{{#Wiki_filter: | {{#Wiki_filter:August 27, 2019 | ||
==SUBJECT:== | ==SUBJECT:== | ||
UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - | UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - | ||
(REPORT 05000335/2019005 AND 05000389/2019005) | |||
==Dear Mr. Moul:== | ==Dear Mr. Moul:== | ||
| Line 34: | Line 34: | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Randall A. Musser, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure: | |||
St Lucie Inspection/Activity Plan (09/01/2019 - 06/30/2021) | Randall A. Musser, Chief | ||
cc: Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - | |||
Reactor Projects Branch 3 | |||
Division of Reactor Projects | |||
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 | |||
Enclosure: | |||
St Lucie Inspection/Activity Plan (09/01/2019 - 06/30/2021) | |||
cc: Distribution via Listserv SUBJECT: | |||
UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 - | |||
(REPORT 05000335/2019005 AND 05000389/2019005) | |||
DISTRIBUTION: | DISTRIBUTION: | ||
M. Kowal, RII R. Musser, BC L. Pressley, SPE R. Taylor, SPE OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPAssessment Resource ROPReports Resource Institute of Nuclear Power Operations (INPO) | M. Kowal, RII R. Musser, BC L. Pressley, SPE R. Taylor, SPE OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPAssessment Resource ROPReports Resource Institute of Nuclear Power Operations (INPO) | ||
ADAMS Accession Number: ML19239A233 OFFICE RII:DRP RII:DRP NAME LPressley RMusser DATE 8/22/2019 8/22/2019 OFFICIAL AGENCY RECORD | |||
ADAMS Accession Number: ML19239A233 OFFICE RII:DRP RII:DRP | |||
NAME LPressley RMusser | |||
DATE 8/22/2019 8/22/2019 | |||
OFFICIAL AGENCY RECORD | |||
Enclosure | |||
2 | |||
}} | }} | ||
Latest revision as of 14:48, 4 January 2025
| ML19239A233 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/27/2019 |
| From: | Randy Musser NRC/RGN-II, Division Reactor Projects II |
| To: | Moul D Florida Power & Light Co |
| Reeder D | |
| References | |
| IR 2019005 | |
| Download: ML19239A233 (5) | |
Text
August 27, 2019
SUBJECT:
UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 -
(REPORT 05000335/2019005 AND 05000389/2019005)
Dear Mr. Moul:
The enclosed inspection plan lists the inspections scheduled through June 30, 2021 for St. Lucie Plant Unit 1 and Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.
You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections), and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020.
The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4603 with any questions you have regarding this letter.
Sincerely,
/RA/
Randall A. Musser, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
St Lucie Inspection/Activity Plan (09/01/2019 - 06/30/2021)
cc: Distribution via Listserv SUBJECT:
UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 -
(REPORT 05000335/2019005 AND 05000389/2019005)
DISTRIBUTION:
M. Kowal, RII R. Musser, BC L. Pressley, SPE R. Taylor, SPE OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPAssessment Resource ROPReports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession Number: ML19239A233 OFFICE RII:DRP RII:DRP
NAME LPressley RMusser
DATE 8/22/2019 8/22/2019
OFFICIAL AGENCY RECORD
Enclosure
2