{{#Wiki_filter:Page I of I Perry Buckberg -WP copy of RAI letter From: Perry Buckberg To: Doug Ellis Date: 11/17/2006 10:50 AM  
{{#Wiki_filter:Page I of I Perry Buckberg - WP copy of RAI letter From:       Perry Buckberg To:         Doug Ellis Date:       11/17/2006 10:50 AM


==Subject:==
==Subject:==
WP copy of RAI letter CC: Kent Howard Doug, Please see the attached.Perry file://C:\temp\GW  
WP copy of RAI letter CC:         Kent Howard Doug, Please see the attached.
}OOOO1.HTM 12/12/2006 L!cA\tým p\GW }00002TM P Pgi 15-ý-g -el -11 Mail Envelope Properties (455DDA31.4D6
Perry file://C:\temp\GW }OOOO1.HTM           12/12/2006
: 9: 8248)
 
L!cA\tým p\GW }00002TM P                                                                                   Pgi 15-ý-g-el -11 Mail Envelope Properties     (455DDA31.4D6 : 9: 8248)


==Subject:==
==Subject:==
Creation Date From: Created By: WP copy of RAI letter 11/17/2006 10:50:09 AM Perry Buckberg PHIB 1 @nrc.gov Recipients entergy.com AM dellisl (Doug Ellis)Action Transferred Date & Time 11/17/2006 10:50:47 nrc.gov OWGWPOO4.HQGWDOOI AM KLHI CC (Kent Howard)Delivered 11/17/2006 10:50:15 Post Office Delivered Route OWGWPOO4.HQGWDO01 Files Size MESSAGE 473 TEXT.htm 326 RAI 10_23 B.I.16.1 Transmittal letter.wpd PM entergy.com 11/17/2006 10:50:15 AM nrc.gov Date & Time 11/17/2006 10:50:09 AM 31215 11/2/2006 1:20:54 Options " Auto Delete:.Expiration Date: Notify Recipients:
WP copy of RAI letter Creation Date          11/17/2006 10:50:09 AM From:                  Perry Buckberg Created By:            PHIB 1@nrc.gov Recipients                                       Action              Date & Time entergy.com                                     Transferred         11/17/2006 10:50:47 AM dellisl (Doug Ellis) nrc.gov OWGWPOO4.HQGWDOOI                             Delivered           11/17/2006 10:50:15 AM KLHI CC (Kent Howard)
Priority: ReplyRequested:
Post Office                                     Delivered           Route entergy.com OWGWPOO4.HQGWDO01                               11/17/2006 10:50:15 AM     nrc.gov Files                            Size            Date & Time MESSAGE                        473              11/17/2006 10:50:09 AM TEXT.htm                        326 RAI 10_23 B.I.16.1 Transmittal letter.wpd        31215               11/2/2006 1:20:54 PM Options "
Return Notification:
Auto Delete:                   No
Concealed  
                .Expiration Date:               None Notify Recipients:             Yes Priority:                       Standard ReplyRequested:                 No Return Notification:           None Concealed  


==Subject:==
==Subject:==
Security: To Be Delivered:
No Security:                       Standard To Be Delivered:               Immediate Status Tracking:               Delivered
Status Tracking: No None Yes Standard No None No Standard Immediate Delivered Mr. Michael Kansler President Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601-1839
 
Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1839


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669),  
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669),


==Dear Mr. Kansler:==
==Dear Mr. Kansler:==
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an application pursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review. Specifically, the enclosed request for additional information is from the recent NRC Region I Inspection team observations related to the containment inservice inspection (CII) program.This issue was discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1383 or via e-mail phb1 @nrc.gov.Sincerely, Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293  
 
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an application pursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review. Specifically, the enclosed request for additional information is from the recent NRC Region I Inspection team observations related to the containment inservice inspection (CII) program.
This issue was discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1383 or via e-mail phb1 @nrc.gov.
Sincerely, Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293


==Enclosure:==
==Enclosure:==


As Stated cc w/encl: See next page Mr. Michael Kansler President Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601-1839
As Stated cc w/encl: See next page
 
C:\temp\RAI 10_23 B.1.16.1 Transmittal letter.wpd OFFICE      PM:RLRA:DLR          PM:RLRC:DLR        LA:DLR        OGC          BC:REBB:DLR NAME        PBuckberg            JDavis                          Uttal        LLund DATE        10/  /06            10/ /06            10/ /06      10/    /06  10/  /06
 
Letter to Michael Kansler from Perry Buckberg dated: October xx, 2006


==SUBJECT:==
==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)
HARD COPY DLR R/F E-MAIL:
RWeisman GGalletti DShum SSmith (srs3)
SDuraiswamy RidsNrrDIr RidsNrrDIrRIra RidsNrrDIrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam.
SHoffman SUttal SJShea AWilliamson JDavis KChang GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1


==Dear Mr. Kansler:==
Pilgrim Nuclear Power Station cc:
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an application pursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review. Specifically, the enclosed request for additional information is from the recent NRC Region I Inspection team 6bservations related to the containment inservice inspection (CII) program.This issue was discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1383 or via e-mail phbl @nrc.gov.Sincerely, Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Regional Administrator, Region I    Secretary of Public Safety U. S. Nuclear Regulatory Commission  Executive Office of Public Safety 475 Allendale Road                  One Ashburton Place King of Prussia, PA 19406-1415      Boston, MA 02108 Senior Resident Inspector            Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission   Management Agency Pilgrim Nuclear Power Station        Attn: James Muckerheide Post Office Box 867                  400 Worcester Road Plymouth, MA 02360                  Framingham, MA 01702-5399 Chairman, Board of Selectmen        Mr. William D. Meinert 11 Lincoln Street                    Nuclear Engineer Plymouth, MA 02360                  Massachusetts Municipal Wholesale Electric Company Chairman                            P.O. Box 426 Nuclear Matters Committee            Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street                    Mr. Michael A. Balduzzi Plymouth, MA 02360                  Site Vice President Entergy Nuclear Operations, Inc.
 
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall                            600 Rocky Hill Road 878 Tremont Street                  Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner          Director, Nuclear Safety Assurance Massachusetts Department of         Entergy Nuclear Operations, Inc.- :- "
==Enclosure:==
Environmental Protection            Pilgrim Nuclear Power Station          1 -7 One Winter Street                    600 Rocky Hill Road Boston, MA 02108                    Plymouth, MA 02360-5508 Office of the Attorney General      Mr. Bryan S. Ford One Ashburton Place                  Manager, Licensing 20th Floor                          Entergy Nuclear Operations, Inc.
Boston, MA 02108                    Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health      Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1 M2A        Mr. Gary J. Taylor 529 Main Street                      Chief Executive Officer Charlestown, MA 02129                Entergy Operations 1340 Echelon Parkway Jackson, MS 39213


As Stated cc w/encl: See next page ADAMS Accession No.: C:\temp\RAI 10_23 B.1.16.1 Transmittal letter.wpd OFFICE PM:RLRA:DLR PM:RLRC:DLR LA:DLR OGC BC:REBB:DLR NAME PBuckberg JDavis Uttal LLund DATE 10/ /06 10/ /06 10/ /06 10/ /06 10/ /06 OFFICIAL RECORD COPY Letter to Michael Kansler from Perry Buckberg dated: October xx, 2006
Pilgrim Nuclear Power Station      cc:
Mr. John T. Herron                    Ms. Stacey Lousteau Sr. VP and Chief Operating Officer    Treasury Department Entergy Nuclear Operations, Inc.      Entergy Services, Inc.
440 Hamilton Avenue                    639 Loyola Avenue White Plains, NY 10601                New Orleans, LA 70113 Mr. Oscar Limpias                      Mr. James Sniezek Vice President, Engineering            5486 Nithsdale Drive Entergy Nuclear Operations, Inc.      Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601                Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz                Entergy Nuclear Operations, Inc.
Vice President, Operations Support    440 Hamilton Avenue Entergy Nuclear Operations, Inc.      White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601                Mr. James Ross Nuclear Energy Institute Mr. John F. McCann                    1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance    Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                    Plymouth Public Library White Plains, NY 10601                Attn: Dinah O'Brien 132 South Street Ms. Charlene D. Faison                Plymouth, MA 02360 Manager, Licensing Ehtergy,:Nuclear Operations, Inc.      Duxbury:Free; Library
.440.Hamilton Avenue                    ATTN:,Ms..Elaine Winquist WhitePlains, NY 10601                  77 AldenStreet Duxbury, MA .02332 Mr. Michael D. Lyster 5931 Barclay Lane                      Kingston Public Library Naples, FL 34110-7306                  ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb                  Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc.      Ms. Mary Lampert 440 Hamilton Avenue                    Duxbury Nuclear Advisory, Chair White Plains, NY 10601                Pilgrim Watch, Director 148 Washington Street Mr. Kevin H. Bronson                  Duxbury, MA 02332 General Manager, Plant Operations Entergy Nuclear Operations, Inc.      Mr. Garrett D. Edwards Pilgrim Nuclear Power Station          814 Waverly Road 600 Rocky Hill Road                    Kennett Square, PA 19348 Plymouth, MA 02360-5508


