ML18142B276: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 28: | Line 28: | ||
3'iII'/~~4<<t 1PJ | 3'iII'/~~4<<t 1PJ | ||
'~"~- RE Ginna>,f/1 NOTE:" IP "'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~ ~ | '~"~- RE Ginna>,f/1 NOTE:" IP "'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~ ~ | ||
SEND DIRECTLY TO KREGER/J .COLLINS | SEND DIRECTLY TO KREGER/J .COLLINS FOR ACTION/INFORMATION CRG 76 BRANCH CHIEF: Pur le | ||
FOR ACTION/INFORMATION CRG 76 BRANCH CHIEF: Pur le | |||
{KS..POR~ZEOM.- | {KS..POR~ZEOM.- | ||
IIC ~ST.: | IIC ~ST.: | ||
| Line 36: | Line 34: | ||
,; INTERNAL DISTRI BUTION | ,; INTERNAL DISTRI BUTION | ||
- --NR -PDR- | - --NR -PDR- | ||
- SGHRQEDER IPPOLITO UBKlN | - SGHRQEDER IPPOLITO UBKlN | ||
.NOVAK CHECK GRIMES CASE TEDESCO MACCARY EISENHUT | .NOVAK CHECK GRIMES CASE TEDESCO MACCARY EISENHUT | ||
-BAER- | -BAER- | ||
'HAO VOLLMER BUNCH | 'HAO VOLLMER BUNCH | ||
..KREGER J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: 'Roc ester TIC: | ..KREGER J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: 'Roc ester TIC: | ||
72 | 72 | ||
Revision as of 23:33, 2 February 2020
| ML18142B276 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 07/19/1976 |
| From: | White L Rochester Gas & Electric Corp |
| To: | O'Reilly J NRC/IE, NRC Region 1 |
| References | |
| LER 1976-20-00 | |
| Download: ML18142B276 (6) | |
Text
5 U.Si NUCLEAR ACGULATOAYCO ION DOCKET NUMBER NRC FOAM 1 50-2/ 4 IZ.7III FILE'l4UMBEA
.NRC DISTRIBUTION FOII" PART 50 DOCKET MATERIAL INCIDEKZ REPORT DATE OF DOCUMENT J.P; O'Reilly FROM'ochestereCas 6 Elec. Corp.
7-15-76 Rochester N.Y. DATE AECEIVEO
.I i E.. D. Whit , Jr.
7-g-76 LETTER 0 NOTOA IZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED El ORIGINAL ZlUNCLASSIFIEO 1 QCOerj DESCAIPTION ENCLOSURE Ltr.'rans the'following...... Li'censee event report(ROI/76-17) on 6-18-76 concerning Monitoring and Enrichment of
,I Accumulator Boion 'Concentration;............
(1 signed cy recieved)
(2 pgs.)
ACKN0%1 KDGKD Be NOT RzMOVz
~~gmwQtaT i '
3'iII'/~~4<<t 1PJ
'~"~- RE Ginna>,f/1 NOTE:" IP "'PERSONNEL ZXFOSURE IS INVOIIVEB~cn>~ ~
SEND DIRECTLY TO KREGER/J .COLLINS FOR ACTION/INFORMATION CRG 76 BRANCH CHIEF: Pur le
{KS..POR~ZEOM.-
IIC ~ST.:
SEN', TO ZA: "~
,; INTERNAL DISTRI BUTION
- --NR -PDR-
- SGHRQEDER IPPOLITO UBKlN
.NOVAK CHECK GRIMES CASE TEDESCO MACCARY EISENHUT
-BAER-
'HAO VOLLMER BUNCH
..KREGER J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: 'Roc ester TIC:
72
r f ,1 r
4 0"'
9 ill@'~ l"k '~
~ ~ 'tr ~ w,
>!I
/, / "lj
'l";
'"'OCHESTER ELECTRIC CORPORATIO
'F GAS AND AVENUE, ROCHES ( ER, N.Y. 14649 LEON D. WHITE. JR. T t I. t P v 0 h t VICC I'RtSIDtRT 8" e ipt;sa 5JG 2700
+yA c.. /
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Subject. Reportable Occurrence 76-17 (30-day report), "A"Accumulator level below Technical Specification limit "R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
Dear Mr. O'Reilly:
In accordance with Technical Specifications, Article 6.9.2b, the attached report of Reportable Occurrence 76-17, 30-day, is hereby submitted. Two additional copies of this letter and the attachment are enclosed.
Very truly yours, t
r tr
/
L. D. White, Jr.
Attachment cc: Dr. Ernst Volgenau (30)
Mr. William G. McDonald (3)
~.
lel,>,w,
",1
- i ~
K l~
li (7
4 LER 76-17/3L
~ s
~ ICENSEE EVENT REPORT ~
CONTROL BLOCK: (PLEASE PRINT ALL REQUIRED INFORIVIATIONg 1 6 UCENSEE UCENSE EVENT NAME LCENSE NUMBER TYPE TYPE
[oaf N Y R E G 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1 L0003~I
~
7 89 14 15 25 26 30 31 32 REPORT REPORT CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE Qogcoov ~L ~L 0 6 0 0 2 4 4 0 6 1 6 7 6 0 2 1 6 2 6 7 8 57 58 59 60 61 68 69 74 75 80 I
EVENT OESCRIPTION uring performance of procedure S-16.11, "Monitoring and Enrichment of Accumulator 7 8 9 80 Boron Concentration," "A" Accumu drain valve was opened with controls at the rear of 7 89 80
~04 ontrol board. The operator then proceeded to front of control board to monitor level 7 8 9 80 Qpg indicators reading more conservative than those at the rear, and noted level lowered to "B"il Accumulator was at proper level. Proper (cont'd.
il i 80 rgg~]
46% 0 under Additional Factors)
~
7 89 PRME 80 SYSTEM CAUSE COMPONENT COMPONENT MANUFACTURER 7 8 9 10 11 12 17 43 44 47 48 CAUSE OESCRIPTION toOB] -16.11 did not provide precautions relative to operator remaining at valve controls 7 '89 80
~og during lowering level. As recommended by PORC (meeting 75-76, item 76-932) S-16. 11 7 89 80
~10 as. changed to incorporate the appropriate precautions.
7 89 FACIUTY METHOD OF 80 STATUS % POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION
@~i E ~10 O NA 7 8 9 10 12 13 44 45 46 60 FORM OF ACTIVITY COATENT AMOUNT OF ACTIVITY LOCATION OF RELEASE NA 7 8 9 10 11 44 45 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION IiioI ~00 0 E NA 7 89 11 12 13 60 PERSONNEL INJURIES NUMBER DESCRIPTION tiiol ~00 0 NA 7 89 11 12 OFFSITE CONSEQUENCES 7 89 LOSS OR OAMAGE TO FACILITY TYPE DESCRIPTION 7 69 10 SG PUBLICITY NA 7 89 60 AOOITIONAL FACTORS
[ice] (cont'd. from Event Description) level was restored in 11 minutes. Corrective Action 7 .8-9 60 Report 1081 was issued and documents the PORC-recommended actions. (Reportable
~19 Occurrence 76-l7, 30-day) .
7 89 60 NAME'ruce A. Snow PHQNE.7 16/546-2700, ext. 29 1-2 14 4 o>>
'ERIC 0
r r ears.
~
J