{{#Wiki_filter:CLINTON POWER STATIONJob Performance MeasureReset a Recirc Flow Control Valve LockoutJPM Number: 3302.0116Revision Number: 00 Date: 7/30/03Developed By:     T. Pickley                         7/30/03   InstructorDateValidated By:    J. Anderson                 10/17/03SME or InstructorDateReview By:     P. Ryan                         _8/18/03Operations RepresentativeDate Page 2 of 9JOB PERFORMANCE MEASURE VALIDATION CHECKLISTNOTE:All steps of this checklist should be performed upon initial validation. Prior to JPMusage, revalidate JPM using steps 8 through 11 below.________1. Task description and number, JPM description and number are identified.________2. Knowledge and Abilities (K/A) references are included.
{{#Wiki_filter:CLINTON POWER STATION Job Performance Measure Reset a Recirc Flow Control Valve Lockout JPM Number:     3302.0116 Revision Number: 00 Date: 7/30/03 Developed By:     T. Pickley                     7/30/03 Instructor                        Date Validated By:    J. Anderson                     10/17/03 SME or Instructor                Date Review By:     P. Ryan                       _8/18/03 Operations Representative        Date
________3. Performance location specified. (in-plant, control room, or simulator)
 
________4. Initial setup conditions are identified.
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:   All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________5. Initiating and terminating cues are properly identified.________6. Task standards identified and verified by SME review.________7. Critical steps meet the criteria for critical steps and are identified with anasterisk (*).________8. Verify the procedure referenced by this JPM matches the most currentrevision of that procedure:
________      1. Task description and number, JPM description and number are identified.
Procedure Rev. _____ Date _____________________9. Pilot test the JPM:a. verify cues both verbal and visual are free of conflict, and
________      2. Knowledge and Abilities (K/A) references are included.
: b. ensure performance time is accurate.________10. If the JPM cannot be performed as written with proper responses, then revisethe JPM.________11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
________      3. Performance location specified. (in-plant, control room, or simulator)
SME/InstructorDate SME/InstructorDate SME/InstructorDate CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                         REVISION: 00Page 3 of 9Revision Record (Summary)
________      4. Initial setup conditions are identified.
: 1. Revision 00,This is a new JPM CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                         REVISION: 00Page 4 of 9Operator's Name:                                                                 SSN:
________      5. Initiating and terminating cues are properly identified.
Job Title:     NLO     RO     SRO     STA     SRO CertJPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve LockoutRevision Number: 00   Task Number and Title: 330201.16, Complete in plant actions to perform FCV Lockout/ResetSuggested Testing Environment:Simulator     Actual Testing Environment:     Simulator     Plant     Control RoomTesting Method:SimulateFaulted:NoPerform Alternate Path:NoTime Critical:NoEstimated Time to Complete:
________      6. Task standards identified and verified by SME review.
10   _minutesActual Time Used:
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
minutes
________      8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
________      9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
________      10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                                  Date SME/Instructor                                                  Date SME/Instructor                                                  Date Page 2 of 9
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                               REVISION: 00 Revision Record (Summary)
: 1. Revision 00,   This is a new JPM Page 3 of 9
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                     REVISION: 00 Operators Name:                                             SSN:
Job Title: NLO RO SRO STA SRO Cert JPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve Lockout Revision Number:       00 Task Number and Title: 330201.16, Complete in plant actions to perform FCV Lockout/Reset Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate                            Faulted:     No Perform                  Alternate Path:     No Time Critical:       No Estimated Time to Complete: 10 _minutes                Actual Time Used:             minutes


==References:==
==References:==
CPS 3302.01, Reactor RecirculationEVALUATION
CPS 3302.01, Reactor Recirculation EVALUATION


==SUMMARY==
==SUMMARY==
:Were all the Critical Elements performed satisfactorily?YesNoThe operator's performance was evaluated against the standards contained in this JPM, and has beendetermined to be:SatisfactoryUnsatisfactoryComments:                                                                                                                    
:
Were all the Critical Elements performed satisfactorily?             Yes              No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                       Satisfactory                  Unsatisfactory Comments:
Evaluators Name: __________________________
Evaluators Signature:                                                          Date:
Page 4 of 9
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                          REVISION: 00 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
SIMULATOR SET-UP CONDITIONS:
The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow Control Valve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.
TASK STANDARDS:
The FCV lock out is reset.
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
None PROCEDURAL/
 
