ML053210417: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 78.AD.001.101 0 09/26/05 2.1.18 N/A 2.913.0 JPM Number Rev. | {{#Wiki_filter:PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 78.AD.001.101 0 09/26/05 2.1.18 N/A 2.913.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. | ||
No. Date NUREG 1123 WA No. WA Imp. To Sys. No. | To Sys. No. | ||
Task Title: Document a Failed LPRM Detector Completed By: Validated Rich Chin 09/26/05 Writer Date lnst ructorNVriter Date Approval: | |||
Nuclear Trng. Supv. -- Date of Performance: | Nuclear Trng. Supv. Date | ||
-- 15/25 Date of Performance: Validation Time (Min.) Time Taken (Min.) | |||
Evaluator Name: Signature Typed or Printed Comments: | JPM Performed By: | ||
Funn NTP-QA-31 8-1. Rev 0. Pagc 1 of 2 2005 NRC Exam Rev.1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 78.AD.001.101 . 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | Student Name: | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | Last First M.I. Employee ## / S.S. # | ||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Funn NTP-QA-31 8-1. Rev 0. Pagc 1 of 2 2005 NRC Exam Rev.1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 78.AD.001.101 | |||
. | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | |||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | |||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | |||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. 01-078-001 LPRM STATUS CONTROL, (Rev. 8) - B. TS amendment 217 | II. REFERENCES A. 01-078-001 LPRM STATUS CONTROL, (Rev. 8) | ||
None IV. TASK CONDITIONS A. Unit 1 is in MODE 1at 80% power. B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48- | - B. TS amendment 217 III. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s): | ||
None IV. TASK CONDITIONS A. Unit 1 is in MODE 1at 80% power. | |||
Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1 Appl. To/JPM No.: S/RO 78.AD.001 .lo1 Step | B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-17 8 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room. | ||
Ensure the following material is available to support performance of this JPM: A COPY of 01-078-001. | D. All OPRM channels are INOPERABLE V. INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instructions for LPRM detector 48-178. | ||
0 Prepare attachments A | VI. TASK STANDARD Zone 4 is identified as not having more than 50% upscale alarms operable, placard place on reactor panel, Unit Supervisor Notified to reference TRO 3.3.9, SROs must additionally identify required TRO actions. | ||
& B with zone 4 having exactly 50% operable LPRM upscale alarms. | h m n KIP-QA-31.8-1. Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1 | ||
Blank copy of attachment A & 6. | |||
j PERFORMANCE CHECKLIST Page 3 of 8 Appl. To/JPM No.: S/RO 78.AD.001.lo1 Student Name: | |||
Step Action Standard Comments EVALUATOR NOTE: | |||
Refers to section 4. | Ensure the following material is available to support performance of this JPM: | ||
Rev. 0. | A COPY of 01-078-001. | ||
Allow candidate to use blank attachments from the copy of the procedure provided. Obtains a blank copy of Attachment A & B. Completes new Attachment A. *Critical Step #Critical Sequence | 0 Prepare attachments A & B with zone 4 having exactly 50% operable LPRM upscale alarms. | ||
Rev. 0, Page I of I 2005 NRC Exam Rev.1 Appl. To/JPM No.: S/RO 78.AD.001.101 | 0 Blank copy of attachment A & 6. | ||
Notify Reactor Engineering of all LPRM upscale alarms determined inoperable. | EVALUATOR NOTE: | ||
*Critical Step #Critical Sequence | To begin this JPM, provide the candidate with the Task Conditions and Initiating Cue Sheet. | ||
Obtains a controlled copy of procedure. Controlled copy of 01-078-001 obtained. | |||
Rev. 0. Page I of I 2005 NRC Exam Rev.1 I Appl. To/JPM No.: S/RO 78.AD.001.101 - Step *10 | Refers to correct section. Refers to section 4. | ||
< required # of LPRM Upscale Alarms. | *Critical Step #Critical Sequence Fonn NTP-QA-31.8-2. Rev.0. P q c I of I 2005 NRC Exam Rev.1 | ||
EVALUATOR NOTE: The placard is required to remain posted until all zones have 930% upscale alarms operable. | |||
Refer to TRO 3.3.9 LPRM, upscale alarm instrumentation Complete an LPRM vs. APRWLPRM Group Status Control Log (Attachment B) each time LPRM operability status is changed Circle all inoperable | PERFORMANCE CHECKLIST Page 4 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name: | ||
-Step Standard Eva1 Comments Action Determines current LPRM status. Obtains the Operations Special Log Book in the Unit 1 control room and locates the previously completed copy of Attachment A & B. | |||
EVALUATOR CUE: | |||
Rev. 0. Page I of I 2005 NRC Exam Rw.1 Appl. To/JPM No.: S/RO 78.AD.001.101 Step | When the candidate identifies where the current LPRM Upscale Alarm Status Control Log is retained provide the candidate with previously filled-out copy of Attachments A & B. | ||
This completes the JPM for the ROs ONLY EVALUATOR CUE: FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec and TRO for the INOPERABLE LPRMs Upscale alarms. Obtains a copy of the Tech Specs and TRM | EVALUATOR NOTE: | ||
Allow candidate to use blank attachments from the copy of the procedure provided. | |||
Obtains a blank copy of Attachment A & B. Blank copy obtained. | |||
Completes new Attachment A. Enters 1 for Unit. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page I of I 2005 NRC Exam Rev.1 | |||
/ | |||
PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name: | |||
Action Standard Eva1 Comments EVALUATOR CUE: Transfers the previous LPRM data to the new Attachment A. | |||
If candidate elects to verify position of switches in lower relay room, provide the cue that the switches are in the positions indicated on OR Attachment A (Special log book) | |||
Candidate may desire to verify switches in lower relay room. | |||
Enter a check (d) in column (2) for LPRM Place a checkmark in column 2 adjacent to alarms determined inoperable or bypassed for LPRM detector 48-17B in Zone 4. | |||
all other reasons. | |||
Consider all LPRM Upscale Alarms with a Circles YES for zone 1, 2, 3, 5, 6, 7, 8, and 9. | |||
check in column (1) or (2) of Attachment A as inoperable Determine if 250% of LPRM Upscale alarms in each zone are operable. | |||
Circles NO for zone 4. | |||
Notify Reactor Engineering of all LPRM upscale N/A alarms determined inoperable. | |||
Previously noted in JPM cue. | |||
*Critical Step #Critical Sequence Fotm NTP-QA-31.8-2. Rev. 0. Page I of I 2005 NRC Exam Rev.1 | |||
I i | |||
PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name: | |||
-Step Action Standard Eva1 Comments | |||
*10 Attach placard to 1C651 indicating < required # Attaches placard to operating panel 1C651. | |||
of LPRM Upscale Alarms. | |||
EVALUATOR NOTE: | |||
The placard is required to remain posted until all zones have 930% upscale alarms operable. | |||
*11 Refer to TRO 3.3.9 LPRM, upscale alarm Notifies the Unit Supervisor to Refer to TRO instrumentation 3.3.9 LPRM 12 Complete an LPRM vs. APRWLPRM Group Enters 1 for Unit. | |||
Status Control Log (Attachment B) each time LPRM operability status is changed Circle all inoperable LPRMs on LPRM vs. | |||
APRWLPRM Group Status Control Log (Attachment B). | |||
13 Transfers the previous LPRM data to the new Attachment B. | |||
14 Circles LPRM detector 48-17 for APRM E, under the column 6Level. | |||
15 Obtains review. Submit the completed Attachment A and 8 to the Unit Supervisor. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page I of I 2005 NRC Exam Rw.1 | |||
1 PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name: | |||
- | |||
Step Action Standard Eva1 Comments EVALUATOR CUE: | |||
This completes the JPM for the ROs ONLY EVALUATOR CUE: | |||
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec and TRO for the INOPERABLE LPRMs Upscale alarms. | |||
16 Obtains a copy of the Tech Specs and TRM | |||
==References:== | ==References:== | ||
TRO 3.3.9 Determines the following actions are required: | TRO 3.3.9 | ||
TRO 3.3.9 condition H Within 1 hour Post a sign on the reactor panel that less than 50% of the LPRM Upscale alarms are OPERABLE AND TRO 3.3.9 Condition E Immediately Place the reactor mode switch in the shutdown position | *17 Determines required actions Determines the following actions are required: | ||
Rev. 0. Page I of 1 2005 NRC Exam Rev.1 00 0 00 a, rn a | TRO 3.3.9 condition H Within 1 hour Post a sign on the reactor panel that less than 50% of the LPRM Upscale alarms are OPERABLE AND TRO 3.3.9 Condition E Immediately Place the reactor mode switch in the shutdown position | ||
*Critical Step #Critical Sequence h,rm NIT-QA-31.8-2. Rev. 0. Page I of 1 2005 NRC Exam Rev.1 | |||
00 | |||
D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required | + | ||
D. All OPRM channels are INOPERABLE E. It has been determined that | 0 00 a, | ||
< 50% of LPRM Upscale alarms in zone 4 are operable. | rn a | ||
F. The combination of thermal power and core flow is IN Region I1 of the power to Flow Map. INITIATING CUE Determine the required Tech Spec and TRO actions. - 2005 NRC Exam Rev.1 Page 3 of 4 SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE | a | ||
D. All OPRM channels are INOPERABLE E. It has been determined that e 50% of LPRM Upscale alarms in zone 4 are operable. F. The combination of thermal power and core flow is IN Region II of the power to Flow Map. INITIATING CUE - Determine the required Tech Spec and TRO actions. | TASK CONDITIONS | ||
2005 NRC Exam Rev.1 Page 4 of 4 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE 1 APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.AD.273.002 0 09/26/05 2.1.12 N/A 4.0 APPl. JPM Number Rev. No. | -...- A. Unit 1 is in MODE l a t 80% power. | ||
Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Determine TRO applicability and complete the LCORRO log sheet. Completed By: Rich Chin Writer A | : 8. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-178 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room. | ||
Supv. Date of Performance: | D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instruction for LPRM detector 48-178. | ||
2005 NRC Exam Rev.1 Page 1 of 4 | |||
Form NTP-QA-31.8-1. | |||
Rev. 0. Page 1 01 2 2M)S NRC Exam Rev. 1 | TASK CONDITIONS | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | - A. Unit 1 is in MODE l a t 80% power. | ||
B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-17 8 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room. | |||
D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instruction for LPRM detector 48-178. | |||
-- | |||
2005 NRC Exam Rev.1 Page 2 of 4 | |||
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE l a t 80% power. | |||
B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-178. | |||
C. LPRM detector 48-176 is failed and bypassed. | |||
D. All OPRM channels are INOPERABLE E. It has been determined that < 50% of LPRM Upscale alarms in zone 4 are operable. | |||
F. The combination of thermal power and core flow is IN Region I1 of the power to Flow Map. | |||
INITIATING CUE Determine the required Tech Spec and TRO actions. | |||
- | |||
2005 NRC Exam Rev.1 Page 3 of 4 | |||
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE l a t 80% power. | |||
B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-178. | |||
C. LPRM detector 48-178 is failed and bypassed. | |||
D. All OPRM channels are INOPERABLE E. It has been determined that e 50% of LPRM Upscale alarms in zone 4 are operable. | |||
F. The combination of thermal power and core flow is IN Region II of the power to Flow Map. | |||
INITIATING CUE | |||
- Determine the required Tech Spec and TRO actions. | |||
2005 NRC Exam Rev.1 Page 4 of 4 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE 1 APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.AD.273.002 0 09/26/05 2.1.12 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. | |||
To Sys. No. | |||
Task Title: Determine TRO applicability and complete the LCORRO log sheet. | |||
Completed By: Validated Rich Chin 09/26/05 Writer Date InstructorNVriter Date A pprovaI: | |||
Nuclear Trng. Supv. Date 15 Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
- | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # / S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1. Rev. 0.Page 1 01 2 2M)S NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.AD.273.002 I. SAFETY CONSIDERATIONS | |||
-.- | |||
A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | |||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | |||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
REFERENCES NDAP-QA-0312, | II. REFERENCES NDAP-QA-0312, CONTROLS OF LCOS, TROS AND SAFETY FUNCTION DETERMINATION PROGRAM (Revision 8 ) | ||
Tech Specs 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s): | |||
NONE TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power. 6. | NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power. | ||
: 6. B RPS Bus De-energized30 minutes ago due to a voltage regulator failure in the MG set. | |||
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. | C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment 6. | ||
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. VI. TASK STANDARD Entry into LCO 3.4.6 declared with LCO/TRO log and Operations portion of Chemistry/Health Physics LCO/TRO Sample /Survey Log sheet filled-out, and Chemistry notified. | D. At step 9 of ON-158-001, LOSS OF RPS attachment 6, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-15711OAl, A2, B1, 82) could be OPENED. All other steps of the attachment were completed successfully. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 2 d 2 2005 NRC Exam Rev. 1 | E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. | ||
, PERFORMANCE CHECKLIST Appl. To/JPM No.: 00.AD.273.002 Step | F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. | ||
Allow candidate to use the forms from the copy of NDAP-QA-0312 that is provided with this JPM. Obtain a controlled copy of NDAP-QA-0312, | G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. | ||
Review applicable TS LCO and Bases or TRM TRO and Bases. EVALUATOR NOTE: Placing Unit 1 in either of the appropriate blocks in the next 2 steps will satisfy the | H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. | ||
V. INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. | |||
VI. TASK STANDARD Entry into LCO 3.4.6 declared with LCO/TRO log and Operations portion of Chemistry/Health Physics LCO/TRO Sample /Survey Log sheet filled-out, and Chemistry notified. | |||
Page | Form NTP-QA-31.8-1, Rev. 0, Page 2 d 2 2005 NRC Exam Rev. 1 | ||
Enter the unit containing the inoperable equipment. | , | ||
Enter the system number. Circle or enter whether the Action is an LCO or TRO and enter the specification number. Enter the applicable MODES. EVALUATOR NOTE: Candidate may choose to place references in the reference document section, however this is not required. | PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | ||
Enter the reference documents, if applicable. | Step Action Standard Comments EVALUATOR NOTE: | ||
The Reference Documents section may also be used to provide clarifying information for the reason the LCO/TRO is being entered. | Due to the nature of this JPM, the candidate may refer to several procedures before determining CRM A & B are both INOPERABLE and LCO 3.4.6 entry is required. Allow candidate to use the forms from the copy of NDAP-QA-0312 that is provided with this JPM. | ||
1 Obtain a controlled copy of NDAP-QA-0312, Controlled copy obtained. | |||
CONTROLS OF LCOS, TROS AND SAFETY FUNCTION DETERMINATION PROGRAM 2 Selects the correct section to perform. Selects section 6.3 3 Review applicable TS LCO and Bases or TRM TRO Reviews TS LCO and Bases and TRM and Bases. TRO and Bases. | |||
Eva1 | Determines LCO 3.4.6 is applicable. | ||
EVALUATOR NOTE: | |||
One for action B.l, and one for 8.2. See attached answer key for specifics of this form should be completed. | Placing Unit 1 in either of the appropriate blocks in the next 2 steps will satisfy the Critical portion for BOTH I | ||
steps. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2.Rev. 0. Page 1 01 1 2005 NRC Exam Rev.1 | |||
, | |||
PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
-Step Action Standard Eva1 Comments | |||
*4 In accordance with the applicable TS/TRM, complete Fills out a copy of Attachment C of a LCO/TRO log sheet (Form NDAP-QA-0312-1) as NDAP-QA-0312 (Form follows: NDAP-QA-0312-1) | |||
Enter the applicable unit for which the log sheet is Records a 1 in the space provided to being completed. designate Unit 1 t 5 Enter the unit containing the inoperable equipment. Records a 1 in the space provided to designate Unit 1 6 Enter the system number. Records a 79 in the space provided. | |||
t 7 Circle or enter whether the Action is an LCO or TRO Circles or records LCO and enter the specification number. | |||
However, caution must be used to ensure the sample/survey is not missed in the event the LCO is not cleared in a timely manner. | Then records 3.4.6. | ||
t 8 Enter the applicable MODES. Records 1,2,3. | |||
EVALUATOR NOTE: | |||
Candidate may choose to place references in the reference document section, however this is not required. | |||
Completing the top section of FORM NDAP-QA-0312-3. | 9 Enter the reference documents, if applicable. The Determines NO reference documents Reference Documents section may also be used to are applicable. | ||
provide clarifying information for the reason the LCO/TRO is being entered. | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 01 1 2005 NRC Exam Rev.1 | |||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
Step Action Standard Eva1 Comments | |||
*lo Reviewhevise all active LOSF worksheets based on Determines from initial conditions that the above inoperable equipment. No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records N/A in the space provided | |||
*11 Determine if LCO 3.0.6 has been applied for any other Determines from initial conditions that system on both Units 1 and 2. No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records an X in the Is this a Safety Function Determination support system? NO space provided AND Records an X in the If YES, is TS 3.0.6 to be applied? NA space provided. | |||
EVALUATOR NOTE: | |||
The next 4 steps of this JPM will require 2 separate line item entries on Attachment C of NDAP-QA-0312. | |||
One for action B.l, and one for 8.2. | |||
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. 2005 NRC Exam Rev. 1 1 of2 TASK CONDITIONS A | See attached answer key for specifics of this form should be completed. | ||
- | |||
*Critical Step #Critical Sequence F o n NTP-QA-31.8-2. Rev. 0. Page 1 01 1 2005 NRC Exam Rev 1 | |||
i PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
Action Standard Comments Enter the Date and Time that the CONDITION was Records B in CONDITION block for entered. both line items Records date and time for each of the actions in the space provided. | |||
Enter the reason for CONDITION and the appropriate Records all of the following REQUIRED ACTION. The REQUIRED ACTION Required Primary Containment should be listed by number and include a brief noun Atmospheric Monitoring System description. | |||
INOPERABLE B.l Analyze grab samples of primary containment atmosphere AND 8.2 Restore required Primary Containment Atmospheric Monitoring System to OPERABLE status Enter the Date and Time by when the REQUIRED In the spaces provided Records: | |||
ACTION must be completed. Once per 12 hours B.l Within 30 days for item 8.2 Initial that the CONDITION has been entered. Records candidate initials in the spaces provided | |||
*Critical Step #Critical Sequence Form NTP-QA-31.82, Rev. 0. Paw 1 of 1 2005 NRC Exam Rev.1 | |||
I PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
Step 16 Action Have another SRO Peer Check the LCORRO entry | |||
- Standard Asks another SRO to Peer Check the | |||
- - Comments and also initial in the "Entered By" box. LCO/TRO entry and initial in the "Entered By" box. | |||
EVALUATOR CUE: | |||
Role-play the second SRO and inform the candidate that you have Peer Checked the LCO/TRO entry, and they can assume that you have initialed the "Entered By" box. | |||
17 If required, additional CONDITION(S) can be entered Determines: | |||
within the same LCORRO as follows: | |||
Form NDAP-QA-0312-5 "LCO/TRO If the REQUIRED ACTION requires a repetitive action Repetitive Required Action Completion (ex; perform action once every 8 hours); Sheet" IS NOT REQUIRED. | |||
COMPLETE Form NDAP-QA-0312-5 "LCO/TRO Repetitive Required Action Completion Sheet" and attach to the LCORRO log sheet EVALUATOR NOTE: | |||
