NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND | NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402) | ||
05000499/2014402) | |||
==Dear Mr. Koehl:== | ==Dear Mr. Koehl:== | ||
On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the | On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility. | ||
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to | The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility. | ||
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | ||
Thus due to the security-related information contained in this correspondence, and | Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | ||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. | Please contact me at (817) 200-1527 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80 Enclosure: | |||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | Inspection Plan cc w/enclosure: | ||
Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 ML14245A444 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: RGN-002 By: MHaire Yes No Non-Publicly Available Sensitive OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ | |||
Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80 | DATE 8/29/2014 Letter to Dennis from Mark S. Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402) | ||
Electronic Distribution by RIV w/enclosure: | |||
Enclosure: | Security Specialist/NSIR (Eric.Wharton@nrc.gov) | ||
Inspection Plan | |||
cc w/enclosure: Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 | |||
ML14245A444 SUNSI Review | |||
05000499/2014402) | |||
Electronic Distribution by RIV w/enclosure | |||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) | Security Specialist/NSIR (Niry.Simonian@nrc.gov) | ||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | ||
Electronic Distribution by RIV w/o enclosure: | |||
Electronic Distribution by RIV w/o enclosure | Regional Administrator (Marc.Dapas@nrc.gov) | ||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | Acting DRP Director (Troy.Pruett@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | Acting DRP Deputy Director (Michael.Hay@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) | |||
Resident Inspector (Nick.Hernandez@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Resident Inspector (Nick.Hernandez@nrc.gov) | |||
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | ||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov) | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | ||
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) | |||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Balwant.Singal@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | Project Manager (Balwant.Singal@nrc.gov) | ||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov) | |||
ROPreports | ROPreports | ||
}} | }} | ||
Revision as of 00:48, 4 November 2019
| ML14245A444 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 09/02/2014 |
| From: | Mark Haire Region 4 Engineering Branch 1 |
| To: | Koehl D South Texas |
| References | |
| IR-2014-402 | |
| Download: ML14245A444 (4) | |
Text
ber 2, 2014
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)
Dear Mr. Koehl:
On August 12, 2014, the NRC completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2015. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-498; 50-499 License Nos.: NPF-76; NPF-80 Enclosure:
Inspection Plan cc w/enclosure:
Mr. M. Chuck Reddix Manager, Security STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 ML14245A444 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: RGN-002 By: MHaire Yes No Non-Publicly Available Sensitive OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/
DATE 8/29/2014 Letter to Dennis from Mark S. Haire, dated September 2, 2014 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014402 AND 05000499/2014402)
Electronic Distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Electronic Distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (Nick.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPreports