IR 05000171/2012008: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 21OO RENAISSANCE | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
==REGION I== | |||
21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA 19406-2713 August 3,2Q12 | |||
==SUBJECT:== | ==SUBJECT:== | ||
EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - NRC INSPECTION REPORT NO. O5OOO171I2O12OO8 | EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - NRC INSPECTION REPORT NO. O5OOO171I2O12OO8 | ||
==Dear Mr. Pacilio:== | ==Dear Mr. Pacilio:== | ||
on July 24 - 25,2012, the U.s. Nuclear | on July 24 - 25,2012, the U.s. Nuclear Regulatoryommission (NRC) conducted an inspection at the peach Bottom Atomic power Station Unit 1. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulaiions, and the condltions of your license. The inspection consisted of observations by the injpector, interviews with personn-el, and a review of procedures and records. The results of the your inspection were discussed with Gary Stathes, Site Vice President, and other members of inspection. The enclosed report presents organization on July 25,2012, at the conclusion of the th6 results of this inspection. No findings of safety significance were identified. | ||
The | Current NRC regulations and guidance are included on the NRC's website at www'nrc.qov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Gommunications. The current Enforcement Policy is included on the NRC's website at www.nrc.qov; select About NRC, Organizations & Functions; Office of Enforcement; Enfor;ment documents; then Enforcement Policy (Under'Related lnformation'). You may at also obtain these documents by contacting the Government Printing Office (GPO) toll-free p.m. EST, Monday through Friday 1-g66-512-1800. The GPO is open from 8:00 a.m, to 5:30 (except Federal holidaYs). | ||
please contact Laurie Kauffman at (61 O) 337-5323 if you have any questions regarding this matter. | |||
w->#- | |||
Sincerely, Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety | |||
===Enclosure:=== | |||
lnspection Report No. 0500017112012008 | |||
REGION I== | |||
INSPECTION REPORT lnspection No. 0500017112012008 Docket No. 050001 71 License No. DPR-12 Licensee: Exelon Generation Company, LLC (Exelon) | |||
Facility: Peach Bottom Atomic Power Station Unit 1 (PB-1) | |||
Address: 1848 Lay Road Delta, Pennsylvania 17 31 4-9032 lnspection Dates: July 24 - 25,2012 Inspector: Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Approved By: Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008'doc | |||
=EXECUTIVE SUMMARY= | |||
Exelon Generation ComPanY, LLC | |||
Peach Bottom Atomic Power Station Unit 1 NRC lnspection Report No. 0500017112012008 A routine announced safety inspection was conducted on July 24 and 25, 2012, by a Region I inspector at PB-1. The inspection included a review of operations, management oversight, maintenance, corrective action program implementation, and plant support activities while in safe storage (SAFSTOR) status. The inspection consisted of observations by the inspector, interviews with Exelon personnel, and a review of procedures and records. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in lnspection Manual Chapter (lMC) 256l, "Decommissioning Power Reactor Inspection Program." | |||
There are currently no ongoing decommissioning activities being conducted at PB-1. Based on the results of this inspection, no findings of safety significance were identified. | |||
lnspection Report No. 050001 7 1 12012008 GlWordDocs\Cu rrent\l nsp Report\RDPR- 1 2.20 1 2008.doc | |||
=REPORT DETAILS= | |||
Background PB-1 is a high temperature gas-cooled demonstration power reactor that operated from February 1966 until October 31,1974, and has been permanently shut down and in SAFSTOR since that time. All fuel has been removed from the reactor and shipped to an offsite facility. The spent fuel pool has been drained and decontaminated, and all radioactive liquids have been removed. | |||
The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in IMC 2561. The inspection consisted of observations by the inspector, interviews with Exelon personnel, and a review of procedures and records. | |||
SAFSTOR Performance and Status Review lnspection Scope (lnspection Procedures (lPs) 36801, 37801 . 40801. 71801. 62801, 83750, 84750,86750) | |||