It is not necessary to initiate a Chemistry/Health Physics LCORRO Sample/Survey Log if the LCO is expected to be cleared prior to the first required action/sample. However, caution must be used to ensure the sample/survey is not missed in the event the LCO is not cleared in a timely manner. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1 | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
Step Action Standard Eva1 Comments 18 If the LCO/TRO Condition requires Chemistry or Determines: | |||
Health Physics to sample or perform a survey, Shift Supervision shall initiate a Chemistry/Health Physics Chemistry/Health Physics LCO/TRO LCO/TRO Sample/Survey Log (FORM Sample/Survey Log (FORM NDAP-QA-0312-3) by: NDAP-QA-0312-3) | |||
IS REQUIRED | |||
*19 Completing the top section of FORM Places the following information on top NDAP-QA-0312-3. section of FORM NDAP-QA-0312-3. | |||
UNIT 1 The LCO/TRO for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE Commenced at LCO entry time TS LCO 3.4.6 Action B.l Sample/Survey within Once per 2 hours | |||
*20 Notifying Chemistry/Health Physics to pick up the log Contacts Chemistry to pick up the log sheet in the Control Room. sheet in the Control Room. | |||
EVALUATOR CUE: | |||
Role-play Chemistry and acknowledge the report. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1 | |||
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: | |||
Step Action Standard Eva1 Comments EVALUATOR CUE: | |||
That completes this JPM | |||
*Critical Step #Critical Sequence Form NTP-OA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1 | |||
ANSWER KEY DO NOT GIVE TO CANDIDATES UNIT SYSTEM MODE 1 79 1,293 Reference Documents ChedHP Reviewhevise all active LOSF worksheets based on the above inoperable equipment. Review Complete N/A Is this a Safety Function Determination support system? YES 0 NO If YES, is TS 3.0.6 to be applied? YES c]NO 0 NA If YES, perform a LOSF Determination using the Safety Function Determination Work Sheet. If NO, cascade LCOs. | |||
t 6 Date/ | |||
Time Entered Todays date and time LCO/TRO CONDITION Entered REASON AND REQUIRED ACTION Required Primary Containment Atmospheric Monitoring System INOPERABLE 6.1 Analyze grab samples of primary containment atmosphere Completion Date/Time Once per 12 hours Entered candidate initials LCO/TRO CONDITION Cleared Datemime Cleared By AND B Todays 6.2 Restore required Primary Containment Within 30 days candidate date and Atmospheric Monitoring System to OPERABLE initials time status I I Reviewed OPS Supv-Nuc: LCO Entered I I | |||
.CO Cleared I | |||
2005 NRC Exam Rev 1 | |||
ANSWER KEY DO NOT GIVE TO CANDIDATES Unit 1 CHEMISTRY/HEALTH PHYSICS LCO/TRO SAMPLWSURVEY LOG T h m R O for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE commenced at LCO / Today . Chemistry samples/Health Physics surveys shall be taken per: | |||
entry time 1 I SAMPLWSURVEY I ANALYSIS I TSnR ACTION WITHIN COMPLETED WITHIN LCO 3.4.6 B.l Once per 12 hours 1 I Report chemistry analysis results to Shift Supervision. | |||
Shift Supervision HEALTH PHYSICS | |||
- | |||
The Desk Foreman Health Physics or the HP Shift Lead Technicians shall notify the HP Duty Foreman immediately following receipt of this log. | |||
CHEMISTRY FIRST SAMPLE DUE DATWIME | |||
--OR-- | |||
FIRST ANALYSIS COMPLETION DUE DATEnlME LCO/TRO cleared at BY Daterrime Shift Supervision Copy sent to Chemistry/HP Foreman. | |||
Technician COMPLETED FORMS SHALL BE INCLUDED WITH THE LCOfiRO LOG SHEET FOR THE SAMPLING LCOTTRO. | |||
Page 1 of 2005 NRC Exam Rev. 1 | |||
- ~~~~ __ | |||
TASK CONDITIONS | |||
- A. Unit 1 is in Mode 1 at 100% power. | |||
: 6. B, RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set. | |||
C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment 6. | |||
D. At step 9 of ON-158-001, LOSS OF RPS attachment 6, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-157110A1, A2, B1, 62) could be OPENED. | |||
All other steps of the attachment were completed successfully. | |||
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. | |||
F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. | |||
G. AR-146-AO5 CONTN RAD DET SYSTEM 6 TROUBLE alarm is locked in. | |||
H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. | |||
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. | |||
2005 NRC Exam Rev. 1 1 of2 | |||
TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power. | |||
B. B RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set. | |||
C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment B. | |||
D. At step 9 of ON-158-001, LOSS OF RPS attachment B, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-157110A1, A2, B1, 82) could be OPENED. | |||
All other steps of the attachment were completed successfully. | |||
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE I S 0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. | |||
F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. | |||
G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. | |||
H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. | |||
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. | INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. | ||
2005 NRC Exam Rev. 1 2 of 2 PPL SUSQUEHANNA, LLC | 2005 NRC Exam Rev. 1 2 of 2 | ||
Nuclear Trng. Supv. Date 10120 Date of Performance: | |||
Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation | . PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 45.0N.007101 1 09/26/05 2.1.25 N/A 2.813.1 APPl- JPM Number Rev. Date NUREG 1123 WA No. WA Imp. | ||
To No. Sys. No. | |||
Form NTP-QA-3 1.8- I, Rev. 0, Page 1 of 2 2005 | Task Title: Determine Cause for Reactor Water Level Indication Anomalylldentify required Tech Spec Actions Completed By: Validated: | ||
Rich Chin 09126/05 Writer Date I nstructorNVriter Date Approval: | |||
Nuclear Trng. Supv. Date 10120 Date of Performance: Validation Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # / S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-3 1.8- I , Rev. 0, Page 1 of 2 2005 N R C Exam R e v 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0N.007.101 | |||
\ 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | \ 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. ON-145-004, RPV WATER LEVEL ANOMALY (Rev. | II. REFERENCES A. ON-145-004, RPV WATER LEVEL ANOMALY (Rev. 8 ) | ||
B. Tech Specs 111. REACTIVITY MANI PULATlONS This JPM satisfies the requirements of Operational Activity(s): | |||
None IV. TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. B. An anomaly exists with RPV water level instrument indication. | None IV. TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. | ||
V. INITIATING CUE Use the appropriate procedure to address the anomaly. VI. TASK STANDARD Identifies instrument anomaly is due to Instrument Bus 1 1Y125 breaker 01 being tripped or de-energized, and re-energizes the instruments. | B. An anomaly exists with RPV water level instrument indication. | ||
SROs additionally, identify the Required Tech Spec Actions. | V. INITIATING CUE Use the appropriate procedure to address the anomaly. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC. Exam Rev. 1 | VI. TASK STANDARD Identifies instrument anomaly is due to Instrument Bus 1 1Y125 breaker 01 being tripped or de-energized, and re-energizes the instruments. SROs additionally, identify the Required Tech Spec Actions. | ||
Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC. Exam Rev. 1 | |||
LI- | I PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | ||
Step Action Standard Comments EVALUATOR NOTE: | |||
0 This JPM must be performed in the simulator. | |||
Establish task conditions as directed on attached setup instructions. | |||
0 When the candidate is ready to begin JPM, place the simulator to RUN. | |||
$1 Reviews RPV water level instruments indications in Determines the following level indicators the simulator to determine which indicators are are reading zero: | |||
affected. | |||
LI-14201B1 on 1C651 LI-14201B on C601 LI-142038 on C601 EVALUATOR NOTE: | |||
Candidate may reference ON-117-001, LOSS OF INSTRUMENT BUS instead of ON-145-004, RPV WATER LEVEL ANOMALY. As long as all critical steps are accomplished this would be acceptable. | |||
However, it may be necessary to ask a follow-up question for the Tech Specs. | |||
2 Obtains a controlled copy of ON-145-004. Controlled copy obtained. | |||
3 Reviews Symptoms and Observations for Ensures the Symptoms and Observations applicability. are applicable. | |||
*Critical Step #Critical Sequence Form NTP-QA-31 8-2, Rev 0.P a p I of I 2005 NRC Exam Rev.1 | |||
i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | |||
Step Action Standard Comments Records date and time of event. Enter current date and time. | |||
Selects the appropriate section and attachment. Selects Section 3.5 and Attachment B. | |||
Perform following for level instrumentation On Attachment 6 pages land 2 malfunction: determines the following common reference leg condensing chambers and Refer to Attachment B checking following: | |||
excess flow check valves are still indicating normal values and are NOT the source of the anomaly: | |||
Instruments with common reference leg condensing chambers or excess flow check valves. | |||
LI-B21 1R605 LR-C32 1R608 LI-14201A LI-14201A1 LI-l4203A LI-B21 1R604 LI-C23 1R606B LWPR 14201A | |||
*Critical Step #Critical Sequence Form h T I - Q A - 3 1 8-2. Rev 0. Page I of I 2005 NRC Exam Rev 1 | |||
LI- | , | ||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | |||
-Step 7 | |||
Action Instruments and indications with common variable leg Standard On Attachment B pages 1and 2 Eva1 Comments supplies or excess flow check valves. determines the following common variable leg condensing chambers and excess flow check valves are still indicating normal values and are NOT the source of the anomaly: | |||
LI-B21 1R605 LR-C32 1R608 LI-14201A LI-14201A1 LI-l4203A LI-621 1R604 LI-C23 1R606B LWPR 14201A EVALUATOR CUE: | |||
If requested, inform candidate all instrumentation power is selected to its normal source. | |||
*Critical Step #Critical Sequence Fonn NIT-QA-31.8-2. Rev. 0. Papc I of I 2005 NRC Exam Rev.1 | |||
j PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | |||
Automatic actions and alarms. | Action Standard Comments 8-Instruments with common power supplies. Determines the following indicators a common power supply: | ||
IF level cannot be determined 2 +13" by at least two (2) independent indications, Enter EO 100 102, RPV Control. Comply with TS 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, 3.3.5.1, 3.3.4.2 and 3.3.5.2. | LI-14201B1 on 1C651 LI-14201B on 1C601 LI-142038 on 1C601 Identifies a loss of 1Y125 breaker 01 as the common mode failure. | ||
Automatic actions and alarms. NONE IF level cannot be determined 2 +13" by at least two Determines this is N/A since other level (2) independent indications, Enter EO 100 102, RPV indications are available. | |||
Control. | |||
EVALUATOR CUE: Role-play NPO and repoi. 1Y125 breaker 01 is tripped. Informs Unit Supervisor that 1Y125 breaker 01 is tripped. EVALUATOR CUE: Role-play Unit Supervisor and acknowledge the report And Instruct candidate to attempt one closure of | Comply with TS 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, Recognizes the need to Comply with TS 3.3.5.1, 3.3.4.2 and 3.3.5.2. 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, 3.3.5.1, 3.3.4.2 and 3.3.5.2. | ||
EVALUATOR CUE: | |||
If necessary, Role-play Unit Supervisor and acknowledge the request. | |||
*Critical Step #Critical Sequence Form NIP-QA-31 8-2. Rev. 0. Page I of I 2005 NAC Exam Rev.1 | |||
I PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | |||
~ | |||
Step Action Standard Comments 12 IF applicable, Restore power supplies for failed Contacts NPO to check status of 1Y125 instrumentation. breaker 01 EVALUATOR CUE: | |||
Role-play NPO and repoi. 1Y125 breaker 01 is tripped. | |||
13 Informs Unit Supervisor that 1Y125 breaker 01 is Informs Unit Supervisor that 1Y125 tripped. breaker 01 is tripped. | |||
EVALUATOR CUE: | |||
Role-play Unit Supervisor and acknowledge the report And Instruct candidate to attempt one closure of 1Y125 breaker 01 is tripped. | |||
*14 Contact NPO and instruct NPO to close 1Y125 Contacts NPO and instructs NPO to close breaker 01. 1Y125 breaker 01. | |||
BOOTH OPERATOR CUE: | |||
Remove malfunction on 1Y125 breaker 01. | Remove malfunction on 1Y125 breaker 01. | ||
MRF DB117271 CLOSE | MRF DB117271 CLOSE | ||
Role-play NPO and report 1Y125 breaker 01 is CLOSED. Verifies level instruments are reading NORMAL EVALUATOR CUE: | *Critical Step #Critical Sequence hmnhTPQA-31 8-2. Rev. 0.P q c I of I 2005 NRC Exam Rev 1 | ||
This completes the JPM for the RO ONLY EVALUATOR CUE: FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec required actions for the failed level transmitters. Obtains a copy of the Tech Specs | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | |||
Action Standard Comments EVALUATOR CUE: | |||
Role-play NPO and report 1Y125 breaker 01 is CLOSED. | |||
Verifies level instruments are reading NORMAL Verifies the following indicators are now reading normal: | |||
LI-14201B1 on 1C65 LI-14201B on 1C601 LI-142038 on 1C601 EVALUATOR CUE: | |||
This completes the JPM for the RO ONLY EVALUATOR CUE: | |||
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec required actions for the failed level transmitters. | |||
Obtains a copy of the Tech Specs | |||
==References:== | ==References:== | ||
Tech Spec 3.3.3.1 | Tech Spec 3.3.3.1 | ||
Rev 0. Pqr 1 uf 1 2005 NRC Exam Rev.1 PERFORMANCE CHECKLIST Appl. To/JPM No.: 45.0N.007.101 Step +I7 | *Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev 0. Pqr 1 uf 1 2005 NRC Exam Rev.1 | ||
Within 30 days restore required channel to operable status. | PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name: | ||
C. It has been determined that extended range level transmitter LT-142038 has lost power. INITIATING CUE Determine the required Tech Spec actions. 2005 NRC. Exam Rev. 1 | Step Action Standard Eva1 Comments | ||
C. It has been determined that extended range level transmitter LT-142038 has lost power. INITIATING CUE Determine the required Tech Spec actions. | +I7 Determines required actions Determines the following action is required: | ||
2005 NRC. Exam Rev. 1 Page | Within 30 days restore required channel to operable status. | ||
EVALUATOR CUE: | |||
This completes the JPM. | |||
- | |||
*Critical Step #Critical Sequence Form NTF-QA 31.8-2, Rev 0. P q c I of 1 2005 NRC Exam Rev.1 | |||
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. | |||
: 8. An anomaly exists with RPV water level instrument indication. | |||
C. It has been determined that extended range level transmitter LT-142038 has lost power. | |||
INITIATING CUE Determine the required Tech Spec actions. | |||
Page 1 of 4 2005 NRC. Exam Rev. 1 | |||
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. | |||
B. An anomaly exists with RPV water level instrument indication. | |||
C. It has been determined that extended range level transmitter LT-142038 has lost power. | |||
INITIATING CUE Determine the required Tech Spec actions. | |||
Page 2 of 4 2005 NRC. Exam Rev. 1 | |||
TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. | |||
B. An anomaly exists in RPV water level instrument indication. | |||
INITIATING CUE Use the appropriate procedure to address the anomaly. | |||
Page 3 of 4 2005 NRC. Exam Rev. 1 | |||
TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power. | |||
B. An anomaly exists in RPV water level instrument indication. | |||
INITIATING CUE Use the appropriate procedure to address the anomaly. | INITIATING CUE Use the appropriate procedure to address the anomaly. | ||
Page 4 of 4 2005 NRC. Exam Rev. 1 | |||
No. Date NUREG 1123 WA No. WA Imp. To Sys. No. | PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 00.AD.269.101 0 09/26/05 2.2.24 N/A 2.6/3.8 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. | ||
Supv. Date of Performance: | To Sys. No. | ||
Task Title: Determine Trip Inputs to Zone 3 Is0 Signals Lockout Relay XY07553A Using Controlled Electrical Prints Completed By: Validated Rich Chin 09/26/05 Writer Date InstructorNVriter Date Approval: | |||
Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: Evaluator Name: Signature Typed or Printed Comments: | Nuclear Trng. Supv. Date 20/30 Date of Performance: Validation Time (Min.) Time Taken (Min.) | ||
Form NTP-QA-31.8-1, Rev. 0, Page I of 2 2005 NRC Exam Rev. 1 | JPM Performed By: | ||
.- REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.AD.269.101 | Student Name: | ||
\ 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | Last First M.I. Employee # / S.S. # | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | ||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1, Rev. 0, Page I of 2 2005 NRC Exam Rev. 1 | |||
.- | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.AD.269.101 | |||
\ | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | |||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | |||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. E 201 sheet 1 (Rev. 27) B. E 184 sheet 1 (Rev. 19) C. E 184 sheet 3 (Rev. 17) | II. REFERENCES A. E 201 sheet 1 (Rev. 27) | ||
None IV. TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. V. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor. | B. E 184 sheet 1 (Rev. 19) | ||
VI. TASK STANDARD All of the trip input signals to Zone 3 Is0 Signals Lockout Relay XY07553A are identified. | C. E 184 sheet 3 (Rev. 17) | ||
SROs must additionally identify the required Tech Spec actions for an inoperable input. | III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s): | ||
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. I Appl. To/JPM No.: S/RO 00.AD.269.101 Step | None IV. TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. | ||
These would all be acceptable. Candidate obtains the controlled copy of the electrical print. Locates relay XY07553A on print E 201 sheet 1. EVALUATOR NOTE The following steps 3 - 9 may be done in any order. Candidate may also elect not to report result back to supervisor until they have completed the task. This JPM is written with a report back after each determination as a convenience to the evaluator. | V. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor. | ||
VI. TASK STANDARD All of the trip input signals to Zone 3 Is0 Signals Lockout Relay XY07553A are identified. SROs must additionally identify the required Tech Spec actions for an inoperable input. | |||
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. I | |||
0 Refuel floor exhaust 0 Refuel floor wall exhaust AND Reports this to the supervisor | I PERFORMANCE CHECKLIST Page 3 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name: | ||
~ Action Determines the need to transition to another electrical | Step Action Standard Eva1 Comments EVALUATOR NOTE Candidate may use any number of different mediums to obtain the controlled copy of the electrical drawings. | ||
These would all be acceptable. | |||
: 1. Candidate obtains the controlled copy of the electrical References the electrical print print. index, OR the operating manuals and determine the appropriate print is E 201 sheet 1. | |||
: 2. Locates relay XY07553A on print E 201 sheet 1. Locates relay XY07553A at grid location C6. | |||
EVALUATOR NOTE The following steps 3 - 9 may be done in any order. | |||
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec LCO for the INOPERABLE relay. Obtains a copy of the Tech Specs | Candidate may also elect not to report result back to supervisor until they have completed the task. This JPM is written with a report back after each determination as a convenience to the evaluator. | ||
- | |||
Within 24 hours place the following channel in TRIP: Unit 1 Refuel floor high exhaust duct radiation-high | *Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. I | ||
PERFORMANCE CHECKLIST Page 4 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name: | |||
Step Action Standard Eva1 Comments | |||
*3 Candidate determines Unit 1 High radiation inputs a trip Determines that High radiation signal to relay XY07553A. from the following Unit 1 locations will input a trip signal into relay XY07553A [Grid location B7] | |||
Refuel floor exhaust 0 Refuel floor wall exhaust 0 Railroad access shaft exhaust AND Reports this to the supervisor t4 Candidate determines Unit 2 High radiation inputs a trip Determines that High radiation signal to relay XY07553A. from the following Unit 2 locations will input a trip signal into relay XY07553A [Grid location B8] | |||
0 Refuel floor exhaust 0 Refuel floor wall exhaust AND Reports this to the supervisor | |||
= | |||
*Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. I | |||
( | |||
PERFORMANCE CHECKLIST Page 5 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name: | |||
~ | |||
