 2 of 2) NONE                       TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE           N/A       2 OF 2 2.3-6     FIGURE 2.3-6 (Sheet 1 of 2) NONE                       GENERAL TOPOGRAPHY - 50 MILES                             N/A       1 OF 2 2.3-6     FIGURE 2.3-6 (Sheet 2 of 2) NONE                       GENERAL TOPOGRAPHY - 50 MILES                             N/A       2 OF 2 Page 2 of 83
MPS-3 FSAR Page 2 of 83 2.1-12 FIGURE 2.1-12 MAY 1993 LPZ POPULATION SECTORS N/A N/A 2.2-1 FIGURE 2.2-1 APRIL 1997 MAJOR INDUSTRIAL, TRANSPORTATION AND MILITARY FACILITIES N/A N/A 2.2-2 FIGURE 2.2-2 MAY 1993 INSTRUMENT LANDING PATTERNS AT TRUMBULL AIRPORT N/A N/A 2.2-3 FIGURE 2.2-3 NONE AIR LANES ADJACENT TO MILLSTONE POINT N/A N/A 2.2-4 FIGURE 2.2-4 MAY 1993 NEW LONDON COUNTY - STATE HIGHWAYS AND TOWN ROADS N/A N/A 2.2-5 FIGURE 2.2-5 AMENDMENT 10 OCTOBER 1984 PROPANE CONCENTRATION OUTSIDE AND INSIDE THE CONTROL ROOM N/A N/A 2.3-1 FIGURE 2.3-1 APRIL 1992 TOPOGRAPHY IN THE VICINITY OF MILLSTONE POINT N/A N/A 2.3-2 FIGURE 2.3-2 NONE TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE N/A N/A 2.3-3 FIGURE 2.3-3 NONE TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE N/A N/A 2.3-4 FIGURE 2.3-4 (Sheet 1 of 2)
NONE TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE N/A 1 OF 2 2.3-4 FIGURE 2.3-4 (Sheet 2 of 2)
NONE TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE N/A 2 OF 2 2.3-5 FIGURE 2.3-5 (Sheet 1 of 2)
NONE TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE N/A 1 OF 2 2.3-5 FIGURE 2.3-5 (Sheet 2 of 2)
NONE TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE N/A 2 OF 2 2.3-6 FIGURE 2.3-6 (Sheet 1 of 2)
NONE GENERAL TOPOGRAPHY - 50 MILES N/A 1 OF 2 2.3-6 FIGURE 2.3-6 (Sheet 2 of 2)
NONE GENERAL TOPOGRAPHY - 50 MILES N/A 2 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                                              SHEET Number                                                                                                                                Number 2.3-7     FIGURE 2.3-7     APRIL 1992                 METEOROLOGICAL INSTRUMENT AND DATA QUALITY ASSURANCE FLOW DIAGRAM               N/A       N/A 2.4-1     FIGURE 2.4-1     [17.5]                     FACILITIES LOCATED ON THE SITE                                                 N/A       N/A 2.4-2     FIGURE 2.4-2     NONE                       PUBLIC WATER SUPPLIES WITHIN 20 MILES OF SITE                                   N/A       N/A 2.4-3     FIGURE 2.4-3     NONE                       LOCATIONS OF HYDROGRAPHIC FIELD SURVEY STATIONS JUNE TO OCTOBER 1965           N/A       N/A 2.4-4     FIGURE 2.4-4     NONE                       TIDAL CURRENTS MEASURED BY ESSEX MARINE LABORATORY                             N/A       N/A 2.4-5     FIGURE 2.4-5     NONE                       BOTTOM PROFILES ESTABLISHED BY ESSEX MARINE LABORATORY                         N/A       N/A 2.4-6     FIGURE 2.4-6     NONE                       FREQUENCY OF TIDAL FLOODING AT NEW LONDON, CONECTICUT                           N/A       N/A 2.4-7     FIGURE 2.4-7     [23.1]                     SITE GRADE AND DRAINAGE BASIN FOR PMP RUNOFF ANALYSIS                           N/A       N/A 2.4-8     FIGURE 2.4-8     JULY 1997                 BOTTOM PROFILE ALONG PATH OF MAXIMUM SURFACE WINDS                             N/A       N/A 2.4-9     FIGURE 2.4-9     NONE                       COINCIDENT WAVE AND SURGE SLOW-SPEED PROBABLE MAXIMUM HURRICANE                 N/A       N/A 2.4-10   FIGURE 2.4-10   NONE                       COINCIDENT WAVE AND SURGE MEDIUM-SPEED PROBABLE MAXIMUM HURRICANE               N/A       N/A 2.4-11   FIGURE 2.4-11   NONE                       COINCIDENT WAVE AND SURGE HIGH-SPEED PROBABLE MAXIMUM HURRICANE                 N/A       N/A 2.4-12   FIGURE 2.4-12   NONE                       LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS SLOW SPEED OF TRANSLATION   N/A       N/A 2.4-13   FIGURE 2.4-13   NONE                       LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS MEDIUM SPEED OF TRANSLATION N/A       N/A 2.4-14   FIGURE 2.4-14   NONE                       LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS HIGH SPEED OF TRANSLATION   N/A       N/A Page 3 of 83
MPS-3 FSAR Page 3 of 83 2.3-7 FIGURE 2.3-7 APRIL 1992 METEOROLOGICAL INSTRUMENT AND DATA QUALITY ASSURANCE FLOW DIAGRAM N/A N/A 2.4-1 FIGURE 2.4-1
[17.5]
FACILITIES LOCATED ON THE SITE N/A N/A 2.4-2 FIGURE 2.4-2 NONE PUBLIC WATER SUPPLIES WITHIN 20 MILES OF SITE N/A N/A 2.4-3 FIGURE 2.4-3 NONE LOCATIONS OF HYDROGRAPHIC FIELD SURVEY STATIONS JUNE TO OCTOBER 1965 N/A N/A 2.4-4 FIGURE 2.4-4 NONE TIDAL CURRENTS MEASURED BY ESSEX MARINE LABORATORY N/A N/A 2.4-5 FIGURE 2.4-5 NONE BOTTOM PROFILES ESTABLISHED BY ESSEX MARINE LABORATORY N/A N/A 2.4-6 FIGURE 2.4-6 NONE FREQUENCY OF TIDAL FLOODING AT NEW LONDON, CONECTICUT N/A N/A 2.4-7 FIGURE 2.4-7
[23.1]
SITE GRADE AND DRAINAGE BASIN FOR PMP RUNOFF ANALYSIS N/A N/A 2.4-8 FIGURE 2.4-8 JULY 1997 BOTTOM PROFILE ALONG PATH OF MAXIMUM SURFACE WINDS N/A N/A 2.4-9 FIGURE 2.4-9 NONE COINCIDENT WAVE AND SURGE SLOW-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-10 FIGURE 2.4-10 NONE COINCIDENT WAVE AND SURGE MEDIUM-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-11 FIGURE 2.4-11 NONE COINCIDENT WAVE AND SURGE HIGH-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-12 FIGURE 2.4-12 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS SLOW SPEED OF TRANSLATION N/A N/A 2.4-13 FIGURE 2.4-13 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS MEDIUM SPEED OF TRANSLATION N/A N/A 2.4-14 FIGURE 2.4-14 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS HIGH SPEED OF TRANSLATION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL      DATE / Revision [ ]                                      TITLE                                                SHEET Number                                                                                                                                Number 2.4-15   FIGURE 2.4-15   NONE                     WAVE TRANSECTS ON LONG ISLAND SOUND                                             N/A       N/A 2.4-16   FIGURE 2.4-16   NONE                     AREAS UNDER EFFECT OF WAVE SHOALING AND WAVE REFRACTION                         N/A       N/A 2.4-17   FIGURE 2.4-17   NONE                     WAVE REFRACTION DIAGRAM, BLOCK ISLAND SOUND GRID                               N/A       N/A 2.4-18   FIGURE 2.4-18   NONE                     WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH SOUTH 30 DEGREE EAST N/A       N/A 2.4-19   FIGURE 2.4-19   NONE                     WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 85 DEGREE SOUTH N/A       N/A 2.4-20   FIGURE 2.4-20   NONE                     WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 45 DEGREE SOUTH N/A       N/A 2.4-21   FIGURE 2.4-21   NONE                     WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 17 DEGREE SOUTH N/A       N/A 2.4-22   FIGURE 2.4-22   NONE                     TOPOGRAPHY AND RUNUP TRANSECTS MILLSTONE LOCATION                               N/A       N/A 2.4-23   FIGURE 2.4-23   NONE                     INTAKE TRANSECT A                                                               N/A       N/A 2.4-24   FIGURE 2.4-24   NONE                     RUNUP TRANSECT B (WEST)                                                         N/A       N/A 2.4-25   FIGURE 2.4-25   NONE                     RUNUP TRANSECT B (EAST)                                                         N/A       N/A 2.4-26   FIGURE 2.4-26   SEPTEMBER 1997           WAVE CLAPOTIS AT INTAKE                                                         N/A       N/A 2.4-27   FIGURE 2.4-27   NONE                     INPUTS TO ONE DIMENSIONAL SETDOWN MODEL                                         N/A       N/A 2.4-28   FIGURE 2.4-28   NONE                     LARGE RADIUS PROBABLE MAXIMUM HURRICANE ISOVEL FIELD                           N/A       N/A 2.4-29   FIGURE 2.4-29   NONE                     LARGE RADIUS, SLOW SPEED OF TRANSLATION TIME VARIANT WIND FIELD-MILLSTONE       N/A       N/A Page 4 of 83
MPS-3 FSAR Page 4 of 83 2.4-15 FIGURE 2.4-15 NONE WAVE TRANSECTS ON LONG ISLAND SOUND N/A N/A 2.4-16 FIGURE 2.4-16 NONE AREAS UNDER EFFECT OF WAVE SHOALING AND WAVE REFRACTION N/A N/A 2.4-17 FIGURE 2.4-17 NONE WAVE REFRACTION DIAGRAM, BLOCK ISLAND SOUND GRID N/A N/A 2.4-18 FIGURE 2.4-18 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH SOUTH 30 DEGREE EAST N/A N/A 2.4-19 FIGURE 2.4-19 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 85 DEGREE SOUTH N/A N/A 2.4-20 FIGURE 2.4-20 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 45 DEGREE SOUTH N/A N/A 2.4-21 FIGURE 2.4-21 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 17 DEGREE SOUTH N/A N/A 2.4-22 FIGURE 2.4-22 NONE TOPOGRAPHY AND RUNUP TRANSECTS MILLSTONE LOCATION N/A N/A 2.4-23 FIGURE 2.4-23 NONE INTAKE TRANSECT A N/A N/A 2.4-24 FIGURE 2.4-24 NONE RUNUP TRANSECT B (WEST)
N/A N/A 2.4-25 FIGURE 2.4-25 NONE RUNUP TRANSECT B (EAST)
N/A N/A 2.4-26 FIGURE 2.4-26 SEPTEMBER 1997 WAVE CLAPOTIS AT INTAKE N/A N/A 2.4-27 FIGURE 2.4-27 NONE INPUTS TO ONE DIMENSIONAL SETDOWN MODEL N/A N/A 2.4-28 FIGURE 2.4-28 NONE LARGE RADIUS PROBABLE MAXIMUM HURRICANE ISOVEL FIELD N/A N/A 2.4-29 FIGURE 2.4-29 NONE LARGE RADIUS, SLOW SPEED OF TRANSLATION TIME VARIANT WIND FIELD-MILLSTONE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                              Number 2.4-30   FIGURE 2.4-30   JULY 1997                 SETDOWN VERSUS WIND SPEED                                                     N/A       N/A 2.4-31   FIGURE 2.4-31   NONE                       BOUNDARY OF THE MODELED AREA                                                 N/A       N/A 2.4-32   FIGURE 2.4-32   NONE                       ONSITE WELL LOCATIONS                                                         N/A       N/A PROBABLE SEEPAGE PATH FROM BORON RECOVERY TANK AND WASTE DISPOSAL BUILDING TO 2.4-33    FIGURE 2.4-33    NONE                                                                                                    N/A       N/A LONG ISLAND SOUND 2.4-34   FIGURE 2.4-34   AMENDMENT 6 JANUARY 1984   SCUPPER DETAILS-CONTROL, HYDROGEN RECOMBINER AND CONTAINMENT ENCLOSURE       N/A       N/A 2.4-35   FIGURE 2.4-35   AMENDMENT 6 JANUARY 1984   ROOF PLUG SEALING DETAIL - HYDROGEN RECOMBINER BUILDING                       N/A       N/A 2.4-36   FIGURE 2.4-36   AMENDMENT 6 JANUARY 1984   HATCH COVER DETAILS - CIRCULATING WATER PUMPHOUSE SERVICE WATER PUMP CUBICLE N/A       N/A 2.4-37   FIGURE 2.4-37   AMENDMENT 9 JULY 1984     HATCH COVER DETAILS - CONTROL BUILDING MECHANICAL ROOM                       N/A       N/A 2.5.1-1   FIGURE 2.5.1-1   NONE                       REGIONAL PHYSIOGRAPHIC MAP                                                   N/A       N/A 2.5.1-2   FIGURE 2.5.1-2   NONE                       REGIONAL PRE-PLEISTOCENE SEDIMENTS OF THE CONTINENTAL MARGIN                 N/A       N/A 2.5.1-3   FIGURE 2.5.1-3   NONE                       SITE SURFICIAL GEOLOGY                                                       N/A       N/A 2.5.1-4   FIGURE 2.5.1-4   NONE                       REGIONAL GEOLOGIC MAP                                                         N/A       N/A 2.5.1-5   FIGURE 2.5.1-5   NONE                       REGIONAL GEOLOCIC SECTION                                                     N/A       N/A 2.5.1-6   FIGURE 2.5.1-6   NONE                       REGIONAL TECTONIC MAP                                                         N/A       N/A 2.5.1-7   FIGURE 2.5.1-7   NONE                       STRATIGRAPHIC CORRELATION CHART FOR THE SITE AND SURROUNDING REGION           N/A       N/A Page 5 of 83
MPS-3 FSAR Page 5 of 83 2.4-30 FIGURE 2.4-30 JULY 1997 SETDOWN VERSUS WIND SPEED N/A N/A 2.4-31 FIGURE 2.4-31 NONE BOUNDARY OF THE MODELED AREA N/A N/A 2.4-32 FIGURE 2.4-32 NONE ONSITE WELL LOCATIONS N/A N/A 2.4-33 FIGURE 2.4-33 NONE PROBABLE SEEPAGE PATH FROM BORON RECOVERY TANK AND WASTE DISPOSAL BUILDING TO LONG ISLAND SOUND N/A N/A 2.4-34 FIGURE 2.4-34 AMENDMENT 6 JANUARY 1984 SCUPPER DETAILS-CONTROL, HYDROGEN RECOMBINER AND CONTAINMENT ENCLOSURE N/A N/A 2.4-35 FIGURE 2.4-35 AMENDMENT 6 JANUARY 1984 ROOF PLUG SEALING DETAIL - HYDROGEN RECOMBINER BUILDING N/A N/A 2.4-36 FIGURE 2.4-36 AMENDMENT 6 JANUARY 1984 HATCH COVER DETAILS - CIRCULATING WATER PUMPHOUSE SERVICE WATER PUMP CUBICLE N/A N/A 2.4-37 FIGURE 2.4-37 AMENDMENT 9 JULY 1984 HATCH COVER DETAILS - CONTROL BUILDING MECHANICAL ROOM N/A N/A 2.5.1-1 FIGURE 2.5.1-1 NONE REGIONAL PHYSIOGRAPHIC MAP N/A N/A 2.5.1-2 FIGURE 2.5.1-2 NONE REGIONAL PRE-PLEISTOCENE SEDIMENTS OF THE CONTINENTAL MARGIN N/A N/A 2.5.1-3 FIGURE 2.5.1-3 NONE SITE SURFICIAL GEOLOGY N/A N/A 2.5.1-4 FIGURE 2.5.1-4 NONE REGIONAL GEOLOGIC MAP N/A N/A 2.5.1-5 FIGURE 2.5.1-5 NONE REGIONAL GEOLOCIC SECTION N/A N/A 2.5.1-6 FIGURE 2.5.1-6 NONE REGIONAL TECTONIC MAP N/A N/A 2.5.1-7 FIGURE 2.5.1-7 NONE STRATIGRAPHIC CORRELATION CHART FOR THE SITE AND SURROUNDING REGION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                      Drawing FIGURE LABEL                DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                                      Number 2.5.1-8   FIGURE 2.5.1-8 (Sh. 1 of 3) NONE                     REGIONAL STRATIGRAPHIC CORRELATION CHART                                     N/A       1 OF 3 2.5.1-8   FIGURE 2.5.1-8 (Sh. 2 of 3) NONE                     REGIONAL STRATIGRAPHIC CORRELATION CHART                                     N/A       2 OF 3 2.5.1-8   FIGURE 2.5.1-8 (Sh. 3 of 3) NONE                     REGIONAL STRATIGRAPHIC CORRELATION CHART                                     N/A       3 OF 3 LANDSAT PHOTOGRAPHS OF CONNECTICUT, RHODE ISLAND,SOUTHERN MASSACHUSETTS, AND 2.5.1-9   FIGURE 2.5.1-9             NONE                                                                                                 N/A       N/A EASTERN NEW YORK 2.5.1-10 FIGURE 2.5.1-10             NONE                     LINEAMENT MAP FROM LANDSAT PHOTOGRAPHS                                       N/A       N/A 2.5.1-11 FIGURE 2.5.1-11             NONE                     REGIONAL AEROMAGNETIC MAP                                                   N/A       N/A 2.5.1-12 FIGURE 2.5.1-12             NONE                     REGIONAL BOUGUER GRAVITY MAP                                                 N/A       N/A 2.5.1-13 FIGURE 2.5.1-13             NONE                     SITE BEDROCK GEOLOGY                                                         N/A       N/A 2.5.1-14 FIGURE 2.5.1-14             NONE                     TECTONIC MAP OF EASTERN CONNECTICUT                                         N/A       N/A 2.5.1-15 FIGURE 2.5.1-15             NONE                     CONTOUR DIAGRAM OF POLES TO FOLIATION PLANES - FINAL GRADE                   N/A       N/A 2.5.1-16 FIGURE 2.5.1-16             NONE                     CONTOUR DIAGRAM OF POLES TO JOINT PLANES - FINAL GRADE                       N/A       N/A 2.5.1-17 FIGURE 2.5.1-17             NONE                     CONTOUR PLOT OF BEARING AND PLUNGE OF SLICKENSIDES FINAL GRADE               N/A       N/A 2.5.1-18 FIGURE 2.5.1-18             NONE                     GENERALIZED LOCATION OF FAULTS                                               N/A       N/A 2.5.2-1   FIGURE 2.5.2-1             NONE                     LOCATION OF SEISMIC STATIONS                                                 N/A       N/A 2.5.2-2   FIGURE 2.5.2-2             NONE                     EPICENTERS OF EARTHQUAKES WITHIN 200 MILE RADIUS                             N/A       N/A Page 6 of 83
MPS-3 FSAR Page 6 of 83 2.5.1-8 FIGURE 2.5.1-8 (Sh. 1 of 3)
NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 1 OF 3 2.5.1-8 FIGURE 2.5.1-8 (Sh. 2 of 3)
NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 2 OF 3 2.5.1-8 FIGURE 2.5.1-8 (Sh. 3 of 3)
NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 3 OF 3 2.5.1-9 FIGURE 2.5.1-9 NONE LANDSAT PHOTOGRAPHS OF CONNECTICUT, RHODE ISLAND,SOUTHERN MASSACHUSETTS, AND EASTERN NEW YORK N/A N/A 2.5.1-10 FIGURE 2.5.1-10 NONE LINEAMENT MAP FROM LANDSAT PHOTOGRAPHS N/A N/A 2.5.1-11 FIGURE 2.5.1-11 NONE REGIONAL AEROMAGNETIC MAP N/A N/A 2.5.1-12 FIGURE 2.5.1-12 NONE REGIONAL BOUGUER GRAVITY MAP N/A N/A 2.5.1-13 FIGURE 2.5.1-13 NONE SITE BEDROCK GEOLOGY N/A N/A 2.5.1-14 FIGURE 2.5.1-14 NONE TECTONIC MAP OF EASTERN CONNECTICUT N/A N/A 2.5.1-15 FIGURE 2.5.1-15 NONE CONTOUR DIAGRAM OF POLES TO FOLIATION PLANES - FINAL GRADE N/A N/A 2.5.1-16 FIGURE 2.5.1-16 NONE CONTOUR DIAGRAM OF POLES TO JOINT PLANES - FINAL GRADE N/A N/A 2.5.1-17 FIGURE 2.5.1-17 NONE CONTOUR PLOT OF BEARING AND PLUNGE OF SLICKENSIDES FINAL GRADE N/A N/A 2.5.1-18 FIGURE 2.5.1-18 NONE GENERALIZED LOCATION OF FAULTS N/A N/A 2.5.2-1 FIGURE 2.5.2-1 NONE LOCATION OF SEISMIC STATIONS N/A N/A 2.5.2-2 FIGURE 2.5.2-2 NONE EPICENTERS OF EARTHQUAKES WITHIN 200 MILE RADIUS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                Drawing FIGURE LABEL      DATE / Revision [ ]                                        TITLE                                  SHEET Number                                                                                                                  Number 2.5.2-3   FIGURE 2.5.2-3   NONE                     LOCATION OF EARTHQUAKES WITHIN THE 50 MILE RADIUS                 N/A       N/A 2.5.2-4   FIGURE 2.5.2-4   NONE                     ISOSEISMAL MAP EARHQUAKE OF NOVEMBER 9, 1727                       N/A       N/A 2.5.2-5   FIGURE 2.5.2-5   NONE                     ISOSEISMAL MAP EARTHQUAKE OF NOVEMBER 18, 1755                     N/A       N/A 2.5.2-6   FIGURE 2.5.2-6   NONE                     ISOSEISMAL MAP EARTHQUAKE OF MAY 16, 1791                         N/A       N/A 2.5.2-7   FIGURE 2.5.2-7   NONE                     ISOSEISMAL MAP EARTHQUAKE OF AUGUST 10, 1884                       N/A       N/A 2.5.2-8   FIGURE 2.5.2-8   NONE                     ISOSEISMAL MAP EARTHQUAKE OF MARCH 1, 1925 (FEBRUARY 28, 1925 EST) N/A       N/A 2.5.2-9   FIGURE 2.5.2-9   NONE                     ISOSEISMAL MAP EARTHQUAKE OF DECEMBER 20 AND 24, 1940             N/A       N/A 2.5.2-10 FIGURE 2.5.2-10 NONE                     TECTONIC PROVINCES                                                 N/A       N/A 2.5.3-1   FIGURE 2.5.3-1   NONE                     T-2 FAULT ZONE FINAL EXCAVATION GRADE NORTHERN SECTION             N/A       N/A 2.5.3-2   FIGURE 2.5.3-2   NONE                     T-2 FAULT ZONE FINAL EXCAVATION GRADE SOUTHERN SECTION             N/A       N/A 2.5.3-3   FIGURE 2.5.3-3   NONE                     T-3 FAULT ZONE FINAL EXCAVATION GRADE                             N/A       N/A 2.5.4-1   FIGURE 2.5.4-1   NONE                     GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - EAST       N/A       N/A 2.5.4-2   FIGURE 2.5.4-2   NONE                     GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - WEST       N/A       N/A 2.5.4-3   FIGURE 2.5.4-3   NONE                     GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL         N/A       N/A 2.5.4-4   FIGURE 2.5.4-4   NONE                     GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL         N/A       N/A Page 7 of 83
MPS-3 FSAR Page 7 of 83 2.5.2-3 FIGURE 2.5.2-3 NONE LOCATION OF EARTHQUAKES WITHIN THE 50 MILE RADIUS N/A N/A 2.5.2-4 FIGURE 2.5.2-4 NONE ISOSEISMAL MAP EARHQUAKE OF NOVEMBER 9, 1727 N/A N/A 2.5.2-5 FIGURE 2.5.2-5 NONE ISOSEISMAL MAP EARTHQUAKE OF NOVEMBER 18, 1755 N/A N/A 2.5.2-6 FIGURE 2.5.2-6 NONE ISOSEISMAL MAP EARTHQUAKE OF MAY 16, 1791 N/A N/A 2.5.2-7 FIGURE 2.5.2-7 NONE ISOSEISMAL MAP EARTHQUAKE OF AUGUST 10, 1884 N/A N/A 2.5.2-8 FIGURE 2.5.2-8 NONE ISOSEISMAL MAP EARTHQUAKE OF MARCH 1, 1925 (FEBRUARY 28, 1925 EST)
N/A N/A 2.5.2-9 FIGURE 2.5.2-9 NONE ISOSEISMAL MAP EARTHQUAKE OF DECEMBER 20 AND 24, 1940 N/A N/A 2.5.2-10 FIGURE 2.5.2-10 NONE TECTONIC PROVINCES N/A N/A 2.5.3-1 FIGURE 2.5.3-1 NONE T-2 FAULT ZONE FINAL EXCAVATION GRADE NORTHERN SECTION N/A N/A 2.5.3-2 FIGURE 2.5.3-2 NONE T-2 FAULT ZONE FINAL EXCAVATION GRADE SOUTHERN SECTION N/A N/A 2.5.3-3 FIGURE 2.5.3-3 NONE T-3 FAULT ZONE FINAL EXCAVATION GRADE N/A N/A 2.5.4-1 FIGURE 2.5.4-1 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - EAST N/A N/A 2.5.4-2 FIGURE 2.5.4-2 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - WEST N/A N/A 2.5.4-3 FIGURE 2.5.4-3 NONE GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-4 FIGURE 2.5.4-4 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                        Drawing FIGURE LABEL      DATE / Revision [ ]                                      TITLE                                            SHEET Number                                                                                                                          Number 2.5.4-5   FIGURE 2.5.4-5   NONE                     GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL                 N/A       N/A 2.5.4-6   FIGURE 2.5.4-6   NONE                     GEOLOGIC MAP OF FINAL GRADE - FLOORS OF STRUCTURES                         N/A       N/A 2.5.4-7   FIGURE 2.5.4-7   NONE                     GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - WEST               N/A       N/A 2.5.4-8   FIGURE 2.5.4-8   NONE                     GEOLOGIC MAP OF FINAL GRADE PUMPHOUSE FLOOR                               N/A       N/A 2.5.4-9   FIGURE 2.5.4-9   NONE                     GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - EAST               N/A       N/A 2.5.4-10 FIGURE 2.5.4-10 NONE                     GEOLOGIC MAP OF FINAL GRADE SOUTHEAST QUADRANT OF CONTAINMENT WALLS       N/A       N/A 2.5.4-11 FIGURE 2.5.4-11 NONE                     GEOLOGIC MAP OF FINAL GRADE SOUTHWEST QUADRANT OF CONTAINMENT WALLS       N/A       N/A 2.5.4-12 FIGURE 2.5.4-12 NONE                     GEOLOGIC MAP OF FINAL GRADE NORTHWEST QUADRANT OF CONTAINMENT WALLS       N/A       N/A 2.5.4-13 FIGURE 2.5.4-13 NONE                     GEOLOGIC MAP OF FINAL GRADE NORTHEAST QUADRANT OF CONTAINMENT WALLS       N/A       N/A 2.5.4-14 FIGURE 2.5.4-14 NONE                     GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING SUMP WELLS N/A       N/A 2.5.4-15 FIGURE 2.5.4-15 NONE                     GEOLOGIC MAP OF FINAL GRADE AUXILIARY BUILDING PIPE TUNNEL PIT WALLS       N/A       N/A 2.5.4-16 FIGURE 2.5.4-16 NONE                     GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF EXCAVATION                       N/A       N/A 2.5.4-17 FIGURE 2.5.4-17 NONE                     GEOLOGIC MAP OF FINAL GRADE NORTHEAST AND SOUTHEAST PUMPHOUSE WALLS       N/A       N/A 2.5.4-18 FIGURE 2.5.4-18 NONE                     GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING WALLS     N/A       N/A 2.5.4-19 FIGURE 2.5.4-19 NONE                     GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR                         N/A       N/A Page 8 of 83
MPS-3 FSAR Page 8 of 83 2.5.4-5 FIGURE 2.5.4-5 NONE GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-6 FIGURE 2.5.4-6 NONE GEOLOGIC MAP OF FINAL GRADE - FLOORS OF STRUCTURES N/A N/A 2.5.4-7 FIGURE 2.5.4-7 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - WEST N/A N/A 2.5.4-8 FIGURE 2.5.4-8 NONE GEOLOGIC MAP OF FINAL GRADE PUMPHOUSE FLOOR N/A N/A 2.5.4-9 FIGURE 2.5.4-9 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - EAST N/A N/A 2.5.4-10 FIGURE 2.5.4-10 NONE GEOLOGIC MAP OF FINAL GRADE SOUTHEAST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-11 FIGURE 2.5.4-11 NONE GEOLOGIC MAP OF FINAL GRADE SOUTHWEST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-12 FIGURE 2.5.4-12 NONE GEOLOGIC MAP OF FINAL GRADE NORTHWEST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-13 FIGURE 2.5.4-13 NONE GEOLOGIC MAP OF FINAL GRADE NORTHEAST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-14 FIGURE 2.5.4-14 NONE GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING SUMP WELLS N/A N/A 2.5.4-15 FIGURE 2.5.4-15 NONE GEOLOGIC MAP OF FINAL GRADE AUXILIARY BUILDING PIPE TUNNEL PIT WALLS N/A N/A 2.5.4-16 FIGURE 2.5.4-16 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF EXCAVATION N/A N/A 2.5.4-17 FIGURE 2.5.4-17 NONE GEOLOGIC MAP OF FINAL GRADE NORTHEAST AND SOUTHEAST PUMPHOUSE WALLS N/A N/A 2.5.4-18 FIGURE 2.5.4-18 NONE GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING WALLS N/A N/A 2.5.4-19 FIGURE 2.5.4-19 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                            SHEET Number                                                                                                                              Number 2.5.4-20 FIGURE 2.5.4-20       NONE                     GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR                       N/A       N/A 2.5.4-21 FIGURE 2.5.4-21       NONE                     GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL               N/A       N/A 2.5.4-22 FIGURE 2.5.4-22       NONE                     GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL               N/A       N/A 2.5.4-23 FIGURE 2.5.4-23       NONE                     GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR                       N/A       N/A 2.5.4-24 FIGURE 2.5.4-24       NONE                     GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR                       N/A       N/A 2.5.4-25 FIGURE 2.5.4-25       NONE                     GEOLOGIC MAP OF FINAL GRADE WEST WALL OF DISCHARGE TUNNEL                 N/A       N/A 2.5.4-26 FIGURE 2.5.4-26       NONE                     GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL                 N/A       N/A 2.5.4-27 FIGURE 2.5.4-27       NONE                     GEOLOGIC MAP OF FINAL GRADE DISCHARGE WEIR ROCK FACE                     N/A       N/A 2.5.4-28 FIGURE 2.5.4-28       NONE                     CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS ONSHORE BORING COMPOSITE   N/A       N/A 2.5.4-29 FIGURE 2.5.4-29       NONE                     CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS BORINGS P1 TO P8 COMPOSITE N/A       N/A 2.5.4-30 FIGURE 2.5.4-30 SH. 1 NONE                     GRAIN SIZE DISTRIBUTION CURVES                                           N/A       1 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 2 NONE                     GRAIN SIZE DISTRIBUTION CURVES                                           N/A       2 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 3 NONE                     GRAIN SIZE DISTRIBUTION CURVES                                           N/A       3 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 4 NONE                     GRAIN SIZE DISTRIBUTION CURVES                                           N/A       4 OF 4 2.5.4-31 FIGURE 2.5.4-31       AMENDMENT 5 NOVEMBER 1983 BORING LOCATION PLAN                                                     N/A       N/A Page 9 of 83
MPS-3 FSAR Page 9 of 83 2.5.4-20 FIGURE 2.5.4-20 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-21 FIGURE 2.5.4-21 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-22 FIGURE 2.5.4-22 NONE GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-23 FIGURE 2.5.4-23 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-24 FIGURE 2.5.4-24 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-25 FIGURE 2.5.4-25 NONE GEOLOGIC MAP OF FINAL GRADE WEST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-26 FIGURE 2.5.4-26 NONE GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-27 FIGURE 2.5.4-27 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE WEIR ROCK FACE N/A N/A 2.5.4-28 FIGURE 2.5.4-28 NONE CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS ONSHORE BORING COMPOSITE N/A N/A 2.5.4-29 FIGURE 2.5.4-29 NONE CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS BORINGS P1 TO P8 COMPOSITE N/A N/A 2.5.4-30 FIGURE 2.5.4-30 SH. 1 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 1 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 2 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 2 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 3 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 3 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 4 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 4 OF 4 2.5.4-31 FIGURE 2.5.4-31 AMENDMENT 5 NOVEMBER 1983 BORING LOCATION PLAN N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                    Drawing FIGURE LABEL      DATE / Revision [ ]                                          TITLE                                  SHEET Number                                                                                                                    Number 2.5.4-32 FIGURE 2.5.4-32 NONE                     PLOT PLAN SHOWING LOCATIONS OF THE BORINGS AND THE GEOLOGIC SECTIONS N/A       N/A 2.5.4-33 FIGURE 2.5.4-33 NONE                     GEOLOGIC PROFILE SECTIONS A-A' AND B-B'                             N/A       N/A 2.5.4-34 FIGURE 2.5.4-34 AUGUST 1996               GEOLOGIC PROFILE, SECTIONS C-C', D-D', AND E'E'                     N/A       N/A 2.5.4-35 FIGURE 2.5.4-35 NONE                     GEOLOGIC PROFILE - SECTIONS F-F' AND G-G'                           N/A       N/A 2.5.4-36 FIGURE 2.5.4-36 AMENDMENT 3 AUGUST 1983   TOP OF BASAL TILL CONTOUR MAP                                       N/A       N/A 2.5.4-37 FIGURE 2.5.4-37 NONE                     GROUNDWATER CONTOUR MAP                                             N/A       N/A 2.5.4-38 FIGURE 2.5.4-38 NONE                     GROUNDWATER OBSERVATION IN BOREHOLES                                 N/A       N/A 2.5.4-39 FIGURE 2.5.4-39 AMENDMENT 3 AUGUST 1983   BEDROCK SURFACE CONTOUR MAP                                         N/A       N/A 2.5.4-40 FIGURE 2.5.4-40 AMENDMENT 3 AUGUST 1983   GENERAL EXCAVATION PLAN                                             N/A       N/A 2.5.4-41 FIGURE 2.5.4-41 AMENDMENT 14 JULY 1985   SHOREFRONT & DREDGING PLAN                                           N/A       N/A 2.5.4-42 FIGURE 2.5.4-42 NONE                     MODULUS VERSUS EFFECTIVE CONFINING PRESSURE STRUCTURAL FILL         N/A       N/A 2.5.4-43 FIGURE 2.5.4-43 AMENDMENT 3 AUGUST 1983   LATERAL PRESSURE DISTRIBUTION                                       N/A       N/A 2.5.4-44 FIGURE 2.5.4-44 NONE                     GRADATON CURVES FORE CATEGORY I STRUCTURAL FILL                     N/A       N/A 2.5.4-45 FIGURE 2.5.4-45 NONE                     K2 VERSUS SHEAR STRAIN FOR BEACH SANDS                               N/A       N/A 2.5.4-46 FIGURE 2.5.4-46 NONE                     EARTHQUAKE INDUCED SHEAR STRESSES IN BEACH SANDS                     N/A       N/A Page 10 of 83
MPS-3 FSAR Page 10 of 83 2.5.4-32 FIGURE 2.5.4-32 NONE PLOT PLAN SHOWING LOCATIONS OF THE BORINGS AND THE GEOLOGIC SECTIONS N/A N/A 2.5.4-33 FIGURE 2.5.4-33 NONE GEOLOGIC PROFILE SECTIONS A-A' AND B-B' N/A N/A 2.5.4-34 FIGURE 2.5.4-34 AUGUST 1996 GEOLOGIC PROFILE, SECTIONS C-C', D-D', AND E'E' N/A N/A 2.5.4-35 FIGURE 2.5.4-35 NONE GEOLOGIC PROFILE - SECTIONS F-F' AND G-G' N/A N/A 2.5.4-36 FIGURE 2.5.4-36 AMENDMENT 3 AUGUST 1983 TOP OF BASAL TILL CONTOUR MAP N/A N/A 2.5.4-37 FIGURE 2.5.4-37 NONE GROUNDWATER CONTOUR MAP N/A N/A 2.5.4-38 FIGURE 2.5.4-38 NONE GROUNDWATER OBSERVATION IN BOREHOLES N/A N/A 2.5.4-39 FIGURE 2.5.4-39 AMENDMENT 3 AUGUST 1983 BEDROCK SURFACE CONTOUR MAP N/A N/A 2.5.4-40 FIGURE 2.5.4-40 AMENDMENT 3 AUGUST 1983 GENERAL EXCAVATION PLAN N/A N/A 2.5.4-41 FIGURE 2.5.4-41 AMENDMENT 14 JULY 1985 SHOREFRONT & DREDGING PLAN N/A N/A 2.5.4-42 FIGURE 2.5.4-42 NONE MODULUS VERSUS EFFECTIVE CONFINING PRESSURE STRUCTURAL FILL N/A N/A 2.5.4-43 FIGURE 2.5.4-43 AMENDMENT 3 AUGUST 1983 LATERAL PRESSURE DISTRIBUTION N/A N/A 2.5.4-44 FIGURE 2.5.4-44 NONE GRADATON CURVES FORE CATEGORY I STRUCTURAL FILL N/A N/A 2.5.4-45 FIGURE 2.5.4-45 NONE K2 VERSUS SHEAR STRAIN FOR BEACH SANDS N/A N/A 2.5.4-46 FIGURE 2.5.4-46 NONE EARTHQUAKE INDUCED SHEAR STRESSES IN BEACH SANDS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL            DATE / Revision [ ]                                        TITLE                                              SHEET Number                                                                                                                                    Number 2.5.4-47 FIGURE 2.5.4-47       JUNE 1997                 CYCLIC STRESS RATION VS CONFINING PRESSURE FOR BEACH SANDS                   N/A       N/A 2.5.4-48 FIGURE 2.5.4-48       NONE                       CYCLIC STRESS RATION VS PENETRATIJON RESISTANCE OF SAND                       N/A       N/A 2.5.4-49 FIGURE 2.5.4-49       NONE                       FACTOR OF SAFETY AGAINST LIQUIFACTION OF BEACH SANDS                         N/A       N/A IDEALIZED SOIL PROFILE LIQUEFACTION ANALYSIS OF ABLATION TILL UNDER DISCHARGE 2.5.4-50 FIGURE 2.5.4-50       NONE                                                                                                     N/A       N/A TUNNEL 2.5.4-51 FIGURE 2.5.4-51       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION H-H'                                                 N/A       N/A 2.5.4-52 FIGURE 2.5.4-52       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION I-I'                                                 N/A       N/A 2.5.4-53 FIGURE 2.5.4-53       AMENDMENT 5 NOVEMBER 1983 LOCATION OF FIELD DENSITY TESTS SERVICE WATER INTAKE LINE                     N/A       N/A LOCATION OF FIELD DENSITY TESTS EMERGENCY GENERATORE ENCLOSURE AND CONTROL 2.5.4-54 FIGURE 2.5.4-54       AMENDMENT 14 JULY 1985                                                                                   N/A       N/A BUILDING 2.5.4-55 FIGURE 2.5.4-55       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION J-J'                                                 N/A       N/A 2.5.4-56 FIGURE 2.5.4-56       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION K-K'                                                 N/A       N/A 2.5.4-57 FIGURE 2.5.4-57 SH. 1 AMENDMENT 3 AUGUST 1983   GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS                   N/A       1 OF 2 2.5.4-57 FIGURE 2.5.4-57 SH. 2 AMENDMENT 3 AUGUST 1983   GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS                   N/A       2 OF 2 EQUIVALENT NUBERS OF UNIFOREM STRESS CYCLES BASED ON STRONGES COMPONENTS OF 2.5.4-58 FIGURE 2.5.4-58       AMENDMENT 3 AUGUST 1983                                                                                 N/A       N/A GROUND MOTION 2.5.4-59 FIGURE 2.5.4-59       AMENDMENT 3 AUGUST 1983   PLAN OF SETTLEMENT MONITORING BENCHMARK LOCATIONS                             N/A       N/A 2.5.4-60 FIGURE 2.5.4-60 SH. 1 AMENDMENT 3 AUGUST 1983   CONTROL BUILDING SETTLEMENT                                                   N/A       1 OF 2 Page 11 of 83
MPS-3 FSAR Page 11 of 83 2.5.4-47 FIGURE 2.5.4-47 JUNE 1997 CYCLIC STRESS RATION VS CONFINING PRESSURE FOR BEACH SANDS N/A N/A 2.5.4-48 FIGURE 2.5.4-48 NONE CYCLIC STRESS RATION VS PENETRATIJON RESISTANCE OF SAND N/A N/A 2.5.4-49 FIGURE 2.5.4-49 NONE FACTOR OF SAFETY AGAINST LIQUIFACTION OF BEACH SANDS N/A N/A 2.5.4-50 FIGURE 2.5.4-50 NONE IDEALIZED SOIL PROFILE LIQUEFACTION ANALYSIS OF ABLATION TILL UNDER DISCHARGE TUNNEL N/A N/A 2.5.4-51 FIGURE 2.5.4-51 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION H-H' N/A N/A 2.5.4-52 FIGURE 2.5.4-52 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION I-I' N/A N/A 2.5.4-53 FIGURE 2.5.4-53 AMENDMENT 5 NOVEMBER 1983 LOCATION OF FIELD DENSITY TESTS SERVICE WATER INTAKE LINE N/A N/A 2.5.4-54 FIGURE 2.5.4-54 AMENDMENT 14 JULY 1985 LOCATION OF FIELD DENSITY TESTS EMERGENCY GENERATORE ENCLOSURE AND CONTROL BUILDING N/A N/A 2.5.4-55 FIGURE 2.5.4-55 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION J-J' N/A N/A 2.5.4-56 FIGURE 2.5.4-56 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION K-K' N/A N/A 2.5.4-57 FIGURE 2.5.4-57 SH. 1 AMENDMENT 3 AUGUST 1983 GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS N/A 1 OF 2 2.5.4-57 FIGURE 2.5.4-57 SH. 2 AMENDMENT 3 AUGUST 1983 GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS N/A 2 OF 2 2.5.4-58 FIGURE 2.5.4-58 AMENDMENT 3 AUGUST 1983 EQUIVALENT NUBERS OF UNIFOREM STRESS CYCLES BASED ON STRONGES COMPONENTS OF GROUND MOTION N/A N/A 2.5.4-59 FIGURE 2.5.4-59 AMENDMENT 3 AUGUST 1983 PLAN OF SETTLEMENT MONITORING BENCHMARK LOCATIONS N/A N/A 2.5.4-60 FIGURE 2.5.4-60 SH. 1 AMENDMENT 3 AUGUST 1983 CONTROL BUILDING SETTLEMENT N/A 1 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                          Drawing FIGURE LABEL          DATE / Revision [ ]                                          TITLE                                      SHEET Number                                                                                                                            Number 2.5.4-60 FIGURE 2.5.4-60 SH. 2 AMENDMENT 3 AUGUST 1983     CONTROL BUILDING SETTLEMENT                                         N/A       2 OF 2 2.5.4-61 FIGURE 2.5.4-61       AMENDMENT 3 AUGUST 1983     EMERGENCY GENERATOR ENCLOSURE SETTLEMENT                             N/A       N/A 2.5.4-62 FIGURE 2.5.4-62       AMENDMENT 3 AUGUST 1983     SOLID WASTE BUILDING SETTLEMENT                                     N/A       N/A 2.5.4-63 FIGURE 2.5.4-63       AMENDMENT 3 AUGUST 1983     LIQUID WASTE BUILDING SETTLEMENT                                     N/A       N/A 2.5.4-64 FIGURE 2.5.4-64       AMENDMENT 3 AUGUST 1983     FUEL BUILDING SETTLEMENT                                             N/A       N/A 2.5.4-65 FIGURE 2.5.4-65       AMENDMENT 5 NOVEMBER 1983   GEOLOGIC PROFILE SECTION L-L'                                       N/A       N/A 2.5.4-66 FIGURE 2.5.4-66       AMENDMENT 5 NOVEMBER 1983   GEOLOGIC PROFILE SECTION M-M'                                       N/A       N/A 2.5.4-67 FIGURE 2.5.4-67       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION N-N'                                       N/A       N/A 2.5.4-68 FIGURE 2.5.4-68       AMENDMENT 5 NOVEMBER 1983   GEOLOGIC PROFILE SECTION O-O'                                       N/A       N/A 2.5.4-69 FIGURE 2.5.4-69       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION P-P'                                       N/A       N/A 2.5.4-70 FIGURE 2.5.4-70       AMENDMENT 8 MAY 1984       GEOLOGIC PROFILE SECTION Q-Q'                                       N/A       N/A 2.5.4-71 FIGURE 2.5.4-71       AMENDMENT 15 SEPTEMBER 1985 GEOLOGIC PROFILE SECTION R-R'                                       N/A       N/A 2.5.4-72 FIGURE 2.5.4-72       AMENDMENT 8 MAY 1984       SOIL - STRUCTURE INTERACTION EMERGENCY GENERATOR ENCLOSURE           N/A       N/A 2.5.4-73 FIGURE 2.5.4-73       AMENDMENT 8 MAY 1984       SHEAR MODULUS CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL) N/A       N/A 2.5.4-74 FIGURE 2.5.4-74       AMENDMENT 8 MAY 1984       DAMPING CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL)       N/A       N/A Page 12 of 83
MPS-3 FSAR Page 12 of 83 2.5.4-60 FIGURE 2.5.4-60 SH. 2 AMENDMENT 3 AUGUST 1983 CONTROL BUILDING SETTLEMENT N/A 2 OF 2 2.5.4-61 FIGURE 2.5.4-61 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE SETTLEMENT N/A N/A 2.5.4-62 FIGURE 2.5.4-62 AMENDMENT 3 AUGUST 1983 SOLID WASTE BUILDING SETTLEMENT N/A N/A 2.5.4-63 FIGURE 2.5.4-63 AMENDMENT 3 AUGUST 1983 LIQUID WASTE BUILDING SETTLEMENT N/A N/A 2.5.4-64 FIGURE 2.5.4-64 AMENDMENT 3 AUGUST 1983 FUEL BUILDING SETTLEMENT N/A N/A 2.5.4-65 FIGURE 2.5.4-65 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION L-L' N/A N/A 2.5.4-66 FIGURE 2.5.4-66 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION M-M' N/A N/A 2.5.4-67 FIGURE 2.5.4-67 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION N-N' N/A N/A 2.5.4-68 FIGURE 2.5.4-68 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION O-O' N/A N/A 2.5.4-69 FIGURE 2.5.4-69 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION P-P' N/A N/A 2.5.4-70 FIGURE 2.5.4-70 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION Q-Q' N/A N/A 2.5.4-71 FIGURE 2.5.4-71 AMENDMENT 15 SEPTEMBER 1985 GEOLOGIC PROFILE SECTION R-R' N/A N/A 2.5.4-72 FIGURE 2.5.4-72 AMENDMENT 8 MAY 1984 SOIL - STRUCTURE INTERACTION EMERGENCY GENERATOR ENCLOSURE N/A N/A 2.5.4-73 FIGURE 2.5.4-73 AMENDMENT 8 MAY 1984 SHEAR MODULUS CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL)
N/A N/A 2.5.4-74 FIGURE 2.5.4-74 AMENDMENT 8 MAY 1984 DAMPING CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL)
N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                        Drawing FIGURE LABEL                  DATE / Revision [ ]                                        TITLE                            SHEET Number                                                                                                                        Number 2.5.4-75 FIGURE 2.5.4-75             AMENDMENT 9 JULY 1984     SHOREFRONT PROFILE USED IN LIQUEFACTION ANALYSES             N/A       N/A 2.5.5-1   FIGURE 2.5.5-1             JANUARY 1998               SECTION THROUGH SHOREFRONT                                   N/A       N/A 2.5.5-2   FIGURE 2.5.5-2             NONE                       TYPICAL WEDGE GEOMETRY                                       N/A       N/A 2.5.5-3   FIGURE 2.5.5-3             NONE                       DESIGN LOADS FOR RING BEAM                                   N/A       N/A 2.5.5-4   FIGURE 2.5.5-4             JANUARY 1998               SHOREFRONT SLOPE STABILITY SECTION - SLOPING ROCK PROFILE   N/A       N/A 2.5.5-5   FIGURE 2.5.5-5             AMENDMENT 8 MAY 1984      
MPS-3 FSAR Page 13 of 83 2.5.4-75 FIGURE 2.5.4-75 AMENDMENT 9 JULY 1984 SHOREFRONT PROFILE USED IN LIQUEFACTION ANALYSES N/A N/A 2.5.5-1 FIGURE 2.5.5-1 JANUARY 1998 SECTION THROUGH SHOREFRONT N/A N/A 2.5.5-2 FIGURE 2.5.5-2 NONE TYPICAL WEDGE GEOMETRY N/A N/A 2.5.5-3 FIGURE 2.5.5-3 NONE DESIGN LOADS FOR RING BEAM N/A N/A 2.5.5-4 FIGURE 2.5.5-4 JANUARY 1998 SHOREFRONT SLOPE STABILITY SECTION - SLOPING ROCK PROFILE N/A N/A 2.5.5-5 FIGURE 2.5.5-5 AMENDMENT 8 MAY 1984


