==SUBJECT:== | |||
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC SECURITY BASELINE INSPECTION REPORT 05000315/2019410 AND 05000316/2019410 | |||
==Dear Mr. Gebbie:== | ==Dear Mr. Gebbie:== | ||
On July 11, 2019 | On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. S. Lies and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. S. Lies and other members of your staff. | |||
The NRC inspector did not identify any finding or violation of more-than-minor significance. | |||
If you choose to provide a response that contains Security-Related Information, please mark your entire response | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | Sincerely, | ||
/RA/ Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Docket | /RA/ | ||
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74 | |||
===Enclosure:=== | ===Enclosure:=== | ||
As stated | As stated | ||
==Inspection Report== | ==Inspection Report== | ||
Docket | Docket Numbers: 05000315 and 05000316 License Numbers: DPR-58 and DPR-74 Report Numbers: 05000315/2019410 and 05000316/2019410 Enterprise Identifier: I-2019-410-0048 Licensee: Indiana Michigan Power Company Nuclear Generation Group Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Inspection Dates: June 3, 2019, to July 12, 2019 Inspector: M. Ziolkowski, Senior Physical Security Inspector Approved By: Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure | ||
DPR-58 and DPR-74 Report Numbers: | |||
05000315/2019410 and 05000316/2019410 Enterprise Identifier: | |||
I-2019-410-0048 Licensee: Indiana Michigan Power Company Nuclear Generation Group Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Inspection Dates: | |||
June 3, 2019 | |||
, to July 12, 2019 Inspector: | |||
M. Ziolkowski , Senior Physical Security Inspector Approved By: | |||
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety | |||
=SUMMARY= | =SUMMARY= | ||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | ||
List of Findings and Violations No findings or violations of more-than-minor significance were identified. | |||
Additional Tracking Items None. | Additional Tracking Items None. | ||
=INSPECTION SCOPES= | |||
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | |||
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. | |||
-Water Reactor Inspection Program | |||
- Operations Phase. | |||
==SAFEGUARDS== | ==SAFEGUARDS== | ||
| Line 70: | Line 63: | ||
Access Control=== | Access Control=== | ||
{{IP sample|IP=IP 71130.02|count=1}} | {{IP sample|IP=IP 71130.02|count=1}} | ||
-d), 02.07, 02.08 (d | (1) | ||
-f, I) | * Tier I: All | ||
* Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I) | |||
* Tier III: 02.09 | |||
==71130.06 - Protection of Safeguards Information== | ==71130.06 - Protection of Safeguards Information== | ||
| Line 79: | Line 74: | ||
Protection of Safeguards Information=== | Protection of Safeguards Information=== | ||
{{IP sample|IP=IP 71130.06|count=1}} | {{IP sample|IP=IP 71130.06|count=1}} | ||
-b), 02.07.c Tier III: 02.08, 02.09 (a | (1) | ||
-b) | * Tier I: All | ||
* Tier II: 02.04.b, 02.05 (a-b), 02.07.c | |||
* Tier III: 02.08, 02.09 (a-b) | |||
==71130.07 - Security Training== | ==71130.07 - Security Training== | ||
| Line 89: | Line 86: | ||
Security Training=== | Security Training=== | ||
{{IP sample|IP=IP 71130.07|count=1}} | {{IP sample|IP=IP 71130.07|count=1}} | ||
-b), 02.06b, 02.09 (a | (1) | ||
-b) | * Tier I: All | ||
-b), 02.13 (a | * Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b) | ||
-c) | * Tier III: 02.12 (a-b), 02.13 (a-c) | ||
===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below: | |||
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) | PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) | ||
=== | |||
- 3/30/2019) | {{IP sample|IP=IP 71151|count=1}} | ||
(1) (10.01/2018 - 3/30/2019) | |||
==INSPECTION RESULTS== | ==INSPECTION RESULTS== | ||
| Line 103: | Line 103: | ||
==EXIT MEETINGS AND DEBRIEFS== | ==EXIT MEETINGS AND DEBRIEFS== | ||
The inspector verified no proprietary information was retained or documented in this report. | The inspector verified no proprietary information was retained or documented in this report. | ||
* On July 11, 2019, the inspector presented the security baseline inspection results to Mr. S. Lies and other members of the licensee staff. | |||
On July 11, 2019, the inspector presented the security baseline inspection results to Mr. S. Lies and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | =DOCUMENTS REVIEWED= | ||
Inspection | Inspection Type Designation Description or Title Revision or | ||
Description or Title | Procedure Date | ||
Revision or Date 71130.02 Procedures | 71130.02 Procedures PMP-2060- Security Requirements for Plant 34 | ||
PMP-2060- | SEC-006 Personnel | ||
SPP-2060- | SPP-2060- Protected Area Access/Exit 23 | ||
Safeguards Information Access | SFI-209 Requirements | ||
Procedures | SPP-2060- Security Core, Key and Lock 24 | ||
DTG-SPS- | SFI-214 Program | ||
PMP-2030- | 71130.06 Miscellaneous Safeguards Information Access 06/24/2019 | ||
Self- | List | ||
2019-4198-1 NRC Inspection Quick Hit Self Assessment | Procedures DTG-SPS- SGI Retained Memory 0 | ||
- Protection of Safeguards Information | 073 Verification | ||