A routine announced safety inspection was conducted on July 24 and 25,2012, at PB-1. | |||
The | The inspector reviewed the SAFSTOR program as outlined in the Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), and procedure LS-PB-800, "Unit 1 Process Control Program," to assess the adequacy of management oversight of SAFSTOR responsibilities for the PB-1 facility. Specifically, the inspector reviewed the decommissioning management and staff organization and Exelon's implementation of SAFSTOR activities related to safe storage of radioactive material. The inspector discussed any design changes or modifications since the previous inspection, reviewed the fire protection prograrn, and conducted a tour to assess the material condition of the accessible areas of the PB-1 facility. | ||
The inspector verified that Exelon completed semi-annual surveillance test (ST), | |||
ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual Inspection." The inspector reviewed the results of surveillance testing conducted on November 18, 2011 and May 17, 2012 to ensure exclusion area barriers and personnel access doors to the containment building, the radioactive waste building, and the spent fuel pool building were being maintained in accordance with TS 2.19.b.1 ; and that water accumulation in the containment sump was less than TS 2.1.b.9 limits. | |||
The inspector reviewed activities and documentation associated with the following SAFSTOR programs: occupational exposure, radioactive effluent control, and site radiological environmental monitoring program (REMP). The inspector reviewed radioactive gaseous effluent release permits, the annual REMP report, and the annual effluent report, which included a summary of the radioactive waste management and transportation programs. | |||
The inspector reviewed the annual Decommissioning Status Report 'for 2011 (dated March 23,2012) and the PB-1 Nuclear Oversight Audit Report (dated November 22, 2011). The inspector also reviewed corrective action program (CAP) issue reports (lRs)and assignment reports (ARs) associated with PB-1 to determine if issues were being lnspection Report No. 050001 7 1 12012008 GlWordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc | |||
properly identified and evaluated, and if corrective actions were appropriately prioritized in the CAP. | |||
b. Observations and Findinqs The inspector noted that there were no personnel changes within the Exelon organization related to the SAFSTOR activities and confirmed that the staff effectively implemented SAFSTOR activities. The inspector confirmed that no design changes, or plant modifications were made since the previous inspection and PB-1 required reporting submittals were completed in accordance with TS requirements. The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures. The inspector also confirmed that no dismantlement or decommissioning activities were performed since the previous inspection. The annual radiological effluent and radiological environmental monitoring reports demonstrated that all calculated doses were below regulatory dose criteria of 10 CFR 50, Appendix l. | |||
The inspector determined that issues were entered into the CAP, prioritized and evaluated commensurate with their safety significance. Corrective actions were implemented to address identified issues, and were being tracked to closure using the CAP. | |||
====c. Conclusions==== | |||
There are currently no ongoing decommissioning activities being conducted at PB-1. | |||
Based on the results of this inspection, no findings of safety significance were identified. | |||
3.0 | |||
The inspector | =====Exit Meeting Summary===== | ||
On July 25 2012, the inspector presented the inspection results to Gary Stathes, Site Vice President and other members of Exelon's staff. The inspector confirmed that proprietary information was not provided or examined during the inspection. | |||
lnspection Report No. 050001 71 12012008 G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc | |||
