ML19242D142: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                                              .
                                                                                  .
BOSTON EDISON CO:!PAirl TELECOPY !!ESS AGE To:    215-337-5272                    '
BOSTON EDISON CO:!PAirl TELECOPY !!ESS AGE To:    215-337-5272                    '
                                                                                     ^"U" Datc/ Time:
                                                                                     ^"U" Datc/ Time:
                                                                                            '
                                                                                                   /
                                                                                                   /
Telephone Number To: Director, rec i on I                                    From: Pilgrim Nuclear Power Station Office of Inspection and Enforec=ent                            RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission                              Plymouth, MA      02360 631 Park Avenue King of Prussia, PA 19406
Telephone Number To: Director, rec i on I                                    From: Pilgrim Nuclear Power Station Office of Inspection and Enforec=ent                            RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission                              Plymouth, MA      02360 631 Park Avenue King of Prussia, PA 19406
Line 31: Line 28:
== Description:==
== Description:==
On June 12, 1979 while performing repcirs on the          "A" Core Spray Systea uinimum flow lina, a de;;radation of primary containment intagrity occurred.
On June 12, 1979 while performing repcirs on the          "A" Core Spray Systea uinimum flow lina, a de;;radation of primary containment intagrity occurred.
.
Thic is a vicla tio*r af Tech. Spec. 3.7. A.2.
Thic is a vicla tio*r af Tech. Spec. 3.7. A.2.
                                                                                                                    .
                                                                                                                .
            .
Cause and Corrective Action: ITnile investigating problems with the Core Spray Lcop                        "A" minirum flot, line, the disc in the 6" check valve required repair and was recoved and replaced,          thus violating pricary containment integrity. Tln              occurrence was identified during an unscheduled IE Inspection.
Cause and Corrective Action: ITnile investigating problems with the Core Spray Lcop                        "A" minirum flot, line, the disc in the 6" check valve required repair and was recoved and replaced,          thus violating pricary containment integrity. Tln              occurrence was identified during an unscheduled IE Inspection.
Facility Status:                                                          100  % Thermal MU c) Routine Scartup                                                    g) Shutdown d) Routin Shutdo.m                                                    h) Refueling e) Steady State              X                                      'i) Other f) Load Changing                                                      j) Not Applicaple A written follow-up report will be sent within tuo wechs.                                                        .
Facility Status:                                                          100  % Thermal MU c) Routine Scartup                                                    g) Shutdown d) Routin Shutdo.m                                                    h) Refueling e) Steady State              X                                      'i) Other f) Load Changing                                                      j) Not Applicaple A written follow-up report will be sent within tuo wechs.                                                        .
NRC person notified _            Mr. R. Archi tzel            Prepared by      John M. Fol con
NRC person notified _            Mr. R. Archi tzel            Prepared by      John M. Fol con e
                                                                .....-
9D\
e 9D\
Mall (2) copies to:                                                                          ; ,
Mall (2) copies to:                                                                          ; ,
                                                                                           ." ' '    , [~]
                                                                                           ." ' '    , [~]

Revision as of 01:31, 2 February 2020

RO 79-029/01X-0 on 790809:degradation of Primary Containment Integrity Occurred on 790612 During Repairs of Core Spray Sys Min Flow Line A.While Investigating Problem,Violation Noted in 6-inch Check Valve.Valve Repaired
ML19242D142
Person / Time
Site: Pilgrim
Issue date: 08/09/1979
From: Fulton J
BOSTON EDISON CO.
To:
References
NUDOCS 7908140547
Download: ML19242D142 (1)


Text

.

BOSTON EDISON CO:!PAirl TELECOPY !!ESS AGE To: 215-337-5272 '

^"U" Datc/ Time:

/

Telephone Number To: Director, rec i on I From: Pilgrim Nuclear Power Station Office of Inspection and Enforec=ent RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406

Subject:

PRO:12T REPORTABLE OCCURRENCE Docket Number 50-293; License DPR-35 .

Ascigned LER Number 79-029/01X-0 Event

Description:

On June 12, 1979 while performing repcirs on the "A" Core Spray Systea uinimum flow lina, a de;;radation of primary containment intagrity occurred.

Thic is a vicla tio*r af Tech. Spec. 3.7. A.2.

Cause and Corrective Action: ITnile investigating problems with the Core Spray Lcop "A" minirum flot, line, the disc in the 6" check valve required repair and was recoved and replaced, thus violating pricary containment integrity. Tln occurrence was identified during an unscheduled IE Inspection.

Facility Status: 100  % Thermal MU c) Routine Scartup g) Shutdown d) Routin Shutdo.m h) Refueling e) Steady State X 'i) Other f) Load Changing j) Not Applicaple A written follow-up report will be sent within tuo wechs. .

NRC person notified _ Mr. R. Archi tzel Prepared by John M. Fol con e

9D\

Mall (2) copies to:  ; ,

." ' ' , [~]

Director Office o f !!an.:gement Informatica and Progra-- Control -

U. S. "ucle'.c Regulatory Co:C'sion -

Wa nh it' ,; to r. , D.C. 2'M 33

- b,s 7908140 [ 9 7