IR 05000338/2013403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ril 17, 2013 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ril 17, 2013 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Heacock:== | ==Dear Mr. Heacock:== | ||
On March 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the | On March 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 14, 2013, with Mr. F. Mladen and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of | |||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety | Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure: | ||
Inspection Report 05000338/2013403 and 05000339/2013403 w/Att.: (OUO) | |||
Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 | cc w/encl.: (See page 3) ML13107B218 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/PSB2 RII: DRS/PSB2 SIGNATURE /RA/ /RA/ /RA via email/ /RA/ /RA/ | ||
NAME R. PATTERSON J. WALLO K. DAVIS G. MCCOY B. DESAI DATE 4/16/2013 4/15/2013 4/16/2013 4/10/2013 4/17/2013 4/ /2013 4/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc: | |||
Enclosure: | Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Clarence L. Gum Manager, Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117 | ||
Inspection Report 05000338/2013403 and 05000339/2013403 w/Att.: (OUO) cc w/encl.: (See page 3) | |||
ML13107B218 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/PSB2 RII: DRS/PSB2 SIGNATURE /RA/ /RA/ /RA via email/ /RA/ /RA/ NAME R. PATTERSON J. WALLO K. DAVIS G. MCCOY B. DESAI DATE 4/16/2013 4/15/2013 4/16/2013 4/10/2013 4/17/2013 4/ /2013 4/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard | |||
Glen Allen, VA 23060-6711 | |||
Clarence L. Gum Manager, Nuclear Protection Services North Anna Power Station 1022 Haley Drive | |||
Mineral, VA 23117 | |||
}} | }} | ||
Revision as of 19:33, 4 November 2019
| ML13107B218 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 04/17/2013 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Heacock D Virginia Electric & Power Co (VEPCO) |
| References | |
| IR-13-403 | |
| Download: ML13107B218 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ril 17, 2013
SUBJECT:
NORTH ANNA POWER STATION - NRC SECURITY INSPECTION REPORT 05000338/2013403 AND 05000339/2013403
Dear Mr. Heacock:
On March 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your North Anna Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 14, 2013, with Mr. F. Mladen and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-338, 50-339 License No.: NPF-4, NPF-7 Enclosure:
Inspection Report 05000338/2013403 and 05000339/2013403 w/Att.: (OUO)
cc w/encl.: (See page 3) ML13107B218 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/PSB2 RII: DRS/PSB2 SIGNATURE /RA/ /RA/ /RA via email/ /RA/ /RA/
NAME R. PATTERSON J. WALLO K. DAVIS G. MCCOY B. DESAI DATE 4/16/2013 4/15/2013 4/16/2013 4/10/2013 4/17/2013 4/ /2013 4/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
Nelson K. Martin Manager Nuclear Fleet Protection Services Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Margaret A. Earle Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Clarence L. Gum Manager, Nuclear Protection Services North Anna Power Station 1022 Haley Drive Mineral, VA 23117