Step Action Standard Comments 5 Determines the need to transition to another electrical Determines the other 2 inputs to drawing. trip relay XY07553A are on drawings 184 sheet 1 and 3 by observing the notes 6 Candidate obtains the controlled copy of the electrical Obtains the controlled copy of the print E 184 sheet 1. electrical print E 184 sheet 1. | |||
wc7 Candidate determines Unit 1 Div 1 LOCA isolation signal Determines Unit 1 Div 1 LOCA inputs a trip signal to relay XY07553A. isolation signal inputs a trip signal to relay XY07553A and this signal is generated by : | |||
0 Manual isolation Lo-Lo water reactor level (trip2) 0 Hi drywell pressure Switch in TEST mode AND Reports this to the supervisor 8 Candidate obtains the controlled copy of the electrical Obtains the controlled copy of the print E 184 sheet 3. electrical print E 184 sheet 3. | |||
*Critical Step #Critical Sequence Form NTP-QA-3 1.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
I PERFORMANCE CHECKLIST Page 6 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name: | |||
Step Action Standard Comments U9 Candidate determines Unit 2 Div 1 LOCA isolation signal Determines Unit 2 Div 1 LOCA inputs a trip signal to relay XY07553A. isolation signal inputs a trip signal to relay XY07553A and this signal is generated by : | |||
Manual isolation RPV low level (trip 2) 0 Hi drywell pressure 0 Switch in TEST mode AND Reports this to the supervisor 10 Candidate determines there are no more inputs to relay Determines there are no more XY07553A inputs to relay XY07553A, and reports this to the supervisor. | |||
EVALUATOR CUE: | |||
This completes the JPM for the ROs ONLY | |||
*Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 7 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name: | |||
~ | |||
Action Standard Eva1 Comments EVALUATOR CUE: | |||
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec LCO for the INOPERABLE relay. | |||
Obtains a copy of the Tech Specs References Tech Spec 3.3.6.2 Determines required actions for Tech Spec 3.3.6.2 Determines the following actions will be required: | |||
Within 24 hours place the following channel in TRIP: | |||
Unit 1 Refuel floor high exhaust duct radiation-high EVALUATOR CUE: | |||
This completes the JPM | |||
*Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with: | |||
NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place. | |||
A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE. | |||
INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination? | INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination? | ||
Page 1 of 4 2005 NRC Exam Rev. 1 SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with: NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place. A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE. | Page 1 of 4 2005 NRC Exam Rev. 1 | ||
SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with: | |||
NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place. | |||
A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE. | |||
INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination? | INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination? | ||
2005 NRC Exam Rev. I | Page 2 of 4 2005 NRC Exam Rev. I | ||
2005 NRC Exam Rev. 1 | |||
2005 NRC Exam Rev. 1 | - TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. | ||
INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor. | |||
Review and Approve A Radioactive Liquid Release Permit Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval : Nuclear Trng. Supv. Date Date of Performance: | Page 3 of 4 2005 NRC Exam Rev. 1 | ||
Form NTP-QA-31.8-1, Rev. | TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. | ||
0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 69.0P.044.051 | INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor. | ||
Page 4 of 4 2005 NRC Exam Rev. 1 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 69.0P.044.051 1 9/27/05 2.3.6 N/A 3.1 Appl. JPM Number Rev. Date NUREG 1123 WA No. WA Imp. | |||
To No. Sys. No. | |||
Task Title: Review and Approve A Radioactive Liquid Release Permit Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval : | |||
Nuclear Trng. Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee ## / S.S. ## | |||
Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 69.0P.044.051 | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | : 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | |||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPN will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPN will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES OP-069-050, Release of Liquid Radioactive Waste (Revision 31 ) | II. REFERENCES OP-069-050, Release of Liquid Radioactive Waste (Revision 31) | ||
NONE IV. TASK CONDITIONS | I11. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s): | ||
B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT- | NONE IV. TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment. | ||
TASK STANDARD Identifies INCORRECT settings for Actual High Rad setpoint and Actual Alert Rad setpoint. | B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. | ||
Form NTP-QA-31.8-1, Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1 1 Appl. To/JPM No.: 69.0P.044.051 Step | C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312. | ||
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331is 3.1OE3 CPM V. INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form. | |||
Due to the nature of this JPM, the candidate may elect to perform the calculations FIRST before proceeding to Radwaste to Verify the proper setpoints. This is acceptable. EVALUATOR NOTE: | VI TASK STANDARD I | ||
If candidate indicates t, ,at he/she would proceed to Radwaste to Verify the proper setpoints, provide the candidate with the necessary cues from the attached OP-069-050, Release of Liquid Radioactive Waste Attachment A | Identifies INCORRECT settings for Actual High Rad setpoint and Actual Alert Rad setpoint. | ||
7.OE4 + 3.1 E3 = 7.31 E4 and compares this to the number in block 2.1.6.n (1.1 E5) AND Determines there is a math error Performs the following calculation: | Form NTP-QA-31.8-1,Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1 | ||
5.6E4 + 3.1 E3 = 5.91 E4 and compares this to the number in block 3.1.6.0 (8.7E5) AND Determines there is a math error Checks required setpoint and actua setpoint for High Rad setpoint. | |||
Determines Setpoints have been incorrectly set to the setpoints determined by the math error. | 1 PERFORMANCE CHECKLIST Page 3 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name: | ||
Step EVALUATOR NOTE: | |||
Standard Checks required setpoint and actual setpoint for Alert Rad setpoint. | - Action Standard Eva1 Comments Provide the candidate with a filled out copy of OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit completed through step 2.1.8. Insure High Rad setpoint calculation (in step 2.1.6.n) AND ACTUAL High Rad setpoint (in step 2.1.7 Position 0) are filled out with the MATH errors specified in steps 3 and 4 of this JPM. Student may use OP-069-050, Release of Liquid Radioactive Waste for guidance, however no marks should be made on that copy. | ||
Determines Setpoints have been incorrectly set to the setpoints determined by the math error. Determines: | Provide the candidate with a filled out OP-069-050, Release of Liquid Radioactive Waste Attachment F. | ||
Provide the candidate with a blank OP-069-050, Release of Liquid Radioactive Waste Attachment G. | |||
Provide the candidate with a filled out OP-069-050, Release of Liquid Radioactive Waste Attachment H. | |||
A complete Release permit for Laundry Drain Sample Tank OT-312 will consist of Attachments A, F, G Iand H. | |||
1 Obtain a controlled copy of OP-069-050, Release of Controlled copy obtained. | |||
Liquid Radioactive Waste | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
I i i PERFORMANCE CHECKLIST Page 4 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name: | |||
Step Action Standard Comments 2 Selects the correct section to perform. Selects section step 2.1.8 which requires review of previously completed steps 2.1.5.g through 2.1.7 of OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit EVALUATOR NOTE: | |||
Due to the nature of this JPM, the candidate may elect to perform the calculations FIRST before proceeding to Radwaste to Verify the proper setpoints. This is acceptable. | |||
EVALUATOR NOTE: | |||
If candidate indicates t, ,at he/she would proceed to Radwaste to Verify the proper setpoints, provide the candidate with the necessary cues from the attached OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit for items 2.1 5.9, 2.1.6.f, 2.1.6.k, 2.1.6.1 | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 5 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name: | |||
Step Action Standard Comments | |||
*3 Verifies High Rad setpoint Performs the following calculation: | |||
7.OE4 + 3.1 E3 = 7.31 E4 and compares this to the number in block 2.1.6.n (1.1 E5) | |||
AND Determines there is a math error 454 Verifies Alert Rad setpoint Performs the following calculation: | |||
5.6E4 + 3.1 E3 = 5.91 E4 and compares this to the number in block 3.1.6.0 (8.7E5) | |||
AND Determines there is a math error 455 Verifies Liquid Radwaste Radiation h,dnitor Setpoint Checks required setpoint and actua inputs for Function Switch position 0 setpoint for High Rad setpoint. | |||
Determines Setpoints have been incorrectly set to the setpoints determined by the math error. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
/ | |||
PERFORMANCE CHECKLIST Page 6 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name: | |||
I Step 3K6 | |||
- Action Verifies Liquid Radwaste Radiation Monitor Setpoint Standard Checks required setpoint and actual Eva1 Comments inputs for Function Switch position 1 setpoint for Alert Rad setpoint. | |||
Determines Setpoints have been incorrectly set to the setpoints determined by the math error. | |||
7 Resolves the discrepancy Determines: | |||
The math errors and setpoint adjustments will need corrected before the permit can be authorized for discharge. | The math errors and setpoint adjustments will need corrected before the permit can be authorized for discharge. | ||
EVALUATOR CUE: | |||
: 6. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT- | That completes this JPM. | ||
B. Total Site Blowdown Flow Transmitter FIT- | *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | ||
Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Control Room Communicator Emergency Notification Completed By: Validated: Rich Chin 9/27/05 Writer Date InstructorANriter Date Approval : Nuclear Trng. Supv. | |||
TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment. | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE RO 00.EP.004.002 | : 6. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. | ||
C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312. | |||
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331 is 3.1OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form. | |||
2005 NRC Exam Rev. 1 1 of2 | |||
TASK CONDITIONS | |||
- A. Both Units are at 100% power, all systems in normal alignment. | |||
B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. | |||
C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312. | |||
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-06433] is 3.1OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup JAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form. | |||
2005 NRC Exam Rev. 1 2 of 2 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET RO 00. EP.004.002 0 9/27/05 2.4.43 NIA 2.8 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. | |||
To Sys. No. | |||
Task Title: Control Room Communicator Emergency Notification Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorANriter Date Approval : | |||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # / S.S. # | |||
Performance ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Eva1uator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE RO 00.EP.004.002 | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | : 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | : 1. Whenever any electrical panel is opened for inspection during JPM performance. | ||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | |||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | |||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. EP-PS-100 EMERGENCY DIRECTOR, CONTROL ROOM: Emergency-Plan-Position Specific Instruction (Rev. 22) B. EP-PS-126, EMERGENCY PLAN COMMUNICATOR: Emergency Plan-Position Specific Instruction (Rev. 23) C. EP-TP-003, COMMUNICATION PROCESS (Rev. 0) 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s): | II. REFERENCES A. EP-PS-100 EMERGENCY DIRECTOR, CONTROL ROOM: Emergency-Plan-Position Specific Instruction (Rev. 22) | ||
B. EP-PS-126, EMERGENCY PLAN COMMUNICATOR: Emergency Plan-Position Specific Instruction (Rev. 23) | |||
C. EP-TP-003, COMMUNICATION PROCESS (Rev. 0) 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s): | |||
None IV. TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) | None IV. TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) | ||
V. INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure. VI. TASK STANDARD Identify the ENR form is incomplete; Contact the offsite agencies within 15 minutes from initiation of the ENR form; Communicate the Emergency Classification, Unit, declaration Time and Date to the off site agencies. | V. INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST Page 3 of 9 | VI. TASK STANDARD Identify the ENR form is incomplete; Contact the offsite agencies within 15 minutes from initiation of the ENR form; Communicate the Emergency Classification, Unit, declaration Time and Date to the off site agencies. | ||
Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC Exam Rev. 1 | |||
Role play as Control Room ED and Place OA3 on line 4 of the ENR Form. Return completed ENR form to the candidate. EVALUATOR CUE: | |||
After the ENR has been corrected and returned to the candidate, the Time Critical Portion of the JPM begins. Record Start Time | PERFORMANCE CHECKLIST Page 3 of 9 | ||
. . To/JPM No.: RO 00.EP.004.002 Appl. Student Name: | |||
NOTE: Do not communicate the control number to offsite agencies. | _____ ~~~ | ||
This block is gray shaded on the ENR form. Within 15 minutes of declaration, using the purple colored phone button, dial | Step Action Standard Eva1 Comments EVALUATOR NOTE: | ||
Record stop Time NOTE: When you communicate your phone number to the offsite agencies, the prefix for 4XXX numbers is (570) 759. (The 191 call originates from a 4XXX number.) Communicate ENR Form | This is a time critical JPM. | ||
Ensure a copy of EP-PS-100, EP-TP-003, and EP-PS-126 are available to support performance of this JPM. | |||
My telephone number is: 570-759-4902 Notification time is: Current Time Communicates the following for line 3: EMERGENCY CLASSIFICATION: | Have current, filled-out copy of ENR Form available, with Line 4 BLANK If performing in the simulator, place a yellow sticky on each of the 2 communicator phones with the following call-back number: | ||
ALERT UNIT: ONE and TWO Declaration Time: 5 MINUTES AGO DATE: | 570-759-4902 EVALUATOR NOTE: | ||
To begin this JPM, provide the candidate with the Tasl Conditions and Initiating Cue Sheet. | |||
Role play as Control Room ED and give student filled-out ENR Form. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
If necessary, role-play the off site agency and | |||
This completes the JPM EVALUATOR NOTE: In order for the candidate to pass the Time Critical element of this JPM, they must complete step 2 of this JPM within 15 minutes. | PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name: | ||
2005 NRC Exam Rev. 1 | Step Action Standard Eva1 Comments | ||
*l Obtain and review Event Notification Report (ENR) Reviews ENR form to verify Lines 1, 3, 4, 5, 6, and 7 form with the Shift Manager/ED. are all filled out. | |||
Perform Emergency Plan Classification (Scenario ILO-304) and Complete the ENR form Completed By: Validated: Rich Chin 9/27/05 Writer Date InstructorMlriter Date Approval: Nuclear Trng. | Determines: | ||
Supv. | Line 4 is NOT filled out Reports to the ED that line 4 MUST be filled out EVALUATOR CUE: | ||
Date Time Critical 15 Minutes Validated Time (Min.) Time Taken (Min.) - JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | Role play as Control Room ED and Place OA3 on line 4 of the ENR Form. | ||
Evaluator Name: Signature Typed or Printed Comments: | Return completed ENR form to the candidate. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.304 - 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | EVALUATOR CUE: | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | After the ENR has been corrected and returned to the candidate, the Time Critical Portion of the JPM begins. | ||
Record Start Time | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NAC Exam Rev. 1 | |||
! | |||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name: | |||
Action Standard Eva1 Comments NOTE: | |||
If the MOC does not answer, do not wait. | |||
Transmit the ENR form information to the emergency agencies. | |||
NOTE: | |||
Do not communicate the control number to offsite agencies. This block is gray shaded on the ENR form. | |||
Within 15 minutes of declaration, using the purple Dials 191 on the purple colored button colored phone button, dial 1 91 to transmit the ENR form to the following: | |||
(Dialing 191 will simultaneously connect the listed Verifies the following agencies are on the line: | |||
agencies in a conference call.) | |||
(1) Penna. Emergency Management Agency (2) Columbia County EMA (3) Luzerne County EMA Media Operations Center EVALUATOWBOOTH CUE: | |||
Role-play the receiving agencies and confirm each agency is on the line and you are Ready to Copy | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name: | |||
Action Standard Eva1 Comments EVALUATOR NOTE: | |||
After contact with the offsite agencies has been confirmed, the Time Critical Portion of the JPM ends. | |||
Record stop Time NOTE: | |||
When you communicate your phone number to the offsite agencies, the prefix for 4XXX numbers is (570) 759. (The 191 call originates from a 4XXX number.) | |||
Communicate ENR Form Communicates the following for line Call status: | |||
This is a Drill | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name: | |||
Step Action Standard 1 Eva1 Comments Communicates the following for line 2: | |||
This is: Candidates Name at Susquehanna Steam Electric Station. | |||
My telephone number is: 570-759-4902 Notification time is: Current Time 46 EVALUATOR NOTE: Communicates the following for line 3: | |||
Initial Declaration is not critical EMERGENCY CLASSIFICATION: | |||
ALERT UNIT: | |||
ONE and TWO Declaration Time: | |||
5 MINUTES AGO DATE: | |||
TODAYS DATE THIS REPRESENTS NAN: | |||
INIT1AL DECLARATION | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
i PERFORMANCE CHECKLIST Page 8 of 9 Appl. | |||
. . To/JPM No.: RO 00.EP.004.002 Student Name: | |||
Step Action Standard Eva1 Comments f 6 Communicates the following for line 4: | |||
The Classification Designation is: | |||
OA3 BRIEF NON-TECHNICAL DESCRIPTION OF THE EVENT: | |||
OA3 7 Communicates the following for line 5: | |||
THERE IS: | |||
NO NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS 8 Communicates the following for line 6: | |||
WIND DIRECTION IS FROM: | |||
21O WIND SPEED IS: | |||
85 mph 9 Communicates the following for line 7: | |||
THIS IS A DRILL | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
(, | |||
PERFORMANCE CHECKLIST Page 9 of 9 Appl. | |||
. . To/JPM No.: RO 00.EP.004.002 Student Name: | |||
= | |||
Step Action Standard Eva1 Comments EVALUATOWBOOTH CUE: | |||
Candidate may choose to have one of the offsite agencies REPEAT back the communicated information. If necessary, role-play the off site agency and Repeat back the information. | |||
EVALUATOR CUE: | |||
This completes the JPM | |||
* EVALUATOR NOTE: | |||
In order for the candidate to pass the Time Critical element of this JPM, they must complete step 2 of this JPM within 15 minutes. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) | |||
INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure. | |||
Page 1 of 2 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) | |||
INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure. | |||
Page 2 of 2 2005 NRC Exam Rev. 1 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.304 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp. | |||
To Sys. No. | |||
Task Title: Perform Emergency Plan Classification (Scenario ILO-304) and Complete the ENR form Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorMlriter Date Approval: | |||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
- | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # / S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.304 | |||
- | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | |||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | |||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
II. REFERENCES A. B. ILO-304, SIMULATOR EVALUATION SCENARIO C. EP-PS- | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-304, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-100-C E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s): | |||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Alert Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 | V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
VI. TASK STANDARD Emergency classification of Alert Emergency declared within 15 minutes. | |||
Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 N R C Exam Rev. 1 | |||
I PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Step Student Name: | |||
- | |||
Action Standard Eva1 Comments EVALUATOR NOTE: | |||
This JPM must be performed in the simulator following completion of the scenario ILO-304 as Unit Supervisor. | This JPM must be performed in the simulator following completion of the scenario ILO-304 as Unit Supervisor. | ||
This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. EVALUATOR NOTE: | This is a time critical JPM. | ||
To begin this JPM, provide the candidate with the Initiating Cue Sheet. EVALUATOR NOTE: | Ensure a copy of EP-PS-100 is available to support performance of this JPM. | ||
After the candidate reviews the Task Conditions | EVALUATOR NOTE: | ||
To begin this JPM, provide the candidate with the Initiating Cue Sheet. | |||
EVALUATOR NOTE: | |||
After the candidate reviews the Task Conditions / | |||
Initiating Cue Sheet: | |||
Determines Tab A is appropriate Tab to classify the event. Identifies from participation as The Unit Supervisor, that an RCS leak > 50 gpm has occurred, and a momentary ATWS. | 0 Ask if the candidate is ready to begin the JPM. | ||
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. | |||
Record Start Time | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
I am assuming duties of the Emergency Director. Alert Emergency Classification declared based on FA1 Any loss or potential loss of either the Fuel clad or RCS OR MA3 RPS setpoint exceeded and RPS automatic scram did not reduce reactor power to < 5% AND ARI initiated to reduce power below 5% Time and Date of Classification. Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator. Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator | |||
EVALUATOR CUE: Inform the candidate that the Control # in the next step will be CR-ILO-304 Fill out and approve the Emergency Notification Report Form. | I PERFORMANCE CHECKLIST Page 4 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | ||
EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | Step Action Standard Eva1 Comments Obtains a copy of EP-PS-100. Controlled copy obtained. | ||
Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event. | |||
Evaluates information. Identifies from participation as The Unit Supervisor, that an RCS leak > 50 gpm has occurred, and a momentary ATWS. | |||
EVALUATOR CUE: | |||
SRO 00.EP.001.304 Step *14 | Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request. | ||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
5 mph LINE 7. | I PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | ||
~~ | |||
Step Action Standard Eva1 Comments | |||
~ ~~ | |||
*4 Choose appropriate emergency classification level. FA1 Any loss or potential loss of either the Fuel clad or RCS OR MA3 RPS setpoint exceeded and RPS automatic scram did not reduce reactor power to c 5% | |||
AND ARI initiated to reduce power below 5% | |||
5 Record Time of Alert Emergency declaration 6 Determines appropriate procedure section for the Determines TAB C Manage the Alert classification. Emergency is the appropriate TAB. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 6 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | |||
~ | |||
Step Action Standard Eva1 Comments Document and communicate the Emergency Announces to Control Room Personnel: | |||
Classification. I am assuming duties of the Emergency Director. | |||
Alert Emergency Classification declared based on FA1 Any loss or potential loss of either the Fuel clad or RCS OR MA3 RPS setpoint exceeded and RPS automatic scram did not reduce reactor power to < 5% | |||
AND ARI initiated to reduce power below 5% | |||
Time and Date of Classification. | |||
If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | |||
If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
i PERFORMANCE CHECKLIST Page 7 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | |||
Step Action Standard Eva1 Comments 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9. | |||
transmitted by the Emergency Plan Communicator. | |||
EVALUATOR CUE: | |||
Inform the candidate that the Control # in the next step will be CR-ILO-304 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows: | |||
Control # CR-ILO-304 LINE 1. | |||
Call Status: | |||
Places checkmark in This is a drill box EVALUATOR NOTE: | |||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | |||
Step Action Standard Eva1 Comments | |||
*12 Completes line 3 LINE 3. | |||
EVALUATOR NOTE: Emergency Classification: | |||
Initial Declaration is not critical Places checkmark in Alert Emergency box Places checkmark in Unit one box Records the Declaration time and date. | |||
Places a checkmark in this represents NAN initial declaration box in classification status. | |||
EVALUATOR NOTE: | |||
FA1 or MA3 alone is sufficient for the Brief Non-Technical Description for the initial notification. | |||
Candidate may paraphrase this description | |||
*13 Completes line 4 LINE 4. | |||
The Emergency action level (EAL) number is: | |||
Records EAL FA1 OR MA3 Brief non -technical description of the event: | |||
RecordsFAl OR MA3 | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 9 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | |||
Step Action Standard Eva1 Comments | |||
~ | |||
*14 Completes line 5 LINE 5. | |||
Places a checkmark in the No non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from 10" Wind Speed is: 5 mph 16 Completes line 7 LINE 7. | |||
== Conclusion:== | == Conclusion:== | ||
Places a checkmark in this is a drill box. | |||
Approved: - HidHer name Time: - Current time Date: - Current Date | Approves the Emergency Notification Report Form Records the following on space provided: | ||
Rev. 0, Page 1 of 1 2005 NRC Exam Rev. I PERFORMANCE CHECKLIST Page 10 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: Step 18 | Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE: | ||
If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: | Candidate may review the filled out ENR form with the E Plan Communicator. | ||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2.Rev. 0, Page 1 of 1 2005 NRC Exam Rev. I | |||
PERFORMANCE CHECKLIST Page 10 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name: | |||
- | |||
Step Action Standard Eva1 Comments 18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator. | |||
EVALUATOR CUE: | |||
If necessary, Role-play the communicator and accept the filled out form. | |||
EVALUATOR CUE: | |||
Inform the candidate the JPM is complete. | Inform the candidate the JPM is complete. | ||
EVALUATOR NOTE: The total time from the JPM start to step 5 of the JPM must be | EVALUATOR NOTE: | ||
The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory. | |||
*Critical Step #Critical Sequence Form NTP-QAB1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam Rev. 1 | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
Page 1 of 2 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
2005 NRC Exam Rev. 1 | Page 2 of 2 2005 NRC Exam Rev. 1 | ||
Perform Emergency Plan Classification (Scenario ILO-305) and Complete the ENR form Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval: | PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.305 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp. | ||
Nuclear Trng. Supv. | To Sys. No. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.305 - 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | Task Title: Perform Emergency Plan Classification (Scenario ILO-305) and Complete the ENR form Completed By: Validated: | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval: | ||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # I S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1,Rev. 0,Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.305 | |||
- | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | |||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | |||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. B. ILO-305, SIMULATOR EVALUATION SCENARIO C. EP-PS- | II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-305, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 III. R EACTlVlTY MAN1PULATIONS This JPM satisfies the following Operational Activity(s): | ||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST | V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
After the candidate reviews the Task Conditions | VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. | ||
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 | |||
0 | |||
Identifies appropriate Tab Evaluates information. | I PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | ||
EVALUATOR CUE: Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on | - | ||
Step Action Standard Eva1 Comments EVALUATOR NOTE: | |||
0 This JPM must be performed in the simulator following completion of the scenario ILO-305 as Unit Supervisor. | |||
0 This is a time critical JPM. | |||
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM. | |||
EVALUATOR NOTE: | |||
To begin this JPM, provide the candidate with the Initiating Cue Sheet. | |||
I am assuming duties of the Emergency Director. Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | EVALUATOR NOTE: | ||
Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator Refers to ENR Form under Tab | After the candidate reviews the Task Conditions / | ||
: | Initiating Cue Sheet: | ||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). Completes line 3 EVALUATOR NOTE: | 0 Ask if the candidate is ready to begin the JPM. | ||
Initial Declaration is not critical | 0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. | ||
Candidate may paraphrase this description Completes line 4 | Record Start Time | ||
Records EAL FS1 Brief non -technical description of the event: Records FS1 LINE 5. Places a checkmark in the AN Airborne Non-routine radiological release box LINE 6 Records Wind Direction is from: 10" Wind Speed is: | - | ||
5 mph | *Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | ||
Give the approved ENR form to the E Plan | |||
If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: | I PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | ||
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Controlled copy obtained. | |||
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event. | |||
3 Evaluates information. Identifies from participation as The Unit Supervisor, that 2 Reactor Building Areas exceeded Max Safe Radiation levels. | |||
EVALUATOR CUE: | |||
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request. | |||
*4 Choose appropriate emergency classification level. FSl Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
! | |||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | |||
Step Action Standard Eva1 Comments | |||
~ | |||
7 Document and communicate the Emergency Announces to Control Room Personnel: | |||
Classification. I am assuming duties of the Emergency Director. | |||
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | |||
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | |||
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9. | |||
transmitted by the Emergency Plan Communicator. | |||
EVALUATOR CUE: | |||
Inform the candidate that the Control # in the next step will be CR-ILO-305 | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
I PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | |||
~ | |||
Step Action Standard Eva1 Comments 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows: | |||
Control # CR-ILO-305 LINE 1. | |||
Call Status: | |||
Places checkmark in This is a drill box EVALUATOR NOTE: | |||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | |||
*12 Completes line 3 LINE 3. | |||
EVALUATOR NOTE: Emergency Classification: | |||
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. | |||
Places a checkmark in this represents NAN initial declaration box in classification status. | |||
*Critical Step #Critical Sequence Form NTP-OA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | |||
Step Action Standard Eva1 Comments EVALUATOR NOTE: | |||
FSl alone is sufficient for the Brief Non-Technical Description for the initial notification. | |||
Candidate may paraphrase this description Completes line 4 LINE 4. | |||
The Emergency action level (EAL) number is: | |||
Records EAL FS1 Brief non -technical description of the event: | |||
Records FS1 3k14 Completes line 5 LINE 5. | |||
Places a checkmark in the AN Airborne Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
( | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: | |||
Step Action Standard Eva1 Comments 16 Completes line 7 LINE 7. | |||
== Conclusion:== | |||
Places a checkmark in this is a drill box. | |||
*17 Approves the Emergency Notification Report Form Records the following on space provided: | |||
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE: | |||
Candidate may review the filled out ENR form with the E Plan Communicator. | |||
18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator . Communicator. | |||
EVALUATOR CUE: | |||
If necessary, Role-play the communicator and accept the filled out form. | |||
EVALUATOR CUE: | |||
Inform the candidate the JPM is complete. | Inform the candidate the JPM is complete. | ||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
0, c | |||
0 Q, | |||
c | |||
.-0 CI 2 | |||
0- | |||
.. | |||
0 Z | |||
- | |||
a 2 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | |||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | |||
Page 1 of 2 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | |||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | |||
Page 2 of 2 2005 NRC Exam Rev. 1 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.504 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. | |||
To Sys. No. | |||
Task Title: Perform Emergency Plan Classification (Scenario ILO-504) and Complete the ENR form Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval: | |||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
- | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # / S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
-- | |||
Form NTP-QA91.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.504 | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | : 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
It. REFERENCES A. B. ILO-504, SIMULATOR EVALUATION SCENARIO C. EP-PS- | It. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-504, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s): | ||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | |||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: | V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
5 mph throughout the scenario. | VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. | ||
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.504 | Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 | ||
0 | i PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name: | ||
Choose appropriate emergency classification level. Record Time of Site Area Emergency declaration Determines appropriate procedure section for the | Step Action Standard Eva1 EVALUATOR NOTE: | ||
0 This JPM must be performed in the simulator following completion of the scenario ILO-504 as Unit Supervisor. | |||
0 This is a time critical JPM. | |||
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM. | |||
EVALUATOR NOTE: | |||
To begin this JPM, provide the candidate with the Initiating Cue Sheet. | |||
EVALUATOR NOTE: | |||
I am assuming duties of the Emergency Director. | After the candidate reviews the Task Conditions / | ||
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan | Initiating Cue Sheet: | ||
: | 0 Ask if the candidate is ready to begin the JPM. | ||
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. | |||
Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. | Record Start Time | ||
Places a checkmark in this represents NAN initial declaration box in classification status. | *Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | ||
Candidate may paraphrase this description Completes line 4 | |||
SRO 00.EP.001.504 Step 16 | i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name: | ||
Give the approved ENR form to the E Plan Communicator. | Step Action Standard Eva1 Comments | ||
EVALUATOR CUE: If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: | ~~ | ||
1 Obtains a copy of EP-PS-100. Controlled copy obtained. | |||
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event. | |||
3 Evaluates information. Identifies from participation as The Unit Supervisor, RPV water level dropped below -1 61 inches EVALUATOR CUE: | |||
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request. | |||
*4 Choose appropriate emergency classification level. FS1 Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB. | |||
*Critical Step #Critical Sequence Form NTP-QA31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
i PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO4 Student Name: | |||
Step Action Standard Eva1 Comments 7 Document and communicate the Emergency Announces to Control Room Personnel: | |||
Classification. I am assuming duties of the Emergency Director. | |||
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | |||
a If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | |||
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9. | |||
transmitted by the Emergency Plan Communicator. | |||
EVALUATOR CUE: | |||
Inform the candidate that the Control # in the next step will be CR-ILO-504 | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
I PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name: | |||
Step Action Standard Eva1 Comments | |||
-~ | |||
11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows: | |||
Control # CR-ILO-504 LINE 1. | |||
Call Status: | |||
Places checkmark in This is a drill box EVALUATOR NOTE: | |||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | |||
5 12 Completes line 3 LINE 3. | |||
EVALUATOR NOTE: Emergency Classification: | |||
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. | |||
Places a checkmark in this represents NAN initial declaration box in classification status. | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name: | |||
Step Action Standard Eva1 Comments EVALUATOR NOTE: | |||
FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification. | |||
Candidate may paraphrase this description Completes line 4 LINE 4. | |||
The Emergency action level EAL) number is: | |||
Records EAL FS1 Brief non -technical description of the event: | |||
Records FS1 | |||
*14 Completes line 5 LINE 5. | |||
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name: | |||
Step Action Standard Comments 16 Completes line 7 LINE 7. | |||
== Conclusion:== | |||
Places a checkmark in this is a drill box. | |||
*17 Approves the Emergency Notification Report Form Records the following on space provided: | |||
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE: | |||
Candidate may review the filled out ENR form with the E Plan Communicator. | |||
18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator. | |||
EVALUATOR CUE: | |||
If necessary, Role-play the communicator and accept the filled out form. | |||
EVALUATOR CUE: | |||
Inform the candidate the JPM is complete. | Inform the candidate the JPM is complete. | ||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO4 Step Action Standard Eva1 Comments EVALUATOR NOTE: | |||
The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
Page | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2. | TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | ||
Rev. 0. Page 1 of 1 2005 NRC Exam Rev. 1 TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
2005 NRC Exam Rev. 1 | Page 1 of 2 2005 NRC Exam Rev. 1 | ||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam Rev. 1 | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
No. Date NUREG 1123 WA No. K/A Imp. To Sys. No. Task Title: | Page 2 of 2 2005 NRC Exam Rev. 1 | ||
