{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713    March 4, 2015 Mr. Bryan Hanson Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2014001 AND 05000353/2014001)
{{#Wiki_filter:rch 4, 2015
 
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2014001 AND 05000353/2014001)


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
On February 9, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Limerick Generating Station (Limerick) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of inspections at your facility. The NRC determined the performance at Limerick Generating Station, Units 1 and 2 during the most recent quarter was within the Regulatory ReOversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in the NRC Inspection Report Nos. 05000352/2014405 and 05000353/2014405, sent on October 23, 2014. Therefore, the NRC plans to conduct a By a letter (ML15028A450) dated January 27, 2015, your staff notified the NRC of your readiness for the 95001 supplemental inspection and this onsite inspection has been scheduled for the week of March 16, 2015. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulationsof PracticPublic Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5262 with any questions you have regarding this letter.
On February 9, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Limerick Generating Station (Limerick) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined the performance at Limerick Generating Station, Units 1 and 2 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in the NRC Inspection Report Nos. 05000352/2014405 and 05000353/2014405, sent on October 23, 2014. Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. By a letter (ML15028A450) dated January 27, 2015, your staff notified the NRC of your readiness for the 95001 supplemental inspection and this onsite inspection has been scheduled for the week of March 16, 2015.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at (610) 337-5262 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Ho K. Nieh Director Division of Reactor Projects Docket Nos.: 50-352, 50-353 License Nos.: NPF-39, NPF-85 Enclosure: Limerick Generating Station Inspection/Activity Plan cc: Distribution via ListServ  
/RA/
Ho K. Nieh Director Division of Reactor Projects Docket Nos.: 50-352, 50-353 License Nos.: NPF-39, NPF-85 Enclosure: Limerick Generating Station Inspection/Activity Plan cc: Distribution via ListServ
 
ML15062A213 Non-Sensitive  Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP  RI/DRP NAME SBarber/ GSB FBower/ FLB  HNieh/ HKN DATE 02/19/15 02/19 /15  02/25/15
 
Page 1 of 2      Limerick 01/26/2015 09:40:28    Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 10/6EXAM - INITIAL OL EXAM      4 1 01/12/2015 01/21/2015 U01892 FY15-LIMERICK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION      1 1, 2 03/16/2015 03/20/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/16/2015 03/20/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/16/2015 03/20/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/16/2015 03/20/2015 IP 71124.04 Occupational Dose Assessment 1, 2 03/16/2015 03/20/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION PROTECTION      1 1, 2 04/13/2015 04/17/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2015 04/17/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/13/2015 04/17/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2015 04/17/2015 IP 71124.04 Occupational Dose Assessment 1, 2 04/13/2015 04/17/2015 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - U2 INSERVICE INSPECTION    1 2 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR CDBI - COMPONENT DESIGN BASIS INSPECTION    6 1, 2 06/08/2015 06/12/2015 IP 7111121 Component Design Bases Inspection 1, 2 06/22/2015 06/26/2015 IP 7111121 Component Design Bases Inspection 1, 2 07/06/2015 07/10/2015 IP 7111121 Component Design Bases Inspection 71124 - REMP      1 1, 2 07/13/2015 07/17/2015 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI LOADING INSPECTION    1 1, 2 07/13/2015 07/17/2015 IP 60855  Operation Of An ISFSI 1, 2 07/13/2015 07/17/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 12/7EXAM - INITIAL OL EXAM      4 1 12/07/2015 12/11/2015 U01912 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1 01/18/2016 01/22/2016 U01912 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION      1 1, 2 09/14/2015 09/18/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/14/2015 09/18/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/14/2015 09/18/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/14/2015 09/18/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.