==SUMMARY==
==SUMMARY==
OF CIU TEST RESULTS - BEACH AREA OUTWASH SANDS       N/A       N/A 2.5.5-6   FIGURE 2.5.5-6             AMENDMENT 8 MAY 1984       POTENTIAL FAILURE WEDGES WEST SIDE OF CONTAINMENT EXCAVATION N/A       N/A 2.5.5-7   FIGURE 2.5.5-7             AMENDMENT 8 MAY 1984       ROCK SURFACE NEAR NORTH EDGE OF MAIN STEAM VALVE BUILDING   N/A       N/A 3.2-1     FIGURE 3.2-1               NONE                       LINE DESINATION, SAFETY CLASS BOUNDARIES                     N/A       N/A 3.3-1     FIGURE 3.3-1               AMENDMENT 11 NOVEMBER 1984 DYNAMIC LOAD FACTOR CURVE FOR TORNADO PRESSURE DROP         N/A       N/A 3.4-1     FIGURE 3.4-1 (Sheet 1 of 4) OCTOBER 1997               CIRCULATING AND SERVICE WATER PUMPHOUSE                     N/A       1 OF 4 3.4-1     FIGURE 3.4-1 (Sheet 2 of 4) NONE                       CIRCULATING AND SERVICE WATER PUMPHOUSE                     N/A       2 OF 4 3.4-1     FIGURE 3.4-1 (Sheet 3 of 4) NONE                       CIRCULATING AND SERVICE WATER PUMPHOUSE                     N/A       3 OF 4 3.4-1     FIGURE 3.4-1 (Sheet 4 of 4) NONE                       CIRCULATING AND SERVICE WATER PUMPHOUSE                     N/A       4 OF 4 3.5-1     FIGURE 3.5-1               NONE                       TURBINE PLACEMENT & ORIENTATION FOR THREE UNIT SITE         N/A       N/A Page 13 of 83
OF CIU TEST RESULTS - BEACH AREA OUTWASH SANDS N/A N/A 2.5.5-6 FIGURE 2.5.5-6 AMENDMENT 8 MAY 1984 POTENTIAL FAILURE WEDGES WEST SIDE OF CONTAINMENT EXCAVATION N/A N/A 2.5.5-7 FIGURE 2.5.5-7 AMENDMENT 8 MAY 1984 ROCK SURFACE NEAR NORTH EDGE OF MAIN STEAM VALVE BUILDING N/A N/A 3.2-1 FIGURE 3.2-1 NONE LINE DESINATION, SAFETY CLASS BOUNDARIES N/A N/A 3.3-1 FIGURE 3.3-1 AMENDMENT 11 NOVEMBER 1984 DYNAMIC LOAD FACTOR CURVE FOR TORNADO PRESSURE DROP N/A N/A 3.4-1 FIGURE 3.4-1 (Sheet 1 of 4)
OCTOBER 1997 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 1 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 2 of 4)
NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 2 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 3 of 4)
NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 3 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 4 of 4)
NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 4 OF 4 3.5-1 FIGURE 3.5-1 NONE TURBINE PLACEMENT & ORIENTATION FOR THREE UNIT SITE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL            DATE / Revision [ ]                                        TITLE                                              SHEET Number                                                                                                                                    Number 3.5-2     FIGURE 3.5-2         NONE                       TURBINE PLACEMENT AND ORIENTATION PROFILE                                     N/A       N/A 3.5-3     FIGURE 3.5-3         [16]                       DELETED BY PKG FSC 02-MP3-013                                                 N/A       N/A 3.5-4     FIGURE 3.5-4         [16]                       DELETED BY PKG FSC 02-MP3-013                                                 N/A       N/A 3.5-5     FIGURE 3.5-5         [16]                       DELETED BY PKG FSC 02-MP3-013                                                 N/A       N/A 3.5-6     FIGURE 3.5-6         AMENDMENT 3 AUGUST 1983   MISSILE BARRIER BEAM COLUMN                                                   N/A       N/A 3.6-1     FIGURE 3.6-1         NONE                       FLUID SYSTEMS SUBJECTED TO BREAK AND CRACK ANALYSIS                           N/A       N/A 3.6-2     FIGURE 3.6-2         NONE                       RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 3 FEET - 8 INCHES N/A       N/A 3.6-3     FIGURE 3.6-3         [20.1]                     RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 24 FEET - 6 INCHES N/A       N/A 3.6-4     FIGURE 3.6-4         NONE                       RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 51 FEET - 4 INCHES N/A       N/A 3.6-5     FIGURE 3.6-5         NONE                       RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 1-1                 N/A       N/A 3.6-6     FIGURE 3.6-6         NONE                       RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 2-2                 N/A       N/A 3.6-7     FIGURE 3.6-7         NONE                       RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 3-3, 4-4             N/A       N/A 3.6-8     FIGURE 3.6-8         JANUARY 1998               MAIN STEAM SYSTEM                                                             N/A       N/A 3.6-8     NOTES TO FIGURE 3.6-8 [16]                       DATA FOR PIPE RUPTURE RESTRAINTS - MAIN STEAM SYSTEM                         N/A       N/A 3.6-9     FIGURE 3.6-9         NONE                       MAIN STEAM SYSTEM (CONTINUED)                                                 N/A       N/A Page 14 of 83
MPS-3 FSAR Page 14 of 83 3.5-2 FIGURE 3.5-2 NONE TURBINE PLACEMENT AND ORIENTATION PROFILE N/A N/A 3.5-3 FIGURE 3.5-3
[16]
DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-4 FIGURE 3.5-4
[16]
DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-5 FIGURE 3.5-5
[16]
DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-6 FIGURE 3.5-6 AMENDMENT 3 AUGUST 1983 MISSILE BARRIER BEAM COLUMN N/A N/A 3.6-1 FIGURE 3.6-1 NONE FLUID SYSTEMS SUBJECTED TO BREAK AND CRACK ANALYSIS N/A N/A 3.6-2 FIGURE 3.6-2 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 3 FEET - 8 INCHES N/A N/A 3.6-3 FIGURE 3.6-3
[20.1]
RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 24 FEET - 6 INCHES N/A N/A 3.6-4 FIGURE 3.6-4 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 51 FEET - 4 INCHES N/A N/A 3.6-5 FIGURE 3.6-5 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 1-1 N/A N/A 3.6-6 FIGURE 3.6-6 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 2-2 N/A N/A 3.6-7 FIGURE 3.6-7 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 3-3, 4-4 N/A N/A 3.6-8 FIGURE 3.6-8 JANUARY 1998 MAIN STEAM SYSTEM N/A N/A 3.6-8 NOTES TO FIGURE 3.6-8
[16]
DATA FOR PIPE RUPTURE RESTRAINTS - MAIN STEAM SYSTEM N/A N/A 3.6-9 FIGURE 3.6-9 NONE MAIN STEAM SYSTEM (CONTINUED)
N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                        Drawing FIGURE LABEL              DATE / Revision [ ]                                        TITLE                                                  SHEET Number                                                                                                                                          Number 3.6-10   FIGURE 3.6-10         JANUARY 1998               FEEDWATER SYSTEM POSTULATED PIPE RUPTURE LOCATIONS                                 N/A       N/A 3.6-11   FIGURE 3.6-11         JANUARY 1998               FEEDWATER SYTEM PIPE RUPTURE RESTRAINTS                                           N/A       N/A 3.6-11   NOTES TO FIGURE 3.6-11 [16]                       DATA FOR PIPE RUPTURE RESTRAINTS - MAIN FEEDWATER SYSTEM                           N/A       N/A 3.6-12   FIGURE 3.6-12         JANUARY 1998               REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING                                   N/A       N/A 3.6-12   NOTES TO FIGURE 3.6-12 [16])                     DATA FOR PIPE RUPTURE RESTRAINTS - REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING N/A       N/A REACTOR COOLANT SYSTEM - LOW PRESSURE SAFETY INJECTION & RESIDUAL HEAT REMOVAL 3.6-13   FIGURE 3.6-13         JANUARY 1998                                                                                                  N/A        N/A PIPING DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM, LOW PRESSURE SAFETY 3.6-13    NOTES TO FIGURE 3.6-13 [16]                                                                                                          N/A        N/A INJECTION, HIGH PRESSURE SAFETY INJECTION, AND RESIDUAL HEAT REMOVAL PIPING 3.6-14   FIGURE 3.6-14         APRIL 1998                 REACTOR COOLANT SYSTEM - PRESSURIZER CUBICLE PIPING                               N/A       N/A DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM PRESSURIZER CUBICLE 3.6-14   NOTES TO FIGURE 3.6-14 [16]                                                                                                         N/A       N/A PIPING 3.6-15   FIGURE 3.6-15         JANUARY 1998               CHEMICAL AND VOLUME CONTROL SYSTEM - CHARGING LINE PIPING                         N/A       N/A DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - NORMAL 3.6-15   NOTES TO FIGURE 3.6-15 [16]                                                                                                         N/A       N/A CHARGING 3.6-16   FIGURE 3.6-16         JANUARY 1998               CHEMICAL AND VOLUME CONTROL SYSTEM - LETDOWN LINE PIPING                           N/A       N/A 3.6-16   NOTES TO FIGURE 3.6-16 [16])                     DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - LETDOWN LINE     N/A       N/A 3.6-17   FIGURE 3.6-17         JANUARY 1998               CHEMICAL AND VOLUME CONTROL SYSTEM - SEAL WATER INJECTION PIPING                   N/A       N/A 3.6-18   FIGURE 3.6-18         JANUARY 1998               STEAM GENERATOR BLOWDOWN SYSTEM                                                   N/A       N/A Page 15 of 83
MPS-3 FSAR Page 15 of 83 3.6-10 FIGURE 3.6-10 JANUARY 1998 FEEDWATER SYSTEM POSTULATED PIPE RUPTURE LOCATIONS N/A N/A 3.6-11 FIGURE 3.6-11 JANUARY 1998 FEEDWATER SYTEM PIPE RUPTURE RESTRAINTS N/A N/A 3.6-11 NOTES TO FIGURE 3.6-11
[16]
DATA FOR PIPE RUPTURE RESTRAINTS - MAIN FEEDWATER SYSTEM N/A N/A 3.6-12 FIGURE 3.6-12 JANUARY 1998 REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING N/A N/A 3.6-12 NOTES TO FIGURE 3.6-12
[16])
DATA FOR PIPE RUPTURE RESTRAINTS - REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING N/A N/A 3.6-13 FIGURE 3.6-13 JANUARY 1998 REACTOR COOLANT SYSTEM - LOW PRESSURE SAFETY INJECTION & RESIDUAL HEAT REMOVAL PIPING N/A N/A 3.6-13 NOTES TO FIGURE 3.6-13
[16]
DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM, LOW PRESSURE SAFETY INJECTION, HIGH PRESSURE SAFETY INJECTION, AND RESIDUAL HEAT REMOVAL PIPING N/A N/A 3.6-14 FIGURE 3.6-14 APRIL 1998 REACTOR COOLANT SYSTEM - PRESSURIZER CUBICLE PIPING N/A N/A 3.6-14 NOTES TO FIGURE 3.6-14
[16]
DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM PRESSURIZER CUBICLE PIPING N/A N/A 3.6-15 FIGURE 3.6-15 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - CHARGING LINE PIPING N/A N/A 3.6-15 NOTES TO FIGURE 3.6-15
[16]
DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - NORMAL CHARGING N/A N/A 3.6-16 FIGURE 3.6-16 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - LETDOWN LINE PIPING N/A N/A 3.6-16 NOTES TO FIGURE 3.6-16
[16])
DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - LETDOWN LINE N/A N/A 3.6-17 FIGURE 3.6-17 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - SEAL WATER INJECTION PIPING N/A N/A 3.6-18 FIGURE 3.6-18 JANUARY 1998 STEAM GENERATOR BLOWDOWN SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                    Drawing FIGURE LABEL            DATE / Revision [ ]                                        TITLE                                                SHEET Number                                                                                                                                    Number 3.6-18   NOTES TO FIGURE 3.6-18 [16]                     DATA FOR PIPE RUPTURE RESTRAINTS STEAM GENERATOR BLOWDOWN SYSTEM               N/A       N/A 3.6-19   FIGURE 3.6-19         NONE                     PIPE RUPTURE ANALYSIS FLOW CHART                                               N/A       N/A 3.6-20   FIGURE 3.6-20         NONE                     VARIATION OF STEADY STATE STEAM BLOWDOWN VERSUS FRICTION                       N/A       N/A 3.6-21   FIGURE 3.6-21         NONE                     PIPE, RESTRAINT, INTERMEDIATE STRUCTURE SYSTEM MATHEMATICAL MODEL               N/A       N/A 3.6-22   FIGURE 3.6-22         NONE                     LAMINATED STRAP RESTRAINT FOR SMALL LINES                                       N/A       N/A FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT 3.6-23   FIGURE 3.6-23         NONE                                                                                                     N/A        N/A NODE 10 FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT 3.6-24   FIGURE 3.6-24         NONE                                                                                                     N/A        N/A NODE 14 FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET MOMENT FORCE AT 3.6-25   FIGURE 3.6-25         NONE                                                                                                     N/A       N/A NODE 14 3.6-26   FIGURE 3.6-26         NONE                     FORCE ACTING ON THE STRAP NODE 8                                               N/A       N/A 3.6-27   FIGURE 3.6-27         NONE                     FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, ENERGY             N/A       N/A 3.6-28   FIGURE 3.6-28         NONE                     ENERGY BALANCE ANALYSIS MODEL                                                   N/A       N/A 3.6-29   FIGURE 3.6-29         NONE                     PIPE CRUSH BUMPER                                                               N/A       N/A 3.6-30   FIGURE 3.6-30         NONE                     PIPE CRUSH BUMPER                                                               N/A       N/A 3.6-31   FIGURE 3.6-31         NONE                     OMNI-DIRECTIONAL PIP RUPTURE RESTRAINT                                         N/A       N/A 3.6-32   FIGURE 3.6-32         [26]                     AUXILIARY FEEDWATER SYSTEM                                                     N/A       N/A Page 16 of 83
MPS-3 FSAR Page 16 of 83 3.6-18 NOTES TO FIGURE 3.6-18
[16]
DATA FOR PIPE RUPTURE RESTRAINTS STEAM GENERATOR BLOWDOWN SYSTEM N/A N/A 3.6-19 FIGURE 3.6-19 NONE PIPE RUPTURE ANALYSIS FLOW CHART N/A N/A 3.6-20 FIGURE 3.6-20 NONE VARIATION OF STEADY STATE STEAM BLOWDOWN VERSUS FRICTION N/A N/A 3.6-21 FIGURE 3.6-21 NONE PIPE, RESTRAINT, INTERMEDIATE STRUCTURE SYSTEM MATHEMATICAL MODEL N/A N/A 3.6-22 FIGURE 3.6-22 NONE LAMINATED STRAP RESTRAINT FOR SMALL LINES N/A N/A 3.6-23 FIGURE 3.6-23 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT NODE 10 N/A N/A 3.6-24 FIGURE 3.6-24 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT NODE 14 N/A N/A 3.6-25 FIGURE 3.6-25 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET MOMENT FORCE AT NODE 14 N/A N/A 3.6-26 FIGURE 3.6-26 NONE FORCE ACTING ON THE STRAP NODE 8 N/A N/A 3.6-27 FIGURE 3.6-27 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, ENERGY N/A N/A 3.6-28 FIGURE 3.6-28 NONE ENERGY BALANCE ANALYSIS MODEL N/A N/A 3.6-29 FIGURE 3.6-29 NONE PIPE CRUSH BUMPER N/A N/A 3.6-30 FIGURE 3.6-30 NONE PIPE CRUSH BUMPER N/A N/A 3.6-31 FIGURE 3.6-31 NONE OMNI-DIRECTIONAL PIP RUPTURE RESTRAINT N/A N/A 3.6-32 FIGURE 3.6-32
[26]
AUXILIARY FEEDWATER SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL      DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                    Number 3.6-33   FIGURE 3.6-33   JANUARY 1998             REACTOR COOLANT SYSTEM SMALL BORE PIPING IN STEAM GENERATOR CUBICLES               N/A       N/A 3.7B-1   FIGURE 3.7B-1   NONE                     HORIZONTAL DESIGN RESPONSE SPECTRA 0.17 G SSE                                       N/A       N/A 3.7B-2   FIGURE 3.7B-2   NONE                     HORIZONTAL DESIGN RESPONSE SPECTRA 0.09 G OBE                                       N/A       N/A 3.7B-3   FIGURE 3.7B-3   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 0.5 PERCENT DAMPING VALUE                 N/A       N/A 3.7B-4   FIGURE 3.7B-4   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 1.0 PERCENT DAMPING VALUE                 N/A       N/A 3.7B-5   FIGURE 3.7B-5   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 2.0 PERCENT DAMPING VALUE                 N/A       N/A 3.7B-6   FIGURE 3.7B-6   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 6.0 PERCENT DAMPING VALUE                 N/A       N/A 3.7B-7   FIGURE 3.7B-7   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 7.0 PERCENT DAMPING VALUE                 N/A       N/A 3.7B-8   FIGURE 3.7B-8   NONE                     HORIZONTAL TIME HISTORY RESPONSE SPECTRA 10 PERCENT DAMPING VALUE                   N/A       N/A 3.7B-9   FIGURE 3.7B-9   NONE                     DYNAMIC MODEL OF THE CONTAINMENT STRUCTURE                                         N/A       N/A 3.7B-10   FIGURE 3.7B-10   NONE                     DYNAMIC MODEL OF THE MAIN STEAM VALVE BUILDING                                     N/A       N/A 3.7B-11   FIGURE 3.7B-11   NONE                     DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE N-S VIEW                         N/A       N/A 3.7B-12   FIGURE 3.7B-12   NONE                     DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE E-W VIEW                         N/A       N/A REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA N-3.7B-13  FIGURE 3.7B-13  NONE                                                                                                         N/A        N/A S EXCITATION SSE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA E-3.7B-14  FIGURE 3.7B-14  NONE                                                                                                          N/A       N/A W EXCITATION SSE Page 17 of 83
MPS-3 FSAR Page 17 of 83 3.6-33 FIGURE 3.6-33 JANUARY 1998 REACTOR COOLANT SYSTEM SMALL BORE PIPING IN STEAM GENERATOR CUBICLES N/A N/A 3.7B-1 FIGURE 3.7B-1 NONE HORIZONTAL DESIGN RESPONSE SPECTRA 0.17 G SSE N/A N/A 3.7B-2 FIGURE 3.7B-2 NONE HORIZONTAL DESIGN RESPONSE SPECTRA 0.09 G OBE N/A N/A 3.7B-3 FIGURE 3.7B-3 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 0.5 PERCENT DAMPING VALUE N/A N/A 3.7B-4 FIGURE 3.7B-4 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 1.0 PERCENT DAMPING VALUE N/A N/A 3.7B-5 FIGURE 3.7B-5 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 2.0 PERCENT DAMPING VALUE N/A N/A 3.7B-6 FIGURE 3.7B-6 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 6.0 PERCENT DAMPING VALUE N/A N/A 3.7B-7 FIGURE 3.7B-7 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 7.0 PERCENT DAMPING VALUE N/A N/A 3.7B-8 FIGURE 3.7B-8 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 10 PERCENT DAMPING VALUE N/A N/A 3.7B-9 FIGURE 3.7B-9 NONE DYNAMIC MODEL OF THE CONTAINMENT STRUCTURE N/A N/A 3.7B-10 FIGURE 3.7B-10 NONE DYNAMIC MODEL OF THE MAIN STEAM VALVE BUILDING N/A N/A 3.7B-11 FIGURE 3.7B-11 NONE DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE N-S VIEW N/A N/A 3.7B-12 FIGURE 3.7B-12 NONE DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE E-W VIEW N/A N/A 3.7B-13 FIGURE 3.7B-13 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-14 FIGURE 3.7B-14 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL      DATE / Revision [ ]                                        TITLE                                                SHEET Number                                                                                                                                Number REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA 3.7B-15  FIGURE 3.7B-15  NONE                                                                                                     N/A        N/A VERTICAL EXCITATION SSE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES 3.7B-16  FIGURE 3.7B-16  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES 3.7B-17  FIGURE 3.7B-17  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES 3.7B-18  FIGURE 3.7B-18  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES 3.7B-19  FIGURE 3.7B-19  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES 3.7B-20  FIGURE 3.7B-20  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES 3.7B-21  FIGURE 3.7B-21  NONE                                                                                                     N/A        N/A AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED 3.7B-22  FIGURE 3.7B-22  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED 3.7B-23  FIGURE 3.7B-23  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA E-W EXCITATION SSE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED 3.7B-24  FIGURE 3.7B-24  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA VERTICAL EXCITATION SSE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED 3.7B-25  FIGURE 3.7B-25  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED 3.7B-26  FIGURE 3.7B-26  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA E-W EXCITATION SSE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED 3.7B-27  FIGURE 3.7B-27  NONE                                                                                                     N/A        N/A RESPONSE SPECTRA VERTICAL EXCITATION SSE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-28  FIGURE 3.7B-28  NONE                                                                                                     N/A        N/A SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-29  FIGURE 3.7B-29  NONE                                                                                                      N/A       N/A SPECTRA E-W EXCITATION SSE Page 18 of 83
MPS-3 FSAR Page 18 of 83 3.7B-15 FIGURE 3.7B-15 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-16 FIGURE 3.7B-16 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-17 FIGURE 3.7B-17 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-18 FIGURE 3.7B-18 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-19 FIGURE 3.7B-19 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-20 FIGURE 3.7B-20 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-21 FIGURE 3.7B-21 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-22 FIGURE 3.7B-22 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-23 FIGURE 3.7B-23 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-24 FIGURE 3.7B-24 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-25 FIGURE 3.7B-25 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-26 FIGURE 3.7B-26 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-27 FIGURE 3.7B-27 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-28 FIGURE 3.7B-28 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-29 FIGURE 3.7B-29 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL      DATE / Revision [ ]                                        TITLE                                                    SHEET Number                                                                                                                                    Number REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-30  FIGURE 3.7B-30  NONE                                                                                                         N/A        N/A SPECTRA VERTICAL EXCITATION SSE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-31  FIGURE 3.7B-31  NONE                                                                                                         N/A        N/A SPECTRA N-S EXCITATION SSE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-32  FIGURE 3.7B-32  NONE                                                                                                         N/A        N/A SPECTRA E-W EXCITATION SSE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-33  FIGURE 3.7B-33  NONE                                                                                                         N/A        N/A SPECTRA VERTICAL EXCITATION SSE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA N-S 3.7B-34  FIGURE 3.7B-34  NONE                                                                                                         N/A        N/A EXCITATION SSE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA E-W 3.7B-35  FIGURE 3.7B-35  NONE                                                                                                         N/A        N/A EXCITATION SSE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA 3.7B-36  FIGURE 3.7B-36  NONE                                                                                                         N/A        N/A VERTICAL EXCITATION SSE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-37  FIGURE 3.7B-37  NONE                                                                                                         N/A        N/A SPECTRA N-S EXCITATION SSE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION41 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-38  FIGURE 3.7B-38  NONE                                                                                                         N/A        N/A SPECTRA E-W EXCITATION SSE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE 3.7B-39  FIGURE 3.7B-39  NONE                                                                                                         N/A        N/A SPECTRA VERTICAL EXCITATION SSE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-40  FIGURE 3.7B-40  NONE                                                                                                         N/A        N/A SPECTRA N-S EXCITATION SSE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-41  FIGURE 3.7B-41  NONE                                                                                                         N/A        N/A SPECTRA E-W EXCITATION SSE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE 3.7B-42  FIGURE 3.7B-42  NONE                                                                                                          N/A       N/A SPECTRA VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE 3.7B-43   FIGURE 3.7B-43   AMENDMENT 3 AUGUST 1983                                                                                       N/A        N/A ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET 3.7B-44   FIGURE 3.7B-44   NONE                                                                                                         N/A        N/A
MPS-3 FSAR Page 19 of 83 3.7B-30 FIGURE 3.7B-30 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-31 FIGURE 3.7B-31 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-32 FIGURE 3.7B-32 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-33 FIGURE 3.7B-33 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-34 FIGURE 3.7B-34 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-35 FIGURE 3.7B-35 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-36 FIGURE 3.7B-36 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-37 FIGURE 3.7B-37 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-38 FIGURE 3.7B-38 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-39 FIGURE 3.7B-39 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-40 FIGURE 3.7B-40 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-41 FIGURE 3.7B-41 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-42 FIGURE 3.7B-42 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-43 FIGURE 3.7B-43 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A 3.7B-44 FIGURE 3.7B-44 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET
                                                    - 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE Page 19 of 83
- 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL      DATE / Revision [ ]                                          TITLE                                              SHEET Number                                                                                                                                Number EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
MPS-3 FSAR Page 20 of 83 3.7B-45 FIGURE 3.7B-45 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
3.7B-45   FIGURE 3.7B-45   AMENDMENT 3 AUGUST 1983                                                                                   N/A        N/A 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE 3.7B-46   FIGURE 3.7B-46   AMENDMENT 3 AUGUST 1983                                                                                   N/A        N/A ELEVATION 9 FEET - 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET 3.7B-47   FIGURE 3.7B-47   NONE                                                                                                     N/A        N/A
0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A 3.7B-46 FIGURE 3.7B-46 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-47 FIGURE 3.7B-47 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET
                                                    - 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
- 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-48 FIGURE 3.7B-48 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
3.7B-48   FIGURE 3.7B-48   AMENDMENT 3 AUGUST 1983                                                                                   N/A        N/A 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE 3.7B-49   FIGURE 3.7B-49   AMENDMENT 3 AUGUST 1983                                                                                   N/A        N/A ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET 3.7B-50   FIGURE 3.7B-50   NONE                                                                                                     N/A        N/A
0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-49 FIGURE 3.7B-49 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-50 FIGURE 3.7B-50 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET
                                                    - 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
- 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-51 FIGURE 3.7B-51 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -
3.7B-51   FIGURE 3.7B-51   AMENDMENT 3 AUGUST 1983                                                                                   N/A        N/A 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED 3.7B-52   FIGURE 3.7B-52   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED 3.7B-53   FIGURE 3.7B-53   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA E-W EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED 3.7B-54   FIGURE 3.7B-54   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED 3.7B-55   FIGURE 3.7B-55   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED 3.7B-56   FIGURE 3.7B-56   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA E-W EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED 3.7B-57   FIGURE 3.7B-57   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED 3.7B-58   FIGURE 3.7B-58   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED 3.7B-59   FIGURE 3.7B-59   NONE                                                                                                     N/A        N/A RESPONSE SPECTRA E-W EXCITATION SSE Page 20 of 83
0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-52 FIGURE 3.7B-52 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-53 FIGURE 3.7B-53 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-54 FIGURE 3.7B-54 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-55 FIGURE 3.7B-55 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-56 FIGURE 3.7B-56 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-57 FIGURE 3.7B-57 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-58 FIGURE 3.7B-58 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-59 FIGURE 3.7B-59 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL      DATE / Revision [ ]                                          TITLE                                                SHEET Number                                                                                                                                  Number EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED 3.7B-60  FIGURE 3.7B-60  NONE                                                                                                       N/A        N/A RESPONSE SPECTRA VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES 3.7B-61  FIGURE 3.7B-61  NONE                                                                                                       N/A        N/A AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES 3.7B-62  FIGURE 3.7B-62  NONE                                                                                                       N/A        N/A AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BEDROCK 3.7B-63  FIGURE 3.7B-63  NONE                                                                                                       N/A        N/A N-S EXCITATION SSE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BASE OF 3.7B-64  FIGURE 3.7B-64  NONE                                                                                                        N/A       N/A STRUCTURE N-S EXCITATION SSE 3.7B-65   FIGURE 3.7B-65   NONE                       TYPICAL MATHEMATICAL MODEL OF A PIPING SYSTEM                                   N/A       N/A 3.7B-66   FIGURE 3.7B-66   NONE                       REPRESENTATION OF FAMILY OF PEAK RESPONSE CURVES WITHIN BROADENED RESONANT PEAK N/A       N/A HYPOTHETICAL VERSUS ACTUAL RESPONSE OF MULTIPLE MODES WITHIN BROADENED 3.7B-67   FIGURE 3.7B-67   NONE                                                                                                       N/A       N/A RESPONSE PEAK 3.7B-68   FIGURE 3.7B-68   NONE                       JUSTIFICATION OF STATIC LOAD FACTOR                                             N/A       N/A 3.7B-69   FIGURE 3.7B-69   NONE                       TYPICAL AMPLIFIED RESPONSE SPECTRA                                             N/A       N/A 3.7B-70   FIGURE 3.7B-70   NONE                       MODEL BEAMS                                                                     N/A       N/A 3.7B-71   FIGURE 3.7B-71   AMENDMENT 15 SEPTEMBER 1985 DAMPING VALUE FOR SEISMIC ANALYSIS OF PIPING                                   N/A       N/A 3.7N-1   FIGURE 3.7N-1   NONE                       MULTI-DEGREE OF FREEDOM SYSTEM                                                 N/A       N/A 3.8-1     FIGURE 3.8-1     NOVEMBER 1997               CONTAINMENT STRUCTURE FOUNDATION DETAIL                                         N/A       N/A 3.8-2     FIGURE 3.8-2     NONE                       TYPICAL DETAIL OF DOME CYLINDER JUNCTION                                       N/A       N/A Page 21 of 83
MPS-3 FSAR Page 21 of 83 3.7B-60 FIGURE 3.7B-60 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-61 FIGURE 3.7B-61 NONE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-62 FIGURE 3.7B-62 NONE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-63 FIGURE 3.7B-63 NONE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BEDROCK N-S EXCITATION SSE N/A N/A 3.7B-64 FIGURE 3.7B-64 NONE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BASE OF STRUCTURE N-S EXCITATION SSE N/A N/A 3.7B-65 FIGURE 3.7B-65 NONE TYPICAL MATHEMATICAL MODEL OF A PIPING SYSTEM N/A N/A 3.7B-66 FIGURE 3.7B-66 NONE REPRESENTATION OF FAMILY OF PEAK RESPONSE CURVES WITHIN BROADENED RESONANT PEAK N/A N/A 3.7B-67 FIGURE 3.7B-67 NONE HYPOTHETICAL VERSUS ACTUAL RESPONSE OF MULTIPLE MODES WITHIN BROADENED RESPONSE PEAK N/A N/A 3.7B-68 FIGURE 3.7B-68 NONE JUSTIFICATION OF STATIC LOAD FACTOR N/A N/A 3.7B-69 FIGURE 3.7B-69 NONE TYPICAL AMPLIFIED RESPONSE SPECTRA N/A N/A 3.7B-70 FIGURE 3.7B-70 NONE MODEL BEAMS N/A N/A 3.7B-71 FIGURE 3.7B-71 AMENDMENT 15 SEPTEMBER 1985 DAMPING VALUE FOR SEISMIC ANALYSIS OF PIPING N/A N/A 3.7N-1 FIGURE 3.7N-1 NONE MULTI-DEGREE OF FREEDOM SYSTEM N/A N/A 3.8-1 FIGURE 3.8-1 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL N/A N/A 3.8-2 FIGURE 3.8-2 NONE TYPICAL DETAIL OF DOME CYLINDER JUNCTION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL      DATE / Revision [ ]                                          TITLE                                                  SHEET Number                                                                                                                                  Number 3.8-3     FIGURE 3.8-3     NOVEMBER 1997               KNUCKLE PLATE                                                                   N/A       N/A 3.8-4     FIGURE 3.8-4     NONE                       MAT REINFORCEMENT WITH RADIAL SHEAR BAR ASSEMBLY                                 N/A       N/A 3.8-5     FIGURE 3.8-5     NONE                       REINFORCEMENT AROUND MAIN STEAM PENETRATIONS                                     N/A       N/A 3.8-6     FIGURE 3.8-6     NONE                       REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF PERSONNEL ACCESS LOCK         N/A       N/A 3.8-7     FIGURE 3.8-7     NONE                       REINFORCING DETAILS PERSONNEL ACCESS LOCK OPENING                               N/A       N/A 3.8-8     FIGURE 3.8-8     NONE                       TYPICAL REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF EQUIPMENT ACCESS HATCH N/A       N/A 3.8-9     FIGURE 3.8-9     NONE                       REINFORCING DETAILS EQUIPMENT ACCESS HATCH OPENING                               N/A       N/A 3.8-10   FIGURE 3.8-10   NONE                       BASE PLATE DETAILS CONTAINMENT ENCLOSURE STRUCTURE                               N/A       N/A 3.8-11   FIGURE 3.8-11   NONE                       RING AT APEX OF CONTAINMENT STRUCTURE DOME                                       N/A       N/A 3.8-12   FIGURE 3.8-12   NONE                       ELEVATION DOME MAINTENANCE TRUSS                                                 N/A       N/A 3.8-13   FIGURE 3.8-13   NONE                       LINER BUCKLE PLATE                                                               N/A       N/A 3.8-14   FIGURE 3.8-14   NONE                       BASIC LINER DIMENSIONS                                                           N/A       N/A 3.8-15   FIGURE 3.8-15   AMENDMENT 15 SEPTEMBER 1985 TYPICAL PIPING PENETRATIONS                                                     N/A       N/A 3.8-16   FIGURE 3.8-16   AMENDMENT 15 SEPTEMBER 1985 TYPICAL SLEEVED PIPING PENETRATION                                               N/A       N/A 3.8-17   FIGURE 3.8-17   AMENDMENT 15 SEPTEMBER 1985 MULTIPLE PIPE PENETRATION ASSEMBLY                                               N/A       N/A Page 22 of 83
MPS-3 FSAR Page 22 of 83 3.8-3 FIGURE 3.8-3 NOVEMBER 1997 KNUCKLE PLATE N/A N/A 3.8-4 FIGURE 3.8-4 NONE MAT REINFORCEMENT WITH RADIAL SHEAR BAR ASSEMBLY N/A N/A 3.8-5 FIGURE 3.8-5 NONE REINFORCEMENT AROUND MAIN STEAM PENETRATIONS N/A N/A 3.8-6 FIGURE 3.8-6 NONE REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF PERSONNEL ACCESS LOCK N/A N/A 3.8-7 FIGURE 3.8-7 NONE REINFORCING DETAILS PERSONNEL ACCESS LOCK OPENING N/A N/A 3.8-8 FIGURE 3.8-8 NONE TYPICAL REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF EQUIPMENT ACCESS HATCH N/A N/A 3.8-9 FIGURE 3.8-9 NONE REINFORCING DETAILS EQUIPMENT ACCESS HATCH OPENING N/A N/A 3.8-10 FIGURE 3.8-10 NONE BASE PLATE DETAILS CONTAINMENT ENCLOSURE STRUCTURE N/A N/A 3.8-11 FIGURE 3.8-11 NONE RING AT APEX OF CONTAINMENT STRUCTURE DOME N/A N/A 3.8-12 FIGURE 3.8-12 NONE ELEVATION DOME MAINTENANCE TRUSS N/A N/A 3.8-13 FIGURE 3.8-13 NONE LINER BUCKLE PLATE N/A N/A 3.8-14 FIGURE 3.8-14 NONE BASIC LINER DIMENSIONS N/A N/A 3.8-15 FIGURE 3.8-15 AMENDMENT 15 SEPTEMBER 1985 TYPICAL PIPING PENETRATIONS N/A N/A 3.8-16 FIGURE 3.8-16 AMENDMENT 15 SEPTEMBER 1985 TYPICAL SLEEVED PIPING PENETRATION N/A N/A 3.8-17 FIGURE 3.8-17 AMENDMENT 15 SEPTEMBER 1985 MULTIPLE PIPE PENETRATION ASSEMBLY N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                            Drawing FIGURE LABEL        DATE / Revision [ ]                                          TITLE                          SHEET Number                                                                                                              Number 3.8-18   FIGURE 3.8-18       AMENDMENT 15 SEPTEMBER 1985 UNSLEEVED PIPING PENETRATION                             N/A       N/A 3.8-19   FIGURE 3.8-19       AMENDMENT 15 SEPTEMBER 1985 ELECTRICAL PENETRATION                                   N/A       N/A 3.8-20   FIGURE 3.8-20       AMENDMENT 2 APRIL 1983     FUEL TRANSFER TUBE                                       N/A       N/A 3.8-21   FIGURE 3.8-21       NOVEMBER 1997               PERSONNEL HATCH                                         N/A       N/A 3.8-22   FIGURE 3.8-22       NOVEMBER 1997               EQUIPMENT HATCH                                         N/A       N/A 3.8-23   FIGURE 3.8-23 SH. 1 NOVEMBER 1997               CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A       1 OF 2 3.8-23   FIGURE 3.8-23 SH. 2 NOVEMBER 1997               CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A       2 OF 2 3.8-24   FIGURE 3.8-24 SH. 1 NONE                       DETAIL OF RING GIRDER AT ESF BUILDING                   N/A       1 OF 3 3.8-24   FIGURE 3.8-24 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DETAIL OF RING GIRDER AT ESF BUILDING                   N/A       2 OF 3 3.8-24   FIGURE 3.8-24 SH. 3 NONE                       DETAIL OF RING GIRDER AT ESF BUILDING                   N/A       3 OF 3 3.8-25   FIGURE 3.8-25       NONE                       CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS     N/A       N/A 3.8-26   FIGURE 3.8-26       NONE                       CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS     N/A       N/A 3.8-27   FIGURE 3.8-27       NONE                       CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS     N/A       N/A 3.8-28   FIGURE 3.8-28       NONE                       CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS     N/A       N/A 3.8-29   FIGURE 3.8-29       NONE                       CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS     N/A       N/A Page 23 of 83
MPS-3 FSAR Page 23 of 83 3.8-18 FIGURE 3.8-18 AMENDMENT 15 SEPTEMBER 1985 UNSLEEVED PIPING PENETRATION N/A N/A 3.8-19 FIGURE 3.8-19 AMENDMENT 15 SEPTEMBER 1985 ELECTRICAL PENETRATION N/A N/A 3.8-20 FIGURE 3.8-20 AMENDMENT 2 APRIL 1983 FUEL TRANSFER TUBE N/A N/A 3.8-21 FIGURE 3.8-21 NOVEMBER 1997 PERSONNEL HATCH N/A N/A 3.8-22 FIGURE 3.8-22 NOVEMBER 1997 EQUIPMENT HATCH N/A N/A 3.8-23 FIGURE 3.8-23 SH. 1 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A 1 OF 2 3.8-23 FIGURE 3.8-23 SH. 2 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A 2 OF 2 3.8-24 FIGURE 3.8-24 SH. 1 NONE DETAIL OF RING GIRDER AT ESF BUILDING N/A 1 OF 3 3.8-24 FIGURE 3.8-24 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DETAIL OF RING GIRDER AT ESF BUILDING N/A 2 OF 3 3.8-24 FIGURE 3.8-24 SH. 3 NONE DETAIL OF RING GIRDER AT ESF BUILDING N/A 3 OF 3 3.8-25 FIGURE 3.8-25 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-26 FIGURE 3.8-26 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-27 FIGURE 3.8-27 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-28 FIGURE 3.8-28 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-29 FIGURE 3.8-29 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                  Drawing FIGURE LABEL      DATE / Revision [ ]                                  TITLE                          SHEET Number                                                                                                    Number 3.8-30   FIGURE 3.8-30   NONE                     CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A       N/A 3.8-31   FIGURE 3.8-31   NONE                     CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A       N/A 3.8-32   FIGURE 3.8-32   NONE                     LOAD PLOT NOMENCLATURE                               N/A       N/A 3.8-33   FIGURE 3.8-33   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-34   FIGURE 3.8-34   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-35   FIGURE 3.8-35   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-36   FIGURE 3.8-36   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-37   FIGURE 3.8-37   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-38   FIGURE 3.8-38   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-39   FIGURE 3.8-39   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-40   FIGURE 3.8-40   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-41   FIGURE 3.8-41   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-42   FIGURE 3.8-42   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-43   FIGURE 3.8-43   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-44   FIGURE 3.8-44   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A Page 24 of 83
MPS-3 FSAR Page 24 of 83 3.8-30 FIGURE 3.8-30 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-31 FIGURE 3.8-31 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-32 FIGURE 3.8-32 NONE LOAD PLOT NOMENCLATURE N/A N/A 3.8-33 FIGURE 3.8-33 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-34 FIGURE 3.8-34 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-35 FIGURE 3.8-35 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-36 FIGURE 3.8-36 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-37 FIGURE 3.8-37 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-38 FIGURE 3.8-38 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-39 FIGURE 3.8-39 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-40 FIGURE 3.8-40 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-41 FIGURE 3.8-41 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-42 FIGURE 3.8-42 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-43 FIGURE 3.8-43 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-44 FIGURE 3.8-44 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                    Drawing FIGURE LABEL      DATE / Revision [ ]                                      TITLE                      SHEET Number                                                                                                    Number 3.8-45   FIGURE 3.8-45   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-46   FIGURE 3.8-46   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-47   FIGURE 3.8-47   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-48   FIGURE 3.8-48   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-49   FIGURE 3.8-49   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-50   FIGURE 3.8-50   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-51   FIGURE 3.8-51   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-52   FIGURE 3.8-52   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-53   FIGURE 3.8-53   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-54   FIGURE 3.8-54   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-55   FIGURE 3.8-55   NONE                     CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A       N/A 3.8-56   FIGURE 3.8-56   NONE                     DETAILS OF WALL DIAGONALS AT CONTAINMENT MAT         N/A       N/A (SHT 1 OF 3.8-57   FIGURE 3.8-57   NOVEMBER 1997             DETAILS OF WATERPROOF MEMBRANE                       N/A       2) (Part 1 OF 2)
MPS-3 FSAR Page 25 of 83 3.8-45 FIGURE 3.8-45 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-46 FIGURE 3.8-46 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-47 FIGURE 3.8-47 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-48 FIGURE 3.8-48 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-49 FIGURE 3.8-49 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-50 FIGURE 3.8-50 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-51 FIGURE 3.8-51 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-52 FIGURE 3.8-52 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-53 FIGURE 3.8-53 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-54 FIGURE 3.8-54 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-55 FIGURE 3.8-55 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-56 FIGURE 3.8-56 NONE DETAILS OF WALL DIAGONALS AT CONTAINMENT MAT N/A N/A 3.8-57 FIGURE 3.8-57 NOVEMBER 1997 DETAILS OF WATERPROOF MEMBRANE N/A (SHT 1 OF
(SHT 1 OF 3.8-57   FIGURE 3.8-57   NOVEMBER 1997             DETAILS OF WATERPROOF MEMBRANE                       N/A       2) (Part 2 OF 2) 3.8-57   FIGURE 3.8-57   MARCH 2001 (00-42)       DETAILS OF WATERPROOF MEMBRANE                       N/A       2 OF 2 Page 25 of 83
: 2) (Part 1 OF 2) 3.8-57 FIGURE 3.8-57 NOVEMBER 1997 DETAILS OF WATERPROOF MEMBRANE N/A (SHT 1 OF
: 2) (Part 2 OF 2) 3.8-57 FIGURE 3.8-57 MARCH 2001 (00-42)
DETAILS OF WATERPROOF MEMBRANE N/A 2 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                                Number 3.8-58   FIGURE 3.8-58 SH. 1 NOVEMBER 1997               DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED) N/A       1 OF 2 3.8-58   FIGURE 3.8-58 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED) N/A       2 OF 2 3.8-59   FIGURE 3.8-59       [28.1]                     CONTAINMENT STUCTURE, PLAN VIEW                                           N/A       N/A     15-7 3.8-60   FIGURE 3.8-60       AMENDMENT 3 AUGUST 1983     CONTAINMENT STRUCTURE, ELEVATION VIEWS                                     N/A       N/A 3.8-61   FIGURE 3.8-61       NONE                       CONTAINMENT ENCLOSURE BUILDING                                             N/A       N/A 3.8-62   FIGURE 3.8-62 SH. 1 [28.1]                     AUXILIARY BUILDING                                                         N/A       1 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 2 [28.1]                     AUXILIARY BUILDING                                                         N/A       2 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 3 [28.1]                     AUXILIARY BUILDING                                                         N/A       3 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 4 [28.1]                     AUXILIARY BUILDING                                                         N/A       4 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 5 [28.1]                     AUXILIARY BUILDING                                                         N/A       5 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 6 [28.1]                     AUXILIARY BUILDING                                                         N/A       6 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 7 [28.1]                     AUXILIARY BUILDING                                                         N/A       7 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 8 [28.1]                     AUXILIARY BUILDING                                                         N/A       8 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 9 [28.1]                     AUXILIARY BUILDING                                                         N/A       9 OF 10 15-7 3.8-62   FIGURE 3.8-62 SH. 10 [28.1]                     AUXILIARY BUILDING                                                         N/A       10 OF 10 15-7 Page 26 of 83
MPS-3 FSAR Page 26 of 83 3.8-58 FIGURE 3.8-58 SH. 1 NOVEMBER 1997 DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED)
N/A 1 OF 2 3.8-58 FIGURE 3.8-58 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED)
N/A 2 OF 2 3.8-59 FIGURE 3.8-59
[28.1]
CONTAINMENT STUCTURE, PLAN VIEW N/A N/A 3.8-60 FIGURE 3.8-60 AMENDMENT 3 AUGUST 1983 CONTAINMENT STRUCTURE, ELEVATION VIEWS N/A N/A 3.8-61 FIGURE 3.8-61 NONE CONTAINMENT ENCLOSURE BUILDING N/A N/A 3.8-62 FIGURE 3.8-62 SH. 1
[28.1]
AUXILIARY BUILDING N/A 1 OF 10 3.8-62 FIGURE 3.8-62 SH. 2
[28.1]
AUXILIARY BUILDING N/A 2 OF 10 3.8-62 FIGURE 3.8-62 SH. 3
[28.1]
AUXILIARY BUILDING N/A 3 OF 10 3.8-62 FIGURE 3.8-62 SH. 4
[28.1]
AUXILIARY BUILDING N/A 4 OF 10 3.8-62 FIGURE 3.8-62 SH. 5
[28.1]
AUXILIARY BUILDING N/A 5 OF 10 3.8-62 FIGURE 3.8-62 SH. 6
[28.1]
AUXILIARY BUILDING N/A 6 OF 10 3.8-62 FIGURE 3.8-62 SH. 7
[28.1]
AUXILIARY BUILDING N/A 7 OF 10 3.8-62 FIGURE 3.8-62 SH. 8
[28.1]
AUXILIARY BUILDING N/A 8 OF 10 3.8-62 FIGURE 3.8-62 SH. 9
[28.1]
AUXILIARY BUILDING N/A 9 OF 10 3.8-62 FIGURE 3.8-62 SH. 10
[28.1]
AUXILIARY BUILDING N/A 10 OF 10 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                        Drawing FIGURE LABEL          DATE / Revision [ ]                                TITLE            SHEET Number                                                                                        Number 3.8-63   FIGURE 3.8-63 SH. 1 [28.1]                     FUEL BUILDING                       N/A       1 OF 6 15-7 3.8-63   FIGURE 3.8-63 SH. 2 [28.1]                     FUEL BUILDING                       N/A       2 OF 6 15-7 3.8-63   FIGURE 3.8-63 SH. 3 [28.1]                     FUEL BUILDING                       N/A       3 OF 6 15-7 3.8-63   FIGURE 3.8-63 SH. 4 [28.1]                     FUEL BUILDING                       N/A       4 OF 6 15-7 3.8-63   FIGURE 3.8-63 SH. 5 [28.1]                     FUEL BUILDING                       N/A       5 OF 6 15-7 3.8-63   FIGURE 3.8-63 SH. 6 AMENDMENT 13 APRIL 1983   FUEL BUILDING                       N/A       6 OF 6
MPS-3 FSAR Page 27 of 83 3.8-63 FIGURE 3.8-63 SH. 1
[28.1]                                                                            15-7 3.8-64   FIGURE 3.8-64 SH. 1                           CONTROL BUILDING                     N/A       1 OF 4 3.8-64   FIGURE 3.8-64 SH. 2 NONE                       CONTROL BUILDING                     N/A       2 OF 4 3.8-64   FIGURE 3.8-64 SH. 3 DECEMBER 1997             CONTROL BUILDING                     N/A       3 OF 4 3.8-64   FIGURE 3.8-64 SH. 4 AMENDMENT 13 APRIL 1983   CONTROL BUILDING                     N/A       4 OF 4 3.8-65   FIGURE 3.8-65       [28.1]                     CABLE TUNNEL                         N/A       N/A   15-7 3.8-66   FIGURE 3.8-66 SH. 1 [28.1]                     EMERGENCY GENERATOR ENCLOSURE       N/A       1 OF 5 15-7 3.8-66   FIGURE 3.8-66 SH. 2 [28.1]                     EMERGENCY GENERATOR ENCLOSURE       N/A       2 OF 5 15-7 3.8-66   FIGURE 3.8-66 SH. 3 AMENDMENT 8 MAY 1984       EMERGENCY GENERATOR ENCLOSURE       N/A       3 OF 5 3.8-66   FIGURE 3.8-66 SH. 4 [28.1]                     EMERGENCY GENERATOR ENCLOSURE       N/A       4 OF 5 15-7 Page 27 of 83
[28.1]
FUEL BUILDING N/A 1 OF 6 3.8-63 FIGURE 3.8-63 SH. 2
[28.1]
FUEL BUILDING N/A 2 OF 6 3.8-63 FIGURE 3.8-63 SH. 3
[28.1]
FUEL BUILDING N/A 3 OF 6 3.8-63 FIGURE 3.8-63 SH. 4
[28.1]
FUEL BUILDING N/A 4 OF 6 3.8-63 FIGURE 3.8-63 SH. 5
[28.1]
FUEL BUILDING N/A 5 OF 6 3.8-63 FIGURE 3.8-63 SH. 6 AMENDMENT 13 APRIL 1983 FUEL BUILDING N/A 6 OF 6 3.8-64 FIGURE 3.8-64 SH. 1
[28.1]
CONTROL BUILDING N/A 1 OF 4 3.8-64 FIGURE 3.8-64 SH. 2 NONE CONTROL BUILDING N/A 2 OF 4 3.8-64 FIGURE 3.8-64 SH. 3 DECEMBER 1997 CONTROL BUILDING N/A 3 OF 4 3.8-64 FIGURE 3.8-64 SH. 4 AMENDMENT 13 APRIL 1983 CONTROL BUILDING N/A 4 OF 4 3.8-65 FIGURE 3.8-65
[28.1]
CABLE TUNNEL N/A N/A 3.8-66 FIGURE 3.8-66 SH. 1
[28.1]
EMERGENCY GENERATOR ENCLOSURE N/A 1 OF 5 3.8-66 FIGURE 3.8-66 SH. 2
[28.1]
EMERGENCY GENERATOR ENCLOSURE N/A 2 OF 5 3.8-66 FIGURE 3.8-66 SH. 3 AMENDMENT 8 MAY 1984 EMERGENCY GENERATOR ENCLOSURE N/A 3 OF 5 3.8-66 FIGURE 3.8-66 SH. 4
[28.1]
EMERGENCY GENERATOR ENCLOSURE N/A 4 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                  Drawing FIGURE LABEL              DATE / Revision [ ]                                    TITLE                SHEET Number                                                                                                    Number 3.8-66   FIGURE 3.8-66 SH. 5   AMENDMENT 8 MAY 1984       EMERGENCY GENERATOR ENCLOSURE               N/A       5 OF 5 3.8-66   NOTES TO FIGURE 3.8-66 [16]                       EMERGENCY DIESEL GENERATOR - EQUIPMENT INDEX N/A       1 OF 2 3.8-67   FIGURE 3.8-67 SH. 1   MARCH 2001 (00-27)         ENGINEERED SAFETY FEATURES BUILDING         N/A       1 OF 9 3.8-67   FIGURE 3.8-67 SH. 2   [28.1]                     ENGINEERED SAFETY FEATURES BUILDING         N/A       2 OF 9 15-7 3.8-67   FIGURE 3.8-67 SH. 3   [28.1]                     ENGINEERED SAFETY FEATURES BUILDING         N/A       3 OF 9 15-7 3.8-67   FIGURE 3.8-67 SH. 4   [28.1]                     ENGINEERED SAFETY FEATURES BUILDING         N/A       4 OF 9 15-7 3.8-67   FIGURE 3.8-67 SH. 5   NONE                       ENGINEERED SAFETY FEATURES BUILDING         N/A       5 OF 9 3.8-67   FIGURE 3.8-67 SH. 6   NONE                       ENGINEERED SAFETY FEATURES BUILDING         N/A       6 OF 9 3.8-67   FIGURE 3.8-67 SH. 7   NONE                       ENGINEERED SAFETY FEATURES BUILDING         N/A       7 OF 9 3.8-67   FIGURE 3.8-67 SH. 8   NONE                       ENGINEERED SAFETY FEATURES BUILDING         N/A       8 OF 9 3.8-67   FIGURE 3.8-67 SH. 9   MARCH 2001 (00-27)         ENGINEERED SAFETY FEATURES BUILDING         N/A       9 OF 9 3.8-68   FIGURE 3.8-68 SH. 1   [28.1]                     MAIN STEAM VALVE BUILDING                   N/A       1 OF 4 15-7 3.8-68   FIGURE 3.8-68 SH. 2   [28.1]                     MAIN STEAM VALVE BUILDING                   N/A       2 OF 4 15-7 3.8-68   FIGURE 3.8-68 SH. 3   [28.1]                     MAIN STEAM VALVE BUILDING                   N/A       3 OF 4 15-7 3.8-68   FIGURE 3.8-68 SH. 4   NONE                       MAIN STEAM VALVE BUILDING                   N/A       4 OF 4 Page 28 of 83
MPS-3 FSAR Page 28 of 83 3.8-66 FIGURE 3.8-66 SH. 5 AMENDMENT 8 MAY 1984 EMERGENCY GENERATOR ENCLOSURE N/A 5 OF 5 3.8-66 NOTES TO FIGURE 3.8-66
[16]
EMERGENCY DIESEL GENERATOR - EQUIPMENT INDEX N/A 1 OF 2 3.8-67 FIGURE 3.8-67 SH. 1 MARCH 2001 (00-27)
ENGINEERED SAFETY FEATURES BUILDING N/A 1 OF 9 3.8-67 FIGURE 3.8-67 SH. 2
[28.1]
ENGINEERED SAFETY FEATURES BUILDING N/A 2 OF 9 3.8-67 FIGURE 3.8-67 SH. 3
[28.1]
ENGINEERED SAFETY FEATURES BUILDING N/A 3 OF 9 3.8-67 FIGURE 3.8-67 SH. 4
[28.1]
ENGINEERED SAFETY FEATURES BUILDING N/A 4 OF 9 3.8-67 FIGURE 3.8-67 SH. 5 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 5 OF 9 3.8-67 FIGURE 3.8-67 SH. 6 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 6 OF 9 3.8-67 FIGURE 3.8-67 SH. 7 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 7 OF 9 3.8-67 FIGURE 3.8-67 SH. 8 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 8 OF 9 3.8-67 FIGURE 3.8-67 SH. 9 MARCH 2001 (00-27)
ENGINEERED SAFETY FEATURES BUILDING N/A 9 OF 9 3.8-68 FIGURE 3.8-68 SH. 1
[28.1]
MAIN STEAM VALVE BUILDING N/A 1 OF 4 3.8-68 FIGURE 3.8-68 SH. 2
[28.1]
MAIN STEAM VALVE BUILDING N/A 2 OF 4 3.8-68 FIGURE 3.8-68 SH. 3
[28.1]
MAIN STEAM VALVE BUILDING N/A 3 OF 4 3.8-68 FIGURE 3.8-68 SH. 4 NONE MAIN STEAM VALVE BUILDING N/A 4 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                            Drawing FIGURE LABEL          DATE / Revision [ ]                                          TITLE                                      SHEET Number                                                                                                                            Number 3.8-69   FIGURE 3.8-69 SH. 1 OCTOBER 1997               CIRCULATING AND SERVICE WATER PUMPHOUSE                                 N/A       1 OF 4 3.8-69   FIGURE 3.8-69 SH. 2 SEPTEMBER 1995             CIRCULATING AND SERVICE WATER PUMPHOUSE                                 N/A       2 OF 4 3.8-69   FIGURE 3.8-69 SH. 3 NONE                       CIRCULATING AND SERVICE WATER PUMPHOUSE                                 N/A       3 OF 4 3.8-69   FIGURE 3.8-69 SH. 4 AMENDMENT 15 SEPTEMBER 1985 CIRCULATING AND SERVICE WATER PUMPHOUSE                                 N/A       4 OF 4 3.8-70   FIGURE 3.8-70 SH. 1 [28.1]                     RECOMBINER BUILDING                                                     N/A       1 OF 4 15-7 3.8-70   FIGURE 3.8-70 SH. 2 NONE                       RECOMBINER BUILDING                                                     N/A       2 OF 4 3.8-70   FIGURE 3.8-70 SH. 3 NONE                       RECOMBINER BUILDING                                                     N/A       3 OF 4 3.8-70   FIGURE 3.8-70 SH. 4 [28.1]                     RECOMBINER BUILDING                                                     N/A       4 OF 4 15-7 3.8-71   FIGURE 3.8-71       NONE                       CIRCULATING DISCHARGE STRUCTURE AND TUNNEL                             N/A       N/A 3.8-72   FIGURE 3.8-72 SH. 1 [28.1]                     SERVICE BUILDING PLAN ELEVATION 4 FEET - 6 INCHES                       N/A       1 OF 4 15-7 3.8-72   FIGURE 3.8-72 SH. 2 [28.1]                     SERVICE BUILDING PLAN ELEVATION 24 FEET - 6 INCHES                     N/A       2 OF 4 15-7 3.8-72   FIGURE 3.8-72 SH. 3 NONE                       SERVICE BUILDING PLAN ELEVATION 38 FEET - 6 INCHES                     N/A       3 OF 4 3.8-72   FIGURE 3.8-72 SH. 4 [28.1]                     SERVICE BUILDING PLAN ELEVATION 49 FEET - 6 INCHES & 52 FEET - 6 INCHES N/A       4 OF 4 15-7 3.8-73   FIGURE 3.8-73 SH. 1 [28.1]                     TURBINE BUILDING PLAN OPERATING FLOOR ELEVATION 64 FEET - 6 INCHES     N/A       1 OF 5 15-7 3.8-73   FIGURE 3.8-73 SH. 2 [28.1]                     TURBINE BUILDING BASEMENT ELEVATION 14 FEET - 6 INCHES                 N/A       2 OF 5 15-7 Page 29 of 83
MPS-3 FSAR Page 29 of 83 3.8-69 FIGURE 3.8-69 SH. 1 OCTOBER 1997 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 1 OF 4 3.8-69 FIGURE 3.8-69 SH. 2 SEPTEMBER 1995 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 2 OF 4 3.8-69 FIGURE 3.8-69 SH. 3 NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 3 OF 4 3.8-69 FIGURE 3.8-69 SH. 4 AMENDMENT 15 SEPTEMBER 1985 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 4 OF 4 3.8-70 FIGURE 3.8-70 SH. 1
[28.1]
RECOMBINER BUILDING N/A 1 OF 4 3.8-70 FIGURE 3.8-70 SH. 2 NONE RECOMBINER BUILDING N/A 2 OF 4 3.8-70 FIGURE 3.8-70 SH. 3 NONE RECOMBINER BUILDING N/A 3 OF 4 3.8-70 FIGURE 3.8-70 SH. 4
[28.1]
RECOMBINER BUILDING N/A 4 OF 4 3.8-71 FIGURE 3.8-71 NONE CIRCULATING DISCHARGE STRUCTURE AND TUNNEL N/A N/A 3.8-72 FIGURE 3.8-72 SH. 1
[28.1]
SERVICE BUILDING PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 4 3.8-72 FIGURE 3.8-72 SH. 2
[28.1]
SERVICE BUILDING PLAN ELEVATION 24 FEET - 6 INCHES N/A 2 OF 4 3.8-72 FIGURE 3.8-72 SH. 3 NONE SERVICE BUILDING PLAN ELEVATION 38 FEET - 6 INCHES N/A 3 OF 4 3.8-72 FIGURE 3.8-72 SH. 4
[28.1]
SERVICE BUILDING PLAN ELEVATION 49 FEET - 6 INCHES & 52 FEET - 6 INCHES N/A 4 OF 4 3.8-73 FIGURE 3.8-73 SH. 1
[28.1]
TURBINE BUILDING PLAN OPERATING FLOOR ELEVATION 64 FEET - 6 INCHES N/A 1 OF 5 3.8-73 FIGURE 3.8-73 SH. 2
[28.1]
TURBINE BUILDING BASEMENT ELEVATION 14 FEET - 6 INCHES N/A 2 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL          DATE / Revision [ ]                                        TITLE                                          SHEET Number                                                                                                                              Number 3.8-73   FIGURE 3.8-73 SH. 3 [28.1]                     TURBINE BUILDING PLAN - MEZZANINE ELEVATION 38 FEET - 6 INCHES             N/A       3 OF 5 15-7 3.8-73   FIGURE 3.8-73 SH. 4 [28.1]                     TURBINE BUILDING 2-2                                                       N/A       4 OF 5 15-7 3.8-73   FIGURE 3.8-73 SH. 5 AMENDMENT 3 AUGUST 1983   TURBINE BUILDING 5-5                                                       N/A       5 OF 5 3.8-74   FIGURE 3.8-74 SH. 1 [28.1]                     SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 4 FEET - 6 INCHES N/A       1 OF 7  15-7 3.8-74   FIGURE 3.8-74 SH. 2 [28.1]                     SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 24 FEET - 6 INCHES N/A       2 OF 7  15-7 3.8-74   FIGURE 3.8-74 SH. 3 AUGUST 1996               SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 43 FEET - 6 INCHES N/A       3 OF 7 3.8-74   FIGURE 3.8-74 SH. 4 AMENDMENT 3 AUGUST 1983   SOLID AND LIQUID WASTE DISPOSAL BUILDING 1-1                               N/A       4 OF 7 3.8-74   FIGURE 3.8-74 SH. 5 [28.1]                     SOLID AND LIQUID WASTE DISPOSAL BUILDING 2-2                               N/A       5 OF 7  15-7 3.8-74   FIGURE 3.8-74 SH. 6 [28.1]                     SOLID AND LIQUID WASTE DISPOSAL BUILDING 4-4                               N/A       6 OF 7  15-7 3.8-74   FIGURE 3.8-74 SH. 7 [28.1]                     SOLID AND LIQUID WASTE DISPOSAL BUILDING 7-7                               N/A       7 OF 7  15-7 3.8-75   FIGURE 3.8-75 SH. 1 AMENDMENT 3 AUGUST 1983   WAREHOUSE NO. 5 PLAN ELEVATION 4 FEET - 6 INCHES                           N/A       1 OF 12 3.8-75   FIGURE 3.8-75 SH. 2 [28.1]                     WAREHOUSE NO. 5 PLAN ELEVATION 28 FEET - 6 INCHES                         N/A       2 OF 12 15-7 3.8-75   FIGURE 3.8-75 SH. 3 [28.1]                     WAREHOUSE NO. 5 1-1                                                       N/A       3 OF 12 15-7 3.8-75   FIGURE 3.8-75 SH. 4 [28.1]                     WAREHOUSE NO. 5 2-2                                                       N/A       4 OF 12 15-7 3.8-75   FIGURE 3.8-75 SH. 5 [28.1]                     WAREHOUSE NO. 5 3-3                                                       N/A       5 OF 12 15-7 Page 30 of 83
MPS-3 FSAR Page 30 of 83 3.8-73 FIGURE 3.8-73 SH. 3
[28.1]
TURBINE BUILDING PLAN - MEZZANINE ELEVATION 38 FEET - 6 INCHES N/A 3 OF 5 3.8-73 FIGURE 3.8-73 SH. 4
[28.1]
TURBINE BUILDING 2-2 N/A 4 OF 5 3.8-73 FIGURE 3.8-73 SH. 5 AMENDMENT 3 AUGUST 1983 TURBINE BUILDING 5-5 N/A 5 OF 5 3.8-74 FIGURE 3.8-74 SH. 1
[28.1]
SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 7 3.8-74 FIGURE 3.8-74 SH. 2
[28.1]
SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 24 FEET - 6 INCHES N/A 2 OF 7 3.8-74 FIGURE 3.8-74 SH. 3 AUGUST 1996 SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 43 FEET - 6 INCHES N/A 3 OF 7 3.8-74 FIGURE 3.8-74 SH. 4 AMENDMENT 3 AUGUST 1983 SOLID AND LIQUID WASTE DISPOSAL BUILDING 1-1 N/A 4 OF 7 3.8-74 FIGURE 3.8-74 SH. 5
[28.1]
SOLID AND LIQUID WASTE DISPOSAL BUILDING 2-2 N/A 5 OF 7 3.8-74 FIGURE 3.8-74 SH. 6
[28.1]
SOLID AND LIQUID WASTE DISPOSAL BUILDING 4-4 N/A 6 OF 7 3.8-74 FIGURE 3.8-74 SH. 7
[28.1]
SOLID AND LIQUID WASTE DISPOSAL BUILDING 7-7 N/A 7 OF 7 3.8-75 FIGURE 3.8-75 SH. 1 AMENDMENT 3 AUGUST 1983 WAREHOUSE NO. 5 PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 12 3.8-75 FIGURE 3.8-75 SH. 2
[28.1]
WAREHOUSE NO. 5 PLAN ELEVATION 28 FEET - 6 INCHES N/A 2 OF 12 3.8-75 FIGURE 3.8-75 SH. 3
[28.1]
WAREHOUSE NO. 5 1-1 N/A 3 OF 12 3.8-75 FIGURE 3.8-75 SH. 4
[28.1]
WAREHOUSE NO. 5 2-2 N/A 4 OF 12 3.8-75 FIGURE 3.8-75 SH. 5
[28.1]
WAREHOUSE NO. 5 3-3 N/A 5 OF 12 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                              SHEET Number                                                                                                                  Number 3.8-75   FIGURE 3.8-75 SH. 6 [28.1]                     WAREHOUSE NO. 5 4-4                                         N/A       6 OF 12 15-7 3.8-75   FIGURE 3.8-75 SH. 7 NONE                       WAREHOUSE NO. 5 5-5                                         N/A       7 OF 12 3.8-75   FIGURE 3.8-75 SH. 8 NONE                       WAREHOUSE NO. 5 6-6                                         N/A       8 OF 12 3.8-75   FIGURE 3.8-75 SH. 9 [28.1]                     NONE                                                         N/A       9 OF 12 15-7 3.8-75   FIGURE 3.8-75 SH. 10 NONE                       WAREHOUSE NO. 5 8-8                                         N/A       10 OF 12 3.8-75   FIGURE 3.8-75 SH. 11 NONE                       WAREHOUSE NO. 5 9-9                                         N/A       11 OF 12 3.8-75   FIGURE 3.8-75 SH. 12 [28.1]                     NONE                                                         N/A       12 OF 12 15-7 3.8-76   FIGURE 3.8-76 SH. 1 NONE                       AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 25 FEET - 0 INCHES N/A       1 OF 5 3.8-76   FIGURE 3.8-76 SH. 2 NONE                       AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 40 FEET - 6 INCHES N/A       2 OF 5 3.8-76   FIGURE 3.8-76 SH. 3 NONE                       AUXILIARY BOILER ENCLOSURE 1-1                               N/A       3 OF 5 3.8-76   FIGURE 3.8-76 SH. 4 NONE                       AUXILIARY BOILER ENCLOSURE 2-2                               N/A       4 OF 5 3.8-76   FIGURE 3.8-76 SH. 5 NONE                       AUXILIARY BOILER ENCLOSURE 3-3                               N/A       5 OF 5 3.8-77   FIGURE 3.8-77       DECEMBER 1997             ARRANGEMENT OF HORIZONTAL SHEAR KEYS                         N/A       N/A 3.8-78   FIGURE 3.8-78       NONE                       TYPICAL SHEAR KEY DETAIL                                     N/A       N/A 3.8-79   FIGURE 3.8-79       AMENDMENT 2 APRIL 1983     FUEL POOL TEMPERATURE TRANSIENTS                             N/A       N/A Page 31 of 83
MPS-3 FSAR Page 31 of 83 3.8-75 FIGURE 3.8-75 SH. 6
[28.1]
WAREHOUSE NO. 5 4-4 N/A 6 OF 12 3.8-75 FIGURE 3.8-75 SH. 7 NONE WAREHOUSE NO. 5 5-5 N/A 7 OF 12 3.8-75 FIGURE 3.8-75 SH. 8 NONE WAREHOUSE NO. 5 6-6 N/A 8 OF 12 3.8-75 FIGURE 3.8-75 SH. 9
[28.1]
NONE N/A 9 OF 12 3.8-75 FIGURE 3.8-75 SH. 10 NONE WAREHOUSE NO. 5 8-8 N/A 10 OF 12 3.8-75 FIGURE 3.8-75 SH. 11 NONE WAREHOUSE NO. 5 9-9 N/A 11 OF 12 3.8-75 FIGURE 3.8-75 SH. 12
[28.1]
NONE N/A 12 OF 12 3.8-76 FIGURE 3.8-76 SH. 1 NONE AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 25 FEET - 0 INCHES N/A 1 OF 5 3.8-76 FIGURE 3.8-76 SH. 2 NONE AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 40 FEET - 6 INCHES N/A 2 OF 5 3.8-76 FIGURE 3.8-76 SH. 3 NONE AUXILIARY BOILER ENCLOSURE 1-1 N/A 3 OF 5 3.8-76 FIGURE 3.8-76 SH. 4 NONE AUXILIARY BOILER ENCLOSURE 2-2 N/A 4 OF 5 3.8-76 FIGURE 3.8-76 SH. 5 NONE AUXILIARY BOILER ENCLOSURE 3-3 N/A 5 OF 5 3.8-77 FIGURE 3.8-77 DECEMBER 1997 ARRANGEMENT OF HORIZONTAL SHEAR KEYS N/A N/A 3.8-78 FIGURE 3.8-78 NONE TYPICAL SHEAR KEY DETAIL N/A N/A 3.8-79 FIGURE 3.8-79 AMENDMENT 2 APRIL 1983 FUEL POOL TEMPERATURE TRANSIENTS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET 15-7 15-7 15-7