Supv. | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.505 0 9/27/05 2.4.41 NIA 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. K/A Imp. | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.505 | To Sys. No. | ||
Task Title: Perform Emergency Plan Classification (Scenario ILO-505) and Complete the ENR form Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorANriter Date Approval: | |||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # I S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1,Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.505 | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | : 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | : 1. Whenever any electrical panel is opened for inspection during JPM performance. | ||
II. REFERENCES A. B. ILO-505, SIMULATOR EVALUATION SCENARIO C. EP-PS- | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | |||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | |||
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-505, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MAN1PULATlONS This JPM satisfies the following Operational Activity(s): | |||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO OO.EP.OO1 SO5 Step Action EVALUATOR NOTE: | V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
0 This JPM must be performed in the simulator following completion of the scenario ILO-505 as Unit Supervisor. | VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. | ||
This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. | Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 | ||
To begin this JPM, provide the candidate with the Initiating Cue Sheet. EVALUATOR NOTE: After the candidate reviews the Task Conditions | |||
PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO5 Student Name: | |||
Choose appropriate emergency classification level. Record Time of Site Area Emergency declaration Determines appropriate procedure section for the | Step Action Standard Eva1 Comments EVALUATOR NOTE: | ||
0 This JPM must be performed in the simulator following completion of the scenario ILO-505 as Unit Supervisor. | |||
0 This is a time critical JPM. | |||
Ensure a copy of EP-PS-100 is available to support performance of this JPM. | |||
EVALUATOR NOTE: | |||
I am assuming duties of the Emergency Director. Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | To begin this JPM, provide the candidate with the Initiating Cue Sheet. | ||
Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | EVALUATOR NOTE: | ||
Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator Refers to ENR Form under Tab 9. | After the candidate reviews the Task Conditions / | ||
Initiating Cue Sheet: | |||
EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | Ask if the candidate is ready to begin the JPM. | ||
Completes line 3 EVALUATOR NOTE: Initial Declaration is not critical | 0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. | ||
Record Start Time | |||
Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. Places a checkmark in this represents | *Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | ||
; PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.505 Step | |||
Candidate may paraphrase this description Completes line 4 | 1 PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: | ||
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Sontrolled copy obtained. | |||
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event. | |||
3 Evaluates information. Identifies from participation as The Unit Supervisor, RPV water level dropped below -161 inches EVALUATOR CUE: | |||
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request. | |||
*4 Choose appropriate emergency classification level. FS1 Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB. | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 | |||
- Student Name: | |||
Step Action Standard Eva1 Comments 7 Document and communicate the Emergency Announces to Control Room Personnel: | |||
Classification. | |||
I am assuming duties of the Emergency Director. | |||
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | |||
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | |||
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9. | |||
transmitted by the Emergency Plan Communicator. | |||
EVALUATOR CUE: | |||
Inform the candidate that the Control # in the next step will be CR-ILO-505 | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Step Student Name: | |||
- | |||
Eva1 Comments Action Standard 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows: | |||
Control # CR-ILO-505 LINE 1. | |||
Call Status: | |||
Places checkmark in This is a drill box EVALUATOR NOTE: | |||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | |||
*12 Completes line 3 LINE 3. | |||
EVALUATOR NOTE: Emergency Classification: | |||
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. | |||
Places a checkmark in this represents N A N initial declaration box in classification status. | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
; | |||
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: | |||
Step Action Standard Eva1 Comments EVALUATOR NOTE: | |||
FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification. | |||
Candidate may paraphrase this description 3k13 Completes line 4 LINE 4. | |||
The Emergency action level (EAL) number is: | |||
Records EAL FS1 Brief non -technical description of the event: | |||
Records FSl 3k14 Completes line 5 LINE 5. | |||
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph | |||
*Critical Step #Critical Sequence Form NTP-OA-31.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: | |||
- | |||
Step Action Standard Eva1 Comments 16 Completes line 7 LINE 7. | |||
== Conclusion:== | == Conclusion:== | ||
Places a checkmark in this is a drill box. Records the following on space provided: | |||
Approved: - HidHer name Time: - Current time Date: - Current Date Provides the filled out ENR form to the E Plan Communicator. | Places a checkmark in this is a drill box. | ||
jk17 Approves the Emergency Notification Report Form Records the following on space provided: | |||
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE: | |||
Assume Wind Direction was from: | Candidate may review the filled out ENR form with the E Plan Communicator. | ||
10" and Wind Speed was: 5 mph throughout the scenario. | 18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam Rev. 1 | EVALUATOR CUE: | ||
Assume Wind Direction was from: | If necessary, Role-play the communicator and accept the filled out form. | ||
10" and Wind Speed was: 5 mph throughout the scenario. | EVALUATOR CUE: | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form, 2005 NRC Exam Rev. 1 | Inform the candidate the JPM is complete. | ||
Perform Emergency Plan Classification (Scenario ILO-602) and Complete the ENR form Completed By: Validated: Rich Chin 9/27/05 Writer Date | *Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1 | ||
Nuclear Trng. Supv. | |||
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: | |||
Form NTP-QA-31.8-1, Rev. | Step Action Standard Eva1 Comments EVALUATOR NOTE: | ||
0, Page 1 of 2 2005 NRC Exam Rev. 1 REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.602 | The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory. | ||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | |||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | |||
Page 1 of 2 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | |||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form, Page 2 of 2 2005 NRC Exam Rev. 1 | |||
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE | |||
- APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.602 0 9/27/05 2.4.41 N/A 4.0 ADDI. | |||
I , | |||
JPM Number Rev. No. Date NUREG 1123 KIA No. KIA ImD. | |||
To Sys. No. | |||
Task Title: Perform Emergency Plan Classification (Scenario ILO-602) and Complete the ENR form Completed By: Validated: | |||
Rich Chin 9/27/05 Writer Date InstructorMl riter Date Approval: | |||
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.) | |||
JPM Performed By: | |||
Student Name: | |||
Last First M.I. Employee # I S.S. # | |||
Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uation: | |||
Evaluator Name: | |||
Signature Typed or Printed Comments: | |||
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1 | |||
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.602 | |||
: 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | : 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations. | ||
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance. | B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: | ||
: 1. Whenever any electrical panel is opened for inspection during JPM performance. | |||
: 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | : 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary. | ||
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved. | ||
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required. | ||
II. REFERENCES A. B. ILO-602, SIMULATOR EVALUATION SCENARIO C. EP-PS- | II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-602, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s): | ||
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: Step Action EVALUATOR NOTE: 0 This JPM must be performed in the simulator following completion of the scenario ILO-602 as Unit Supervisor. | V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. | VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. | ||
Form NTP-QA-31.8-1, Rev. 0 , Page 2 of 2 2005 NRC Exam Rev. 1 | |||
Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 i PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.602 Step 1 | |||
Identifies appropriate Tab Evaluates information. | PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: | ||
EVALUATOR CUE: Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on | Step Action Standard Eva1 Comments EVALUATOR NOTE: | ||
0 This JPM must be performed in the simulator following completion of the scenario ILO-602 as Unit Supervisor. | |||
0 This is a time critical JPM. | |||
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM. | |||
EVALUATOR NOTE: | |||
I am assuming duties of the Emergency Director. | To begin this JPM, provide the candidate with the Initiating Cue Sheet. | ||
Site Area Emergency Classification declared based on MS3 ATWS and ARI fail to reduce power to less than 5% FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | EVALUATOR NOTE: | ||
After the candidate reviews the Task Conditions / | |||
0, Page 1 of 1 2005 NRC Exam Rev. 1 PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: - Step 10 | Initiating Cue Sheet: | ||
EVALUATOR CUE: Inform the candidate that the Control | 0 Ask if the candidate is ready to begin the JPM. | ||
# in the next step will be CR-ILO-602 Fill out and approve the Emergency Notification Report Form. | 0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. | ||
EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | Record Start Time | ||
*Critical Step #Critical Sequence Form NTP-OA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
LINE 4. The Emergency action level (EAL) number is: Records EAL MS 3 or FS1 Brief non -technical description of the event: Records MS 3 or FS1 | i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: | ||
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Controlled copy obtained. | |||
5 mph LINE 7. | 2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event. | ||
3 Evaluates information. Identifies from participation as The Unit Supervisor, ATWS and RPV water level dropped below -161 inches EVALUATOR CUE: | |||
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request. | |||
*4 Choose appropriate emergency classification level. MS3 ATWS and ARI fail to reduce power to less than 5% | |||
OR FS Loss or Potential loss of ANY 2 Fission Product Barriers | |||
- c | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
( | |||
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Step Student Name: | |||
- | |||
Eva1 Comments Action Standard 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB. | |||
7 Document and communicate the Emergency Announces to Control Room Personnel: | |||
Classification. I am assuming duties of the Emergency Director. | |||
Site Area Emergency Classification declared based on MS3 ATWS and ARI fail to reduce power to less than 5% | |||
OR FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification. | |||
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator. | |||
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 | |||
- Student Name: | |||
- | |||
Step Action Standard Eva1 Comments 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9. | |||
transmitted by the Emergency Plan Communicator. | |||
EVALUATOR CUE: | |||
Inform the candidate that the Control # in the next step will be CR-ILO-602 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows: | |||
Control # CR-ILO-602 LINE 1. | |||
Call Status: | |||
Places checkmark in This is a drill box EVALUATOR NOTE: | |||
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
i PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: | |||
Step Action Standard Eva1 Comments | |||
*12 Completes line 3 LINE 3. | |||
EVALUATOR NOTE: Emergency Classification: | |||
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. | |||
Places a checkmark in this represents NAN initial declaration box in classification status. | |||
EVALUATOR NOTE: | |||
MS3 or FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification. | |||
Candidate may paraphrase this description | |||
*13 Completes line 4 LINE 4. | |||
The Emergency action level (EAL) number is: | |||
Records EAL MS 3 or FS1 Brief non -technical description of the event: | |||
Records MS 3 or FS1 | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 | |||
- | |||
Step | |||
~ | |||
Student Name: | |||
Standard Comments Action | |||
~ | |||
+k14 Completes line 5 LINE 5. | |||
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph 16 Completes line 7 LINE 7. | |||
== Conclusion:== | == Conclusion:== | ||
Places a checkmark in this is a drill box. Records the following on space provided: | Places a checkmark in this is a drill box. | ||
Approved: - HidHer name Time: - Current time Date: - Current Date | +k17 Approves the Emergency Notification Report Form Records the following on space provided: | ||
EVALUATORC If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: Inform the candidate the JPM is complete. | Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE: | ||
EVALUATOR NOTE: The total time from the JPM start to step 5 of the JPM must be | Candidate may review the filled out ENR form with the E Plan Communicator. | ||
If RPV water level drops below -205 inches the EAL will escalate to a General Emergency under MG3, and the ENR form will also reflect AN airborne NON routine radiological release based on loss of the Fuel clad barrier | *Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | ||
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: | |||
Step Action Standard Eva1 Comments 18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator. | |||
EVALUATORC If necessary, Role-play the communicator and accept the filled out form. | |||
EVALUATOR CUE: | |||
Inform the candidate the JPM is complete. | |||
EVALUATOR NOTE: | |||
The total time from the JPM start to step 5 of the JPM must be 2 1 5 minutes in order for the time critical portion of the JPM to be satisfactory. | |||
EVALUATOR NOTE: | |||
If RPV water level drops below -205 inches the EAL will escalate to a General Emergency under MG3, and the ENR form will also reflect AN airborne NON routine radiological release based on loss of the Fuel clad barrier. | |||
- | |||
*Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam Rev. 1 | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
Page 1 of 2 2005 NRC Exam Rev. 1 | |||
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. | |||
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario. | ||
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam Rev. 1 | INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. | ||
Page 2 of 2 2005 NRC Exam Rev. 1}} | |||
Revision as of 23:49, 23 November 2019
| ML053210417 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/19/2005 |
| From: | Roush K Susquehanna |
| To: | Todd Fish Operations Branch I |
| Conte R | |
| References | |
| Download: ML053210417 (124) | |
Text
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 78.AD.001.101 0 09/26/05 2.1.18 N/A 2.913.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.
To Sys. No.
Task Title: Document a Failed LPRM Detector Completed By: Validated Rich Chin 09/26/05 Writer Date lnst ructorNVriter Date Approval:
Nuclear Trng. Supv. Date
-- 15/25 Date of Performance: Validation Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee ## / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Funn NTP-QA-31 8-1. Rev 0. Pagc 1 of 2 2005 NRC Exam Rev.1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 78.AD.001.101
.
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. 01-078-001 LPRM STATUS CONTROL, (Rev. 8)
- B. TS amendment 217 III. REACTIVITY MAN1PULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. Unit 1 is in MODE 1at 80% power.
B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-17 8 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room.
D. All OPRM channels are INOPERABLE V. INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instructions for LPRM detector 48-178.
VI. TASK STANDARD Zone 4 is identified as not having more than 50% upscale alarms operable, placard place on reactor panel, Unit Supervisor Notified to reference TRO 3.3.9, SROs must additionally identify required TRO actions.
h m n KIP-QA-31.8-1. Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1
j PERFORMANCE CHECKLIST Page 3 of 8 Appl. To/JPM No.: S/RO 78.AD.001.lo1 Student Name:
Step Action Standard Comments EVALUATOR NOTE:
Ensure the following material is available to support performance of this JPM:
A COPY of 01-078-001.
0 Prepare attachments A & B with zone 4 having exactly 50% operable LPRM upscale alarms.
0 Blank copy of attachment A & 6.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Task Conditions and Initiating Cue Sheet.
Obtains a controlled copy of procedure. Controlled copy of 01-078-001 obtained.
Refers to correct section. Refers to section 4.
- Critical Step #Critical Sequence Fonn NTP-QA-31.8-2. Rev.0. P q c I of I 2005 NRC Exam Rev.1
PERFORMANCE CHECKLIST Page 4 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name:
-Step Standard Eva1 Comments Action Determines current LPRM status. Obtains the Operations Special Log Book in the Unit 1 control room and locates the previously completed copy of Attachment A & B.
EVALUATOR CUE:
When the candidate identifies where the current LPRM Upscale Alarm Status Control Log is retained provide the candidate with previously filled-out copy of Attachments A & B.
EVALUATOR NOTE:
Allow candidate to use blank attachments from the copy of the procedure provided.
Obtains a blank copy of Attachment A & B. Blank copy obtained.
Completes new Attachment A. Enters 1 for Unit.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0, Page I of I 2005 NRC Exam Rev.1
/
PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name:
Action Standard Eva1 Comments EVALUATOR CUE: Transfers the previous LPRM data to the new Attachment A.
If candidate elects to verify position of switches in lower relay room, provide the cue that the switches are in the positions indicated on OR Attachment A (Special log book)
Candidate may desire to verify switches in lower relay room.
Enter a check (d) in column (2) for LPRM Place a checkmark in column 2 adjacent to alarms determined inoperable or bypassed for LPRM detector 48-17B in Zone 4.
all other reasons.
Consider all LPRM Upscale Alarms with a Circles YES for zone 1, 2, 3, 5, 6, 7, 8, and 9.
check in column (1) or (2) of Attachment A as inoperable Determine if 250% of LPRM Upscale alarms in each zone are operable.
Circles NO for zone 4.
Notify Reactor Engineering of all LPRM upscale N/A alarms determined inoperable.
Previously noted in JPM cue.
- Critical Step #Critical Sequence Fotm NTP-QA-31.8-2. Rev. 0. Page I of I 2005 NRC Exam Rev.1
I i
PERFORMANCE CHECKLIST Page 6 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name:
-Step Action Standard Eva1 Comments
- 10 Attach placard to 1C651 indicating < required # Attaches placard to operating panel 1C651.
of LPRM Upscale Alarms.
EVALUATOR NOTE:
The placard is required to remain posted until all zones have 930% upscale alarms operable.
- 11 Refer to TRO 3.3.9 LPRM, upscale alarm Notifies the Unit Supervisor to Refer to TRO instrumentation 3.3.9 LPRM 12 Complete an LPRM vs. APRWLPRM Group Enters 1 for Unit.
Status Control Log (Attachment B) each time LPRM operability status is changed Circle all inoperable LPRMs on LPRM vs.