==SUBJECT:==
REQUEST FOR ADDITIONAL INFORMATION (RAI)
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)HARD COPY DLR R/F E-MAIL: RWeisman GGalletti DShum SSmith (srs3)SDuraiswamy RidsNrrDIr RidsNrrDIrRIra RidsNrrDIrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam.
PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTION B.1.1 6.1 CONTAINMENT INSERVICE INSPECTION B.1.16.1 Containment Inservice Inspection (CII)
SHoffman SUttal SJShea AWilliamson JDavis KChang GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc: Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.- :- " Pilgrim Nuclear Power Station 1 -7 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station-2-cc: Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Ehtergy,:Nuclear Operations, Inc..440.Hamilton Avenue WhitePlains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Plymouth Public Library Attn: Dinah O'Brien 132 South Street Plymouth, MA 02360 Duxbury:Free; Library ATTN:,Ms..Elaine Winquist 77 AldenStreet Duxbury, MA .02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364 Ms. Mary Lampert Duxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348 REQUEST FOR ADDITIONAL INFORMATION (RAI)PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTION B.1.1 6.1 CONTAINMENT INSERVICE INSPECTION B.1.16.1 Containment Inservice Inspection (CII)RAI B.1.16.1 1 In the Pilgrim Nuclear Power Station (PNPS) aging management program B.1.16.1 of the license renewal application (LRA), the applicant stated: "CII inspections during RFO 15 (April 2005) did not reveal evidence of loss of material.
RAI B.1.16.1 1       In the Pilgrim Nuclear Power Station (PNPS) aging management program B.1.16.1 of the license renewal application (LRA), the applicant stated: "CII inspections during RFO 15 (April 2005) did not reveal evidence of loss of material. Absence of degradation provides evidence that the program is effective for managing the aging effect." In addition, in the LRA, Amendment 2 (ML061710422) under, "Ongoing Actions to Prevent Drywell Corrosion", PNPS stated, "Functional checks are performed each refueling outage on the flow switch associated with the bellows seal leakage monitoring system."
Absence of degradation provides evidence that the program is effective for managing the aging effect." In addition, in the LRA, Amendment 2 (ML061710422) under, "Ongoing Actions to Prevent Drywell Corrosion", PNPS stated, "Functional checks are performed each refueling outage on the flow switch associated with the bellows seal leakage monitoring system." However, the recent NRC Region I inspection team bbservations indicated that: a. The flow switch in the bellows rupture drain had failed its surveillance in December 2005, and has not been fixed or evaluated.
However, the recent NRC Region I inspection team bbservations indicated that:
In addition, the flow switch also had been failed in 1999.b. Monitoring of other drains has been inconclusive and not well documented.
: a.     The flow switch in the bellows rupture drain had failed its surveillance in December 2005, and has not been fixed or evaluated. In addition, the flow switch also had been failed in 1999.
: c. The torus room floor has had water on the floor on multiple occasions.
: b.       Monitoring of other drains has been inconclusive and not well documented.
Please provide a detailed discussion, including record, corrective actions taken, and<*','-..preventive action in response to this plant specific operating experienGe and discuss .its&impadt: 'on the aging management of potential loss of material due to corrosion in the>'..-,;
: c.     The torus room floor has had water on the floor on multiple occasions.
inaccessible area of the Mark I steel containment drywell shell; including the sand-pocket region for the periOd of'.extended operation.  
Please provide a detailed discussion, including record, corrective actions taken, and<*','-.
.- , ENCLOSURE}}
      .preventive action in response to this plant specific operating experienGe and discuss .its&
impadt: 'on the aging management of potential loss of material due to corrosion in the>'..-,;
inaccessible area of the Mark I steel containment drywell shell; including the sand
      -pocket region for the periOd of'.extended operation.     .-   ,
ENCLOSURE}}

Revision as of 11:19, 23 November 2019

2006/11/17-E-MAIL: (PD) Wp Copy of RAI Letter
ML063480328
Person / Time
Site: Pilgrim
Issue date: 11/17/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Ellis D
Entergy Corp
References
%dam200612, TAC 3698
Download: ML063480328 (8)


Text

Page I of I Perry Buckberg - WP copy of RAI letter From: Perry Buckberg To: Doug Ellis Date: 11/17/2006 10:50 AM

Subject:

WP copy of RAI letter CC: Kent Howard Doug, Please see the attached.