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                SHEET Number                                                                                                                Number 3.8-80   FIGURE 3.8-80   AMENDMENT 2 APRIL 1983     FUEL POOL - FUEL BUILDING TEMPERATURE CONDITIONS               N/A       N/A 3.8-81   FIGURE 3.8-81   JUNE 1992                 FUEL POOL TEMPERATURE TRANSIENTS - FOR HIGHER ENRICHMENT FUEL N/A       N/A 3.8-82   FIGURE 3.8-82   SEPTEMBER 2000             FUEL POOL TEMPERATURE TRANSIENTS - FULL CORE OFFLOAD           N/A       N/A 3.8-83   FIGURE 3.8-83   MARCH 2001 (00-50)         MILLSTONE STACK ELEVATIONS AND SECTIONS                       N/A       N/A 3.8-84   FIGURE 3.8-84   MARCH 2001 (00-50)         MILLSTONE STACK - MATHEMATICAL MODEL                           N/A       N/A 3.9.B-1   FIGURE 3.9.B-1   NONE                       REACTOR COOLANT PPG.                                           N/A       N/A 3.9.B-2   FIGURE 3.9.B-2   NONE                       DYNAMIC MODEL - TYPICAL RCS LOOP                               N/A       N/A 3.9.B-3   FIGURE 3.9.B-3   NONE                       DYNAMIC MODEL - CENTER SECTION                                 N/A       N/A 3.9.B-4   FIGURE 3.9.B-4   NONE                       X2 VIEW - ROTATED AXIS                                         N/A       N/A 3.9.B-5   FIGURE 3.9.B-5   NONE                       SNUBBER ORIENTATION                                           N/A       N/A 3.9N-1   FIGURE 3.9N-1   [21.3]                     REACTOR PRESSURE VESSEL AND INTERNALS SYSTEM MODEL             N/A       N/A 3.9N-2   FIGURE 3.9N-2   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-039                           N/A       N/A 3.9N-3   FIGURE 3.9N-3   NONE                       RPV SUPPORT MODEL FOR WESTINGHOUSE INTERNALS RESPONSE ANALYSIS N/A       N/A 3.9N-4   FIGURE 3.9N-4   DECEMBER 1997             CONTROL ROD DRIVE MECHANISM                                   N/A       N/A 3.9N-5   FIGURE 3.9N-5   NONE                       CONTROL ROD DRIVE MECHANISM SCHEMATIC                         N/A       N/A Page 32 of 83
MPS-3 FSAR Page 32 of 83 3.8-80 FIGURE 3.8-80 AMENDMENT 2 APRIL 1983 FUEL POOL - FUEL BUILDING TEMPERATURE CONDITIONS N/A N/A 3.8-81 FIGURE 3.8-81 JUNE 1992 FUEL POOL TEMPERATURE TRANSIENTS - FOR HIGHER ENRICHMENT FUEL N/A N/A 3.8-82 FIGURE 3.8-82 SEPTEMBER 2000 FUEL POOL TEMPERATURE TRANSIENTS - FULL CORE OFFLOAD N/A N/A 3.8-83 FIGURE 3.8-83 MARCH 2001 (00-50)
MILLSTONE STACK ELEVATIONS AND SECTIONS N/A N/A 3.8-84 FIGURE 3.8-84 MARCH 2001 (00-50)
MILLSTONE STACK - MATHEMATICAL MODEL N/A N/A 3.9.B-1 FIGURE 3.9.B-1 NONE REACTOR COOLANT PPG.
N/A N/A 3.9.B-2 FIGURE 3.9.B-2 NONE DYNAMIC MODEL - TYPICAL RCS LOOP N/A N/A 3.9.B-3 FIGURE 3.9.B-3 NONE DYNAMIC MODEL - CENTER SECTION N/A N/A 3.9.B-4 FIGURE 3.9.B-4 NONE X2 VIEW - ROTATED AXIS N/A N/A 3.9.B-5 FIGURE 3.9.B-5 NONE SNUBBER ORIENTATION N/A N/A 3.9N-1 FIGURE 3.9N-1
[21.3]
REACTOR PRESSURE VESSEL AND INTERNALS SYSTEM MODEL N/A N/A 3.9N-2 FIGURE 3.9N-2
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-039 N/A N/A 3.9N-3 FIGURE 3.9N-3 NONE RPV SUPPORT MODEL FOR WESTINGHOUSE INTERNALS RESPONSE ANALYSIS N/A N/A 3.9N-4 FIGURE 3.9N-4 DECEMBER 1997 CONTROL ROD DRIVE MECHANISM N/A N/A 3.9N-5 FIGURE 3.9N-5 NONE CONTROL ROD DRIVE MECHANISM SCHEMATIC N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL      DATE / Revision [ ]                                      TITLE                                                SHEET Number                                                                                                                                Number 3.9N-6   FIGURE 3.9N-6   NONE                     NOMINAL LATCH CLEARANCE AT MINIMUM AND MAXIMUM CLEARANCE                       N/A       N/A 3.9N-7   FIGURE 3.9N-7   DECEMBER 1997             CONTROL ROD DRIVE MECHANISM SCHEMATIC LATCH CLEARANCE THERMAL EFFECT           N/A       N/A 3.9N-8   FIGURE 3.9N-8   NONE                     LOWER CORE SUPPORT ASSEMBLY (CORE BARREL ASSEMBLY)                             N/A       N/A 3.9N-9   FIGURE 3.9N-9   NONE                     UPPER CORE SUPPORT ASSEMBLY                                                     N/A       N/A 3.9N-10   FIGURE 3.9N-10   NONE                     PLAN VIEW OF UPPER CORE SUPPORT ASSEMBLY                                       N/A       N/A 3.9N-11   FIGURE 3.9N-11   JANUARY 1991             NEUTRON SHIELD PANEL DESIGN                                                     N/A       N/A 3.9N-12   FIGURE 3.9N-12   JANUARY 1991             NEUTRON SHIELD PANEL DESIGN DETAILS                                             N/A       N/A 3A.1.2-1 FIGURE 3A.1.2-1 NONE                     ONE HUNDRED ELEMENT IDEALIZATION OF THIN WALL CYLINDER                         N/A       N/A 3A.1.4-1 FIGURE 3A.1.4-1 NONE                     ELEMENT PLOT                                                                   N/A       N/A 3A.1.4-2 FIGURE 3A.1.4-2 NONE                     HARMONIC AXISYMMETRIC PLAIN STRAIN                                             N/A       N/A 3A.1.5-1 FIGURE 3A.1.5-1 NONE                     TAC2D SAMPLE PROBLEM THERMAL MODEL                                             N/A       N/A TRANSIENT TEMPERATURES IN A RIGHT CIRCULAR CYLINDER COMPARISON OF TAC2D RESULTS 3A.1.5-2 FIGURE 3A.1.5-2 NONE                                                                                                     N/A       N/A WITH SERIES SOLUTION 3A.1.6-1 FIGURE 3A.1.6-1 NONE                     STRUCTURAL MODEL                                                               N/A       N/A 3A.1.7-1 FIGURE 3A.1.7.-1 NONE                     FINITE ELEMENT GRID FOR PLAXLY-FLUSH COMPARISON                                 N/A       N/A 3A.1.7-2 FIGURE 3A.1.7.-2 NONE                     HORIZONTAL AMPLIFIED RESPONSE SPECTRA AT TOP MASS IN BEAM STRUCTURE                       N/A Page 33 of 83
MPS-3 FSAR Page 33 of 83 3.9N-6 FIGURE 3.9N-6 NONE NOMINAL LATCH CLEARANCE AT MINIMUM AND MAXIMUM CLEARANCE N/A N/A 3.9N-7 FIGURE 3.9N-7 DECEMBER 1997 CONTROL ROD DRIVE MECHANISM SCHEMATIC LATCH CLEARANCE THERMAL EFFECT N/A N/A 3.9N-8 FIGURE 3.9N-8 NONE LOWER CORE SUPPORT ASSEMBLY (CORE BARREL ASSEMBLY)
N/A N/A 3.9N-9 FIGURE 3.9N-9 NONE UPPER CORE SUPPORT ASSEMBLY N/A N/A 3.9N-10 FIGURE 3.9N-10 NONE PLAN VIEW OF UPPER CORE SUPPORT ASSEMBLY N/A N/A 3.9N-11 FIGURE 3.9N-11 JANUARY 1991 NEUTRON SHIELD PANEL DESIGN N/A N/A 3.9N-12 FIGURE 3.9N-12 JANUARY 1991 NEUTRON SHIELD PANEL DESIGN DETAILS N/A N/A 3A.1.2-1 FIGURE 3A.1.2-1 NONE ONE HUNDRED ELEMENT IDEALIZATION OF THIN WALL CYLINDER N/A N/A 3A.1.4-1 FIGURE 3A.1.4-1 NONE ELEMENT PLOT N/A N/A 3A.1.4-2 FIGURE 3A.1.4-2 NONE HARMONIC AXISYMMETRIC PLAIN STRAIN N/A N/A 3A.1.5-1 FIGURE 3A.1.5-1 NONE TAC2D SAMPLE PROBLEM THERMAL MODEL N/A N/A 3A.1.5-2 FIGURE 3A.1.5-2 NONE TRANSIENT TEMPERATURES IN A RIGHT CIRCULAR CYLINDER COMPARISON OF TAC2D RESULTS WITH SERIES SOLUTION N/A N/A 3A.1.6-1 FIGURE 3A.1.6-1 NONE STRUCTURAL MODEL N/A N/A 3A.1.7-1 FIGURE 3A.1.7.-1 NONE FINITE ELEMENT GRID FOR PLAXLY-FLUSH COMPARISON N/A N/A 3A.1.7-2 FIGURE 3A.1.7.-2 NONE HORIZONTAL AMPLIFIED RESPONSE SPECTRA AT TOP MASS IN BEAM STRUCTURE N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                          Drawing FIGURE LABEL      DATE / Revision [ ]                                          TITLE                          SHEET Number                                                                                                          Number 3A.2.3-1 FIGURE 3A.2.3-1 NONE                     TARGET FOR LOW TRAJECTORY MISSILE                           N/A       N/A 3A.2.11-1 FIGURE 3A.2.11-1 NONE                     CANTILEVER PIPE USED IN MIT EXPERIMENT                     N/A       N/A 3A.3-1   FIGURE 3A.3-1   NONE                     MATHEMATICAL MODEL FOR FLEXIBILITY ANALYSIS VERIFICATION   N/A       N/A 3A.3-2   FIGURE 3A.3-2   NONE                     NUPIPE PROGRAM FORCE TIME - HISTORY VERIFICATION           N/A       N/A 3A.3-3   FIGURE 3A.3-3   NONE                     MATHEMATICAL MODEL FOR CLASS I STRESS VERIFICATION         N/A       N/A 3A.3-4   FIGURE 3A.3-4   NONE                     TEST PROBLEM - SAVAL                                       N/A       N/A 3A.3-5   FIGURE 3A.3-5   NONE                     SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A       N/A 3A.3-6   FIGURE 3A.3-6   NONE                     SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A       N/A 3A.3-7   FIGURE 3A.3-7   NONE                     COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END         N/A       N/A 3A.3-8   FIGURE 3A.3-8   NONE                     COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END         N/A       N/A 3A.3-9   FIGURE 3A.3-9   NONE                     COMPARISON OF PRESSURE RESPONSES BY STEHAM & EXPERIMENT     N/A       N/A 3A.3-10   FIGURE 3A.3-10   NONE                     HYDRAULIC NETWORK FOR VERIFICATION PROBLELM                 N/A       N/A 3A.3-11   FIGURE 3A.3-11   NONE                     HYDRAULIC NETWORK FO R WATHAM VERIFICATION                 N/A       N/A 3A.3-12   FIGURE 3A.3-12   NONE                     HEAD - VERSUS - TIME PLOT FOR JUNCTION J                   N/A       N/A 3A.3-13   FIGURE 3A.3-13   NONE                     HEAD - VERSUS - TIME PLOT AT VALVE                         N/A       N/A Page 34 of 83
MPS-3 FSAR Page 34 of 83 3A.2.3-1 FIGURE 3A.2.3-1 NONE TARGET FOR LOW TRAJECTORY MISSILE N/A N/A 3A.2.11-1 FIGURE 3A.2.11-1 NONE CANTILEVER PIPE USED IN MIT EXPERIMENT N/A N/A 3A.3-1 FIGURE 3A.3-1 NONE MATHEMATICAL MODEL FOR FLEXIBILITY ANALYSIS VERIFICATION N/A N/A 3A.3-2 FIGURE 3A.3-2 NONE NUPIPE PROGRAM FORCE TIME - HISTORY VERIFICATION N/A N/A 3A.3-3 FIGURE 3A.3-3 NONE MATHEMATICAL MODEL FOR CLASS I STRESS VERIFICATION N/A N/A 3A.3-4 FIGURE 3A.3-4 NONE TEST PROBLEM - SAVAL N/A N/A 3A.3-5 FIGURE 3A.3-5 NONE SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A N/A 3A.3-6 FIGURE 3A.3-6 NONE SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A N/A 3A.3-7 FIGURE 3A.3-7 NONE COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END N/A N/A 3A.3-8 FIGURE 3A.3-8 NONE COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END N/A N/A 3A.3-9 FIGURE 3A.3-9 NONE COMPARISON OF PRESSURE RESPONSES BY STEHAM & EXPERIMENT N/A N/A 3A.3-10 FIGURE 3A.3-10 NONE HYDRAULIC NETWORK FOR VERIFICATION PROBLELM N/A N/A 3A.3-11 FIGURE 3A.3-11 NONE HYDRAULIC NETWORK FO R WATHAM VERIFICATION N/A N/A 3A.3-12 FIGURE 3A.3-12 NONE HEAD - VERSUS - TIME PLOT FOR JUNCTION J N/A N/A 3A.3-13 FIGURE 3A.3-13 NONE HEAD - VERSUS - TIME PLOT AT VALVE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                                              SHEET Number                                                                                                                                Number 3A.3-14   FIGURE 3A.3-14   NOVEMBER 1987             DESIGN INPUT TO A PROBLEM                                                     N/A       N/A 3A.3-15   FIGURE 3A.3-15   NOVEMBER 1987             PIPE 1 SEGMENT 1 FORCE - TIME HISTORY                                         N/A       N/A 4.2-1     FIGURE 4.2-1     JUNE 1999                 FUEL ASSEMBLY CROSS SECTION 17 X 17                                           N/A       N/A 4.2-2     FIGURE 4.2-2     JANUARY 1998               COMPARISON OF THE 17X17 V5H FUEL ASSEMBLY AND THE 17X17 STANDARD FUEL ASSEMBLY N/A       N/A 4.2-3     FIGURE 4.2-3     JANUARY 1998               17X17 VANTAGE 5-H FUEL ROD ASSEMBLY                                           N/A       N/A 4.2-4     FIGURE 4.2-4     JUNE 1994                 V5H FUEL ASSEMBLY PLAN VIEW                                                   N/A       N/A 4.2-5     FIGURE 4.2-5     OCTOBER 1997               GRID TO THIMBLE ATTACHMENT JOINTS                                             N/A       N/A 4.2-6     FIGURE 4.2-6     JUNE 1992                 THIMBLE/INSERT/TOP GRID SLEEVE BULGE JOINT GEOMETRY                           N/A       N/A 4.2-7     FIGURE 4.2-7     JANUARY 1998               GUIDE THIMBLE TO BOTTOM NOZZLE JOINT                                           N/A       N/A 4.2-8     FIGURE 4.2-8     JANUARY 1998               ROD CLUSTER CONTROL AND DRIVE ROD ASSEMBLY WITH INTERFACING COMPONENTS         N/A       N/A 4.2-9     FIGURE 4.2-9     [21.3]                     DELETED BY CHANGE PKG FSC 08-MP3-027                                           N/A       N/A 4.2-9A   FIGURE 4.2-9A   [21.3]                     FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY (WESTINGHOUSE)                       N/A       N/A 4.2-9B   FIGURE 4.2-9B   [21.3]                     FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY AND ABSORBER ROD (AREVA)             N/A       N/A 4.2-10   FIGURE 4.2-10   [21.3]                     ABSORBER ROD (WESTINGHOUSE)                                                   N/A       N/A 4.2-11   FIGURE 4.2-11   OCTOBER 1997               BURNABLE ABSORBER ASSEMBLY                                                     N/A       N/A Page 35 of 83
MPS-3 FSAR Page 35 of 83 3A.3-14 FIGURE 3A.3-14 NOVEMBER 1987 DESIGN INPUT TO A PROBLEM N/A N/A 3A.3-15 FIGURE 3A.3-15 NOVEMBER 1987 PIPE 1 SEGMENT 1 FORCE - TIME HISTORY N/A N/A 4.2-1 FIGURE 4.2-1 JUNE 1999 FUEL ASSEMBLY CROSS SECTION 17 X 17 N/A N/A 4.2-2 FIGURE 4.2-2 JANUARY 1998 COMPARISON OF THE 17X17 V5H FUEL ASSEMBLY AND THE 17X17 STANDARD FUEL ASSEMBLY N/A N/A 4.2-3 FIGURE 4.2-3 JANUARY 1998 17X17 VANTAGE 5-H FUEL ROD ASSEMBLY N/A N/A 4.2-4 FIGURE 4.2-4 JUNE 1994 V5H FUEL ASSEMBLY PLAN VIEW N/A N/A 4.2-5 FIGURE 4.2-5 OCTOBER 1997 GRID TO THIMBLE ATTACHMENT JOINTS N/A N/A 4.2-6 FIGURE 4.2-6 JUNE 1992 THIMBLE/INSERT/TOP GRID SLEEVE BULGE JOINT GEOMETRY N/A N/A 4.2-7 FIGURE 4.2-7 JANUARY 1998 GUIDE THIMBLE TO BOTTOM NOZZLE JOINT N/A N/A 4.2-8 FIGURE 4.2-8 JANUARY 1998 ROD CLUSTER CONTROL AND DRIVE ROD ASSEMBLY WITH INTERFACING COMPONENTS N/A N/A 4.2-9 FIGURE 4.2-9
[21.3]
DELETED BY CHANGE PKG FSC 08-MP3-027 N/A N/A 4.2-9A FIGURE 4.2-9A
[21.3]
FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY (WESTINGHOUSE)
N/A N/A 4.2-9B FIGURE 4.2-9B
[21.3]
FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY AND ABSORBER ROD (AREVA)
N/A N/A 4.2-10 FIGURE 4.2-10
[21.3]
ABSORBER ROD (WESTINGHOUSE)
N/A N/A 4.2-11 FIGURE 4.2-11 OCTOBER 1997 BURNABLE ABSORBER ASSEMBLY N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                                  SHEET Number                                                                                                                                  Number 4.2-13   FIGURE 4.2-13   JANUARY 1998               PRIMARY SOURCE ASSEMBLY                                                         N/A       N/A 4.2-14A   FIGURE 4.2-14A   JANUARY 1998               SINGLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY                                   N/A       N/A 4.2-14B   FIGURE 4.2-14B   JANUARY 1998               DOUBLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY                                   N/A       N/A 4.2-15   FIGURE 4.2-15   JANUARY 1998               THIMBLE PLUG ASSEMBLY                                                           N/A       N/A 4.3-1     FIGURE 4.3-1     JUNE 1992                 FUEL LOADING ARRANGEMENT                                                         N/A       N/A 4.3-2     FIGURE 4.3-2     SEPTEMBER 1997             TYPICAL PRODUCTION AND CONSUMPTION OF HIGHER ISOTOPES                           N/A       N/A TYPICAL BORON CONCENTRATION VERSUS FIRST CYCLE BURNUP WITH AND WITHOUT 4.3-3     FIGURE 4.3-3     SEPTEMBER 1997                                                                                             N/A       N/A BURNABLE ABSORBER RODS 4.3-4     FIGURE 4.3-4     SEPTEMBER 1997             TYPICAL INTEGRAL FUEL BURNABLE ABSORBER ROD ARRANGEMENT WITHIN AN ASSEMBLY       N/A       N/A 4.3-5     FIGURE 4.3-5     JUNE 1992                 BURNABLE ABSORBER ASSEMBLY LOADING PATTERN (TYPICAL)                             N/A       N/A 4.3-5A   FIGURE 4.3-5A   [15]                       INTEGRAL FUEL BURNABLE ABSORBER AND SOURCE ROD LOCATIONS (TYPICAL)               N/A       N/A COMPARISON OF A TYPICAL ASSEMBLY AXIAL POWER DISTRIBUTIN WITH CORE AVERAGE AXIAL 4.3-17    FIGURE 4.3-17    NONE                                                                                                        N/A       N/A DISTRIBUTION BANK D SLIGHTY INSERTED 4.3-21   FIGURE 4.3-21   [17.2]                     TYPICAL MAXIMUM NORMALIZED Fq X POWER VERSUS AXIAL HEIGHT                       N/A       N/A TYPICAL COMPARISON BETWEEN CALCULATED AND MEASURED RELATIVE FUEL ASSEMBLY 4.3-24   FIGURE 4.3-24   SEPTEMBER 1997                                                                                             N/A       N/A POWER DISTRIBUTION 4.3-25   FIGURE 4.3-25   NONE                       COMPARISON OF TYPICAL CALCULATED AND MEASURED AXIAL SHAPES                       N/A       N/A 4.3-26   FIGURE 4.3-26   SEPTEMBER 1997             TYPICAL MEASURED VALUES OF Fq FOR FULL POWER TOD CONFIGURATIONS                 N/A       N/A Page 36 of 83
MPS-3 FSAR Page 36 of 83 4.2-13 FIGURE 4.2-13 JANUARY 1998 PRIMARY SOURCE ASSEMBLY N/A N/A 4.2-14A FIGURE 4.2-14A JANUARY 1998 SINGLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY N/A N/A 4.2-14B FIGURE 4.2-14B JANUARY 1998 DOUBLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY N/A N/A 4.2-15 FIGURE 4.2-15 JANUARY 1998 THIMBLE PLUG ASSEMBLY N/A N/A 4.3-1 FIGURE 4.3-1 JUNE 1992 FUEL LOADING ARRANGEMENT N/A N/A 4.3-2 FIGURE 4.3-2 SEPTEMBER 1997 TYPICAL PRODUCTION AND CONSUMPTION OF HIGHER ISOTOPES N/A N/A 4.3-3 FIGURE 4.3-3 SEPTEMBER 1997 TYPICAL BORON CONCENTRATION VERSUS FIRST CYCLE BURNUP WITH AND WITHOUT BURNABLE ABSORBER RODS N/A N/A 4.3-4 FIGURE 4.3-4 SEPTEMBER 1997 TYPICAL INTEGRAL FUEL BURNABLE ABSORBER ROD ARRANGEMENT WITHIN AN ASSEMBLY N/A N/A 4.3-5 FIGURE 4.3-5 JUNE 1992 BURNABLE ABSORBER ASSEMBLY LOADING PATTERN (TYPICAL)
N/A N/A 4.3-5A FIGURE 4.3-5A
[15]
INTEGRAL FUEL BURNABLE ABSORBER AND SOURCE ROD LOCATIONS (TYPICAL)
N/A N/A 4.3-17 FIGURE 4.3-17 NONE COMPARISON OF A TYPICAL ASSEMBLY AXIAL POWER DISTRIBUTIN WITH CORE AVERAGE AXIAL DISTRIBUTION BANK D SLIGHTY INSERTED N/A N/A 4.3-21 FIGURE 4.3-21
[17.2]
TYPICAL MAXIMUM NORMALIZED Fq X POWER VERSUS AXIAL HEIGHT N/A N/A 4.3-24 FIGURE 4.3-24 SEPTEMBER 1997 TYPICAL COMPARISON BETWEEN CALCULATED AND MEASURED RELATIVE FUEL ASSEMBLY POWER DISTRIBUTION N/A N/A 4.3-25 FIGURE 4.3-25 NONE COMPARISON OF TYPICAL CALCULATED AND MEASURED AXIAL SHAPES N/A N/A 4.3-26 FIGURE 4.3-26 SEPTEMBER 1997 TYPICAL MEASURED VALUES OF Fq FOR FULL POWER TOD CONFIGURATIONS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                    Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                                                    SHEET Number                                                                                                                                    Number TYPICAL DOPPLER TEMPERATURE COEFFICIENT AT BEGINNING OF LIFE AND END-OF-LIFE, CYCLE 4.3-27    FIGURE 4.3-27    NONE                                                                                                          N/A       N/A I
MPS-3 FSAR Page 37 of 83 4.3-27 FIGURE 4.3-27 NONE TYPICAL DOPPLER TEMPERATURE COEFFICIENT AT BEGINNING OF LIFE AND END-OF-LIFE, CYCLE I
4.3-28   FIGURE 4.3-28   NONE                       TYPICAL DOPPLER - ONLY POWER COEFFICIENT AT BOL AND EOL, CYCLE I                   N/A       N/A 4.3-29   FIGURE 4.3-29   NONE                       TYPICAL DOPPLER - ONLY POWER DEFECT AT BOL AND EOL, CYCLE I                         N/A       N/A 4.3-30   FIGURE 4.3-30   NONE                       TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT BOL, CYCLE I, NO RODS                 N/A       N/A 4.3-31   FIGURE 4.3-31   NONE                       TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT EOL, CYCLE I                           N/A       N/A TYPICAL MODERATOR TEMPERATURE COEFFICIENT AS A FUNCTION OF BORON CONCENTRATION 4.3-32   FIGURE 4.3-32   NONE                                                                                                           N/A        N/A AT BOL, CYCLE I, NO RODS TYPICAL HOT FULL POWER TEMPERATURE COEFFICIENT DURING CYCLE I FOR THE CRITICAL 4.3-33    FIGURE 4.3-33    NONE                                                                                                          N/A       N/A BORON CONCENTRATION 4.3-34   FIGURE 4.3-34   NONE                       TYPICAL TOTAL POWER COEFFICIENT AT BOL AND EOL, CYCLE I                             N/A       N/A 4.3-35   FIGURE 4.3-35   NONE                       TYPICAL TOTAL POWER DEFECT AT BOL AND EOL, CYCLE I                                 N/A       N/A 4.3-36   FIGURE 4.3-36   NONE                       ROD CLUSTER CONTROL ASSEMBLY PATTERN                                               N/A       N/A TYPICAL ACCIDENTAL SIMULTANEOUS WITHDRAWAL OF TWO CONTROL BANKS AT EOL, HZP, 4.3-37    FIGURE 4.3-37    NONE                                                                                                          N/A        N/A BANK D AND B MOVING IN THE SAME PLANE 4.3-38   FIGURE 4.3-38   JUNE 1992                 DESIGN TRIP CURVE (TYPICAL)                                                         N/A       N/A 4.3-39   FIGURE 4.3-39   NONE                       TYPICAL NORMALIZED ROD WORTH VERSUS PERCENT INSERTION, ALL RODS OUT BUT ONE         N/A       N/A 4.3-40   FIGURE 4.3-40   SEPTEMBER 1997             TYPICAL AXIAL OFFSET VERSUS TIME, PWR CORE WITH A 12 FOOT HEIGHT AND 121 ASSEMBLIES N/A       N/A TYPICAL X-Y XENON TEST TERMOCOUPLE RESPONSE QUANDRANT TILT DIFFERENCE VERSUS 4.3-41   FIGURE 4.3-41   SEPTEMBER 1997                                                                                                 N/A       N/A TIME Page 37 of 83
N/A N/A 4.3-28 FIGURE 4.3-28 NONE TYPICAL DOPPLER - ONLY POWER COEFFICIENT AT BOL AND EOL, CYCLE I N/A N/A 4.3-29 FIGURE 4.3-29 NONE TYPICAL DOPPLER - ONLY POWER DEFECT AT BOL AND EOL, CYCLE I N/A N/A 4.3-30 FIGURE 4.3-30 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT BOL, CYCLE I, NO RODS N/A N/A 4.3-31 FIGURE 4.3-31 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT EOL, CYCLE I N/A N/A 4.3-32 FIGURE 4.3-32 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AS A FUNCTION OF BORON CONCENTRATION AT BOL, CYCLE I, NO RODS N/A N/A 4.3-33 FIGURE 4.3-33 NONE TYPICAL HOT FULL POWER TEMPERATURE COEFFICIENT DURING CYCLE I FOR THE CRITICAL BORON CONCENTRATION N/A N/A 4.3-34 FIGURE 4.3-34 NONE TYPICAL TOTAL POWER COEFFICIENT AT BOL AND EOL, CYCLE I N/A N/A 4.3-35 FIGURE 4.3-35 NONE TYPICAL TOTAL POWER DEFECT AT BOL AND EOL, CYCLE I N/A N/A 4.3-36 FIGURE 4.3-36 NONE ROD CLUSTER CONTROL ASSEMBLY PATTERN N/A N/A 4.3-37 FIGURE 4.3-37 NONE TYPICAL ACCIDENTAL SIMULTANEOUS WITHDRAWAL OF TWO CONTROL BANKS AT EOL, HZP, BANK D AND B MOVING IN THE SAME PLANE N/A N/A 4.3-38 FIGURE 4.3-38 JUNE 1992 DESIGN TRIP CURVE (TYPICAL)
N/A N/A 4.3-39 FIGURE 4.3-39 NONE TYPICAL NORMALIZED ROD WORTH VERSUS PERCENT INSERTION, ALL RODS OUT BUT ONE N/A N/A 4.3-40 FIGURE 4.3-40 SEPTEMBER 1997 TYPICAL AXIAL OFFSET VERSUS TIME, PWR CORE WITH A 12 FOOT HEIGHT AND 121 ASSEMBLIES N/A N/A 4.3-41 FIGURE 4.3-41 SEPTEMBER 1997 TYPICAL X-Y XENON TEST TERMOCOUPLE RESPONSE QUANDRANT TILT DIFFERENCE VERSUS TIME N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                  Number TYPICAL CALCULATED AND MEASURED DOPPLER DEFECT AND CKOEEFICIENTS AT BOL, 2 - LOOP 4.3-42    FIGURE 4.3-42    SEPTEMBER 1997                                                                                              N/A        N/A PLANT, 121 ASSEMBLIES, 12 FOOT CORE 4.4-1     FIGURE 4.4-1     [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-040                                             N/A       N/A 4.4-2     FIGURE 4.4-2     NONE                       TDC VERSUS REYNOLDS NUMBER FOR 26 INCH GRID SPACING                               N/A       N/A 4.4-3     FIGURE 4.4-3     [21.3]                     TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 4 FOOT ELEVATION     N/A       N/A 4.4-4     FIGURE 4.4-4     [21.3]                     TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 8 FOOT ELEVATION     N/A       N/A 4.4-5     FIGURE 4.4-5     [21.3]                     TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 12 FOOT ELEVATION     N/A       N/A 4.4-6     FIGURE 4.4-6     [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-040                                             N/A       N/A 4.4-7     FIGURE 4.4-7     NONE                       THERMAL CONDUCTIVITY OF UO2 (DATA CORRECTED TO 95% THEORETICAL DENSITY)           N/A       N/A 4.4-8     FIGURE 4.4-8     [21.3]                     REACTOR COOLANT SYSTEM TEMPERATURE - PERCENT POWER MAP                           N/A       N/A 4.4-10   FIGURE 4.4-10   MARCH 2001                 DISTRIBUTION OF INCORE INSTRUMENTATION                                           N/A       N/A 4.4-11   FIGURE 4.4-11   AMENDMENT 9 JULY 1984     ICC FUNCTIONAL BLOCK DIAGRAM (TRAIN A - TRAIN B SIMILAR)                         N/A       N/A 4.4-12   FIGURE 4.4-12   NOVEMBER 1987             TYPICAL REACTOR COOLANT PARAMETERS FOLLOWING SMALL BREAK LOCA                     N/A       N/A 4.4-13   FIGURE 4.4-13   SEPTEMBER 1997             HJTCS FUNCTIONAL CONFIGURATION                                                   N/A       N/A 4.4-14   FIGURE 4.4-14   NOVEMBER 1987             TYPICAL PROBE/SENSOR CONFIGURATION                                               N/A       N/A 4.4-15   FIGURE 4.4-15   NOVEMBER 1987             HJTC SENSOR - HJYC/SPLASH SHIELD                                                 N/A       N/A Page 38 of 83
MPS-3 FSAR Page 38 of 83 4.3-42 FIGURE 4.3-42 SEPTEMBER 1997 TYPICAL CALCULATED AND MEASURED DOPPLER DEFECT AND CKOEEFICIENTS AT BOL, 2 - LOOP PLANT, 121 ASSEMBLIES, 12 FOOT CORE N/A N/A 4.4-1 FIGURE 4.4-1
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-040 N/A N/A 4.4-2 FIGURE 4.4-2 NONE TDC VERSUS REYNOLDS NUMBER FOR 26 INCH GRID SPACING N/A N/A 4.4-3 FIGURE 4.4-3
[21.3]
TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 4 FOOT ELEVATION N/A N/A 4.4-4 FIGURE 4.4-4
[21.3]
TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 8 FOOT ELEVATION N/A N/A 4.4-5 FIGURE 4.4-5
[21.3]
TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 12 FOOT ELEVATION N/A N/A 4.4-6 FIGURE 4.4-6
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-040 N/A N/A 4.4-7 FIGURE 4.4-7 NONE THERMAL CONDUCTIVITY OF UO2 (DATA CORRECTED TO 95% THEORETICAL DENSITY)
N/A N/A 4.4-8 FIGURE 4.4-8
[21.3]
REACTOR COOLANT SYSTEM TEMPERATURE - PERCENT POWER MAP N/A N/A 4.4-10 FIGURE 4.4-10 MARCH 2001 DISTRIBUTION OF INCORE INSTRUMENTATION N/A N/A 4.4-11 FIGURE 4.4-11 AMENDMENT 9 JULY 1984 ICC FUNCTIONAL BLOCK DIAGRAM (TRAIN A - TRAIN B SIMILAR)
N/A N/A 4.4-12 FIGURE 4.4-12 NOVEMBER 1987 TYPICAL REACTOR COOLANT PARAMETERS FOLLOWING SMALL BREAK LOCA N/A N/A 4.4-13 FIGURE 4.4-13 SEPTEMBER 1997 HJTCS FUNCTIONAL CONFIGURATION N/A N/A 4.4-14 FIGURE 4.4-14 NOVEMBER 1987 TYPICAL PROBE/SENSOR CONFIGURATION N/A N/A 4.4-15 FIGURE 4.4-15 NOVEMBER 1987 HJTC SENSOR - HJYC/SPLASH SHIELD N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                            Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                              SHEET Number                                                                                                              Number 4.4-16   FIGURE 4.4-16         APRIL 1994                 ELECTRICAL DIAGRAM OF HJTC                             N/A             N/A 4.4-17   FIGURE 4.4-17         SEPTEMBER 1997             TYPICAL CONFIGURATION (ONE CHANNEL)                     N/A             N/A 4.4-18   FIGURE 4.4-18         NOVEMBER 1987             HEATED JUNCTION THERMOCOUPLE PROBE ASSEMBLY             N/A             N/A 4.4-19   FIGURE 4.4-19         NOVEMBER 1987             HJTC PROBE HOLDER SUPPORT TUBE INSTALLATION             N/A             N/A 4.4-20   FIGURE 4.4-20         NOVEMBER 1987             HJTC PROBE PRESSURE BOUNDARY INSTALLATION               N/A             N/A 4.4-21   FIGURE 4.4-21         NOVEMBER 1987             PROBE HANDLING HARDWARE CONFIGURATION                   N/A             N/A 5.1-1     FIGURE 5.1-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 1 5.1-1     FIGURE 5.1-1 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 2 5.1-1     FIGURE 5.1-1 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 3 5.1-1     FIGURE 5.1-1 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 4 5.1-1     FIGURE 5.1-1 SH. 5   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 5 5.1-1     FIGURE 5.1-1 SH. 6   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 6 5.1-2     FIGURE 5.1-2         NOVEMBER 1987             REACTOR COOLANT SYSTEM PROCESS FLOW DESIGN             N/A             N/A 5.1-2     NOTES TO FIGURE 5.1-2 JULY 1997                 MODE A STEADY STATE FULL POWER OPERATION               N/A             N/A 5.2-1     FIGURE 5.2-1         SEPTEMBER 1997             REACTOR VESSEL INSPECTION AREA                         N/A             N/A Page 39 of 83
MPS-3 FSAR Page 39 of 83 4.4-16 FIGURE 4.4-16 APRIL 1994 ELECTRICAL DIAGRAM OF HJTC N/A N/A 4.4-17 FIGURE 4.4-17 SEPTEMBER 1997 TYPICAL CONFIGURATION (ONE CHANNEL)
N/A N/A 4.4-18 FIGURE 4.4-18 NOVEMBER 1987 HEATED JUNCTION THERMOCOUPLE PROBE ASSEMBLY N/A N/A 4.4-19 FIGURE 4.4-19 NOVEMBER 1987 HJTC PROBE HOLDER SUPPORT TUBE INSTALLATION N/A N/A 4.4-20 FIGURE 4.4-20 NOVEMBER 1987 HJTC PROBE PRESSURE BOUNDARY INSTALLATION N/A N/A 4.4-21 FIGURE 4.4-21 NOVEMBER 1987 PROBE HANDLING HARDWARE CONFIGURATION N/A N/A 5.1-1 FIGURE 5.1-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 1 5.1-1 FIGURE 5.1-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 2 5.1-1 FIGURE 5.1-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 3 5.1-1 FIGURE 5.1-1 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 4 5.1-1 FIGURE 5.1-1 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 5 5.1-1 FIGURE 5.1-1 SH. 6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 6 5.1-2 FIGURE 5.1-2 NOVEMBER 1987 REACTOR COOLANT SYSTEM PROCESS FLOW DESIGN N/A N/A 5.1-2 NOTES TO FIGURE 5.1-2 JULY 1997 MODE A STEADY STATE FULL POWER OPERATION N/A N/A 5.2-1 FIGURE 5.2-1 SEPTEMBER 1997 REACTOR VESSEL INSPECTION AREA N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                    Number 5.2-2     FIGURE 5.2-2         SEPTEMBER 1997             MODEL F STEAM GENERATOR INSPECTION AREA                                       N/A             N/A 5.2-3     FIGURE 5.2-3         DECEMBER 1997             PRESSURIZER INSPECTION AREAS                                                 N/A             N/A 5.3-1     FIGURE 5.3-1         NONE                       IDENTIFICATION AND LOCATON OF BELTLINE REGION MATERIAL FOR THE REACTOR VESSEL N/A             N/A 5.3-2     FIGURE 5.3-2         JUNE 1997                 REACTOR VESSEL INSPECTION AREA                                               N/A             N/A 5.4-1     FIGURE 5.4-1         NONE                       REACTOR COOLANT PUMP                                                         N/A             N/A 5.4-2     FIGURE 5.4-2         NONE                       REACTOR COOLANT PUMP ESTIMATED PERFORMANCE CHARACTERISTICS                   N/A             N/A 5.4-3     FIGURE 5.4-3         NONE                       MODEL F STEAM GENERATOR                                                       N/A             N/A 5.4-4     FIGURE 5.4-4         NONE                       QUATREFOIL TUBE SUPPORT PLATES                                               N/A             N/A 5.4-5     FIGURE 5.4-5 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM         25212-26912 (a) SH 1 OF 3 5.4-5     FIGURE 5.4-5 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM         25212-26912 (a) SH 2 OF 3 PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT 5.4-5     FIGURE 5.4-5 SH. 3   [27.3]                                                                                                   25212-26912 (a) SH 3 OF 3 RECIRCULATION 5.4-6     FIGURE 5.4-6         MAY 1998                   RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM (MODE A)                   N/A             N/A 5.4-6     NOTES TO FIGURE 5.4-6 [21.3]                     MODE A INITIATION OF RESIDUAL HEAT REMOVAL SYSTEM OPERATION                   N/A             N/A 5.4-7     FIGURE 5.4-7         NONE                       PRESSURIZER RELIEF TANK                                                       N/A             N/A 5.4-8     FIGURE 5.4-8         NONE                       PRESSURIZER                                                                   N/A             N/A Page 40 of 83
MPS-3 FSAR Page 40 of 83 5.2-2 FIGURE 5.2-2 SEPTEMBER 1997 MODEL F STEAM GENERATOR INSPECTION AREA N/A N/A 5.2-3 FIGURE 5.2-3 DECEMBER 1997 PRESSURIZER INSPECTION AREAS N/A N/A 5.3-1 FIGURE 5.3-1 NONE IDENTIFICATION AND LOCATON OF BELTLINE REGION MATERIAL FOR THE REACTOR VESSEL N/A N/A 5.3-2 FIGURE 5.3-2 JUNE 1997 REACTOR VESSEL INSPECTION AREA N/A N/A 5.4-1 FIGURE 5.4-1 NONE REACTOR COOLANT PUMP N/A N/A 5.4-2 FIGURE 5.4-2 NONE REACTOR COOLANT PUMP ESTIMATED PERFORMANCE CHARACTERISTICS N/A N/A 5.4-3 FIGURE 5.4-3 NONE MODEL F STEAM GENERATOR N/A N/A 5.4-4 FIGURE 5.4-4 NONE QUATREFOIL TUBE SUPPORT PLATES N/A N/A 5.4-5 FIGURE 5.4-5 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 1 OF 3 5.4-5 FIGURE 5.4-5 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 2 OF 3 5.4-5 FIGURE 5.4-5 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT RECIRCULATION 25212-26912 (a) SH 3 OF 3 5.4-6 FIGURE 5.4-6 MAY 1998 RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM (MODE A)
N/A N/A 5.4-6 NOTES TO FIGURE 5.4-6
[21.3]
MODE A INITIATION OF RESIDUAL HEAT REMOVAL SYSTEM OPERATION N/A N/A 5.4-7 FIGURE 5.4-7 NONE PRESSURIZER RELIEF TANK N/A N/A 5.4-8 FIGURE 5.4-8 NONE PRESSURIZER N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                      Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                                      SHEET Number                                                                                                                      Number 5.4-9     FIGURE 5.4-9     NONE                       RPV SUPPORT SYSTEM                                                   N/A       N/A 5.4-10   FIGURE 5.4-10   NONE                       LEVELING DEVICE (TYPICAL) RPV SUPPORT SYSTEM                         N/A       N/A 5.4-11   FIGURE 5.4-11   NONE                       VERTICAL SUPPORTS (TYPICAL) REACTOR COOLANT PUMPS AND STEAM GENERATOR N/A       N/A 5.4-12   FIGURE 5.4-12   NONE                       LATERAL SUPPORT (TYPICAL) STEAM GENERATOR                             N/A       N/A 5.4-13   FIGURE 5.4-13   NONE                       LATERAL SUPPORT (TYPICAL) REACTOR COOLANT PUMP                       N/A       N/A 5.4-14   FIGURE 5.4-14   NONE                       PRESSURIZER SUPPORT                                                   N/A       1 OF 2 5.4-14   FIGURE 5.4-14   NONE                       PRESSURIZER SUPPORT                                                   N/A       2 OF 2 5.4-15   FIGURE 5.4-15   NONE                       PRESSURIZER SAFETY VALVE SUPPORT SYSTEM                               N/A       1 OF 2 5.4-15   FIGURE 5.4-15   NONE                       PRESSURIZER SAFETY VALVE SUPPORT SYSTEM                               N/A       2 OF 2 6.0-1     FIGURE 6.0-1     OCTOBER 1997               ENGINEERED SAFETY FEATURES                                           N/A       N/A 6.2-1     FIGURE 6.2-1     [27.2]                     CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)                 N/A       N/A 6.2-2     FIGURE 6.2-2     [21.3]                     CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)                 N/A       N/A 6.2-3     FIGURE 6.2-3     [21.3]                     CONTAINMENT VAPOR TEMPERATURE RESPONSE - LOCA                         N/A       N/A 6.2-4     FIGURE 6.2-4     [21.3]                     CONTAINMENT LINER TEMPERATURE RESPONSE - LOCA                         N/A       N/A 6.2-5     FIGURE 6.2-5     [21.3]                     CONTAINMENT DEPRESSURIZATION RESPONSE - LOCA                         N/A       N/A Page 41 of 83
MPS-3 FSAR Page 41 of 83 5.4-9 FIGURE 5.4-9 NONE RPV SUPPORT SYSTEM N/A N/A 5.4-10 FIGURE 5.4-10 NONE LEVELING DEVICE (TYPICAL) RPV SUPPORT SYSTEM N/A N/A 5.4-11 FIGURE 5.4-11 NONE VERTICAL SUPPORTS (TYPICAL) REACTOR COOLANT PUMPS AND STEAM GENERATOR N/A N/A 5.4-12 FIGURE 5.4-12 NONE LATERAL SUPPORT (TYPICAL) STEAM GENERATOR N/A N/A 5.4-13 FIGURE 5.4-13 NONE LATERAL SUPPORT (TYPICAL) REACTOR COOLANT PUMP N/A N/A 5.4-14 FIGURE 5.4-14 NONE PRESSURIZER SUPPORT N/A 1 OF 2 5.4-14 FIGURE 5.4-14 NONE PRESSURIZER SUPPORT N/A 2 OF 2 5.4-15 FIGURE 5.4-15 NONE PRESSURIZER SAFETY VALVE SUPPORT SYSTEM N/A 1 OF 2 5.4-15 FIGURE 5.4-15 NONE PRESSURIZER SAFETY VALVE SUPPORT SYSTEM N/A 2 OF 2 6.0-1 FIGURE 6.0-1 OCTOBER 1997 ENGINEERED SAFETY FEATURES N/A N/A 6.2-1 FIGURE 6.2-1
[27.2]
CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)
N/A N/A 6.2-2 FIGURE 6.2-2
[21.3]
CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)
N/A N/A 6.2-3 FIGURE 6.2-3
[21.3]
CONTAINMENT VAPOR TEMPERATURE RESPONSE - LOCA N/A N/A 6.2-4 FIGURE 6.2-4
[21.3]
CONTAINMENT LINER TEMPERATURE RESPONSE - LOCA N/A N/A 6.2-5 FIGURE 6.2-5
[21.3]
CONTAINMENT DEPRESSURIZATION RESPONSE - LOCA N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                    Number 6.2-6     FIGURE 6.2-6     [21.3]                     CONTAINMENT SUMP TEMPERATURE RESPONSE                                             N/A       N/A 6.2-7     FIGURE 6.2-7     [21.3]                     CONTAINMENT PRESSURE FROM 1.4 FT2 MLSB AT 0% POWER, NO ENTRAINMENT - LIMITING PEAK N/A       N/A PRESSURE CASE 6.2-8     FIGURE 6.2-8     [21.3]                     CONTAINMENT TEMPERATURE FROM 1.4 ft2 MLSB AT 102% POWER, NO ENTRAINMENT - LIMITING N/A       N/A PEAK TEMPERATURE CASE 6.2-9     FIGURE 6.2-9     [21.3]                     CONTAINMENT LINER TEMPERATURE FROM 1.4 FT 2 AT 0%POWER, NO ENTRAINMENT - PEAK     N/A       N/A TEMPERATURE CASE 6.2-10   FIGURE 6.2-10   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-11   FIGURE 6.2-11   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-12   FIGURE 6.2-12   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-13   FIGURE 6.2-13   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-14   FIGURE 6.2-14   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-15   FIGURE 6.2-15   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-16   FIGURE 6.2-16   [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A       N/A 6.2-17   FIGURE 6.2-17   AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT ELEVATION VIEW WITH NODAL ARRANGEMENT                   N/A       N/A 6.2-18   FIGURE 6.2-18   AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 95 FEET - 3 INCHES         N/A       N/A 6.2-18A   FIGURE 6.2-18A   AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 74 FEET - 2 INCHES         N/A       N/A 6.2-18B   FIGURE 6.2-18B   AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 51 FEET - 3 INCHES         N/A       N/A Page 42 of 83
MPS-3 FSAR Page 42 of 83 6.2-6 FIGURE 6.2-6
[21.3]
CONTAINMENT SUMP TEMPERATURE RESPONSE N/A N/A 6.2-7 FIGURE 6.2-7
[21.3]
CONTAINMENT PRESSURE FROM 1.4 FT2 MLSB AT 0% POWER, NO ENTRAINMENT - LIMITING PEAK PRESSURE CASE N/A N/A 6.2-8 FIGURE 6.2-8
[21.3]
CONTAINMENT TEMPERATURE FROM 1.4 ft2 MLSB AT 102% POWER, NO ENTRAINMENT - LIMITING PEAK TEMPERATURE CASE N/A N/A 6.2-9 FIGURE 6.2-9
[21.3]
CONTAINMENT LINER TEMPERATURE FROM 1.4 FT 2 AT 0%POWER, NO ENTRAINMENT - PEAK TEMPERATURE CASE N/A N/A 6.2-10 FIGURE 6.2-10
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-11 FIGURE 6.2-11
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-12 FIGURE 6.2-12
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-13 FIGURE 6.2-13
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-14 FIGURE 6.2-14
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-15 FIGURE 6.2-15
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-16 FIGURE 6.2-16
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-17 FIGURE 6.2-17 AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT ELEVATION VIEW WITH NODAL ARRANGEMENT N/A N/A 6.2-18 FIGURE 6.2-18 AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 95 FEET - 3 INCHES N/A N/A 6.2-18A FIGURE 6.2-18A AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 74 FEET - 2 INCHES N/A N/A 6.2-18B FIGURE 6.2-18B AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 51 FEET - 3 INCHES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL      DATE / Revision [ ]                                        TITLE                                              SHEET Number                                                                                                                              Number 6.2-18C   FIGURE 6.2-18C   AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 25 FEET - 7 INCHES     N/A       N/A 6.2-18D   FIGURE 6.2-18D   AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 12 FEET - 5 INCHES     N/A       N/A 6.2-19   FIGURE 6.2-19   [22]                       STEAM GENERATOR SUBCOMPARTMENT ELEVATION WITH NONDAL ARRANGEMENT             N/A       N/A 6.2-20   FIGURE 6.2-20   [22]                       PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 3 FEET - 8 INCHES N/A       N/A 6.2-21   FIGURE 6.2-21   [22]                       PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 28 FEET - 6 INCHES N/A       N/A 6.2-22   FIGURE 6.2-22   [22]                       PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 51 FEET - 4 INCHES N/A       N/A 6.2-23   FIGURE 6.2-23   DECEMBER 1997             UPPER REACTOR CAVITY SUBCOMPARTMENT PLAN ELEVATION AND NODAL ARRANGEMENT     N/A       N/A 6.2-24   FIGURE 6.2-24   AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT NODALIZATION DIAGRAM                               N/A       N/A 6.2-25   FIGURE 6.2-25   [22]                       STEAM GENERATOR SUBCOMPARTMENT NODALIZATION DIAGRAM                           N/A       N/A 6.2-26   FIGURE 6.2-26   DECEMBER 1997             STAGGERED MESH APPROXIMATION FOR NODES AND INTERNAL JUNCTIONS                 N/A       N/A 6.2-27   FIGURE 6.2-27   NONE                       GENERAL FLOW CHART FOR THREED                                                 N/A       N/A 6.2-28   FIGURE 6.2-28   AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE                                         N/A       N/A 6.2-28A   FIGURE 6.2-28A   AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE                                         N/A       N/A 6.2-29   FIGURE 6.2-29   [22]                       PRESSURE RESPONSE PRESSURIZER CUBICLE                                         N/A       N/A 6.2-29A   FIGURE 6.29A     [22]                       PRESSURE RESPONSE PRESSURIZER CUBICLE                                         N/A       N/A Page 43 of 83
MPS-3 FSAR Page 43 of 83 6.2-18C FIGURE 6.2-18C AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 25 FEET - 7 INCHES N/A N/A 6.2-18D FIGURE 6.2-18D AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 12 FEET - 5 INCHES N/A N/A 6.2-19 FIGURE 6.2-19
[22]
STEAM GENERATOR SUBCOMPARTMENT ELEVATION WITH NONDAL ARRANGEMENT N/A N/A 6.2-20 FIGURE 6.2-20
[22]
PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 3 FEET - 8 INCHES N/A N/A 6.2-21 FIGURE 6.2-21
[22]
PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 28 FEET - 6 INCHES N/A N/A 6.2-22 FIGURE 6.2-22
[22]
PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 51 FEET - 4 INCHES N/A N/A 6.2-23 FIGURE 6.2-23 DECEMBER 1997 UPPER REACTOR CAVITY SUBCOMPARTMENT PLAN ELEVATION AND NODAL ARRANGEMENT N/A N/A 6.2-24 FIGURE 6.2-24 AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT NODALIZATION DIAGRAM N/A N/A 6.2-25 FIGURE 6.2-25
[22]
STEAM GENERATOR SUBCOMPARTMENT NODALIZATION DIAGRAM N/A N/A 6.2-26 FIGURE 6.2-26 DECEMBER 1997 STAGGERED MESH APPROXIMATION FOR NODES AND INTERNAL JUNCTIONS N/A N/A 6.2-27 FIGURE 6.2-27 NONE GENERAL FLOW CHART FOR THREED N/A N/A 6.2-28 FIGURE 6.2-28 AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-28A FIGURE 6.2-28A AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29 FIGURE 6.2-29
[22]
PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29A FIGURE 6.29A
[22]
PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                        Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                            SHEET Number                                                                                                                          Number 6.2-29B   FIGURE 6.2-29B     [22]                       PRESSURE RESPONSE PRESSURIZER CUBICLE                                 N/A             N/A 6.2-29C   FIGURE 6.2-29C     [22]                       PRESSURE RESPONSE PRESSURIZER CUBICLE                                 N/A             N/A 6.2-29D   FIGURE 6.2-29D     [22]                       PRESSURE RESPONSE PRESSURIZER CUBICLE                                 N/A             N/A 6.2-30   FIGURE 6.2-30       [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-31   FIGURE 6.2-31       [22]                       PRESSURE RESPONSE STEAM GENERATOR CUBICLE                             N/A             N/A 6.2-32   FIGURE 6.2-32       [22]                       PRESSURE RESPONSE STEAM GENERATOR CUBICLE                             N/A             N/A 6.2-33   FIGURE 6.2-33       [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-34   FIGURE 6.2-34       [22]                       PRESSURE RESPONSE STEAM GENERATOR CUBICLE                             N/A             N/A 6.2-34A   FIGURE 6.2-34A     [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-34B   FIGURE 6.2-34B     [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-34C   FIGURE 6.2-34C     [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-34D   FIGURE 6.2-34D     [22]                       DELETED BY PKG FSC MP3-UCR-2009-006                                   N/A             N/A 6.2-35   FIGURE 6.2-35       [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                 N/A             N/A 6.2-36   FIGURE 6.2-36       [27.3]                     QUENCH SPRAY AND HYDROGEN RECOMBINER                                 25212-26915 (a) N/A 6.2-37   FIGURE 6.2-37 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 1 OF 3 Page 44 of 83
MPS-3 FSAR Page 44 of 83 6.2-29B FIGURE 6.2-29B
[22]
PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29C FIGURE 6.2-29C
[22]
PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29D FIGURE 6.2-29D
[22]
PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-30 FIGURE 6.2-30
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-31 FIGURE 6.2-31
[22]
PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-32 FIGURE 6.2-32
[22]
PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-33 FIGURE 6.2-33
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34 FIGURE 6.2-34
[22]
PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-34A FIGURE 6.2-34A
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34B FIGURE 6.2-34B
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34C FIGURE 6.2-34C
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34D FIGURE 6.2-34D
[22]
DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-35 FIGURE 6.2-35
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-36 FIGURE 6.2-36
[27.3]
QUENCH SPRAY AND HYDROGEN RECOMBINER 25212-26915 (a) N/A 6.2-37 FIGURE 6.2-37 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 1 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                      Drawing FIGURE LABEL            DATE / Revision [ ]                                        TITLE                                                      SHEET Number                                                                                                                                      Number 6.2-37   FIGURE 6.2-37 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM             25212-26912 (a) SH 2 OF 3 PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT 6.2-37   FIGURE 6.2-37 SH. 3 [27.3]                                                                                                       25212-26912 (a) SH 3 OF 3 RECIRCULATION 6.2-38   FIGURE 6.2-38       [21.3])                     TYPICAL CONTAINMENT STRUCTURE SUMP                                               N/A             N/A SPATIAL DROPLET SIZE DISTRIBUTION OF SPRACO 1713A NOZZLE APPLYING SURFACE AREA 6.2-39   FIGURE 6.2-39       NONE                                                                                                         N/A            N/A CORRECTION AND SPRAYING WATER AT 40 PSIG UNDER LABORATORY CONDITIONS 6.2-40   FIGURE 6.2-40       APRIL 1998                 CONTAINMENT RECIRCULATION PUMPS CHARACTERISTIC CURVES                             N/A             N/A 6.2-41   FIGURE 6.2-41       [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A             N/A CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED 6.2-42   FIGURE 6.2-42       APRIL 1998                                                                                                   N/A            N/A TEMPERATURE (275F), SPRAY HEADER AT 141 FEET 9 INCHES CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED 6.2-43   FIGURE 6.2-43       APRIL 1998                                                                                                   N/A            N/A TEMPERATURE (275F), SPRAY HEADER AT 145 FEET 3 INCHES QUENCH SPRAY COVERAGE BEND LINE (ELEVATION 104 ft), ELEVATED TEMPERATURE (275F),
MPS-3 FSAR Page 45 of 83 6.2-37 FIGURE 6.2-37 SH. 2
6.2-44   FIGURE 6.2-44       [16.2]                                                                                                       N/A            N/A SPRAY HEADERS AT 153 FEET AND 168 FEET 6.2-45   FIGURE 6.2-45       [21.3]                     DELETED BY CHANGE: PKG FSC 07-MP3-038                                             N/A             N/A 6.2-46   FIGURE 6.2-46       MAY 1994                   SUPPLEMENTARY LEAK COLLECTION AND RELEASE SYSTEM                                 N/A             N/A 6.2-47   FIGURE 6.2-47 SH. 1 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM                                                     N/A             1 OF 14 6.2-47   FIGURE 6.2-47 SH. 2 [22.3]                     CONTAINMENT ISOLATION SYSTEM                                                     N/A             2 OF 14 6.2-47   FIGURE 6.2-47 SH. 3 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM                                                     N/A             3 OF 14 6.2-47   FIGURE 6.2-47 SH. 4 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM                                                     N/A             4 OF 14 Page 45 of 83
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 2 OF 3 6.2-37 FIGURE 6.2-37 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT RECIRCULATION 25212-26912 (a) SH 3 OF 3 6.2-38 FIGURE 6.2-38
[21.3])
TYPICAL CONTAINMENT STRUCTURE SUMP N/A N/A 6.2-39 FIGURE 6.2-39 NONE SPATIAL DROPLET SIZE DISTRIBUTION OF SPRACO 1713A NOZZLE APPLYING SURFACE AREA CORRECTION AND SPRAYING WATER AT 40 PSIG UNDER LABORATORY CONDITIONS N/A N/A 6.2-40 FIGURE 6.2-40 APRIL 1998 CONTAINMENT RECIRCULATION PUMPS CHARACTERISTIC CURVES N/A N/A 6.2-41 FIGURE 6.2-41
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-42 FIGURE 6.2-42 APRIL 1998 CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED TEMPERATURE (275F), SPRAY HEADER AT 141 FEET 9 INCHES N/A N/A 6.2-43 FIGURE 6.2-43 APRIL 1998 CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED TEMPERATURE (275F), SPRAY HEADER AT 145 FEET 3 INCHES N/A N/A 6.2-44 FIGURE 6.2-44
[16.2]
QUENCH SPRAY COVERAGE BEND LINE (ELEVATION 104 ft), ELEVATED TEMPERATURE (275F),
SPRAY HEADERS AT 153 FEET AND 168 FEET N/A N/A 6.2-45 FIGURE 6.2-45
[21.3]
DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-46 FIGURE 6.2-46 MAY 1994 SUPPLEMENTARY LEAK COLLECTION AND RELEASE SYSTEM N/A N/A 6.2-47 FIGURE 6.2-47 SH. 1 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 1 OF 14 6.2-47 FIGURE 6.2-47 SH. 2
[22.3]
CONTAINMENT ISOLATION SYSTEM N/A 2 OF 14 6.2-47 FIGURE 6.2-47 SH. 3 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 3 OF 14 6.2-47 FIGURE 6.2-47 SH. 4 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 4 OF 14 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE            SHEET Number                                                                                                Number 6.2-47   FIGURE 6.2-47 SH. 5 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM               N/A       5 OF 14 6.2-47   FIGURE 6.2-47 SH. 6 [22.3]                     CONTAINMENT ISOLATION SYSTEM               N/A       6 OF 14 6.2-47   FIGURE 6.2-47 SH. 7 [22.3]                     CONTAINMENT ISOLATION SYSTEM               N/A       7 OF 14 6.2-47   FIGURE 6.2-47 SH. 8 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM               N/A       8 OF 14 6.2-47   FIGURE 6.2-47 SH. 9 JANUARY 1998               CONTAINMENT ISOLATION SYSTEM               N/A       9 OF 14 6.2-47   FIGURE 6.2-47 SH. 10 [20.1]                     CONTAINMENT ISOLATION SYSTEM               N/A       10 OF 14 6.2-47   FIGURE 6.2-47 SH. 11 JANUARY 1998               CONTAINMENT ISOLATION SYSTEM               N/A       11 OF 14 6.2-47   FIGURE 6.2-47 SH. 12 JANUARY 1998               CONTAINMENT ISOLATION SYSTEM               N/A       12 OF 14 6.2-47   FIGURE 6.2-47 SH. 13 JANUARY 1998               CONTAINMENT ISOLATION SYSTEM               N/A       13 OF 14 6.2-47   FIGURE 6.2-47 SH. 14 SEPTEMBER 1997             CONTAINMENT ISOLATION SYSTEM               N/A       14 OF 14 6.2-48   FIGURE 6.2-48       [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010       N/A       N/A 6.2-49   FIGURE 6.2-49       [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010       N/A       N/A 6.2-50   FIGURE 6.2-50       [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010       N/A       N/A 6.2-51   FIGURE 6.2-51       [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010       N/A       N/A 6.2-52   FIGURE 6.2-52       [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010       N/A       N/A Page 46 of 83
MPS-3 FSAR Page 46 of 83 6.2-47 FIGURE 6.2-47 SH. 5 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 5 OF 14 6.2-47 FIGURE 6.2-47 SH. 6
[22.3]
CONTAINMENT ISOLATION SYSTEM N/A 6 OF 14 6.2-47 FIGURE 6.2-47 SH. 7
[22.3]
CONTAINMENT ISOLATION SYSTEM N/A 7 OF 14 6.2-47 FIGURE 6.2-47 SH. 8 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 8 OF 14 6.2-47 FIGURE 6.2-47 SH. 9 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 9 OF 14 6.2-47 FIGURE 6.2-47 SH. 10
[20.1]
CONTAINMENT ISOLATION SYSTEM N/A 10 OF 14 6.2-47 FIGURE 6.2-47 SH. 11 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 11 OF 14 6.2-47 FIGURE 6.2-47 SH. 12 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 12 OF 14 6.2-47 FIGURE 6.2-47 SH. 13 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 13 OF 14 6.2-47 FIGURE 6.2-47 SH. 14 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 14 OF 14 6.2-48 FIGURE 6.2-48
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-49 FIGURE 6.2-49
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-50 FIGURE 6.2-50
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-51 FIGURE 6.2-51
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-52 FIGURE 6.2-52
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                        Drawing FIGURE LABEL              DATE / Revision [ ]                                      TITLE                                          SHEET Number                                                                                                                          Number 6.2-53   FIGURE 6.2.53         [27.3]                     CONTAINMENT MONITORING SYSTEM                                     25212-26954 (a) N/A 6.2-54   FIGURE 6.2-54         AMENDMENT 15 SEPTEMBER 1985 QUENCH SPRAY PUMP CHARACTERISTIC CURVE                             N/A             N/A 6.2-55   FIGURE 6.2-55         [18.4])                     DELETED BY CHANGE PKG FSC 05-MP3-010                               N/A             N/A 6.2-56   FIGURE 6.2-56         AMENDMENT 8 MAY 1984       CONTAINMENT INTERNAL STRUCTURE OPENINGS                           N/A             N/A 6.2-57   FIGURE 6.2-57         AMENDMENT 8 MAY 1984       EXPECTED LONG-TERM CIRCULATION PATTERNS IN CONTAINMENT             N/A             N/A 6.2-58   FIGURE 6.2-58         AMENDMENT 8 MAY 1984       CONTAINMENT HYDROGEN MONITORING SYSTEM                             N/A             N/A 6.2-59   FIGURE 6.2-59         [21.3]                     CONTAINMENT PRESSURE LIMITING BREAK                               N/A             N/A 6.2-59A   FIGURE 6.2-59A       [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                               N/A             N/A 6.2-60   FIGURE 6.2-60         [21.3]                     CONDENSING WALL HEAT TRANSFER COEFFICIENTS LIMITNG BREAK           N/A             N/A 6.2-61   FIGURE 6.2-61         [20.2]                     DELETED BY CHANGE PKG FSC 07-MP3-024                               N/A             N/A 6.2-62   FIGURE 6.2-62         [20.2]                     DELETED BY CHANGE PKG FSC 07-MP3-024                               N/A             N/A 6.3-1     FIGURE 6.3-1         SEPTEMBER 1997             SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A             1 OF 2 6.3-1     FIGURE 6.3-1         SEPTEMBER 1997             SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A             2 OF 2 6.3-1     NOTES TO FIGURE 6.3-1 MAY 1998                   NOTES TO FIGURE 6.3-1                                             N/A             N/A 6.3-2     FIGURE 6.3-2 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION   25212-26913 (a) SH 1 OF 2 Page 47 of 83
MPS-3 FSAR Page 47 of 83 6.2-53 FIGURE 6.2.53
[27.3]
CONTAINMENT MONITORING SYSTEM 25212-26954 (a) N/A 6.2-54 FIGURE 6.2-54 AMENDMENT 15 SEPTEMBER 1985 QUENCH SPRAY PUMP CHARACTERISTIC CURVE N/A N/A 6.2-55 FIGURE 6.2-55
[18.4])
DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-56 FIGURE 6.2-56 AMENDMENT 8 MAY 1984 CONTAINMENT INTERNAL STRUCTURE OPENINGS N/A N/A 6.2-57 FIGURE 6.2-57 AMENDMENT 8 MAY 1984 EXPECTED LONG-TERM CIRCULATION PATTERNS IN CONTAINMENT N/A N/A 6.2-58 FIGURE 6.2-58 AMENDMENT 8 MAY 1984 CONTAINMENT HYDROGEN MONITORING SYSTEM N/A N/A 6.2-59 FIGURE 6.2-59
[21.3]
CONTAINMENT PRESSURE LIMITING BREAK N/A N/A 6.2-59A FIGURE 6.2-59A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 6.2-60 FIGURE 6.2-60
[21.3]
CONDENSING WALL HEAT TRANSFER COEFFICIENTS LIMITNG BREAK N/A N/A 6.2-61 FIGURE 6.2-61
[20.2]
DELETED BY CHANGE PKG FSC 07-MP3-024 N/A N/A 6.2-62 FIGURE 6.2-62
[20.2]
DELETED BY CHANGE PKG FSC 07-MP3-024 N/A N/A 6.3-1 FIGURE 6.3-1 SEPTEMBER 1997 SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A 1 OF 2 6.3-1 FIGURE 6.3-1 SEPTEMBER 1997 SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A 2 OF 2 6.3-1 NOTES TO FIGURE 6.3-1 MAY 1998 NOTES TO FIGURE 6.3-1 N/A N/A 6.3-2 FIGURE 6.3-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION 25212-26913 (a) SH 1 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                  Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                      SHEET Number                                                                                                                  Number 6.3-2     FIGURE 6.3-2 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION 25212-26913 (a) SH 2 OF 2 6.3-3     FIGURE 6.3-3       DECEMBER 2001 (01-43)     RESIDUAL HEAT REMOVAL PUMP PERFORMANCE CURVE                   N/A             N/A 6.3-4     FIGURE 6.3-4       MAY 1998                   CHARGING PUMP CURVE ASSUMED FOR SAFETY ANALYSIS                 N/A             N/A 6.3-5     FIGURE 6.3-5       MAY 1998                   HIGH HEAD SI PUMP CURVE ASSUMED FOR SAFETY ANALYSIS             N/A             N/A 6.3-6     FIGURE 6.3-6       [24.3]                     REFUELING WATER STORAGE TANK WATER LEVELS                       N/A             N/A 6.4-1     FIGURE 6.4-1       [20.1]                     CONTROL ROOM AREA                                               N/A             N/A 6.4-2     FIGURE 6.4-2       [23.1]                     CONTROL ROOM INTAKE AND HAZARDOUS MATERIAL STORAGE LOCATIONS   N/A             N/A 6.5-1     FIGURE 6.5-1       [21.3]                     POST DBA MINIMUM CONTAINMENT SUMP pH                           N/A             N/A 7.1-1     FIGURE 7.1-1       JULY 1997                 SOLID STATE PROTECTION SYSTEM BLOCK DIAGRAM                     N/A             N/A 7.1-2     FIGURE 7.1-2       [24]                       REACTOR TRIP/ESF ACTUATION MECHANICAL LINKAGE                   N/A             N/A 7.2-1     FIGURE 7.2-1 SH. 1 [27.3]                     FUNCTIONAL DIAGRAMS INDEX & SYMBOLS                             25212-39001 (a) SH4002 7.2-1     FIGURE 7.2-1 SH. 2 [27.3]                     FUNCTIONAL DIAGRAMS REACTOR TRIP SIGNAL                         25212-39001 (a) SH4003 7.2-1     FIGURE 7.2-1 SH. 3 [27.3]                     FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS & MANUAL TRIP SIGNALS   25212-39001 (a) SH4004 7.2-1     FIGURE 7.2-1 SH. 4 [27.3]                     FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS PERMISSIVES & BLOCKS   25212-39001 (a) SH4005 7.2-1     FIGURE 7.2-1 SH. 5 [27.3]                     FUNCTIONAL DIAGRAMS PRIMARY COOLANT SYSTEM TRIP SIGNALS         25212-39001 (a) SH4006 Page 48 of 83
MPS-3 FSAR Page 48 of 83 6.3-2 FIGURE 6.3-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION 25212-26913 (a) SH 2 OF 2 6.3-3 FIGURE 6.3-3 DECEMBER 2001 (01-43)
RESIDUAL HEAT REMOVAL PUMP PERFORMANCE CURVE N/A N/A 6.3-4 FIGURE 6.3-4 MAY 1998 CHARGING PUMP CURVE ASSUMED FOR SAFETY ANALYSIS N/A N/A 6.3-5 FIGURE 6.3-5 MAY 1998 HIGH HEAD SI PUMP CURVE ASSUMED FOR SAFETY ANALYSIS N/A N/A 6.3-6 FIGURE 6.3-6
[24.3]
REFUELING WATER STORAGE TANK WATER LEVELS N/A N/A 6.4-1 FIGURE 6.4-1
[20.1]
CONTROL ROOM AREA N/A N/A 6.4-2 FIGURE 6.4-2
[23.1]
CONTROL ROOM INTAKE AND HAZARDOUS MATERIAL STORAGE LOCATIONS N/A N/A 6.5-1 FIGURE 6.5-1
[21.3]
POST DBA MINIMUM CONTAINMENT SUMP pH N/A N/A 7.1-1 FIGURE 7.1-1 JULY 1997 SOLID STATE PROTECTION SYSTEM BLOCK DIAGRAM N/A N/A 7.1-2 FIGURE 7.1-2
[24]
REACTOR TRIP/ESF ACTUATION MECHANICAL LINKAGE N/A N/A 7.2-1 FIGURE 7.2-1 SH. 1
[27.3]
FUNCTIONAL DIAGRAMS INDEX & SYMBOLS 25212-39001 (a) SH4002 7.2-1 FIGURE 7.2-1 SH. 2
[27.3]
FUNCTIONAL DIAGRAMS REACTOR TRIP SIGNAL 25212-39001 (a) SH4003 7.2-1 FIGURE 7.2-1 SH. 3
[27.3]
FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS & MANUAL TRIP SIGNALS 25212-39001 (a) SH4004 7.2-1 FIGURE 7.2-1 SH. 4
[27.3]
FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS PERMISSIVES & BLOCKS 25212-39001 (a) SH4005 7.2-1 FIGURE 7.2-1 SH. 5
[27.3]
FUNCTIONAL DIAGRAMS PRIMARY COOLANT SYSTEM TRIP SIGNALS 25212-39001 (a) SH4006 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                Number 7.2-1     FIGURE 7.2-1 SH. 6 [27.3]                     FUNCTIONAL DIAGRAMS PRESSURIZER TRIP SIGNALS                                 25212-39001 (a) SH4007 7.2-1     FIGURE 7.2-1 SH. 7 [27.3]                     FUNCTIONAL DIAGRAMS STEAM GENERATOR TRIP SIGNALS                             25212-39001 (a) SH4008 7.2-1     FIGURE 7.2-1 SH. 8 [27.3]                     FUNCTIONAL DIAGRAM SAFEGUARDS ACTUATION SIGNALS                             25212-39001 (a) SH4009 7.2-1     FIGURE 7.2-1 SH. 9 [27.3]                     FUNCTIONAL DIAGRAM ROD CONTROLS & ROD BLOCKS                                 25212-39001 (a) SH4010 7.2-1     FIGURE 7.2-1 SH. 10 [27.3]                     FUNCTIONAL DIAGRAM STEAM DUMP CONTROL                                       25212-39001 (a) SH4011 7.2-1     FIGURE 7.2-1 SH. 11 [27.3]                     FUNCTIONAL DIAGRAM PRESSURIZER PRESSURE & LEVEL CONTROL                     25212-39001 (a) SH4012 7.2-1     FIGURE 7.2-1 SH. 12 [27.3]                     FUNCTIONAL DIAGRAM PRESSURIZER HEATER CONTROL                               25212-39001 (a) SH4013 7.2-1     FIGURE 7.2-1 SH. 13 [27.3]                     FUNCTIONAL DIAGRAM FEEDWATER CONTROL & ISOLATION                             25212-39001 (a) SH4014 7.2-1     FIGURE 7.2-1 SH. 14 [27.3]                     FUNCTIONAL DIAGRAMS FEEDWATER CONTROL & ISOLATION                           25212-39001 (a) SH4015 7.2-1     FIGURE 7.2-1 SH. 15 [27.3]                     FUNCTIONAL DIAGRAMS AUXILLIARY FEEDWATER PUMPS STARTUP                       25212-39001 (a) SH4016 7.2-1     FIGURE 7.2-1 SH. 16 [27.3]                     FUNCTIONAL DIAGRAMS TURBINE TRIP, RUNBACKS & OTHER SIGNALS                   25212-39001 (a) SH4017 7.2-1     FIGURE 7.2-1 SH. 17 [27.3]                     FUNCTIONAL DIAGRAMS LOOP STOP VALVE INTERLOCKS                               25212-39001 (a) SH4018 7.2-1     FIGURE 7.2-1 SH. 18 [27.3]                     FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM                       25212-39001 (a) SH4020 7.2-1     FIGURE 7.2-1 SH. 19 [27.3]                     FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM                       25212-39001 (a) SH4019 7.2-2     FIGURE 7.2-2       NONE                       SETPOINT REDUCTION FUNCTION FOR OVERPOWER AND OVER-TEMPERATURE DELTA T TRIPS N/A             N/A Page 49 of 83
MPS-3 FSAR Page 49 of 83 7.2-1 FIGURE 7.2-1 SH. 6
[27.3]
FUNCTIONAL DIAGRAMS PRESSURIZER TRIP SIGNALS 25212-39001 (a) SH4007 7.2-1 FIGURE 7.2-1 SH. 7
[27.3]
FUNCTIONAL DIAGRAMS STEAM GENERATOR TRIP SIGNALS 25212-39001 (a) SH4008 7.2-1 FIGURE 7.2-1 SH. 8
[27.3]
FUNCTIONAL DIAGRAM SAFEGUARDS ACTUATION SIGNALS 25212-39001 (a) SH4009 7.2-1 FIGURE 7.2-1 SH. 9
[27.3]
FUNCTIONAL DIAGRAM ROD CONTROLS & ROD BLOCKS 25212-39001 (a) SH4010 7.2-1 FIGURE 7.2-1 SH. 10
[27.3]
FUNCTIONAL DIAGRAM STEAM DUMP CONTROL 25212-39001 (a) SH4011 7.2-1 FIGURE 7.2-1 SH. 11
[27.3]
FUNCTIONAL DIAGRAM PRESSURIZER PRESSURE & LEVEL CONTROL 25212-39001 (a) SH4012 7.2-1 FIGURE 7.2-1 SH. 12
[27.3]
FUNCTIONAL DIAGRAM PRESSURIZER HEATER CONTROL 25212-39001 (a) SH4013 7.2-1 FIGURE 7.2-1 SH. 13
[27.3]
FUNCTIONAL DIAGRAM FEEDWATER CONTROL & ISOLATION 25212-39001 (a) SH4014 7.2-1 FIGURE 7.2-1 SH. 14
[27.3]
FUNCTIONAL DIAGRAMS FEEDWATER CONTROL & ISOLATION 25212-39001 (a) SH4015 7.2-1 FIGURE 7.2-1 SH. 15
[27.3]
FUNCTIONAL DIAGRAMS AUXILLIARY FEEDWATER PUMPS STARTUP 25212-39001 (a) SH4016 7.2-1 FIGURE 7.2-1 SH. 16
[27.3]
FUNCTIONAL DIAGRAMS TURBINE TRIP, RUNBACKS & OTHER SIGNALS 25212-39001 (a) SH4017 7.2-1 FIGURE 7.2-1 SH. 17
[27.3]
FUNCTIONAL DIAGRAMS LOOP STOP VALVE INTERLOCKS 25212-39001 (a) SH4018 7.2-1 FIGURE 7.2-1 SH. 18
[27.3]
FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM 25212-39001 (a) SH4020 7.2-1 FIGURE 7.2-1 SH. 19
[27.3]
FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM 25212-39001 (a) SH4019 7.2-2 FIGURE 7.2-2 NONE SETPOINT REDUCTION FUNCTION FOR OVERPOWER AND OVER-TEMPERATURE DELTA T TRIPS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                              Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                          SHEET Number                                                                                                              Number 7.3-1     FIGURE 7.3-1         DECEMBER 1994             FAILURE MODES AND EFFECTS ANALYSIS QUENCH SPRAY SYSTEM   N/A       N/A 7.3-2     FIGURE 7.3-2         NONE                       FAULT TREE DIAGRAM QUENCH SPRAY SYSTEM                   N/A       N/A 7.3-3     FIGURE 7.3-3         SEPTEMBER 1997             TYPICAL ESF TEST CIRCUITS                               N/A       N/A 7.3-4     FIGURE 7.3-4         SEPTEMBER 1997             ENGINEERED SAFEGUARDS TEST CABINET                       N/A       N/A 7.6-1     FIGURE 7.6-1         [21.3]                     LOGIC DIAGRAM FOR RHS ISOLATION VALVES                   N/A       N/A 7.6-1     NOTES TO FIGURE 7.6-1 MAY 1998                   NOTES TO FIGURE 7.6-1                                   N/A       N/A 7.6-2     FIGURE 7.6-2         NONE                       FUNCTIONAL BLOCK DIAGRAM OF ACCUMULATOR ISOLATION VALVES N/A       N/A 7.6-3     FIGURE 7.6-3 SH.1     AMENDMENT 8 MAY 1984       AUTOMATIC RHS AND QSS PUMP SHUTOFF                       N/A       1 OF 2 7.6-3     FIGURE 7.6-3 SH.2     AMENDMENT 8 MAY 1984       AUTOMATIC RHS AND QSS PUMP SHUTOFF                       N/A       2 OF 2 7.6-4     FIGURE 7.6-4         NONE                       REACTOR COOLANT SYSTEM LOOP WITH LOOP STOP VALVES       N/A       N/A 7.7-1     FIGURE 7.7-1         SEPTEMBER 1997             SIMPLIFIED BLOCK DIAGRAM OF REACTOR CONTROL SYSTEM       N/A       N/A 7.7-2     FIGURE 7.7-2         NONE                       CONTROL BANK ROD INSERTION MONITOR                       N/A       N/A 7.7-3     FIGURE 7.7-3         NONE                       ROD DEVIATION COMPARATOR                                 N/A       N/A 7.7-4     FIGURE 7.7-4         APRIL 1998                 BLOCK DIAGRAM OF PRESSURIZER PRESSURE CONTROL SYSTEM     N/A       N/A 7.7-5     FIGURE 7.7-5         NONE                       BLOCK DIAGRAM OF PRESSURIZER LEVEL CONTROL SYSTEM       N/A       N/A Page 50 of 83
MPS-3 FSAR Page 50 of 83 7.3-1 FIGURE 7.3-1 DECEMBER 1994 FAILURE MODES AND EFFECTS ANALYSIS QUENCH SPRAY SYSTEM N/A N/A 7.3-2 FIGURE 7.3-2 NONE FAULT TREE DIAGRAM QUENCH SPRAY SYSTEM N/A N/A 7.3-3 FIGURE 7.3-3 SEPTEMBER 1997 TYPICAL ESF TEST CIRCUITS N/A N/A 7.3-4 FIGURE 7.3-4 SEPTEMBER 1997 ENGINEERED SAFEGUARDS TEST CABINET N/A N/A 7.6-1 FIGURE 7.6-1
[21.3]
LOGIC DIAGRAM FOR RHS ISOLATION VALVES N/A N/A 7.6-1 NOTES TO FIGURE 7.6-1 MAY 1998 NOTES TO FIGURE 7.6-1 N/A N/A 7.6-2 FIGURE 7.6-2 NONE FUNCTIONAL BLOCK DIAGRAM OF ACCUMULATOR ISOLATION VALVES N/A N/A 7.6-3 FIGURE 7.6-3 SH.1 AMENDMENT 8 MAY 1984 AUTOMATIC RHS AND QSS PUMP SHUTOFF N/A 1 OF 2 7.6-3 FIGURE 7.6-3 SH.2 AMENDMENT 8 MAY 1984 AUTOMATIC RHS AND QSS PUMP SHUTOFF N/A 2 OF 2 7.6-4 FIGURE 7.6-4 NONE REACTOR COOLANT SYSTEM LOOP WITH LOOP STOP VALVES N/A N/A 7.7-1 FIGURE 7.7-1 SEPTEMBER 1997 SIMPLIFIED BLOCK DIAGRAM OF REACTOR CONTROL SYSTEM N/A N/A 7.7-2 FIGURE 7.7-2 NONE CONTROL BANK ROD INSERTION MONITOR N/A N/A 7.7-3 FIGURE 7.7-3 NONE ROD DEVIATION COMPARATOR N/A N/A 7.7-4 FIGURE 7.7-4 APRIL 1998 BLOCK DIAGRAM OF PRESSURIZER PRESSURE CONTROL SYSTEM N/A N/A 7.7-5 FIGURE 7.7-5 NONE BLOCK DIAGRAM OF PRESSURIZER LEVEL CONTROL SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                    Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                                  SHEET Number                                                                                                                                    Number 7.7-6     FIGURE 7.7-6       NONE                       BLOCK DIAGRAM OF STEAM GENERATOR WATER LEVEL CONTROL SYSTEM                     N/A       N/A 7.7-7     FIGURE 7.7-7       NONE                       BLOCK DIAGRAM OF MAIN FEEDWATER PUMP SPEED CONTROL SYSTEM                       N/A       N/A 7.7-8     FIGURE 7.7-8       NONE                       BLOCK DIAGRAM OF STEAM DUMP CONTROL SYSTEM                                       N/A       N/A 7.7-9     FIGURE 7.7-9       NONE                       BASIC FLUX-MAPPING SYSTEM                                                       N/A       N/A 7.7-14   FIGURE 7.7-14     SEPTEMBER 1997             SIMPLIFIED BLOCK DIAGRAM OF ROD CONTROL SYSTEM                                   N/A       N/A CONTROL BANK B PARTIAL SIMPLIFIED SCHEMATIC DIAGRAM OF POWER CABINETS 1 BD AND 2 7.7-15    FIGURE 7.7-15      SEPTEMBER 1997                                                                                              N/A       N/A BD 7.8-1     FIGURE 7.8-1       SEPTEMBER 1989             ACTUATION LOGIC SYSTEM ARCHITECTURE                                             N/A       N/A 8.1-1     FIGURE 8.1-1       [23.1])                     ELECTRICAL ONE LINE DIAGRAM                                                     N/A       N/A 8.1-2     FIGURE 8.1-2       JANUARY 1998               345 kV TRANSMISSION MAP OF CONNECTICUT AND WESTERN MASSACHUSETTS                 N/A       N/A 8.1-3     FIGURE 8.1-3       [21.3]                     345 kV SWITCHYARD                                                               N/A       N/A 8.2-1     FIGURE 8.2-1       JANUARY 1998               MILLSTONE - MANCHESTER 345 kV LINE                                               N/A       N/A 8.2-2     FIGURE 8.2-2       [19.2]                     HUNTS BROOK JUNCTION                                                             N/A       N/A 8.3-1     FIGURE 8.3-1 SH. 1 MAY 1997                   ROUTING OF REDUNDANT CIRCUITS                                                   N/A       1 OF 4 8.3-1     FIGURE 8.3-1 SH. 2 MAY 1997                   ROUTING OF REDUNDANT CIRCUITS                                                   N/A       2 OF 4 8.3-1     FIGURE 8.3-1 SH. 3 NONE                       ROUTING OF REDUNDANT CIRCUITS                                                   N/A       3 OF 4 Page 51 of 83
MPS-3 FSAR Page 51 of 83 7.7-6 FIGURE 7.7-6 NONE BLOCK DIAGRAM OF STEAM GENERATOR WATER LEVEL CONTROL SYSTEM N/A N/A 7.7-7 FIGURE 7.7-7 NONE BLOCK DIAGRAM OF MAIN FEEDWATER PUMP SPEED CONTROL SYSTEM N/A N/A 7.7-8 FIGURE 7.7-8 NONE BLOCK DIAGRAM OF STEAM DUMP CONTROL SYSTEM N/A N/A 7.7-9 FIGURE 7.7-9 NONE BASIC FLUX-MAPPING SYSTEM N/A N/A 7.7-14 FIGURE 7.7-14 SEPTEMBER 1997 SIMPLIFIED BLOCK DIAGRAM OF ROD CONTROL SYSTEM N/A N/A 7.7-15 FIGURE 7.7-15 SEPTEMBER 1997 CONTROL BANK B PARTIAL SIMPLIFIED SCHEMATIC DIAGRAM OF POWER CABINETS 1 BD AND 2 BD N/A N/A 7.8-1 FIGURE 7.8-1 SEPTEMBER 1989 ACTUATION LOGIC SYSTEM ARCHITECTURE N/A N/A 8.1-1 FIGURE 8.1-1
[23.1])
ELECTRICAL ONE LINE DIAGRAM N/A N/A 8.1-2 FIGURE 8.1-2 JANUARY 1998 345 kV TRANSMISSION MAP OF CONNECTICUT AND WESTERN MASSACHUSETTS N/A N/A 8.1-3 FIGURE 8.1-3
[21.3]
345 kV SWITCHYARD N/A N/A 8.2-1 FIGURE 8.2-1 JANUARY 1998 MILLSTONE - MANCHESTER 345 kV LINE N/A N/A 8.2-2 FIGURE 8.2-2
[19.2]
HUNTS BROOK JUNCTION N/A N/A 8.3-1 FIGURE 8.3-1 SH. 1 MAY 1997 ROUTING OF REDUNDANT CIRCUITS N/A 1 OF 4 8.3-1 FIGURE 8.3-1 SH. 2 MAY 1997 ROUTING OF REDUNDANT CIRCUITS N/A 2 OF 4 8.3-1 FIGURE 8.3-1 SH. 3 NONE ROUTING OF REDUNDANT CIRCUITS N/A 3 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                      Drawing FIGURE LABEL          DATE / Revision [ ]                                        TITLE                                        SHEET Number                                                                                                                        Number 8.3-1     FIGURE 8.3-1 SH. 4 NONE                       ROUTING OF REDUNDANT CIRCUITS                                     N/A             4 OF 4 8.3-2     FIGURE 8.3-2       [27.3]                     120/208V AC NONVITAL BUS AND NONSAFETY RELATED 125V DC SYSTEMS     25212-30076 (a) N/A 8.3-3     FIGURE 8.3-3       [185]                       120V AC VITAL BUS AND SAFETY RELATED 125V DC SYSTEMS               N/A             N/A 8.3-4     FIGURE 8.3-4       MAY 1997                   POWER SUPPLY - THIRD CHARGING PUMP                                 N/A             N/A 8.3-5     FIGURE 8.3-5       AMENDMENT 3 AUGUST 1983     POWER SUPPLY - THIRD REACTOR PLANT COMPONENT COOLING PUMP         N/A             N/A 8.3-6     FIGURE 8.3-6       AMENDMENT 15 SEPTEMBER 1985 EMERGENCY GENERATOR FUEL OIL TRANSFER PUMPS                       N/A             N/A 8.3-7     FIGURE 8.3-7       MAY 1997                   ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS           N/A             1 OF 2 8.3-7     FIGURE 8.3-7       AMENDMENT 18 MARCH 1986     ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS           N/A             2 OF 2 8.3-9     FIGURE 8.3-9       [23.1]                     6.9 kV AND 4160 VOLT SYSTEMS                                       N/A             N/A 8.3-10   FIGURE 8.3-10 SH. 1 [27.3]                     EMERGENCY GENERATOR LOAD SEQUENCING [3EGS*EG-A/B]                 25212-39241 (a) SH 189 8.3-10   FIGURE 8.3-10 SH. 2 [27.3]                     EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]               25212-39241 (a) SH 190 8.3-10   FIGURE 8.3-10 SH. 3 [27.3]                     EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]               25212-39241 (a) SH 191 8.3-10   FIGURE 8.3-10 SH. 4 [27.3]                     EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B] 25212-39241 (a) SH 192 8.3-10   FIGURE 8.3-10 SH. 5 [27.3]                     EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B] 25212-39241 (a) SH 193 9.1-1     FIGURE 9.1-1       OCTOBER 2000 (98-116)       PICTORIAL VIEW OF TYPICAL REGION 3 RACK MODULE                     N/A             N/A Page 52 of 83
MPS-3 FSAR Page 52 of 83 8.3-1 FIGURE 8.3-1 SH. 4 NONE ROUTING OF REDUNDANT CIRCUITS N/A 4 OF 4 8.3-2 FIGURE 8.3-2
[27.3]
120/208V AC NONVITAL BUS AND NONSAFETY RELATED 125V DC SYSTEMS 25212-30076 (a) N/A 8.3-3 FIGURE 8.3-3
[185]
120V AC VITAL BUS AND SAFETY RELATED 125V DC SYSTEMS N/A N/A 8.3-4 FIGURE 8.3-4 MAY 1997 POWER SUPPLY - THIRD CHARGING PUMP N/A N/A 8.3-5 FIGURE 8.3-5 AMENDMENT 3 AUGUST 1983 POWER SUPPLY - THIRD REACTOR PLANT COMPONENT COOLING PUMP N/A N/A 8.3-6 FIGURE 8.3-6 AMENDMENT 15 SEPTEMBER 1985 EMERGENCY GENERATOR FUEL OIL TRANSFER PUMPS N/A N/A 8.3-7 FIGURE 8.3-7 MAY 1997 ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS N/A 1 OF 2 8.3-7 FIGURE 8.3-7 AMENDMENT 18 MARCH 1986 ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS N/A 2 OF 2 8.3-9 FIGURE 8.3-9
[23.1]
6.9 kV AND 4160 VOLT SYSTEMS N/A N/A 8.3-10 FIGURE 8.3-10 SH. 1
[27.3]
EMERGENCY GENERATOR LOAD SEQUENCING [3EGS*EG-A/B]
25212-39241 (a) SH 189 8.3-10 FIGURE 8.3-10 SH. 2
[27.3]
EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]
25212-39241 (a) SH 190 8.3-10 FIGURE 8.3-10 SH. 3
[27.3]
EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]
25212-39241 (a) SH 191 8.3-10 FIGURE 8.3-10 SH. 4
[27.3]
EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B]
25212-39241 (a) SH 192 8.3-10 FIGURE 8.3-10 SH. 5
[27.3]
EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B]
25212-39241 (a) SH 193 9.1-1 FIGURE 9.1-1 OCTOBER 2000 (98-116)
PICTORIAL VIEW OF TYPICAL REGION 3 RACK MODULE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                          Drawing FIGURE LABEL        DATE / Revision [ ]                                          TITLE                                              SHEET Number                                                                                                                            Number 9.1-2     FIGURE 9.1-2     OCTOBER 2000 (98-116)     TOP VIEW OF 6 x 6 RACK ARRAY (REGION 3)                                   N/A             N/A 9.1-2A   FIGURE 9.1-2(A) [15]                       DELETED BY PKG FSC 98-MP3-116                                             N/A             N/A 9.1-3     FIGURE 9.1-3     OCTOBER 2000 (98-116)     SIDE VIEW OF 6 x 6 RACK ARRAY (REGION 3)                                   N/A             N/A 9.1-5     FIGURE 9.1-5     OCTOBER 2000 (98-116)     ADJUSTABLE FUEL RACK LEVELING PAD (REGION 3)                               N/A             N/A 9.1-6     FIGURE 9.1-6     [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FUEL POOL COOLING AND PURIFICATION SYSTEM 25212-26911 (a) N/A 9.1-7     FIGURE 9.1-7     SEPTEMBER 2000 (96-31)     BULK POOL TRANSIENT TEMPERATURE PLOT (FULL CORE OFFLOAD)                   N/A             N/A 9.1-7A   FIGURE 9.1-7A   SEPTEMBER 2000 (96-31)     BULK POOL TRANSIENT TEMPERATURE PLOT (EMERGENCY CORE OFFLOAD)             N/A             N/A 9.1-8     FIGURE 9.1-8     SEPTEMBER 2000             COOLDOWN CURVE FOR NORMAL OPERATION 94 HOUR LOSS OF POOL COOLING)         N/A             N/A 9.1-9     FIGURE 9.1-9     NONE                       REFUELING MACHINE                                                         N/A             N/A 9.1-10   FIGURE 9.1-10   MARCH 2000 (99-46)         SPENT FUEL BRIDGE AND HOISTING STRUCTURE                                   N/A             N/A 9.1-11   FIGURE 9.1-11   NONE                       NEW FUEL ELEVATOR                                                         N/A             N/A 9.1-12   FIGURE 9.1-12   FEBRUARY 2001 (00-45)     FUEL TRANSFER SYSTEM                                                       N/A             N/A 9.1-13   FIGURE 9.1-13   [15]                       DELETED BY PKG FSC 00-MP3-045                                             N/A             N/A 9.1-14   FIGURE 9.1-14   AUGUST 1999               SPENT FUEL HANDLING TOOL                                                   N/A             N/A 9.1-15   FIGURE 9.1-15   NONE                       NEW FUEL HANDLING TOOL                                                     N/A             N/A Page 53 of 83
MPS-3 FSAR Page 53 of 83 9.1-2 FIGURE 9.1-2 OCTOBER 2000 (98-116)
TOP VIEW OF 6 x 6 RACK ARRAY (REGION 3)
N/A N/A 9.1-2A FIGURE 9.1-2(A)
[15]
DELETED BY PKG FSC 98-MP3-116 N/A N/A 9.1-3 FIGURE 9.1-3 OCTOBER 2000 (98-116)
SIDE VIEW OF 6 x 6 RACK ARRAY (REGION 3)
N/A N/A 9.1-5 FIGURE 9.1-5 OCTOBER 2000 (98-116)
ADJUSTABLE FUEL RACK LEVELING PAD (REGION 3)
N/A N/A 9.1-6 FIGURE 9.1-6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FUEL POOL COOLING AND PURIFICATION SYSTEM 25212-26911 (a) N/A 9.1-7 FIGURE 9.1-7 SEPTEMBER 2000 (96-31)
BULK POOL TRANSIENT TEMPERATURE PLOT (FULL CORE OFFLOAD)
N/A N/A 9.1-7A FIGURE 9.1-7A SEPTEMBER 2000 (96-31)
BULK POOL TRANSIENT TEMPERATURE PLOT (EMERGENCY CORE OFFLOAD)
N/A N/A 9.1-8 FIGURE 9.1-8 SEPTEMBER 2000 COOLDOWN CURVE FOR NORMAL OPERATION 94 HOUR LOSS OF POOL COOLING)
N/A N/A 9.1-9 FIGURE 9.1-9 NONE REFUELING MACHINE N/A N/A 9.1-10 FIGURE 9.1-10 MARCH 2000 (99-46)
SPENT FUEL BRIDGE AND HOISTING STRUCTURE N/A N/A 9.1-11 FIGURE 9.1-11 NONE NEW FUEL ELEVATOR N/A N/A 9.1-12 FIGURE 9.1-12 FEBRUARY 2001 (00-45)
FUEL TRANSFER SYSTEM N/A N/A 9.1-13 FIGURE 9.1-13
[15]
DELETED BY PKG FSC 00-MP3-045 N/A N/A 9.1-14 FIGURE 9.1-14 AUGUST 1999 SPENT FUEL HANDLING TOOL N/A N/A 9.1-15 FIGURE 9.1-15 NONE NEW FUEL HANDLING TOOL N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                                                SHEET Number                                                                                                                                  Number 9.1-16   FIGURE 9.1-16   DECEMBER 1993             REACTOR INTERNALS LIFTING DEVICE                                                 N/A       N/A 9.1-17   FIGURE 9.1-17   NOVEMBER 1997             QUICK ACTING STUD TENSIONER                                                     N/A       1 OF 2 9.1-17   FIGURE 9.1-17   NOVEMBER 1997             QUICK ACTING STUD TENSIONER                                                     N/A       2 OF 2 9.1-18   FIGURE 9.1-18   JUNE 1989                 NEW FUEL POOL LAYOUT                                                             N/A       N/A 9.1-19   FIGURE 9.1-19   JUNE 1989                 NEW FUEL RACK ELEVATION VIEW                                                     N/A       N/A FUEL ASSEMBLY TRANSFER LIMIT VERSUS CCP TEMPERATURE - MILLSTONE UNIT 3 FULL CORE 9.1-20   FIGURE 9.1-20   SEPTEMBER 2000 (96-31)                                                                                     N/A       N/A OFFLOAD 9.1-21   FIGURE 9.1-21   OCTOBER 2000 (98-116)     MILLSTONE UNIT 3 SPENT FUEL POOL LAYOUT                                         N/A       N/A 9.1-22   FIGURE 9.1-22   OCTOBER 2000 (98-116)     REGION 1 BLOCKING SCHEME FOR 3-OUT-OF-4 STORAGE RACKS                           N/A       N/A 9.1-22a   FIGURE 9.1-22a   OCTOBER 2000 (98-116)     PICTORIAL VIEW OF TYPICAL REGION 1 RACK MODULE                                   N/A       N/A 9.1-22b   FIGURE 9.1-22b   OCTOBER 2000 (98-116)     TYPICAL ASSEMBLAGE OF REGION 1 CELLS                                             N/A       N/A 9.1-22c   FIGURE 9.1-22c   OCTOBER 2000 (98-116)     ELEVATION VIEW OF REGION 1 RACK MODULE                                           N/A       N/A 9.1-23a   FIGURE 9.1-23a   OCTOBER 2000 (98-116)     PICTORIAL VIEW OF TYPICAL REGION 2 RACK MODULE                                   N/A       N/A 9.1-23b   FIGURE 9.1-23b   OCTOBER 2000 (98-116)     TYPICAL ARRAY OF REGION 2 CELLS                                                 N/A       N/A 9.1-23c   FIGURE 9.1-23c   OCTOBER 2000 (98-116)     ELEVATION VIEW OF REGION 2 RACK MODULE                                           N/A       N/A 9.1-24   FIGURE 9.1-24   OCTOBER 2000 (98-116)     SUPPORT PEDESTAL FOR REGION 1 AND REGION 2 RACK MODULES                         N/A       N/A Page 54 of 83
MPS-3 FSAR Page 54 of 83 9.1-16 FIGURE 9.1-16 DECEMBER 1993 REACTOR INTERNALS LIFTING DEVICE N/A N/A 9.1-17 FIGURE 9.1-17 NOVEMBER 1997 QUICK ACTING STUD TENSIONER N/A 1 OF 2 9.1-17 FIGURE 9.1-17 NOVEMBER 1997 QUICK ACTING STUD TENSIONER N/A 2 OF 2 9.1-18 FIGURE 9.1-18 JUNE 1989 NEW FUEL POOL LAYOUT N/A N/A 9.1-19 FIGURE 9.1-19 JUNE 1989 NEW FUEL RACK ELEVATION VIEW N/A N/A 9.1-20 FIGURE 9.1-20 SEPTEMBER 2000 (96-31)
FUEL ASSEMBLY TRANSFER LIMIT VERSUS CCP TEMPERATURE - MILLSTONE UNIT 3 FULL CORE OFFLOAD N/A N/A 9.1-21 FIGURE 9.1-21 OCTOBER 2000 (98-116)
MILLSTONE UNIT 3 SPENT FUEL POOL LAYOUT N/A N/A 9.1-22 FIGURE 9.1-22 OCTOBER 2000 (98-116)
REGION 1 BLOCKING SCHEME FOR 3-OUT-OF-4 STORAGE RACKS N/A N/A 9.1-22a FIGURE 9.1-22a OCTOBER 2000 (98-116)
PICTORIAL VIEW OF TYPICAL REGION 1 RACK MODULE N/A N/A 9.1-22b FIGURE 9.1-22b OCTOBER 2000 (98-116)
TYPICAL ASSEMBLAGE OF REGION 1 CELLS N/A N/A 9.1-22c FIGURE 9.1-22c OCTOBER 2000 (98-116)
ELEVATION VIEW OF REGION 1 RACK MODULE N/A N/A 9.1-23a FIGURE 9.1-23a OCTOBER 2000 (98-116)
PICTORIAL VIEW OF TYPICAL REGION 2 RACK MODULE N/A N/A 9.1-23b FIGURE 9.1-23b OCTOBER 2000 (98-116)
TYPICAL ARRAY OF REGION 2 CELLS N/A N/A 9.1-23c FIGURE 9.1-23c OCTOBER 2000 (98-116)
ELEVATION VIEW OF REGION 2 RACK MODULE N/A N/A 9.1-24 FIGURE 9.1-24 OCTOBER 2000 (98-116)
SUPPORT PEDESTAL FOR REGION 1 AND REGION 2 RACK MODULES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                      Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                                      SHEET Number                                                                                                                                        Number 9.2-1       FIGURE 9.2-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER                                 25212-26933 (a) SH 1 9.2-1       FIGURE 9.2-1 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER                                 25212-26933 (a) SH 2 9.2-1       FIGURE 9.2-1 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER                                 25212-26933 (a) SH 3 9.2-1       FIGURE 9.2-1 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER                                 25212-26933 (a) SH 4 9.2-2       FIGURE 9.2-2 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM       25212-26921 (a) SH 1 9.2-2       FIGURE 9.2-2 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM       25212-26921 (a) SH 2 9.2-2       FIGURE 9.2-2 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM       25212-26921 (a) SH 3 9.2-3       FIGURE 9.2-3 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM           25212-26922 (a) SH 1 9.2-3       FIGURE 9.2-3 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM           25212-26922 (a) SH 2 PIPING & INSTRUMENTATION DIAGRAM SAFETY INJECTION PUMP AND NEUTRON SHIELD TANK 9.2-4       FIGURE 9.2-4         [27.3]                                                                                                   25212-26914 (a) SH 1 COOLING SYSTEMS 9.2-5       FIGURE 9.2-5         [27.3]                     CHARGING PUMP SEALING AND LUBRICATION                                         25212-26905 (a) 1 OF 1 9.2-6       FIGURE 9.2-6         [27.3]                     CONDENSATE DEMINERALIZER LIQUID WASTE                                         25212-26929 (a) N/A 9.2-7       FIGURE 9.2-7 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM                       25212-26920 (a) SH 1 0F 7 9.2-7       FIGURE 9.2-7 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM                       25212-26920 (a) SH 2 0F 7 9.2-7(2(A)) FIGURE 9.2-7 SH. 2(A) MAY 1998                   WATER TREATMENT SYSTEM (TEMP MOD)                                             FSAR Figure (a) N/A 9.2-7 SH. 2(A)
MPS-3 FSAR Page 55 of 83 9.2-1 FIGURE 9.2-1 SH. 1
Page 55 of 83
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 1 9.2-1 FIGURE 9.2-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 2 9.2-1 FIGURE 9.2-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 3 9.2-1 FIGURE 9.2-1 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 4 9.2-2 FIGURE 9.2-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 1 9.2-2 FIGURE 9.2-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 2 9.2-2 FIGURE 9.2-2 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 3 9.2-3 FIGURE 9.2-3 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM 25212-26922 (a) SH 1 9.2-3 FIGURE 9.2-3 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM 25212-26922 (a) SH 2 9.2-4 FIGURE 9.2-4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SAFETY INJECTION PUMP AND NEUTRON SHIELD TANK COOLING SYSTEMS 25212-26914 (a) SH 1 9.2-5 FIGURE 9.2-5
[27.3]
CHARGING PUMP SEALING AND LUBRICATION 25212-26905 (a) 1 OF 1 9.2-6 FIGURE 9.2-6
[27.3]
CONDENSATE DEMINERALIZER LIQUID WASTE 25212-26929 (a) N/A 9.2-7 FIGURE 9.2-7 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 1 0F 7 9.2-7 FIGURE 9.2-7 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 2 0F 7 9.2-7(2(A))
FIGURE 9.2-7 SH. 2(A)
MAY 1998 WATER TREATMENT SYSTEM (TEMP MOD)
FSAR Figure (a) 9.2-7 SH. 2(A)
N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                                Number 9.2-7       FIGURE 9.2-7 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM               25212-26920 (a) SH 3 OF 7 9.2-7       FIGURE 9.2-7 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM               25212-26920 (a) SH 4 OF 7 9.2-7       FIGURE 9.2-7 SH. 5   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM               25212-26920 (a) SH 5 OF 7 9.2-7(5(A)) FIGURE 9.2-7 SH. 5(A) MAY 1998                   WATER TREATMENT SYSTEM (TEMP MOD)                                       FSAR Figure(a) N/A 9.2-7 SH. 5(A) 9.2-7       FIGURE 9.2-7 SH. 6   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM               25212-26920 (a) SH 6 OF 7 9.2-8       FIGURE 9.2-8 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RISER DIAGRAM SANITARY DRAINS & VENTS 25212-26947 (a) SH 1 OF 3 9.2-8       FIGURE 9.2-8 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM     25212-26947 (a) SH 2 OF 3 9.2-8       FIGURE 9.2-8 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM     25212-26947 (a) SH 3 OF 3 9.2-9       FIGURE 9.2-9 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                     25212-26926 (a) SH 1 OF 3 9.2-9       FIGURE 9.2-9 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                     25212-26926 (a) SH 2 OF 3 9.2-9       FIGURE 9.2-9 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                     25212-26926 (a) SH 3 OF 3 9.2-10     FIGURE 9.2-10 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 1 OF 2 9.2-10     FIGURE 9.2-10 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 2 OF 2 9.2-11     FIGURE 9.2-11         [27.3]                     PIPING & INSTRUMENTATION DIAGRAM PRIMARY GRADE WATER SYSTEM           25212-26919 (a) SH 1 OF 1 9.3-1       FIGURE 9.3-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR                       25212-26938 (a) SH 1 OF 3 Page 56 of 83
MPS-3 FSAR Page 56 of 83 9.2-7 FIGURE 9.2-7 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 3 OF 7 9.2-7 FIGURE 9.2-7 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 4 OF 7 9.2-7 FIGURE 9.2-7 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 5 OF 7 9.2-7(5(A))
FIGURE 9.2-7 SH. 5(A)
MAY 1998 WATER TREATMENT SYSTEM (TEMP MOD)
FSAR Figure(a) 9.2-7 SH. 5(A)
N/A 9.2-7 FIGURE 9.2-7 SH. 6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 6 OF 7 9.2-8 FIGURE 9.2-8 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RISER DIAGRAM SANITARY DRAINS & VENTS 25212-26947 (a) SH 1 OF 3 9.2-8 FIGURE 9.2-8 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM 25212-26947 (a) SH 2 OF 3 9.2-8 FIGURE 9.2-8 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM 25212-26947 (a) SH 3 OF 3 9.2-9 FIGURE 9.2-9 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 1 OF 3 9.2-9 FIGURE 9.2-9 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 2 OF 3 9.2-9 FIGURE 9.2-9 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 3 OF 3 9.2-10 FIGURE 9.2-10 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 1 OF 2 9.2-10 FIGURE 9.2-10 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 2 OF 2 9.2-11 FIGURE 9.2-11
[27.3]
PIPING & INSTRUMENTATION DIAGRAM PRIMARY GRADE WATER SYSTEM 25212-26919 (a) SH 1 OF 1 9.3-1 FIGURE 9.3-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 1 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                Number 9.3-1     FIGURE 9.3-1 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR                             25212-26938 (a) SH 2 OF 3 9.3-1     FIGURE 9.3-1 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR                             25212-26938 (a) SH 3 OF 3 9.3-2     FIGURE 9.3-2 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING                     25212-26944 (a) SH 1 OF 4 9.3-2     FIGURE 9.3-2 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING                     25212-26944 (a) SH 2 OF 4 9.3-2     FIGURE 9.3-2 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING                     25212-26944 (a) SH 3 OF 4 9.3-2     FIGURE 9.3-2 SH. 4 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING                     25212-26944 (a) SH 4 OF 4 9.3-3     FIGURE 9.3-3 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBNE PLANT SAMPLING                       25212-26943 (a) SH 1 OF 2 9.3-3     FIGURE 9.3-3 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT SAMPLING                     25212-26943 (a) SH 2 OF 2 9.3-4     FIGURE 9.3-4 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE                   25212-26909 (a) SH 1 9.3-4     FIGURE 9.3-4 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE                   25212-26909 (a) SH 2 9.3-5     FIGURE 9.3-5       [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT GASEOUS DRAINS               25212-26907 (a) N/A 9.3-6     FIGURE 9.3-6 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 1 OF 4 9.3-6     FIGURE 9.3-6 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 2 OF 4 9.3-6     FIGURE 9.3-6 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 3 OF 4 9.3-7     FIGURE 9.3-7 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT PUMP SEALS                 25212-26903 (a) N/A Page 57 of 83
MPS-3 FSAR Page 57 of 83 9.3-1 FIGURE 9.3-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 2 OF 3 9.3-1 FIGURE 9.3-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 3 OF 3 9.3-2 FIGURE 9.3-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 1 OF 4 9.3-2 FIGURE 9.3-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 2 OF 4 9.3-2 FIGURE 9.3-2 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 3 OF 4 9.3-2 FIGURE 9.3-2 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 4 OF 4 9.3-3 FIGURE 9.3-3 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBNE PLANT SAMPLING 25212-26943 (a) SH 1 OF 2 9.3-3 FIGURE 9.3-3 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT SAMPLING 25212-26943 (a) SH 2 OF 2 9.3-4 FIGURE 9.3-4 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 1 9.3-4 FIGURE 9.3-4 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 2 9.3-5 FIGURE 9.3-5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT GASEOUS DRAINS 25212-26907 (a) N/A 9.3-6 FIGURE 9.3-6 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 1 OF 4 9.3-6 FIGURE 9.3-6 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 2 OF 4 9.3-6 FIGURE 9.3-6 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 3 OF 4 9.3-7 FIGURE 9.3-7 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT PUMP SEALS 25212-26903 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                        Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                                        SHEET Number                                                                                                                                          Number 9.3-7(1(A)) FIGURE 9.3-7 SH. 1(A) MAY 1998                   REACTOR COOLANT PUMP SEALS SYSTEM (TEMP MOD)                                     FSAR Figure (a) N/A 9.3-7 SH. 1(A) 9.3-8       FIGURE 9.3-8 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL                     25212-26904 (a) SH 1 OF 4 9.3-8       FIGURE 9.3-8 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL                     25212-26904 (a) SH 2 OF 4 9.3-8       FIGURE 9.3-8 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL                     25212-26904 (a) SH 3 OF 4 9.3-8       FIGURE 9.3-8 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL                     25212-26904 (a) SH 4 OF 4 9.3-9       FIGURE 9.3-9 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM                           25212-26908 (a) SH 1 OF 3 9.3-9       FIGURE 9.3-9 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM                           25212-26908 (a) SH 2 OF 3 9.3-9(2(A)) FIGURE 9.3-9 SH. 2(A) MAY 1998                   PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM (TEMP MOD)               FSAR Figure(a) N/A 9.3-9 SH. 2(A) 9.3-9       FIGURE 9.3-9 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM                           25212-26908 (a) SH 3 OF 3 9.3-10     FIGURE 9.3-10 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM                     25212-26955 (a) SH 1 OF 3 9.3-10     FIGURE 9.3-10 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM                     25212-26955 (a) SH 2 OF 3 9.3-10     FIGURE 9.3-10 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM                     25212-26955 (a) SH 3 OF 3 PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-9.4-1       FIGURE 9.4-1 SH. 1   [27.3]                                                                                                     25212-26951 (a) SH 1 OF 5 CONDITIONING PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-9.4-1       FIGURE 9.4-1 SH. 2   [27.3]                                                                                                     25212-26951 (a) SH 2 OF 5 CONDITIONING PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-9.4-1       FIGURE 9.4-1 SH. 3   [27.3]                                                                                                     25212-26951 (a) SH 3 OF 5 CONDITIONING Page 58 of 83
MPS-3 FSAR Page 58 of 83 9.3-7(1(A))
FIGURE 9.3-7 SH. 1(A)
MAY 1998 REACTOR COOLANT PUMP SEALS SYSTEM (TEMP MOD)
FSAR Figure (a) 9.3-7 SH. 1(A)
N/A 9.3-8 FIGURE 9.3-8 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 1 OF 4 9.3-8 FIGURE 9.3-8 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 2 OF 4 9.3-8 FIGURE 9.3-8 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 3 OF 4 9.3-8 FIGURE 9.3-8 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 4 OF 4 9.3-9 FIGURE 9.3-9 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 1 OF 3 9.3-9 FIGURE 9.3-9 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 2 OF 3 9.3-9(2(A))
FIGURE 9.3-9 SH. 2(A)
MAY 1998 PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM (TEMP MOD)
FSAR Figure(a) 9.3-9 SH. 2(A)
N/A 9.3-9 FIGURE 9.3-9 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 3 OF 3 9.3-10 FIGURE 9.3-10 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 1 OF 3 9.3-10 FIGURE 9.3-10 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 2 OF 3 9.3-10 FIGURE 9.3-10 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 3 OF 3 9.4-1 FIGURE 9.4-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 1 OF 5 9.4-1 FIGURE 9.4-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 2 OF 5 9.4-1 FIGURE 9.4-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 3 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                                      SHEET Number                                                                                                                                    Number PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-9.4-1     FIGURE 9.4-1 SH. 4 [27.3]                                                                                                     25212-26951 (a) SH 4 OF 5 CONDITIONING PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-9.4-1     FIGURE 9.4-1 SH. 5 [27.3]                                                                                                     25212-26951 (a) SH 5 OF 5 CONDITIONING 9.4-2     FIGURE 9.4-2 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 1 OF 7 9.4-2     FIGURE 9.4-2 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 2 OF 7 9.4-2     FIGURE 9.4-2 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 3 OF 7 9.4-2     FIGURE 9.4-2 SH. 4 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 4 OF 7 9.4-2     FIGURE 9.4-2 SH. 5 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 5 OF 7 9.4-2     FIGURE 9.4-2 SH. 6 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION                       25212-26948 (a) SH 6 OF 7 9.4-3     FIGURE 9.4-3 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION                       25212-26950 (a) SH 1 OF 5 9.4-3     FIGURE 9.4-3 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION                       25212-26950 (a) SH 2 OF 5 9.4-3     FIGURE 9.4-3 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION                       25212-26950 (a) SH 3 OF 5 9.4-3     FIGURE 9.4-3 SH. 4 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM               25212-26950 (a) SH 4 OF 5 9.4-3     FIGURE 9.4-3 SH. 5 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM               25212-26950 (a) SH 5 OF 5 9.4-4     FIGURE 9.4-4 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION               25212-26952 (a) SH 1 OF 3 9.4-4     FIGURE 9.4-4 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION               25212-26952 (a) SH 2 OF 3 Page 59 of 83
MPS-3 FSAR Page 59 of 83 9.4-1 FIGURE 9.4-1 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 4 OF 5 9.4-1 FIGURE 9.4-1 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 5 OF 5 9.4-2 FIGURE 9.4-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 1 OF 7 9.4-2 FIGURE 9.4-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 2 OF 7 9.4-2 FIGURE 9.4-2 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 3 OF 7 9.4-2 FIGURE 9.4-2 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 4 OF 7 9.4-2 FIGURE 9.4-2 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 5 OF 7 9.4-2 FIGURE 9.4-2 SH. 6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 6 OF 7 9.4-3 FIGURE 9.4-3 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 1 OF 5 9.4-3 FIGURE 9.4-3 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 2 OF 5 9.4-3 FIGURE 9.4-3 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 3 OF 5 9.4-3 FIGURE 9.4-3 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM 25212-26950 (a) SH 4 OF 5 9.4-3 FIGURE 9.4-3 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM 25212-26950 (a) SH 5 OF 5 9.4-4 FIGURE 9.4-4 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 1 OF 3 9.4-4 FIGURE 9.4-4 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 2 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL          DATE / Revision [ ]                                        TITLE                                                    SHEET Number                                                                                                                                  Number 9.4-4     FIGURE 9.4-4 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION               25212-26952 (a) SH 3 OF 3 9.4-5     FIGURE 9.4-5       [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONTAINMENT STRUCTURE VENTILATION             25212-26953 (a) SH 1 OF 1 9.4-6     FIGURE 9.4-6 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION                   25212-26949 (a) SH 1 OF 3 9.4-6     FIGURE 9.4-6 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION                   25212-26949 (a) SH 2 OF 3 9.4-6     FIGURE 9.4-6 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION                   25212-26949 (a) SH 3 OF 3 9.4-7     FIGURE 9.4-7 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION               25212-26936 (a) SH 1 OF 2 9.4-7     FIGURE 9.4-7 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION               25212-26936 (a) SH 2 OF 2 9.4-8     FIGURE 9.4-8 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM                       25212-26937 (a) SH 1 OF 4 9.4-8     FIGURE 9.4-8 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM                       25212-26937 (a) SH 2 OF 4 9.4-8     FIGURE 9.4-8 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM                       25212-26937 (a) SH 3 OF 4 PIPING & INSTRUMENTATION DIAGRAM TECHNICAL SUPPORT CENTER HEATING, VENT AND AIR 9.4-9     FIGURE 9.4-9       [27.3]                                                                                                     25212-26956 (a) SH 1 OF 1 CONDITIONING 9.5-1     FIGURE 9.5-1       AMENDMENT 14 JULY 1985     FIRE PROTECTION SYSTEM (NOW IN FPER FIGURE 4-1)                                 N/A             N/A 9.5-2     FIGURE 9.5-2       [27.3]                     PIPING & INSTRUMENTATION DIAGRAM EMERGENCY GENERATOR FUEL OIL SYSTEM           25212-26917 (a) SH 1 OF 1 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, 9.5-3     FIGURE 9.5-3 SH. 1 [27.3]                                                                                                     25212-26916 (a) SH 1 OF 5 STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, 9.5-3     FIGURE 9.5-3 SH. 2 [27.3]                                                                                                     25212-26916 (a) SH 2 OF 5 STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS Page 60 of 83
MPS-3 FSAR Page 60 of 83 9.4-4 FIGURE 9.4-4 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 3 OF 3 9.4-5 FIGURE 9.4-5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONTAINMENT STRUCTURE VENTILATION 25212-26953 (a) SH 1 OF 1 9.4-6 FIGURE 9.4-6 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 1 OF 3 9.4-6 FIGURE 9.4-6 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 2 OF 3 9.4-6 FIGURE 9.4-6 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 3 OF 3 9.4-7 FIGURE 9.4-7 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION 25212-26936 (a) SH 1 OF 2 9.4-7 FIGURE 9.4-7 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION 25212-26936 (a) SH 2 OF 2 9.4-8 FIGURE 9.4-8 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 1 OF 4 9.4-8 FIGURE 9.4-8 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 2 OF 4 9.4-8 FIGURE 9.4-8 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 3 OF 4 9.4-9 FIGURE 9.4-9
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TECHNICAL SUPPORT CENTER HEATING, VENT AND AIR CONDITIONING 25212-26956 (a) SH 1 OF 1 9.5-1 FIGURE 9.5-1 AMENDMENT 14 JULY 1985 FIRE PROTECTION SYSTEM (NOW IN FPER FIGURE 4-1)
N/A N/A 9.5-2 FIGURE 9.5-2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY GENERATOR FUEL OIL SYSTEM 25212-26917 (a) SH 1 OF 1 9.5-3 FIGURE 9.5-3 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 1 OF 5 9.5-3 FIGURE 9.5-3 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 2 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL          DATE / Revision [ ]                                        TITLE                                                  SHEET Number                                                                                                                                  Number PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, 9.5-3     FIGURE 9.5-3 SH. 3 [27.3]                                                                                                   25212-26916 (a) SH 3 OF 5 STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, 9.5-3     FIGURE 9.5-3 SH. 4 [27.3]                                                                                                   25212-26916 (a) SH 4 OF 5 STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, 9.5-3     FIGURE 9.5-3 SH. 5 [27.3]                                                                                                   25212-26916 (a) SH 5 OF 5 STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 9.5-4     FIGURE 9.5-4       SEPTEMBER 1995             EMERGENCY GENERATOR EXHAUST                                                   N/A 9.5-5     FIGURE 9.5-5 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS               25212-26939 (a) SH 1 OF 3 9.5-5     FIGURE 9.5-5 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS               25212-26939 (a) SH 2 OF 3 9.5-5     FIGURE 9.5-5 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS               25212-26939 (a) SH 3 OF 3 9.5-7     FIGURE 9.5-7       AMENDMENT 3 AUGUST 1983   SITE WATER FIRE PROTECTION                                                   N/A             N/A 10.1-1   FIGURE 10.1-1       NONE                       FUNDAMENTAL DIAGRAM                                                           N/A             N/A 10.1-2   FIGURE 10.1-2       [27.3]                     RATED HEAT BALANCE                                                           25212-23050 (a) SH 9 10.1-3   FIGURE 10.1-3       [17.3]                     DELETED BY CHANGE PKG FSC 03-MP3-027                                         N/A             N/A 10.2-1   FIGURE 10.2-1       [27.3]                     PIPING & INSTRUMENTATION DIAGRAM ELECTO HYDRAULIC CONTROL                     25212-26940 (a) N/A 10.2-2   FIGURE 10.2-2 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS   25212-26941 (a) SH 1 OF 3 10.2-2   FIGURE 10.2-2 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS   25212-26941 (a) SH 2 OF 3 10.2-2   FIGURE 10.2-2 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS   25212-26941 (a) SH 3 OF 3 Page 61 of 83
MPS-3 FSAR Page 61 of 83 9.5-3 FIGURE 9.5-3 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 3 OF 5 9.5-3 FIGURE 9.5-3 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 4 OF 5 9.5-3 FIGURE 9.5-3 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 5 OF 5 9.5-4 FIGURE 9.5-4 SEPTEMBER 1995 EMERGENCY GENERATOR EXHAUST N/A 9.5-5 FIGURE 9.5-5 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 1 OF 3 9.5-5 FIGURE 9.5-5 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 2 OF 3 9.5-5 FIGURE 9.5-5 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 3 OF 3 9.5-7 FIGURE 9.5-7 AMENDMENT 3 AUGUST 1983 SITE WATER FIRE PROTECTION N/A N/A 10.1-1 FIGURE 10.1-1 NONE FUNDAMENTAL DIAGRAM N/A N/A 10.1-2 FIGURE 10.1-2
[27.3]
RATED HEAT BALANCE 25212-23050 (a) SH 9 10.1-3 FIGURE 10.1-3
[17.3]
DELETED BY CHANGE PKG FSC 03-MP3-027 N/A N/A 10.2-1 FIGURE 10.2-1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM ELECTO HYDRAULIC CONTROL 25212-26940 (a) N/A 10.2-2 FIGURE 10.2-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 1 OF 3 10.2-2 FIGURE 10.2-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 2 OF 3 10.2-2 FIGURE 10.2-2 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 3 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                            Drawing FIGURE LABEL              DATE / Revision [ ]                                      TITLE                                          SHEET Number                                                                                                                              Number 10.2-3       FIGURE 10.2-3         [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR SUPPORT SYSTEMS 25212-26942 (a) SH 1 OF 1 10.3-1       FIGURE 10.3-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 1 OF 7 10.3-1       FIGURE 10.3-1 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 2 OF 7 10.3-1       FIGURE 10.3-1 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 3 OF 7 10.3-1       FIGURE 10.3-1 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 4 OF 7 10.3-1       FIGURE 10.3-1 SH. 5   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 5 OF 7 10.3-1       FIGURE 10.3-1 SH. 6   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT             25212-26923 (a) SH 6 OF 7 10.3-2       FIGURE 10.3-2 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 1 OF 3 10.3-2       FIGURE 10.3-2 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 2 OF 3 10.3-2       FIGURE 10.3-2 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 3 OF 3 10.3-3       FIGURE 10.3-3 SH.1     [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CHEMICAL FEED                     25212-26931 (a) SH 1 OF 2 10.3-3(1(A)) FIGURE 10.3-3 SH. 1(A) [24]                       DELETED BY PKG FSC 98-MP3-126                                       N/A             N/A 10.3-4       FIGURE 10.3-4         SEPTEMBER 1997             MAIN STEAM ISOLATION VALVE                                         N/A             N/A 10.4-1       FIGURE 10.4-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                 25212-26926 (a) SH 1 OF 3 10.4-1       FIGURE 10.4-1 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                 25212-26926 (a) SH 2 OF 3 Page 62 of 83
MPS-3 FSAR Page 62 of 83 10.2-3 FIGURE 10.2-3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR SUPPORT SYSTEMS 25212-26942 (a) SH 1 OF 1 10.3-1 FIGURE 10.3-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 1 OF 7 10.3-1 FIGURE 10.3-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 2 OF 7 10.3-1 FIGURE 10.3-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 3 OF 7 10.3-1 FIGURE 10.3-1 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 4 OF 7 10.3-1 FIGURE 10.3-1 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 5 OF 7 10.3-1 FIGURE 10.3-1 SH. 6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 6 OF 7 10.3-2 FIGURE 10.3-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 1 OF 3 10.3-2 FIGURE 10.3-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 2 OF 3 10.3-2 FIGURE 10.3-2 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 3 OF 3 10.3-3 FIGURE 10.3-3 SH.1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CHEMICAL FEED 25212-26931 (a) SH 1 OF 2 10.3-3(1(A)) FIGURE 10.3-3 SH. 1(A)
[24]
DELETED BY PKG FSC 98-MP3-126 N/A N/A 10.3-4 FIGURE 10.3-4 SEPTEMBER 1997 MAIN STEAM ISOLATION VALVE N/A N/A 10.4-1 FIGURE 10.4-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 1 OF 3 10.4-1 FIGURE 10.4-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 2 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                            Drawing FIGURE LABEL          DATE / Revision [ ]                                      TITLE                                                SHEET Number                                                                                                                            Number 10.4-1   FIGURE 10.4-1 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM                       25212-26926 (a) SH 3 OF 3 PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX 10.4-2   FIGURE 10.4-2 SH. 1 [27.3]                                                                                             25212-26927 (a) SH 1 0F 2 PRIMING PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX 10.4-2   FIGURE 10.4-2 SH. 2 [27.3]                                                                                             25212-26927 (a) SH 2 OF 2 PRIMING PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND 10.4-3   FIGURE 10.4-3 SH. 1 [27.3]                                                                                             25212-26924 (a) SH 1 OF 2 EXHAUST PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND 10.4-3   FIGURE 10.4-3 SH. 2 [27.3]                                                                                             25212-26924 (a) SH 2 OF 2 EXHAUST 10.4-4   FIGURE 10.4-4 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM               25212-26932 (a) SH 1 OF 2 10.4-4   FIGURE 10.4-4 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM               25212-26932 (a) SH 2 OF 2 10.4-5   FIGURE 10.4-5 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED     25212-26928 (a) SH 1 OF 5 10.4-5   FIGURE 10.4-5 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED     25212-26928 (a) SH 2 OF 5 10.4-5   FIGURE 10.4-5 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED     25212-26928 (a) SH 3 OF 5 10.4-5   FIGURE 10.4-5 SH. 4 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED     25212-26928 (a) SH 4 OF 5 10.4-5   FIGURE 10.4-5 SH. 5 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED     25212-26928 (a) SH 5 OF 5 10.4-6   FIGURE 10.4-6 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM                       25212-26930 (a) SH 1 OF 4 10.4-6   FIGURE 10.4-6 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM                       25212-26930 (a) SH 2 OF 4 10.4-6   FIGURE 10.4-6 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM                       25212-26930 (a) SH 3 OF 4 Page 63 of 83
MPS-3 FSAR Page 63 of 83 10.4-1 FIGURE 10.4-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 3 OF 3 10.4-2 FIGURE 10.4-2 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX PRIMING 25212-26927 (a) SH 1 0F 2 10.4-2 FIGURE 10.4-2 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX PRIMING 25212-26927 (a) SH 2 OF 2 10.4-3 FIGURE 10.4-3 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND EXHAUST 25212-26924 (a) SH 1 OF 2 10.4-3 FIGURE 10.4-3 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND EXHAUST 25212-26924 (a) SH 2 OF 2 10.4-4 FIGURE 10.4-4 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM 25212-26932 (a) SH 1 OF 2 10.4-4 FIGURE 10.4-4 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM 25212-26932 (a) SH 2 OF 2 10.4-5 FIGURE 10.4-5 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 1 OF 5 10.4-5 FIGURE 10.4-5 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 2 OF 5 10.4-5 FIGURE 10.4-5 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 3 OF 5 10.4-5 FIGURE 10.4-5 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 4 OF 5 10.4-5 FIGURE 10.4-5 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 5 OF 5 10.4-6 FIGURE 10.4-6 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 1 OF 4 10.4-6 FIGURE 10.4-6 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 2 OF 4 10.4-6 FIGURE 10.4-6 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 3 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                    Drawing FIGURE LABEL            DATE / Revision [ ]                                      TITLE                                                    SHEET Number                                                                                                                                      Number 10.4-6       FIGURE 10.4-6 SH. 4   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM                           25212-26930 (a) SH 4 OF 4 10.4-7       FIGURE 10.4-7 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS   25212-26925 (a) SH 1 OF 3 10.4-7       FIGURE 10.4-7 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS   25212-26925 (a) SH 2 OF 3 10.4-7       FIGURE 10.4-7 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS   25212-26925 (a) SH 3 OF 3 10.4-9       FIGURE 10.4-9 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE   25212-26935 (a) SH 1 OF 3 10.4-9(1(A)) FIGURE 10.4-9 SH.1(A) [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE   25212-26935 (a) SH 1 OF 3 10.4-9       FIGURE 10.4-9 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE   25212-26935 (a) SH 2 OF 3 10.4-9       FIGURE 10.4-9 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE   25212-26935 (a) SH 3 OF 3 MINIMUM AUXILIARY FEEDWATER FLOW TO FOUR STEAM GENERATORS LOSS OF NORMAL 10.4-10     FIGURE 10.4-10       [21.3]                                                                                                 N/A             N/A FEEDWATER EVENT MINIMUM AFW FLOW TO THREE EFFECTIVE STEAM GENERATORS FEEDWATER LINE BREAK 10.4-11     FIGURE 10.4-11       FEBRUARY 1998                                                                                           N/A             N/A EVENT MINIMUM AUXILARY FEEDWATER FLOW TO TWO STEAM GENERATORS BETTER ESTIMATE LOSS 10.4-12     FIGURE 10.4-12       [21.3]                                                                                                 N/A            N/A OF NORMAL FEEDWATER EVENT FOR RELIABILITY ANALYSIS 11.2-1       FIGURE 11.2-1 SH. 1   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS   25212-26906 (a) SH 1 OF 4 11.2-1       FIGURE 11.2-1 SH. 2   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS   25212-26906 (a) SH 2 OF 4 11.2-1       FIGURE 11.2-1 SH. 3   [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS   25212-26906 (a) SH 3 OF 4 11.2-2       FIGURE 11.2-2         [27.3]                     PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER LIQUID WASTE       25212-26929 (a) N/A Page 64 of 83
MPS-3 FSAR Page 64 of 83 10.4-6 FIGURE 10.4-6 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 4 OF 4 10.4-7 FIGURE 10.4-7 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 1 OF 3 10.4-7 FIGURE 10.4-7 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 2 OF 3 10.4-7 FIGURE 10.4-7 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 3 OF 3 10.4-9 FIGURE 10.4-9 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 1 OF 3 10.4-9(1(A)) FIGURE 10.4-9 SH.1(A)
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 1 OF 3 10.4-9 FIGURE 10.4-9 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 2 OF 3 10.4-9 FIGURE 10.4-9 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 3 OF 3 10.4-10 FIGURE 10.4-10
[21.3]
MINIMUM AUXILIARY FEEDWATER FLOW TO FOUR STEAM GENERATORS LOSS OF NORMAL FEEDWATER EVENT N/A N/A 10.4-11 FIGURE 10.4-11 FEBRUARY 1998 MINIMUM AFW FLOW TO THREE EFFECTIVE STEAM GENERATORS FEEDWATER LINE BREAK EVENT N/A N/A 10.4-12 FIGURE 10.4-12
[21.3]
MINIMUM AUXILARY FEEDWATER FLOW TO TWO STEAM GENERATORS BETTER ESTIMATE LOSS OF NORMAL FEEDWATER EVENT FOR RELIABILITY ANALYSIS N/A N/A 11.2-1 FIGURE 11.2-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 1 OF 4 11.2-1 FIGURE 11.2-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 2 OF 4 11.2-1 FIGURE 11.2-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 3 OF 4 11.2-2 FIGURE 11.2-2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER LIQUID WASTE 25212-26929 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                  Drawing FIGURE LABEL          DATE / Revision [ ]                                        TITLE                                    SHEET Number                                                                                                                    Number 11.2-3   FIGURE 11.2-3       MAY 1998                   EXPECTED RADIOACTIVE LIQUID WASTE SOURCE AND DISCHARGE PATHS   N/A             N/A 11.3-1   FIGURE 11.3-1 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE     25212-26909 (a) SH 1 OF 3 11.3-1   FIGURE 11.3-1 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE     25212-26909 (a) SH 2 OF 3 11.3-2   FIGURE 11.3-2       [16]                       VENTILATION SYSTEM COMPOSITE DRAWING NORMAL OPERATION           N/A             N/A 11.4-1   FIGURE 11.4-1 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE       25212-26910 (a) SH 1 OF 2 11.4-1   FIGURE 11.4-1 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE       25212-26910 (a) SH 2 OF 2 11.4-2   FIGURE 11.4-2       [21.3]                     (HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM EXPECTED QUANTITIES N/A             N/A 11.4-3   FIGURE 11.4-3       [21.3]                     (HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM DESIGN QUANTITIES   N/A             N/A 12.2-1   FIGURE 12.2-1       [20.3]                     ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS             N/A             N/A 12.2-2   FIGURE 12.2-2       [20.3]                     ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS             N/A             N/A 12.2-3   FIGURE 12.2-3       [20.3]                     ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS             N/A             N/A 12.2-4   FIGURE 12.2-4       [21.3]                     I-131 CONCENTRATION CONTAINMENT (HISTORICAL)                   N/A             N/A 12.3-1   FIGURE 12.3-1       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS) N/A             N/A 12.3-2   FIGURE 12.3-2       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS) N/A             N/A 12.3-3   FIGURE 12.3-3       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS) N/A             N/A Page 65 of 83
MPS-3 FSAR Page 65 of 83 11.2-3 FIGURE 11.2-3 MAY 1998 EXPECTED RADIOACTIVE LIQUID WASTE SOURCE AND DISCHARGE PATHS N/A N/A 11.3-1 FIGURE 11.3-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 1 OF 3 11.3-1 FIGURE 11.3-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 2 OF 3 11.3-2 FIGURE 11.3-2
[16]
VENTILATION SYSTEM COMPOSITE DRAWING NORMAL OPERATION N/A N/A 11.4-1 FIGURE 11.4-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE 25212-26910 (a) SH 1 OF 2 11.4-1 FIGURE 11.4-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE 25212-26910 (a) SH 2 OF 2 11.4-2 FIGURE 11.4-2
[21.3]
(HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM EXPECTED QUANTITIES N/A N/A 11.4-3 FIGURE 11.4-3
[21.3]
(HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM DESIGN QUANTITIES N/A N/A 12.2-1 FIGURE 12.2-1
[20.3]
ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-2 FIGURE 12.2-2
[20.3]
ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-3 FIGURE 12.2-3
[20.3]
ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-4 FIGURE 12.2-4
[21.3]
I-131 CONCENTRATION CONTAINMENT (HISTORICAL)
N/A N/A 12.3-1 FIGURE 12.3-1
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)
N/A N/A 12.3-2 FIGURE 12.3-2
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)
N/A N/A 12.3-3 FIGURE 12.3-3
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)
N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                                Drawing FIGURE LABEL            DATE / Revision [ ]                                        TITLE                                                          SHEET Number                                                                                                                                                Number 12.3-4   FIGURE 12.3-4       December 1997             DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)                             N/A       N/A 12.3-5   N/A                 N/A                       THIS FIGURE MOVED TO SECTION 11.5 (FIGURE 11.5-2)                                           N/A       N/A 12.3-6   FIGURE 12.3-6       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)                             N/A       N/A 12.3-7   FIGURE 12.3-7       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)                             N/A       N/A 12.3-8   FIGURE 12.3-8       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)                             N/A       N/A 12.3-9   FIGURE 12.3-9       [20.3]                     DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)                             N/A       N/A 12.3-10   FIGURE 12.3-10 SH. 1 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 1 to Auxiliary Building                         N/A       SH 1 OF 9 12.3-10   FIGURE 12.3-10 SH. 2 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 2 to the ESF Building                           N/A       SH 2 OF 9 12.3-10   FIGURE 12.3-10 SH. 3 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 3 to Hydrogen Recombiner Building               N/A       SH 3 OF 9 ROUTES TO POST-ACCIDENT VITAL AREAS - Route 4 to Hydrogen Recombiner Building and to Unit 2 12.3-10   FIGURE 12.3-10 SH. 4 [21.3]                                                                                                                 N/A       SH 4 OF 9 Chemistry Labs 12.3-10   FIGURE 12.3-10 SH. 5 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 5 to Fuel Building                             N/A       SH 5 OF 9 12.3-10   FIGURE 12.3-10 SH. 6 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 6 to Turbine Building                           N/A       SH 6 OF 9 12.3-10   FIGURE 12.3-10 SH. 7 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 7 to Diesel Generator                           N/A       SH 7 OF 9 12.3-10   FIGURE 12.3-10 SH. 8 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 8 to ESF Building                               N/A       SH 8 OF 9 12.3-10   FIGURE 12.3-10 SH. 9 [21.3]                     ROUTES TO POST-ACCIDENT VITAL AREAS - Route 9 to Auxiliary Building                         N/A       SH 9 OF 9 Page 66 of 83
MPS-3 FSAR Page 66 of 83 12.3-4 FIGURE 12.3-4 December 1997 DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)
N/A N/A 12.3-5 N/A N/A THIS FIGURE MOVED TO SECTION 11.5 (FIGURE 11.5-2)
N/A N/A 12.3-6 FIGURE 12.3-6
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)
N/A N/A 12.3-7 FIGURE 12.3-7
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)
N/A N/A 12.3-8 FIGURE 12.3-8
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)
N/A N/A 12.3-9 FIGURE 12.3-9
[20.3]
DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)
N/A N/A 12.3-10 FIGURE 12.3-10 SH. 1
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 1 to Auxiliary Building N/A SH 1 OF 9 12.3-10 FIGURE 12.3-10 SH. 2
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 2 to the ESF Building N/A SH 2 OF 9 12.3-10 FIGURE 12.3-10 SH. 3
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 3 to Hydrogen Recombiner Building N/A SH 3 OF 9 12.3-10 FIGURE 12.3-10 SH. 4
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 4 to Hydrogen Recombiner Building and to Unit 2 Chemistry Labs N/A SH 4 OF 9 12.3-10 FIGURE 12.3-10 SH. 5
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 5 to Fuel Building N/A SH 5 OF 9 12.3-10 FIGURE 12.3-10 SH. 6
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 6 to Turbine Building N/A SH 6 OF 9 12.3-10 FIGURE 12.3-10 SH. 7
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 7 to Diesel Generator N/A SH 7 OF 9 12.3-10 FIGURE 12.3-10 SH. 8
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 8 to ESF Building N/A SH 8 OF 9 12.3-10 FIGURE 12.3-10 SH. 9
[21.3]
ROUTES TO POST-ACCIDENT VITAL AREAS - Route 9 to Auxiliary Building N/A SH 9 OF 9 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                  Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                  SHEET Number                                                                                                                    Number 12.3-11   FIGURE 12.3-11   [20.3]                     FUEL TRANSFER TUBE SHIELDING                                     N/A       N/A 12.3-12   FIGURE 12.3-12   [20.3]                     UPPER REACTOR CAVITY NEUTRON SHIELD                             N/A       N/A 12.5-1   FIGURE 12.5-1     June 1997                   DELETED                                                         N/A       N/A 13.1-1   ----              ----                        DELETED BY CHANGE PKG FSC 01-MP3-013                             N/A       N/A 13.5-1   FIGURE 13.5-1     [20.1]                     CONTROL ROOM AREA                                               N/A       N/A 14.2-1   FIGURE 14.2-1     NONE                       STARUP ACTIVITIES LOGIC DIAGRAM                                 N/A       N/A 14.2-2   FIGURE 14.2-2     AMENDMENT 1 FEBRUARY 1983   STARTUP ORGANIZATION CHART                                       N/A       N/A 14.2-3   FIGURE 14.2-3     AMENDMENT 1 FEBRUARY 1983   TEST PROCEDURE PREPARATION                                       N/A       N/A 14.2-4   FIGURE 14.2-4     AMENDMENT 1 FEBRUARY 1983   TEST PROCEDURE PERFORMANCE                                       N/A       N/A 14.2-5   FIGURE 14.2-5     AMENDMENT 8 MAY 1984       PREOPERATIONAL TEST PHASE                                       N/A       N/A 14.2-6   FIGURE 14.2-6     NONE                       INITIAL STARTUP TEST PHASE                                       N/A       N/A 15.0-1   FIGURE 15.0-1     [21.3]                     ILLUSTRATION OF OVERTEMPERATURE AND OVERPOWER DELTA T PROTECTION N/A       N/A 15.0-1A   FIGURE 15.0-1A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                             N/A       N/A 15.0-2   FIGURE 15.0-2     [21.3])                     DOPPLER POWER COEFFICIENT USED IN ACCIDENT ANALYSIS             N/A       N/A 15.0-3   FIGURE 15.0-3     NONE                       RCCA POSITION VERSUS TIME TO DASHPOT                             N/A       N/A Page 67 of 83
MPS-3 FSAR Page 67 of 83 12.3-11 FIGURE 12.3-11
[20.3]
FUEL TRANSFER TUBE SHIELDING N/A N/A 12.3-12 FIGURE 12.3-12
[20.3]
UPPER REACTOR CAVITY NEUTRON SHIELD N/A N/A 12.5-1 FIGURE 12.5-1 June 1997 DELETED N/A N/A 13.1-1 DELETED BY CHANGE PKG FSC 01-MP3-013 N/A N/A 13.5-1 FIGURE 13.5-1
[20.1]
CONTROL ROOM AREA N/A N/A 14.2-1 FIGURE 14.2-1 NONE STARUP ACTIVITIES LOGIC DIAGRAM N/A N/A 14.2-2 FIGURE 14.2-2 AMENDMENT 1 FEBRUARY 1983 STARTUP ORGANIZATION CHART N/A N/A 14.2-3 FIGURE 14.2-3 AMENDMENT 1 FEBRUARY 1983 TEST PROCEDURE PREPARATION N/A N/A 14.2-4 FIGURE 14.2-4 AMENDMENT 1 FEBRUARY 1983 TEST PROCEDURE PERFORMANCE N/A N/A 14.2-5 FIGURE 14.2-5 AMENDMENT 8 MAY 1984 PREOPERATIONAL TEST PHASE N/A N/A 14.2-6 FIGURE 14.2-6 NONE INITIAL STARTUP TEST PHASE N/A N/A 15.0-1 FIGURE 15.0-1
[21.3]
ILLUSTRATION OF OVERTEMPERATURE AND OVERPOWER DELTA T PROTECTION N/A N/A 15.0-1A FIGURE 15.0-1A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.0-2 FIGURE 15.0-2
[21.3])
DOPPLER POWER COEFFICIENT USED IN ACCIDENT ANALYSIS N/A N/A 15.0-3 FIGURE 15.0-3 NONE RCCA POSITION VERSUS TIME TO DASHPOT N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                            Drawing FIGURE LABEL        DATE / Revision [ ]                                        TITLE                            SHEET Number                                                                                                              Number 15.0-4   FIGURE 15.0-4   NONE                       NORMALIZED ROD WORTH VERSUS PERCENT INSERTED                 N/A       N/A 15.0-5   FIGURE 15.0-5   [21.3]                     NORMALIZED RCCA BANK REACTIVITY WORTH VERSUS DROP TIME       N/A       N/A 15.0-6   FIGURE 15.0-6   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-049                         N/A       N/A 15.0-7   FIGURE 15.0-7   NONE                       ABBREVIATIONS                                               N/A       N/A 15.0-8   FIGURE 15.0-8   JANUARY 1998               EXCESSIVE HEAT REMOVAL DUE TO FEEDWATER SYSTEMS MALFUNCTION N/A       N/A 15.0-9   FIGURE 15.0-9   JANUARY 1998               EXCESSIVE LOAD INCREASE                                     N/A       N/A 15.0-10   FIGURE 15.0-10   [21.3]                     DEPRESSURIZATION OF MAIN STEAM SYSTEM                       N/A       N/A 15.0-11   FIGURE 15.0-11   JANUARY 1998               LOSS OF EXTERNAL LOAD/TURBINE TRIP                           N/A       N/A 15.0-12   FIGURE 15.0-12   JANUARY 1998               LOSS OF OFFSITE POWER TO STATION AUXILIARIES                 N/A       N/A 15.0-13   FIGURE 15.0-13   JANUARY 1998               LOSS OF NORMAL FEEDWATER                                     N/A       N/A 15.0-14   FIGURE 15.0-14   [21.3]                     MAJOR RUPTURE OF A MAIN FEEDWATER LINE                       N/A       N/A 15.0-15   FIGURE 15.0-15   JANUARY 1998               LOSS OF FORCED REACTOR COOLANT FLOW                         N/A       N/A 15.0-16   FIGURE 15.0-16   JANUARY 1998               UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL   N/A       N/A 15.0-17   FIGURE 15.0-17   JANUARY 1998               DROPPED ROD CLUSTER CONTROL ASSEMBLY                         N/A       N/A 15.0-18   FIGURE 15.0-18   JANUARY 1998               SINGLE ROD CLUSTER CONTROL ASSEMBLY WITHDRAWAL AT FULL POWER N/A       N/A Page 68 of 83
MPS-3 FSAR Page 68 of 83 15.0-4 FIGURE 15.0-4 NONE NORMALIZED ROD WORTH VERSUS PERCENT INSERTED N/A N/A 15.0-5 FIGURE 15.0-5
[21.3]
NORMALIZED RCCA BANK REACTIVITY WORTH VERSUS DROP TIME N/A N/A 15.0-6 FIGURE 15.0-6
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-049 N/A N/A 15.0-7 FIGURE 15.0-7 NONE ABBREVIATIONS N/A N/A 15.0-8 FIGURE 15.0-8 JANUARY 1998 EXCESSIVE HEAT REMOVAL DUE TO FEEDWATER SYSTEMS MALFUNCTION N/A N/A 15.0-9 FIGURE 15.0-9 JANUARY 1998 EXCESSIVE LOAD INCREASE N/A N/A 15.0-10 FIGURE 15.0-10
[21.3]
DEPRESSURIZATION OF MAIN STEAM SYSTEM N/A N/A 15.0-11 FIGURE 15.0-11 JANUARY 1998 LOSS OF EXTERNAL LOAD/TURBINE TRIP N/A N/A 15.0-12 FIGURE 15.0-12 JANUARY 1998 LOSS OF OFFSITE POWER TO STATION AUXILIARIES N/A N/A 15.0-13 FIGURE 15.0-13 JANUARY 1998 LOSS OF NORMAL FEEDWATER N/A N/A 15.0-14 FIGURE 15.0-14
[21.3]
MAJOR RUPTURE OF A MAIN FEEDWATER LINE N/A N/A 15.0-15 FIGURE 15.0-15 JANUARY 1998 LOSS OF FORCED REACTOR COOLANT FLOW N/A N/A 15.0-16 FIGURE 15.0-16 JANUARY 1998 UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL N/A N/A 15.0-17 FIGURE 15.0-17 JANUARY 1998 DROPPED ROD CLUSTER CONTROL ASSEMBLY N/A N/A 15.0-18 FIGURE 15.0-18 JANUARY 1998 SINGLE ROD CLUSTER CONTROL ASSEMBLY WITHDRAWAL AT FULL POWER N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                              SHEET Number                                                                                                              Number 15.0-21   FIGURE 15.0-21   JANUARY 1998               RUPTURE OF CONTROL ROD DRIVE MECHANISM HOUSING (ROD EJECTION) N/A       N/A 15.0-22   FIGURE 15.0-22   JANUARY 1998               INADVERTENT ECCS OPERATION AT POWER                           N/A       N/A 15.0-23   FIGURE 15.0-23   JANUARY 1998               ACCIDENTAL DEPRESSURIZATION OF REACTOR COOLANT SYSTEM         N/A       N/A 15.0-24   FIGURE 15.0-24   FEBRUARY 1998             STEAM GENERATOR TUBE RUPTURE                                 N/A       N/A 15.0-25   FIGURE 15.0-25   [21.3]                     LOSS OF COOLANT ACCIDENT                                     N/A       N/A 15.0-26   FIGURE 15.0-26   NONE                       CVCS LETDOWN LINE RUPTURE                                     N/A       N/A 15.0-27   FIGURE 15.0-27   NONE                       GWPS GAS DECAY TANK RUPTURE                                   N/A       N/A 15.0-28   FIGURE 15.0-28   NONE                       FLOOR DRAIN TANK FAILURE                                     N/A       N/A 15.0-29   FIGURE 15.0-29   NONE                       FUEL HANDLING ACCIDENT IN FUEL BUILDING                       N/A       N/A 15.0-30   FIGURE 15.0-30   NONE                       FUEL HANDLING ACCIDENT INSIDE CONTAINMENT                     N/A       N/A 15.0-31   FIGURE 15.0-31   NONE                       SPENT FUEL CASK DROP ACCIDENT                                 N/A       N/A 15.1-1   FIGURE 15.1-1   [21.3]                     FEEDWATER CONTROL VALVE MALFUNCTION                           N/A       N/A 15.1-1A   FIGURE 15.1-1A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                         N/A       N/A 15.1-2   FIGURE 15.1-2   [21.3]                     FEEDWATER CONTROL VALVE MALFUNCTION                           N/A       N/A 15.1-2A   FIGURE 15.1-2A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                         N/A       N/A Page 69 of 83
MPS-3 FSAR Page 69 of 83 15.0-21 FIGURE 15.0-21 JANUARY 1998 RUPTURE OF CONTROL ROD DRIVE MECHANISM HOUSING (ROD EJECTION)
N/A N/A 15.0-22 FIGURE 15.0-22 JANUARY 1998 INADVERTENT ECCS OPERATION AT POWER N/A N/A 15.0-23 FIGURE 15.0-23 JANUARY 1998 ACCIDENTAL DEPRESSURIZATION OF REACTOR COOLANT SYSTEM N/A N/A 15.0-24 FIGURE 15.0-24 FEBRUARY 1998 STEAM GENERATOR TUBE RUPTURE N/A N/A 15.0-25 FIGURE 15.0-25
[21.3]
LOSS OF COOLANT ACCIDENT N/A N/A 15.0-26 FIGURE 15.0-26 NONE CVCS LETDOWN LINE RUPTURE N/A N/A 15.0-27 FIGURE 15.0-27 NONE GWPS GAS DECAY TANK RUPTURE N/A N/A 15.0-28 FIGURE 15.0-28 NONE FLOOR DRAIN TANK FAILURE N/A N/A 15.0-29 FIGURE 15.0-29 NONE FUEL HANDLING ACCIDENT IN FUEL BUILDING N/A N/A 15.0-30 FIGURE 15.0-30 NONE FUEL HANDLING ACCIDENT INSIDE CONTAINMENT N/A N/A 15.0-31 FIGURE 15.0-31 NONE SPENT FUEL CASK DROP ACCIDENT N/A N/A 15.1-1 FIGURE 15.1-1
[21.3]
FEEDWATER CONTROL VALVE MALFUNCTION N/A N/A 15.1-1A FIGURE 15.1-1A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-2 FIGURE 15.1-2
[21.3]
FEEDWATER CONTROL VALVE MALFUNCTION N/A N/A 15.1-2A FIGURE 15.1-2A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                          Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                          SHEET Number                                                                                                          Number 15.1-3   FIGURE 15.1-3   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-4   FIGURE 15.1-4   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-5   FIGURE 15.1-5   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-6   FIGURE 15.1-6   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-7   FIGURE 15.1-7   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-8   FIGURE 15.1-8   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-9   FIGURE 15.1-9   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-10   FIGURE 15.1-10   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-11   FIGURE 15.1-11   [21.3]                     Keffective VERSUS TEMPERATURE                             N/A       N/A 15.1-12   FIGURE 15.1-12   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-12A FIGURE 15.1-12A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.1-13   FIGURE 15.1-13   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-050                     N/A       N/A 15.1-13A FIGURE 15.1-13A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.1-14   FIGURE 15.1-14   [21.3]                     DOPPLER POWER FEEDBACK                                   N/A       N/A 15.1-15   FIGURE 15.1-15   [21.3]                     1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A       N/A Page 70 of 83
MPS-3 FSAR Page 70 of 83 15.1-3 FIGURE 15.1-3
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-4 FIGURE 15.1-4
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-5 FIGURE 15.1-5
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-6 FIGURE 15.1-6
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-7 FIGURE 15.1-7
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-8 FIGURE 15.1-8
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-9 FIGURE 15.1-9
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-10 FIGURE 15.1-10
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-11 FIGURE 15.1-11
[21.3]
Keffective VERSUS TEMPERATURE N/A N/A 15.1-12 FIGURE 15.1-12
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-12A FIGURE 15.1-12A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-13 FIGURE 15.1-13
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-13A FIGURE 15.1-13A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-14 FIGURE 15.1-14
[21.3]
DOPPLER POWER FEEDBACK N/A N/A 15.1-15 FIGURE 15.1-15
[21.3]
1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                          Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                          SHEET Number                                                                                                          Number 15.1-15A FIGURE 15.1-15A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.1-16   FIGURE 15.1-16   [21.3]                     1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A       N/A 15.1-16A FIGURE 15.1-16A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.1-17   FIGURE 15.1-17   [17.2]                     1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A       N/A 15.1-17A FIGURE 15.1-17A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-1   FIGURE 15.2-1   [21.3]                     TURBINE TRIP-RCS OVERPRESSURIZATION CASE                 N/A       N/A 15.2-1A   FIGURE 15.2-1A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-2   FIGURE 15.2-2   [21.3]                     TURBINE TRIP-RCS OVERPRESSURIZATION CASE                 N/A       N/A 15.2-2A   FIGURE 15.2-2A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-3   FIGURE 15.2-3   [21.3]                     TURBINE TRIP-DNBR CASE                                   N/A       N/A 15.2-3A   FIGURE 15.2-3A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-4   FIGURE 15.2-4   [21.3]                     TURBINE TRIP-DNBR CASE                                   N/A       N/A 15.2-4A   FIGURE 15.2-4A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-5   FIGURE 15.2-5   [21.3]                     TURBINE TRIP-MSS OVERPRESSURIZATION CASE                 N/A       N/A 15.2-5A   FIGURE 15.2-5A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A Page 71 of 83
MPS-3 FSAR Page 71 of 83 15.1-15A FIGURE 15.1-15A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-16 FIGURE 15.1-16
[21.3]
1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A 15.1-16A FIGURE 15.1-16A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-17 FIGURE 15.1-17
[17.2]
1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A 15.1-17A FIGURE 15.1-17A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-1 FIGURE 15.2-1
[21.3]
TURBINE TRIP-RCS OVERPRESSURIZATION CASE N/A N/A 15.2-1A FIGURE 15.2-1A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-2 FIGURE 15.2-2
[21.3]
TURBINE TRIP-RCS OVERPRESSURIZATION CASE N/A N/A 15.2-2A FIGURE 15.2-2A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-3 FIGURE 15.2-3
[21.3]
TURBINE TRIP-DNBR CASE N/A N/A 15.2-3A FIGURE 15.2-3A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-4 FIGURE 15.2-4
[21.3]
TURBINE TRIP-DNBR CASE N/A N/A 15.2-4A FIGURE 15.2-4A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-5 FIGURE 15.2-5
[21.3]
TURBINE TRIP-MSS OVERPRESSURIZATION CASE N/A N/A 15.2-5A FIGURE 15.2-5A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                        Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                          SHEET Number                                                                                                          Number 15.2-6   FIGURE 15.2-6   [21.3]                     TURBINE TRIP-MSS OVERPRESSURIZATION CASE                 N/A       N/A 15.2-6A   FIGURE 15.2-6A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-7   FIGURE 15.2-7   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-051                     N/A       N/A 15.2-7A   FIGURE 15.2-7A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-8   FIGURE 15.2-8   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-051                     N/A       N/A 15.2-8A   FIGURE 15.2-8A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                     N/A       N/A 15.2-9   FIGURE 15.2-9   [21.3]                     LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-9A   FIGURE 15.2-9A   [21.3]                     LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-10   FIGURE 15.2-10   [21.3]                     LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-10A FIGURE 15.2-10A [21.3]                     LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-11   FIGURE 15.2-11   [21.3]                     LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-11A FIGURE 15.2-11A [21.3]                     LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-12   FIGURE 15.2-12   [21.3]                     LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-12A FIGURE 15.2-12A [21.3]                     LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-13   FIGURE 15.2-13   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE       N/A       N/A Page 72 of 83
MPS-3 FSAR Page 72 of 83 15.2-6 FIGURE 15.2-6
[21.3]
TURBINE TRIP-MSS OVERPRESSURIZATION CASE N/A N/A 15.2-6A FIGURE 15.2-6A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-7 FIGURE 15.2-7
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-051 N/A N/A 15.2-7A FIGURE 15.2-7A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-8 FIGURE 15.2-8
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-051 N/A N/A 15.2-8A FIGURE 15.2-8A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-9 FIGURE 15.2-9
[21.3]
LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-9A FIGURE 15.2-9A
[21.3]
LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-10 FIGURE 15.2-10
[21.3]
LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-10A FIGURE 15.2-10A
[21.3]
LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-11 FIGURE 15.2-11
[21.3]
LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-11A FIGURE 15.2-11A
[21.3]
LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-12 FIGURE 15.2-12
[21.3]
LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-12A FIGURE 15.2-12A
[21.3]
LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-13 FIGURE 15.2-13
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                      Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                      SHEET Number                                                                                                      Number 15.2-13A FIGURE 15.2-13A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-14   FIGURE 15.2-14   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-14A FIGURE 15.2-14A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-15   FIGURE 15.2-15   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-15A FIGURE 15.2-15A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-16   FIGURE 15.2-16   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-16A FIGURE 15.2-16A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-17   FIGURE 15.2-17   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-17A FIGURE 15.2-17A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-18   FIGURE 15.2-18   [21.3]                     MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE   N/A       N/A 15.2-18A FIGURE 15.2-18A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-19   FIGURE 15.2-19   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-19A FIGURE 15.2-19A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A 15.2-20   FIGURE 15.2-20   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A       N/A 15.2-20A FIGURE 15.2-20A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                 N/A       N/A Page 73 of 83
MPS-3 FSAR Page 73 of 83 15.2-13A FIGURE 15.2-13A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-14 FIGURE 15.2-14
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-14A FIGURE 15.2-14A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-15 FIGURE 15.2-15
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-15A FIGURE 15.2-15A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-16 FIGURE 15.2-16
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-16A FIGURE 15.2-16A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-17 FIGURE 15.2-17
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-17A FIGURE 15.2-17A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-18 FIGURE 15.2-18
[21.3]
MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-18A FIGURE 15.2-18A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-19 FIGURE 15.2-19
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-19A FIGURE 15.2-19A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-20 FIGURE 15.2-20
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-20A FIGURE 15.2-20A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                          Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                            SHEET Number                                                                                                                          Number 15.2-21   FIGURE 15.2-21   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE                     N/A       N/A 15.2-21A FIGURE 15.2-21A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                     N/A       N/A 15.2-22   FIGURE 15.2-22   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE                     N/A       N/A 15.2-22A FIGURE 15.2-22A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                     N/A       N/A 15.2-23   FIGURE 15.2-23   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE                     N/A       N/A 15.2-23A FIGURE 15.2-23A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                     N/A       N/A 15.2-24   FIGURE 15.2-24   [21.3]                     MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE                     N/A       N/A 15.2-24A FIGURE 15.2-24A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                     N/A       N/A 15.3-1   FIGURE 15.3-1   [21.3]                     FLOW TRANSIENTS ONE PUMP COASTING DOWN                                   N/A       N/A 15.3-2   FIGURE 15.3-2   [21.3]                     NUCLEAR POWER AND PRESSURIZER PRESSUR TRANSIENTS, ONE PUMP COASTING DOWN N/A       N/A 15.3-3   FIGURE 15.3-3   [21.3]                     AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENT, ONE PUMP COASTING DOWN       N/A       N/A 15.3-4   FIGURE 15.3-4   [21.3]                     DNBR VERSUS TIME, ONE PUMP COASTING DOWN                                 N/A       N/A 15.3-5   FIGURE 15.3-5   [21.3]                     CORE FLOW COASTDOWN, FOUR PUMPS COASTING DOWN                             N/A       N/A 15.3-6   FIGURE 15.3-6   [21.3]                     NUCLEAR POWER & PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS COASTING DOWN N/A       N/A 15.3-7   FIGURE 15.3-7   [21.3]                     AVERAGE & HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS COASTING DOWN     N/A       N/A Page 74 of 83
MPS-3 FSAR Page 74 of 83 15.2-21 FIGURE 15.2-21
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-21A FIGURE 15.2-21A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-22 FIGURE 15.2-22
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-22A FIGURE 15.2-22A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-23 FIGURE 15.2-23
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-23A FIGURE 15.2-23A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-24 FIGURE 15.2-24
[21.3]
MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-24A FIGURE 15.2-24A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-1 FIGURE 15.3-1
[21.3]
FLOW TRANSIENTS ONE PUMP COASTING DOWN N/A N/A 15.3-2 FIGURE 15.3-2
[21.3]
NUCLEAR POWER AND PRESSURIZER PRESSUR TRANSIENTS, ONE PUMP COASTING DOWN N/A N/A 15.3-3 FIGURE 15.3-3
[21.3]
AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENT, ONE PUMP COASTING DOWN N/A N/A 15.3-4 FIGURE 15.3-4
[21.3]
DNBR VERSUS TIME, ONE PUMP COASTING DOWN N/A N/A 15.3-5 FIGURE 15.3-5
[21.3]
CORE FLOW COASTDOWN, FOUR PUMPS COASTING DOWN N/A N/A 15.3-6 FIGURE 15.3-6
[21.3]
NUCLEAR POWER & PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS COASTING DOWN N/A N/A 15.3-7 FIGURE 15.3-7
[21.3]
AVERAGE & HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS COASTING DOWN N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                              Number 15.3-8   FIGURE 15.3-8   [21.3]                     DNBR VERSUS TIME, FOUR PUMPS COASTING DOWN                                   N/A       N/A 15.3-9   FIGURE 15.3-9   [21.3]                     FLOW TRANSIENTS, ONE LOCKED ROTOR                                           N/A       N/A 15.3-9A   FIGURE 15.3-9A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A 15.3-10   FIGURE 15.3-10   [21.3]                     RCS PRESSURE, ONE LOCKED ROTOR                                               N/A       N/A 15.3-10A FIGURE 15.3-10A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A 15.3-11   FIGURE 15.3-11   [21.3]                     NUCLEAR POWER AND CORE AVERAGE HEAT FLUX TRANSIENTS, ONE LOCKED ROTOR       N/A       N/A 15.3-11A FIGURE 15.3-11A [17.2])                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A MAXIMUM CLAD TEMPERATURE AT HOT SPOT FOR FOUR LOOPS IN OPERATION, ONE LOCKED 15.3-12   FIGURE 15.3-12   [21.3]                                                                                                   N/A       N/A ROTOR 15.3-12A FIGURE 15.3-12A [17.2])                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A 15.3-13   FIGURE 15.3-13   [21.3]                     CORE FLOW TRANSIENT, FOUR PUMPS EXPERIENCING FREQUENCY DECAY                 N/A       N/A NUCLEAR POWER AND PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS EXPERIENCING 15.3-14   FIGURE 15.3-14   [21.3]                                                                                                   N/A       N/A FREQUENCY DECAY AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS EXPERIENCING 15.3-15   FIGURE 15.3-15   [21.3]                                                                                                   N/A       N/A FREQUENCY DECAY 15.3-16   FIGURE 15.3-16   [21.3]                     DNBR VERSUS TIME, FOUR PUMPS EXPERIENCING FREQUENCY DECAY                   N/A       N/A NEUTRON & THERMAL FLUX TRANSIENT FOR UNCONTROLLED RCCA WITHDRAWAL FORM A 15.4-1   FIGURE 15.4-1   MARCH 1998                                                                                               N/A       N/A SUBCRITICAL CONDITION 15.4-2   FIGURE 15.4-2   N/A                         OMITTED                                                                     N/A       N/A Page 75 of 83
MPS-3 FSAR Page 75 of 83 15.3-8 FIGURE 15.3-8
[21.3]
DNBR VERSUS TIME, FOUR PUMPS COASTING DOWN N/A N/A 15.3-9 FIGURE 15.3-9
[21.3]
FLOW TRANSIENTS, ONE LOCKED ROTOR N/A N/A 15.3-9A FIGURE 15.3-9A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-10 FIGURE 15.3-10
[21.3]
RCS PRESSURE, ONE LOCKED ROTOR N/A N/A 15.3-10A FIGURE 15.3-10A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-11 FIGURE 15.3-11
[21.3]
NUCLEAR POWER AND CORE AVERAGE HEAT FLUX TRANSIENTS, ONE LOCKED ROTOR N/A N/A 15.3-11A FIGURE 15.3-11A
[17.2])
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-12 FIGURE 15.3-12
[21.3]
MAXIMUM CLAD TEMPERATURE AT HOT SPOT FOR FOUR LOOPS IN OPERATION, ONE LOCKED ROTOR N/A N/A 15.3-12A FIGURE 15.3-12A
[17.2])
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-13 FIGURE 15.3-13
[21.3]
CORE FLOW TRANSIENT, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-14 FIGURE 15.3-14
[21.3]
NUCLEAR POWER AND PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-15 FIGURE 15.3-15
[21.3]
AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-16 FIGURE 15.3-16
[21.3]
DNBR VERSUS TIME, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.4-1 FIGURE 15.4-1 MARCH 1998 NEUTRON & THERMAL FLUX TRANSIENT FOR UNCONTROLLED RCCA WITHDRAWAL FORM A SUBCRITICAL CONDITION N/A N/A 15.4-2 FIGURE 15.4-2 N/A OMITTED N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                              SHEET Number                                                                                                                              Number FUEL & CLAD TEMPERATURE TRANSIENTS UNCONTROLLED RCCA WITHDRAWAL FROM A 15.4-3   FIGURE 15.4-3   MARCH 1998                                                                                               N/A       N/A SUBCRITICAL CONDITION UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-4   FIGURE 15.4-4   [20.1]                                                                                                   N/A        N/A FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE) 15.4-4A   FIGURE 15.4-4A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-5   FIGURE 15.4-5   [20.1]                                                                                                   N/A        N/A FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE) 15.4-5A   FIGURE 15.4-5A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-6   FIGURE 15.4-6   [20.1]                                                                                                   N/A        N/A FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE) 15.4-6A   FIGURE 15.4-6A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-7   FIGURE 15.4-7   [20.1]                                                                                                   N/A        N/A FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE) 15.4-7A   FIGURE 15.4-7A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-8   FIGURE 15.4-8   [20.1]                                                                                                   N/A        N/A FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE) 15.4-8A   FIGURE 15.4-8A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY 15.4-9   FIGURE 15.4-9   [20.1]                                                                                                   N/A        N/A FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE) 15.4-9A   FIGURE 15.4-9A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A 15.4-10   FIGURE 15.4-10   [20.1]                     MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: ROD WITHDRAWAL FROM 100% POWER N/A       N/A 15.4-10A FIGURE 15.4-10A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A       N/A Page 76 of 83
MPS-3 FSAR Page 76 of 83 15.4-3 FIGURE 15.4-3 MARCH 1998 FUEL & CLAD TEMPERATURE TRANSIENTS UNCONTROLLED RCCA WITHDRAWAL FROM A SUBCRITICAL CONDITION N/A N/A 15.4-4 FIGURE 15.4-4
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-4A FIGURE 15.4-4A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-5 FIGURE 15.4-5
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-5A FIGURE 15.4-5A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-6 FIGURE 15.4-6
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-6A FIGURE 15.4-6A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-7 FIGURE 15.4-7
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-7A FIGURE 15.4-7A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-8 FIGURE 15.4-8
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-8A FIGURE 15.4-8A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-9 FIGURE 15.4-9
[20.1]
UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)
N/A N/A 15.4-9A FIGURE 15.4-9A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-10 FIGURE 15.4-10
[20.1]
MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: ROD WITHDRAWAL FROM 100% POWER N/A N/A 15.4-10A FIGURE 15.4-10A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                       TITLE                                                SHEET Number                                                                                                                                Number MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 60% RATED 15.4-11  FIGURE 15.4-11  [20.1]                                                                                                    N/A       N/A THERMAL POWER 15.4-11A FIGURE 15.4-11A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                           N/A       N/A MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 10% RATED 15.4-12   FIGURE 15.4-12   [20.1]                                                                                                   N/A       N/A THERMAL POWER 15.4-13   FIGURE 15.4-13   AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL                       N/A       N/A 15.4-14   FIGURE 15.4-14   AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL                       N/A       N/A 15.4-21   FIGURE 15.4-21   NONE                       INTERCHANGE BETWEEN REGION 1 AND REGION 3 ASSEMBLY                             N/A       N/A INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING 15.4-22   FIGURE 15.4-22   NONE                                                                                                     N/A        N/A RETAINED BY THE REGION 2 ASSEMBLY INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING 15.4-23   FIGURE 15.4-23   NONE                                                                                                     N/A       N/A RETAINED BY THE REGION 1 ASSEMBLY 15.4-24   FIGURE 15.4-24   NONE                       ENRICHMENT ERROR: A REGION 2 ASSEMBLY LOADED INTO THE CORE CENTRAL POSITION   N/A       N/A 15.4-25   FIGURE 15.4-25   NONE                       LOADING A REGION 2 ASSEMBLY INTO A REGION 1 POSTION NEAR CORE PERIPHERY       N/A       N/A 15.4-26   FIGURE 15.4-26   [17.2]                     NUCLEAR POWER TRANSIENT BOL HFP RCCA EJECTION                                 N/A       N/A 15.4-26A FIGURE 15.4-26A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                           N/A       N/A 15.4-27   FIGURE 15.4-27   [17.2]                     HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - BOL HFP RCCA EJECTION           N/A       N/A 15.4-27A FIGURE 15.4-27A [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                           N/A       N/A 15.4-28   FIGURE 15.4-28   MARCH 1998                 NUCLEAR POWER TRANSIENT EOL HZP RCCA EJECTION (TWO RCPs RUNNING)               N/A       N/A Page 77 of 83
MPS-3 FSAR Page 77 of 83 15.4-11 FIGURE 15.4-11
[20.1]
MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 60% RATED THERMAL POWER N/A N/A 15.4-11A FIGURE 15.4-11A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-12 FIGURE 15.4-12
[20.1]
MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 10% RATED THERMAL POWER N/A N/A 15.4-13 FIGURE 15.4-13 AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL N/A N/A 15.4-14 FIGURE 15.4-14 AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL N/A N/A 15.4-21 FIGURE 15.4-21 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 3 ASSEMBLY N/A N/A 15.4-22 FIGURE 15.4-22 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING RETAINED BY THE REGION 2 ASSEMBLY N/A N/A 15.4-23 FIGURE 15.4-23 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING RETAINED BY THE REGION 1 ASSEMBLY N/A N/A 15.4-24 FIGURE 15.4-24 NONE ENRICHMENT ERROR: A REGION 2 ASSEMBLY LOADED INTO THE CORE CENTRAL POSITION N/A N/A 15.4-25 FIGURE 15.4-25 NONE LOADING A REGION 2 ASSEMBLY INTO A REGION 1 POSTION NEAR CORE PERIPHERY N/A N/A 15.4-26 FIGURE 15.4-26
[17.2]
NUCLEAR POWER TRANSIENT BOL HFP RCCA EJECTION N/A N/A 15.4-26A FIGURE 15.4-26A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-27 FIGURE 15.4-27
[17.2]
HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - BOL HFP RCCA EJECTION N/A N/A 15.4-27A FIGURE 15.4-27A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-28 FIGURE 15.4-28 MARCH 1998 NUCLEAR POWER TRANSIENT EOL HZP RCCA EJECTION (TWO RCPs RUNNING)
N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                Drawing FIGURE LABEL        DATE / Revision [ ]                                      TITLE                                                SHEET Number                                                                                                                                Number HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - EOL HZP RCCA EJECTION (TWO RCPs 15.4-29  FIGURE 15.4-29  MARCH 1999                                                                                                N/A        N/A RUNNING)
MPS-3 FSAR Page 78 of 83 15.4-29 FIGURE 15.4-29 MARCH 1999 HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - EOL HZP RCCA EJECTION (TWO RCPs RUNNING)
REACTOR COOLANT SYSTEM INTEGRATED BREAK FLOW FOLLOWING A ROD EJECTION 15.4-30  FIGURE 15.4-30  NONE                                                                                                      N/A       N/A ACCIDENT CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, NUCLEAR POWER AND 15.5-1   FIGURE 15.5-1   [21.3]                                                                                                     N/A        N/A VESSEL AVERAGE TEMPERATURE VERSUS TIME CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, PRESSURIZER PRESSURE 15.5-2   FIGURE 15.5-2   [21.3]                                                                                                     N/A       N/A AND PRESSURIZER WATER VOLUME VERSUS TIME 15.5-3   FIGURE 15.5-3   [21.3]                     DELETED BY CHANGE PKG FSC 07-MP3-055                                           N/A       N/A 15.6-1   FIGURE 15.6-1   [21.3]                     INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE                               N/A       N/A 15.6-1A   FIGURE 15.6-1A   [17.2]                     Deleted by CHANGE PKG FSC 02-MP3-017                                           N/A       N/A 15.6-2   FIGURE 15.6-2   [21.3]                     INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE                               N/A       N/A 15.6-2A   FIGURE 15.6-2A   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                           N/A       N/A 15.6-3   FIGURE 15.6-3   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                           N/A       N/A 15.6.3-1 FIGURE 15.6.3-1 [21.3]                     PRESSURIZER LEVEL                                                               N/A       N/A 15.6.3-2 FIGURE 15.6.3-2 [21.3]                     Reactor Coolant System Pressure                                                 N/A       N/A 15.6.3-3 FIGURE 15.6.3-3 [21.3]                     SECONDARY PRESSURE                                                             N/A       N/A 15.6.3-4 FIGURE 15.6.3-4 [21.3]                     RUPTURED LOOP HOT AND COLD LEG RCS TEMPERATURES                                 N/A       N/A 15.6.3-5 FIGURE 15.6.3-5 [21.3]                     INTACT LOOP HOT AND COLD LEG RCS TEMPERATURES                                   N/A       N/A Page 78 of 83
N/A N/A 15.4-30 FIGURE 15.4-30 NONE REACTOR COOLANT SYSTEM INTEGRATED BREAK FLOW FOLLOWING A ROD EJECTION ACCIDENT N/A N/A 15.5-1 FIGURE 15.5-1
[21.3]
CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, NUCLEAR POWER AND VESSEL AVERAGE TEMPERATURE VERSUS TIME N/A N/A 15.5-2 FIGURE 15.5-2
[21.3]
CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, PRESSURIZER PRESSURE AND PRESSURIZER WATER VOLUME VERSUS TIME N/A N/A 15.5-3 FIGURE 15.5-3
[21.3]
DELETED BY CHANGE PKG FSC 07-MP3-055 N/A N/A 15.6-1 FIGURE 15.6-1
[21.3]
INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE N/A N/A 15.6-1A FIGURE 15.6-1A
[17.2]
Deleted by CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6-2 FIGURE 15.6-2
[21.3]
INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE N/A N/A 15.6-2A FIGURE 15.6-2A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6-3 FIGURE 15.6-3
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6.3-1 FIGURE 15.6.3-1
[21.3]
PRESSURIZER LEVEL N/A N/A 15.6.3-2 FIGURE 15.6.3-2
[21.3]
Reactor Coolant System Pressure N/A N/A 15.6.3-3 FIGURE 15.6.3-3
[21.3]
SECONDARY PRESSURE N/A N/A 15.6.3-4 FIGURE 15.6.3-4
[21.3]
RUPTURED LOOP HOT AND COLD LEG RCS TEMPERATURES N/A N/A 15.6.3-5 FIGURE 15.6.3-5
[21.3]
INTACT LOOP HOT AND COLD LEG RCS TEMPERATURES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL        DATE / Revision [ ]                                                    TITLE                                    SHEET Number                                                                                                                                  Number 15.6.3-6 FIGURE 15.6.3-6 [21.3]                     PRIMARY TO SECONDARY BREAK FLOW RATE                                             N/A       N/A 15.6.3-7 FIGURE 15.6.3-7 [21.3]                     Differential Pressure Between Reactor Coolant System and Ruptured Steam Generator N/A       N/A 15.6.3-8 FIGURE 15.6.3-8 [21.3]                     Ruptured Steam Generator Water Volume                                             N/A       N/A 15.6.3-9 FIGURE 15.6.3-9 [21.3]                     Ruptured Steam Generator Water Mass                                               N/A       N/A 15.6.3-10 FIGURE 15.6.3-10 [21.3]                     Ruptured Steam Generator Mass Release Rate to the Atmosphere                     N/A       N/A 15.6.3-11 FIGURE 15.6.3-11 [21.3]                     Intact Steam Generators Mass Release Rate to the Atmosphere.                     N/A       N/A 15.6.3-12 FIGURE 15.6.3-12 [21.3]                     FLASHED BREAK FLOW                                                               N/A       N/A 15.6-4   FIGURE 15.6-4   NONE                       SEQUENCE OF EVENTS FOR LARGE BREAK LOCA ANALYSIS                                 N/A       N/A 15.6-5   FIGURE 15.6-5   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                             N/A       N/A 15.6-6   FIGURE 15.6-6   [17]                       CODE INTERFACE DESCRIPTION FOR SMALL BREAK LOCA MODEL                             N/A       N/A 15.6-7   FIGURE 15.6-7   [17]                       SMALL BREAK POWER SHAPE                                                           N/A       N/A 15.6-8   FIGURE 15.6-8   [21.3]                     PEAK CLAD TERMPERATURE - DECLG (Cd = 0.6)                                         N/A       N/A 15.6-8A   FIGURE 15.6-8A   [21.3]                     Deleted by CHANGE PKG FSC 07-MP3-054                                             N/A       N/A 15.6-9   FIGURE 15.6-9   [21.3]                     Limiting PCT Case Vessel Side Break Flow                                         N/A       N/A 15.6-10   FIGURE 15.6-10   [21.3]                     Limiting PCT Case Loop Side Break Flow                                           N/A       N/A Page 79 of 83
MPS-3 FSAR Page 79 of 83 15.6.3-6 FIGURE 15.6.3-6
[21.3]
PRIMARY TO SECONDARY BREAK FLOW RATE N/A N/A 15.6.3-7 FIGURE 15.6.3-7
[21.3]
Differential Pressure Between Reactor Coolant System and Ruptured Steam Generator N/A N/A 15.6.3-8 FIGURE 15.6.3-8
[21.3]
Ruptured Steam Generator Water Volume N/A N/A 15.6.3-9 FIGURE 15.6.3-9
[21.3]
Ruptured Steam Generator Water Mass N/A N/A 15.6.3-10 FIGURE 15.6.3-10
[21.3]
Ruptured Steam Generator Mass Release Rate to the Atmosphere N/A N/A 15.6.3-11 FIGURE 15.6.3-11
[21.3]
Intact Steam Generators Mass Release Rate to the Atmosphere.
N/A N/A 15.6.3-12 FIGURE 15.6.3-12
[21.3]
FLASHED BREAK FLOW N/A N/A 15.6-4 FIGURE 15.6-4 NONE SEQUENCE OF EVENTS FOR LARGE BREAK LOCA ANALYSIS N/A N/A 15.6-5 FIGURE 15.6-5
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-6 FIGURE 15.6-6
[17]
CODE INTERFACE DESCRIPTION FOR SMALL BREAK LOCA MODEL N/A N/A 15.6-7 FIGURE 15.6-7
[17]
SMALL BREAK POWER SHAPE N/A N/A 15.6-8 FIGURE 15.6-8
[21.3]
PEAK CLAD TERMPERATURE - DECLG (Cd = 0.6)
N/A N/A 15.6-8A FIGURE 15.6-8A
[21.3]
Deleted by CHANGE PKG FSC 07-MP3-054 N/A N/A 15.6-9 FIGURE 15.6-9
[21.3]
Limiting PCT Case Vessel Side Break Flow N/A N/A 15.6-10 FIGURE 15.6-10
[21.3]
Limiting PCT Case Loop Side Break Flow N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                              Drawing FIGURE LABEL        DATE / Revision [ ]                                                  TITLE                  SHEET Number                                                                                                              Number 15.6-11   FIGURE 15.6-11   [21.3]                     Limiting PCT Case Broken and Intact Loop Void Fraction       N/A       N/A 15.6-12   FIGURE 15.6-12   [21.3]                     Limiting PCT Case Hot Assembly Top Third of Core Vapor Flow   N/A       N/A 15.6-13   FIGURE 15.6-13   [21.3]                     Limiting PCT Case Pressurizer Pressure                       N/A       N/A 15.6-14   FIGURE 15.6-14   [21.3]                     Limiting PCT Case Lower Plenum Collapsed Liquid Level         N/A       N/A 15.6-15   FIGURE 15.6-15   [21.3]                     Limiting PCT Case Vessel Fluid Mass                           N/A       N/A 15.6-16   FIGURE 15.6-16   [21.3]                     Limiting PCT Case Loop 2 Accumulator Flow                     N/A       N/A 15.6-17   FIGURE 15.6-17   [21.3]                     Limiting PCT Case Loop 2 Safety Injection Flow               N/A       N/A 15.6-18   FIGURE 15.6-18   [21.3]                     Limiting PCT Case Core Average Channel Collapsed Liquid Level N/A       N/A 15.6-19   FIGURE 15.6-19   [21.3]                     Limiting PCT Case Loop 2 Downcomer Collapsed Liquid Level     N/A       N/A 15.6-20   FIGURE 15.6-20   [21.3]                     BELOCA Analysis Axial Power Shape Operating Space Envelope   N/A       N/A 15.6-21   FIGURE 15.6-21   [21.3]                     Lower Bound Containment Pressure                             N/A       N/A 15.6-22   FIGURE 15.6-22   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                         N/A       N/A 15.6-23   FIGURE 15.6-23   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                         N/A       N/A 15.6-24   FIGURE 15.6-24   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                         N/A       N/A 15.6-25   FIGURE 15.6-25   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                         N/A       N/A Page 80 of 83
MPS-3 FSAR Page 80 of 83 15.6-11 FIGURE 15.6-11
[21.3]
Limiting PCT Case Broken and Intact Loop Void Fraction N/A N/A 15.6-12 FIGURE 15.6-12
[21.3]
Limiting PCT Case Hot Assembly Top Third of Core Vapor Flow N/A N/A 15.6-13 FIGURE 15.6-13
[21.3]
Limiting PCT Case Pressurizer Pressure N/A N/A 15.6-14 FIGURE 15.6-14
[21.3]
Limiting PCT Case Lower Plenum Collapsed Liquid Level N/A N/A 15.6-15 FIGURE 15.6-15
[21.3]
Limiting PCT Case Vessel Fluid Mass N/A N/A 15.6-16 FIGURE 15.6-16
[21.3]
Limiting PCT Case Loop 2 Accumulator Flow N/A N/A 15.6-17 FIGURE 15.6-17
[21.3]
Limiting PCT Case Loop 2 Safety Injection Flow N/A N/A 15.6-18 FIGURE 15.6-18
[21.3]
Limiting PCT Case Core Average Channel Collapsed Liquid Level N/A N/A 15.6-19 FIGURE 15.6-19
[21.3]
Limiting PCT Case Loop 2 Downcomer Collapsed Liquid Level N/A N/A 15.6-20 FIGURE 15.6-20
[21.3]
BELOCA Analysis Axial Power Shape Operating Space Envelope N/A N/A 15.6-21 FIGURE 15.6-21
[21.3]
Lower Bound Containment Pressure N/A N/A 15.6-22 FIGURE 15.6-22
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-23 FIGURE 15.6-23
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-24 FIGURE 15.6-24
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-25 FIGURE 15.6-25
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                        Drawing FIGURE LABEL        DATE / Revision [ ]                                                      TITLE                                          SHEET Number                                                                                                                                          Number 15.6-26   FIGURE 15.6-26   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                                     N/A       N/A 15.6-27   FIGURE 15.6-27   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                                     N/A       N/A 15.6-28   FIGURE 15.6-28   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                                     N/A       N/A 15.6-29   FIGURE 15.6-29   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                                     N/A       N/A 15.6-30   FIGURE 15.6-30   [21.3]                     Deleted by FSARCR PKG FSC 07-MP3-054                                                     N/A       N/A 15.6-31   FIGURE 15.6-31   [21.3]                     Reactor Coolant System Pressure (4 inch Break)                                           N/A       N/A 15.6-32   FIGURE 15.6-32   [21.3]                     Core Mixture Level (4 inch Break)                                                       N/A       N/A 15.6-33   FIGURE 15.6-33   [21.3]                     Clad Temperature Transient at Peak Temperature Elevation (4 inch Break)                 N/A       N/A 15.6-34   FIGURE 15.6-34   [21.3]                     Core Exit Steam Flow Rate (4 inch Break)                                                 N/A       N/A 15.6-35   FIGURE 15.6-35   [21.3]                     Clad Surface Heat Transfer Coefficient at Peak Clad Temperature Elevation (4 inch Break) N/A       N/A 15.6-36   FIGURE 15.6-36   [21.3]                     Fluid Temperature at Peak Clad Temperature Elevation (4 inch Break)                     N/A       N/A 15.6-37   FIGURE 15.6-37   [21.3]                     Reactor Coolant System Pressure (1.5 inch Break)                                         N/A       N/A 15.6-38   FIGURE 15.6-38   [21.3]                     Reactor Coolant System Pressure (2 inch Break)                                           N/A       N/A 15.6-39   FIGURE 15.6-39   [21.3]                     Reactor Coolant System Pressure (3 inch Break)                                           N/A       N/A 15.6-40   FIGURE 15.6-40   [21.3]                     Reactor Coolant System Pressure (6 inch Break)                                           N/A       N/A Page 81 of 83
MPS-3 FSAR Page 81 of 83 15.6-26 FIGURE 15.6-26
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-27 FIGURE 15.6-27
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-28 FIGURE 15.6-28
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-29 FIGURE 15.6-29
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-30 FIGURE 15.6-30
[21.3]
Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-31 FIGURE 15.6-31
[21.3]
Reactor Coolant System Pressure (4 inch Break)
N/A N/A 15.6-32 FIGURE 15.6-32
[21.3]
Core Mixture Level (4 inch Break)
N/A N/A 15.6-33 FIGURE 15.6-33
[21.3]
Clad Temperature Transient at Peak Temperature Elevation (4 inch Break)
N/A N/A 15.6-34 FIGURE 15.6-34
[21.3]
Core Exit Steam Flow Rate (4 inch Break)
N/A N/A 15.6-35 FIGURE 15.6-35
[21.3]
Clad Surface Heat Transfer Coefficient at Peak Clad Temperature Elevation (4 inch Break)
N/A N/A 15.6-36 FIGURE 15.6-36
[21.3]
Fluid Temperature at Peak Clad Temperature Elevation (4 inch Break)
N/A N/A 15.6-37 FIGURE 15.6-37
[21.3]
Reactor Coolant System Pressure (1.5 inch Break)
N/A N/A 15.6-38 FIGURE 15.6-38
[21.3]
Reactor Coolant System Pressure (2 inch Break)
N/A N/A 15.6-39 FIGURE 15.6-39
[21.3]
Reactor Coolant System Pressure (3 inch Break)
N/A N/A 15.6-40 FIGURE 15.6-40
[21.3]
Reactor Coolant System Pressure (6 inch Break)
N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                  Drawing FIGURE LABEL            DATE / Revision [ ]                                                  TITLE                                      SHEET Number                                                                                                                                    Number 15.6-41   FIGURE 15.6-41       [21.3]                     Reactor Coolant System Pressure (8.75 inch Break)                           N/A             N/A 15.6-42   FIGURE 15.6-42       [21.3]                     Core Mixture Level (1.5 inch Break)                                         N/A             N/A 15.6-43   FIGURE 15.6-43       [21.3]                     Core Mixture Level (2 inch Break)                                           N/A             N/A 15.6-44 through   N/A                   [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A             N/A
MPS-3 FSAR Page 82 of 83 15.6-41 FIGURE 15.6-41
-62 15.B       ALL FIGURES           [17.2]                     DELETED BY CHANGE PKG FSC 02-MP3-017                                         N/A             N/A FPER 3-1   N/A                   N/A                       FIRE PROTECTION ORGANIZATIONAL CHART (HAS BEEN DELETED)                     N/A             N/A FPER 4-1   FPER FIGURE 4-1 SH. 1 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION                             25212-26946 (a) SH 1 OF 5 FPER 4-1   FPER FIGURE 4-1 SH. 2 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION                             25212-26946 (a) SH 2 OF 5 FPER 4-1   FPER FIGURE 4-1 SH. 3 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION                             25212-26946 (a) SH 3 OF 5 FPER 4-1   FPER FIGURE 4-1 SH. 4 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION                             25212-26946 (a) SH 4 OF 5 FPER 4-1   FPER FIGURE 4-1 SH. 5 [27.3]                     PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION                             25212-26946 (a) SH 5 OF 5 PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION SYSTEM (FIRE PUMP HOUSE AND FPER 4-1   FPER FIGURE 4-1 SH. 6 [27.3]                                                                                                 25212-26970 (a) SH 1 YARD)
[21.3]
FPER 77(A) FPER FIGURE 77A       [27.3]                     FIRE HAZARDS ANALYSIS PLAN ELEVATION 3 FEET - 8 INCHES                       25212-24260 (a) N/A FPER 77(B) FPER FIGURE 77 B     [27.3]                     FIRE HAZARDS ANALYSIS PLAN ELEVATION 24 FEET - 6 INCHES                     25212-24261 (a) N/A FPER 77(C) FPER FIGURE 77 C     [27.3]                     FIRE HAZARDS ANALYSIS PLAN ELEVATION 38 FEET - 6 INCHES                     25212-24262 (a) N/A Page 82 of 83
Reactor Coolant System Pressure (8.75 inch Break)
N/A N/A 15.6-42 FIGURE 15.6-42
[21.3]
Core Mixture Level (1.5 inch Break)
N/A N/A 15.6-43 FIGURE 15.6-43
[21.3]
Core Mixture Level (2 inch Break)
N/A N/A 15.6-44 through  
-62 N/A
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.B ALL FIGURES
[17.2]
DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A FPER 3-1 N/A N/A FIRE PROTECTION ORGANIZATIONAL CHART (HAS BEEN DELETED)
N/A N/A FPER 4-1 FPER FIGURE 4-1 SH. 1
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 1 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 2
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 2 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 3
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 3 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 4
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 4 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 5
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 5 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 6
[27.3]
PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION SYSTEM (FIRE PUMP HOUSE AND YARD) 25212-26970 (a) SH 1 FPER 77(A) FPER FIGURE 77A
[27.3]
FIRE HAZARDS ANALYSIS PLAN ELEVATION 3 FEET - 8 INCHES 25212-24260 (a) N/A FPER 77(B)
FPER FIGURE 77 B
[27.3]
FIRE HAZARDS ANALYSIS PLAN ELEVATION 24 FEET - 6 INCHES 25212-24261 (a) N/A FPER 77(C)
FPER FIGURE 77 C
[27.3]
FIRE HAZARDS ANALYSIS PLAN ELEVATION 38 FEET - 6 INCHES 25212-24262 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET


MPS-3 FSAR LIST OF EFFECTIVE FIGURES Figure                                                                                                                                                                        Drawing FIGURE LABEL                              DATE / Revision [ ]                                                                                    TITLE                  SHEET Number                                                                                                                                                                          Number FPER 77(D) FPER FIGURE 77 D                           [27.3]                                         FIRE HAZARDS ANALYSIS PLAN ELEVATION 52 FEET- 6 INCHES                   25212-24263 (a) N/A FPER 77(E) FPER FIGURE 77 E                           [27.3]                                         FIRE HAZARDS ANALYSIS (ROOF PLAN)                                         25212-24264 (a) N/A FPER 77(F) FPER FIGURE 77 F                           [27.3]                                         FIRE HAZARDS ANALYSIS (SECTIONS)                                         25212-24265 (a) N/A FPER 8-1     FPER FIGURE 8-1                         AMENDMENT 17 NOVEMBER 1985 PROCESS CONTROL TRANSFER SCHEME (TYPICAL)                                                     N/A             N/A FPER 8-2     FPER FIGURE 8-2                         AMENDMENT 17 NOVEMBER 1985 PROCESS INSTRUMENTATION TRANSFER SCHEME                                                       N/A             N/A
MPS-3 FSAR Page 83 of 83 FPER 77(D) FPER FIGURE 77 D
: a. Incorporated by reference this engineering controlled drawing is, coincidentally, an MPS-3 FSAR figure. Refer to the controlled plant drawing for the latest revision.
[27.3]
Page 83 of 83}}
FIRE HAZARDS ANALYSIS PLAN ELEVATION 52 FEET-6 INCHES 25212-24263 (a) N/A FPER 77(E)
FPER FIGURE 77 E
[27.3]
FIRE HAZARDS ANALYSIS (ROOF PLAN) 25212-24264 (a) N/A FPER 77(F)
FPER FIGURE 77 F
[27.3]
FIRE HAZARDS ANALYSIS (SECTIONS) 25212-24265 (a) N/A FPER 8-1 FPER FIGURE 8-1 AMENDMENT 17 NOVEMBER 1985 PROCESS CONTROL TRANSFER SCHEME (TYPICAL)
N/A N/A FPER 8-2 FPER FIGURE 8-2 AMENDMENT 17 NOVEMBER 1985 PROCESS INSTRUMENTATION TRANSFER SCHEME N/A N/A a.
Incorporated by reference this engineering controlled drawing is, coincidentally, an MPS-3 FSAR figure. Refer to the controlled plant drawing for the latest revision.
LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]
TITLE Drawing Number SHEET}}