APRWLPRM Group Status Control Log (Attachment B).
13 Transfers the previous LPRM data to the new Attachment B.
14 Circles LPRM detector 48-17 for APRM E, under the column 6Level.
15 Obtains review. Submit the completed Attachment A and 8 to the Unit Supervisor.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page I of I 2005 NRC Exam Rw.1
1 PERFORMANCE CHECKLIST Page 7 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 Student Name:
-
Step Action Standard Eva1 Comments EVALUATOR CUE:
This completes the JPM for the ROs ONLY EVALUATOR CUE:
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec and TRO for the INOPERABLE LPRMs Upscale alarms.
16 Obtains a copy of the Tech Specs and TRM
References:
TRO 3.3.9
- 17 Determines required actions Determines the following actions are required:
TRO 3.3.9 condition H Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Post a sign on the reactor panel that less than 50% of the LPRM Upscale alarms are OPERABLE AND TRO 3.3.9 Condition E Immediately Place the reactor mode switch in the shutdown position
- Critical Step #Critical Sequence h,rm NIT-QA-31.8-2. Rev. 0. Page I of 1 2005 NRC Exam Rev.1
00
+
0 00 a,
rn a
a
TASK CONDITIONS
-...- A. Unit 1 is in MODE l a t 80% power.
- 8. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-178 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room.
D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instruction for LPRM detector 48-178.
2005 NRC Exam Rev.1 Page 1 of 4
TASK CONDITIONS
- A. Unit 1 is in MODE l a t 80% power.
B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-178. LPRM detector 48-17 8 is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room.
D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required hardcopy documentation in accordance with the appropriate instruction for LPRM detector 48-178.
--
2005 NRC Exam Rev.1 Page 2 of 4
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE l a t 80% power.
B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-178.
C. LPRM detector 48-176 is failed and bypassed.
D. All OPRM channels are INOPERABLE E. It has been determined that < 50% of LPRM Upscale alarms in zone 4 are operable.
F. The combination of thermal power and core flow is IN Region I1 of the power to Flow Map.
INITIATING CUE Determine the required Tech Spec and TRO actions.
-
2005 NRC Exam Rev.1 Page 3 of 4
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE l a t 80% power.
B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-178.
C. LPRM detector 48-178 is failed and bypassed.
D. All OPRM channels are INOPERABLE E. It has been determined that e 50% of LPRM Upscale alarms in zone 4 are operable.
F. The combination of thermal power and core flow is IN Region II of the power to Flow Map.
INITIATING CUE
- Determine the required Tech Spec and TRO actions.
2005 NRC Exam Rev.1 Page 4 of 4
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE 1 APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.AD.273.002 0 09/26/05 2.1.12 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.
To Sys. No.
Task Title: Determine TRO applicability and complete the LCORRO log sheet.
Completed By: Validated Rich Chin 09/26/05 Writer Date InstructorNVriter Date A pprovaI:
Nuclear Trng. Supv. Date 15 Date of Performance: Validated Time (Min.) Time Taken (Min.)
-
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1. Rev. 0.Page 1 01 2 2M)S NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.AD.273.002 I. SAFETY CONSIDERATIONS
-.-
A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES NDAP-QA-0312, CONTROLS OF LCOS, TROS AND SAFETY FUNCTION DETERMINATION PROGRAM (Revision 8 )
Tech Specs 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power.
C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment 6.
D. At step 9 of ON-158-001, LOSS OF RPS attachment 6, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-15711OAl, A2, B1, 82) could be OPENED. All other steps of the attachment were completed successfully.
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay.
F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in.
G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in.
H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit.
V. INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms.
VI. TASK STANDARD Entry into LCO 3.4.6 declared with LCO/TRO log and Operations portion of Chemistry/Health Physics LCO/TRO Sample /Survey Log sheet filled-out, and Chemistry notified.
Form NTP-QA-31.8-1, Rev. 0, Page 2 d 2 2005 NRC Exam Rev. 1
,
PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Step Action Standard Comments EVALUATOR NOTE:
Due to the nature of this JPM, the candidate may refer to several procedures before determining CRM A & B are both INOPERABLE and LCO 3.4.6 entry is required. Allow candidate to use the forms from the copy of NDAP-QA-0312 that is provided with this JPM.
1 Obtain a controlled copy of NDAP-QA-0312, Controlled copy obtained.
CONTROLS OF LCOS, TROS AND SAFETY FUNCTION DETERMINATION PROGRAM 2 Selects the correct section to perform. Selects section 6.3 3 Review applicable TS LCO and Bases or TRM TRO Reviews TS LCO and Bases and TRM and Bases. TRO and Bases.
Determines LCO 3.4.6 is applicable.
EVALUATOR NOTE:
Placing Unit 1 in either of the appropriate blocks in the next 2 steps will satisfy the Critical portion for BOTH I
steps.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2.Rev. 0. Page 1 01 1 2005 NRC Exam Rev.1
,
PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
-Step Action Standard Eva1 Comments
- 4 In accordance with the applicable TS/TRM, complete Fills out a copy of Attachment C of a LCO/TRO log sheet (Form NDAP-QA-0312-1) as NDAP-QA-0312 (Form follows: NDAP-QA-0312-1)
Enter the applicable unit for which the log sheet is Records a 1 in the space provided to being completed. designate Unit 1 t 5 Enter the unit containing the inoperable equipment. Records a 1 in the space provided to designate Unit 1 6 Enter the system number. Records a 79 in the space provided.
t 7 Circle or enter whether the Action is an LCO or TRO Circles or records LCO and enter the specification number.
Then records 3.4.6.
t 8 Enter the applicable MODES. Records 1,2,3.
EVALUATOR NOTE:
Candidate may choose to place references in the reference document section, however this is not required.
9 Enter the reference documents, if applicable. The Determines NO reference documents Reference Documents section may also be used to are applicable.
provide clarifying information for the reason the LCO/TRO is being entered.
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 01 1 2005 NRC Exam Rev.1
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Step Action Standard Eva1 Comments
- lo Reviewhevise all active LOSF worksheets based on Determines from initial conditions that the above inoperable equipment. No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records N/A in the space provided
- 11 Determine if LCO 3.0.6 has been applied for any other Determines from initial conditions that system on both Units 1 and 2. No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records an X in the Is this a Safety Function Determination support system? NO space provided AND Records an X in the If YES, is TS 3.0.6 to be applied? NA space provided.
EVALUATOR NOTE:
The next 4 steps of this JPM will require 2 separate line item entries on Attachment C of NDAP-QA-0312.
One for action B.l, and one for 8.2.
See attached answer key for specifics of this form should be completed.
-
- Critical Step #Critical Sequence F o n NTP-QA-31.8-2. Rev. 0. Page 1 01 1 2005 NRC Exam Rev 1
i PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Action Standard Comments Enter the Date and Time that the CONDITION was Records B in CONDITION block for entered. both line items Records date and time for each of the actions in the space provided.
Enter the reason for CONDITION and the appropriate Records all of the following REQUIRED ACTION. The REQUIRED ACTION Required Primary Containment should be listed by number and include a brief noun Atmospheric Monitoring System description.
INOPERABLE B.l Analyze grab samples of primary containment atmosphere AND 8.2 Restore required Primary Containment Atmospheric Monitoring System to OPERABLE status Enter the Date and Time by when the REQUIRED In the spaces provided Records:
ACTION must be completed. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.l Within 30 days for item 8.2 Initial that the CONDITION has been entered. Records candidate initials in the spaces provided
- Critical Step #Critical Sequence Form NTP-QA-31.82, Rev. 0. Paw 1 of 1 2005 NRC Exam Rev.1
I PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Step 16 Action Have another SRO Peer Check the LCORRO entry
- Standard Asks another SRO to Peer Check the
- - Comments and also initial in the "Entered By" box. LCO/TRO entry and initial in the "Entered By" box.
EVALUATOR CUE:
Role-play the second SRO and inform the candidate that you have Peer Checked the LCO/TRO entry, and they can assume that you have initialed the "Entered By" box.
17 If required, additional CONDITION(S) can be entered Determines:
within the same LCORRO as follows:
Form NDAP-QA-0312-5 "LCO/TRO If the REQUIRED ACTION requires a repetitive action Repetitive Required Action Completion (ex; perform action once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />); Sheet" IS NOT REQUIRED.
COMPLETE Form NDAP-QA-0312-5 "LCO/TRO Repetitive Required Action Completion Sheet" and attach to the LCORRO log sheet EVALUATOR NOTE:
It is not necessary to initiate a Chemistry/Health Physics LCORRO Sample/Survey Log if the LCO is expected to be cleared prior to the first required action/sample. However, caution must be used to ensure the sample/survey is not missed in the event the LCO is not cleared in a timely manner.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Step Action Standard Eva1 Comments 18 If the LCO/TRO Condition requires Chemistry or Determines:
Health Physics to sample or perform a survey, Shift Supervision shall initiate a Chemistry/Health Physics Chemistry/Health Physics LCO/TRO LCO/TRO Sample/Survey Log (FORM Sample/Survey Log (FORM NDAP-QA-0312-3) by: NDAP-QA-0312-3)
IS REQUIRED
- 19 Completing the top section of FORM Places the following information on top NDAP-QA-0312-3. section of FORM NDAP-QA-0312-3.
UNIT 1 The LCO/TRO for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE Commenced at LCO entry time TS LCO 3.4.6 Action B.l Sample/Survey within Once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
- 20 Notifying Chemistry/Health Physics to pick up the log Contacts Chemistry to pick up the log sheet in the Control Room. sheet in the Control Room.
EVALUATOR CUE:
Role-play Chemistry and acknowledge the report.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name:
Step Action Standard Eva1 Comments EVALUATOR CUE:
That completes this JPM
- Critical Step #Critical Sequence Form NTP-OA-31.8-2. Rev. 0. Page 1 of 1 2005 NRC Exam Rev.1
ANSWER KEY DO NOT GIVE TO CANDIDATES UNIT SYSTEM MODE 1 79 1,293 Reference Documents ChedHP Reviewhevise all active LOSF worksheets based on the above inoperable equipment. Review Complete N/A Is this a Safety Function Determination support system? YES 0 NO If YES, is TS 3.0.6 to be applied? YES c]NO 0 NA If YES, perform a LOSF Determination using the Safety Function Determination Work Sheet. If NO, cascade LCOs.
t 6 Date/
Time Entered Todays date and time LCO/TRO CONDITION Entered REASON AND REQUIRED ACTION Required Primary Containment Atmospheric Monitoring System INOPERABLE 6.1 Analyze grab samples of primary containment atmosphere Completion Date/Time Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Entered candidate initials LCO/TRO CONDITION Cleared Datemime Cleared By AND B Todays 6.2 Restore required Primary Containment Within 30 days candidate date and Atmospheric Monitoring System to OPERABLE initials time status I I Reviewed OPS Supv-Nuc: LCO Entered I I
.CO Cleared I
2005 NRC Exam Rev 1
ANSWER KEY DO NOT GIVE TO CANDIDATES Unit 1 CHEMISTRY/HEALTH PHYSICS LCO/TRO SAMPLWSURVEY LOG T h m R O for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE commenced at LCO / Today . Chemistry samples/Health Physics surveys shall be taken per:
entry time 1 I SAMPLWSURVEY I ANALYSIS I TSnR ACTION WITHIN COMPLETED WITHIN LCO 3.4.6 B.l Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 1 I Report chemistry analysis results to Shift Supervision.
Shift Supervision HEALTH PHYSICS
-
The Desk Foreman Health Physics or the HP Shift Lead Technicians shall notify the HP Duty Foreman immediately following receipt of this log.
CHEMISTRY FIRST SAMPLE DUE DATWIME
--OR--
FIRST ANALYSIS COMPLETION DUE DATEnlME LCO/TRO cleared at BY Daterrime Shift Supervision Copy sent to Chemistry/HP Foreman.
Technician COMPLETED FORMS SHALL BE INCLUDED WITH THE LCOfiRO LOG SHEET FOR THE SAMPLING LCOTTRO.
Page 1 of 2005 NRC Exam Rev. 1
- ~~~~ __
TASK CONDITIONS
- A. Unit 1 is in Mode 1 at 100% power.
C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment 6.
D. At step 9 of ON-158-001, LOSS OF RPS attachment 6, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-157110A1, A2, B1, 62) could be OPENED.
All other steps of the attachment were completed successfully.
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay.
F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in.
G. AR-146-AO5 CONTN RAD DET SYSTEM 6 TROUBLE alarm is locked in.
H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit.
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms.
2005 NRC Exam Rev. 1 1 of2
TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power.
B. B RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set.
C. B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment B.
D. At step 9 of ON-158-001, LOSS OF RPS attachment B, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-157110A1, A2, B1, 82) could be OPENED.
All other steps of the attachment were completed successfully.
E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE I S 0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay.
F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in.
G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in.
H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit.
INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms.
2005 NRC Exam Rev. 1 2 of 2
. PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 45.0N.007101 1 09/26/05 2.1.25 N/A 2.813.1 APPl- JPM Number Rev. Date NUREG 1123 WA No. WA Imp.
To No. Sys. No.
Task Title: Determine Cause for Reactor Water Level Indication Anomalylldentify required Tech Spec Actions Completed By: Validated:
Rich Chin 09126/05 Writer Date I nstructorNVriter Date Approval:
Nuclear Trng. Supv. Date 10120 Date of Performance: Validation Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-3 1.8- I , Rev. 0, Page 1 of 2 2005 N R C Exam R e v 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0N.007.101
\ 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. ON-145-004, RPV WATER LEVEL ANOMALY (Rev. 8 )
B. Tech Specs 111. REACTIVITY MANI PULATlONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power.
B. An anomaly exists with RPV water level instrument indication.
V. INITIATING CUE Use the appropriate procedure to address the anomaly.
VI. TASK STANDARD Identifies instrument anomaly is due to Instrument Bus 1 1Y125 breaker 01 being tripped or de-energized, and re-energizes the instruments. SROs additionally, identify the Required Tech Spec Actions.
Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC. Exam Rev. 1
I PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
Step Action Standard Comments EVALUATOR NOTE:
0 This JPM must be performed in the simulator.
Establish task conditions as directed on attached setup instructions.
0 When the candidate is ready to begin JPM, place the simulator to RUN.
$1 Reviews RPV water level instruments indications in Determines the following level indicators the simulator to determine which indicators are are reading zero:
affected.
LI-14201B1 on 1C651 LI-14201B on C601 LI-142038 on C601 EVALUATOR NOTE:
Candidate may reference ON-117-001, LOSS OF INSTRUMENT BUS instead of ON-145-004, RPV WATER LEVEL ANOMALY. As long as all critical steps are accomplished this would be acceptable.
However, it may be necessary to ask a follow-up question for the Tech Specs.
2 Obtains a controlled copy of ON-145-004. Controlled copy obtained.
3 Reviews Symptoms and Observations for Ensures the Symptoms and Observations applicability. are applicable.
- Critical Step #Critical Sequence Form NTP-QA-31 8-2, Rev 0.P a p I of I 2005 NRC Exam Rev.1
i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
Step Action Standard Comments Records date and time of event. Enter current date and time.
Selects the appropriate section and attachment. Selects Section 3.5 and Attachment B.
Perform following for level instrumentation On Attachment 6 pages land 2 malfunction: determines the following common reference leg condensing chambers and Refer to Attachment B checking following:
excess flow check valves are still indicating normal values and are NOT the source of the anomaly:
Instruments with common reference leg condensing chambers or excess flow check valves.
LI-B21 1R605 LR-C32 1R608 LI-14201A LI-14201A1 LI-l4203A LI-B21 1R604 LI-C23 1R606B LWPR 14201A
- Critical Step #Critical Sequence Form h T I - Q A - 3 1 8-2. Rev 0. Page I of I 2005 NRC Exam Rev 1
,
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
-Step 7
Action Instruments and indications with common variable leg Standard On Attachment B pages 1and 2 Eva1 Comments supplies or excess flow check valves. determines the following common variable leg condensing chambers and excess flow check valves are still indicating normal values and are NOT the source of the anomaly:
LI-B21 1R605 LR-C32 1R608 LI-14201A LI-14201A1 LI-l4203A LI-621 1R604 LI-C23 1R606B LWPR 14201A EVALUATOR CUE:
If requested, inform candidate all instrumentation power is selected to its normal source.
- Critical Step #Critical Sequence Fonn NIT-QA-31.8-2. Rev. 0. Papc I of I 2005 NRC Exam Rev.1
j PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
Action Standard Comments 8-Instruments with common power supplies. Determines the following indicators a common power supply:
LI-14201B1 on 1C651 LI-14201B on 1C601 LI-142038 on 1C601 Identifies a loss of 1Y125 breaker 01 as the common mode failure.
Automatic actions and alarms. NONE IF level cannot be determined 2 +13" by at least two Determines this is N/A since other level (2) independent indications, Enter EO 100 102, RPV indications are available.
Control.
Comply with TS 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, Recognizes the need to Comply with TS 3.3.5.1, 3.3.4.2 and 3.3.5.2. 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, 3.3.5.1, 3.3.4.2 and 3.3.5.2.
EVALUATOR CUE:
If necessary, Role-play Unit Supervisor and acknowledge the request.
- Critical Step #Critical Sequence Form NIP-QA-31 8-2. Rev. 0. Page I of I 2005 NAC Exam Rev.1
I PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
~
Step Action Standard Comments 12 IF applicable, Restore power supplies for failed Contacts NPO to check status of 1Y125 instrumentation. breaker 01 EVALUATOR CUE:
Role-play NPO and repoi. 1Y125 breaker 01 is tripped.