ML15062A213  SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SBarber/ GSB FBower/ FLB HNieh/ HKN DATE 02/19/15 02/19 /15 02/25/15 Page 1 of 2 01/26/2015 09:40:28 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LimerickInspection / Activity Plan 01/01/2015-06/30/201610/6EXAM-INITIAL OL EXAM 4 1 FY15-LIMERICK INITIAL OPERATOR LICENSING EXAM U01892 01/12/2015 01/21/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/16/2015 03/20/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/16/2015 03/20/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/16/2015 03/20/2015 1, 2 IP Occupational Dose Assessment71124.04 03/16/2015 03/20/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/16/2015 03/20/201571124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 04/13/2015 04/17/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 04/13/2015 04/17/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 04/13/2015 04/17/2015 1, 2 IP Occupational Dose Assessment71124.04 04/13/2015 04/17/2015 1, 2 IP Radiation Monitoring Instrumentation71124.05 04/13/2015 04/17/20157111108G-U2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - BWR7111108G 04/20/2015 04/24/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP Component Design Bases Inspection7111121 06/08/2015 06/12/2015 1, 2 IP Component Design Bases Inspection7111121 06/22/2015 06/26/2015 1, 2 IP Component Design Bases Inspection7111121 07/06/2015 07/10/201571124-REMP 1 1, 2 IP Radiological Environmental Monitoring Program71124.07 07/13/2015 07/17/2015 ISFSI-ISFSI LOADING INSPECTION 1 1, 2 IP Operation Of An ISFSI 60855 07/13/2015 07/17/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/13/2015 07/17/201512/7EXAM-INITIAL OL EXAM 4 1 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM U01912 12/07/201512/11/2015 1 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM U01912 01/18/2016 01/22/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/14/2015 09/18/2015 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/14/2015 09/18/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/14/2015 09/18/2015 1, 2 IP Occupational Dose Assessment71124.04 09/14/2015 09/18/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2     Limerick 01/26/2015 09:40:28   Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 71124 - RADIATION PROTECTION      1 1, 2 09/14/2015 09/18/2015 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/14/2015 09/18/2015 IP 71151  Performance Indicator Verification 7111111B - REQUAL INSP W/ P/F RESULTS      2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE      6 1, 2 11/16/2015 11/20/2015 IP 7111401 Exercise Evaluation 1, 2 11/16/2015 11/20/2015 IP 7111408 Exercise Evaluation - Scenario Review 71124.08 - RADWASTE        1 1, 2 01/11/2016 01/15/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION PROTECTION       1 1 02/22/2016 02/26/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/22/2016 02/26/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/22/2016 02/26/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/22/2016 02/26/2016 IP 71124.04 Occupational Dose Assessment 1, 2 02/22/2016 02/26/2016 IP 71124.05 Radiation Monitoring Instrumentation ISI - U1 INSERVICE INSPECTION      1 1 03/28/2016 04/01/2016 IP 7111108G Inservice Inspection Activities - BWR 71124 - RADIATION PROTECTION      1 1, 2 03/28/2016 04/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/28/2016 04/01/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/28/2016 04/01/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/28/2016 04/01/2016 IP 71124.04 Occupational Dose Assessment 1, 2 03/28/2016 04/01/2016 IP 71124.05 Radiation Monitoring Instrumentation TRI FI - TRIENNIAL FIRE PROTECTION       4 1, 2 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]
1, 2 06/20/2016 06/24/2016 IP 7111105T Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.


Page 2 of 2 01/26/2015 09:40:28 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site LimerickInspection / Activity Plan 01/01/2015-06/30/201671124-RADIATION PROTECTION 1 1, 2 IP Radiation Monitoring Instrumentation71124.05 09/14/2015 09/18/2015 1, 2 IP Performance Indicator Verification71151 09/14/2015 09/18/20157111111B-REQUAL INSP W/ P/F RESULTS 2 1, 2 IP Licensed Operator Requalification Program7111111B11/16/201511/20/2015 EP-EP EXERCISE 6 1, 2 IP Exercise Evaluation711140111/16/201511/20/2015 1, 2 IP Exercise Evaluation - Scenario Review711140811/16/201511/20/201571124.08-RADWASTE 1 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/11/2016 01/15/201671124-RADIATION PROTECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 02/22/2016 02/26/2016 1 IP Occupational ALARA Planning and Controls71124.02 02/22/2016 02/26/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 02/22/2016 02/26/2016 1, 2 IP Occupational Dose Assessment71124.04 02/22/2016 02/26/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 02/22/2016 02/26/2016 ISI-U1 INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR7111108G 03/28/2016 04/01/201671124-RADIATION PROTECTION 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/28/2016 04/01/2016 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/28/2016 04/01/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/28/2016 04/01/2016 1, 2 IP Occupational Dose Assessment71124.04 03/28/2016 04/01/2016 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/28/2016 04/01/2016 TRI FI-TRIENNIAL FIRE PROTECTION 4 1, 2 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/2016 1, 2 IP Fire Protection [Triennial]7111105T 06/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Revision as of 14:41, 31 October 2019

ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001)
ML15062A213
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/04/2015
From: Ho Nieh
Division Reactor Projects I
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
BOWER, FL
Shared Package
ML15049A476 List:
References
IR 2014001
Download: ML15062A213 (5)


Text

rch 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2014001 AND 05000353/2014001)

Dear Mr. Hanson:

On February 9, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the Limerick Generating Station (Limerick) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Limerick Generating Station, Units 1 and 2 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in the NRC Inspection Report Nos. 05000352/2014405 and 05000353/2014405, sent on October 23, 2014. Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. By a letter (ML15028A450) dated January 27, 2015, your staff notified the NRC of your readiness for the 95001 supplemental inspection and this onsite inspection has been scheduled for the week of March 16, 2015.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to ROP baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Ho K. Nieh Director Division of Reactor Projects Docket Nos.: 50-352, 50-353 License Nos.: NPF-39, NPF-85 Enclosure: Limerick Generating Station Inspection/Activity Plan cc: Distribution via ListServ

ML15062A213 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME SBarber/ GSB FBower/ FLB HNieh/ HKN DATE 02/19/15 02/19 /15 02/25/15

Page 1 of 2 Limerick 01/26/2015 09:40:28 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 10/6EXAM - INITIAL OL EXAM 4 1 01/12/2015 01/21/2015 U01892 FY15-LIMERICK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION 1 1, 2 03/16/2015 03/20/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/16/2015 03/20/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/16/2015 03/20/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/16/2015 03/20/2015 IP 71124.04 Occupational Dose Assessment 1, 2 03/16/2015 03/20/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION PROTECTION 1 1, 2 04/13/2015 04/17/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2015 04/17/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/13/2015 04/17/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2015 04/17/2015 IP 71124.04 Occupational Dose Assessment 1, 2 04/13/2015 04/17/2015 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - U2 INSERVICE INSPECTION 1 2 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 06/08/2015 06/12/2015 IP 7111121 Component Design Bases Inspection 1, 2 06/22/2015 06/26/2015 IP 7111121 Component Design Bases Inspection 1, 2 07/06/2015 07/10/2015 IP 7111121 Component Design Bases Inspection 71124 - REMP 1 1, 2 07/13/2015 07/17/2015 IP 71124.07 Radiological Environmental Monitoring Program ISFSI - ISFSI LOADING INSPECTION 1 1, 2 07/13/2015 07/17/2015 IP 60855 Operation Of An ISFSI 1, 2 07/13/2015 07/17/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 12/7EXAM - INITIAL OL EXAM 4 1 12/07/2015 12/11/2015 U01912 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1 01/18/2016 01/22/2016 U01912 FY16 - LIMERICK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION 1 1, 2 09/14/2015 09/18/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/14/2015 09/18/2015 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/14/2015 09/18/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/14/2015 09/18/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Limerick 01/26/2015 09:40:28 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIATION PROTECTION 1 1, 2 09/14/2015 09/18/2015 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/14/2015 09/18/2015 IP 71151 Performance Indicator Verification 7111111B - REQUAL INSP W/ P/F RESULTS 2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE 6 1, 2 11/16/2015 11/20/2015 IP 7111401 Exercise Evaluation 1, 2 11/16/2015 11/20/2015 IP 7111408 Exercise Evaluation - Scenario Review 71124.08 - RADWASTE 1 1, 2 01/11/2016 01/15/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION PROTECTION 1 1 02/22/2016 02/26/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/22/2016 02/26/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/22/2016 02/26/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/22/2016 02/26/2016 IP 71124.04 Occupational Dose Assessment 1, 2 02/22/2016 02/26/2016 IP 71124.05 Radiation Monitoring Instrumentation ISI - U1 INSERVICE INSPECTION 1 1 03/28/2016 04/01/2016 IP 7111108G Inservice Inspection Activities - BWR 71124 - RADIATION PROTECTION 1 1, 2 03/28/2016 04/01/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/28/2016 04/01/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/28/2016 04/01/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/28/2016 04/01/2016 IP 71124.04 Occupational Dose Assessment 1, 2 03/28/2016 04/01/2016 IP 71124.05 Radiation Monitoring Instrumentation TRI FI - TRIENNIAL FIRE PROTECTION 4 1, 2 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

1, 2 06/20/2016 06/24/2016 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.