Latest revision as of 15:55, 8 January 2025

Final Safety Analysis Report, Rev. 30, Frontmatter
ML17212A063
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/2017
From:
Dominion Nuclear Connecticut
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17212A038 List:
References
17-208
Download: ML17212A063 (138)


Text

MILLSTONE POWER STATION UNIT 3 FINAL SAFETY ANALYSIS REPORT

1 of 2 Revision Summary Revision 29 (2016 - 2017 Reporting Period)

Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)

Summary Description of Changes 29 4/7/16 Administrative As identified in the 2016 NRC Submittal List of Changed Pages and submitted Summary of Change.

Administrative (FSAR content not affected). Change indicator(s) and page change identification(s) present in the 2016 NRC Submittal were removed in preparation for the 2017 Annual Report. This forms the base line for changes incorporated under the Revision 29 series. Revision level of the authoring files are unchanged. This supports Revision/Change traceability.

29.1 09/29/16 MP3-UCR-2014-014 Table 10.4-4 Reflects updated discussion on TDAFW pump overspeed values. (DC:

MP3-14-01107) 29.1 09/29/16 MP3-UCR-2015-008 Section 5.2.5.1.3, 5.4.1.2.2, 5.4.1.3.1, 5.4.1.3.4, 5.4.1.3.7, 5.4.1.3.10, 5.4.1.3.11, 5.4. 7.2.1, Table 5.4-1, Figure 5.4-1, Sections 9.2.2.1.3, 9.2.8.2, 9.3.4.2.1, 9.3.4.2.5, Table 9.3-6 Reflects replacement of RCP B & C seals (3R17). (DC: MP3-14-01022) 29.1 09/29/16 MP3-UCR-2015-023 Section 9.1.2 Type Update UCR associated with LAR (LBDCR 15-MP3-009). (Lic Ltr 15-410, CR580759) 29.1 09/29/16 MP3-UCR-2015-030 Sections 7.3.1.1.5, 10.4.9.5 TDAFW control transfer switch position (DC: MP3-15-01124) 29.1 09/29/16 MP3-UCR-2015-033 Section 8.3.1.1.6 SBO Diesel Autostart (DC: MP3-15-01099) 29.1 09/29/16 MP3-UCR-2016-001 Section 9.5.4.4 Change to the fuel oil sampling wording to remove ambiguity.

(CA3018205) 29.1 09/29/16 MP3-UCR-2016-003 Sections 4.2.2, 4.2.2.2.2, 4.2.2.3.3, 4.4.2.2.7, 15.0.3.2, 15.4.2.2, 15.6.1.2 M3C18 reload project (EVAL-ENG-RSE-M3C18, Rev. 0) 29.1 09/29/16 MP3-UCR-2016-007 Section 9.2.8 Change section 9.2.8 to correct the amount of flow able to be supplied to the boric acid blender by the Primary Grade Water pumps. (CR 1028775/

CA 3025491)

2 of 2 29.1 09/29/16 MP3-UCR-2016-009 Section 5.3.1.6 Remove capsule withdrawal schedule from page 5.3-6 and incorporate edits to final paragraph of section 5.3.1.6. (NRC Safety Evaluation by letter dated March 17, 2016 serial # 16-131) 29.1 09/29/16 MP3-UCR-2016-010 Section 10.4.8.1, Table 10.1-1 Change to the Steam Generator blowdown system venturi volumetric flow to differential pressure relationship (DC: MP3-10-01139) 29.1 09/29/16 MP3-UCR-2016-012 Section 5.3.1.6 Update Capsule withdrawal schedule on page 5.3-6. (TRM Change 16-MP3-007) 29.1 09/29/16 MP3-UCR-2016-014 Chapter 8 List of Figures; Sections 8.1.3; 8.2.1; 8.2.2; Figure 8.2-1; Figure 8.2-2 Unit 3 SLOD Removal (LBDCR 15-MP3-006) 29.2 12/22/16 MP3-UCR-2013-016 Table 6.2-63, Table 9.4-3, Table 9.4-8 Implementation of an open phase protection system which protects important to safety equipment from the potentially detrimental effects of an open phase event.

29.2 12/22/16 MP3-UCR-2015-009 2.1.2.5 Updating the SAR to extend the Heavy Haul Road to Unit 3 Fuel Building 29.2 12/22/16 MP3-UCR-2016-005 9.1.2, Figure 15.0-31 FSAR Section 9.1.4.2.6 is added to the FSAR to describe the dry storage option of Unit 3 spent fuel at the ISFSI.

29.2 12/22/16 MP3-UCR-2016-013 FPER, Section 5.5 Analysis 56 Loading, closure and transfer activities for the transfer of spent fuel from the Unit 3 SFP to the site ISFSI utilizing the NUHOMS Dry Shielded Canister (DSC) and Transfer Cask (TC).

29.2 12/22/16 MP3-UCR-2016-020 19.2.1.20 MP3 HVK Chiller Service Water Thermal Performance Testing Elimination 29.2 12/22/16 MP3-UCR-2016-021 8.1.3 Eversource 348 line teleprotection.

29.3 03/30/17 MP3-UCR-2015-018 Table 9.2-5 Reflects replacement of CCP HX E1B. MP3-14-01187 29.3 03/30/17 MP3-UCR-2016-018 2.4.7, 2.4.11.6, 10.4.5.2 Reference to and discussion regarding the recirculation tempering line is removed from these sections. MP3-16-01042 Revision 29 (2016 - 2017 Reporting Period)

Revision Revision Release Date Change Activity Document Elements Affected (Sections, Tables, Figures)

Summary Description of Changes

MPS-3 FSAR LOES 1 of 14 LIST OF EFFECTIVE SECTIONS Section Title CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

1.1 INTRODUCTION

1.2 GENERAL PLANT DESCRIPTION 1.3 COMPARISON TABLES 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.6 GENERAL REFERENCES (HISTORICAL) 1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8N NSSS CONFORMANCE TO NRC REGULATORY GUIDES 1.9 STANDARD REVIEW PLAN DOCUMENTATION OF DIFFERENCES 1.10 TMI ACTION ITEMS 1.11 MATERIAL INCORPORATED BY REFERENCE CHAPTER 2 - SITE CHARACTERISTICS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 2.1 GEOGRAPHY AND DEMOGRAPHY 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.3 METEOROLOGY

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 2 of 14 2.4 HYDROLOGIC ENGINEERING 2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING 2.5.1 BASIC GEOLOGICAL AND SEISMIC INFORMATION 2.5.2 VIBRATORY GROUND MOTION 2.5.3 SURFACE FAULTING 2.5.4 STABILITY OF SUBSURFACE MATERIALS AND FOUNDATIONS 2.5.5 STABILITY OF SLOPES 2.5.6 EMBANKMENTS AND DAMS APPENDIX 2.5A - AGE OF TILL AT MILLSTONE POINT APPENDIX 2.5B - PETROGRAPHIC REPORTS, FINAL GRADE APPENDIX 2.5C - MINERALOGICAL ANALYSIS OF MILLSTONE FAULT GOUGE SAMPLES APPENDIX 2.5D - POTASSIUM - ARGON AGE DETERMINATION APPENDIX 2.5E - SEPARATION OF < 2 FRACTION AND CLAY ANALYSIS OF SAMPLES B, C, D (ESF BUILDING) AND P-1 AND P-2 (PUMPHOUSE)

APPENDIX 2.5F - DYNAMIC SOIL TESTING ON BEACH SANDS APPENDIX 2.5G - CONSOLIDATED UNDRAINED TESTS ON BEACH SANDS APPENDIX 2.5H - SEISMIC VELOCITY MEASUREMENTS APPENDIX 2.5I - DIRECT SHEAR TESTS ON NATURAL ROCK JOINTS APPENDIX 2.5J - BORING LOGS APPENDIX 2.5K - SEISMIC SURVEY APPENDIX 2.5L - SEISMIC AND BATHYMETRIC SURVEY APPENDIX 2.5M - LABORATORY TEST PROGRAM FOR PROPOSED ADDITIONAL STRUCTURAL BACKFILL SOURCES CHAPTER 3 - DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS TABLE OF CONTENTS

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 3 of 14 LIST OF TABLES LIST OF FIGURES 3.1 CONFORMANCE WITH NRC GENERAL DESIGN CRITERIA 3.2 CLASSIFICATION OF STRUCTURES, SYSTEMS, AND COMPONENTS 3.3 WIND AND TORNADO LOADINGS 3.4 WATER LEVEL (FLOOD) DESIGN 3.5 MISSILE PROTECTION 3.6 PROTECTION AGAINST DYNAMIC EFFECTS ASSOCIATED WITH THE POSTULATED RUPTURES OF PIPING 3.7 SEISMIC DESIGN 3.7B.1 SEISMIC INPUT 3.7N SEISMIC DESIGN 3.7.4 SEISMIC INSTRUMENTATION 3.8 DESIGN OF CATEGORY I STRUCTURES 3.9 MECHANICAL SYSTEMS AND COMPONENTS 3.9B BALANCE OF PLANT (BOP) SCOPE 3.9N NUCLEAR STEAM SUPPLY SYSTEM (NSSS) SCOPE 3.9.6 INSERVICE TESTING OF PUMPS AND VALVES 3.10 SEISMIC QUALIFICATION OF SEISMIC CATEGORY I INSTRUMENTATION AND ELECTRICAL EQUIPMENT 3.11 ENVIRONMENTAL DESIGN OF MECHANICAL AND ELECTRICAL EQUIPMENT APPENDIX 3A - COMPUTER PROGRAMS FOR DYNAMIC AND STATIC ANALYSIS OF SEISMIC CATEGORY I STRUCTURES, EQUIPMENT, AND COMPONENTS PART I - STRUCTURES PART II - EQUIP & COMPONENTS PART III - PIPING SYSTEMS

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 4 of 14 APPENDIX 3B - ENVIRONMENTAL DESIGN CONDITIONS CHAPTER 4 - REACTOR TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 4.1

SUMMARY

DESCRIPTION 4.2 FUEL SYSTEM DESIGN 4.3 NUCLEAR DESIGN 4.4 THERMAL AND HYDRAULIC DESIGN 4.5 REACTOR MATERIALS 4.6 FUNCTIONAL DESIGN OF REACTIVITY CONTROL SYSTEMS CHAPTER 5 - REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 5.1

SUMMARY

DESCRIPTION 5.2 INTEGRITY OF REACTOR COOLANT PRESSURE BOUNDARY 5.3 REACTOR VESSEL 5.4 COMPONENT AND SUBSYSTEM DESIGN CHAPTER 6 - ENGINEERED SAFETY FEATURES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

6.0 INTRODUCTION

6.1 ENGINEERED SAFETY FEATURE MATERIALS 6.2 CONTAINMENT SYSTEMS

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 5 of 14 6.3 EMERGENCY CORE COOLING SYSTEM 6.4 HABITABILITY SYSTEMS 6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.6 INSERVICE INSPECTION OF CLASS 2 AND 3 COMPONENTS CHAPTER 7 - INSTRUMENTS AND CONTROLS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

7.1 INTRODUCTION

7.2 REACTOR TRIP SYSTEM 7.3 ENGINEERED SAFETY FEATURES SYSTEM 7.4 SYSTEMS REQUIRED FOR SAFE SHUTDOWN 7.5 SAFETY RELATED DISPLAY INSTRUMENTATION APPENDIX 7.5AMILLSTONE UNIT 3 DEVIATIONS TO REGULATORY GUIDE 1.97 REVISION 2 TABLE OF CONTENTS DEVIATION 1 DEVIATION 2 DEVIATION 3 DEVIATION 4 DEVIATION 5 DEVIATION 6 DEVIATION 7 DEVIATION 8 DEVIATION 9 DEVIATION 10 DEVIATION 11 DEVIATION 12 DEVIATION 13 DEVIATION 14

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 6 of 14 DEVIATION 15 DEVIATION 16 DEVIATION 17 DEVIATION 18 DEVIATION 19 DEVIATION 20 DEVIATION 21 DEVIATION 22 DEVIATION 23 DEVIATION 24 DEVIATION 25 DEVIATION 26 DEVIATION 27 DEVIATION 28 DEVIATION 29 DEVIATION 30 DEVIATION 31 DEVIATION 32 DEVIATION 33 DEVIATION 34 7.6 ALL OTHER SYSTEMS REQUIRED FOR SAFETY 7.7 CONTROL SYSTEMS NOT REQUIRED FOR SAFETY 7.8 ANTICIPATED TRANSIENTS WITHOUT SCRAM MITIGATION SYSTEM ACTUATION CIRCUITRY (ATWS) (AMSAC)

CHAPTER 8 - ELECTRIC POWER TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

8.1 INTRODUCTION

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 7 of 14 8.2 OFFSITE POWER SYSTEM 8.3 ONSITE POWER SYSTEMS CHAPTER 9 - AUXILIARY SYSTEMS TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 9.1 FUEL STORAGE AND HANDLING 9.2 WATER SYSTEMS 9.3 PROCESS AUXILIARIES 9.4 AIR-CONDITIONING, HEATING, COOLING, AND VENTILATION SYSTEMS 9.5 OTHER AUXILIARY SYSTEMS CHAPTER 10 - STEAM AND POWER CONVERSION SYSTEM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 10.1

SUMMARY

DESCRIPTION 10.2 TURBINE-GENERATOR 10.3 MAIN STEAM SYSTEM 10.4 OTHER FEATURES OF MAIN STEAM AND POWER CONVERSION SYSTEM CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

11.0 BACKGROUND

11.1 SOURCE TERMS 11.2 LIQUID WASTE MANAGEMENT SYSTEMS 11.3 GASEOUS WASTE MANAGEMENT SYSTEMS 11.4 SOLID WASTE MANAGEMENT

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 8 of 14 11.5 PROCESS, EFFLUENT, AND AIRBORNE RADIATION MONITORING SYSTEMS APPENDIX 11A PART I PART II PART III CHAPTER 12 - RADIATION PROTECTION TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

12.0 INTRODUCTION

12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS IS REASONABLY ACHIEVABLE (ALARA) 12.2 RADIATION SOURCES 12.3 RADIATION PROTECTION DESIGN FEATURES 12.4 DOSE ASSESSMENT 12.5 HEALTH PHYSICS PROGRAM CHAPTER 13 - CONDUCT OF OPERATIONS TABLE OF CONTENTS LIST OF FIGURES 13.1 ORGANIZATIONAL STRUCTURE 13.2 TRAINING PROGRAMS 13.3 EMERGENCY PLANNING 13.4 REVIEW AND AUDIT 13.5 PLANT PROCEDURES 13.6 PHYSICAL SECURITY PLANS CHAPTER 14 - INITIAL TEST PROGRAM TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 9 of 14 14.1 SPECIFIC INFORMATION TO BE INCLUDED IN PRELIMINARY SAFETY ANALYSIS REPORTS 14.2 SPECIFIC INFORMATION TO BE INCLUDED IN FINAL SAFETY ANALYSIS REPORT CHAPTER 15 - ACCIDENT ANALYSES TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES

15.0 INTRODUCTION

15.1 INCREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.2 DECREASE IN HEAT REMOVAL BY THE SECONDARY SYSTEM 15.3 DECREASE IN REACTOR COOLANT SYSTEM FLOW RATE 15.4 REACTIVITY AND POWER DISTRIBUTION ANOMALIES 15.5 INCREASE IN REACTOR COOLANT INVENTORY 15.6 DECREASE IN REACTOR COOLANT INVENTORY 15.7 RADIOACTIVE RELEASE FROM A SUBSYSTEM OR COMPONENT 15.8 ANTICIPATED TRANSIENTS WITHOUT SCRAM APPENDIX 15A - DOSE METHODOLOGY APPENDIX 15B - DELETED by FSARCR PKG FSC 02-MP3-017 CHAPTER 16 - TECHNICAL SPECIFICATIONS TABLE OF CONTENTS 16.1 MILLSTONE UNIT 3 TECHNICAL SPECIFICATIONS CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS 17.1 QUALITY ASSURANCE PROGRAM DESCRIPTION (QAPD) TOPICAL REPORT

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 10 of 14 CHAPTER 18 - HUMAN FACTORS ENGINEERING TABLE OF CONTENTS 18.1 HUMAN FACTORS CONTROL ROOM DESIGN REVIEW 18.2 SAFETY PARAMETER DISPLAY SYSTEM (SPDS)

CHAPTER 19 - LICENSE RENEWAL TABLE OF CONTENTS

19.0 INTRODUCTION

19.1 AGING MANAGEMENT 19.2 PROGRAMS THAT MANAGE THE EFFECTS OF AGEING ON STRUCTURES AND COMPONENTS WITHIN THE SCOPE OF LICENSE RENEWAL 19.3 TIME-LIMITED AGING ANALYSIS 19.4 TLAA SUPPORT PROGRAMS 19.5 EXEMPTIONS 19.6 LICENSE RENEWAL COMMITMENTS FIRE PROTECTION EVALUATION REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES 1

INTRODUCTION 2

HISTORICAL BACKGROUND 3

ADMINISTRATION 4

PLANT DESIGN FEATURES 5

FIRE HAZARD ANALYSIS ANALYSIS FOR FIRE AREAS ANALYSIS 1 ANALYSIS 2 ANALYSIS 3.

ANALYSIS 4

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 11 of 14 ANALYSIS 5 ANALYSIS 6 ANALYSIS 7 ANALYSIS 8 ANALYSIS 9 ANALYSIS 10 ANALYSIS 11 ANALYSIS 12 ANALYSIS 13 ANALYSIS 14 ANALYSIS 15 ANALYSIS 16 ANALYSIS 17 ANALYSIS 18 ANALYSIS 19 ANALYSIS 20 ANALYSIS 21 ANALYSIS 22 ANALYSIS 23 ANALYSIS 24 ANALYSIS 25 ANALYSIS 26 ANALYSIS 27.

ANALYSIS 28 ANALYSIS 29 ANALYSIS 30 ANALYSIS 31 ANALYSIS 32 ANALYSIS 33 ANALYSIS 34 ANALYSIS 35

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 12 of 14 ANALYSIS 36 ANALYSIS 37 ANALYSIS 38 ANALYSIS 39 ANALYSIS 40 ANALYSIS 41 ANALYSIS 42 ANALYSIS 43 ANALYSIS 44 ANALYSIS 45 ANALYSIS 46 ANALYSIS 47 ANALYSIS 48 ANALYSIS 49 ANALYSIS 50 ANALYSIS 51 ANALYSIS 52 ANALYSIS 53 ANALYSIS 54 ANALYSIS 55 ANALYSIS 56 ANALYSIS 57 ANALYSIS 58 ANALYSIS 59A ANALYSIS 59B ANALYSIS 59C ANALYSIS 59D ANALYSIS 59E ANALYSIS 59F ANALYSIS 59G ANALYSIS 59H

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 13 of 14 ANALYSIS 59I ANALYSIS 60 ANALYSIS 61 ANALYSIS 62 ANALYSIS 63 ANALYSIS 64 ANALYSIS 65 ANALYSIS 66 ANALYSIS 67 ANALYSIS 68 ANALYSIS 69 ANALYSIS 70 ANALYSIS 71 ANALYSIS 72.

ANALYSIS 73 ANALYSIS 74 ANALYSIS 75 ANALYSIS 76 ANALYSIS 77 ANALYSIS 78 ANALYSIS 79 ANALYSIS 80 ANALYSIS 81 ANALYSIS 82 ANALYSIS 83 ANALYSIS 84 ANALYSIS 85 ANALYSIS 86 ANALYSIS 87 ANALYSIS 88 ANALYSIS 89

MPS-3 FSAR LIST OF EFFECTIVE SECTIONS (CONTINUED)

LOES 14 of 14 ANALYSIS 90 ANALYSIS 91 ANALYSIS 92 ANALYSIS 93 ANALYSIS 94 ANALYSIS 95 ANALYSIS 96 ANALYSIS 97 ANALYSIS 98 ANALYSIS 99 ANALYSIS 100 6

SAFE SHUTDOWN EVALUATION 7

SUPPORT SYSTEMS 8

RESOLUTION OF SAFE SHUTDOWN EVALUATION PROBLEM AREAS 9

OPERATOR ACTIONS REQUIRED FOLLOWING A FIRE 10 CONCLUSIONS APPENDIX A -

SUMMARY

OF COMPLIANCE WITH BRANCH TECHNICAL POSITION APCSB 9.5-1, APPENDIX A (JULY 1, 1976)

APPENDIX B - COMPARISON OF MILLSTONE 3 PLANT DESIGN TO BRANCH TECHNICAL POSITION CMEB 9.5-1 GUIDELINES (NUREG 0800, JULY 1981)

APPENDIX C -

SUMMARY

OF COMPARISON WITH 10 CFR 50, APPENDIX R

MPS-3 FSAR LOET 1 of 38 LIST OF EFFECTIVE TABLES Number Title CHAPTER 1 1.3-1 Design Comparison 1.3-2 Comparison Of Engineered Safety Features 1.3-3 Comparison Of Containment Concepts 1.3-4 Comparison Of Containment Atmosphere Pressure Sensor Parameters 1.3-5 Comparison Of Reactor Coolant Pump Bus Protection 1.3-6 Comparison Of Engineered Safety Feature Actuation Signals 1.3-7 Comparison Of Emergency Generator And Steam Generator Auxiliary Feedwater Pump Start Signals 1.3-8 Comparison Of Process And Effluent Radiation Monitoring Systems 1.3-9 Comparison Of Area Radiation Monitoring Systems 1.3-10 Comparison Of Airborne Radiation Monitoring Systems 1.3-11 Comparison Of Electrical System Parameters 1.3-12 Comparison Of Radioactive Liquid Waste Systems 1.3-13 Comparison Of Radioactive Gaseous Waste Systems 1.3-14 Comparison Of Radioactive Solid Waste Systems 1.3-15 Comparison Of Other Reactor Plant Systems 1.3-16 Comparison Of Final And Preliminary Information 1.6-1 Topical Reports as General References (Historical) 1.7-1 Electrical, Instrumentation, And Control Reference Documentation 1.7-2 Piping And Instrumentation Diagrams 1.7-3 Omitted 1.7-4 Special Reports And Programs 1.8-1 NRC Regulatory Guides 1.8N-1 NRC Regulatory Guides

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 2 of 38 1.9-1 Summary Of Differences From SRP 1.9-2 SRP Differences And Justifications 1.10-1 TMI Action Items CHAPTER 2 2.1-1 1990 Population and Population Densities Cities and Towns Within 10 Miles of Millstone 2.1-2 Population Growth 1960-1990 2.1-3 Population Distribution 1985 (0-20 km) 2.1-4 Population Distribution Within 10 Miles of Millstone 1990 Census 2.1-5 Population Distribution Within 10 Miles of Millstone 2000 Projected 2.1-6 Population Distribution Within 10 Miles of Millstone 2010 Projected 2.1-7 Population Distribution Within 10 Miles of Millstone 2020 Projected 2.1-8 Population Distribution Within 10 Miles of Millstone 2030 Projected 2.1-9 Population Distribution 1985 (0-80 km) 2.1-10 Population Distribution Within 50 Miles of Millstone 1990 Census 2.1-11 Population Distribution Within 50 Miles of Millstone 2000 Projected 2.1-12 Population Distribution Within 50 Miles of Millstone 2010 Projected 2.1-13 Population Distribution Within 50 Miles of Millstone 2020 Projected 2.1-14 Population Distribution Within 50 Miles of Millstone 2030 Projected 2.1-15 Transient Population Within 10 Miles of Millstone 1991-1992 School Enrollment 2.1-16 Transient Population Within 10 Miles of Millstone (Employment)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 3 of 38 2.1-17 Transient Population Within 10 Miles of Millstone State Parks and Forests (With Documented Attendance) 2.1-18 Low Population Zone Permanent Population Distributions 2.1-19 Low Population Zone School Enrollment and Employment 2.1-20 Metropolitan Areas Within 50 Miles of Millstone 1990 Census Population 2.1-21 Population Centers Within 50 Miles of Millstone 2.1-22 Population Density 1985 (0-20 km) 2.1-23 Population Density 1985 (0-80 km) 2.1-24 Population Density Within 10 Miles of Millstone 1990 (People per Square Mile) 2.1-25 Population Density Within 10 Miles of Millstone 2030 (People per Square Mile) 2.1-26 Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 2.1-27 Population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 2.1-28 Cumulative Population Density 1985 2.1-29 Cumulative Population Density Within 50 Miles of Millstone 1990 (People per Square Mile) 2.1-30 Cumulative population Density Within 50 Miles of Millstone 2030 (People per Square Mile) 2.2-1 Description of Facilities 2.2-2 List of Hazardous Materials Potentially Capable of Producing Significant Missiles 2.2-3 Summary of Exposure Distance Calculation 2.2-4 Aggregate Probability of Explosion or Violent Rupture Capable of Missile Generation 2.2-5 Types of Tank Car Missiles 2.2-6 Tank Car Fragment Range (Feet) at 10-Degree Launch Angle

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 4 of 38 2.2-7 Estimated Ignition Probabilities 2.2-8 Probability of an Unconfined Vapor Cloud Explosion 2.3-1 Monthly, Seasonal, and annual averages and Extremes of temperatures at Bridgeport, Conn. (1901-1981) 2.3-2 Mean Number of Days with Selected Temperature Conditions at Bridgeport, Conn. (1966-1981) 2.3-3 Monthly, Seasonal, and Annual Averages and Extremes of Relative Humidity at Bridgeport, Conn. (1949-1981) 2.3-4 Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 2.3-5 Occurrence of Bridgeport Wind Persistence Episodes Within the Same 22.5-Degree Sector (1949-1965) 2.3-6 Monthly, Seasonal, and Annual Frequency Distributions of Wind Direction at Bridgeport, Conn. (1949-1980) 2.3-7 Monthly, Seasonal, and Annual Wind Speed Extremes at Bridgeport, Conn. (1961-1990) 2.3-8 Mean Number of Days of Thunderstorm Occurrence at Bridgeport, Conn. (1951-1981) 2.3-9 Monthly, Seasonal, and Annual Averages and Extremes of Precipitation at Bridgeport, Conn. (1901-June 1982) 2.3-10 Estimated Precipitation Extremes for Periods up to 24 Hours and Recurrence Intervals Up to 100 Years 2.3-11 Monthly, Seasonal, and Annual Averages and Extremes of Snowfall at Bridgeport, Conn. (1893-June 1990) 2.3-12 Monthly, Seasonal, and Annual Averages of Freezing Rain and Drizzle at Bridgeport, Conn. (1949-1980) 2.3-13 Average Monthly, Seasonal, and Annual Hours and Frequencies (percent) of Various Fog Conditions (1949-1980) at Bridgeport, Connecticut 2.3-14 Monthly and Annual Wind Direction and Speed Distributions for Surface Winds, at Bridgeport, Conn. (1949-1980) 2.3-15 Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone (1974-1981)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 5 of 38 2.3-16 Comparison of Wind Direction Frequency Distribution by Quadrant at Bridgeport, Conn. and Millstone 2.3-17 Comparison of Average Wind Speed by Quadrant at Bridgeport, Conn. and Millstone 2.3-18 Occurrence of Wind Persistence Episodes Within the Same 22.5-Degree Sector at Millstone (1974-1981) 2.3-19 Millstone Climatological Summary (1974-1992) 2.3-20 Comparison of Monthly and Annual Average Dry-Bulb and Dewpoint Temperature Averages at Bridgeport, Conn. and Millstone 2.3-21 Comparison of Monthly and Annual Average Relative Humidity Averages at Bridgeport and Millstone 2.3-22 Mean Number of Days with Heavy Fog at Bridgeport, Conn. and Block Island, Rhode Island (1951-1981) 2.3-23 Wind Direction/Stability Class/Visibility Joint Frequency Distribution at Millstone 2.3-24 Persistence of Poor Visibility ( 1 Mile) Conditions at Millstone (Hours) (1974-1981) 2.3-25 Bridgeport Pasquill Stability Class Distribution (1949-1980) 2.3-26 Millstone Stability Class Distribution Using Delta-T for Stability Determination 2.3-27 Millstone Stability Class Distribution Using Sigma Theta for Stability Determination 2.3-28 Comparison of Pasquill Stability Class Distribution at Bridgeport, Conn. and Millstone 2.3-29 Persistence of Stable Conditions (E, F, and G Stabilities) at Millstone (1974-1981) 2.3-30 Seasonal and Annual Atmospheric Mixing Depths at Millstone 2.3-31 On-site Meteorological Tower Measurements 2.3-32 Millstone Meteorological Tower Instrumentation 2.3-33 Monthly Summary of Data Recovery Rates/

Meterological System

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 6 of 38 2.3-34 Distances from Release Points to Receptors 2.4-1 Connecticut Public Water Supplies within 20 Miles of Millstone 3 2.4-2 Maximum Wave Heights Generated by Slow, Medium, and High Speed storms (Deep-Water Fetch) 2.4-3 Maximum Shallow Water Waves (After Refraction)

Slow Speed Probable Maximum Hurricane 2.4-4 Maximum Shallow Water Waves (After Refraction)

Medium Speed Probable Maximum Hurricane 2.4-5 Maximum Shallow Water Waves (After Refraction)

High Speed Probable Maximum Hurricane 2.4-6 Lowest Tides at New London, Connecticut 1938-1974 2.4-7 Circulating Water System and Service Water System Heat Loads 2.4-8 Dilution Factors and Travel Time 2.4-9 Category I Structures-Roof Survey 2.4-10 Input Data to Program HEC-2 Water Surface Computations 2.4-11 Computed Water Surface Elevations at Safety-Related Structures 2.4-12 Roof Area and Ponding Level Due to PMP Category I Structures 2.4-13 Overflow Length of the Parapet Wall on the Roof Used in PMP Analysis-Category I Structures 2.5.1-1 Rock Formations of the Coastal Plain off Southern New England 2.5.1-2 Rock Formations of Western Connecticut 2.5.1-3 Rock Formations of Eastern Connecticut and Western Rhode Island 2.5.1-4 Rock Formations of Central Rhode Island (and not Included in Previous Descriptions) 2.5.1-5 Rock Formations in Northern and Eastern Rhode Island and Southern Massachusetts

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 7 of 38 2.5.1-6 Rock Formations of Central Massachusetts 2.5.1-7 Rock Units of Clinton-Newbury Fault System, Eastern Massachusetts, and New Hampshire 2.5.1-8 Descriptions of Lineaments from LANDSAT Photographs (shown on Figure 2.5.1-10) 2.5.2-1 Modified Mercalli (MM) Intensity Scale of 1931 2.5.2-2 List of Operating Seismic Stations 2.5.2-3 Chronological Catalog of Earthquake Activity within 200 Miles of the Site 2.5.2-4 List of Earthquakes within the 50-Mile Radius 2.5.3-1 List of Faults 2.5.3-2 List of Samples 2.5.3-3 List of K/Ar Age Determinations of Fault Gouge 2.5.4-1 List of Joints-Final Grade Floors of Structures 2.5.4-2 List of Foliations-Final Grade Floors of Structures 2.5.4-3 List of Slickensides-Final Grade Floors of Structures 2.5.4-4 List of Joints-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-5 List of Foliations-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-6 List of Slickensides-Final Grade Containment and Engineered Safety Features Building Walls 2.5.4-7 List of Joints-Final Grade Walls of Structures 2.5.4-8 List of Foliations-Final Grade Walls of Structures 2.5.4-9 List of Slickensides-Final Grade Walls of Structures 2.5.4-10 Rock Compression Test Results 2.5.4-11 Direct Shear Test Results From Joint and Foliating Surfaces 2.5.4-12 Summary of Static Soil Properties for Beach Sands 2.5.4-13 Natural Water Contents of Split Spoon Samples 2.5.4-14 Foundation Data for Major Structures

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 8 of 38 2.5.4-15 List of Approximate Boring Locations, Ground Elevations, and Groundwater Elevations 2.5.4-16 Summary of Water Pressure Test Data 2.5.4-17 Groundwater Observations 2.5.4-18 Factors of Safety Against Liquefaction of Beach Sands 2.5.4-19 In-Place Density Test Results on Category I Structural Backfill Beneath the Service Water Intake Pipe Encasement 2.5.4-20 In-Place Density Test Results at Control and Emergency Generator Enclosure Buildings 2.5.4-21A Emergency Generator Enclosure-Free Field Soil Properties from SHAKE Analysis 2.5.4-21B Emergency Generator Enclosure-Soil Properties with Structure Effects from SHAKE Analysis 2.5.4-22 Control Building SHAKE Free Field Soil Properties Input 2.5.4-23 Bearing Capacity of Major Structures 2.5.4-24 Results of Two-Dimensional Liquefaction Analysis of Beach Area Sands CHAPTER 3 3.2-1 List Of QA Category I and Seismic Category I Structures, Systems, and Components 3.2-2 Safety Classes 2 and 3 Instrument Tubing Requirements 3.2-3 Instrument Tubing Examination and Testing Program 3.2-4 Comparison of Proposed Tubing Examination and Testing with ASME III Requirements 3.3-1 Structural Panels Subject to Tornado Pressure Drop 3.5-1 Safety Related Structures, Systems, and Components Outside Containment Required for Safe Reactor Shutdown 3.5-2 Safety Related Structures, Systems, and Components Inside Containment Required for Safe Reactor Shutdown

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 9 of 38 3.5-3 Summary of Control Rod Drive Mechanism Missile Analysis 3.5-4 Valve-Missile Characteristics 3.5-5 Piping Temperature Element Assembly-Missile Characteristics 3.5-6 Characteristics of Other Missiles Postulated within Reactor Containment 3.5-7 Turbine-Target Distances and Impact Areas 3.5-8 Deleted by change PKG FSC 02-MP3-13 3.5-9 Deleted by change PKG FSC 02-MP3-13 3.5-10 Deleted by change PKG FSC 02-MP3-13 3.5-11 Deleted by change PKG FSC 02-MP3-13 3.5-12 Deleted by change PKG FSC 02-MP3-13 3.5-13 Postulated Tornado-Generated External Missiles 3.5-14 Barrier Deflection and Ductility Ratios for Tornado-Borne Missiles Plus 360 Mph Tornado Wind 3.5-15 Barrier Deflection and Ductility Ratio for a Beam-Column Plus 360 Mph Tornado Wind 3.6-1 High-Energy Systems Remote from Essential Structures, Systems, and Components 3.6-2 High-Energy Systems in Proximity to Essential Structures, Systems, and Components 3.6-3 Moderate-Energy Systems in Remote from Essential Structures, Systems, and Components 3.6-4 Moderate-Energy Systems Proximate to Essential Structures, Systems, and Components 3.6-5 Essential Structures, Systems, and Components Required for Safe Reactor Shutdown 3.6-6 Postulated Breaks Main Steam System 3.6-7 Pipe Whip Effects Main Steam System 3.6-8 Jet Impingement Effects-Main Steam System 3.6-9 Postulated Breaks Main Feedwater System

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 10 of 38 3.6-10 Pipe Whip Effects-Main Feedwater System 3.6-11 Jet Impingement Effects-Main Steam System 3.6-12 Postulated Breaks-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping. Letdown Line, and Normal Charging 3.6-13 Pipe Whip Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Fill Piping, Loop Drain Piping, Letdown and Normal Charging 3.6-14 JET Impingement Effects-Reactor Coolant System-Loop Stop Valve Bypass Piping, Excess Letdown Piping, Loop Drain Piping, Loop Fill Piping, Letdown Line, and Normal Charging 3.6-15 Postulated Breaks-Reactor Coolant System-Pressurizer Cubicle Piping 3.6-16 Pipe Whip Effects-Reactor Coolant System Pressurizer Cubicle Piping 3.6-17 Jet Impingement Effects-Reactor Coolant System-Pressurizer Cubicle Piping 3.6-18 Postulated Pipe Breaks-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-19 Pipe Whip Effects-Reactor Coolant System-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-20 Jet Impingement Effects-Low Pressure Safety Injection, High Pressure Safety Injection, and Residual Heat Removal Piping 3.6-21 Postulated Breaks-Chemical Volume Control System-Normal Charging 3.6-22 Pipe Whip Effects-Chemical Volume Control System-Normal Charging 3.6-23 Jet Impingement Effects-Chemical Volume Control System-Normal Charging

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 11 of 38 3.6-24 Postulated Breaks-Chemical Volume Control System-Letdown Line 3.6-25 Pipe Whip Effects-Chemical Volume Control System-Letdown Line 3.6-26 Jet Impingement Effects-Chemical and Volume Control System-Letdown Line Piping 3.6-27 Postulated Breaks-Seal Water Injection System 3.6-28 Pipe Whip Effects-Chemical Volume Control System-Seal Water Injection Line 3.6-29 Jet Impingement Effects-Chemical Volume Control System-Seal Water Injecti0n Line 3.6-30 Postulated Breaks-Steam Generator Blowdown System 3.6-31 Pipe Whip Effects-Steam Generator Blowdown System 3.6-32 Jet Impingement Effects-Steam Generator Blowdown System 3.6-33 Energy Absorbing Capacity of a 4-inch Sch. 80 Pipe 3.6-34 Postulated Breaks Auxiliary Feedwater System 3.6-35 Pipe Whip Effects Auxiliary Feedwater System 3.6-36 Jet Impingement Effects Auxiliary Feedwater Systems 3.7-1 Seismic Instrumentation 3.7B-1 Damping Factors 3.7B-2 Methods of Seismic Analysis Used for Seismic Category I Structures 3.7B-3 Containment and Internal Structures Significant Modal Frequencies and Participation Factors Uncracked Model 3.7B-4 Containment and Internal Structures Significant Modal Frequencies and Participation Factors Cracked Model 3.7B-5 Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Uncracked Model 3.7B-6 Containment and Internal Structures Significant Mode Shapes (Normalized Eigenvectors) Cracked Model

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 12 of 38 3.7B-7 Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Uncracked Model, Response Spectrum Analysis 3.7B-8 Containment and Internal Structures SRSS Accelerations and Displacements for Safe Shutdown Earthquake Cracked Model, Response Spectrum Analysis 3.7B-9 Containment and Internal Structures Degrees of Freedom 3.7B-10 Containment and Internal Structure Enveloped Accelerations and Displacements Horizontal-motion 3.7B-11 Containment and Internal Structure Enveloped Accelerations and Displacements Vertical-Motion 3.7B-12 Main Steam Valve Building Significant Modal Frequencies and Participation Factors 3.7B-13 Main Steam Valve Building Significant Mode Shapes (Eigenvectors) 3.7B-14 Main Steam Valve Building CSM Accelerations for Safe Shutdown Earthquake from Response Spectrum Analysis 3.7B-15 Main Steam Valve Building CSM Displacements for Safe Shutdown Earthquake from Response Spectrum Analysis 3.7B-16 Main Steam Valve Building ABS of Safe Shutdown Earthquake Responses 3.7B-17 Main Steam Valve Building Degrees of Freedom 3.7B-18 Emergency Generator Enclosure Accelerations and Displacements Horizontal-motion 3.7B-19 Emergency Generator Enclosure Accelerations and Displacements Vertical - Motion 3.7B-20 Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Uncracked Properties)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 13 of 38 3.7B-21 Comparison of Response Spectra and Time History Analysis Results Containment and Internal Structures (Cracked Properties) 3.7B-22 Comparison of Response Spectra and Time History Analysis Results Main Steam Valve Building SSE Accelerations 3.7B-23 1 G Flat Response 3.7B-24 Modal Density, n 3.7B-25 Amplified Response Dynamic Factor Study 3.7B-26 Piping System Seismic Design and Analysis Criteria 3.7N-1 Damping Values Used for Seismic Analysis for Westinghouse Supplied Equipment 3.8-1 Loading Conditions - Liner Plate and Access Openings 3.8-2 Loading Conditions, Penetration 3.8-3 Loads and Loading Combinations 3.8-4 Load Combinations for ASME III Class 2 Penetrations except Quench, Recirculation, and Safety Injection Piping 3.8-5 Load Combinations for ASME III Class 2 Penetrations for the Quench Spray, Recirculation Spray, and Safety Injection Systems 3.8-6 Load Combinations for ASME III Class MC Sleeved Penetrations 3.8-7 Nomenclature for Tables 3.8-4 through 3.8-6 3.9B-1 List of Input Documents Describing Design Transient for Fatigue Analysis of RCP and Associated Class 1 Piping 3.9B-2 List of MNPS-3 Documents Describing Components Requiring Inelastic Analysis 3.9B-3 Preoperational Tests 3.9B-4 Omitted 3.9B-5 Stress Limits for ASME Section III Class 1 (NB)

Seismic Category I Components (Elastic Analysis)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 14 of 38 3.9B-6 Comparison of Class 1 Requirements Regulatory Guide 1.48 vs Tables 3.9b-5 and 3.9b-10 3.9B-7 Stress Limits for ASME Section III Class 2 and 3 Components (Elastic Analysis) 3.9B-8 Comparison of Classes 2 and 3 Requirements Regulatory Guide 1.48 vs Table 3.9B-7 3.9B-9 Stress Limits for ASME Section III Class 1, 2, and 3 Component Supports 3.9B-9 A Load Combinations for ASME Section III Class 1, 2, and 3 Component Supports 3.9B-10 ASME III Class 1 Stress and Fatigue Analysis Requirements per NB3650 3.9B-11 ASME III Class 2 and 3 Stress Analysis Requirements per NC3650 and ND3650 3.9B-12 Loadings Applicable to Piping Systems 3.9B-13 Active Pumps and Valves 3.9B-14 Omitted 3.9B-15 Postulated Primary Loop Breaks 3.9B-16 Steam Generator and Reactor Coolant Pump Support Snubber Embedment Loads (KIPS) 3.9B-17 Steam Generator and Reactor Coolant Pump Support Column Embedment Loads (KIPS) 3.9B-18 Factors of Safety for Primary Members of Steam Generators and Reactor Coolant Pump Supports 3.9B-19 Minimum Design Margins for Pressurizer Support 3.9B-20 Design Margins for the Primary Members of the Pressurizer Safety Valve Support 3.9B-21 Design Margins for Primary Members of Reactor Pressure Vessel Support 3.9B-22 Design Margins for Primary Loop Bumper Support Structure 3.9N-1 Summary of Reactor Coolant System Design Transients

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 15 of 38 3.9N-2 Loading Combinations for Reactor Coolant System Components 3.9N-3 Allowable Stresses for Reactor Coolant System Components 3.9N-4 Design Loading Combinations for ASME Code Class 2 and 3 Components and Supports 3.9N-5 Stress Criteria for Safety Code Class 2 and Class 3 Tanks 3.9N-6 Stress Criteria for ASME Code Class 2 Tanks 3.9N-7 Stress Criteria for ASME Code Class 2 and Class 3 Inactive Pumps 3.9N-8 Stress Criteria for Safety Related ASME Code Class 2 and Class 3 Active and Inactive Valves 3.9N-9 Stress Criteria for ASME Code Class 2 and 3 Piping 3.9N-10 Design Criteria for Active Pumps 3.9N-11 Active Pumps 3.9N-12 Active Valves 3.9N-13 Maximum Deflections Allowed for Reactor Internal Support Structures 3.10N-1 Seismic Category I Instrumentation and Electrical Equipment in Westinghouse NSSS Scope of Supply 3.11N-1 Safety-Related Equipment in Westinghouse NSSS Scope of Supply 3.A.1.2-1 Thin-Wall Cylinder, Pertinent Parameters 3A.1.2-2 Exact and Computer Stresses for Thin-wall Cylinder 3A.1.4-1 Infinitely Long Solid Cylinder, Pertinent Parameters 3A.1.5-1 Input Thermal Parameter Functions for TAC2D Sample Problem 3A.1.6-1 Peak Acceleration and Displacement 3A.1.6-2 Horizontal Amplified Response Spectra 3A.1.10-1 Pertinent Parameters of a Cylindrical Shell 3A.1.10-2 Summary of Results

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 16 of 38 3A.1.11-1 Test Problem Data 3A.1.11-2 A Comparison of Hand and Computer Program Results 3A.2.1-1 Infinitely Long Solid Cylinder, Pertinent Parameters 3A.2.4-1 Comparison of Results of SLOSH vs AEC Analysis 3A.2.6-1 Comparison of Experimental Data with Analytical Data Using LIMITA 3 3A.3-1 Comparison of Support Reaction Due to Thermal, Anchor Movement, and External Force Loading 3A.3-2 Comparison of Deflections and Rotations Due to Thermal, Anchor Movement, and External Force Loading 3A.3-3 Comparison of Stress Due To Thermal, Anchor Movement, and External Force Loading 3A.3-4 Comparison of Internal Forces Due To Deadweight Analysis 3A.3-5 Comparison of Deflections and Rotation Due to Deadweight Analysis 3A.3-6 Comparison of Stresses Due to Deadweight Analysis 3A.3-7 Comparison of Natural Frequencies 3A.3-8 Comparison of Natural frequencies 3A.3-9 Comparison of Class 1 Pipe Stress Analysis 3A.3-10 Individual Pair Usage Factor for Point No. 30 3A.3-11 Comparison of PITRUST With Franklin Institute Program CYLNOZ and Hand Calculation 3A.3-12 Comparison of PITRUST With Reference 8 Results 3A.3-13 Comparison of PILUG Computer Program Output With Hand Calculations 3A.3-14 Summary of Comparison of SAVAL Computer Output With Hand Calculation As-Designed Condition 3A.3-15 Summary of Comparison of SAVAL Computer Output With Hand Calculation Reinforced Condition (1 1/4 Pad) 3A.3-16 Nodal Force Comparison

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 17 of 38 3A.3-17 Input Data for WATHAM 3A.3-18 Comparison of NODAL Force Calculation At Time = 2.34 Seconds 3A.3-19 Comparison of PITRIFE Computer Program Output With STRUDL-II Output 3A.3-20 Comparison of PITRIFE Computer Program Output With Hand Calculations 3A.3-21 BENDCORD Program--Verification Problem 3A.3-22 Pipe 1, Segment 1 Force Versus Time for Run Number S2807011 CHAPTER 4 4.1-1 Reactor Design Parameter Table 4.1-2 Analytical Techniques In Core Design 4.1-3 Design Loading Conditions For Reactor Core Components 4.2-1 Fuel Assembly Component Stresses 4.3-1 Reactor Core Description (First Cycle) 4.3-2 Nuclear Design Parameters (First Cycle) 4.3-3 Typical Reactivity Requirements For Rod Cluster Control Assemblies 4.3-4 Omitted 4.3-5 Axial Stability Index Pressurized Water Reactor Core With A 12-Foot Height 4.3-6 Typical Neutron Flux Levels (n/cm2-sec) At Full Power 4.3-7 Typical Comparison Of Measured And Calculated Doppler Defects 4.3-8 Omitted 4.3-9 Omitted 4.3-10 Typical Comparison Of Measured And Calculated AG-IN-CD Rod Worth 4.3-11 Typical Comparison Of Measured And Calculated Moderator Coefficients At HZP, BOL

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 18 of 38 4.4-1 Thermal And Hydraulic Design Parameters 4.4-2 Void Fractions At Nominal Reactor Conditions With Design Hot Channel Factors 4.4-3 Radiation Levels From HJTC Probe (R/Hr)

CHAPTER 5 5.1-1 System Design and Operating Parameters 5.2-1 Applicable Code Addenda for Class 1 Reactor Coolant System Components 5.2-2 Primary and Auxiliary Components Material Specifications 5.2-3 Reactor Vessels Internal Material Specifications 5.2-4 Reactor Coolant Water Chemistry Specification 5.2-5 Safety Valve Support Bracket Loads 5.2-6 Relief Valves Referenced to Code Case N-242 5.2-7 Millstone Unit No. 3 RTPTS Values (°F) 5.3-1 Reactor Vessel Non-Destructive Examination 5.3-2 Reactor Vessel Fracture Toughness Properties 5.3-3 Reactor Vessel Beltline Region Material Chemical Composition (WT PERCENT) 5.3-4 Adjusted Referenced Temperature (ART) Values (°F) 5.3-5 Reactor Vessel Closure Head Bolting Material Properties 5.3-6 Reactor Vessel Design Parameters 5.4-1 Reactor Coolant Pump Design Parameters 5.4-2 Reactor Coolant Pump Non-Destructive Examination Program 5.4-3 Steam Generator Design Data 5.4-4 Steam Generator Nondestructive Examination Program 5.4-5 Reactor Coolant Piping Design Parameters 5.4-6 Reactor Coolant Piping Quality Assurance Program

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 19 of 38 5.4-7 Design Bases for Residual Heat Removal System Operation 5.4-8 Residual Heat Removal System Component Data 5.4-9 Residual Heat Removal System-Cold Shutdown Operations-Failure Modes and Effects Analysis 5.4-10 Pressurizer Design Data 5.4-11 Reactor Coolant System Design Pressure Settings 5.4-12 Pressurizer Quality Assurance Program 5.4-13 Pressure Relief Tank Design Data 5.4-14 Relief Valve Discharge to the Pressurizer Relief Tank 5.4-15 Reactor Coolant System Design Parameters 5.4-16 Non-Destructive Examination Program Reactor Coolant System Valves 5.4-17 Pressurizer Valves Design Parameters 5.4-18 Equipment Supports, Loading Combinations, and Design Allowable Stresses 5.4-19 Reactor Vessel Head Vent System Equipment Design Parameters CHAPTER 6 6.1-1 Typical Materials Employed for Components of ESF Systems 6.1-2 Parameters for Ultimate Sump pH Calculation 6.1-3 Painted Surface Area Inside Containment 6.1-4 Other Organic Materials Used Inside Containment 6.2-1 Containment Peak Pressure and Temperature Results Following a Main Steam Line Break Inside Containment 6.2-2 Passive Heat Sinks 6.2-3 Containment Design Evaluation Parameters 6.2-4 LOCA Peak Pressure Results 6.2-5 LOCA Peak Pressure - DEHL Break - Initial Condition Sensitivity 6.2-6 LOCA Sequence of Events-Containment Peak Pressure

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 20 of 38 6.2-6A LOCA Peak Temperature Results 6.2-6B LOCA Sequence of Events-Containment Peak Temperature 6.2-6C LOCA-Containment Depressurization Results-DEPS Break 6.2-6D LOCA Sequence of Events-Containment Depressurization 6.2-6E LOCA-Containment Sump Water Temperature at RSS Pump Start 6.2-6F LOCA-Accident Chronology for Pump Suction Double Ended Rupture-Limiting Case for Containment Sump Temperature 6.2-6G Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 0% Power-Limiting Case for Containment Pressure 6.2-6H Accident Chronology for Full Double-Ended Rupture Main Steam Line Break at 102% Power-Limiting Case for Containment Temperature 6.2-7 System Parameters Initial Conditions for LOCA Mass and Energy Release Analysis 6.27A LOCA Mass and Energy Analysis Core Decay Heat Fraction 6.2-8 Double Ended Hot Leg Break Blowdown Mass and Energy Releases 6.2-9 Double Ended Pump Suction Break with Minimum ECCS Flows Blowdown Mass and Energy Release 6.2-10 Double Ended Pump Suction Break with Maximum ECCS Flows Blowdown Mass and Energy Release 6.2-11 Double Ended Cold Leg Break with Minimum ECCS Flow Blowdown Mass and Energy Releases 6.2-12 Deleted by PACKAGE FSC MP3-UCR-2013-008 6.2-13 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Blowdown Mass and Energy Releases 6.2-14 Double Ended Hot Leg Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-15 Double Ended Pump Suction Break with Minimum ECCS Flows Refloods Mass and Energy Releases 6.2-16 Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Mass and Energy Releases

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 21 of 38 6.2-17 Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-18 Deleted by PACKAGE FSC MP3-UCR-2013-008.................................

6.2-19 3.0 ft2 Suction Split Break with Minimum ECCS Flows Reflood Mass and Energy Releases 6.2-20 Double Ended Hot Leg Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21 Double Ended Pump Suction Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21A Double Ended Pump Suction Break with Maximum ECCS Flows Reflood Principal Parameters 6.2-21B Double Ended Cold Leg Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21C Deleted by PACKAGE FSC MP3-UCR-2013-008.................................

6.2-21D 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Reflood Principal Parameters 6.2-21E Double Ended Hot Leg Break with Minimum ECCS Flows Mass Balance 6.2-21F Double Ended Hot Leg Break with Minimum ECCS Flows Energy Balance 6.2-21G Double Ended Pump Suction Break with Minimum ECCS Flows Mass Balance 6.2-21H Double Ended Pump Suction Break with Minimum ECCS Flows Energy Balance 6.2-21I Double Ended Pump Suction Break with Maximum ECCS Flows Mass Balance 6.2-21J Double Ended Pump Suction Break with Maximum ECCS Flows Energy Balance 6.2-21K Double Ended Cold Leg Break with Minimum ECCS Flows Mass Balance 6.2-21L Double Ended Cold Leg Break with Minimum ECCS Flows Energy Balance 6.2-21M Deleted by PACKAGE FSC MP3-UCR-2013-008.................................

6.2-21N Deleted by PACKAGE FSC MP3-UCR-2013-008.................................

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 22 of 38 6.2-21O 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Energy Balance 6.2-21P 3.0 ft2 Pump Suction Split Break with Minimum ECCS Flows Mass Balance 6.2-22 Deleted by Change PKG FSC 07-MP3-038 6.2-23 Main Steam Line Break Mass and Energy Releases Inside Containment-Initial Conditions Assumptions 6.2-24 Deleted by Change PKG FSC 07-MP3-038 6.2-25 Deleted by Change PKG FSC 07-MP3-038 6.2-26 Steam Generator Cubicle Peak Differential Pressures Feedwater Break Line 6.2-27 THREED Input for Analysis at Pressurizer Cubicle 6.2-28 THREED Input for Analysis Of Steam Generator Cubicle A 6.2-29 Deleted by PKG FSC MP3-UCR-2009-006 6.2-30 Deleted by PKG FSC MP3-UCR-2009-006 6.2-31 Mass and Energy Release Rates for a Spray Line DER in the Pressurizer Cubicle 6.2-32 Deleted by Change PKG FSC 07-MP3-038 6.2-32A Mass and Energy Release Rates for a Surge Line DER in the Pressurizer Cubicle 6.2-33 Pressurizer Cubicle Peak Differential Pressures 6.2-34 Deleted by PKG FSC MP3-UCR-2009-006 6.2-35 Mass and Energy Release Rates for a Double Ended Guillotine Break of the Pressurizer Surge Line (Used for a 196.6-Square Inch Hot Leg LDR in the Steam Generator Cubicle) 6.2-36 Deleted by PKG FSC MP3-UCR-2009-006 6.2-36A Mass and Energy Release Rates for a Feedwater Line SES in the Steam Generator Line 6.2-36 B Deleted by PKG FSC MP3-UCR-2009-006 6.2-37 Deleted by PKG FSC MP3-UCR-2009-006

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 23 of 38 6.2-37 A Deleted by PKG FSC MP3-UCR-2009-006 6.2-37 B Deleted by PKG FSC MP3-UCR-2009-006 6.2-38 Steam Generator Cubicle Peak Differential Pressures, Pressurizer Surge Line LDR 6.2-39 Steam Generator Cubicle Peak Differential Pressures, Residual Heat Removal Line LDR 6.2-40 Deleted by PKG FSC MP3-UCR-2009-006 6.2-41 Deleted by PKG FSC MP3-UCR-2009-006 6.2-42 Deleted by PKG FSC MP3-UCR-2009-006 6.2-43 Subcompartment Design and Maximum Calculated Differential Pressures 6.2-44 Omitted 6.2-45 Deleted by Change PKG FSC 07-MP3-038 6.2-46 Deleted by Change PKG FSC 07-MP3-038 6.2-47 Deleted by Change PKG FSC 07-MP3-038 6.2-48 Deleted by Change PKG FSC 07-MP3-038 6.2-49 Deleted by Change PKG FSC 07-MP3-038 6.2-50 Deleted by Change PKG FSC 07-MP3-038 6.2-51 Deleted by Change PKG FSC 07-MP3-038 6.2-52 Deleted by Change PKG FSC 07-MP3-038 6.2-53 Deleted by Change PKG FSC 07-MP3-038 6.2-54 Deleted by Change PKG FSC 07-MP3-038 6.2-55 Deleted by Change PKG FSC 07-MP3-038 6.2-56 Deleted by Change PKG FSC 07-MP3-038 6.2-57 Deleted by Change PKG FSC 07-MP3-038 6.2-58 Deleted by Change PKG FSC 07-MP3-038 6.2-59 Balance of Plant Parameters Used in Steam Line Break Mass and Energy Release Calculation 6.2-60 Parameters for ECCS Containment Backpressure Analysis 6.2-61 Containment Heat Removal Systems Component Data

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 24 of 38 6.2-62 Containment Heat Removal Systems-Consequences of Components Malfunctions 6.2-63 Supplementary Leak Collection and Release System Principal Component and Design Parameters 6.2-64 Containment Enclosure Building Design Parameters 6.2-65 Containment Penetration 6.2-66 Omitted 6.2-67 Hydrogen Recombiner System Design Parameters 6.2-68 Deleted by change PKG FSC 05-MP3-010 6.2-69 Deleted by change PKG FSC 05-MP3-010 6.2-70 System Alignment for Type A Tests 6.2-71 Pipe Insulation Inside Containment (8 Inches and Larger) 6.2-72 DECLG Mass and Energy Releases for the Limiting Transient 6.2-73 Deleted by Change PKG FSC 07-MP3-038 6.2-74 Deleted by Change PKG FSC 07-MP3-038 6.2-75 Deleted by Change PKG FSC 02-MP3-017 6.2-76 Deleted by Change PKG FSC 02-MP3-017 6.2-77 Passive Heat Sink Data for Minimum Post LOCA Containment Pressure Analysis 6.2-78 Input Data for Minimum Containment Pressure Analysis 6.3-1 Emergency Core Cooling System Component Parameters 6.3-2 Emergency Core Cooling System Relief Valve Data 6.3-3 Motor Operated Isolation Valves in the Emergency Core Cooling System 6.3-4 Materials Employed for Emergency Core Cooling System Components 6.3-5 Single Active Failure Analysis for Emergency Core Cooling System Components 6.3-6 Emergency Core Cooling System Recirculation Piping Passive Failure Analysis

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 25 of 38 6.3-7 Switchover Procedure 6.3-8 Emergency Core Cooling System Shared Functions Evaluation 6.3-9 Normal Operating Status of Emergency Core Cooling System Components for Core Cooling 6.3-10 Failure Mode and Effects Analysis-Emergency Core Cooling System-Active Components 6.3-11 Net Positive Suction Head for Emergency Core Cooling System Pumps 6.4-1 Control Room Component Performance Characteristics for Habitability Systems 6.5-1 Comparison of ESF Filter Systems with Respect to Regulatory Guide 1.52, Rev. 2 Positions 6.6-1 Inservice Inspection Program Class 2 & 3 Systems CHAPTER 7 7.1-1 Listing of Applicable Criteria 7.2-1 List of Reactor Trips 7.2-2 Protection System Interlocks 7.2-3 Reactor Trip System Instrumentation 7.2-4 Reactor Trip Correlation 7.3-1 Interlocks for Engineered Safety Features Actuation System 7.3-2 Engineered Safety Features Actuation System Instrumentation 7.3-3 Safety Injection Signal 7.3-4 Containment Isolation Phase A 7.3-5 Steam Line Isolation 7.3-6 Feedwater Isolation 7.3-7 Control Building Isolation 7.3-8 Containment Depressurization Actuation 7.3-9 Containment Isolation Phase B

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 26 of 38 7.3-10 Instrumentation and Control Systems for Engineered Safety Features and Essential Auxiliary Supporting Systems 7.4-1 Instruments and Controls Outside Control Room for Cold Shutdown 7.5-1 Accident Monitoring Instrumentation List 7.5-1 Attachment 1 Accident Monitoring Instrumentation List 7.7-1 Plant Control System Interlocks CHAPTER 8 8.1-1 Class IE System Load Identification and Function 8.1-2 Acceptance Criteria for Electric Power 8.3-1 Omitted 8.3-2 Cable in Trays 8.3-3 Nonsafety-Related Equipment Connected to Safety-Related Buses 8.3-4 125V DC Safety Related Bus Loading 8.3-5 Omitted 8.3-6 Electrical Equipment not Requiring Internal Cable Separation CHAPTER 9 9.1-1 Fuel Pool Cooling and Purification System Principal Component Design Characteristics 9.1-2 Performance Characteristics of the Fuel Pool Cooling System (One Fuel Pool Cooler Operating) 9.2-1 Service Water System Flow Requirements 9.2-2 Service Water System Heat Transfer Requirements 9.2-3 Automatic Operation of Service Water System Valves 9.2-4 Consequence of Component Failure 9.2-5 Reactor Plant Component Cooling System Major Component Design Data

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 27 of 38 9.2-6 Consequences of Component Failures Reactor Plant Component Cooling Water System 9.2-7 Chilled Water System Heat Load and Flow Rates 9.2-8 Chilled Water System Major Component Design Data 9.2-9 Neutron Shield Tank Cooling System Component Data Summary 9.2-10 Charging Pumps Cooling System Component Data Summary 9.2-11 Consequences of Component Failures, Charging Pumps Cooling Subsystem 9.2-12 Safety Injection Pumps Cooling System Component Data Summary 9.2-13 Consequences of Component Failure-Safety Injection Pumps Cooling Subsystem 9.2-14 Condensate Demineralizer Component Cooling Water System (3CCD) Design Data 9.2-15 Design Data for Major Components in the Water Treating System 9.2-16 Primary Grade Water System Major Component Design Data 9.2-17 Primary Grade Water Chemistry Specifications 9.3-1 Sampling Points-Reactor Plant 9.3-2 Sampling Points-Turbine Plant 9.3-3 Post-Accident Sampling System Principal Components Design and Parameters 9.3-4 Chemical and Volume Control System Design Parameters 9.3-5 Principal Component Data Summary 9.3-6 Failure Mode and Effects Analysis Chemical and Volume Control System Active Components-Normal Plant Operation and Safe Shutdown 9.3-7 Boron Recovery System Principal Component Design and Performance Characteristics

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 28 of 38 9.3-8 Assumptions Used in Activity Discharge Calculations 9.3-9 Boron Recovery System Failure Analysis 9.4-1 Indoor Design Temperatures for Control Building 9.4-2 Control Building Component Performance Characteristics for Air Conditioning, Heating, Cooling, and Ventilation Systems 9.4-3 Design Data for Major Components in Fuel Building Ventilation System 9.4-4 Auxiliary Building Ventilation System Principal Components and Design Parameters 9.4-5 Turbine Building Ventilation System Principal Components and Approximate Parameters 9.4-6 Engineered Safety Features Building Principal Components with Approximate Design Parameters 9.4-7 Engineered Safety Features Building Ventilation Systems Consequences of Component Failures 9.4-8 Containment Air Filtration Subsystem Principal Components Design and Approximate Parameters 9.4-9 Containment Air Recirculation System Principal Components Design and Approximate Parameters 9.4-10 Containment Air Recirculation System Operation Modes and Approximate Design Conditions of Air Recirculation Fan Coolers 9.4-11 Containment Purge Air Subsystem Principal Components and Approximate Parameters 9.4-12 CRDM Cooling System Principal Components and Approximate Parameters 9.4-13 Waste Disposal Building Heating and Ventilation System 9.5-1 Compliance with Fire Protection Technical Requirements 9.5-2 Emergency Diesel Generator Cooling Water System Leakage Summary Per Diesel

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 29 of 38 9.5-3 Design Data for Motor Components in Emergency Generator Cooling Water Systems 9.5-4 Design Data for the Major Components of Emergency Generator-Diesel Lubricating Oil System 9.5-5 Gaseous Hydrogen Storage Tubes 9.5-6 Equipment Supplied by the Nitrogen System 9.5-7 Nitrogen System Major Component Design Data 9.5-8 Design Data for Major Components in the Containment Vacuum System 9.5-9 Emergency Generator Auxiliary System Component Characteristics 9.5-10 Cooling Water System Leakages CHAPTER 10 10.1-1 Steam and Power Conversion System Principle Design and Performance Characteristics 10.3-1 Materials of Main Steam and Feedwater Valves and Piping 10.3-2 Materials of Main Steam Safety Valves 10.3-3 Materials of Main Steam Pressure Relieving Valves 10.3-4 Materials of Main Steam/Feedwater Valves 10.4-1 Circulating Water and Associated Systems Design and Performance Characteristics 10.4-2 Design Data Condensate Polishing System 10.4-3 Condensate and Feedwater System Equipment Design parameters 10.4-4 Equipment Design Parameters 10.4-5 Omitted 10.4-6 Condenser: Physical Characteristics and Performance Requirements 10.4-7 Deleted by PKG FSC MP3-UCR-2010-012 CHAPTER 11

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 30 of 38 11.1-1 Iodine and Noble Gas Inventory in Reactor Core-Original License Basis (HISTORICAL) 11.1-2 (HISTORICAL) Reactor Coolant Equilibrium Concentrations-Original License Basis (HISTORICAL) 11.1-2A Design Reactor Coolant Equilibrium Concentrations at 3723 MWt 11.1-3 Parameters Used in the Calculation of Reactor Coolant, Secondary Side Liquid, and Secondary Side Steam Fission and Activation Product Activity-Original License Basis (HISTORICAL) 11.1-3A Parameters Used in the Calculation of Design Reactor Coolant Fission and Activation Product Activity 11.1-4 Tritium Production 11.1-5 Reactor Coolant N-16 Activity 11.1-6 Secondary Side Liquid Equilibrium Concentrations-Original License Basis (HISTORICAL) 11.1-7 Secondary Side Steam Equilibrium (HISTORICAL)

Concentrations-Original License Basis 11.2-1 Liquid Waste Management System Daily Input Flows 11.2-2 Liquid Waste Management System Design Data 11.2-3 Tank Overflow Protection 11.2-4 (HISTORICAL) Expected Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/ml) Following Treatment-Original License Basis 11.2-5 Expected Annual Radioactive Liquid Releases Prior to Dilution in the Circulating Water Discharge System and Prior to Inclusion of Anticipated Operational Occurrences (HISTORICAL) 11.2-6 Expected Annual Radioactive Liquid Releases After Dilution in the Circulating Water Discharge System and Inclusion of Anticipated Operational Occurrences (HISTORICAL) 11.2-7 Design Radioactive Liquid Concentrations From Each Liquid Release Stream (Ci/gm) Following Treatment

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 31 of 38 11.2-8 Design Annual Radioactive Liquid Releases Prior to Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System 11.2-9 Design Annual Radioactive Liquid Releases Following Addition of Anticipated Operational Occurrences and Dilution in the circulating Water Discharge System 11.2-10 Fraction of MPC Released-Design Case (HISTORICAL) 11.2-11 Assumptions Used for the Radioactive Liquid Waste System Failure (Release to Atmosphere) and for the Liquid Containing Tank Failure 11.2-12 Boron Recovery Tank Concentrations (Ci/cc) 11.2-13 Activity Released to Atmosphere from a Radioactive Liquid Containing Tank Failure (Boron Recovery Tank 11.2.14 Radioactive Concentrations in Groundwater Entering Niantic Bay Following a Rupture of Boron Recovery Tank 11.3-1 Total Expected Radioactive Gaseous Released to Atmosphere from Millstone 3 (HISTORICAL) 11.3-2 Radioactive Gaseous Source Term Parameters (HISTORICAL) 11.3-3 Radioactive Gaseous Waste System 11.3-4 Codes and Standards 11.3-5 Expected Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL) 11.3-6 Expected Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL) 11.3-7 Expected Radioactive Gaseous Releases to Atmosphere via Turbine Building (HISTORICAL) 11.3-8 Design Radioactive Gaseous Releases to Atmosphere via Ventilation Vent (HISTORICAL) 11.3-9 Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 via Millstone 1 Stack (HISTORICAL) 11.3-10 Design Radioactive Gaseous Releases to Atmosphere via Turbine Building Roof (HISTORICAL)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 32 of 38 11.3-11 Design Radioactive Gaseous Releases to Atmosphere from Millstone 3 (HISTORICAL) 11.3-12 Assumptions Used for the Process Gas Charcoal Bed Adsorber Bypass Analysis 11.3-13 Radioisotope Releases from the Process Gas Charcoal Bed Adsorber and Associated Piping 11.4-1 Volume of Spent Resin Generated Annually 11.4-2 Radioactive Solid Waste System Component Data 11.4-3 Omitted 11.4-4 Radioactive Solid Waste Annual Shipments 11.5-1 Gaseous Monitors 11.5-2 Liquid Process Monitors 11.5-3 Radiological Samples Taken at Reactor Plant Sample Sink 11A-1 Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents 11A-2 Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents 11A-3 Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents 11A-4 Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents 11A-5 Annual Doses to Maximum Individual in the Adult Group from Gaseous Effluents 11A-6 Annual Doses to Maximum Individual in the Teen Group from Gaseous Effluents 11A-7 Annual Doses to Maximum Individual in the Child Group from Gaseous Effluents 11A-8 Annual Doses to Maximum Individual in the Infant Group from Gaseous Effluents 11A-9 Omitted 11A-10 Omitted 11A-11 Omitted

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 33 of 38 11A-12 Omitted 11A-13 Annual Doses to Maximum Individual in the Adult Group from Liquid Effluents 11A-14 Annual Doses to Maximum Individual in the Teen Group from Liquid Effluents 11A-15 Annual Doses to Maximum Individual in the Child Group from Liquid Effluents 11A-16 Comparison of Maximum Calculated Doses from Millstone 3 Nuclear Plant with Appendix I Design Objectives 11A-17 Calculated Population Dose 11A.2-1 Dilution Factors, Travel Times from the Site, and Population Served 11A.2-2 Parameters and Assumptions Used in Equations for Estimating Doses to Humans 11A.2-3 Meterological Data 11A.2-4 Parameters and Assumptions Used in Estimating Doses to Biota 11A.3-1 Base Case Annual Population Doses Due to Liquid Effluents 11A.3-2 Base Case Annual Population Doses Due to Gaseous Effluents CHAPTER 12 12.2-1 Parameters Used in Calculation of Design Radiation Source Inventories (HISTORICAL) 12.2-2 Radioactive Sources in Containment Building (HISTORICAL) 12.2-3 Radioactive Sources in the Auxiliary Building (HISTORICAL) 12.2-4 Radioactive Sources in the Waste Disposal Building (HISTORICAL) 12.2-5 Radioactive Sources in the Fuel Building (HISTORICAL) 12.2-5 A Other Radioactive Sources (HISTORICAL)

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 34 of 38 12.2-6 Inventory of an Average Fuel Assembly after 650 Days of Operation at 3,636 MWt at Shutdown and 100 Hours after Shutdown (Ci) (HISTORICAL) 12.2-7 Source Intensity in the Most Radioactive Fuel Assembly after 650 Days of Operation at 3636 Mwt (HISTORICAL) 12.2-8 Radionuclide Concentrations in the Spent Fuel Pool from Refueling 100 Hours after Shutdown (HISTORICAL) 12.2-9 Radiation Sources Reactor Coolant Nitrogen-16 Activity (HISTORICAL) 12.2-10 Assumptions Used in the Calculation of Airborne Concentrations (HISTORICAL) 12.2-11 Airborne Concentrations Inside Major Buildings (µci/cc) (HISTORICAL) 12.3-1 Radiation Zones 12.3-2 Radiation Monitoring System - Area Radiation Detector Location 12.3-3 Operator Activity Locations and Time Durations 12.3-4 Activity Initiation Time 12.5-1 Deleted by change PKG FSC 04-MP3-040 12.5-2 Deleted by change PKG FSC 04-MP3-040 CHAPTER 14 14.2-1 Preoperational/Acceptance Test Program Test Descriptions 14.2-2 Startup Test Descriptions 14.2-3 Preoperational/Acceptance/Startup Tests Acceptance Criteria Sources CHAPTER 15 15.0-1 Nuclear Steam Supply System Power Ratings 15.0-2 Summary of Initial Conditions and Computer Codes Used

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 35 of 38 15.0-3 Nominal Values of Pertinent Plant Parameters Utilized in the Accident Analysis 15.0-4 Trip Point and Time Delays to Trip Assumed in Accident Analysis 15.0-5 Deleted by PKG FSC 07-MP2-049 15.0-6 Plant Systems and Equipment Required for the Mitigation of Transient and Accident Conditions 15.0-7 Fission Product Inventory in Reactor Core 15.0-8 Potential Doses Due to Accidents 15.0-9 Typical Power-Temperature Distribution for Full Core 15.0-10 Technical Specification Coolant Concentrations 15.0-11 Atmospheric Dispersion Data Used for Design Basis Accident Analysis 15.0-12 Reactor Coolant Iodine Concentrations Assuming Pre-Accident Iodine Spike 15.0-13 Iodine Release Rates in Reactor Coolant Due to Concurrent Iodine Spike 15.1-1 Time Sequence of Events For Incidents Which Cause an Increase in Heat Removal by the Secondary System 15.1-2 Equipment Required Following A Rupture of a Main Steam Line 15.1-3 Assumptions Used in Main Steam Line Break Analysis 15.1-4 Deleted by change PKG FSC 04-MP3-017 15.2-1 Time Sequence for Events for Incidents Which Cause a Decrease in Heat Removal by the Secondary System 15.2-2 Natural Circulation Flow 15.3-1 Time Sequence of Events for Incidents Which Result in a Decrease in Reactor Coolant System Flow 15.3-1 A Time Sequence of Events for Under Frequency Event 15.3-2 Summary of Results for Locked Rotor Transients 15.3-3 Assumptions Used in Locked Rotor Analysis

MPS-3 FSAR LIST OF EFFECTIVE TABLES (CONTINUED)

Table Title LOET 36 of 38 15.4-1 Time Sequence of Events For Incidents Which Cause Reactivity and Power Distribution Anomalies 15.4-2 Minimum Calculated DNBR for a Typical Case of Rod Cluster Control Assembly Misalignment 15.4-3 Parameters Used in the Analysis of the Rod Cluster Control Assembly Ejection Accident 15.4-4 Parameters Used in Rod Ejection Accident Analysis 15.4-5 Integrated Break Flow (lbm) in Containment 15.4-6 Deleted by change PKG FSC 04-MP3-017 15.5-1 Time Sequence of Events-CVCS Malfunction that Increases Reactor Coolant Inventory 15.6-1 Time Sequence of Events for Inadvertent Opening of a Pressurizer Safety Valve 15.6-2 Assumptions Used in Analysis of Failure of Small Lines Carrying Primary Coolant Outside Containment 15.6-3 Plant Operating Range Allowed by the Best Estimate Large Break LOCA Analysis 15.6-4 Large Break LOCA Containment Data Used for Calculation of Containment Pressure 15.6-5 Best Estimate Large Break LOCA Results 15.6-6 Total Minimum Injected Safety Injection Flow Used in Best Estimate large Break LOCA Analysis 15.6-7 Large Break LOCA Containment Data Used for Calculation of Containment Pressure 15.6-8 Peak Clad Temperature including All Penalties and benefits, Best Estimate large Break LOCA (BE LBLOCA) 15.6-9 Assumptions Used for the Radiological Consequences of a LOCA Analysis 15.6-10 Deleted by change PKG FSC 04-MP3-017 15.6-11 Deleted by change PKG FSC 07-MP3-054 15.6-12 Assumptions Used for the Control Room Habitability Analysis 15.6-13 Deleted by change PKG FSC 04-MP3-017

MPS-3 FSAR LOET 37 of 38 15.6-14 Time Sequence of Events for Incidents Which Cause a Decrease in Reactor Coolant Inventory (Small Break) 15.6-15 Input Parameters Used in the ECCS Analysis (Small Break) 15.6-16 Small Break LOCA Results Fuel Cladding Data 15.6-17 Small Break LOCA Safety Injection Flow Rate for 1.5 inch to 6 inch Breaks 15.6-18 Small Break LOCA Safety Injection Flow Rate for 8.75 inch Break Before Switchover 15.6-19 Omitted 15.6-20 Omitted 15.6-21 Deleted 15.6-22 Deleted 15.6.3-1 Operator Action Times for Design Basis SGTR Analysis 15.6.3-2 SGTR Analysis Sequence of Events 15.6.3-3 SGTR Mass Releases Total Mass Flow (Pounds) 15.6.3-4 SGTR Analysis Parameters Used in Evaluating Radiological Consequences 15.6.3-5 Deleted by Change PKG FSC 07-MP3-054 15.6.3-6 SGTR Analysis Iodine Spike Appearance Rates 15.6.3-7 Deleted by change PKG FSC 04-MP3-017 15.6.3-8 Deleted by change PKG FSC 04-MP3-017 15.6.3-9 Deleted by change PKG FSC 04-MP3-017 15.6.3-10 Deleted by change PKG FSC 04-MP3-017 15.7-1 Omitted 15.7-2 Table Relocated to Table 11.3-13 by change PKG FSC 04-MP3-017 15.7-3 Table Relocated to Table 11.3-12 by change PKG FSC 04-MP3-017 15.7-4 Table Relocated to Table 11.2-12 by change PKG FSC 04-MP3-017 15.7-5 Table Relocated to Table 11.2-11 by change PKG FSC 04-MP3-017 15.7-6 Table Relocated to Table 11.2-13 by change PKG FSC 04-MP3-017 15.7-7 Table Relocated to Table 11.2-14 by change PKG FSC 04-MP3-017

MPS-3 FSAR LOET 38 of 38 15.7-8 Parameters for Postulated Fuel Handling Accident 15.7-9 Deleted by change PKG FSC 04-MP3-017 15.7-10 Deleted by change PKG FSC 07-MP3-056 15.7-11 Deleted by change PKG FSC 04-MP3-017 15B Tables Deleted by change PKG FSC 02-MP3-017 CHAPTER 19 19.6-1 License Renewal Commitments FPER FPER 4-1 Sprinkler/Waterspray Protected Areas FPER 4-2 CO2 Protected Areas FPER 9-1 Plant Functions which Could be Affected by a Fire in Different Fire Areas and Options Available to Complete Function (Table has been Deleted)

MPS-3 FSAR Page 1 of 83 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 1.2-2 FIGURE 1.2-2

[27.2]

PLOT PLAN 25212-10002 (a) N/A 1.2-3 FIGURE 1.2-3 SH-1

[27.2]

PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 1 OF 3 1.2-3 FIGURE 1.2-3 SH-2

[27.2]

PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 2 OF 3 1.2-3 FIGURE 1.2-3 SH-3

[27.2]

PIPING & INSTRUMENTATION DIAGRAM LEGEND 25212-26900 (a) 3 OF 3 2.1-1 FIGURE 2.1-1 MAY 1993 GENERAL SITE LOCATION N/A N/A 2.1-2 FIGURE 2.1-2 MAY 1993 GENERAL VICINITY N/A N/A 2.1-3 FIGURE 2.1-3

[17.5]

SITE LAYOUT N/A N/A 2.1-4 FIGURE 2.1-4

[17.5]

SITE PLAN N/A N/A 2.1-5 FIGURE 2.1-5 MAY 1993 TOWNS WITHIN 10 MILES N/A N/A 2.1-6 FIGURE 2.1-6 MAY 1993 1985 POPULATION DISTRIBUTION 0-20 KILOMETER N/A N/A 2.1-7 FIGURE 2.1-7 MAY 1993 POPULATION SECTORS FOR 0-10 MILES N/A N/A 2.1-8 FIGURE 2.1-8 MAY 1993 COUNTIES WITHIN 50 MILES N/A N/A 2.1-9 FIGURE 2.1-9 MAY 1993 1985 POPULATION DISTRIBUTION 0-80 KILOMETER N/A N/A 2.1-10 FIGURE 2.1-10 MAY 1993 POPULATION SECTORS FOR 0-50 MILES N/A N/A 2.1-11 FIGURE 2.1-11 MAY 1993 ROADS AND FACILITIES IN THE LPZ N/A N/A

MPS-3 FSAR Page 2 of 83 2.1-12 FIGURE 2.1-12 MAY 1993 LPZ POPULATION SECTORS N/A N/A 2.2-1 FIGURE 2.2-1 APRIL 1997 MAJOR INDUSTRIAL, TRANSPORTATION AND MILITARY FACILITIES N/A N/A 2.2-2 FIGURE 2.2-2 MAY 1993 INSTRUMENT LANDING PATTERNS AT TRUMBULL AIRPORT N/A N/A 2.2-3 FIGURE 2.2-3 NONE AIR LANES ADJACENT TO MILLSTONE POINT N/A N/A 2.2-4 FIGURE 2.2-4 MAY 1993 NEW LONDON COUNTY - STATE HIGHWAYS AND TOWN ROADS N/A N/A 2.2-5 FIGURE 2.2-5 AMENDMENT 10 OCTOBER 1984 PROPANE CONCENTRATION OUTSIDE AND INSIDE THE CONTROL ROOM N/A N/A 2.3-1 FIGURE 2.3-1 APRIL 1992 TOPOGRAPHY IN THE VICINITY OF MILLSTONE POINT N/A N/A 2.3-2 FIGURE 2.3-2 NONE TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE N/A N/A 2.3-3 FIGURE 2.3-3 NONE TOPOGRAPHICAL PROFILES WITHIN 5 MILES OF SITE N/A N/A 2.3-4 FIGURE 2.3-4 (Sheet 1 of 2)

NONE TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE N/A 1 OF 2 2.3-4 FIGURE 2.3-4 (Sheet 2 of 2)

NONE TOPOGRAPHIC PROFILES WITHIN 50 MILES OF SITE N/A 2 OF 2 2.3-5 FIGURE 2.3-5 (Sheet 1 of 2)

NONE TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE N/A 1 OF 2 2.3-5 FIGURE 2.3-5 (Sheet 2 of 2)

NONE TOPOGRAPHICAL PROFILES WITHIN 50 MILES OF SITE N/A 2 OF 2 2.3-6 FIGURE 2.3-6 (Sheet 1 of 2)

NONE GENERAL TOPOGRAPHY - 50 MILES N/A 1 OF 2 2.3-6 FIGURE 2.3-6 (Sheet 2 of 2)

NONE GENERAL TOPOGRAPHY - 50 MILES N/A 2 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 3 of 83 2.3-7 FIGURE 2.3-7 APRIL 1992 METEOROLOGICAL INSTRUMENT AND DATA QUALITY ASSURANCE FLOW DIAGRAM N/A N/A 2.4-1 FIGURE 2.4-1

[17.5]

FACILITIES LOCATED ON THE SITE N/A N/A 2.4-2 FIGURE 2.4-2 NONE PUBLIC WATER SUPPLIES WITHIN 20 MILES OF SITE N/A N/A 2.4-3 FIGURE 2.4-3 NONE LOCATIONS OF HYDROGRAPHIC FIELD SURVEY STATIONS JUNE TO OCTOBER 1965 N/A N/A 2.4-4 FIGURE 2.4-4 NONE TIDAL CURRENTS MEASURED BY ESSEX MARINE LABORATORY N/A N/A 2.4-5 FIGURE 2.4-5 NONE BOTTOM PROFILES ESTABLISHED BY ESSEX MARINE LABORATORY N/A N/A 2.4-6 FIGURE 2.4-6 NONE FREQUENCY OF TIDAL FLOODING AT NEW LONDON, CONECTICUT N/A N/A 2.4-7 FIGURE 2.4-7

[23.1]

SITE GRADE AND DRAINAGE BASIN FOR PMP RUNOFF ANALYSIS N/A N/A 2.4-8 FIGURE 2.4-8 JULY 1997 BOTTOM PROFILE ALONG PATH OF MAXIMUM SURFACE WINDS N/A N/A 2.4-9 FIGURE 2.4-9 NONE COINCIDENT WAVE AND SURGE SLOW-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-10 FIGURE 2.4-10 NONE COINCIDENT WAVE AND SURGE MEDIUM-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-11 FIGURE 2.4-11 NONE COINCIDENT WAVE AND SURGE HIGH-SPEED PROBABLE MAXIMUM HURRICANE N/A N/A 2.4-12 FIGURE 2.4-12 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS SLOW SPEED OF TRANSLATION N/A N/A 2.4-13 FIGURE 2.4-13 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS MEDIUM SPEED OF TRANSLATION N/A N/A 2.4-14 FIGURE 2.4-14 NONE LOCUS OF HURRICANE EYE HURRICANE TYPE: LARGE RADIUS HIGH SPEED OF TRANSLATION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 4 of 83 2.4-15 FIGURE 2.4-15 NONE WAVE TRANSECTS ON LONG ISLAND SOUND N/A N/A 2.4-16 FIGURE 2.4-16 NONE AREAS UNDER EFFECT OF WAVE SHOALING AND WAVE REFRACTION N/A N/A 2.4-17 FIGURE 2.4-17 NONE WAVE REFRACTION DIAGRAM, BLOCK ISLAND SOUND GRID N/A N/A 2.4-18 FIGURE 2.4-18 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH SOUTH 30 DEGREE EAST N/A N/A 2.4-19 FIGURE 2.4-19 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 85 DEGREE SOUTH N/A N/A 2.4-20 FIGURE 2.4-20 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 45 DEGREE SOUTH N/A N/A 2.4-21 FIGURE 2.4-21 NONE WAVE REFRACTION DIAGRAM, MILLSTONE GRID, ANGLE OF APPROACH WEST 17 DEGREE SOUTH N/A N/A 2.4-22 FIGURE 2.4-22 NONE TOPOGRAPHY AND RUNUP TRANSECTS MILLSTONE LOCATION N/A N/A 2.4-23 FIGURE 2.4-23 NONE INTAKE TRANSECT A N/A N/A 2.4-24 FIGURE 2.4-24 NONE RUNUP TRANSECT B (WEST)

N/A N/A 2.4-25 FIGURE 2.4-25 NONE RUNUP TRANSECT B (EAST)

N/A N/A 2.4-26 FIGURE 2.4-26 SEPTEMBER 1997 WAVE CLAPOTIS AT INTAKE N/A N/A 2.4-27 FIGURE 2.4-27 NONE INPUTS TO ONE DIMENSIONAL SETDOWN MODEL N/A N/A 2.4-28 FIGURE 2.4-28 NONE LARGE RADIUS PROBABLE MAXIMUM HURRICANE ISOVEL FIELD N/A N/A 2.4-29 FIGURE 2.4-29 NONE LARGE RADIUS, SLOW SPEED OF TRANSLATION TIME VARIANT WIND FIELD-MILLSTONE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 5 of 83 2.4-30 FIGURE 2.4-30 JULY 1997 SETDOWN VERSUS WIND SPEED N/A N/A 2.4-31 FIGURE 2.4-31 NONE BOUNDARY OF THE MODELED AREA N/A N/A 2.4-32 FIGURE 2.4-32 NONE ONSITE WELL LOCATIONS N/A N/A 2.4-33 FIGURE 2.4-33 NONE PROBABLE SEEPAGE PATH FROM BORON RECOVERY TANK AND WASTE DISPOSAL BUILDING TO LONG ISLAND SOUND N/A N/A 2.4-34 FIGURE 2.4-34 AMENDMENT 6 JANUARY 1984 SCUPPER DETAILS-CONTROL, HYDROGEN RECOMBINER AND CONTAINMENT ENCLOSURE N/A N/A 2.4-35 FIGURE 2.4-35 AMENDMENT 6 JANUARY 1984 ROOF PLUG SEALING DETAIL - HYDROGEN RECOMBINER BUILDING N/A N/A 2.4-36 FIGURE 2.4-36 AMENDMENT 6 JANUARY 1984 HATCH COVER DETAILS - CIRCULATING WATER PUMPHOUSE SERVICE WATER PUMP CUBICLE N/A N/A 2.4-37 FIGURE 2.4-37 AMENDMENT 9 JULY 1984 HATCH COVER DETAILS - CONTROL BUILDING MECHANICAL ROOM N/A N/A 2.5.1-1 FIGURE 2.5.1-1 NONE REGIONAL PHYSIOGRAPHIC MAP N/A N/A 2.5.1-2 FIGURE 2.5.1-2 NONE REGIONAL PRE-PLEISTOCENE SEDIMENTS OF THE CONTINENTAL MARGIN N/A N/A 2.5.1-3 FIGURE 2.5.1-3 NONE SITE SURFICIAL GEOLOGY N/A N/A 2.5.1-4 FIGURE 2.5.1-4 NONE REGIONAL GEOLOGIC MAP N/A N/A 2.5.1-5 FIGURE 2.5.1-5 NONE REGIONAL GEOLOCIC SECTION N/A N/A 2.5.1-6 FIGURE 2.5.1-6 NONE REGIONAL TECTONIC MAP N/A N/A 2.5.1-7 FIGURE 2.5.1-7 NONE STRATIGRAPHIC CORRELATION CHART FOR THE SITE AND SURROUNDING REGION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 6 of 83 2.5.1-8 FIGURE 2.5.1-8 (Sh. 1 of 3)

NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 1 OF 3 2.5.1-8 FIGURE 2.5.1-8 (Sh. 2 of 3)

NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 2 OF 3 2.5.1-8 FIGURE 2.5.1-8 (Sh. 3 of 3)

NONE REGIONAL STRATIGRAPHIC CORRELATION CHART N/A 3 OF 3 2.5.1-9 FIGURE 2.5.1-9 NONE LANDSAT PHOTOGRAPHS OF CONNECTICUT, RHODE ISLAND,SOUTHERN MASSACHUSETTS, AND EASTERN NEW YORK N/A N/A 2.5.1-10 FIGURE 2.5.1-10 NONE LINEAMENT MAP FROM LANDSAT PHOTOGRAPHS N/A N/A 2.5.1-11 FIGURE 2.5.1-11 NONE REGIONAL AEROMAGNETIC MAP N/A N/A 2.5.1-12 FIGURE 2.5.1-12 NONE REGIONAL BOUGUER GRAVITY MAP N/A N/A 2.5.1-13 FIGURE 2.5.1-13 NONE SITE BEDROCK GEOLOGY N/A N/A 2.5.1-14 FIGURE 2.5.1-14 NONE TECTONIC MAP OF EASTERN CONNECTICUT N/A N/A 2.5.1-15 FIGURE 2.5.1-15 NONE CONTOUR DIAGRAM OF POLES TO FOLIATION PLANES - FINAL GRADE N/A N/A 2.5.1-16 FIGURE 2.5.1-16 NONE CONTOUR DIAGRAM OF POLES TO JOINT PLANES - FINAL GRADE N/A N/A 2.5.1-17 FIGURE 2.5.1-17 NONE CONTOUR PLOT OF BEARING AND PLUNGE OF SLICKENSIDES FINAL GRADE N/A N/A 2.5.1-18 FIGURE 2.5.1-18 NONE GENERALIZED LOCATION OF FAULTS N/A N/A 2.5.2-1 FIGURE 2.5.2-1 NONE LOCATION OF SEISMIC STATIONS N/A N/A 2.5.2-2 FIGURE 2.5.2-2 NONE EPICENTERS OF EARTHQUAKES WITHIN 200 MILE RADIUS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 7 of 83 2.5.2-3 FIGURE 2.5.2-3 NONE LOCATION OF EARTHQUAKES WITHIN THE 50 MILE RADIUS N/A N/A 2.5.2-4 FIGURE 2.5.2-4 NONE ISOSEISMAL MAP EARHQUAKE OF NOVEMBER 9, 1727 N/A N/A 2.5.2-5 FIGURE 2.5.2-5 NONE ISOSEISMAL MAP EARTHQUAKE OF NOVEMBER 18, 1755 N/A N/A 2.5.2-6 FIGURE 2.5.2-6 NONE ISOSEISMAL MAP EARTHQUAKE OF MAY 16, 1791 N/A N/A 2.5.2-7 FIGURE 2.5.2-7 NONE ISOSEISMAL MAP EARTHQUAKE OF AUGUST 10, 1884 N/A N/A 2.5.2-8 FIGURE 2.5.2-8 NONE ISOSEISMAL MAP EARTHQUAKE OF MARCH 1, 1925 (FEBRUARY 28, 1925 EST)

