{{#Wiki_filter:LOP DG Start Instrumentation 3.3.5 SURVEILLANCE REQUIREMENTS_______
{{#Wiki_filter:LOP DG Start Instrumentation 3.3.5 SURVEILLANCE REQUIREMENTS_______
SURVEILLANCE FREQUENCY SR 3.3.5.1 Perform CHANNEL CHECK of the 480 V bus 12 hours Degraded Voltage Function.-----------------  
SURVEILLANCE                                 FREQUENCY SR 3.3.5.1   Perform CHANNEL CHECK of the 480 V bus                   12 hours Degraded Voltage Function.
----- NOTE--------------  
              ----------------- ----- NOTE-------------- --------     31 days Verification of setpoint not required SR 3.3.5.2   Perform TADOT of the 480 V bus Degraded Voltage Function.
-------- 31 days Verification of setpoint not required SR 3.3.5.2 Perform TADOT of the 480 V bus Degraded Voltage Function.SR 3.3.5.3 Perform TADOT of each of the following:
SR 3.3.5.3   Perform TADOT of each of the following:                 24 months
24 months a. 480 V bus Undervoltage Function; and b. 480 V bus SBO Function.SR 3.3.5.4 Perform ACTUATION LOGIC TEST of each of the 24 months following:
: a.     480 V bus Undervoltage Function; and
: a. 480 V bus Undervoltage Function; and b. 480 V bus SBO Function.SR 3.3.5.5 Perform CHANNEL CALIBRATION with Allowable 24 months Values as follows: a. 480 V bus Undervoltage Function Allowable Value::206.6 V with a time delay5 3.7 seconds.b. 480 V bus Degraded Voltage Function Allowable Value::419 V and5 423 V with time delays as follows: i. 2:153 seconds and5 207 seconds (No SI Signal); and ii. 8.4 seconds and 11.4 seconds (Coincident SI).C. 480 V bus SBO Function Allowable Value: 2t 198.6 V.INDIAN POINT 2 3.3.5-4 INDIN PONT 3.35-4Amendment No. 24 7 LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)
: b.     480 V bus SBO Function.
CONDITION REQUIRED ACTION COMPLETION TiME C. Required Action and associated C.1 Enter applicable Immediately Completion Time not met. Condition(s) and Required Action(s) for OR the associated DG made inoperable by LOP DO Two channels of Degraded start instrumentation.
SR 3.3.5.4   Perform ACTUATION LOGIC TEST of each of the             24 months following:
Voltage Function inoperable in one or more buses.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY----------------
: a.         480 V bus Undervoltage Function; and
NOTE ---- ---_-Verification of setpoint not required 31 days SR 3.3.5.1 Perform TADOT.SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows: a. Undervoltage (480 V bus) Relay Allowable 24 months Value :200 V.b. Degraded Voltage (480 V bus) Relay (Non-Si) 18 months Allowable Value :414 V with a time delay<z 45 seconds.c. Degraded Voltage (480 V bus) Relay 18 months (Coincident SI) Allowable Value !414 V with a time delay 10 seconds.INDIAN POINT 3 3.3.5-2 INDIN PONT 3.35-2Amendment 23 1}}
: b.         480 V bus SBO Function.
SR 3.3.5.5   Perform CHANNEL CALIBRATION with Allowable             24 months Values as follows:
: a.         480 V bus Undervoltage Function Allowable Value:
                          &#x17d;:206.6 V with a time delay5*3.7 seconds.
: b.         480 V bus Degraded Voltage Function Allowable Value:
                          &#x17d;:419 V and5*423 V with time delays as follows:
: i. 2:153 seconds and5*207 seconds (No SI Signal); and ii.   &#x17d; 8.4 seconds and
* 11.4 seconds (Coincident SI).
C.         480 V bus SBO Function Allowable Value:
2t 198.6 V.
INDIAN POINT 2                             3.3.5-4                       INDIN         No. 24 7 PONT3.35-4Amendment
 
LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)
CONDITION                               REQUIRED ACTION               COMPLETION TiME C. Required Action and associated         C.1   Enter applicable               Immediately Completion Time not met.                     Condition(s) and Required Action(s) for OR                                           the associated DG made inoperable by LOP DO Two channels of Degraded                     start instrumentation.
Voltage Function inoperable in one or more buses.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY
                        ----------------     NOTE ----         ---   _-
Verification of setpoint not required             31 days SR 3.3.5.1         Perform TADOT.
SR 3.3.5.2         Perform CHANNEL CALIBRATION with Allowable Value as follows:
: a. Undervoltage (480 V bus) Relay Allowable                 24 months Value &#x17d;:200 V.
: b. Degraded Voltage (480 V bus) Relay (Non-Si)               18 months Allowable Value &#x17d;:414 V with a time delay
                          <z45 seconds.
: c. Degraded Voltage (480 V bus) Relay                           18 months (Coincident SI) Allowable Value &#x17d;!414 V with a time delay
* 10 seconds.
INDIAN POINT 3                                     3.3.5-2                                 INDIN       23 1 PONT3.35-2Amendment}}

Revision as of 17:40, 23 November 2019

Technical Specifications, Issuance of Amendment Setpoint Verification of Trip Actuating Devices, MC6956 and MC6958
ML061630026
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/07/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC6956, TAC MC6957
Download: ML061630026 (2)


Text

LOP DG Start Instrumentation 3.3.5 SURVEILLANCE REQUIREMENTS_______

SURVEILLANCE FREQUENCY SR 3.3.5.1 Perform CHANNEL CHECK of the 480 V bus 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Degraded Voltage Function.


----- NOTE-------------- -------- 31 days Verification of setpoint not required SR 3.3.5.2 Perform TADOT of the 480 V bus Degraded Voltage Function.

SR 3.3.5.3 Perform TADOT of each of the following: 24 months

a. 480 V bus Undervoltage Function; and
b. 480 V bus SBO Function.

SR 3.3.5.4 Perform ACTUATION LOGIC TEST of each of the 24 months following:

a. 480 V bus Undervoltage Function; and
b. 480 V bus SBO Function.

SR 3.3.5.5 Perform CHANNEL CALIBRATION with Allowable 24 months Values as follows:

a. 480 V bus Undervoltage Function Allowable Value:

Ž:206.6 V with a time delay5*3.7 seconds.

b. 480 V bus Degraded Voltage Function Allowable Value:

Ž:419 V and5*423 V with time delays as follows:

i. 2:153 seconds and5*207 seconds (No SI Signal); and ii. Ž 8.4 seconds and
  • 11.4 seconds (Coincident SI).

C. 480 V bus SBO Function Allowable Value:

2t 198.6 V.

INDIAN POINT 2 3.3.5-4 INDIN No. 24 7 PONT3.35-4Amendment

LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TiME C. Required Action and associated C.1 Enter applicable Immediately Completion Time not met. Condition(s) and Required Action(s) for OR the associated DG made inoperable by LOP DO Two channels of Degraded start instrumentation.

Voltage Function inoperable in one or more buses.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY


NOTE ---- --- _-

Verification of setpoint not required 31 days SR 3.3.5.1 Perform TADOT.

SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows:

a. Undervoltage (480 V bus) Relay Allowable 24 months Value Ž:200 V.
b. Degraded Voltage (480 V bus) Relay (Non-Si) 18 months Allowable Value Ž:414 V with a time delay

<z45 seconds.

c. Degraded Voltage (480 V bus) Relay 18 months (Coincident SI) Allowable Value Ž!414 V with a time delay
  • 10 seconds.

INDIAN POINT 3 3.3.5-2 INDIN 23 1 PONT3.35-2Amendment