PARTIAL LIST OF PERSONS CONTACTED Licensee J. Armstrong, Regufatory Affairs Manager D. Dullum, Regulatory Affairs Engineer J. Dunlap, Radiation Protection M. Herr, Operations Director S. Hess, Nuclear Oversight Manager D. Hines, Radiation Protection Supervisor D. Hornberger, Chemistry/Radwaste Technician M. Kaminski, Nuclear Oversight J. Koester, Fire Marshal T. Moore, Engineering Director P. Navim, Plant Manager R. Reiner, Chemistry/Environmental/Radioactive Waste Manager E. Schwarz, Radiochemist R. Shortes, Radiation Engineering Manager G. Stathes, Site Vice President J. Stenclik, Chemistry Manager G. Swayne, Enercon Project Manager Chemistry contractor ITEMS OPEN. CLOSED. AND DISCUSSED None LIST OF | |||
=DOCUMENTS REVIEWED= | |||
UFSAR, Revision 7.0, April2Q12 | |||
), dated November 22, 2011 LS-PB-800, Rev. 1, "Unit 1 Process Control Program" CY-PB-200-100, Rev. 0, "Entry into Unit 1 During SAFSTOR Decomrnissioning Status" ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual lnspection," Revision 18 ST-C-O95-805-2, "Liquid Radwaste Discharge" SE-S Earthquake - Procedure, Rev. 18 (PB Units 2 and 3)Fireline - Contractor Report, June 3, 2011 RT-0-037-325-2, Rev. 14, "Monthly Inspection of Outside Area Fire Extinguishers," July 1 0,2012 RT-0-037-335-2, Rev. 13, "Annual Inspection of Outside Area Fire Extinguishers," May 26, 2012 RT-M-378-320-2, Rev 2, "Verification of Fire Hose Hydrostatic Testing," January 30,2012 Radiation Work Permits: PB 1-1 1-10002, Rev 1 , 2011 PB-1-12-10002, Rev 0, 2012 Assignment Reports (ARs): 1172342;1274137;1280941;1291466;1291575;1291589; | TS, Amendment 1 1, dated August 27,2003 | ||
PBAPS Unit 1 Decommissioning Status Report - 2A11, dated March 23,2012 | |||
Nuclear Oversight Audit Report, NOSA-PEA-1 1-16 (AR01280941 ), dated November 22, 2011 | |||
LS-PB-800, Rev. 1, "Unit 1 Process Control Program" | |||
CY-PB-200-100, Rev. 0, "Entry into Unit 1 During SAFSTOR Decomrnissioning Status" | |||
ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual lnspection," Revision 18 | |||
ST-C-O95-805-2, "Liquid Radwaste Discharge" | |||
SE-S Earthquake - Procedure, Rev. 18 (PB Units 2 and 3) | |||
Fireline - Contractor Report, June 3, 2011 | |||
RT-0-037-325-2, Rev. 14, "Monthly Inspection of Outside Area Fire Extinguishers," July 1 0,2012 | |||
RT-0-037-335-2, Rev. 13, "Annual Inspection of Outside Area Fire Extinguishers," May 26, 2012 | |||
RT-M-378-320-2, Rev 2, "Verification of Fire Hose Hydrostatic Testing," January 30,2012 | |||
Radiation Work Permits: PB 1-1 1-10002, Rev 1 , 2011 PB-1-12-10002, Rev 0, 2012 | |||
Assignment Reports (ARs): 1172342;1274137;1280941;1291466;1291575;1291589; | |||
291591: 1291594; 1291596; 1 291602; 1 3001 37; 1303777; 1307487; 1349573; 1350412; | |||
353392; 13627 45: 1 385686; 1 291624; 1254563; 1 385686; 1 300 1 37; 1 3627 45 | |||
lnspection Report No. 0500017112012004 | |||
G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008.doc | |||
LIST OF ACRONYMS USED | |||
AR Assignment Report | |||
CAP Corrective Action Program | |||
Exelon Exelon Generation CompanY, LLC | |||
tMc Inspection Manual Chapter | |||
IP Inspection Procedure | |||
IR lssue Report | |||
NRC N uclear Regulatory Commission | |||
PB-1 Peach Bottom Atomic Power Station Unit 't | |||
REMP Rad iolog ica I Envi ronmenta I Mon itori ng Prog ram | |||
SAFSTOR Safe Storage | |||
ST Surveillance Test | |||
TS Technical Specifi cation | |||
UFSAR Update Final Safety Analysis Report | |||
lnspection Report No. 050001 71 12012008 | |||
G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc | |||
}} | }} | ||
Revision as of 23:55, 11 November 2019
| ML12222A186 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/03/2012 |
| From: | Marc Ferdas Decommissioning Branch I |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-12-008 | |
| Download: ML12222A186 (8) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA 19406-2713 August 3,2Q12
SUBJECT:
EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - NRC INSPECTION REPORT NO. O5OOO171I2O12OO8
Dear Mr. Pacilio:
on July 24 - 25,2012, the U.s. Nuclear Regulatoryommission (NRC) conducted an inspection at the peach Bottom Atomic power Station Unit 1. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulaiions, and the condltions of your license. The inspection consisted of observations by the injpector, interviews with personn-el, and a review of procedures and records. The results of the your inspection were discussed with Gary Stathes, Site Vice President, and other members of inspection. The enclosed report presents organization on July 25,2012, at the conclusion of the th6 results of this inspection. No findings of safety significance were identified.
Current NRC regulations and guidance are included on the NRC's website at www'nrc.qov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Gommunications. The current Enforcement Policy is included on the NRC's website at www.nrc.qov; select About NRC, Organizations & Functions; Office of Enforcement; Enfor;ment documents; then Enforcement Policy (Under'Related lnformation'). You may at also obtain these documents by contacting the Government Printing Office (GPO) toll-free p.m. EST, Monday through Friday 1-g66-512-1800. The GPO is open from 8:00 a.m, to 5:30 (except Federal holidaYs).
please contact Laurie Kauffman at (61 O) 337-5323 if you have any questions regarding this matter.
w->#-
Sincerely, Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety
Enclosure:
lnspection Report No. 0500017112012008
REGION I==
INSPECTION REPORT lnspection No. 0500017112012008 Docket No. 050001 71 License No. DPR-12 Licensee: Exelon Generation Company, LLC (Exelon)
Facility: Peach Bottom Atomic Power Station Unit 1 (PB-1)
Address: 1848 Lay Road Delta, Pennsylvania 17 31 4-9032 lnspection Dates: July 24 - 25,2012 Inspector: Laurie A. Kauffman Health Physicist Decommissioning Branch Division of Nuclear Materials Safety Approved By: Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety Document Name: G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008'doc
EXECUTIVE SUMMARY
Exelon Generation ComPanY, LLC
Peach Bottom Atomic Power Station Unit 1 NRC lnspection Report No. 0500017112012008 A routine announced safety inspection was conducted on July 24 and 25, 2012, by a Region I inspector at PB-1. The inspection included a review of operations, management oversight, maintenance, corrective action program implementation, and plant support activities while in safe storage (SAFSTOR) status. The inspection consisted of observations by the inspector, interviews with Exelon personnel, and a review of procedures and records. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in lnspection Manual Chapter (lMC) 256l, "Decommissioning Power Reactor Inspection Program."
There are currently no ongoing decommissioning activities being conducted at PB-1. Based on the results of this inspection, no findings of safety significance were identified.
lnspection Report No. 050001 7 1 12012008 GlWordDocs\Cu rrent\l nsp Report\RDPR- 1 2.20 1 2008.doc
REPORT DETAILS
Background PB-1 is a high temperature gas-cooled demonstration power reactor that operated from February 1966 until October 31,1974, and has been permanently shut down and in SAFSTOR since that time. All fuel has been removed from the reactor and shipped to an offsite facility. The spent fuel pool has been drained and decontaminated, and all radioactive liquids have been removed.
The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in IMC 2561. The inspection consisted of observations by the inspector, interviews with Exelon personnel, and a review of procedures and records.
SAFSTOR Performance and Status Review lnspection Scope (lnspection Procedures (lPs) 36801, 37801 . 40801. 71801. 62801, 83750, 84750,86750)
A routine announced safety inspection was conducted on July 24 and 25,2012, at PB-1.
The inspector reviewed the SAFSTOR program as outlined in the Updated Final Safety Analysis Report (UFSAR), Technical Specifications (TS), and procedure LS-PB-800, "Unit 1 Process Control Program," to assess the adequacy of management oversight of SAFSTOR responsibilities for the PB-1 facility. Specifically, the inspector reviewed the decommissioning management and staff organization and Exelon's implementation of SAFSTOR activities related to safe storage of radioactive material. The inspector discussed any design changes or modifications since the previous inspection, reviewed the fire protection prograrn, and conducted a tour to assess the material condition of the accessible areas of the PB-1 facility.
The inspector verified that Exelon completed semi-annual surveillance test (ST),
ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual Inspection." The inspector reviewed the results of surveillance testing conducted on November 18, 2011 and May 17, 2012 to ensure exclusion area barriers and personnel access doors to the containment building, the radioactive waste building, and the spent fuel pool building were being maintained in accordance with TS 2.19.b.1 ; and that water accumulation in the containment sump was less than TS 2.1.b.9 limits.
The inspector reviewed activities and documentation associated with the following SAFSTOR programs: occupational exposure, radioactive effluent control, and site radiological environmental monitoring program (REMP). The inspector reviewed radioactive gaseous effluent release permits, the annual REMP report, and the annual effluent report, which included a summary of the radioactive waste management and transportation programs.
The inspector reviewed the annual Decommissioning Status Report 'for 2011 (dated March 23,2012) and the PB-1 Nuclear Oversight Audit Report (dated November 22, 2011). The inspector also reviewed corrective action program (CAP) issue reports (lRs)and assignment reports (ARs) associated with PB-1 to determine if issues were being lnspection Report No. 050001 7 1 12012008 GlWordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc
properly identified and evaluated, and if corrective actions were appropriately prioritized in the CAP.
b. Observations and Findinqs The inspector noted that there were no personnel changes within the Exelon organization related to the SAFSTOR activities and confirmed that the staff effectively implemented SAFSTOR activities. The inspector confirmed that no design changes, or plant modifications were made since the previous inspection and PB-1 required reporting submittals were completed in accordance with TS requirements. The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures. The inspector also confirmed that no dismantlement or decommissioning activities were performed since the previous inspection. The annual radiological effluent and radiological environmental monitoring reports demonstrated that all calculated doses were below regulatory dose criteria of 10 CFR 50, Appendix l.