71130.07 Corrective | PMP-2030- Protection of Nuclear Security 23 | ||
AR 2019- | SIC-001 Documents/Records | ||
06/26/2019 | Self- 2019-4198-1 NRC Inspection Quick Hit Self 0 | ||
Miscellaneous | Assessments Assessment - Protection of | ||
National Rifle Association Endorsement | Safeguards Information | ||
- Tactical Qualification Course | 71130.07 Corrective AR 2019- TAC Fire Basis Document 06/26/2019 | ||
Action 6417 | |||
Procedures | Documents | ||
DTG-SPS- | Resulting from | ||
SE-C-AR018 Suspected Tampering | Inspection | ||
SE-C-AR028 Deadly Force | Miscellaneous National Rifle Association 12/07/2017 | ||
SE-C-AR049 Response Activities | Endorsement - Tactical | ||
SE-C-AR063 Bomb Threats and Search | Qualification Course | ||
SE-Q- | Procedures DTG-SPS- Practical Physical Fitness Test 0 | ||
SE-Q- | 066 | ||
SPP-2060- | SE-C-AR018 Suspected Tampering 2 | ||
TPD-600- | SE-C-AR028 Deadly Force 0 | ||
Self- | SE-C-AR049 Response Activities 0 | ||
GT 2018- | SE-C-AR063 Bomb Threats and Search 0 | ||
- Security Training | SE-Q- Force-on-Force 40 Hr. 0 | ||
FOF01-1 Qualification Card | |||
(Initial) | |||
SE-Q- Force-on-Force 40 Hr. 0 | |||
FOF01-2 Qualification Card | |||
SPP-2060- Site Protective Services Security 8 | |||
SFI-105 Organization and | |||
Responsibilities | |||
TPD-600- Security Training Program 10 | |||
SEC Description | |||
Self- GT 2018- NRC Inspection Quick Hit Self 0 | |||
Assessments 10514 Assessment - Security Training | |||
5 | |||
}} | }} | ||
Revision as of 23:16, 7 October 2019
| ML19227A339 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 08/15/2019 |
| From: | Diana Betancourt-Roldan Plant Support Branch II |
| To: | Gebbie J Indiana Michigan Power Co |
| References | |
| IR 2019410 | |
| Download: ML19227A339 (8) | |
Text
ust 15, 2019
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2NRC SECURITY BASELINE INSPECTION REPORT 05000315/2019410 AND 05000316/2019410
Dear Mr. Gebbie:
On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 and discussed the results of this inspection with Mr. S. Lies and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspector did not identify any finding or violation of more-than-minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000315 and 05000316 License Numbers: DPR-58 and DPR-74 Report Numbers: 05000315/2019410 and 05000316/2019410 Enterprise Identifier: I-2019-410-0048 Licensee: Indiana Michigan Power Company Nuclear Generation Group Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Inspection Dates: June 3, 2019, to July 12, 2019 Inspector: M. Ziolkowski, Senior Physical Security Inspector Approved By: Diana Betancourt-Roldan, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more-than-minor significance were identified.
Additional Tracking Items None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
===The inspector evaluated the security access control program. The following elements were evaluated from this IP.
Access Control===
(1)
- Tier I: All
- Tier II: 02.06 (a, c-d), 02.07, 02.08 (d-f, I)
- Tier III: 02.09
71130.06 - Protection of Safeguards Information
===The inspector evaluated the safeguards information protection program. The following elements were evaluated from this IP:
Protection of Safeguards Information===
(1)
- Tier I: All
- Tier II: 02.04.b, 02.05 (a-b), 02.07.c
- Tier III: 02.08, 02.09 (a-b)
71130.07 - Security Training
===The inspector evaluated the nuclear Security Training Program. The following elements were evaluated from this IP.
Security Training===
(1)
- Tier I: All
- Tier II: 02.05 (a-b), 02.06b, 02.09 (a-b)
- Tier III: 02.12 (a-b), 02.13 (a-c)
===71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
(1) (10.01/2018 - 3/30/2019)
INSPECTION RESULTS
No findings or violations were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
- On July 11, 2019, the inspector presented the security baseline inspection results to Mr. S. Lies and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Procedures PMP-2060- Security Requirements for Plant 34
SEC-006 Personnel
SPP-2060- Protected Area Access/Exit 23
SFI-209 Requirements
SPP-2060- Security Core, Key and Lock 24
SFI-214 Program
71130.06 Miscellaneous Safeguards Information Access 06/24/2019
List
Procedures DTG-SPS- SGI Retained Memory 0
073 Verification
PMP-2030- Protection of Nuclear Security 23
SIC-001 Documents/Records
Self- 2019-4198-1 NRC Inspection Quick Hit Self 0
Assessments Assessment - Protection of
Safeguards Information
71130.07 Corrective AR 2019- TAC Fire Basis Document 06/26/2019
Action 6417
Documents
Resulting from
Inspection
Miscellaneous National Rifle Association 12/07/2017
Endorsement - Tactical
Qualification Course
Procedures DTG-SPS- Practical Physical Fitness Test 0
066
SE-C-AR018 Suspected Tampering 2
SE-C-AR028 Deadly Force 0
SE-C-AR049 Response Activities 0
SE-C-AR063 Bomb Threats and Search 0
SE-Q- Force-on-Force 40 Hr. 0
FOF01-1 Qualification Card
(Initial)
SE-Q- Force-on-Force 40 Hr. 0
FOF01-2 Qualification Card
SPP-2060- Site Protective Services Security 8
SFI-105 Organization and
Responsibilities
TPD-600- Security Training Program 10
SEC Description
Self- GT 2018- NRC Inspection Quick Hit Self 0
Assessments 10514 Assessment - Security Training
5