==REFERENCES:==
 
CPS 3302.01 Reactor Recirculation EVALUATOR INSTRUCTIONS:
Amplifying cues are provided within the JPM steps.
INITIAL CONDITIONS AND INITIATING CUE:
The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.
START TIME:
Page 5 of 9
 
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                        REVISION: 00
==========================================================================
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
==========================================================================
PERFORMANCE STEPS
: 1.        Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.
Standard No adjustment needed CUE Comments SAT      UNSAT        Comment Number
: 2.        Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.
Standard Determines that annunciator 5003-4H is due to the manual lockout.
CUE Comments SAT      UNSAT        Comment Number Page 6 of 9


Evaluator's Name: __________________________Evaluator's Signature:                                                                                     Date:            
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                  REVISION: 00
: 3.      Reset any FCV runback signal per section 8.4.2.
Standard No FCV runback signal is present.
CUE Comments SAT      UNSAT        Comment Number
*4.      Zero the A(B) loop SERVO ERROR.
Standard Raises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUE Comments SAT      UNSAT        Comment Number
: 5.      Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow Control Hydraulic System.
Standard The HPU is already running CUE Comments SAT      UNSAT        Comment Number Page 7 of 9


CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                         REVISION: 00Page 5 of 9READ TO THE OPERATORI will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complet ethe task successfully, the objective of this Job Performance Measure will be satisfied.SIMULATOR SET-UP CONDITIONS
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                                     REVISION: 00
:The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow ControlValve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.TASK STANDARDS
*6.      Depress the A(B) FCV A/B Motion Inhibit Reset.
:The FCV lock out is reset.TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS
Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.
:NonePROCEDURAL/REFERENCES
Standard Depresses the B FCV Motion Inhibit Reset switch CUE Comments          Annunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about the status of the B lead RR HPU, respond that it is in service.
:CPS 3302.01 Reactor RecirculationEVALUATOR INSTRUCTIONS
SAT      UNSAT          Comment Number STOP TIME: _____________
:Amplifying cues are provided within the JPM steps.INITIAL CONDITIONS AND INITIATING CUE
TERMINATING CUES:
:The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is completeand the HPU has been restarted. You are to reset the Flow Control Valve lockout.START TIME:
The B Recirc Flow Control Valve lockout is reset.
CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                        REVISION: 00Page 6 of 9
K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER                                              K/A NUMBER             RO                SRO 202002                                                        A4.08                  3.3                3.3 Page 8 of 9
==========================================================================PERFORMANCE INFORMATIONCritical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meetthe standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.


==========================================================================PERFORMANCE STEPS1.Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.StandardNo adjustment needed CUECommentsSAT        UNSAT      Comment Number2.Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.StandardDetermines that annunciator 5003-4H is due to the manual lockout.
CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116                                                               REVISION: 00 INITIATING CUE The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.
CUECommentsSAT        UNSAT      Comment Number CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                        REVISION: 00Page 7 of 93.Reset any FCV runback signal per section 8.4.2.StandardNo FCV runback signal is present.
Page 9 of 9}}
CUECommentsSAT        UNSAT      Comment Number*4.Zero the A(B) loop SERVO ERROR.StandardRaises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUECommentsSAT        UNSAT      Comment Number5.Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow ControlHydraulic System.StandardThe HPU is already running CUECommentsSAT        UNSAT      Comment Number CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                         REVISION: 00Page 8 of 9*6.Depress the A(B) FCV A/B Motion Inhibit Reset.Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.StandardDepresses the B FCV Motion Inhibit Reset switch CUECommentsAnnunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about thestatus of the B lead RR HPU, respond that it is in service.SAT        UNSAT      Comment NumberSTOP TIME:_____________TERMINATING CUES:The B Recirc Flow Control Valve lockout is reset.K/A REFERENCE NUMBERS                Importance RatingK/A SYSTEM NUMBERK/A NUMBER RO SRO202002A4.083.33.3 CLINTON POWER STATIONSYSTEM JPMJPM NUMBER: 3302.0116                                        REVISION: 00Page 9 of 9INITIATING CUEThe B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and theHPU has been restarted. You are to reset the Flow Control Valve lockout.}}