N/A N/A 2.5.2-9 FIGURE 2.5.2-9 NONE ISOSEISMAL MAP EARTHQUAKE OF DECEMBER 20 AND 24, 1940 N/A N/A 2.5.2-10 FIGURE 2.5.2-10 NONE TECTONIC PROVINCES N/A N/A 2.5.3-1 FIGURE 2.5.3-1 NONE T-2 FAULT ZONE FINAL EXCAVATION GRADE NORTHERN SECTION N/A N/A 2.5.3-2 FIGURE 2.5.3-2 NONE T-2 FAULT ZONE FINAL EXCAVATION GRADE SOUTHERN SECTION N/A N/A 2.5.3-3 FIGURE 2.5.3-3 NONE T-3 FAULT ZONE FINAL EXCAVATION GRADE N/A N/A 2.5.4-1 FIGURE 2.5.4-1 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - EAST N/A N/A 2.5.4-2 FIGURE 2.5.4-2 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE WALLS - WEST N/A N/A 2.5.4-3 FIGURE 2.5.4-3 NONE GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-4 FIGURE 2.5.4-4 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 8 of 83 2.5.4-5 FIGURE 2.5.4-5 NONE GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-6 FIGURE 2.5.4-6 NONE GEOLOGIC MAP OF FINAL GRADE - FLOORS OF STRUCTURES N/A N/A 2.5.4-7 FIGURE 2.5.4-7 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - WEST N/A N/A 2.5.4-8 FIGURE 2.5.4-8 NONE GEOLOGIC MAP OF FINAL GRADE PUMPHOUSE FLOOR N/A N/A 2.5.4-9 FIGURE 2.5.4-9 NONE GEOLOGIC MAP OF FINAL GRADE SERVICE WATER LINE FLOOR - EAST N/A N/A 2.5.4-10 FIGURE 2.5.4-10 NONE GEOLOGIC MAP OF FINAL GRADE SOUTHEAST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-11 FIGURE 2.5.4-11 NONE GEOLOGIC MAP OF FINAL GRADE SOUTHWEST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-12 FIGURE 2.5.4-12 NONE GEOLOGIC MAP OF FINAL GRADE NORTHWEST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-13 FIGURE 2.5.4-13 NONE GEOLOGIC MAP OF FINAL GRADE NORTHEAST QUADRANT OF CONTAINMENT WALLS N/A N/A 2.5.4-14 FIGURE 2.5.4-14 NONE GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING SUMP WELLS N/A N/A 2.5.4-15 FIGURE 2.5.4-15 NONE GEOLOGIC MAP OF FINAL GRADE AUXILIARY BUILDING PIPE TUNNEL PIT WALLS N/A N/A 2.5.4-16 FIGURE 2.5.4-16 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF EXCAVATION N/A N/A 2.5.4-17 FIGURE 2.5.4-17 NONE GEOLOGIC MAP OF FINAL GRADE NORTHEAST AND SOUTHEAST PUMPHOUSE WALLS N/A N/A 2.5.4-18 FIGURE 2.5.4-18 NONE GEOLOGIC MAP OF FINAL GRADE ENGINEERED SAFETY FEATURES BUILDING WALLS N/A N/A 2.5.4-19 FIGURE 2.5.4-19 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 9 of 83 2.5.4-20 FIGURE 2.5.4-20 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-21 FIGURE 2.5.4-21 NONE GEOLOGIC MAP OF FINAL GRADE NORTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-22 FIGURE 2.5.4-22 NONE GEOLOGIC MAP OF FINAL GRADE SOUTH WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-23 FIGURE 2.5.4-23 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-24 FIGURE 2.5.4-24 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE TUNNEL FLOOR N/A N/A 2.5.4-25 FIGURE 2.5.4-25 NONE GEOLOGIC MAP OF FINAL GRADE WEST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-26 FIGURE 2.5.4-26 NONE GEOLOGIC MAP OF FINAL GRADE EAST WALL OF DISCHARGE TUNNEL N/A N/A 2.5.4-27 FIGURE 2.5.4-27 NONE GEOLOGIC MAP OF FINAL GRADE DISCHARGE WEIR ROCK FACE N/A N/A 2.5.4-28 FIGURE 2.5.4-28 NONE CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS ONSHORE BORING COMPOSITE N/A N/A 2.5.4-29 FIGURE 2.5.4-29 NONE CORRECTED BLOW COUNT PLOT PUMPHOUSE AREA SANDS BORINGS P1 TO P8 COMPOSITE N/A N/A 2.5.4-30 FIGURE 2.5.4-30 SH. 1 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 1 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 2 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 2 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 3 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 3 OF 4 2.5.4-30 FIGURE 2.5.4-30 SH. 4 NONE GRAIN SIZE DISTRIBUTION CURVES N/A 4 OF 4 2.5.4-31 FIGURE 2.5.4-31 AMENDMENT 5 NOVEMBER 1983 BORING LOCATION PLAN N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 10 of 83 2.5.4-32 FIGURE 2.5.4-32 NONE PLOT PLAN SHOWING LOCATIONS OF THE BORINGS AND THE GEOLOGIC SECTIONS N/A N/A 2.5.4-33 FIGURE 2.5.4-33 NONE GEOLOGIC PROFILE SECTIONS A-A' AND B-B' N/A N/A 2.5.4-34 FIGURE 2.5.4-34 AUGUST 1996 GEOLOGIC PROFILE, SECTIONS C-C', D-D', AND E'E' N/A N/A 2.5.4-35 FIGURE 2.5.4-35 NONE GEOLOGIC PROFILE - SECTIONS F-F' AND G-G' N/A N/A 2.5.4-36 FIGURE 2.5.4-36 AMENDMENT 3 AUGUST 1983 TOP OF BASAL TILL CONTOUR MAP N/A N/A 2.5.4-37 FIGURE 2.5.4-37 NONE GROUNDWATER CONTOUR MAP N/A N/A 2.5.4-38 FIGURE 2.5.4-38 NONE GROUNDWATER OBSERVATION IN BOREHOLES N/A N/A 2.5.4-39 FIGURE 2.5.4-39 AMENDMENT 3 AUGUST 1983 BEDROCK SURFACE CONTOUR MAP N/A N/A 2.5.4-40 FIGURE 2.5.4-40 AMENDMENT 3 AUGUST 1983 GENERAL EXCAVATION PLAN N/A N/A 2.5.4-41 FIGURE 2.5.4-41 AMENDMENT 14 JULY 1985 SHOREFRONT & DREDGING PLAN N/A N/A 2.5.4-42 FIGURE 2.5.4-42 NONE MODULUS VERSUS EFFECTIVE CONFINING PRESSURE STRUCTURAL FILL N/A N/A 2.5.4-43 FIGURE 2.5.4-43 AMENDMENT 3 AUGUST 1983 LATERAL PRESSURE DISTRIBUTION N/A N/A 2.5.4-44 FIGURE 2.5.4-44 NONE GRADATON CURVES FORE CATEGORY I STRUCTURAL FILL N/A N/A 2.5.4-45 FIGURE 2.5.4-45 NONE K2 VERSUS SHEAR STRAIN FOR BEACH SANDS N/A N/A 2.5.4-46 FIGURE 2.5.4-46 NONE EARTHQUAKE INDUCED SHEAR STRESSES IN BEACH SANDS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 11 of 83 2.5.4-47 FIGURE 2.5.4-47 JUNE 1997 CYCLIC STRESS RATION VS CONFINING PRESSURE FOR BEACH SANDS N/A N/A 2.5.4-48 FIGURE 2.5.4-48 NONE CYCLIC STRESS RATION VS PENETRATIJON RESISTANCE OF SAND N/A N/A 2.5.4-49 FIGURE 2.5.4-49 NONE FACTOR OF SAFETY AGAINST LIQUIFACTION OF BEACH SANDS N/A N/A 2.5.4-50 FIGURE 2.5.4-50 NONE IDEALIZED SOIL PROFILE LIQUEFACTION ANALYSIS OF ABLATION TILL UNDER DISCHARGE TUNNEL N/A N/A 2.5.4-51 FIGURE 2.5.4-51 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION H-H' N/A N/A 2.5.4-52 FIGURE 2.5.4-52 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION I-I' N/A N/A 2.5.4-53 FIGURE 2.5.4-53 AMENDMENT 5 NOVEMBER 1983 LOCATION OF FIELD DENSITY TESTS SERVICE WATER INTAKE LINE N/A N/A 2.5.4-54 FIGURE 2.5.4-54 AMENDMENT 14 JULY 1985 LOCATION OF FIELD DENSITY TESTS EMERGENCY GENERATORE ENCLOSURE AND CONTROL BUILDING N/A N/A 2.5.4-55 FIGURE 2.5.4-55 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION J-J' N/A N/A 2.5.4-56 FIGURE 2.5.4-56 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION K-K' N/A N/A 2.5.4-57 FIGURE 2.5.4-57 SH. 1 AMENDMENT 3 AUGUST 1983 GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS N/A 1 OF 2 2.5.4-57 FIGURE 2.5.4-57 SH. 2 AMENDMENT 3 AUGUST 1983 GRAIN SIZE DISTRIBUTION CURVES PUMPHOUSE AREA OUTWASH SANDS N/A 2 OF 2 2.5.4-58 FIGURE 2.5.4-58 AMENDMENT 3 AUGUST 1983 EQUIVALENT NUBERS OF UNIFOREM STRESS CYCLES BASED ON STRONGES COMPONENTS OF GROUND MOTION N/A N/A 2.5.4-59 FIGURE 2.5.4-59 AMENDMENT 3 AUGUST 1983 PLAN OF SETTLEMENT MONITORING BENCHMARK LOCATIONS N/A N/A 2.5.4-60 FIGURE 2.5.4-60 SH. 1 AMENDMENT 3 AUGUST 1983 CONTROL BUILDING SETTLEMENT N/A 1 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 12 of 83 2.5.4-60 FIGURE 2.5.4-60 SH. 2 AMENDMENT 3 AUGUST 1983 CONTROL BUILDING SETTLEMENT N/A 2 OF 2 2.5.4-61 FIGURE 2.5.4-61 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE SETTLEMENT N/A N/A 2.5.4-62 FIGURE 2.5.4-62 AMENDMENT 3 AUGUST 1983 SOLID WASTE BUILDING SETTLEMENT N/A N/A 2.5.4-63 FIGURE 2.5.4-63 AMENDMENT 3 AUGUST 1983 LIQUID WASTE BUILDING SETTLEMENT N/A N/A 2.5.4-64 FIGURE 2.5.4-64 AMENDMENT 3 AUGUST 1983 FUEL BUILDING SETTLEMENT N/A N/A 2.5.4-65 FIGURE 2.5.4-65 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION L-L' N/A N/A 2.5.4-66 FIGURE 2.5.4-66 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION M-M' N/A N/A 2.5.4-67 FIGURE 2.5.4-67 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION N-N' N/A N/A 2.5.4-68 FIGURE 2.5.4-68 AMENDMENT 5 NOVEMBER 1983 GEOLOGIC PROFILE SECTION O-O' N/A N/A 2.5.4-69 FIGURE 2.5.4-69 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION P-P' N/A N/A 2.5.4-70 FIGURE 2.5.4-70 AMENDMENT 8 MAY 1984 GEOLOGIC PROFILE SECTION Q-Q' N/A N/A 2.5.4-71 FIGURE 2.5.4-71 AMENDMENT 15 SEPTEMBER 1985 GEOLOGIC PROFILE SECTION R-R' N/A N/A 2.5.4-72 FIGURE 2.5.4-72 AMENDMENT 8 MAY 1984 SOIL - STRUCTURE INTERACTION EMERGENCY GENERATOR ENCLOSURE N/A N/A 2.5.4-73 FIGURE 2.5.4-73 AMENDMENT 8 MAY 1984 SHEAR MODULUS CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL)

N/A N/A 2.5.4-74 FIGURE 2.5.4-74 AMENDMENT 8 MAY 1984 DAMPING CURVE TYPE 2 SOIL (STRUCTURAL BACKFILL AND BASAL TILL)

N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 13 of 83 2.5.4-75 FIGURE 2.5.4-75 AMENDMENT 9 JULY 1984 SHOREFRONT PROFILE USED IN LIQUEFACTION ANALYSES N/A N/A 2.5.5-1 FIGURE 2.5.5-1 JANUARY 1998 SECTION THROUGH SHOREFRONT N/A N/A 2.5.5-2 FIGURE 2.5.5-2 NONE TYPICAL WEDGE GEOMETRY N/A N/A 2.5.5-3 FIGURE 2.5.5-3 NONE DESIGN LOADS FOR RING BEAM N/A N/A 2.5.5-4 FIGURE 2.5.5-4 JANUARY 1998 SHOREFRONT SLOPE STABILITY SECTION - SLOPING ROCK PROFILE N/A N/A 2.5.5-5 FIGURE 2.5.5-5 AMENDMENT 8 MAY 1984

SUMMARY

OF CIU TEST RESULTS - BEACH AREA OUTWASH SANDS N/A N/A 2.5.5-6 FIGURE 2.5.5-6 AMENDMENT 8 MAY 1984 POTENTIAL FAILURE WEDGES WEST SIDE OF CONTAINMENT EXCAVATION N/A N/A 2.5.5-7 FIGURE 2.5.5-7 AMENDMENT 8 MAY 1984 ROCK SURFACE NEAR NORTH EDGE OF MAIN STEAM VALVE BUILDING N/A N/A 3.2-1 FIGURE 3.2-1 NONE LINE DESINATION, SAFETY CLASS BOUNDARIES N/A N/A 3.3-1 FIGURE 3.3-1 AMENDMENT 11 NOVEMBER 1984 DYNAMIC LOAD FACTOR CURVE FOR TORNADO PRESSURE DROP N/A N/A 3.4-1 FIGURE 3.4-1 (Sheet 1 of 4)

OCTOBER 1997 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 1 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 2 of 4)

NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 2 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 3 of 4)

NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 3 OF 4 3.4-1 FIGURE 3.4-1 (Sheet 4 of 4)

NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 4 OF 4 3.5-1 FIGURE 3.5-1 NONE TURBINE PLACEMENT & ORIENTATION FOR THREE UNIT SITE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 14 of 83 3.5-2 FIGURE 3.5-2 NONE TURBINE PLACEMENT AND ORIENTATION PROFILE N/A N/A 3.5-3 FIGURE 3.5-3

[16]

DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-4 FIGURE 3.5-4

[16]

DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-5 FIGURE 3.5-5

[16]

DELETED BY PKG FSC 02-MP3-013 N/A N/A 3.5-6 FIGURE 3.5-6 AMENDMENT 3 AUGUST 1983 MISSILE BARRIER BEAM COLUMN N/A N/A 3.6-1 FIGURE 3.6-1 NONE FLUID SYSTEMS SUBJECTED TO BREAK AND CRACK ANALYSIS N/A N/A 3.6-2 FIGURE 3.6-2 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 3 FEET - 8 INCHES N/A N/A 3.6-3 FIGURE 3.6-3

[20.1]

RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 24 FEET - 6 INCHES N/A N/A 3.6-4 FIGURE 3.6-4 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - ELEVATION 51 FEET - 4 INCHES N/A N/A 3.6-5 FIGURE 3.6-5 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 1-1 N/A N/A 3.6-6 FIGURE 3.6-6 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 2-2 N/A N/A 3.6-7 FIGURE 3.6-7 NONE RELATIVE LOCATIONS OF SAFETY-RELATED EQUIPMENT - SECTION 3-3, 4-4 N/A N/A 3.6-8 FIGURE 3.6-8 JANUARY 1998 MAIN STEAM SYSTEM N/A N/A 3.6-8 NOTES TO FIGURE 3.6-8

[16]

DATA FOR PIPE RUPTURE RESTRAINTS - MAIN STEAM SYSTEM N/A N/A 3.6-9 FIGURE 3.6-9 NONE MAIN STEAM SYSTEM (CONTINUED)

N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 15 of 83 3.6-10 FIGURE 3.6-10 JANUARY 1998 FEEDWATER SYSTEM POSTULATED PIPE RUPTURE LOCATIONS N/A N/A 3.6-11 FIGURE 3.6-11 JANUARY 1998 FEEDWATER SYTEM PIPE RUPTURE RESTRAINTS N/A N/A 3.6-11 NOTES TO FIGURE 3.6-11

[16]

DATA FOR PIPE RUPTURE RESTRAINTS - MAIN FEEDWATER SYSTEM N/A N/A 3.6-12 FIGURE 3.6-12 JANUARY 1998 REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING N/A N/A 3.6-12 NOTES TO FIGURE 3.6-12

[16])

DATA FOR PIPE RUPTURE RESTRAINTS - REACTOR COOLANT SYSTEM - PRIMARY COOLANT PIPING N/A N/A 3.6-13 FIGURE 3.6-13 JANUARY 1998 REACTOR COOLANT SYSTEM - LOW PRESSURE SAFETY INJECTION & RESIDUAL HEAT REMOVAL PIPING N/A N/A 3.6-13 NOTES TO FIGURE 3.6-13

[16]

DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM, LOW PRESSURE SAFETY INJECTION, HIGH PRESSURE SAFETY INJECTION, AND RESIDUAL HEAT REMOVAL PIPING N/A N/A 3.6-14 FIGURE 3.6-14 APRIL 1998 REACTOR COOLANT SYSTEM - PRESSURIZER CUBICLE PIPING N/A N/A 3.6-14 NOTES TO FIGURE 3.6-14

[16]

DATA FOR PIPE RUPTURE RESTRAINTS REACTOR COOLANT SYSTEM PRESSURIZER CUBICLE PIPING N/A N/A 3.6-15 FIGURE 3.6-15 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - CHARGING LINE PIPING N/A N/A 3.6-15 NOTES TO FIGURE 3.6-15

[16]

DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - NORMAL CHARGING N/A N/A 3.6-16 FIGURE 3.6-16 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - LETDOWN LINE PIPING N/A N/A 3.6-16 NOTES TO FIGURE 3.6-16

[16])

DATA FOR PIPE RUPTURE RESTRAINTS CHEMICAL VOLUME CONTROL SYSTEM - LETDOWN LINE N/A N/A 3.6-17 FIGURE 3.6-17 JANUARY 1998 CHEMICAL AND VOLUME CONTROL SYSTEM - SEAL WATER INJECTION PIPING N/A N/A 3.6-18 FIGURE 3.6-18 JANUARY 1998 STEAM GENERATOR BLOWDOWN SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 16 of 83 3.6-18 NOTES TO FIGURE 3.6-18

[16]

DATA FOR PIPE RUPTURE RESTRAINTS STEAM GENERATOR BLOWDOWN SYSTEM N/A N/A 3.6-19 FIGURE 3.6-19 NONE PIPE RUPTURE ANALYSIS FLOW CHART N/A N/A 3.6-20 FIGURE 3.6-20 NONE VARIATION OF STEADY STATE STEAM BLOWDOWN VERSUS FRICTION N/A N/A 3.6-21 FIGURE 3.6-21 NONE PIPE, RESTRAINT, INTERMEDIATE STRUCTURE SYSTEM MATHEMATICAL MODEL N/A N/A 3.6-22 FIGURE 3.6-22 NONE LAMINATED STRAP RESTRAINT FOR SMALL LINES N/A N/A 3.6-23 FIGURE 3.6-23 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT NODE 10 N/A N/A 3.6-24 FIGURE 3.6-24 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET SHEAR FORCE AT NODE 14 N/A N/A 3.6-25 FIGURE 3.6-25 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, NET MOMENT FORCE AT NODE 14 N/A N/A 3.6-26 FIGURE 3.6-26 NONE FORCE ACTING ON THE STRAP NODE 8 N/A N/A 3.6-27 FIGURE 3.6-27 NONE FEEDWATER SYSTEM SHORT LOOP STRAP NEAR THE STEAM GENERATOR, ENERGY N/A N/A 3.6-28 FIGURE 3.6-28 NONE ENERGY BALANCE ANALYSIS MODEL N/A N/A 3.6-29 FIGURE 3.6-29 NONE PIPE CRUSH BUMPER N/A N/A 3.6-30 FIGURE 3.6-30 NONE PIPE CRUSH BUMPER N/A N/A 3.6-31 FIGURE 3.6-31 NONE OMNI-DIRECTIONAL PIP RUPTURE RESTRAINT N/A N/A 3.6-32 FIGURE 3.6-32

[26]

AUXILIARY FEEDWATER SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 17 of 83 3.6-33 FIGURE 3.6-33 JANUARY 1998 REACTOR COOLANT SYSTEM SMALL BORE PIPING IN STEAM GENERATOR CUBICLES N/A N/A 3.7B-1 FIGURE 3.7B-1 NONE HORIZONTAL DESIGN RESPONSE SPECTRA 0.17 G SSE N/A N/A 3.7B-2 FIGURE 3.7B-2 NONE HORIZONTAL DESIGN RESPONSE SPECTRA 0.09 G OBE N/A N/A 3.7B-3 FIGURE 3.7B-3 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 0.5 PERCENT DAMPING VALUE N/A N/A 3.7B-4 FIGURE 3.7B-4 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 1.0 PERCENT DAMPING VALUE N/A N/A 3.7B-5 FIGURE 3.7B-5 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 2.0 PERCENT DAMPING VALUE N/A N/A 3.7B-6 FIGURE 3.7B-6 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 6.0 PERCENT DAMPING VALUE N/A N/A 3.7B-7 FIGURE 3.7B-7 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 7.0 PERCENT DAMPING VALUE N/A N/A 3.7B-8 FIGURE 3.7B-8 NONE HORIZONTAL TIME HISTORY RESPONSE SPECTRA 10 PERCENT DAMPING VALUE N/A N/A 3.7B-9 FIGURE 3.7B-9 NONE DYNAMIC MODEL OF THE CONTAINMENT STRUCTURE N/A N/A 3.7B-10 FIGURE 3.7B-10 NONE DYNAMIC MODEL OF THE MAIN STEAM VALVE BUILDING N/A N/A 3.7B-11 FIGURE 3.7B-11 NONE DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE N-S VIEW N/A N/A 3.7B-12 FIGURE 3.7B-12 NONE DYNAMIC MODEL OF THE EMERGENCY GENERATOR ENCLOSURE E-W VIEW N/A N/A 3.7B-13 FIGURE 3.7B-13 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-14 FIGURE 3.7B-14 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 18 of 83 3.7B-15 FIGURE 3.7B-15 NONE REACTOR CONTAINMENT MAT ELEVATION -37 FEET - 3 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-16 FIGURE 3.7B-16 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-17 FIGURE 3.7B-17 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-18 FIGURE 3.7B-18 NONE REACTOR CONTAINMENT STEAM GENERATORS SUPPORT SLAB ELEVATION 3 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-19 FIGURE 3.7B-19 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-20 FIGURE 3.7B-20 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-21 FIGURE 3.7B-21 NONE REACTOR CONTAINMENT TOP OF PRIMARY SHIELD WALL ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-22 FIGURE 3.7B-22 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-23 FIGURE 3.7B-23 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-24 FIGURE 3.7B-24 NONE REACTOR CONTAINMENT OPERATING FLOOR ELEVATION 50 FEET - 10 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-25 FIGURE 3.7B-25 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-26 FIGURE 3.7B-26 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-27 FIGURE 3.7B-27 NONE REACTOR CONTAINMENT TOP OF CRANE WALL ELEVATION 109 FEET - 1 INCH AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-28 FIGURE 3.7B-28 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-29 FIGURE 3.7B-29 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 19 of 83 3.7B-30 FIGURE 3.7B-30 NONE REACTOR CONTAINMENT SPRING LINE ELEVATION 104 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-31 FIGURE 3.7B-31 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-32 FIGURE 3.7B-32 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-33 FIGURE 3.7B-33 NONE REACTOR CONTAINMENT DOME APEX ELEVATION 163 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-34 FIGURE 3.7B-34 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-35 FIGURE 3.7B-35 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-36 FIGURE 3.7B-36 NONE MAIN STEAM VALVE BUILDING ELEVATION 9 FEET-0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-37 FIGURE 3.7B-37 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-38 FIGURE 3.7B-38 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-39 FIGURE 3.7B-39 NONE MAIN STEAM VALVE BUILDING FLOOR SLAB ELEVATION 41 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-40 FIGURE 3.7B-40 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-41 FIGURE 3.7B-41 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-42 FIGURE 3.7B-42 NONE MAIN STEAM VALVE BUILDING ROOF SLAB ELEVATION 85 FEET - 4 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-43 FIGURE 3.7B-43 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A 3.7B-44 FIGURE 3.7B-44 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET

- 0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 20 of 83 3.7B-45 FIGURE 3.7B-45 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -

0 INCHES FOR HORIZONTAL ACCELERATION N-S EXCITATION SSE N/A N/A 3.7B-46 FIGURE 3.7B-46 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-47 FIGURE 3.7B-47 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET

- 0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-48 FIGURE 3.7B-48 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -

0 INCHES FOR VERTICAL ACCELERATION VERTICAL EXCITATION SSE N/A N/A 3.7B-49 FIGURE 3.7B-49 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT BASE OF STRUCTURE ELEVATION 9 FEET - 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-50 FIGURE 3.7B-50 NONE EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT FLOOR SLAB ELEVATION 51 FEET

- 0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-51 FIGURE 3.7B-51 AMENDMENT 3 AUGUST 1983 EMERGENCY GENERATOR ENCLOSURE TRANSFER FUNCTION AT ROOF SLAB ELEVATION 66 FEET -

0 INCHES FOR HORIZONTAL ACCELERATION E-W EXCITATION SSE N/A N/A 3.7B-52 FIGURE 3.7B-52 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-53 FIGURE 3.7B-53 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-54 FIGURE 3.7B-54 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-55 FIGURE 3.7B-55 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-56 FIGURE 3.7B-56 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A 3.7B-57 FIGURE 3.7B-57 NONE EMERGENCY GENERATOR ENCLOSURE FLOOR SLAB ELEVATION 51 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-58 FIGURE 3.7B-58 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-59 FIGURE 3.7B-59 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA E-W EXCITATION SSE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 21 of 83 3.7B-60 FIGURE 3.7B-60 NONE EMERGENCY GENERATOR ENCLOSURE ROOF SLAB ELEVATION 66 FEET - 0 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-61 FIGURE 3.7B-61 NONE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA N-S EXCITATION SSE N/A N/A 3.7B-62 FIGURE 3.7B-62 NONE EMERGENCY GENERATOR ENCLOSURE DIESEL GENERATOR MAT ELEVATION 24 FEET - 6 INCHES AMPLIFIED RESPONSE SPECTRA VERTICAL EXCITATION SSE N/A N/A 3.7B-63 FIGURE 3.7B-63 NONE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BEDROCK N-S EXCITATION SSE N/A N/A 3.7B-64 FIGURE 3.7B-64 NONE EMERGENCY GENERATOR ENCLOSURE HORIZONTAL ACCELERATION TIME HISTORY AT BASE OF STRUCTURE N-S EXCITATION SSE N/A N/A 3.7B-65 FIGURE 3.7B-65 NONE TYPICAL MATHEMATICAL MODEL OF A PIPING SYSTEM N/A N/A 3.7B-66 FIGURE 3.7B-66 NONE REPRESENTATION OF FAMILY OF PEAK RESPONSE CURVES WITHIN BROADENED RESONANT PEAK N/A N/A 3.7B-67 FIGURE 3.7B-67 NONE HYPOTHETICAL VERSUS ACTUAL RESPONSE OF MULTIPLE MODES WITHIN BROADENED RESPONSE PEAK N/A N/A 3.7B-68 FIGURE 3.7B-68 NONE JUSTIFICATION OF STATIC LOAD FACTOR N/A N/A 3.7B-69 FIGURE 3.7B-69 NONE TYPICAL AMPLIFIED RESPONSE SPECTRA N/A N/A 3.7B-70 FIGURE 3.7B-70 NONE MODEL BEAMS N/A N/A 3.7B-71 FIGURE 3.7B-71 AMENDMENT 15 SEPTEMBER 1985 DAMPING VALUE FOR SEISMIC ANALYSIS OF PIPING N/A N/A 3.7N-1 FIGURE 3.7N-1 NONE MULTI-DEGREE OF FREEDOM SYSTEM N/A N/A 3.8-1 FIGURE 3.8-1 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL N/A N/A 3.8-2 FIGURE 3.8-2 NONE TYPICAL DETAIL OF DOME CYLINDER JUNCTION N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 22 of 83 3.8-3 FIGURE 3.8-3 NOVEMBER 1997 KNUCKLE PLATE N/A N/A 3.8-4 FIGURE 3.8-4 NONE MAT REINFORCEMENT WITH RADIAL SHEAR BAR ASSEMBLY N/A N/A 3.8-5 FIGURE 3.8-5 NONE REINFORCEMENT AROUND MAIN STEAM PENETRATIONS N/A N/A 3.8-6 FIGURE 3.8-6 NONE REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF PERSONNEL ACCESS LOCK N/A N/A 3.8-7 FIGURE 3.8-7 NONE REINFORCING DETAILS PERSONNEL ACCESS LOCK OPENING N/A N/A 3.8-8 FIGURE 3.8-8 NONE TYPICAL REINFORCING DETAILS SECTIONS THROUGH RING BEAM OF EQUIPMENT ACCESS HATCH N/A N/A 3.8-9 FIGURE 3.8-9 NONE REINFORCING DETAILS EQUIPMENT ACCESS HATCH OPENING N/A N/A 3.8-10 FIGURE 3.8-10 NONE BASE PLATE DETAILS CONTAINMENT ENCLOSURE STRUCTURE N/A N/A 3.8-11 FIGURE 3.8-11 NONE RING AT APEX OF CONTAINMENT STRUCTURE DOME N/A N/A 3.8-12 FIGURE 3.8-12 NONE ELEVATION DOME MAINTENANCE TRUSS N/A N/A 3.8-13 FIGURE 3.8-13 NONE LINER BUCKLE PLATE N/A N/A 3.8-14 FIGURE 3.8-14 NONE BASIC LINER DIMENSIONS N/A N/A 3.8-15 FIGURE 3.8-15 AMENDMENT 15 SEPTEMBER 1985 TYPICAL PIPING PENETRATIONS N/A N/A 3.8-16 FIGURE 3.8-16 AMENDMENT 15 SEPTEMBER 1985 TYPICAL SLEEVED PIPING PENETRATION N/A N/A 3.8-17 FIGURE 3.8-17 AMENDMENT 15 SEPTEMBER 1985 MULTIPLE PIPE PENETRATION ASSEMBLY N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 23 of 83 3.8-18 FIGURE 3.8-18 AMENDMENT 15 SEPTEMBER 1985 UNSLEEVED PIPING PENETRATION N/A N/A 3.8-19 FIGURE 3.8-19 AMENDMENT 15 SEPTEMBER 1985 ELECTRICAL PENETRATION N/A N/A 3.8-20 FIGURE 3.8-20 AMENDMENT 2 APRIL 1983 FUEL TRANSFER TUBE N/A N/A 3.8-21 FIGURE 3.8-21 NOVEMBER 1997 PERSONNEL HATCH N/A N/A 3.8-22 FIGURE 3.8-22 NOVEMBER 1997 EQUIPMENT HATCH N/A N/A 3.8-23 FIGURE 3.8-23 SH. 1 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A 1 OF 2 3.8-23 FIGURE 3.8-23 SH. 2 NOVEMBER 1997 CONTAINMENT STRUCTURE FOUNDATION DETAIL WITH RING GIRDER N/A 2 OF 2 3.8-24 FIGURE 3.8-24 SH. 1 NONE DETAIL OF RING GIRDER AT ESF BUILDING N/A 1 OF 3 3.8-24 FIGURE 3.8-24 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DETAIL OF RING GIRDER AT ESF BUILDING N/A 2 OF 3 3.8-24 FIGURE 3.8-24 SH. 3 NONE DETAIL OF RING GIRDER AT ESF BUILDING N/A 3 OF 3 3.8-25 FIGURE 3.8-25 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-26 FIGURE 3.8-26 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-27 FIGURE 3.8-27 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-28 FIGURE 3.8-28 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-29 FIGURE 3.8-29 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 24 of 83 3.8-30 FIGURE 3.8-30 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-31 FIGURE 3.8-31 NONE CONTAINMENT STRUCTURE MAT MOMENT AND SHEAR DIAGRAMS N/A N/A 3.8-32 FIGURE 3.8-32 NONE LOAD PLOT NOMENCLATURE N/A N/A 3.8-33 FIGURE 3.8-33 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-34 FIGURE 3.8-34 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-35 FIGURE 3.8-35 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-36 FIGURE 3.8-36 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-37 FIGURE 3.8-37 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-38 FIGURE 3.8-38 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-39 FIGURE 3.8-39 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-40 FIGURE 3.8-40 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-41 FIGURE 3.8-41 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-42 FIGURE 3.8-42 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-43 FIGURE 3.8-43 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-44 FIGURE 3.8-44 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 25 of 83 3.8-45 FIGURE 3.8-45 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-46 FIGURE 3.8-46 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-47 FIGURE 3.8-47 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-48 FIGURE 3.8-48 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-49 FIGURE 3.8-49 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-50 FIGURE 3.8-50 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-51 FIGURE 3.8-51 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-52 FIGURE 3.8-52 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-53 FIGURE 3.8-53 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-54 FIGURE 3.8-54 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-55 FIGURE 3.8-55 NONE CONTAINMENT STRUCTURE WALL AND DOME FORCE RESULTANTS N/A N/A 3.8-56 FIGURE 3.8-56 NONE DETAILS OF WALL DIAGONALS AT CONTAINMENT MAT N/A N/A 3.8-57 FIGURE 3.8-57 NOVEMBER 1997 DETAILS OF WATERPROOF MEMBRANE N/A (SHT 1 OF

2) (Part 1 OF 2) 3.8-57 FIGURE 3.8-57 NOVEMBER 1997 DETAILS OF WATERPROOF MEMBRANE N/A (SHT 1 OF
2) (Part 2 OF 2) 3.8-57 FIGURE 3.8-57 MARCH 2001 (00-42)

DETAILS OF WATERPROOF MEMBRANE N/A 2 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 26 of 83 3.8-58 FIGURE 3.8-58 SH. 1 NOVEMBER 1997 DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED)

N/A 1 OF 2 3.8-58 FIGURE 3.8-58 SH. 2 AMENDMENT 15 SEPTEMBER 1985 DISPLACEMENT PROFILE FOR CONTAINMENT SHELL UNDER PRESSURE TEST (PREDICTED)

N/A 2 OF 2 3.8-59 FIGURE 3.8-59

[28.1]

CONTAINMENT STUCTURE, PLAN VIEW N/A N/A 3.8-60 FIGURE 3.8-60 AMENDMENT 3 AUGUST 1983 CONTAINMENT STRUCTURE, ELEVATION VIEWS N/A N/A 3.8-61 FIGURE 3.8-61 NONE CONTAINMENT ENCLOSURE BUILDING N/A N/A 3.8-62 FIGURE 3.8-62 SH. 1

[28.1]

AUXILIARY BUILDING N/A 1 OF 10 3.8-62 FIGURE 3.8-62 SH. 2

[28.1]

AUXILIARY BUILDING N/A 2 OF 10 3.8-62 FIGURE 3.8-62 SH. 3

[28.1]

AUXILIARY BUILDING N/A 3 OF 10 3.8-62 FIGURE 3.8-62 SH. 4

[28.1]

AUXILIARY BUILDING N/A 4 OF 10 3.8-62 FIGURE 3.8-62 SH. 5

[28.1]

AUXILIARY BUILDING N/A 5 OF 10 3.8-62 FIGURE 3.8-62 SH. 6

[28.1]

AUXILIARY BUILDING N/A 6 OF 10 3.8-62 FIGURE 3.8-62 SH. 7

[28.1]

AUXILIARY BUILDING N/A 7 OF 10 3.8-62 FIGURE 3.8-62 SH. 8

[28.1]

AUXILIARY BUILDING N/A 8 OF 10 3.8-62 FIGURE 3.8-62 SH. 9

[28.1]

AUXILIARY BUILDING N/A 9 OF 10 3.8-62 FIGURE 3.8-62 SH. 10

[28.1]

AUXILIARY BUILDING N/A 10 OF 10 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7

MPS-3 FSAR Page 27 of 83 3.8-63 FIGURE 3.8-63 SH. 1

[28.1]

FUEL BUILDING N/A 1 OF 6 3.8-63 FIGURE 3.8-63 SH. 2

[28.1]

FUEL BUILDING N/A 2 OF 6 3.8-63 FIGURE 3.8-63 SH. 3

[28.1]

FUEL BUILDING N/A 3 OF 6 3.8-63 FIGURE 3.8-63 SH. 4

[28.1]

FUEL BUILDING N/A 4 OF 6 3.8-63 FIGURE 3.8-63 SH. 5

[28.1]

FUEL BUILDING N/A 5 OF 6 3.8-63 FIGURE 3.8-63 SH. 6 AMENDMENT 13 APRIL 1983 FUEL BUILDING N/A 6 OF 6 3.8-64 FIGURE 3.8-64 SH. 1

[28.1]

CONTROL BUILDING N/A 1 OF 4 3.8-64 FIGURE 3.8-64 SH. 2 NONE CONTROL BUILDING N/A 2 OF 4 3.8-64 FIGURE 3.8-64 SH. 3 DECEMBER 1997 CONTROL BUILDING N/A 3 OF 4 3.8-64 FIGURE 3.8-64 SH. 4 AMENDMENT 13 APRIL 1983 CONTROL BUILDING N/A 4 OF 4 3.8-65 FIGURE 3.8-65

[28.1]

CABLE TUNNEL N/A N/A 3.8-66 FIGURE 3.8-66 SH. 1

[28.1]

EMERGENCY GENERATOR ENCLOSURE N/A 1 OF 5 3.8-66 FIGURE 3.8-66 SH. 2

[28.1]

EMERGENCY GENERATOR ENCLOSURE N/A 2 OF 5 3.8-66 FIGURE 3.8-66 SH. 3 AMENDMENT 8 MAY 1984 EMERGENCY GENERATOR ENCLOSURE N/A 3 OF 5 3.8-66 FIGURE 3.8-66 SH. 4

[28.1]

EMERGENCY GENERATOR ENCLOSURE N/A 4 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7

MPS-3 FSAR Page 28 of 83 3.8-66 FIGURE 3.8-66 SH. 5 AMENDMENT 8 MAY 1984 EMERGENCY GENERATOR ENCLOSURE N/A 5 OF 5 3.8-66 NOTES TO FIGURE 3.8-66

[16]

EMERGENCY DIESEL GENERATOR - EQUIPMENT INDEX N/A 1 OF 2 3.8-67 FIGURE 3.8-67 SH. 1 MARCH 2001 (00-27)

ENGINEERED SAFETY FEATURES BUILDING N/A 1 OF 9 3.8-67 FIGURE 3.8-67 SH. 2

[28.1]

ENGINEERED SAFETY FEATURES BUILDING N/A 2 OF 9 3.8-67 FIGURE 3.8-67 SH. 3

[28.1]

ENGINEERED SAFETY FEATURES BUILDING N/A 3 OF 9 3.8-67 FIGURE 3.8-67 SH. 4

[28.1]

ENGINEERED SAFETY FEATURES BUILDING N/A 4 OF 9 3.8-67 FIGURE 3.8-67 SH. 5 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 5 OF 9 3.8-67 FIGURE 3.8-67 SH. 6 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 6 OF 9 3.8-67 FIGURE 3.8-67 SH. 7 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 7 OF 9 3.8-67 FIGURE 3.8-67 SH. 8 NONE ENGINEERED SAFETY FEATURES BUILDING N/A 8 OF 9 3.8-67 FIGURE 3.8-67 SH. 9 MARCH 2001 (00-27)

ENGINEERED SAFETY FEATURES BUILDING N/A 9 OF 9 3.8-68 FIGURE 3.8-68 SH. 1

[28.1]

MAIN STEAM VALVE BUILDING N/A 1 OF 4 3.8-68 FIGURE 3.8-68 SH. 2

[28.1]

MAIN STEAM VALVE BUILDING N/A 2 OF 4 3.8-68 FIGURE 3.8-68 SH. 3

[28.1]

MAIN STEAM VALVE BUILDING N/A 3 OF 4 3.8-68 FIGURE 3.8-68 SH. 4 NONE MAIN STEAM VALVE BUILDING N/A 4 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7

MPS-3 FSAR Page 29 of 83 3.8-69 FIGURE 3.8-69 SH. 1 OCTOBER 1997 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 1 OF 4 3.8-69 FIGURE 3.8-69 SH. 2 SEPTEMBER 1995 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 2 OF 4 3.8-69 FIGURE 3.8-69 SH. 3 NONE CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 3 OF 4 3.8-69 FIGURE 3.8-69 SH. 4 AMENDMENT 15 SEPTEMBER 1985 CIRCULATING AND SERVICE WATER PUMPHOUSE N/A 4 OF 4 3.8-70 FIGURE 3.8-70 SH. 1

[28.1]

RECOMBINER BUILDING N/A 1 OF 4 3.8-70 FIGURE 3.8-70 SH. 2 NONE RECOMBINER BUILDING N/A 2 OF 4 3.8-70 FIGURE 3.8-70 SH. 3 NONE RECOMBINER BUILDING N/A 3 OF 4 3.8-70 FIGURE 3.8-70 SH. 4

[28.1]

RECOMBINER BUILDING N/A 4 OF 4 3.8-71 FIGURE 3.8-71 NONE CIRCULATING DISCHARGE STRUCTURE AND TUNNEL N/A N/A 3.8-72 FIGURE 3.8-72 SH. 1

[28.1]

SERVICE BUILDING PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 4 3.8-72 FIGURE 3.8-72 SH. 2

[28.1]

SERVICE BUILDING PLAN ELEVATION 24 FEET - 6 INCHES N/A 2 OF 4 3.8-72 FIGURE 3.8-72 SH. 3 NONE SERVICE BUILDING PLAN ELEVATION 38 FEET - 6 INCHES N/A 3 OF 4 3.8-72 FIGURE 3.8-72 SH. 4

[28.1]

SERVICE BUILDING PLAN ELEVATION 49 FEET - 6 INCHES & 52 FEET - 6 INCHES N/A 4 OF 4 3.8-73 FIGURE 3.8-73 SH. 1

[28.1]

TURBINE BUILDING PLAN OPERATING FLOOR ELEVATION 64 FEET - 6 INCHES N/A 1 OF 5 3.8-73 FIGURE 3.8-73 SH. 2

[28.1]

TURBINE BUILDING BASEMENT ELEVATION 14 FEET - 6 INCHES N/A 2 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7

MPS-3 FSAR Page 30 of 83 3.8-73 FIGURE 3.8-73 SH. 3

[28.1]

TURBINE BUILDING PLAN - MEZZANINE ELEVATION 38 FEET - 6 INCHES N/A 3 OF 5 3.8-73 FIGURE 3.8-73 SH. 4

[28.1]

TURBINE BUILDING 2-2 N/A 4 OF 5 3.8-73 FIGURE 3.8-73 SH. 5 AMENDMENT 3 AUGUST 1983 TURBINE BUILDING 5-5 N/A 5 OF 5 3.8-74 FIGURE 3.8-74 SH. 1

[28.1]

SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 7 3.8-74 FIGURE 3.8-74 SH. 2

[28.1]

SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 24 FEET - 6 INCHES N/A 2 OF 7 3.8-74 FIGURE 3.8-74 SH. 3 AUGUST 1996 SOLID AND LIQUID WASTE DISPOSAL BUILDING PLAN ELEVATION 43 FEET - 6 INCHES N/A 3 OF 7 3.8-74 FIGURE 3.8-74 SH. 4 AMENDMENT 3 AUGUST 1983 SOLID AND LIQUID WASTE DISPOSAL BUILDING 1-1 N/A 4 OF 7 3.8-74 FIGURE 3.8-74 SH. 5

[28.1]

SOLID AND LIQUID WASTE DISPOSAL BUILDING 2-2 N/A 5 OF 7 3.8-74 FIGURE 3.8-74 SH. 6

[28.1]

SOLID AND LIQUID WASTE DISPOSAL BUILDING 4-4 N/A 6 OF 7 3.8-74 FIGURE 3.8-74 SH. 7

[28.1]

SOLID AND LIQUID WASTE DISPOSAL BUILDING 7-7 N/A 7 OF 7 3.8-75 FIGURE 3.8-75 SH. 1 AMENDMENT 3 AUGUST 1983 WAREHOUSE NO. 5 PLAN ELEVATION 4 FEET - 6 INCHES N/A 1 OF 12 3.8-75 FIGURE 3.8-75 SH. 2

[28.1]

WAREHOUSE NO. 5 PLAN ELEVATION 28 FEET - 6 INCHES N/A 2 OF 12 3.8-75 FIGURE 3.8-75 SH. 3

[28.1]

WAREHOUSE NO. 5 1-1 N/A 3 OF 12 3.8-75 FIGURE 3.8-75 SH. 4

[28.1]

WAREHOUSE NO. 5 2-2 N/A 4 OF 12 3.8-75 FIGURE 3.8-75 SH. 5

[28.1]

WAREHOUSE NO. 5 3-3 N/A 5 OF 12 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7 15-7

MPS-3 FSAR Page 31 of 83 3.8-75 FIGURE 3.8-75 SH. 6

[28.1]

WAREHOUSE NO. 5 4-4 N/A 6 OF 12 3.8-75 FIGURE 3.8-75 SH. 7 NONE WAREHOUSE NO. 5 5-5 N/A 7 OF 12 3.8-75 FIGURE 3.8-75 SH. 8 NONE WAREHOUSE NO. 5 6-6 N/A 8 OF 12 3.8-75 FIGURE 3.8-75 SH. 9

[28.1]

NONE N/A 9 OF 12 3.8-75 FIGURE 3.8-75 SH. 10 NONE WAREHOUSE NO. 5 8-8 N/A 10 OF 12 3.8-75 FIGURE 3.8-75 SH. 11 NONE WAREHOUSE NO. 5 9-9 N/A 11 OF 12 3.8-75 FIGURE 3.8-75 SH. 12

[28.1]

NONE N/A 12 OF 12 3.8-76 FIGURE 3.8-76 SH. 1 NONE AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 25 FEET - 0 INCHES N/A 1 OF 5 3.8-76 FIGURE 3.8-76 SH. 2 NONE AUXILIARY BOILER ENCLOSURE PLAN ELEVATION 40 FEET - 6 INCHES N/A 2 OF 5 3.8-76 FIGURE 3.8-76 SH. 3 NONE AUXILIARY BOILER ENCLOSURE 1-1 N/A 3 OF 5 3.8-76 FIGURE 3.8-76 SH. 4 NONE AUXILIARY BOILER ENCLOSURE 2-2 N/A 4 OF 5 3.8-76 FIGURE 3.8-76 SH. 5 NONE AUXILIARY BOILER ENCLOSURE 3-3 N/A 5 OF 5 3.8-77 FIGURE 3.8-77 DECEMBER 1997 ARRANGEMENT OF HORIZONTAL SHEAR KEYS N/A N/A 3.8-78 FIGURE 3.8-78 NONE TYPICAL SHEAR KEY DETAIL N/A N/A 3.8-79 FIGURE 3.8-79 AMENDMENT 2 APRIL 1983 FUEL POOL TEMPERATURE TRANSIENTS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET 15-7 15-7 15-7

MPS-3 FSAR Page 32 of 83 3.8-80 FIGURE 3.8-80 AMENDMENT 2 APRIL 1983 FUEL POOL - FUEL BUILDING TEMPERATURE CONDITIONS N/A N/A 3.8-81 FIGURE 3.8-81 JUNE 1992 FUEL POOL TEMPERATURE TRANSIENTS - FOR HIGHER ENRICHMENT FUEL N/A N/A 3.8-82 FIGURE 3.8-82 SEPTEMBER 2000 FUEL POOL TEMPERATURE TRANSIENTS - FULL CORE OFFLOAD N/A N/A 3.8-83 FIGURE 3.8-83 MARCH 2001 (00-50)

MILLSTONE STACK ELEVATIONS AND SECTIONS N/A N/A 3.8-84 FIGURE 3.8-84 MARCH 2001 (00-50)

MILLSTONE STACK - MATHEMATICAL MODEL N/A N/A 3.9.B-1 FIGURE 3.9.B-1 NONE REACTOR COOLANT PPG.

N/A N/A 3.9.B-2 FIGURE 3.9.B-2 NONE DYNAMIC MODEL - TYPICAL RCS LOOP N/A N/A 3.9.B-3 FIGURE 3.9.B-3 NONE DYNAMIC MODEL - CENTER SECTION N/A N/A 3.9.B-4 FIGURE 3.9.B-4 NONE X2 VIEW - ROTATED AXIS N/A N/A 3.9.B-5 FIGURE 3.9.B-5 NONE SNUBBER ORIENTATION N/A N/A 3.9N-1 FIGURE 3.9N-1

[21.3]

REACTOR PRESSURE VESSEL AND INTERNALS SYSTEM MODEL N/A N/A 3.9N-2 FIGURE 3.9N-2

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-039 N/A N/A 3.9N-3 FIGURE 3.9N-3 NONE RPV SUPPORT MODEL FOR WESTINGHOUSE INTERNALS RESPONSE ANALYSIS N/A N/A 3.9N-4 FIGURE 3.9N-4 DECEMBER 1997 CONTROL ROD DRIVE MECHANISM N/A N/A 3.9N-5 FIGURE 3.9N-5 NONE CONTROL ROD DRIVE MECHANISM SCHEMATIC N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 33 of 83 3.9N-6 FIGURE 3.9N-6 NONE NOMINAL LATCH CLEARANCE AT MINIMUM AND MAXIMUM CLEARANCE N/A N/A 3.9N-7 FIGURE 3.9N-7 DECEMBER 1997 CONTROL ROD DRIVE MECHANISM SCHEMATIC LATCH CLEARANCE THERMAL EFFECT N/A N/A 3.9N-8 FIGURE 3.9N-8 NONE LOWER CORE SUPPORT ASSEMBLY (CORE BARREL ASSEMBLY)

N/A N/A 3.9N-9 FIGURE 3.9N-9 NONE UPPER CORE SUPPORT ASSEMBLY N/A N/A 3.9N-10 FIGURE 3.9N-10 NONE PLAN VIEW OF UPPER CORE SUPPORT ASSEMBLY N/A N/A 3.9N-11 FIGURE 3.9N-11 JANUARY 1991 NEUTRON SHIELD PANEL DESIGN N/A N/A 3.9N-12 FIGURE 3.9N-12 JANUARY 1991 NEUTRON SHIELD PANEL DESIGN DETAILS N/A N/A 3A.1.2-1 FIGURE 3A.1.2-1 NONE ONE HUNDRED ELEMENT IDEALIZATION OF THIN WALL CYLINDER N/A N/A 3A.1.4-1 FIGURE 3A.1.4-1 NONE ELEMENT PLOT N/A N/A 3A.1.4-2 FIGURE 3A.1.4-2 NONE HARMONIC AXISYMMETRIC PLAIN STRAIN N/A N/A 3A.1.5-1 FIGURE 3A.1.5-1 NONE TAC2D SAMPLE PROBLEM THERMAL MODEL N/A N/A 3A.1.5-2 FIGURE 3A.1.5-2 NONE TRANSIENT TEMPERATURES IN A RIGHT CIRCULAR CYLINDER COMPARISON OF TAC2D RESULTS WITH SERIES SOLUTION N/A N/A 3A.1.6-1 FIGURE 3A.1.6-1 NONE STRUCTURAL MODEL N/A N/A 3A.1.7-1 FIGURE 3A.1.7.-1 NONE FINITE ELEMENT GRID FOR PLAXLY-FLUSH COMPARISON N/A N/A 3A.1.7-2 FIGURE 3A.1.7.-2 NONE HORIZONTAL AMPLIFIED RESPONSE SPECTRA AT TOP MASS IN BEAM STRUCTURE N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 34 of 83 3A.2.3-1 FIGURE 3A.2.3-1 NONE TARGET FOR LOW TRAJECTORY MISSILE N/A N/A 3A.2.11-1 FIGURE 3A.2.11-1 NONE CANTILEVER PIPE USED IN MIT EXPERIMENT N/A N/A 3A.3-1 FIGURE 3A.3-1 NONE MATHEMATICAL MODEL FOR FLEXIBILITY ANALYSIS VERIFICATION N/A N/A 3A.3-2 FIGURE 3A.3-2 NONE NUPIPE PROGRAM FORCE TIME - HISTORY VERIFICATION N/A N/A 3A.3-3 FIGURE 3A.3-3 NONE MATHEMATICAL MODEL FOR CLASS I STRESS VERIFICATION N/A N/A 3A.3-4 FIGURE 3A.3-4 NONE TEST PROBLEM - SAVAL N/A N/A 3A.3-5 FIGURE 3A.3-5 NONE SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A N/A 3A.3-6 FIGURE 3A.3-6 NONE SUDDEN DISCHARGE OF A GAS FROM A PIPE LINE THROUGH A NOZZLE N/A N/A 3A.3-7 FIGURE 3A.3-7 NONE COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END N/A N/A 3A.3-8 FIGURE 3A.3-8 NONE COMPARISON OF PRESSURE RESPONSE AT THE CLSOSED END N/A N/A 3A.3-9 FIGURE 3A.3-9 NONE COMPARISON OF PRESSURE RESPONSES BY STEHAM & EXPERIMENT N/A N/A 3A.3-10 FIGURE 3A.3-10 NONE HYDRAULIC NETWORK FOR VERIFICATION PROBLELM N/A N/A 3A.3-11 FIGURE 3A.3-11 NONE HYDRAULIC NETWORK FO R WATHAM VERIFICATION N/A N/A 3A.3-12 FIGURE 3A.3-12 NONE HEAD - VERSUS - TIME PLOT FOR JUNCTION J N/A N/A 3A.3-13 FIGURE 3A.3-13 NONE HEAD - VERSUS - TIME PLOT AT VALVE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 35 of 83 3A.3-14 FIGURE 3A.3-14 NOVEMBER 1987 DESIGN INPUT TO A PROBLEM N/A N/A 3A.3-15 FIGURE 3A.3-15 NOVEMBER 1987 PIPE 1 SEGMENT 1 FORCE - TIME HISTORY N/A N/A 4.2-1 FIGURE 4.2-1 JUNE 1999 FUEL ASSEMBLY CROSS SECTION 17 X 17 N/A N/A 4.2-2 FIGURE 4.2-2 JANUARY 1998 COMPARISON OF THE 17X17 V5H FUEL ASSEMBLY AND THE 17X17 STANDARD FUEL ASSEMBLY N/A N/A 4.2-3 FIGURE 4.2-3 JANUARY 1998 17X17 VANTAGE 5-H FUEL ROD ASSEMBLY N/A N/A 4.2-4 FIGURE 4.2-4 JUNE 1994 V5H FUEL ASSEMBLY PLAN VIEW N/A N/A 4.2-5 FIGURE 4.2-5 OCTOBER 1997 GRID TO THIMBLE ATTACHMENT JOINTS N/A N/A 4.2-6 FIGURE 4.2-6 JUNE 1992 THIMBLE/INSERT/TOP GRID SLEEVE BULGE JOINT GEOMETRY N/A N/A 4.2-7 FIGURE 4.2-7 JANUARY 1998 GUIDE THIMBLE TO BOTTOM NOZZLE JOINT N/A N/A 4.2-8 FIGURE 4.2-8 JANUARY 1998 ROD CLUSTER CONTROL AND DRIVE ROD ASSEMBLY WITH INTERFACING COMPONENTS N/A N/A 4.2-9 FIGURE 4.2-9

[21.3]

DELETED BY CHANGE PKG FSC 08-MP3-027 N/A N/A 4.2-9A FIGURE 4.2-9A

[21.3]

FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY (WESTINGHOUSE)

N/A N/A 4.2-9B FIGURE 4.2-9B

[21.3]

FULL LENGTH ROD CLUSTER CONTROL ASSEMBLY AND ABSORBER ROD (AREVA)

N/A N/A 4.2-10 FIGURE 4.2-10

[21.3]

ABSORBER ROD (WESTINGHOUSE)

N/A N/A 4.2-11 FIGURE 4.2-11 OCTOBER 1997 BURNABLE ABSORBER ASSEMBLY N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 36 of 83 4.2-13 FIGURE 4.2-13 JANUARY 1998 PRIMARY SOURCE ASSEMBLY N/A N/A 4.2-14A FIGURE 4.2-14A JANUARY 1998 SINGLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY N/A N/A 4.2-14B FIGURE 4.2-14B JANUARY 1998 DOUBLE ENCAPSULATED SECONDARY SOURCE ASSEMBLY N/A N/A 4.2-15 FIGURE 4.2-15 JANUARY 1998 THIMBLE PLUG ASSEMBLY N/A N/A 4.3-1 FIGURE 4.3-1 JUNE 1992 FUEL LOADING ARRANGEMENT N/A N/A 4.3-2 FIGURE 4.3-2 SEPTEMBER 1997 TYPICAL PRODUCTION AND CONSUMPTION OF HIGHER ISOTOPES N/A N/A 4.3-3 FIGURE 4.3-3 SEPTEMBER 1997 TYPICAL BORON CONCENTRATION VERSUS FIRST CYCLE BURNUP WITH AND WITHOUT BURNABLE ABSORBER RODS N/A N/A 4.3-4 FIGURE 4.3-4 SEPTEMBER 1997 TYPICAL INTEGRAL FUEL BURNABLE ABSORBER ROD ARRANGEMENT WITHIN AN ASSEMBLY N/A N/A 4.3-5 FIGURE 4.3-5 JUNE 1992 BURNABLE ABSORBER ASSEMBLY LOADING PATTERN (TYPICAL)

N/A N/A 4.3-5A FIGURE 4.3-5A

[15]

INTEGRAL FUEL BURNABLE ABSORBER AND SOURCE ROD LOCATIONS (TYPICAL)

N/A N/A 4.3-17 FIGURE 4.3-17 NONE COMPARISON OF A TYPICAL ASSEMBLY AXIAL POWER DISTRIBUTIN WITH CORE AVERAGE AXIAL DISTRIBUTION BANK D SLIGHTY INSERTED N/A N/A 4.3-21 FIGURE 4.3-21

[17.2]

TYPICAL MAXIMUM NORMALIZED Fq X POWER VERSUS AXIAL HEIGHT N/A N/A 4.3-24 FIGURE 4.3-24 SEPTEMBER 1997 TYPICAL COMPARISON BETWEEN CALCULATED AND MEASURED RELATIVE FUEL ASSEMBLY POWER DISTRIBUTION N/A N/A 4.3-25 FIGURE 4.3-25 NONE COMPARISON OF TYPICAL CALCULATED AND MEASURED AXIAL SHAPES N/A N/A 4.3-26 FIGURE 4.3-26 SEPTEMBER 1997 TYPICAL MEASURED VALUES OF Fq FOR FULL POWER TOD CONFIGURATIONS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 37 of 83 4.3-27 FIGURE 4.3-27 NONE TYPICAL DOPPLER TEMPERATURE COEFFICIENT AT BEGINNING OF LIFE AND END-OF-LIFE, CYCLE I

N/A N/A 4.3-28 FIGURE 4.3-28 NONE TYPICAL DOPPLER - ONLY POWER COEFFICIENT AT BOL AND EOL, CYCLE I N/A N/A 4.3-29 FIGURE 4.3-29 NONE TYPICAL DOPPLER - ONLY POWER DEFECT AT BOL AND EOL, CYCLE I N/A N/A 4.3-30 FIGURE 4.3-30 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT BOL, CYCLE I, NO RODS N/A N/A 4.3-31 FIGURE 4.3-31 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AT EOL, CYCLE I N/A N/A 4.3-32 FIGURE 4.3-32 NONE TYPICAL MODERATOR TEMPERATURE COEFFICIENT AS A FUNCTION OF BORON CONCENTRATION AT BOL, CYCLE I, NO RODS N/A N/A 4.3-33 FIGURE 4.3-33 NONE TYPICAL HOT FULL POWER TEMPERATURE COEFFICIENT DURING CYCLE I FOR THE CRITICAL BORON CONCENTRATION N/A N/A 4.3-34 FIGURE 4.3-34 NONE TYPICAL TOTAL POWER COEFFICIENT AT BOL AND EOL, CYCLE I N/A N/A 4.3-35 FIGURE 4.3-35 NONE TYPICAL TOTAL POWER DEFECT AT BOL AND EOL, CYCLE I N/A N/A 4.3-36 FIGURE 4.3-36 NONE ROD CLUSTER CONTROL ASSEMBLY PATTERN N/A N/A 4.3-37 FIGURE 4.3-37 NONE TYPICAL ACCIDENTAL SIMULTANEOUS WITHDRAWAL OF TWO CONTROL BANKS AT EOL, HZP, BANK D AND B MOVING IN THE SAME PLANE N/A N/A 4.3-38 FIGURE 4.3-38 JUNE 1992 DESIGN TRIP CURVE (TYPICAL)

N/A N/A 4.3-39 FIGURE 4.3-39 NONE TYPICAL NORMALIZED ROD WORTH VERSUS PERCENT INSERTION, ALL RODS OUT BUT ONE N/A N/A 4.3-40 FIGURE 4.3-40 SEPTEMBER 1997 TYPICAL AXIAL OFFSET VERSUS TIME, PWR CORE WITH A 12 FOOT HEIGHT AND 121 ASSEMBLIES N/A N/A 4.3-41 FIGURE 4.3-41 SEPTEMBER 1997 TYPICAL X-Y XENON TEST TERMOCOUPLE RESPONSE QUANDRANT TILT DIFFERENCE VERSUS TIME N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 38 of 83 4.3-42 FIGURE 4.3-42 SEPTEMBER 1997 TYPICAL CALCULATED AND MEASURED DOPPLER DEFECT AND CKOEEFICIENTS AT BOL, 2 - LOOP PLANT, 121 ASSEMBLIES, 12 FOOT CORE N/A N/A 4.4-1 FIGURE 4.4-1

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-040 N/A N/A 4.4-2 FIGURE 4.4-2 NONE TDC VERSUS REYNOLDS NUMBER FOR 26 INCH GRID SPACING N/A N/A 4.4-3 FIGURE 4.4-3

[21.3]

TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 4 FOOT ELEVATION N/A N/A 4.4-4 FIGURE 4.4-4

[21.3]

TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 8 FOOT ELEVATION N/A N/A 4.4-5 FIGURE 4.4-5

[21.3]

TYPICAL NORMALIZED RADIAL FLOW AND ENTHALPY DISTRIBUTION AT 12 FOOT ELEVATION N/A N/A 4.4-6 FIGURE 4.4-6

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-040 N/A N/A 4.4-7 FIGURE 4.4-7 NONE THERMAL CONDUCTIVITY OF UO2 (DATA CORRECTED TO 95% THEORETICAL DENSITY)

N/A N/A 4.4-8 FIGURE 4.4-8

[21.3]

REACTOR COOLANT SYSTEM TEMPERATURE - PERCENT POWER MAP N/A N/A 4.4-10 FIGURE 4.4-10 MARCH 2001 DISTRIBUTION OF INCORE INSTRUMENTATION N/A N/A 4.4-11 FIGURE 4.4-11 AMENDMENT 9 JULY 1984 ICC FUNCTIONAL BLOCK DIAGRAM (TRAIN A - TRAIN B SIMILAR)

N/A N/A 4.4-12 FIGURE 4.4-12 NOVEMBER 1987 TYPICAL REACTOR COOLANT PARAMETERS FOLLOWING SMALL BREAK LOCA N/A N/A 4.4-13 FIGURE 4.4-13 SEPTEMBER 1997 HJTCS FUNCTIONAL CONFIGURATION N/A N/A 4.4-14 FIGURE 4.4-14 NOVEMBER 1987 TYPICAL PROBE/SENSOR CONFIGURATION N/A N/A 4.4-15 FIGURE 4.4-15 NOVEMBER 1987 HJTC SENSOR - HJYC/SPLASH SHIELD N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 39 of 83 4.4-16 FIGURE 4.4-16 APRIL 1994 ELECTRICAL DIAGRAM OF HJTC N/A N/A 4.4-17 FIGURE 4.4-17 SEPTEMBER 1997 TYPICAL CONFIGURATION (ONE CHANNEL)

N/A N/A 4.4-18 FIGURE 4.4-18 NOVEMBER 1987 HEATED JUNCTION THERMOCOUPLE PROBE ASSEMBLY N/A N/A 4.4-19 FIGURE 4.4-19 NOVEMBER 1987 HJTC PROBE HOLDER SUPPORT TUBE INSTALLATION N/A N/A 4.4-20 FIGURE 4.4-20 NOVEMBER 1987 HJTC PROBE PRESSURE BOUNDARY INSTALLATION N/A N/A 4.4-21 FIGURE 4.4-21 NOVEMBER 1987 PROBE HANDLING HARDWARE CONFIGURATION N/A N/A 5.1-1 FIGURE 5.1-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 1 5.1-1 FIGURE 5.1-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 2 5.1-1 FIGURE 5.1-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 3 5.1-1 FIGURE 5.1-1 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 4 5.1-1 FIGURE 5.1-1 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 5 5.1-1 FIGURE 5.1-1 SH. 6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT SYSTEM 25212-26902 (a) SH 6 5.1-2 FIGURE 5.1-2 NOVEMBER 1987 REACTOR COOLANT SYSTEM PROCESS FLOW DESIGN N/A N/A 5.1-2 NOTES TO FIGURE 5.1-2 JULY 1997 MODE A STEADY STATE FULL POWER OPERATION N/A N/A 5.2-1 FIGURE 5.2-1 SEPTEMBER 1997 REACTOR VESSEL INSPECTION AREA N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 40 of 83 5.2-2 FIGURE 5.2-2 SEPTEMBER 1997 MODEL F STEAM GENERATOR INSPECTION AREA N/A N/A 5.2-3 FIGURE 5.2-3 DECEMBER 1997 PRESSURIZER INSPECTION AREAS N/A N/A 5.3-1 FIGURE 5.3-1 NONE IDENTIFICATION AND LOCATON OF BELTLINE REGION MATERIAL FOR THE REACTOR VESSEL N/A N/A 5.3-2 FIGURE 5.3-2 JUNE 1997 REACTOR VESSEL INSPECTION AREA N/A N/A 5.4-1 FIGURE 5.4-1 NONE REACTOR COOLANT PUMP N/A N/A 5.4-2 FIGURE 5.4-2 NONE REACTOR COOLANT PUMP ESTIMATED PERFORMANCE CHARACTERISTICS N/A N/A 5.4-3 FIGURE 5.4-3 NONE MODEL F STEAM GENERATOR N/A N/A 5.4-4 FIGURE 5.4-4 NONE QUATREFOIL TUBE SUPPORT PLATES N/A N/A 5.4-5 FIGURE 5.4-5 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 1 OF 3 5.4-5 FIGURE 5.4-5 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 2 OF 3 5.4-5 FIGURE 5.4-5 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT RECIRCULATION 25212-26912 (a) SH 3 OF 3 5.4-6 FIGURE 5.4-6 MAY 1998 RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM (MODE A)

N/A N/A 5.4-6 NOTES TO FIGURE 5.4-6

[21.3]

MODE A INITIATION OF RESIDUAL HEAT REMOVAL SYSTEM OPERATION N/A N/A 5.4-7 FIGURE 5.4-7 NONE PRESSURIZER RELIEF TANK N/A N/A 5.4-8 FIGURE 5.4-8 NONE PRESSURIZER N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 41 of 83 5.4-9 FIGURE 5.4-9 NONE RPV SUPPORT SYSTEM N/A N/A 5.4-10 FIGURE 5.4-10 NONE LEVELING DEVICE (TYPICAL) RPV SUPPORT SYSTEM N/A N/A 5.4-11 FIGURE 5.4-11 NONE VERTICAL SUPPORTS (TYPICAL) REACTOR COOLANT PUMPS AND STEAM GENERATOR N/A N/A 5.4-12 FIGURE 5.4-12 NONE LATERAL SUPPORT (TYPICAL) STEAM GENERATOR N/A N/A 5.4-13 FIGURE 5.4-13 NONE LATERAL SUPPORT (TYPICAL) REACTOR COOLANT PUMP N/A N/A 5.4-14 FIGURE 5.4-14 NONE PRESSURIZER SUPPORT N/A 1 OF 2 5.4-14 FIGURE 5.4-14 NONE PRESSURIZER SUPPORT N/A 2 OF 2 5.4-15 FIGURE 5.4-15 NONE PRESSURIZER SAFETY VALVE SUPPORT SYSTEM N/A 1 OF 2 5.4-15 FIGURE 5.4-15 NONE PRESSURIZER SAFETY VALVE SUPPORT SYSTEM N/A 2 OF 2 6.0-1 FIGURE 6.0-1 OCTOBER 1997 ENGINEERED SAFETY FEATURES N/A N/A 6.2-1 FIGURE 6.2-1

[27.2]

CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)

N/A N/A 6.2-2 FIGURE 6.2-2

[21.3]

CONTAINMENT PRESSURE RESPONSE - LOCA (BREAK LOCATION)

N/A N/A 6.2-3 FIGURE 6.2-3

[21.3]

CONTAINMENT VAPOR TEMPERATURE RESPONSE - LOCA N/A N/A 6.2-4 FIGURE 6.2-4

[21.3]

CONTAINMENT LINER TEMPERATURE RESPONSE - LOCA N/A N/A 6.2-5 FIGURE 6.2-5

[21.3]

CONTAINMENT DEPRESSURIZATION RESPONSE - LOCA N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 42 of 83 6.2-6 FIGURE 6.2-6

[21.3]

CONTAINMENT SUMP TEMPERATURE RESPONSE N/A N/A 6.2-7 FIGURE 6.2-7

[21.3]

CONTAINMENT PRESSURE FROM 1.4 FT2 MLSB AT 0% POWER, NO ENTRAINMENT - LIMITING PEAK PRESSURE CASE N/A N/A 6.2-8 FIGURE 6.2-8

[21.3]

CONTAINMENT TEMPERATURE FROM 1.4 ft2 MLSB AT 102% POWER, NO ENTRAINMENT - LIMITING PEAK TEMPERATURE CASE N/A N/A 6.2-9 FIGURE 6.2-9

[21.3]

CONTAINMENT LINER TEMPERATURE FROM 1.4 FT 2 AT 0%POWER, NO ENTRAINMENT - PEAK TEMPERATURE CASE N/A N/A 6.2-10 FIGURE 6.2-10

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-11 FIGURE 6.2-11

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-12 FIGURE 6.2-12

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-13 FIGURE 6.2-13

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-14 FIGURE 6.2-14

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-15 FIGURE 6.2-15

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-16 FIGURE 6.2-16

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-17 FIGURE 6.2-17 AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT ELEVATION VIEW WITH NODAL ARRANGEMENT N/A N/A 6.2-18 FIGURE 6.2-18 AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 95 FEET - 3 INCHES N/A N/A 6.2-18A FIGURE 6.2-18A AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 74 FEET - 2 INCHES N/A N/A 6.2-18B FIGURE 6.2-18B AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 51 FEET - 3 INCHES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 43 of 83 6.2-18C FIGURE 6.2-18C AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 25 FEET - 7 INCHES N/A N/A 6.2-18D FIGURE 6.2-18D AMENDMENT 11 NOVEMBER 1984 PLAN VIEW FOR THE PRESSURIZER SUBCOMPARTMENT ELEVATION 12 FEET - 5 INCHES N/A N/A 6.2-19 FIGURE 6.2-19

[22]

STEAM GENERATOR SUBCOMPARTMENT ELEVATION WITH NONDAL ARRANGEMENT N/A N/A 6.2-20 FIGURE 6.2-20

[22]

PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 3 FEET - 8 INCHES N/A N/A 6.2-21 FIGURE 6.2-21

[22]

PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 28 FEET - 6 INCHES N/A N/A 6.2-22 FIGURE 6.2-22

[22]

PLAN VIEW FOR THE STEAM GENERATOR SUBCOMPARTMENT ELEVATION 51 FEET - 4 INCHES N/A N/A 6.2-23 FIGURE 6.2-23 DECEMBER 1997 UPPER REACTOR CAVITY SUBCOMPARTMENT PLAN ELEVATION AND NODAL ARRANGEMENT N/A N/A 6.2-24 FIGURE 6.2-24 AMENDMENT 11 NOVEMBER 1984 PRESSURIZER SUBCOMPARTMENT NODALIZATION DIAGRAM N/A N/A 6.2-25 FIGURE 6.2-25

[22]

STEAM GENERATOR SUBCOMPARTMENT NODALIZATION DIAGRAM N/A N/A 6.2-26 FIGURE 6.2-26 DECEMBER 1997 STAGGERED MESH APPROXIMATION FOR NODES AND INTERNAL JUNCTIONS N/A N/A 6.2-27 FIGURE 6.2-27 NONE GENERAL FLOW CHART FOR THREED N/A N/A 6.2-28 FIGURE 6.2-28 AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-28A FIGURE 6.2-28A AMENDMENT 11 NOVEMBER 1984 PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29 FIGURE 6.2-29

[22]

PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29A FIGURE 6.29A

[22]

PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 44 of 83 6.2-29B FIGURE 6.2-29B

[22]

PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29C FIGURE 6.2-29C

[22]

PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-29D FIGURE 6.2-29D

[22]

PRESSURE RESPONSE PRESSURIZER CUBICLE N/A N/A 6.2-30 FIGURE 6.2-30

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-31 FIGURE 6.2-31

[22]

PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-32 FIGURE 6.2-32

[22]

PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-33 FIGURE 6.2-33

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34 FIGURE 6.2-34

[22]

