{{#Wiki_filter:-3-(3) EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;(4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required;(5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein. The items identified in Attachment 1 to this license shall be completed as specified.
{{#Wiki_filter:     (3) EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)   EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
Attachment 1 is hereby incorporated into this license.(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 151 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.Amendment No. 70 79 114 1-2,151 LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1 (page 1 of 1)Loss of Power Instrumentation REQUIRED CHANNELS PER SURVEILLANCE DIVISION REQUIREMENTS FUNCTION 1. Divisions 1 and 2 -4.16 kV Emergency Bus Undervoltage
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
: a. Loss of Voltage -4.16 kV basis b. Loss of Voltage -Time Delay c. Degraded Voltage -4.16 kV basis d. Degraded Voltage -rime Delay, No LOCA e. Degraded Voltage -Time Delay, LOCA 2. Division 3 -4.16 kV Emergency Bus Undervoltage
(1)   Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
: a. Loss of Voltage -4.16 kV basis b. Loss of Voltage -Time Delay c. Degraded Voltage -4.16 kV basis d. Degraded Voltage -Time Delay, No LOCA e. Degraded Voltage -Time Delay, LOCA ALLOWABLE VALUE SR 3.3.8.1.1 SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.1 SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.1 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.1 SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.3 SR 3.3.8.1.4 SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4 2 2850 V and 3090 V 2 2.67 seconds and 3.33 seconds 23689.0 V and  3735.2 V 2 53.4 seconds and 66.6 seconds 2 4.5 seconds and 5.7 seconds 2 2831 V and s 3259 V 2 2.67 seconds and 3.33 seconds3674.0 V and  3721.2 V 2 53.4 seconds and< 66.6 seconds 2 4.5 seconds and< 5.7 seconds i, I I RIVER BEND 3.3-74 Amendment No. 81 95 1.28- 147, 1 51}}
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 151 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 70 79 114 1-2,151
 
LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1 (page 1 of 1)
Loss of Power Instrumentation REQUIRED CHANNELS PER               SURVEILLANCE                       ALLOWABLE FUNCTION                  DIVISION           REQUIREMENTS                           VALUE
: 1. Divisions 1 and 2 - 4.16 kV Emergency Bus Undervoltage
: a. Loss of Voltage - 4.16 kV basis                         SR 3.3.8.1.1     2 2850 V and* 3090 V SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4
: b. Loss of Voltage - Time Delay                            SR 3.3.8.1.3       2 2.67 seconds and SR 3.3.8.1.4
* 3.33 seconds
: c. Degraded Voltage - 4.16 kV basis                        SR 3.3.8.1.1     2&#x17d;3689.0 V and
* 3735.2 V SR 3.3.8.1.2 SR 3.3.8.1.3 SR   3.3.8.1.4
: d. Degraded Voltage - rime Delay, No                      SR 3.3.8.1.3       2 53.4 seconds and LOCA                                                    SR 3.3.8.1.4
* 66.6 seconds
: e. Degraded Voltage - Time Delay,                          SR 3.3.8.1.3       2 4.5 seconds and LOCA                                                    SR 3.3.8.1.4
* 5.7 seconds
: 2. Division 3 - 4.16 kV Emergency Bus Undervoltage
: a. Loss of Voltage - 4.16 kV basis                          SR 3.3.8.1.1       2 2831 V and s 3259 V SR 3.3.8.1.3 SR 3.3.8.1.4
: b. Loss of Voltage - Time Delay                            SR 3.3.8.1.3       2 2.67 seconds and SR 3.3.8.1.4
* 3.33 seconds
: c. Degraded Voltage - 4.16 kV basis                        SR 3.3.8.1.1     &#x17d;3674.0 V and
* 3721.2 V SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4
: d. Degraded Voltage - Time Delay, No                        SR 3.3.8.1.3       2 53.4 seconds and LOCA                                                    SR 3.3.8.1.4      < 66.6 seconds i,    I
: e. Degraded Voltage - Time Delay,                          SR 3.3.8.1.2       2 4.5 seconds and LOCA                                                    SR 3.3.8.1.3      < 5.7 seconds SR 3.3.8.1.4 I
RIVER BEND                                                 3.3-74                 Amendment No. 81 95 1.28- 147, 151}}

Revision as of 18:28, 23 November 2019

Technical Specifications, Removal of Temp Note to Loss of Power
ML061380236
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/17/2006
From:
Office of Nuclear Reactor Regulation
To:
vaidya B, NRR/DLPM, 415-3308
Shared Package
ML060830194 List:
References
TAC MC9274
Download: ML061380236 (2)


Text

(3) EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter 1 and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 151 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 70 79 114 1-2,151

LOP Instrumentation 3.3.8.1 Table 3.3.8.1-1 (page 1 of 1)

Loss of Power Instrumentation REQUIRED CHANNELS PER SURVEILLANCE ALLOWABLE FUNCTION DIVISION REQUIREMENTS VALUE

1. Divisions 1 and 2 - 4.16 kV Emergency Bus Undervoltage
a. Loss of Voltage - 4.16 kV basis SR 3.3.8.1.1 2 2850 V and* 3090 V SR 3.3.8.1.2 SR 3.3.8.1.3 SR 3.3.8.1.4
b. Loss of Voltage - Time Delay SR 3.3.8.1.3 2 2.67 seconds and SR 3.3.8.1.4
  • 3.33 seconds
c. Degraded Voltage - 4.16 kV basis SR 3.3.8.1.1 2Ž3689.0 V and
d. Degraded Voltage - rime Delay, No SR 3.3.8.1.3 2 53.4 seconds and LOCA SR 3.3.8.1.4
  • 66.6 seconds
e. Degraded Voltage - Time Delay, SR 3.3.8.1.3 2 4.5 seconds and LOCA SR 3.3.8.1.4
  • 5.7 seconds
2. Division 3 - 4.16 kV Emergency Bus Undervoltage
a. Loss of Voltage - 4.16 kV basis SR 3.3.8.1.1 2 2831 V and s 3259 V SR 3.3.8.1.3 SR 3.3.8.1.4
b. Loss of Voltage - Time Delay SR 3.3.8.1.3 2 2.67 seconds and SR 3.3.8.1.4
  • 3.33 seconds
c. Degraded Voltage - 4.16 kV basis SR 3.3.8.1.1 Ž3674.0 V and
d. Degraded Voltage - Time Delay, No SR 3.3.8.1.3 2 53.4 seconds and LOCA SR 3.3.8.1.4 < 66.6 seconds i, I
e. Degraded Voltage - Time Delay, SR 3.3.8.1.2 2 4.5 seconds and LOCA SR 3.3.8.1.3 < 5.7 seconds SR 3.3.8.1.4 I

RIVER BEND 3.3-74 Amendment No. 81 95 1.28- 147, 151