13 Informs Unit Supervisor that 1Y125 breaker 01 is Informs Unit Supervisor that 1Y125 tripped. breaker 01 is tripped.
EVALUATOR CUE:
Role-play Unit Supervisor and acknowledge the report And Instruct candidate to attempt one closure of 1Y125 breaker 01 is tripped.
- 14 Contact NPO and instruct NPO to close 1Y125 Contacts NPO and instructs NPO to close breaker 01. 1Y125 breaker 01.
BOOTH OPERATOR CUE:
Remove malfunction on 1Y125 breaker 01.
MRF DB117271 CLOSE
- Critical Step #Critical Sequence hmnhTPQA-31 8-2. Rev. 0.P q c I of I 2005 NRC Exam Rev 1
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
Action Standard Comments EVALUATOR CUE:
Role-play NPO and report 1Y125 breaker 01 is CLOSED.
Verifies level instruments are reading NORMAL Verifies the following indicators are now reading normal:
LI-14201B1 on 1C65 LI-14201B on 1C601 LI-142038 on 1C601 EVALUATOR CUE:
This completes the JPM for the RO ONLY EVALUATOR CUE:
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec required actions for the failed level transmitters.
Obtains a copy of the Tech Specs
References:
- Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev 0. Pqr 1 uf 1 2005 NRC Exam Rev.1
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: 45.0N.007.101 Student Name:
Step Action Standard Eva1 Comments
+I7 Determines required actions Determines the following action is required:
Within 30 days restore required channel to operable status.
EVALUATOR CUE:
This completes the JPM.
-
- Critical Step #Critical Sequence Form NTF-QA 31.8-2, Rev 0. P q c I of 1 2005 NRC Exam Rev.1
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power.
- 8. An anomaly exists with RPV water level instrument indication.
C. It has been determined that extended range level transmitter LT-142038 has lost power.
INITIATING CUE Determine the required Tech Spec actions.
Page 1 of 4 2005 NRC. Exam Rev. 1
SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power.
B. An anomaly exists with RPV water level instrument indication.
C. It has been determined that extended range level transmitter LT-142038 has lost power.
INITIATING CUE Determine the required Tech Spec actions.
Page 2 of 4 2005 NRC. Exam Rev. 1
TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power.
B. An anomaly exists in RPV water level instrument indication.
INITIATING CUE Use the appropriate procedure to address the anomaly.
Page 3 of 4 2005 NRC. Exam Rev. 1
TASK CONDITIONS A. Unit 1 is in MODE 1 at 100% reactor power.
B. An anomaly exists in RPV water level instrument indication.
INITIATING CUE Use the appropriate procedure to address the anomaly.
Page 4 of 4 2005 NRC. Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET S/RO 00.AD.269.101 0 09/26/05 2.2.24 N/A 2.6/3.8 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.
To Sys. No.
Task Title: Determine Trip Inputs to Zone 3 Is0 Signals Lockout Relay XY07553A Using Controlled Electrical Prints Completed By: Validated Rich Chin 09/26/05 Writer Date InstructorNVriter Date Approval:
Nuclear Trng. Supv. Date 20/30 Date of Performance: Validation Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page I of 2 2005 NRC Exam Rev. 1
.-
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 00.AD.269.101
\
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. E 201 sheet 1 (Rev. 27)
B. E 184 sheet 1 (Rev. 19)
C. E 184 sheet 3 (Rev. 17)
III. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
None IV. TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681.
V. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.
VI. TASK STANDARD All of the trip input signals to Zone 3 Is0 Signals Lockout Relay XY07553A are identified. SROs must additionally identify the required Tech Spec actions for an inoperable input.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. I
I PERFORMANCE CHECKLIST Page 3 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE Candidate may use any number of different mediums to obtain the controlled copy of the electrical drawings.
These would all be acceptable.
- 1. Candidate obtains the controlled copy of the electrical References the electrical print print. index, OR the operating manuals and determine the appropriate print is E 201 sheet 1.
- 2. Locates relay XY07553A on print E 201 sheet 1. Locates relay XY07553A at grid location C6.
EVALUATOR NOTE The following steps 3 - 9 may be done in any order.
Candidate may also elect not to report result back to supervisor until they have completed the task. This JPM is written with a report back after each determination as a convenience to the evaluator.
-
- Critical Step #Critical Sequence Form NTP-QA-3 I .8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. I
PERFORMANCE CHECKLIST Page 4 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name:
Step Action Standard Eva1 Comments
- 3 Candidate determines Unit 1 High radiation inputs a trip Determines that High radiation signal to relay XY07553A. from the following Unit 1 locations will input a trip signal into relay XY07553A [Grid location B7]
Refuel floor exhaust 0 Refuel floor wall exhaust 0 Railroad access shaft exhaust AND Reports this to the supervisor t4 Candidate determines Unit 2 High radiation inputs a trip Determines that High radiation signal to relay XY07553A. from the following Unit 2 locations will input a trip signal into relay XY07553A [Grid location B8]
0 Refuel floor exhaust 0 Refuel floor wall exhaust AND Reports this to the supervisor
=
- Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. I
(
PERFORMANCE CHECKLIST Page 5 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name:
~
Step Action Standard Comments 5 Determines the need to transition to another electrical Determines the other 2 inputs to drawing. trip relay XY07553A are on drawings 184 sheet 1 and 3 by observing the notes 6 Candidate obtains the controlled copy of the electrical Obtains the controlled copy of the print E 184 sheet 1. electrical print E 184 sheet 1.
wc7 Candidate determines Unit 1 Div 1 LOCA isolation signal Determines Unit 1 Div 1 LOCA inputs a trip signal to relay XY07553A. isolation signal inputs a trip signal to relay XY07553A and this signal is generated by :
0 Manual isolation Lo-Lo water reactor level (trip2) 0 Hi drywell pressure Switch in TEST mode AND Reports this to the supervisor 8 Candidate obtains the controlled copy of the electrical Obtains the controlled copy of the print E 184 sheet 3. electrical print E 184 sheet 3.
- Critical Step #Critical Sequence Form NTP-QA-3 1.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 6 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name:
Step Action Standard Comments U9 Candidate determines Unit 2 Div 1 LOCA isolation signal Determines Unit 2 Div 1 LOCA inputs a trip signal to relay XY07553A. isolation signal inputs a trip signal to relay XY07553A and this signal is generated by :
Manual isolation RPV low level (trip 2) 0 Hi drywell pressure 0 Switch in TEST mode AND Reports this to the supervisor 10 Candidate determines there are no more inputs to relay Determines there are no more XY07553A inputs to relay XY07553A, and reports this to the supervisor.
EVALUATOR CUE:
This completes the JPM for the ROs ONLY
- Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0,Page 1 of I 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 7 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Student Name:
~
Action Standard Eva1 Comments EVALUATOR CUE:
FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec LCO for the INOPERABLE relay.
Obtains a copy of the Tech Specs References Tech Spec 3.3.6.2 Determines required actions for Tech Spec 3.3.6.2 Determines the following actions will be required:
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> place the following channel in TRIP:
Unit 1 Refuel floor high exhaust duct radiation-high EVALUATOR CUE:
This completes the JPM
- Critical Step #Critical Sequence Form NTP-QA-3 1.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with:
NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place.
A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE.
INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination?
Page 1 of 4 2005 NRC Exam Rev. 1
SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with:
NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place.
A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE.
INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination?
Page 2 of 4 2005 NRC Exam Rev. I
- TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681.
INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.
Page 3 of 4 2005 NRC Exam Rev. 1
TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681.
INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.
Page 4 of 4 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 69.0P.044.051 1 9/27/05 2.3.6 N/A 3.1 Appl. JPM Number Rev. Date NUREG 1123 WA No. WA Imp.
To No. Sys. No.
Task Title: Review and Approve A Radioactive Liquid Release Permit Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval :
Nuclear Trng. Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee ## / S.S. ##
Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 69.0P.044.051
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPN will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES OP-069-050, Release of Liquid Radioactive Waste (Revision 31)
I11. R EACTlVlTY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):
NONE IV. TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment.
B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service.
C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312.
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331is 3.1OE3 CPM V. INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form.
VI TASK STANDARD I
Identifies INCORRECT settings for Actual High Rad setpoint and Actual Alert Rad setpoint.
Form NTP-QA-31.8-1,Rev. 0. Page 2 of 2 2005 NRC Exam Rev. 1
1 PERFORMANCE CHECKLIST Page 3 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name:
Step EVALUATOR NOTE:
- Action Standard Eva1 Comments Provide the candidate with a filled out copy of OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit completed through step 2.1.8. Insure High Rad setpoint calculation (in step 2.1.6.n) AND ACTUAL High Rad setpoint (in step 2.1.7 Position 0) are filled out with the MATH errors specified in steps 3 and 4 of this JPM. Student may use OP-069-050, Release of Liquid Radioactive Waste for guidance, however no marks should be made on that copy.
Provide the candidate with a filled out OP-069-050, Release of Liquid Radioactive Waste Attachment F.
Provide the candidate with a blank OP-069-050, Release of Liquid Radioactive Waste Attachment G.
Provide the candidate with a filled out OP-069-050, Release of Liquid Radioactive Waste Attachment H.
A complete Release permit for Laundry Drain Sample Tank OT-312 will consist of Attachments A, F, G Iand H.
1 Obtain a controlled copy of OP-069-050, Release of Controlled copy obtained.
Liquid Radioactive Waste
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I i i PERFORMANCE CHECKLIST Page 4 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name:
Step Action Standard Comments 2 Selects the correct section to perform. Selects section step 2.1.8 which requires review of previously completed steps 2.1.5.g through 2.1.7 of OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit EVALUATOR NOTE:
Due to the nature of this JPM, the candidate may elect to perform the calculations FIRST before proceeding to Radwaste to Verify the proper setpoints. This is acceptable.
EVALUATOR NOTE:
If candidate indicates t, ,at he/she would proceed to Radwaste to Verify the proper setpoints, provide the candidate with the necessary cues from the attached OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit for items 2.1 5.9, 2.1.6.f, 2.1.6.k, 2.1.6.1
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 5 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name:
Step Action Standard Comments
- 3 Verifies High Rad setpoint Performs the following calculation:
7.OE4 + 3.1 E3 = 7.31 E4 and compares this to the number in block 2.1.6.n (1.1 E5)
AND Determines there is a math error 454 Verifies Alert Rad setpoint Performs the following calculation:
5.6E4 + 3.1 E3 = 5.91 E4 and compares this to the number in block 3.1.6.0 (8.7E5)
AND Determines there is a math error 455 Verifies Liquid Radwaste Radiation h,dnitor Setpoint Checks required setpoint and actua inputs for Function Switch position 0 setpoint for High Rad setpoint.
Determines Setpoints have been incorrectly set to the setpoints determined by the math error.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
/
PERFORMANCE CHECKLIST Page 6 of 6 Appl. To/JPM No.: 69.0P.044.051 Student Name:
I Step 3K6
- Action Verifies Liquid Radwaste Radiation Monitor Setpoint Standard Checks required setpoint and actual Eva1 Comments inputs for Function Switch position 1 setpoint for Alert Rad setpoint.
Determines Setpoints have been incorrectly set to the setpoints determined by the math error.
7 Resolves the discrepancy Determines:
The math errors and setpoint adjustments will need corrected before the permit can be authorized for discharge.
EVALUATOR CUE:
That completes this JPM.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment.
- 6. Total Site Blowdown Flow Transmitter FIT-01596 is out of service.
C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312.
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331 is 3.1OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form.
2005 NRC Exam Rev. 1 1 of2
TASK CONDITIONS
- A. Both Units are at 100% power, all systems in normal alignment.
B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service.
C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-312.
D. OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-06433] is 3.1OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup JAW OP-069-050, Release of Liquid Radioactive Waste Attachment A Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit step 2.1.8 and sign the appropriate block on the form.
2005 NRC Exam Rev. 1 2 of 2
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET RO 00. EP.004.002 0 9/27/05 2.4.43 NIA 2.8 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.
To Sys. No.
Task Title: Control Room Communicator Emergency Notification Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorANriter Date Approval :
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ) Satisfactory ( ) Unsatisfactory Evaluation:
Eva1uator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE RO 00.EP.004.002
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. EP-PS-100 EMERGENCY DIRECTOR, CONTROL ROOM: Emergency-Plan-Position Specific Instruction (Rev. 22)
B. EP-PS-126, EMERGENCY PLAN COMMUNICATOR: Emergency Plan-Position Specific Instruction (Rev. 23)
C. EP-TP-003, COMMUNICATION PROCESS (Rev. 0) 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3)
V. INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.
VI. TASK STANDARD Identify the ENR form is incomplete; Contact the offsite agencies within 15 minutes from initiation of the ENR form; Communicate the Emergency Classification, Unit, declaration Time and Date to the off site agencies.
Form NTP-QA-31.8-1, Rev. 0,Page 2 of 2 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 3 of 9
. . To/JPM No.: RO 00.EP.004.002 Appl. Student Name:
_____ ~~~
Step Action Standard Eva1 Comments EVALUATOR NOTE:
This is a time critical JPM.
Ensure a copy of EP-PS-100, EP-TP-003, and EP-PS-126 are available to support performance of this JPM.
Have current, filled-out copy of ENR Form available, with Line 4 BLANK If performing in the simulator, place a yellow sticky on each of the 2 communicator phones with the following call-back number:
570-759-4902 EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Tasl Conditions and Initiating Cue Sheet.
Role play as Control Room ED and give student filled-out ENR Form.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name:
Step Action Standard Eva1 Comments
- l Obtain and review Event Notification Report (ENR) Reviews ENR form to verify Lines 1, 3, 4, 5, 6, and 7 form with the Shift Manager/ED. are all filled out.
Determines:
Line 4 is NOT filled out Reports to the ED that line 4 MUST be filled out EVALUATOR CUE:
Role play as Control Room ED and Place OA3 on line 4 of the ENR Form.
Return completed ENR form to the candidate.
EVALUATOR CUE:
After the ENR has been corrected and returned to the candidate, the Time Critical Portion of the JPM begins.
Record Start Time
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NAC Exam Rev. 1
!
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name:
Action Standard Eva1 Comments NOTE:
If the MOC does not answer, do not wait.
Transmit the ENR form information to the emergency agencies.
NOTE:
Do not communicate the control number to offsite agencies. This block is gray shaded on the ENR form.
Within 15 minutes of declaration, using the purple Dials 191 on the purple colored button colored phone button, dial 1 91 to transmit the ENR form to the following:
(Dialing 191 will simultaneously connect the listed Verifies the following agencies are on the line:
agencies in a conference call.)
(1) Penna. Emergency Management Agency (2) Columbia County EMA (3) Luzerne County EMA Media Operations Center EVALUATOWBOOTH CUE:
Role-play the receiving agencies and confirm each agency is on the line and you are Ready to Copy
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name:
Action Standard Eva1 Comments EVALUATOR NOTE:
After contact with the offsite agencies has been confirmed, the Time Critical Portion of the JPM ends.
Record stop Time NOTE:
When you communicate your phone number to the offsite agencies, the prefix for 4XXX numbers is (570) 759. (The 191 call originates from a 4XXX number.)
Communicate ENR Form Communicates the following for line Call status:
This is a Drill
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Student Name:
Step Action Standard 1 Eva1 Comments Communicates the following for line 2:
This is: Candidates Name at Susquehanna Steam Electric Station.
My telephone number is: 570-759-4902 Notification time is: Current Time 46 EVALUATOR NOTE: Communicates the following for line 3:
Initial Declaration is not critical EMERGENCY CLASSIFICATION:
ALERT UNIT:
ONE and TWO Declaration Time:
5 MINUTES AGO DATE:
TODAYS DATE THIS REPRESENTS NAN:
INIT1AL DECLARATION
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 8 of 9 Appl.
. . To/JPM No.: RO 00.EP.004.002 Student Name:
Step Action Standard Eva1 Comments f 6 Communicates the following for line 4:
The Classification Designation is:
OA3 BRIEF NON-TECHNICAL DESCRIPTION OF THE EVENT:
OA3 7 Communicates the following for line 5:
THERE IS:
NO NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS 8 Communicates the following for line 6:
WIND DIRECTION IS FROM:
21O WIND SPEED IS:
85 mph 9 Communicates the following for line 7:
THIS IS A DRILL
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
(,
PERFORMANCE CHECKLIST Page 9 of 9 Appl.
. . To/JPM No.: RO 00.EP.004.002 Student Name:
=
Step Action Standard Eva1 Comments EVALUATOWBOOTH CUE:
Candidate may choose to have one of the offsite agencies REPEAT back the communicated information. If necessary, role-play the off site agency and Repeat back the information.
EVALUATOR CUE:
This completes the JPM
- EVALUATOR NOTE:
In order for the candidate to pass the Time Critical element of this JPM, they must complete step 2 of this JPM within 15 minutes.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3)
INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3)
INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.
Page 2 of 2 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.304 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp.
To Sys. No.
Task Title: Perform Emergency Plan Classification (Scenario ILO-304) and Complete the ENR form Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorMlriter Date Approval:
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
-
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.304
-
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-304, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-100-C E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
VI. TASK STANDARD Emergency classification of Alert Emergency declared within 15 minutes.
Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 N R C Exam Rev. 1
I PERFORMANCE CHECKLIST Page 3 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Step Student Name:
-
Action Standard Eva1 Comments EVALUATOR NOTE:
This JPM must be performed in the simulator following completion of the scenario ILO-304 as Unit Supervisor.