PRESSURE RESPONSE STEAM GENERATOR CUBICLE N/A N/A 6.2-34A FIGURE 6.2-34A

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34B FIGURE 6.2-34B

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34C FIGURE 6.2-34C

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-34D FIGURE 6.2-34D

[22]

DELETED BY PKG FSC MP3-UCR-2009-006 N/A N/A 6.2-35 FIGURE 6.2-35

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-36 FIGURE 6.2-36

[27.3]

QUENCH SPRAY AND HYDROGEN RECOMBINER 25212-26915 (a) N/A 6.2-37 FIGURE 6.2-37 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 1 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 45 of 83 6.2-37 FIGURE 6.2-37 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION SYSTEM 25212-26912 (a) SH 2 OF 3 6.2-37 FIGURE 6.2-37 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM LOW PRESSURE SAFETY INJECTION/CONTAINMENT RECIRCULATION 25212-26912 (a) SH 3 OF 3 6.2-38 FIGURE 6.2-38

[21.3])

TYPICAL CONTAINMENT STRUCTURE SUMP N/A N/A 6.2-39 FIGURE 6.2-39 NONE SPATIAL DROPLET SIZE DISTRIBUTION OF SPRACO 1713A NOZZLE APPLYING SURFACE AREA CORRECTION AND SPRAYING WATER AT 40 PSIG UNDER LABORATORY CONDITIONS N/A N/A 6.2-40 FIGURE 6.2-40 APRIL 1998 CONTAINMENT RECIRCULATION PUMPS CHARACTERISTIC CURVES N/A N/A 6.2-41 FIGURE 6.2-41

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-42 FIGURE 6.2-42 APRIL 1998 CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED TEMPERATURE (275F), SPRAY HEADER AT 141 FEET 9 INCHES N/A N/A 6.2-43 FIGURE 6.2-43 APRIL 1998 CONTAINMENT RECIRCULATION SPRAY COVERAGE BEND LINE (ELEVATION 104 FEET), ELEVATED TEMPERATURE (275F), SPRAY HEADER AT 145 FEET 3 INCHES N/A N/A 6.2-44 FIGURE 6.2-44

[16.2]

QUENCH SPRAY COVERAGE BEND LINE (ELEVATION 104 ft), ELEVATED TEMPERATURE (275F),

SPRAY HEADERS AT 153 FEET AND 168 FEET N/A N/A 6.2-45 FIGURE 6.2-45

[21.3]

DELETED BY CHANGE: PKG FSC 07-MP3-038 N/A N/A 6.2-46 FIGURE 6.2-46 MAY 1994 SUPPLEMENTARY LEAK COLLECTION AND RELEASE SYSTEM N/A N/A 6.2-47 FIGURE 6.2-47 SH. 1 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 1 OF 14 6.2-47 FIGURE 6.2-47 SH. 2

[22.3]

CONTAINMENT ISOLATION SYSTEM N/A 2 OF 14 6.2-47 FIGURE 6.2-47 SH. 3 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 3 OF 14 6.2-47 FIGURE 6.2-47 SH. 4 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 4 OF 14 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 46 of 83 6.2-47 FIGURE 6.2-47 SH. 5 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 5 OF 14 6.2-47 FIGURE 6.2-47 SH. 6

[22.3]

CONTAINMENT ISOLATION SYSTEM N/A 6 OF 14 6.2-47 FIGURE 6.2-47 SH. 7

[22.3]

CONTAINMENT ISOLATION SYSTEM N/A 7 OF 14 6.2-47 FIGURE 6.2-47 SH. 8 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 8 OF 14 6.2-47 FIGURE 6.2-47 SH. 9 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 9 OF 14 6.2-47 FIGURE 6.2-47 SH. 10

[20.1]

CONTAINMENT ISOLATION SYSTEM N/A 10 OF 14 6.2-47 FIGURE 6.2-47 SH. 11 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 11 OF 14 6.2-47 FIGURE 6.2-47 SH. 12 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 12 OF 14 6.2-47 FIGURE 6.2-47 SH. 13 JANUARY 1998 CONTAINMENT ISOLATION SYSTEM N/A 13 OF 14 6.2-47 FIGURE 6.2-47 SH. 14 SEPTEMBER 1997 CONTAINMENT ISOLATION SYSTEM N/A 14 OF 14 6.2-48 FIGURE 6.2-48

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-49 FIGURE 6.2-49

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-50 FIGURE 6.2-50

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-51 FIGURE 6.2-51

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-52 FIGURE 6.2-52

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 47 of 83 6.2-53 FIGURE 6.2.53

[27.3]

CONTAINMENT MONITORING SYSTEM 25212-26954 (a) N/A 6.2-54 FIGURE 6.2-54 AMENDMENT 15 SEPTEMBER 1985 QUENCH SPRAY PUMP CHARACTERISTIC CURVE N/A N/A 6.2-55 FIGURE 6.2-55

[18.4])

DELETED BY CHANGE PKG FSC 05-MP3-010 N/A N/A 6.2-56 FIGURE 6.2-56 AMENDMENT 8 MAY 1984 CONTAINMENT INTERNAL STRUCTURE OPENINGS N/A N/A 6.2-57 FIGURE 6.2-57 AMENDMENT 8 MAY 1984 EXPECTED LONG-TERM CIRCULATION PATTERNS IN CONTAINMENT N/A N/A 6.2-58 FIGURE 6.2-58 AMENDMENT 8 MAY 1984 CONTAINMENT HYDROGEN MONITORING SYSTEM N/A N/A 6.2-59 FIGURE 6.2-59

[21.3]

CONTAINMENT PRESSURE LIMITING BREAK N/A N/A 6.2-59A FIGURE 6.2-59A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 6.2-60 FIGURE 6.2-60

[21.3]

CONDENSING WALL HEAT TRANSFER COEFFICIENTS LIMITNG BREAK N/A N/A 6.2-61 FIGURE 6.2-61

[20.2]

DELETED BY CHANGE PKG FSC 07-MP3-024 N/A N/A 6.2-62 FIGURE 6.2-62

[20.2]

DELETED BY CHANGE PKG FSC 07-MP3-024 N/A N/A 6.3-1 FIGURE 6.3-1 SEPTEMBER 1997 SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A 1 OF 2 6.3-1 FIGURE 6.3-1 SEPTEMBER 1997 SAFETY INJECTION RESIDUAL HEAT REMOVAL SYSTEM PROCESS FLOW DIAGRAM N/A 2 OF 2 6.3-1 NOTES TO FIGURE 6.3-1 MAY 1998 NOTES TO FIGURE 6.3-1 N/A N/A 6.3-2 FIGURE 6.3-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION 25212-26913 (a) SH 1 OF 2 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 48 of 83 6.3-2 FIGURE 6.3-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM HIGH PRESSURE SAFETY INJECTION 25212-26913 (a) SH 2 OF 2 6.3-3 FIGURE 6.3-3 DECEMBER 2001 (01-43)

RESIDUAL HEAT REMOVAL PUMP PERFORMANCE CURVE N/A N/A 6.3-4 FIGURE 6.3-4 MAY 1998 CHARGING PUMP CURVE ASSUMED FOR SAFETY ANALYSIS N/A N/A 6.3-5 FIGURE 6.3-5 MAY 1998 HIGH HEAD SI PUMP CURVE ASSUMED FOR SAFETY ANALYSIS N/A N/A 6.3-6 FIGURE 6.3-6

[24.3]

REFUELING WATER STORAGE TANK WATER LEVELS N/A N/A 6.4-1 FIGURE 6.4-1

[20.1]

CONTROL ROOM AREA N/A N/A 6.4-2 FIGURE 6.4-2

[23.1]

CONTROL ROOM INTAKE AND HAZARDOUS MATERIAL STORAGE LOCATIONS N/A N/A 6.5-1 FIGURE 6.5-1

[21.3]

POST DBA MINIMUM CONTAINMENT SUMP pH N/A N/A 7.1-1 FIGURE 7.1-1 JULY 1997 SOLID STATE PROTECTION SYSTEM BLOCK DIAGRAM N/A N/A 7.1-2 FIGURE 7.1-2

[24]

REACTOR TRIP/ESF ACTUATION MECHANICAL LINKAGE N/A N/A 7.2-1 FIGURE 7.2-1 SH. 1

[27.3]

FUNCTIONAL DIAGRAMS INDEX & SYMBOLS 25212-39001 (a) SH4002 7.2-1 FIGURE 7.2-1 SH. 2

[27.3]

FUNCTIONAL DIAGRAMS REACTOR TRIP SIGNAL 25212-39001 (a) SH4003 7.2-1 FIGURE 7.2-1 SH. 3

[27.3]

FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS & MANUAL TRIP SIGNALS 25212-39001 (a) SH4004 7.2-1 FIGURE 7.2-1 SH. 4

[27.3]

FUNCTIONAL DIAGRAMS NUCLEAR INSTRUMENTS PERMISSIVES & BLOCKS 25212-39001 (a) SH4005 7.2-1 FIGURE 7.2-1 SH. 5

[27.3]

FUNCTIONAL DIAGRAMS PRIMARY COOLANT SYSTEM TRIP SIGNALS 25212-39001 (a) SH4006 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 49 of 83 7.2-1 FIGURE 7.2-1 SH. 6

[27.3]

FUNCTIONAL DIAGRAMS PRESSURIZER TRIP SIGNALS 25212-39001 (a) SH4007 7.2-1 FIGURE 7.2-1 SH. 7

[27.3]

FUNCTIONAL DIAGRAMS STEAM GENERATOR TRIP SIGNALS 25212-39001 (a) SH4008 7.2-1 FIGURE 7.2-1 SH. 8

[27.3]

FUNCTIONAL DIAGRAM SAFEGUARDS ACTUATION SIGNALS 25212-39001 (a) SH4009 7.2-1 FIGURE 7.2-1 SH. 9

[27.3]

FUNCTIONAL DIAGRAM ROD CONTROLS & ROD BLOCKS 25212-39001 (a) SH4010 7.2-1 FIGURE 7.2-1 SH. 10

[27.3]

FUNCTIONAL DIAGRAM STEAM DUMP CONTROL 25212-39001 (a) SH4011 7.2-1 FIGURE 7.2-1 SH. 11

[27.3]

FUNCTIONAL DIAGRAM PRESSURIZER PRESSURE & LEVEL CONTROL 25212-39001 (a) SH4012 7.2-1 FIGURE 7.2-1 SH. 12

[27.3]

FUNCTIONAL DIAGRAM PRESSURIZER HEATER CONTROL 25212-39001 (a) SH4013 7.2-1 FIGURE 7.2-1 SH. 13

[27.3]

FUNCTIONAL DIAGRAM FEEDWATER CONTROL & ISOLATION 25212-39001 (a) SH4014 7.2-1 FIGURE 7.2-1 SH. 14

[27.3]

FUNCTIONAL DIAGRAMS FEEDWATER CONTROL & ISOLATION 25212-39001 (a) SH4015 7.2-1 FIGURE 7.2-1 SH. 15

[27.3]

FUNCTIONAL DIAGRAMS AUXILLIARY FEEDWATER PUMPS STARTUP 25212-39001 (a) SH4016 7.2-1 FIGURE 7.2-1 SH. 16

[27.3]

FUNCTIONAL DIAGRAMS TURBINE TRIP, RUNBACKS & OTHER SIGNALS 25212-39001 (a) SH4017 7.2-1 FIGURE 7.2-1 SH. 17

[27.3]

FUNCTIONAL DIAGRAMS LOOP STOP VALVE INTERLOCKS 25212-39001 (a) SH4018 7.2-1 FIGURE 7.2-1 SH. 18

[27.3]

FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM 25212-39001 (a) SH4020 7.2-1 FIGURE 7.2-1 SH. 19

[27.3]

FUNCTIONAL DIAGRAMS PRESSURIZER PRESSURE RELIEF SYSTEM 25212-39001 (a) SH4019 7.2-2 FIGURE 7.2-2 NONE SETPOINT REDUCTION FUNCTION FOR OVERPOWER AND OVER-TEMPERATURE DELTA T TRIPS N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 50 of 83 7.3-1 FIGURE 7.3-1 DECEMBER 1994 FAILURE MODES AND EFFECTS ANALYSIS QUENCH SPRAY SYSTEM N/A N/A 7.3-2 FIGURE 7.3-2 NONE FAULT TREE DIAGRAM QUENCH SPRAY SYSTEM N/A N/A 7.3-3 FIGURE 7.3-3 SEPTEMBER 1997 TYPICAL ESF TEST CIRCUITS N/A N/A 7.3-4 FIGURE 7.3-4 SEPTEMBER 1997 ENGINEERED SAFEGUARDS TEST CABINET N/A N/A 7.6-1 FIGURE 7.6-1

[21.3]

LOGIC DIAGRAM FOR RHS ISOLATION VALVES N/A N/A 7.6-1 NOTES TO FIGURE 7.6-1 MAY 1998 NOTES TO FIGURE 7.6-1 N/A N/A 7.6-2 FIGURE 7.6-2 NONE FUNCTIONAL BLOCK DIAGRAM OF ACCUMULATOR ISOLATION VALVES N/A N/A 7.6-3 FIGURE 7.6-3 SH.1 AMENDMENT 8 MAY 1984 AUTOMATIC RHS AND QSS PUMP SHUTOFF N/A 1 OF 2 7.6-3 FIGURE 7.6-3 SH.2 AMENDMENT 8 MAY 1984 AUTOMATIC RHS AND QSS PUMP SHUTOFF N/A 2 OF 2 7.6-4 FIGURE 7.6-4 NONE REACTOR COOLANT SYSTEM LOOP WITH LOOP STOP VALVES N/A N/A 7.7-1 FIGURE 7.7-1 SEPTEMBER 1997 SIMPLIFIED BLOCK DIAGRAM OF REACTOR CONTROL SYSTEM N/A N/A 7.7-2 FIGURE 7.7-2 NONE CONTROL BANK ROD INSERTION MONITOR N/A N/A 7.7-3 FIGURE 7.7-3 NONE ROD DEVIATION COMPARATOR N/A N/A 7.7-4 FIGURE 7.7-4 APRIL 1998 BLOCK DIAGRAM OF PRESSURIZER PRESSURE CONTROL SYSTEM N/A N/A 7.7-5 FIGURE 7.7-5 NONE BLOCK DIAGRAM OF PRESSURIZER LEVEL CONTROL SYSTEM N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 51 of 83 7.7-6 FIGURE 7.7-6 NONE BLOCK DIAGRAM OF STEAM GENERATOR WATER LEVEL CONTROL SYSTEM N/A N/A 7.7-7 FIGURE 7.7-7 NONE BLOCK DIAGRAM OF MAIN FEEDWATER PUMP SPEED CONTROL SYSTEM N/A N/A 7.7-8 FIGURE 7.7-8 NONE BLOCK DIAGRAM OF STEAM DUMP CONTROL SYSTEM N/A N/A 7.7-9 FIGURE 7.7-9 NONE BASIC FLUX-MAPPING SYSTEM N/A N/A 7.7-14 FIGURE 7.7-14 SEPTEMBER 1997 SIMPLIFIED BLOCK DIAGRAM OF ROD CONTROL SYSTEM N/A N/A 7.7-15 FIGURE 7.7-15 SEPTEMBER 1997 CONTROL BANK B PARTIAL SIMPLIFIED SCHEMATIC DIAGRAM OF POWER CABINETS 1 BD AND 2 BD N/A N/A 7.8-1 FIGURE 7.8-1 SEPTEMBER 1989 ACTUATION LOGIC SYSTEM ARCHITECTURE N/A N/A 8.1-1 FIGURE 8.1-1

[23.1])

ELECTRICAL ONE LINE DIAGRAM N/A N/A 8.1-2 FIGURE 8.1-2 JANUARY 1998 345 kV TRANSMISSION MAP OF CONNECTICUT AND WESTERN MASSACHUSETTS N/A N/A 8.1-3 FIGURE 8.1-3

[21.3]

345 kV SWITCHYARD N/A N/A 8.2-1 FIGURE 8.2-1 JANUARY 1998 MILLSTONE - MANCHESTER 345 kV LINE N/A N/A 8.2-2 FIGURE 8.2-2

[19.2]

HUNTS BROOK JUNCTION N/A N/A 8.3-1 FIGURE 8.3-1 SH. 1 MAY 1997 ROUTING OF REDUNDANT CIRCUITS N/A 1 OF 4 8.3-1 FIGURE 8.3-1 SH. 2 MAY 1997 ROUTING OF REDUNDANT CIRCUITS N/A 2 OF 4 8.3-1 FIGURE 8.3-1 SH. 3 NONE ROUTING OF REDUNDANT CIRCUITS N/A 3 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 52 of 83 8.3-1 FIGURE 8.3-1 SH. 4 NONE ROUTING OF REDUNDANT CIRCUITS N/A 4 OF 4 8.3-2 FIGURE 8.3-2

[27.3]

120/208V AC NONVITAL BUS AND NONSAFETY RELATED 125V DC SYSTEMS 25212-30076 (a) N/A 8.3-3 FIGURE 8.3-3

[185]

120V AC VITAL BUS AND SAFETY RELATED 125V DC SYSTEMS N/A N/A 8.3-4 FIGURE 8.3-4 MAY 1997 POWER SUPPLY - THIRD CHARGING PUMP N/A N/A 8.3-5 FIGURE 8.3-5 AMENDMENT 3 AUGUST 1983 POWER SUPPLY - THIRD REACTOR PLANT COMPONENT COOLING PUMP N/A N/A 8.3-6 FIGURE 8.3-6 AMENDMENT 15 SEPTEMBER 1985 EMERGENCY GENERATOR FUEL OIL TRANSFER PUMPS N/A N/A 8.3-7 FIGURE 8.3-7 MAY 1997 ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS N/A 1 OF 2 8.3-7 FIGURE 8.3-7 AMENDMENT 18 MARCH 1986 ROUTING OF PREFERRED OFFSITE AND STANDBY ONSITE CIRCUITS N/A 2 OF 2 8.3-9 FIGURE 8.3-9

[23.1]

6.9 kV AND 4160 VOLT SYSTEMS N/A N/A 8.3-10 FIGURE 8.3-10 SH. 1

[27.3]

EMERGENCY GENERATOR LOAD SEQUENCING [3EGS*EG-A/B]

25212-39241 (a) SH 189 8.3-10 FIGURE 8.3-10 SH. 2

[27.3]

EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]

25212-39241 (a) SH 190 8.3-10 FIGURE 8.3-10 SH. 3

[27.3]

EMERGENCY GENERATOR LONG TERM LOADING [3EGS*EG-A/B]

25212-39241 (a) SH 191 8.3-10 FIGURE 8.3-10 SH. 4

[27.3]

EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B]

25212-39241 (a) SH 192 8.3-10 FIGURE 8.3-10 SH. 5

[27.3]

EMERGENCY GENERATOR LOADING: EMERGENCY LOAD SHEDDING [3EGS*EG-A/B]

25212-39241 (a) SH 193 9.1-1 FIGURE 9.1-1 OCTOBER 2000 (98-116)

PICTORIAL VIEW OF TYPICAL REGION 3 RACK MODULE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 53 of 83 9.1-2 FIGURE 9.1-2 OCTOBER 2000 (98-116)

TOP VIEW OF 6 x 6 RACK ARRAY (REGION 3)

N/A N/A 9.1-2A FIGURE 9.1-2(A)

[15]

DELETED BY PKG FSC 98-MP3-116 N/A N/A 9.1-3 FIGURE 9.1-3 OCTOBER 2000 (98-116)

SIDE VIEW OF 6 x 6 RACK ARRAY (REGION 3)

N/A N/A 9.1-5 FIGURE 9.1-5 OCTOBER 2000 (98-116)

ADJUSTABLE FUEL RACK LEVELING PAD (REGION 3)

N/A N/A 9.1-6 FIGURE 9.1-6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FUEL POOL COOLING AND PURIFICATION SYSTEM 25212-26911 (a) N/A 9.1-7 FIGURE 9.1-7 SEPTEMBER 2000 (96-31)

BULK POOL TRANSIENT TEMPERATURE PLOT (FULL CORE OFFLOAD)

N/A N/A 9.1-7A FIGURE 9.1-7A SEPTEMBER 2000 (96-31)

BULK POOL TRANSIENT TEMPERATURE PLOT (EMERGENCY CORE OFFLOAD)

N/A N/A 9.1-8 FIGURE 9.1-8 SEPTEMBER 2000 COOLDOWN CURVE FOR NORMAL OPERATION 94 HOUR LOSS OF POOL COOLING)

N/A N/A 9.1-9 FIGURE 9.1-9 NONE REFUELING MACHINE N/A N/A 9.1-10 FIGURE 9.1-10 MARCH 2000 (99-46)

SPENT FUEL BRIDGE AND HOISTING STRUCTURE N/A N/A 9.1-11 FIGURE 9.1-11 NONE NEW FUEL ELEVATOR N/A N/A 9.1-12 FIGURE 9.1-12 FEBRUARY 2001 (00-45)

FUEL TRANSFER SYSTEM N/A N/A 9.1-13 FIGURE 9.1-13

[15]

DELETED BY PKG FSC 00-MP3-045 N/A N/A 9.1-14 FIGURE 9.1-14 AUGUST 1999 SPENT FUEL HANDLING TOOL N/A N/A 9.1-15 FIGURE 9.1-15 NONE NEW FUEL HANDLING TOOL N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 54 of 83 9.1-16 FIGURE 9.1-16 DECEMBER 1993 REACTOR INTERNALS LIFTING DEVICE N/A N/A 9.1-17 FIGURE 9.1-17 NOVEMBER 1997 QUICK ACTING STUD TENSIONER N/A 1 OF 2 9.1-17 FIGURE 9.1-17 NOVEMBER 1997 QUICK ACTING STUD TENSIONER N/A 2 OF 2 9.1-18 FIGURE 9.1-18 JUNE 1989 NEW FUEL POOL LAYOUT N/A N/A 9.1-19 FIGURE 9.1-19 JUNE 1989 NEW FUEL RACK ELEVATION VIEW N/A N/A 9.1-20 FIGURE 9.1-20 SEPTEMBER 2000 (96-31)

FUEL ASSEMBLY TRANSFER LIMIT VERSUS CCP TEMPERATURE - MILLSTONE UNIT 3 FULL CORE OFFLOAD N/A N/A 9.1-21 FIGURE 9.1-21 OCTOBER 2000 (98-116)

MILLSTONE UNIT 3 SPENT FUEL POOL LAYOUT N/A N/A 9.1-22 FIGURE 9.1-22 OCTOBER 2000 (98-116)

REGION 1 BLOCKING SCHEME FOR 3-OUT-OF-4 STORAGE RACKS N/A N/A 9.1-22a FIGURE 9.1-22a OCTOBER 2000 (98-116)

PICTORIAL VIEW OF TYPICAL REGION 1 RACK MODULE N/A N/A 9.1-22b FIGURE 9.1-22b OCTOBER 2000 (98-116)

TYPICAL ASSEMBLAGE OF REGION 1 CELLS N/A N/A 9.1-22c FIGURE 9.1-22c OCTOBER 2000 (98-116)

ELEVATION VIEW OF REGION 1 RACK MODULE N/A N/A 9.1-23a FIGURE 9.1-23a OCTOBER 2000 (98-116)

PICTORIAL VIEW OF TYPICAL REGION 2 RACK MODULE N/A N/A 9.1-23b FIGURE 9.1-23b OCTOBER 2000 (98-116)

TYPICAL ARRAY OF REGION 2 CELLS N/A N/A 9.1-23c FIGURE 9.1-23c OCTOBER 2000 (98-116)

ELEVATION VIEW OF REGION 2 RACK MODULE N/A N/A 9.1-24 FIGURE 9.1-24 OCTOBER 2000 (98-116)

SUPPORT PEDESTAL FOR REGION 1 AND REGION 2 RACK MODULES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 55 of 83 9.2-1 FIGURE 9.2-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 1 9.2-1 FIGURE 9.2-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 2 9.2-1 FIGURE 9.2-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 3 9.2-1 FIGURE 9.2-1 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE WATER 25212-26933 (a) SH 4 9.2-2 FIGURE 9.2-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 1 9.2-2 FIGURE 9.2-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 2 9.2-2 FIGURE 9.2-2 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT COMPONENT COOLING SYSTEM 25212-26921 (a) SH 3 9.2-3 FIGURE 9.2-3 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM 25212-26922 (a) SH 1 9.2-3 FIGURE 9.2-3 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT CHILLED WATER SYSTEM 25212-26922 (a) SH 2 9.2-4 FIGURE 9.2-4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SAFETY INJECTION PUMP AND NEUTRON SHIELD TANK COOLING SYSTEMS 25212-26914 (a) SH 1 9.2-5 FIGURE 9.2-5

[27.3]

CHARGING PUMP SEALING AND LUBRICATION 25212-26905 (a) 1 OF 1 9.2-6 FIGURE 9.2-6

[27.3]

CONDENSATE DEMINERALIZER LIQUID WASTE 25212-26929 (a) N/A 9.2-7 FIGURE 9.2-7 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 1 0F 7 9.2-7 FIGURE 9.2-7 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 2 0F 7 9.2-7(2(A))

FIGURE 9.2-7 SH. 2(A)

MAY 1998 WATER TREATMENT SYSTEM (TEMP MOD)

FSAR Figure (a) 9.2-7 SH. 2(A)

N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 56 of 83 9.2-7 FIGURE 9.2-7 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 3 OF 7 9.2-7 FIGURE 9.2-7 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 4 OF 7 9.2-7 FIGURE 9.2-7 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 5 OF 7 9.2-7(5(A))

FIGURE 9.2-7 SH. 5(A)

MAY 1998 WATER TREATMENT SYSTEM (TEMP MOD)

FSAR Figure(a) 9.2-7 SH. 5(A)

N/A 9.2-7 FIGURE 9.2-7 SH. 6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM WATER TREATMENT SYSTEM 25212-26920 (a) SH 6 OF 7 9.2-8 FIGURE 9.2-8 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RISER DIAGRAM SANITARY DRAINS & VENTS 25212-26947 (a) SH 1 OF 3 9.2-8 FIGURE 9.2-8 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM 25212-26947 (a) SH 2 OF 3 9.2-8 FIGURE 9.2-8 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM DOMESTIC WATER & SANITARY SYSTEM 25212-26947 (a) SH 3 OF 3 9.2-9 FIGURE 9.2-9 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 1 OF 3 9.2-9 FIGURE 9.2-9 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 2 OF 3 9.2-9 FIGURE 9.2-9 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 3 OF 3 9.2-10 FIGURE 9.2-10 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 1 OF 2 9.2-10 FIGURE 9.2-10 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT COMPONENT COOLING WATER 25212-26934 (a) SH 2 OF 2 9.2-11 FIGURE 9.2-11

[27.3]

PIPING & INSTRUMENTATION DIAGRAM PRIMARY GRADE WATER SYSTEM 25212-26919 (a) SH 1 OF 1 9.3-1 FIGURE 9.3-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 1 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 57 of 83 9.3-1 FIGURE 9.3-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 2 OF 3 9.3-1 FIGURE 9.3-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM COMPRESSED AIR 25212-26938 (a) SH 3 OF 3 9.3-2 FIGURE 9.3-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 1 OF 4 9.3-2 FIGURE 9.3-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 2 OF 4 9.3-2 FIGURE 9.3-2 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 3 OF 4 9.3-2 FIGURE 9.3-2 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT SAMPLING 25212-26944 (a) SH 4 OF 4 9.3-3 FIGURE 9.3-3 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBNE PLANT SAMPLING 25212-26943 (a) SH 1 OF 2 9.3-3 FIGURE 9.3-3 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT SAMPLING 25212-26943 (a) SH 2 OF 2 9.3-4 FIGURE 9.3-4 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 1 9.3-4 FIGURE 9.3-4 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 2 9.3-5 FIGURE 9.3-5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT GASEOUS DRAINS 25212-26907 (a) N/A 9.3-6 FIGURE 9.3-6 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 1 OF 4 9.3-6 FIGURE 9.3-6 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 2 OF 4 9.3-6 FIGURE 9.3-6 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE AND AERATED DRAINS 25212-26906 (a) SH 3 OF 4 9.3-7 FIGURE 9.3-7 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR COOLANT PUMP SEALS 25212-26903 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 58 of 83 9.3-7(1(A))

FIGURE 9.3-7 SH. 1(A)

MAY 1998 REACTOR COOLANT PUMP SEALS SYSTEM (TEMP MOD)

FSAR Figure (a) 9.3-7 SH. 1(A)

N/A 9.3-8 FIGURE 9.3-8 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 1 OF 4 9.3-8 FIGURE 9.3-8 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 2 OF 4 9.3-8 FIGURE 9.3-8 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 3 OF 4 9.3-8 FIGURE 9.3-8 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CHEMICAL AND VOLUME CONTROL 25212-26904 (a) SH 4 OF 4 9.3-9 FIGURE 9.3-9 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 1 OF 3 9.3-9 FIGURE 9.3-9 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 2 OF 3 9.3-9(2(A))

FIGURE 9.3-9 SH. 2(A)

MAY 1998 PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM (TEMP MOD)

FSAR Figure(a) 9.3-9 SH. 2(A)

N/A 9.3-9 FIGURE 9.3-9 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM BORON RECOVERY SYSTEM 25212-26908 (a) SH 3 OF 3 9.3-10 FIGURE 9.3-10 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 1 OF 3 9.3-10 FIGURE 9.3-10 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 2 OF 3 9.3-10 FIGURE 9.3-10 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM POST-ACCIDENT SAMPLE SYSTEM 25212-26955 (a) SH 3 OF 3 9.4-1 FIGURE 9.4-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 1 OF 5 9.4-1 FIGURE 9.4-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 2 OF 5 9.4-1 FIGURE 9.4-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 3 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 59 of 83 9.4-1 FIGURE 9.4-1 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 4 OF 5 9.4-1 FIGURE 9.4-1 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTROL BUILDING HEATING, VENTILATION, AND AIR-CONDITIONING 25212-26951 (a) SH 5 OF 5 9.4-2 FIGURE 9.4-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 1 OF 7 9.4-2 FIGURE 9.4-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 2 OF 7 9.4-2 FIGURE 9.4-2 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 3 OF 7 9.4-2 FIGURE 9.4-2 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 4 OF 7 9.4-2 FIGURE 9.4-2 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 5 OF 7 9.4-2 FIGURE 9.4-2 SH. 6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION 25212-26948 (a) SH 6 OF 7 9.4-3 FIGURE 9.4-3 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 1 OF 5 9.4-3 FIGURE 9.4-3 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 2 OF 5 9.4-3 FIGURE 9.4-3 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION 25212-26950 (a) SH 3 OF 5 9.4-3 FIGURE 9.4-3 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM 25212-26950 (a) SH 4 OF 5 9.4-3 FIGURE 9.4-3 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ISOPHASE BUS DUCT COOLING SYSTEM 25212-26950 (a) SH 5 OF 5 9.4-4 FIGURE 9.4-4 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 1 OF 3 9.4-4 FIGURE 9.4-4 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 2 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 60 of 83 9.4-4 FIGURE 9.4-4 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ESF AND MSV BUILDNGS VENTILATION 25212-26952 (a) SH 3 OF 3 9.4-5 FIGURE 9.4-5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONTAINMENT STRUCTURE VENTILATION 25212-26953 (a) SH 1 OF 1 9.4-6 FIGURE 9.4-6 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 1 OF 3 9.4-6 FIGURE 9.4-6 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 2 OF 3 9.4-6 FIGURE 9.4-6 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM SERVICE BUILDING VENTILATION 25212-26949 (a) SH 3 OF 3 9.4-7 FIGURE 9.4-7 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION 25212-26936 (a) SH 1 OF 2 9.4-7 FIGURE 9.4-7 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY BOILER AND VENTLATION 25212-26936 (a) SH 2 OF 2 9.4-8 FIGURE 9.4-8 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 1 OF 4 9.4-8 FIGURE 9.4-8 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 2 OF 4 9.4-8 FIGURE 9.4-8 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM HOT WATER HEATING SYSTEM 25212-26937 (a) SH 3 OF 4 9.4-9 FIGURE 9.4-9

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TECHNICAL SUPPORT CENTER HEATING, VENT AND AIR CONDITIONING 25212-26956 (a) SH 1 OF 1 9.5-1 FIGURE 9.5-1 AMENDMENT 14 JULY 1985 FIRE PROTECTION SYSTEM (NOW IN FPER FIGURE 4-1)

N/A N/A 9.5-2 FIGURE 9.5-2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY GENERATOR FUEL OIL SYSTEM 25212-26917 (a) SH 1 OF 1 9.5-3 FIGURE 9.5-3 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 1 OF 5 9.5-3 FIGURE 9.5-3 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 2 OF 5 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 61 of 83 9.5-3 FIGURE 9.5-3 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 3 OF 5 9.5-3 FIGURE 9.5-3 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 4 OF 5 9.5-3 FIGURE 9.5-3 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR COOLING WATER, STARTING AIR, LUBE OIL, EXHAUST, COMBUSTION AIR, AND CRANKCASE VACUUM SYSTEMS 25212-26916 (a) SH 5 OF 5 9.5-4 FIGURE 9.5-4 SEPTEMBER 1995 EMERGENCY GENERATOR EXHAUST N/A 9.5-5 FIGURE 9.5-5 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 1 OF 3 9.5-5 FIGURE 9.5-5 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 2 OF 3 9.5-5 FIGURE 9.5-5 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM NITROGEN AND HYDROGEN SYSTEMS 25212-26939 (a) SH 3 OF 3 9.5-7 FIGURE 9.5-7 AMENDMENT 3 AUGUST 1983 SITE WATER FIRE PROTECTION N/A N/A 10.1-1 FIGURE 10.1-1 NONE FUNDAMENTAL DIAGRAM N/A N/A 10.1-2 FIGURE 10.1-2

[27.3]

RATED HEAT BALANCE 25212-23050 (a) SH 9 10.1-3 FIGURE 10.1-3

[17.3]

DELETED BY CHANGE PKG FSC 03-MP3-027 N/A N/A 10.2-1 FIGURE 10.2-1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM ELECTO HYDRAULIC CONTROL 25212-26940 (a) N/A 10.2-2 FIGURE 10.2-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 1 OF 3 10.2-2 FIGURE 10.2-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 2 OF 3 10.2-2 FIGURE 10.2-2 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR & FEED PUMP OIL SYSTEMS 25212-26941 (a) SH 3 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 62 of 83 10.2-3 FIGURE 10.2-3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE GENERATOR SUPPORT SYSTEMS 25212-26942 (a) SH 1 OF 1 10.3-1 FIGURE 10.3-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 1 OF 7 10.3-1 FIGURE 10.3-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 2 OF 7 10.3-1 FIGURE 10.3-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 3 OF 7 10.3-1 FIGURE 10.3-1 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 4 OF 7 10.3-1 FIGURE 10.3-1 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 5 OF 7 10.3-1 FIGURE 10.3-1 SH. 6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM MAIN STEAM AND REHEAT 25212-26923 (a) SH 6 OF 7 10.3-2 FIGURE 10.3-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 1 OF 3 10.3-2 FIGURE 10.3-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 2 OF 3 10.3-2 FIGURE 10.3-2 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT MISCELLANEOUS DRAINS 25212-26945 (a) SH 3 OF 3 10.3-3 FIGURE 10.3-3 SH.1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CHEMICAL FEED 25212-26931 (a) SH 1 OF 2 10.3-3(1(A)) FIGURE 10.3-3 SH. 1(A)

[24]

DELETED BY PKG FSC 98-MP3-126 N/A N/A 10.3-4 FIGURE 10.3-4 SEPTEMBER 1997 MAIN STEAM ISOLATION VALVE N/A N/A 10.4-1 FIGURE 10.4-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 1 OF 3 10.4-1 FIGURE 10.4-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 2 OF 3 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 63 of 83 10.4-1 FIGURE 10.4-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE SYSTEM 25212-26926 (a) SH 3 OF 3 10.4-2 FIGURE 10.4-2 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX PRIMING 25212-26927 (a) SH 1 0F 2 10.4-2 FIGURE 10.4-2 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSER AIR REMOVAL SYSTM & WATER BOX PRIMING 25212-26927 (a) SH 2 OF 2 10.4-3 FIGURE 10.4-3 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND EXHAUST 25212-26924 (a) SH 1 OF 2 10.4-3 FIGURE 10.4-3 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM EXTRACTION STEAM AND TG GLAND SEAL AND EXHAUST 25212-26924 (a) SH 2 OF 2 10.4-4 FIGURE 10.4-4 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM 25212-26932 (a) SH 1 OF 2 10.4-4 FIGURE 10.4-4 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CIRCULATING WATER SYSTEM 25212-26932 (a) SH 2 OF 2 10.4-5 FIGURE 10.4-5 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 1 OF 5 10.4-5 FIGURE 10.4-5 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 2 OF 5 10.4-5 FIGURE 10.4-5 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 3 OF 5 10.4-5 FIGURE 10.4-5 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 4 OF 5 10.4-5 FIGURE 10.4-5 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER -MIXED BED 25212-26928 (a) SH 5 OF 5 10.4-6 FIGURE 10.4-6 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 1 OF 4 10.4-6 FIGURE 10.4-6 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 2 OF 4 10.4-6 FIGURE 10.4-6 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 3 OF 4 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 64 of 83 10.4-6 FIGURE 10.4-6 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER SYSTEM 25212-26930 (a) SH 4 OF 4 10.4-7 FIGURE 10.4-7 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 1 OF 3 10.4-7 FIGURE 10.4-7 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 2 OF 3 10.4-7 FIGURE 10.4-7 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FEEDWATER HEATER AND MSR VENTS AND DRAINS 25212-26925 (a) SH 3 OF 3 10.4-9 FIGURE 10.4-9 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 1 OF 3 10.4-9(1(A)) FIGURE 10.4-9 SH.1(A)

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 1 OF 3 10.4-9 FIGURE 10.4-9 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 2 OF 3 10.4-9 FIGURE 10.4-9 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM AUXILIARY STEAM, FEEDWATER AND CONDENSATE 25212-26935 (a) SH 3 OF 3 10.4-10 FIGURE 10.4-10

[21.3]

MINIMUM AUXILIARY FEEDWATER FLOW TO FOUR STEAM GENERATORS LOSS OF NORMAL FEEDWATER EVENT N/A N/A 10.4-11 FIGURE 10.4-11 FEBRUARY 1998 MINIMUM AFW FLOW TO THREE EFFECTIVE STEAM GENERATORS FEEDWATER LINE BREAK EVENT N/A N/A 10.4-12 FIGURE 10.4-12

[21.3]

MINIMUM AUXILARY FEEDWATER FLOW TO TWO STEAM GENERATORS BETTER ESTIMATE LOSS OF NORMAL FEEDWATER EVENT FOR RELIABILITY ANALYSIS N/A N/A 11.2-1 FIGURE 11.2-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 1 OF 4 11.2-1 FIGURE 11.2-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 2 OF 4 11.2-1 FIGURE 11.2-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE LIQUID WASTE & AERATED DRAINS 25212-26906 (a) SH 3 OF 4 11.2-2 FIGURE 11.2-2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM CONDENSATE DEMINERLIZER LIQUID WASTE 25212-26929 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 65 of 83 11.2-3 FIGURE 11.2-3 MAY 1998 EXPECTED RADIOACTIVE LIQUID WASTE SOURCE AND DISCHARGE PATHS N/A N/A 11.3-1 FIGURE 11.3-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 1 OF 3 11.3-1 FIGURE 11.3-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE 25212-26909 (a) SH 2 OF 3 11.3-2 FIGURE 11.3-2

[16]

VENTILATION SYSTEM COMPOSITE DRAWING NORMAL OPERATION N/A N/A 11.4-1 FIGURE 11.4-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE 25212-26910 (a) SH 1 OF 2 11.4-1 FIGURE 11.4-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE SOLID WASTE 25212-26910 (a) SH 2 OF 2 11.4-2 FIGURE 11.4-2

[21.3]

(HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM EXPECTED QUANTITIES N/A N/A 11.4-3 FIGURE 11.4-3

[21.3]

(HISTORICAL) RADIOACTIVE SOLID WASTE SYSTEM DESIGN QUANTITIES N/A N/A 12.2-1 FIGURE 12.2-1

[20.3]

ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-2 FIGURE 12.2-2

[20.3]

ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-3 FIGURE 12.2-3

[20.3]

ARRANGEMENT - OPERATING PERSONNEL ACCESS AND EGRESS N/A N/A 12.2-4 FIGURE 12.2-4

[21.3]

I-131 CONCENTRATION CONTAINMENT (HISTORICAL)

N/A N/A 12.3-1 FIGURE 12.3-1

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)

N/A N/A 12.3-2 FIGURE 12.3-2

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)

N/A N/A 12.3-3 FIGURE 12.3-3

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)

N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 66 of 83 12.3-4 FIGURE 12.3-4 December 1997 DESIGN BASIS RADIATION ZONES FOR SHIELDING (NORMAL OPERATIONS)

N/A N/A 12.3-5 N/A N/A THIS FIGURE MOVED TO SECTION 11.5 (FIGURE 11.5-2)

N/A N/A 12.3-6 FIGURE 12.3-6

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)

N/A N/A 12.3-7 FIGURE 12.3-7

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)

N/A N/A 12.3-8 FIGURE 12.3-8

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)

N/A N/A 12.3-9 FIGURE 12.3-9

[20.3]

DESIGN BASIS RADIATION ZONES FOR SHIELDING (SHUTDOWN/REFUELING)

N/A N/A 12.3-10 FIGURE 12.3-10 SH. 1

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 1 to Auxiliary Building N/A SH 1 OF 9 12.3-10 FIGURE 12.3-10 SH. 2

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 2 to the ESF Building N/A SH 2 OF 9 12.3-10 FIGURE 12.3-10 SH. 3

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 3 to Hydrogen Recombiner Building N/A SH 3 OF 9 12.3-10 FIGURE 12.3-10 SH. 4

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 4 to Hydrogen Recombiner Building and to Unit 2 Chemistry Labs N/A SH 4 OF 9 12.3-10 FIGURE 12.3-10 SH. 5

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 5 to Fuel Building N/A SH 5 OF 9 12.3-10 FIGURE 12.3-10 SH. 6

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 6 to Turbine Building N/A SH 6 OF 9 12.3-10 FIGURE 12.3-10 SH. 7

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 7 to Diesel Generator N/A SH 7 OF 9 12.3-10 FIGURE 12.3-10 SH. 8

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 8 to ESF Building N/A SH 8 OF 9 12.3-10 FIGURE 12.3-10 SH. 9

[21.3]

ROUTES TO POST-ACCIDENT VITAL AREAS - Route 9 to Auxiliary Building N/A SH 9 OF 9 LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 67 of 83 12.3-11 FIGURE 12.3-11

[20.3]

FUEL TRANSFER TUBE SHIELDING N/A N/A 12.3-12 FIGURE 12.3-12

[20.3]

UPPER REACTOR CAVITY NEUTRON SHIELD N/A N/A 12.5-1 FIGURE 12.5-1 June 1997 DELETED N/A N/A 13.1-1 DELETED BY CHANGE PKG FSC 01-MP3-013 N/A N/A 13.5-1 FIGURE 13.5-1

[20.1]

CONTROL ROOM AREA N/A N/A 14.2-1 FIGURE 14.2-1 NONE STARUP ACTIVITIES LOGIC DIAGRAM N/A N/A 14.2-2 FIGURE 14.2-2 AMENDMENT 1 FEBRUARY 1983 STARTUP ORGANIZATION CHART N/A N/A 14.2-3 FIGURE 14.2-3 AMENDMENT 1 FEBRUARY 1983 TEST PROCEDURE PREPARATION N/A N/A 14.2-4 FIGURE 14.2-4 AMENDMENT 1 FEBRUARY 1983 TEST PROCEDURE PERFORMANCE N/A N/A 14.2-5 FIGURE 14.2-5 AMENDMENT 8 MAY 1984 PREOPERATIONAL TEST PHASE N/A N/A 14.2-6 FIGURE 14.2-6 NONE INITIAL STARTUP TEST PHASE N/A N/A 15.0-1 FIGURE 15.0-1

[21.3]

ILLUSTRATION OF OVERTEMPERATURE AND OVERPOWER DELTA T PROTECTION N/A N/A 15.0-1A FIGURE 15.0-1A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.0-2 FIGURE 15.0-2

[21.3])

DOPPLER POWER COEFFICIENT USED IN ACCIDENT ANALYSIS N/A N/A 15.0-3 FIGURE 15.0-3 NONE RCCA POSITION VERSUS TIME TO DASHPOT N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 68 of 83 15.0-4 FIGURE 15.0-4 NONE NORMALIZED ROD WORTH VERSUS PERCENT INSERTED N/A N/A 15.0-5 FIGURE 15.0-5

[21.3]

NORMALIZED RCCA BANK REACTIVITY WORTH VERSUS DROP TIME N/A N/A 15.0-6 FIGURE 15.0-6

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-049 N/A N/A 15.0-7 FIGURE 15.0-7 NONE ABBREVIATIONS N/A N/A 15.0-8 FIGURE 15.0-8 JANUARY 1998 EXCESSIVE HEAT REMOVAL DUE TO FEEDWATER SYSTEMS MALFUNCTION N/A N/A 15.0-9 FIGURE 15.0-9 JANUARY 1998 EXCESSIVE LOAD INCREASE N/A N/A 15.0-10 FIGURE 15.0-10

[21.3]

DEPRESSURIZATION OF MAIN STEAM SYSTEM N/A N/A 15.0-11 FIGURE 15.0-11 JANUARY 1998 LOSS OF EXTERNAL LOAD/TURBINE TRIP N/A N/A 15.0-12 FIGURE 15.0-12 JANUARY 1998 LOSS OF OFFSITE POWER TO STATION AUXILIARIES N/A N/A 15.0-13 FIGURE 15.0-13 JANUARY 1998 LOSS OF NORMAL FEEDWATER N/A N/A 15.0-14 FIGURE 15.0-14

[21.3]

MAJOR RUPTURE OF A MAIN FEEDWATER LINE N/A N/A 15.0-15 FIGURE 15.0-15 JANUARY 1998 LOSS OF FORCED REACTOR COOLANT FLOW N/A N/A 15.0-16 FIGURE 15.0-16 JANUARY 1998 UNCONTROLLED ROD CLUSTER CONTROL ASSEMBLY BANK WITHDRAWAL N/A N/A 15.0-17 FIGURE 15.0-17 JANUARY 1998 DROPPED ROD CLUSTER CONTROL ASSEMBLY N/A N/A 15.0-18 FIGURE 15.0-18 JANUARY 1998 SINGLE ROD CLUSTER CONTROL ASSEMBLY WITHDRAWAL AT FULL POWER N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 69 of 83 15.0-21 FIGURE 15.0-21 JANUARY 1998 RUPTURE OF CONTROL ROD DRIVE MECHANISM HOUSING (ROD EJECTION)

N/A N/A 15.0-22 FIGURE 15.0-22 JANUARY 1998 INADVERTENT ECCS OPERATION AT POWER N/A N/A 15.0-23 FIGURE 15.0-23 JANUARY 1998 ACCIDENTAL DEPRESSURIZATION OF REACTOR COOLANT SYSTEM N/A N/A 15.0-24 FIGURE 15.0-24 FEBRUARY 1998 STEAM GENERATOR TUBE RUPTURE N/A N/A 15.0-25 FIGURE 15.0-25

[21.3]

LOSS OF COOLANT ACCIDENT N/A N/A 15.0-26 FIGURE 15.0-26 NONE CVCS LETDOWN LINE RUPTURE N/A N/A 15.0-27 FIGURE 15.0-27 NONE GWPS GAS DECAY TANK RUPTURE N/A N/A 15.0-28 FIGURE 15.0-28 NONE FLOOR DRAIN TANK FAILURE N/A N/A 15.0-29 FIGURE 15.0-29 NONE FUEL HANDLING ACCIDENT IN FUEL BUILDING N/A N/A 15.0-30 FIGURE 15.0-30 NONE FUEL HANDLING ACCIDENT INSIDE CONTAINMENT N/A N/A 15.0-31 FIGURE 15.0-31 NONE SPENT FUEL CASK DROP ACCIDENT N/A N/A 15.1-1 FIGURE 15.1-1

[21.3]

FEEDWATER CONTROL VALVE MALFUNCTION N/A N/A 15.1-1A FIGURE 15.1-1A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-2 FIGURE 15.1-2

[21.3]

FEEDWATER CONTROL VALVE MALFUNCTION N/A N/A 15.1-2A FIGURE 15.1-2A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 70 of 83 15.1-3 FIGURE 15.1-3

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-4 FIGURE 15.1-4

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-5 FIGURE 15.1-5

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-6 FIGURE 15.1-6

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-7 FIGURE 15.1-7

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-8 FIGURE 15.1-8

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-9 FIGURE 15.1-9

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-10 FIGURE 15.1-10

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-11 FIGURE 15.1-11

[21.3]

Keffective VERSUS TEMPERATURE N/A N/A 15.1-12 FIGURE 15.1-12

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-12A FIGURE 15.1-12A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-13 FIGURE 15.1-13

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-050 N/A N/A 15.1-13A FIGURE 15.1-13A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-14 FIGURE 15.1-14

[21.3]

DOPPLER POWER FEEDBACK N/A N/A 15.1-15 FIGURE 15.1-15

[21.3]

1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 71 of 83 15.1-15A FIGURE 15.1-15A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-16 FIGURE 15.1-16

[21.3]

1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A 15.1-16A FIGURE 15.1-16A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.1-17 FIGURE 15.1-17

[17.2]

1.4 SQUARE FEET STEAMLINE RUPTURE OFFSITE POWER AVAILABLE N/A N/A 15.1-17A FIGURE 15.1-17A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-1 FIGURE 15.2-1

[21.3]

TURBINE TRIP-RCS OVERPRESSURIZATION CASE N/A N/A 15.2-1A FIGURE 15.2-1A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-2 FIGURE 15.2-2

[21.3]

TURBINE TRIP-RCS OVERPRESSURIZATION CASE N/A N/A 15.2-2A FIGURE 15.2-2A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-3 FIGURE 15.2-3

[21.3]

TURBINE TRIP-DNBR CASE N/A N/A 15.2-3A FIGURE 15.2-3A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-4 FIGURE 15.2-4

[21.3]

TURBINE TRIP-DNBR CASE N/A N/A 15.2-4A FIGURE 15.2-4A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-5 FIGURE 15.2-5

[21.3]

TURBINE TRIP-MSS OVERPRESSURIZATION CASE N/A N/A 15.2-5A FIGURE 15.2-5A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 72 of 83 15.2-6 FIGURE 15.2-6

[21.3]

TURBINE TRIP-MSS OVERPRESSURIZATION CASE N/A N/A 15.2-6A FIGURE 15.2-6A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-7 FIGURE 15.2-7

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-051 N/A N/A 15.2-7A FIGURE 15.2-7A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-8 FIGURE 15.2-8

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-051 N/A N/A 15.2-8A FIGURE 15.2-8A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-9 FIGURE 15.2-9

[21.3]

LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-9A FIGURE 15.2-9A

[21.3]

LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-10 FIGURE 15.2-10

[21.3]

LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-10A FIGURE 15.2-10A

[21.3]

LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-11 FIGURE 15.2-11

[21.3]

LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-11A FIGURE 15.2-11A

[21.3]

LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-12 FIGURE 15.2-12

[21.3]

LOSS OF NORMAL FEEDWATER WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-12A FIGURE 15.2-12A

[21.3]

LOSS OF NORMAL FEEDWATER WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-13 FIGURE 15.2-13

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 73 of 83 15.2-13A FIGURE 15.2-13A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-14 FIGURE 15.2-14

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-14A FIGURE 15.2-14A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-15 FIGURE 15.2-15

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-15A FIGURE 15.2-15A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-16 FIGURE 15.2-16

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-16A FIGURE 15.2-16A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-17 FIGURE 15.2-17

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-17A FIGURE 15.2-17A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-18 FIGURE 15.2-18

[21.3]

MAIN FEEDLINE RUPTURE WITH OFFSITE POWER AVAILABLE N/A N/A 15.2-18A FIGURE 15.2-18A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-19 FIGURE 15.2-19

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-19A FIGURE 15.2-19A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-20 FIGURE 15.2-20

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-20A FIGURE 15.2-20A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 74 of 83 15.2-21 FIGURE 15.2-21

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-21A FIGURE 15.2-21A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-22 FIGURE 15.2-22

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-22A FIGURE 15.2-22A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-23 FIGURE 15.2-23

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-23A FIGURE 15.2-23A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.2-24 FIGURE 15.2-24

[21.3]

MAIN FEEDLINE RUPTURE WITHOUT OFFSITE POWER AVAILABLE N/A N/A 15.2-24A FIGURE 15.2-24A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-1 FIGURE 15.3-1

[21.3]

FLOW TRANSIENTS ONE PUMP COASTING DOWN N/A N/A 15.3-2 FIGURE 15.3-2

[21.3]

NUCLEAR POWER AND PRESSURIZER PRESSUR TRANSIENTS, ONE PUMP COASTING DOWN N/A N/A 15.3-3 FIGURE 15.3-3

[21.3]

AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENT, ONE PUMP COASTING DOWN N/A N/A 15.3-4 FIGURE 15.3-4

[21.3]

DNBR VERSUS TIME, ONE PUMP COASTING DOWN N/A N/A 15.3-5 FIGURE 15.3-5

[21.3]

CORE FLOW COASTDOWN, FOUR PUMPS COASTING DOWN N/A N/A 15.3-6 FIGURE 15.3-6

[21.3]

NUCLEAR POWER & PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS COASTING DOWN N/A N/A 15.3-7 FIGURE 15.3-7

[21.3]

AVERAGE & HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS COASTING DOWN N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 75 of 83 15.3-8 FIGURE 15.3-8

[21.3]

DNBR VERSUS TIME, FOUR PUMPS COASTING DOWN N/A N/A 15.3-9 FIGURE 15.3-9

[21.3]

FLOW TRANSIENTS, ONE LOCKED ROTOR N/A N/A 15.3-9A FIGURE 15.3-9A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-10 FIGURE 15.3-10

[21.3]

RCS PRESSURE, ONE LOCKED ROTOR N/A N/A 15.3-10A FIGURE 15.3-10A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-11 FIGURE 15.3-11

[21.3]

NUCLEAR POWER AND CORE AVERAGE HEAT FLUX TRANSIENTS, ONE LOCKED ROTOR N/A N/A 15.3-11A FIGURE 15.3-11A

[17.2])

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-12 FIGURE 15.3-12

[21.3]

MAXIMUM CLAD TEMPERATURE AT HOT SPOT FOR FOUR LOOPS IN OPERATION, ONE LOCKED ROTOR N/A N/A 15.3-12A FIGURE 15.3-12A

[17.2])

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.3-13 FIGURE 15.3-13

[21.3]

CORE FLOW TRANSIENT, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-14 FIGURE 15.3-14

[21.3]

NUCLEAR POWER AND PRESSURIZER PRESSURE TRANSIENTS, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-15 FIGURE 15.3-15

[21.3]

AVERAGE AND HOT CHANNEL HEAT FLUX TRANSIENTS, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.3-16 FIGURE 15.3-16

[21.3]

DNBR VERSUS TIME, FOUR PUMPS EXPERIENCING FREQUENCY DECAY N/A N/A 15.4-1 FIGURE 15.4-1 MARCH 1998 NEUTRON & THERMAL FLUX TRANSIENT FOR UNCONTROLLED RCCA WITHDRAWAL FORM A SUBCRITICAL CONDITION N/A N/A 15.4-2 FIGURE 15.4-2 N/A OMITTED N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 76 of 83 15.4-3 FIGURE 15.4-3 MARCH 1998 FUEL & CLAD TEMPERATURE TRANSIENTS UNCONTROLLED RCCA WITHDRAWAL FROM A SUBCRITICAL CONDITION N/A N/A 15.4-4 FIGURE 15.4-4

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-4A FIGURE 15.4-4A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-5 FIGURE 15.4-5

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-5A FIGURE 15.4-5A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-6 FIGURE 15.4-6

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (75 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-6A FIGURE 15.4-6A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-7 FIGURE 15.4-7

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-7A FIGURE 15.4-7A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-8 FIGURE 15.4-8

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-8A FIGURE 15.4-8A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-9 FIGURE 15.4-9

[20.1]

UNCONTROLLED RCCA BANK WITHDRAWAL FROM FULL POWER WITH MAXIMUM REACTIVITY FEEDBACK (3 PCM/SEC. WITHDRAWAL RATE)

N/A N/A 15.4-9A FIGURE 15.4-9A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-10 FIGURE 15.4-10

[20.1]

MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: ROD WITHDRAWAL FROM 100% POWER N/A N/A 15.4-10A FIGURE 15.4-10A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 77 of 83 15.4-11 FIGURE 15.4-11

[20.1]

MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 60% RATED THERMAL POWER N/A N/A 15.4-11A FIGURE 15.4-11A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-12 FIGURE 15.4-12

[20.1]

MINIMUM DNBR VERSUS REACTIVITY INSERTION RATE: RCCA WITHDRAWAL FROM 10% RATED THERMAL POWER N/A N/A 15.4-13 FIGURE 15.4-13 AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL N/A N/A 15.4-14 FIGURE 15.4-14 AMENDMENT 12 FEBRUARY 1985 DROPPED ROD CLUSTER CONTROL ASSEMBLY, AUTOMATIC CONTROL N/A N/A 15.4-21 FIGURE 15.4-21 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 3 ASSEMBLY N/A N/A 15.4-22 FIGURE 15.4-22 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING RETAINED BY THE REGION 2 ASSEMBLY N/A N/A 15.4-23 FIGURE 15.4-23 NONE INTERCHANGE BETWEEN REGION 1 AND REGION 2 ASSEMBLY, BURNABLE POISON RODS BEING RETAINED BY THE REGION 1 ASSEMBLY N/A N/A 15.4-24 FIGURE 15.4-24 NONE ENRICHMENT ERROR: A REGION 2 ASSEMBLY LOADED INTO THE CORE CENTRAL POSITION N/A N/A 15.4-25 FIGURE 15.4-25 NONE LOADING A REGION 2 ASSEMBLY INTO A REGION 1 POSTION NEAR CORE PERIPHERY N/A N/A 15.4-26 FIGURE 15.4-26

[17.2]

NUCLEAR POWER TRANSIENT BOL HFP RCCA EJECTION N/A N/A 15.4-26A FIGURE 15.4-26A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-27 FIGURE 15.4-27

[17.2]

HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - BOL HFP RCCA EJECTION N/A N/A 15.4-27A FIGURE 15.4-27A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.4-28 FIGURE 15.4-28 MARCH 1998 NUCLEAR POWER TRANSIENT EOL HZP RCCA EJECTION (TWO RCPs RUNNING)

N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 78 of 83 15.4-29 FIGURE 15.4-29 MARCH 1999 HOT SPOT FUEL & CLAD TEMPERATURE VERSUS TIME - EOL HZP RCCA EJECTION (TWO RCPs RUNNING)

N/A N/A 15.4-30 FIGURE 15.4-30 NONE REACTOR COOLANT SYSTEM INTEGRATED BREAK FLOW FOLLOWING A ROD EJECTION ACCIDENT N/A N/A 15.5-1 FIGURE 15.5-1

[21.3]

CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, NUCLEAR POWER AND VESSEL AVERAGE TEMPERATURE VERSUS TIME N/A N/A 15.5-2 FIGURE 15.5-2

[21.3]

CVCS MALFUNCTION THAT INCREASES REACTOR COOLANT INVENTORY, PRESSURIZER PRESSURE AND PRESSURIZER WATER VOLUME VERSUS TIME N/A N/A 15.5-3 FIGURE 15.5-3

[21.3]

DELETED BY CHANGE PKG FSC 07-MP3-055 N/A N/A 15.6-1 FIGURE 15.6-1

[21.3]

INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE N/A N/A 15.6-1A FIGURE 15.6-1A

[17.2]

Deleted by CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6-2 FIGURE 15.6-2

[21.3]

INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE N/A N/A 15.6-2A FIGURE 15.6-2A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6-3 FIGURE 15.6-3

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.6.3-1 FIGURE 15.6.3-1

[21.3]

PRESSURIZER LEVEL N/A N/A 15.6.3-2 FIGURE 15.6.3-2

[21.3]

Reactor Coolant System Pressure N/A N/A 15.6.3-3 FIGURE 15.6.3-3

[21.3]

SECONDARY PRESSURE N/A N/A 15.6.3-4 FIGURE 15.6.3-4

[21.3]

RUPTURED LOOP HOT AND COLD LEG RCS TEMPERATURES N/A N/A 15.6.3-5 FIGURE 15.6.3-5

[21.3]

INTACT LOOP HOT AND COLD LEG RCS TEMPERATURES N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 79 of 83 15.6.3-6 FIGURE 15.6.3-6

[21.3]

PRIMARY TO SECONDARY BREAK FLOW RATE N/A N/A 15.6.3-7 FIGURE 15.6.3-7

[21.3]

Differential Pressure Between Reactor Coolant System and Ruptured Steam Generator N/A N/A 15.6.3-8 FIGURE 15.6.3-8

[21.3]

Ruptured Steam Generator Water Volume N/A N/A 15.6.3-9 FIGURE 15.6.3-9

[21.3]

Ruptured Steam Generator Water Mass N/A N/A 15.6.3-10 FIGURE 15.6.3-10

[21.3]

Ruptured Steam Generator Mass Release Rate to the Atmosphere N/A N/A 15.6.3-11 FIGURE 15.6.3-11

[21.3]

Intact Steam Generators Mass Release Rate to the Atmosphere.

N/A N/A 15.6.3-12 FIGURE 15.6.3-12

[21.3]

FLASHED BREAK FLOW N/A N/A 15.6-4 FIGURE 15.6-4 NONE SEQUENCE OF EVENTS FOR LARGE BREAK LOCA ANALYSIS N/A N/A 15.6-5 FIGURE 15.6-5

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-6 FIGURE 15.6-6

[17]

CODE INTERFACE DESCRIPTION FOR SMALL BREAK LOCA MODEL N/A N/A 15.6-7 FIGURE 15.6-7

[17]

SMALL BREAK POWER SHAPE N/A N/A 15.6-8 FIGURE 15.6-8

[21.3]

PEAK CLAD TERMPERATURE - DECLG (Cd = 0.6)

N/A N/A 15.6-8A FIGURE 15.6-8A

[21.3]

Deleted by CHANGE PKG FSC 07-MP3-054 N/A N/A 15.6-9 FIGURE 15.6-9

[21.3]

Limiting PCT Case Vessel Side Break Flow N/A N/A 15.6-10 FIGURE 15.6-10

[21.3]

Limiting PCT Case Loop Side Break Flow N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 80 of 83 15.6-11 FIGURE 15.6-11

[21.3]

Limiting PCT Case Broken and Intact Loop Void Fraction N/A N/A 15.6-12 FIGURE 15.6-12

[21.3]

Limiting PCT Case Hot Assembly Top Third of Core Vapor Flow N/A N/A 15.6-13 FIGURE 15.6-13

[21.3]

Limiting PCT Case Pressurizer Pressure N/A N/A 15.6-14 FIGURE 15.6-14

[21.3]

Limiting PCT Case Lower Plenum Collapsed Liquid Level N/A N/A 15.6-15 FIGURE 15.6-15

[21.3]

Limiting PCT Case Vessel Fluid Mass N/A N/A 15.6-16 FIGURE 15.6-16

[21.3]

Limiting PCT Case Loop 2 Accumulator Flow N/A N/A 15.6-17 FIGURE 15.6-17

[21.3]

Limiting PCT Case Loop 2 Safety Injection Flow N/A N/A 15.6-18 FIGURE 15.6-18

[21.3]

Limiting PCT Case Core Average Channel Collapsed Liquid Level N/A N/A 15.6-19 FIGURE 15.6-19

[21.3]

Limiting PCT Case Loop 2 Downcomer Collapsed Liquid Level N/A N/A 15.6-20 FIGURE 15.6-20

[21.3]

BELOCA Analysis Axial Power Shape Operating Space Envelope N/A N/A 15.6-21 FIGURE 15.6-21

[21.3]

Lower Bound Containment Pressure N/A N/A 15.6-22 FIGURE 15.6-22

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-23 FIGURE 15.6-23

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-24 FIGURE 15.6-24

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-25 FIGURE 15.6-25

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 81 of 83 15.6-26 FIGURE 15.6-26

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-27 FIGURE 15.6-27

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-28 FIGURE 15.6-28

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-29 FIGURE 15.6-29

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-30 FIGURE 15.6-30

[21.3]

Deleted by FSARCR PKG FSC 07-MP3-054 N/A N/A 15.6-31 FIGURE 15.6-31

[21.3]

Reactor Coolant System Pressure (4 inch Break)

N/A N/A 15.6-32 FIGURE 15.6-32

[21.3]

Core Mixture Level (4 inch Break)

N/A N/A 15.6-33 FIGURE 15.6-33

[21.3]

Clad Temperature Transient at Peak Temperature Elevation (4 inch Break)

N/A N/A 15.6-34 FIGURE 15.6-34

[21.3]

Core Exit Steam Flow Rate (4 inch Break)

N/A N/A 15.6-35 FIGURE 15.6-35

[21.3]

Clad Surface Heat Transfer Coefficient at Peak Clad Temperature Elevation (4 inch Break)

N/A N/A 15.6-36 FIGURE 15.6-36

[21.3]

Fluid Temperature at Peak Clad Temperature Elevation (4 inch Break)

N/A N/A 15.6-37 FIGURE 15.6-37

[21.3]

Reactor Coolant System Pressure (1.5 inch Break)

N/A N/A 15.6-38 FIGURE 15.6-38

[21.3]

Reactor Coolant System Pressure (2 inch Break)

N/A N/A 15.6-39 FIGURE 15.6-39

[21.3]

Reactor Coolant System Pressure (3 inch Break)

N/A N/A 15.6-40 FIGURE 15.6-40

[21.3]

Reactor Coolant System Pressure (6 inch Break)

N/A N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 82 of 83 15.6-41 FIGURE 15.6-41

[21.3]

Reactor Coolant System Pressure (8.75 inch Break)

N/A N/A 15.6-42 FIGURE 15.6-42

[21.3]

Core Mixture Level (1.5 inch Break)

N/A N/A 15.6-43 FIGURE 15.6-43

[21.3]

Core Mixture Level (2 inch Break)

N/A N/A 15.6-44 through

-62 N/A

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A 15.B ALL FIGURES

[17.2]

DELETED BY CHANGE PKG FSC 02-MP3-017 N/A N/A FPER 3-1 N/A N/A FIRE PROTECTION ORGANIZATIONAL CHART (HAS BEEN DELETED)

N/A N/A FPER 4-1 FPER FIGURE 4-1 SH. 1

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 1 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 2

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 2 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 3

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 3 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 4

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 4 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 5

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION 25212-26946 (a) SH 5 OF 5 FPER 4-1 FPER FIGURE 4-1 SH. 6

[27.3]

PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION SYSTEM (FIRE PUMP HOUSE AND YARD) 25212-26970 (a) SH 1 FPER 77(A) FPER FIGURE 77A

[27.3]

FIRE HAZARDS ANALYSIS PLAN ELEVATION 3 FEET - 8 INCHES 25212-24260 (a) N/A FPER 77(B)

FPER FIGURE 77 B

[27.3]

FIRE HAZARDS ANALYSIS PLAN ELEVATION 24 FEET - 6 INCHES 25212-24261 (a) N/A FPER 77(C)

FPER FIGURE 77 C

[27.3]

FIRE HAZARDS ANALYSIS PLAN ELEVATION 38 FEET - 6 INCHES 25212-24262 (a) N/A LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET

MPS-3 FSAR Page 83 of 83 FPER 77(D) FPER FIGURE 77 D

[27.3]

FIRE HAZARDS ANALYSIS PLAN ELEVATION 52 FEET-6 INCHES 25212-24263 (a) N/A FPER 77(E)

FPER FIGURE 77 E

[27.3]

FIRE HAZARDS ANALYSIS (ROOF PLAN) 25212-24264 (a) N/A FPER 77(F)

FPER FIGURE 77 F

[27.3]

FIRE HAZARDS ANALYSIS (SECTIONS) 25212-24265 (a) N/A FPER 8-1 FPER FIGURE 8-1 AMENDMENT 17 NOVEMBER 1985 PROCESS CONTROL TRANSFER SCHEME (TYPICAL)

N/A N/A FPER 8-2 FPER FIGURE 8-2 AMENDMENT 17 NOVEMBER 1985 PROCESS INSTRUMENTATION TRANSFER SCHEME N/A N/A a.

Incorporated by reference this engineering controlled drawing is, coincidentally, an MPS-3 FSAR figure. Refer to the controlled plant drawing for the latest revision.

LIST OF EFFECTIVE FIGURES Figure Number FIGURE LABEL DATE / Revision [ ]

TITLE Drawing Number SHEET