Revision as of 01:14, 24 November 2019

Initial Walkthrough JPM 3302.0116
ML041070483
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/06/2004
From: James Anderson, Pickley T, Ryan P
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation
References
-RFPFR, 50-461/04-301, JPM 3302.0116, Rev 00 50-461/04-301
Download: ML041070483 (12)


Text

CLINTON POWER STATION Job Performance Measure Reset a Recirc Flow Control Valve Lockout JPM Number: 3302.0116 Revision Number: 00 Date: 7/30/03 Developed By: T. Pickley 7/30/03 Instructor Date Validated By: J. Anderson 10/17/03 SME or Instructor Date Review By: P. Ryan _8/18/03 Operations Representative Date

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Revision Record (Summary)

1. Revision 00, This is a new JPM Page 3 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 Operators Name: SSN:

Job Title: NLO RO SRO STA SRO Cert JPM Title/Number: 3302.0116, Reset a Recirc Flow Control Valve Lockout Revision Number: 00 Task Number and Title: 330201.16, Complete in plant actions to perform FCV Lockout/Reset Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: No Perform Alternate Path: No Time Critical: No Estimated Time to Complete: 10 _minutes Actual Time Used: minutes

References:

CPS 3302.01, Reactor Recirculation EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: __________________________

Evaluators Signature: Date:

Page 4 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

SIMULATOR SET-UP CONDITIONS:

The simulator can be operating at any power with Recirc in operation. Manually lockout the B Recirc Flow Control Valve and then restart the HPU. Lower the Flow controller output to cause a 5%-10% Servo Error.

TASK STANDARDS:

The FCV lock out is reset.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS 3302.01 Reactor Recirculation EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS AND INITIATING CUE:

The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.

START TIME:

Page 5 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00

==============================================================

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

==============================================================

PERFORMANCE STEPS

1. Maintain steady state power and balanced recirc loop flows, if possible, by adjusting the operable FCV.

Standard No adjustment needed CUE Comments SAT UNSAT Comment Number

2. Determine/correct the cause of the lockout from alarm indicators on 1H13-P614 and/or the annunciators on 1H13-P680.

Standard Determines that annunciator 5003-4H is due to the manual lockout.

CUE Comments SAT UNSAT Comment Number Page 6 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00

3. Reset any FCV runback signal per section 8.4.2.

Standard No FCV runback signal is present.

CUE Comments SAT UNSAT Comment Number

  • 4. Zero the A(B) loop SERVO ERROR.

Standard Raises the Flow Controller output with the slide switch to Zero the SERVO ERROR CUE Comments SAT UNSAT Comment Number

5. Restore the HPU A(B) equipment to normal operation per CPS 3302.02, Reactor Recirculation Flow Control Hydraulic System.

Standard The HPU is already running CUE Comments SAT UNSAT Comment Number Page 7 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00

  • 6. Depress the A(B) FCV A/B Motion Inhibit Reset.

Verify the lead HPU becomes operational, and FCV motion is no longer inhibited.

Standard Depresses the B FCV Motion Inhibit Reset switch CUE Comments Annunciator 5003-4H will reset and the Motion Inhibit light for FCV B will go out. If asked about the status of the B lead RR HPU, respond that it is in service.

SAT UNSAT Comment Number STOP TIME: _____________

TERMINATING CUES:

The B Recirc Flow Control Valve lockout is reset.

K/A REFERENCE NUMBERS Importance Rating K/A SYSTEM NUMBER K/A NUMBER RO SRO 202002 A4.08 3.3 3.3 Page 8 of 9

CLINTON POWER STATION SYSTEM JPM JPM NUMBER: 3302.0116 REVISION: 00 INITIATING CUE The B Recirc Flow Control Valve was manually locked out to perform maintenance. The maintenance is complete and the HPU has been restarted. You are to reset the Flow Control Valve lockout.

Page 9 of 9