The inspector determined that issues were entered into the CAP, prioritized and evaluated commensurate with their safety significance. Corrective actions were implemented to address identified issues, and were being tracked to closure using the CAP.
c. Conclusions
There are currently no ongoing decommissioning activities being conducted at PB-1.
Based on the results of this inspection, no findings of safety significance were identified.
3.0
Exit Meeting Summary
On July 25 2012, the inspector presented the inspection results to Gary Stathes, Site Vice President and other members of Exelon's staff. The inspector confirmed that proprietary information was not provided or examined during the inspection.
lnspection Report No. 050001 71 12012008 G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc
PARTIAL LIST OF PERSONS CONTACTED Licensee J. Armstrong, Regufatory Affairs Manager D. Dullum, Regulatory Affairs Engineer J. Dunlap, Radiation Protection M. Herr, Operations Director S. Hess, Nuclear Oversight Manager D. Hines, Radiation Protection Supervisor D. Hornberger, Chemistry/Radwaste Technician M. Kaminski, Nuclear Oversight J. Koester, Fire Marshal T. Moore, Engineering Director P. Navim, Plant Manager R. Reiner, Chemistry/Environmental/Radioactive Waste Manager E. Schwarz, Radiochemist R. Shortes, Radiation Engineering Manager G. Stathes, Site Vice President J. Stenclik, Chemistry Manager G. Swayne, Enercon Project Manager Chemistry contractor ITEMS OPEN. CLOSED. AND DISCUSSED None LIST OF
DOCUMENTS REVIEWED
UFSAR, Revision 7.0, April2Q12
TS, Amendment 1 1, dated August 27,2003
PBAPS Unit 1 Decommissioning Status Report - 2A11, dated March 23,2012
Nuclear Oversight Audit Report, NOSA-PEA-1 1-16 (AR01280941 ), dated November 22, 2011
LS-PB-800, Rev. 1, "Unit 1 Process Control Program"
CY-PB-200-100, Rev. 0, "Entry into Unit 1 During SAFSTOR Decomrnissioning Status"
ST-H-099-960-2, "Unit 1 Exclusion Area Semi-Annual lnspection," Revision 18
ST-C-O95-805-2, "Liquid Radwaste Discharge"
SE-S Earthquake - Procedure, Rev. 18 (PB Units 2 and 3)
Fireline - Contractor Report, June 3, 2011
RT-0-037-325-2, Rev. 14, "Monthly Inspection of Outside Area Fire Extinguishers," July 1 0,2012
RT-0-037-335-2, Rev. 13, "Annual Inspection of Outside Area Fire Extinguishers," May 26, 2012
RT-M-378-320-2, Rev 2, "Verification of Fire Hose Hydrostatic Testing," January 30,2012
Radiation Work Permits: PB 1-1 1-10002, Rev 1 , 2011 PB-1-12-10002, Rev 0, 2012
Assignment Reports (ARs): 1172342;1274137;1280941;1291466;1291575;1291589;
291591: 1291594; 1291596; 1 291602; 1 3001 37; 1303777; 1307487; 1349573; 1350412;
353392; 13627 45: 1 385686; 1 291624; 1254563; 1 385686; 1 300 1 37; 1 3627 45
lnspection Report No. 0500017112012004
G:\WordDocs\Current\lnsp Report\RDPR-1 2.201 2008.doc
LIST OF ACRONYMS USED
AR Assignment Report
CAP Corrective Action Program
Exelon Exelon Generation CompanY, LLC
tMc Inspection Manual Chapter
IP Inspection Procedure
IR lssue Report
NRC N uclear Regulatory Commission
PB-1 Peach Bottom Atomic Power Station Unit 't
REMP Rad iolog ica I Envi ronmenta I Mon itori ng Prog ram
SAFSTOR Safe Storage
ST Surveillance Test
TS Technical Specifi cation
UFSAR Update Final Safety Analysis Report
lnspection Report No. 050001 71 12012008
G:\WordDocs\Current\lnsp Report\RDPR-1 2.2012008.doc