This is a time critical JPM.
Ensure a copy of EP-PS-100 is available to support performance of this JPM.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Initiating Cue Sheet.
EVALUATOR NOTE:
After the candidate reviews the Task Conditions /
Initiating Cue Sheet:
0 Ask if the candidate is ready to begin the JPM.
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM.
Record Start Time
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 4 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
Step Action Standard Eva1 Comments Obtains a copy of EP-PS-100. Controlled copy obtained.
Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event.
Evaluates information. Identifies from participation as The Unit Supervisor, that an RCS leak > 50 gpm has occurred, and a momentary ATWS.
EVALUATOR CUE:
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 5 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
~~
Step Action Standard Eva1 Comments
~ ~~
- 4 Choose appropriate emergency classification level. FA1 Any loss or potential loss of either the Fuel clad or RCS OR MA3 RPS setpoint exceeded and RPS automatic scram did not reduce reactor power to c 5%
AND ARI initiated to reduce power below 5%
5 Record Time of Alert Emergency declaration 6 Determines appropriate procedure section for the Determines TAB C Manage the Alert classification. Emergency is the appropriate TAB.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 6 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
~
Step Action Standard Eva1 Comments Document and communicate the Emergency Announces to Control Room Personnel:
Classification. I am assuming duties of the Emergency Director.
Alert Emergency Classification declared based on FA1 Any loss or potential loss of either the Fuel clad or RCS OR MA3 RPS setpoint exceeded and RPS automatic scram did not reduce reactor power to < 5%
AND ARI initiated to reduce power below 5%
Time and Date of Classification.
If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator.
If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 7 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
Step Action Standard Eva1 Comments 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9.
transmitted by the Emergency Plan Communicator.
EVALUATOR CUE:
Inform the candidate that the Control # in the next step will be CR-ILO-304 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows:
Control # CR-ILO-304 LINE 1.
Call Status:
Places checkmark in This is a drill box EVALUATOR NOTE:
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 8 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
Step Action Standard Eva1 Comments
- 12 Completes line 3 LINE 3.
EVALUATOR NOTE: Emergency Classification:
Initial Declaration is not critical Places checkmark in Alert Emergency box Places checkmark in Unit one box Records the Declaration time and date.
Places a checkmark in this represents NAN initial declaration box in classification status.
EVALUATOR NOTE:
FA1 or MA3 alone is sufficient for the Brief Non-Technical Description for the initial notification.
Candidate may paraphrase this description
- 13 Completes line 4 LINE 4.
The Emergency action level (EAL) number is:
Records EAL FA1 OR MA3 Brief non -technical description of the event:
RecordsFAl OR MA3
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 9 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
Step Action Standard Eva1 Comments
~
- 14 Completes line 5 LINE 5.
Places a checkmark in the No non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from 10" Wind Speed is: 5 mph 16 Completes line 7 LINE 7.
Conclusion:
Places a checkmark in this is a drill box.
Approves the Emergency Notification Report Form Records the following on space provided:
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE:
Candidate may review the filled out ENR form with the E Plan Communicator.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2.Rev. 0, Page 1 of 1 2005 NRC Exam Rev. I
PERFORMANCE CHECKLIST Page 10 of 10 Appl. To/JPM No.: SRO 00.EP.001.304 Student Name:
-
Step Action Standard Eva1 Comments 18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator.
EVALUATOR CUE:
If necessary, Role-play the communicator and accept the filled out form.
EVALUATOR CUE:
Inform the candidate the JPM is complete.
EVALUATOR NOTE:
The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory.
- Critical Step #Critical Sequence Form NTP-QAB1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 2 of 2 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.305 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 KIA No. KIA Imp.
To Sys. No.
Task Title: Perform Emergency Plan Classification (Scenario ILO-305) and Complete the ENR form Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval:
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # I S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1,Rev. 0,Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.305
-
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-305, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 III. R EACTlVlTY MAN1PULATIONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
-
Step Action Standard Eva1 Comments EVALUATOR NOTE:
0 This JPM must be performed in the simulator following completion of the scenario ILO-305 as Unit Supervisor.
0 This is a time critical JPM.
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Initiating Cue Sheet.
EVALUATOR NOTE:
After the candidate reviews the Task Conditions /
Initiating Cue Sheet:
0 Ask if the candidate is ready to begin the JPM.
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM.
Record Start Time
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Controlled copy obtained.
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event.
3 Evaluates information. Identifies from participation as The Unit Supervisor, that 2 Reactor Building Areas exceeded Max Safe Radiation levels.
EVALUATOR CUE:
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request.
- 4 Choose appropriate emergency classification level. FSl Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
!
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
Step Action Standard Eva1 Comments
~
7 Document and communicate the Emergency Announces to Control Room Personnel:
Classification. I am assuming duties of the Emergency Director.
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator.
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9.
transmitted by the Emergency Plan Communicator.
EVALUATOR CUE:
Inform the candidate that the Control # in the next step will be CR-ILO-305
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
~
Step Action Standard Eva1 Comments 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows:
Control # CR-ILO-305 LINE 1.
Call Status:
Places checkmark in This is a drill box EVALUATOR NOTE:
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).
- 12 Completes line 3 LINE 3.
EVALUATOR NOTE: Emergency Classification:
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.
Places a checkmark in this represents NAN initial declaration box in classification status.
- Critical Step #Critical Sequence Form NTP-OA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
FSl alone is sufficient for the Brief Non-Technical Description for the initial notification.
Candidate may paraphrase this description Completes line 4 LINE 4.
The Emergency action level (EAL) number is:
Records EAL FS1 Brief non -technical description of the event:
Records FS1 3k14 Completes line 5 LINE 5.
Places a checkmark in the AN Airborne Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
(
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name:
Step Action Standard Eva1 Comments 16 Completes line 7 LINE 7.
Conclusion:
Places a checkmark in this is a drill box.
- 17 Approves the Emergency Notification Report Form Records the following on space provided:
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE:
Candidate may review the filled out ENR form with the E Plan Communicator.
18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator . Communicator.
EVALUATOR CUE:
If necessary, Role-play the communicator and accept the filled out form.
EVALUATOR CUE:
Inform the candidate the JPM is complete.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
0, c
0 Q,
c
.-0 CI 2
0-
..
0 Z
-
a 2
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 2 of 2 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.504 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp.
To Sys. No.
Task Title: Perform Emergency Plan Classification (Scenario ILO-504) and Complete the ENR form Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval:
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
-
JPM Performed By:
Student Name:
Last First M.I. Employee # / S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
--
Form NTP-QA91.8-1, Rev. 0,Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.504
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
It. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-504, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes.
Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name:
Step Action Standard Eva1 EVALUATOR NOTE:
0 This JPM must be performed in the simulator following completion of the scenario ILO-504 as Unit Supervisor.
0 This is a time critical JPM.
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Initiating Cue Sheet.
EVALUATOR NOTE:
After the candidate reviews the Task Conditions /
Initiating Cue Sheet:
0 Ask if the candidate is ready to begin the JPM.
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM.
Record Start Time
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name:
Step Action Standard Eva1 Comments
~~
1 Obtains a copy of EP-PS-100. Controlled copy obtained.
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event.
3 Evaluates information. Identifies from participation as The Unit Supervisor, RPV water level dropped below -1 61 inches EVALUATOR CUE:
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request.
- 4 Choose appropriate emergency classification level. FS1 Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB.
- Critical Step #Critical Sequence Form NTP-QA31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO4 Student Name:
Step Action Standard Eva1 Comments 7 Document and communicate the Emergency Announces to Control Room Personnel:
Classification. I am assuming duties of the Emergency Director.
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.
a If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator.
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9.
transmitted by the Emergency Plan Communicator.
EVALUATOR CUE:
Inform the candidate that the Control # in the next step will be CR-ILO-504
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
I PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name:
Step Action Standard Eva1 Comments
-~
11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows:
Control # CR-ILO-504 LINE 1.
Call Status:
Places checkmark in This is a drill box EVALUATOR NOTE:
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).
5 12 Completes line 3 LINE 3.
EVALUATOR NOTE: Emergency Classification:
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.
Places a checkmark in this represents NAN initial declaration box in classification status.
-
- Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification.
Candidate may paraphrase this description Completes line 4 LINE 4.
The Emergency action level EAL) number is:
Records EAL FS1 Brief non -technical description of the event:
Records FS1
- 14 Completes line 5 LINE 5.
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.504 Student Name:
Step Action Standard Comments 16 Completes line 7 LINE 7.
Conclusion:
Places a checkmark in this is a drill box.
- 17 Approves the Emergency Notification Report Form Records the following on space provided:
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE:
Candidate may review the filled out ENR form with the E Plan Communicator.
18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator.
EVALUATOR CUE:
If necessary, Role-play the communicator and accept the filled out form.
EVALUATOR CUE:
Inform the candidate the JPM is complete.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO4 Step Action Standard Eva1 Comments EVALUATOR NOTE:
The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2. Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 2 of 2 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.505 0 9/27/05 2.4.41 NIA 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. K/A Imp.
To Sys. No.
Task Title: Perform Emergency Plan Classification (Scenario ILO-505) and Complete the ENR form Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorANriter Date Approval:
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # I S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Evaluation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1,Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.505
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-505, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MAN1PULATlONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes.
Form NTP-QA-31.8-1,Rev. 0, Page 2 of 2 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO OO.EP.OO1 SO5 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
0 This JPM must be performed in the simulator following completion of the scenario ILO-505 as Unit Supervisor.
0 This is a time critical JPM.
Ensure a copy of EP-PS-100 is available to support performance of this JPM.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Initiating Cue Sheet.
EVALUATOR NOTE:
After the candidate reviews the Task Conditions /
Initiating Cue Sheet:
Ask if the candidate is ready to begin the JPM.
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM.
Record Start Time
- Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
1 PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name:
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Sontrolled copy obtained.
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event.
3 Evaluates information. Identifies from participation as The Unit Supervisor, RPV water level dropped below -161 inches EVALUATOR CUE:
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request.
- 4 Choose appropriate emergency classification level. FS1 Loss or Potential loss of ANY 2 Fission Product Barriers 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB.
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.505
- Student Name:
Step Action Standard Eva1 Comments 7 Document and communicate the Emergency Announces to Control Room Personnel:
Classification.
I am assuming duties of the Emergency Director.
Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator.
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9.
transmitted by the Emergency Plan Communicator.
EVALUATOR CUE:
Inform the candidate that the Control # in the next step will be CR-ILO-505
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Step Student Name:
-
Eva1 Comments Action Standard 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows:
Control # CR-ILO-505 LINE 1.
Call Status:
Places checkmark in This is a drill box EVALUATOR NOTE:
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).
- 12 Completes line 3 LINE 3.
EVALUATOR NOTE: Emergency Classification:
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.
Places a checkmark in this represents N A N initial declaration box in classification status.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification.
Candidate may paraphrase this description 3k13 Completes line 4 LINE 4.
The Emergency action level (EAL) number is:
Records EAL FS1 Brief non -technical description of the event:
Records FSl 3k14 Completes line 5 LINE 5.
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph
- Critical Step #Critical Sequence Form NTP-OA-31.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name:
-
Step Action Standard Eva1 Comments 16 Completes line 7 LINE 7.
Conclusion:
Places a checkmark in this is a drill box.
jk17 Approves the Emergency Notification Report Form Records the following on space provided:
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE:
Candidate may review the filled out ENR form with the E Plan Communicator.
18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator.
EVALUATOR CUE:
If necessary, Role-play the communicator and accept the filled out form.
EVALUATOR CUE:
Inform the candidate the JPM is complete.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0.Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
The total time from the JPM start to step 5 of the JPM must be 5 15 minutes in order for the time critical portion of the JPM to be satisfactory.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0,Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form, Page 2 of 2 2005 NRC Exam Rev. 1
PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE
- APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.602 0 9/27/05 2.4.41 N/A 4.0 ADDI.
I ,
JPM Number Rev. No. Date NUREG 1123 KIA No. KIA ImD.
To Sys. No.
Task Title: Perform Emergency Plan Classification (Scenario ILO-602) and Complete the ENR form Completed By: Validated:
Rich Chin 9/27/05 Writer Date InstructorMl riter Date Approval:
Nuclear Trng. Supv. Date Time Critical 15 Minutes Date of Performance: Validated Time (Min.) Time Taken (Min.)
JPM Performed By:
Student Name:
Last First M.I. Employee # I S.S. #
Performance ( ) Satisfactory ( ) Unsatisfactory Eva1uation:
Evaluator Name:
Signature Typed or Printed Comments:
Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam Rev. 1
REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.602
- 1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example:
- 1. Whenever any electrical panel is opened for inspection during JPM performance.
- 2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.
C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.
D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.
II. REFERENCES A. EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 B. ILO-602, SIMULATOR EVALUATION SCENARIO C. EP-PS-1OO-A D. EP-PS-1OO-D E. EP-PS-100-9 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):
None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes.
Form NTP-QA-31.8-1, Rev. 0 , Page 2 of 2 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name:
Step Action Standard Eva1 Comments EVALUATOR NOTE:
0 This JPM must be performed in the simulator following completion of the scenario ILO-602 as Unit Supervisor.
0 This is a time critical JPM.
0 Ensure a copy of EP-PS-100 is available to support performance of this JPM.
EVALUATOR NOTE:
To begin this JPM, provide the candidate with the Initiating Cue Sheet.
EVALUATOR NOTE:
After the candidate reviews the Task Conditions /
Initiating Cue Sheet:
0 Ask if the candidate is ready to begin the JPM.
0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM.
Record Start Time
- Critical Step #Critical Sequence Form NTP-OA-31.8-2. Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name:
Step Action Standard Eva1 Comments 1 Obtains a copy of EP-PS-100. Controlled copy obtained.
2 Identifies appropriate Tab Determines Tab A is appropriate Tab to classify the event.
3 Evaluates information. Identifies from participation as The Unit Supervisor, ATWS and RPV water level dropped below -161 inches EVALUATOR CUE:
Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidates request.
- 4 Choose appropriate emergency classification level. MS3 ATWS and ARI fail to reduce power to less than 5%
OR FS Loss or Potential loss of ANY 2 Fission Product Barriers
- c
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
(
PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Step Student Name:
-
Eva1 Comments Action Standard 5 Record Time of Site Area Emergency declaration 6 Determines appropriate procedure section for the Determines TAB D Manage the Site Area classification. Emergency is the appropriate TAB.
7 Document and communicate the Emergency Announces to Control Room Personnel:
Classification. I am assuming duties of the Emergency Director.
Site Area Emergency Classification declared based on MS3 ATWS and ARI fail to reduce power to less than 5%
OR FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.
8 If not performed earlier appoint an Emergency Plan Appoints an Emergency Plan Communicator and Communicator instruct hidher to immediately perform EP-PS-126 E Plan Communicator.
9 If not performed earlier, appoint an NRC Appoints an NRC Communicator and instruct hidher communicator. to perform EP-PS-135 NRC Communicator
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.602
- Student Name:
-
Step Action Standard Eva1 Comments 10 Generate and approve an ENR form to be Refers to ENR Form under Tab 9.
transmitted by the Emergency Plan Communicator.
EVALUATOR CUE:
Inform the candidate that the Control # in the next step will be CR-ILO-602 11 Fill out and approve the Emergency Notification Fills out and approves the Emergency Notification Report Form. Report Form as follows:
Control # CR-ILO-602 LINE 1.
Call Status:
Places checkmark in This is a drill box EVALUATOR NOTE:
The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
i PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name:
Step Action Standard Eva1 Comments
- 12 Completes line 3 LINE 3.
EVALUATOR NOTE: Emergency Classification:
Initial Declaration is not critical Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.
Places a checkmark in this represents NAN initial declaration box in classification status.
EVALUATOR NOTE:
MS3 or FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification.
Candidate may paraphrase this description
- 13 Completes line 4 LINE 4.
The Emergency action level (EAL) number is:
Records EAL MS 3 or FS1 Brief non -technical description of the event:
Records MS 3 or FS1
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.602
-
Step
~
Student Name:
Standard Comments Action
~
+k14 Completes line 5 LINE 5.
Places a checkmark in the NO Non-routine radiological release box 15 Completes line 6 LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph 16 Completes line 7 LINE 7.
Conclusion:
Places a checkmark in this is a drill box.
+k17 Approves the Emergency Notification Report Form Records the following on space provided:
Approved: - HidHer name Time: - Current time Date: - Current Date EVALUATOR NOTE:
Candidate may review the filled out ENR form with the E Plan Communicator.
- Critical Step #Critical Sequence Form NTP-QA-31.8-2,Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
PERFORMANCE CHECKLIST Page 9 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name:
Step Action Standard Eva1 Comments 18 Give the approved ENR form to the E Plan Provides the filled out ENR form to the E Plan Communicator. Communicator.
EVALUATORC If necessary, Role-play the communicator and accept the filled out form.
EVALUATOR CUE:
Inform the candidate the JPM is complete.
EVALUATOR NOTE:
The total time from the JPM start to step 5 of the JPM must be 2 1 5 minutes in order for the time critical portion of the JPM to be satisfactory.
EVALUATOR NOTE:
If RPV water level drops below -205 inches the EAL will escalate to a General Emergency under MG3, and the ENR form will also reflect AN airborne NON routine radiological release based on loss of the Fuel clad barrier.
-
- Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 1 of 2 2005 NRC Exam Rev. 1
TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.
Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.
INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.
Page 2 of 2 2005 NRC Exam Rev. 1