Perry file://C:\temp\GW }OOOO1.HTM 12/12/2006

L!cA\tým p\GW }00002TM P Pgi 15-ý-g-el -11 Mail Envelope Properties (455DDA31.4D6 : 9: 8248)

Subject:

WP copy of RAI letter Creation Date 11/17/2006 10:50:09 AM From: Perry Buckberg Created By: PHIB 1@nrc.gov Recipients Action Date & Time entergy.com Transferred 11/17/2006 10:50:47 AM dellisl (Doug Ellis) nrc.gov OWGWPOO4.HQGWDOOI Delivered 11/17/2006 10:50:15 AM KLHI CC (Kent Howard)

Post Office Delivered Route entergy.com OWGWPOO4.HQGWDO01 11/17/2006 10:50:15 AM nrc.gov Files Size Date & Time MESSAGE 473 11/17/2006 10:50:09 AM TEXT.htm 326 RAI 10_23 B.I.16.1 Transmittal letter.wpd 31215 11/2/2006 1:20:54 PM Options "

Auto Delete: No

.Expiration Date: None Notify Recipients: Yes Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered

Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669),

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an application pursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, an area where additional information is needed to complete the review. Specifically, the enclosed request for additional information is from the recent NRC Region I Inspection team observations related to the containment inservice inspection (CII) program.

This issue was discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1383 or via e-mail phb1 @nrc.gov.

Sincerely, Perry Buckberg, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As Stated cc w/encl: See next page

C:\temp\RAI 10_23 B.1.16.1 Transmittal letter.wpd OFFICE PM:RLRA:DLR PM:RLRC:DLR LA:DLR OGC BC:REBB:DLR NAME PBuckberg JDavis Uttal LLund DATE 10/ /06 10/ /06 10/ /06 10/ /06 10/ /06

Letter to Michael Kansler from Perry Buckberg dated: October xx, 2006

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

HARD COPY DLR R/F E-MAIL:

RWeisman GGalletti DShum SSmith (srs3)

SDuraiswamy RidsNrrDIr RidsNrrDIrRIra RidsNrrDIrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam.

SHoffman SUttal SJShea AWilliamson JDavis KChang GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Michael A. Balduzzi Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations, Inc.- :- "

Environmental Protection Pilgrim Nuclear Power Station 1 -7 One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Bryan S. Ford One Ashburton Place Manager, Licensing 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1 M2A Mr. Gary J. Taylor 529 Main Street Chief Executive Officer Charlestown, MA 02129 Entergy Operations 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Ms. Stacey Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.

440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. James Sniezek Vice President, Engineering 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.

Vice President, Operations Support 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann 1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Plymouth Public Library White Plains, NY 10601 Attn: Dinah O'Brien 132 South Street Ms. Charlene D. Faison Plymouth, MA 02360 Manager, Licensing Ehtergy,:Nuclear Operations, Inc. Duxbury:Free; Library

.440.Hamilton Avenue ATTN:,Ms..Elaine Winquist WhitePlains, NY 10601 77 AldenStreet Duxbury, MA .02332 Mr. Michael D. Lyster 5931 Barclay Lane Kingston Public Library Naples, FL 34110-7306 ATTN: Reference Librarian 6 Green Street Mr. Michael J. Colomb Kingston, MA 02364 Director of Oversight Entergy Nuclear Operations, Inc. Ms. Mary Lampert 440 Hamilton Avenue Duxbury Nuclear Advisory, Chair White Plains, NY 10601 Pilgrim Watch, Director 148 Washington Street Mr. Kevin H. Bronson Duxbury, MA 02332 General Manager, Plant Operations Entergy Nuclear Operations, Inc. Mr. Garrett D. Edwards Pilgrim Nuclear Power Station 814 Waverly Road 600 Rocky Hill Road Kennett Square, PA 19348 Plymouth, MA 02360-5508

REQUEST FOR ADDITIONAL INFORMATION (RAI)

PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTION B.1.1 6.1 CONTAINMENT INSERVICE INSPECTION B.1.16.1 Containment Inservice Inspection (CII)

RAI B.1.16.1 1 In the Pilgrim Nuclear Power Station (PNPS) aging management program B.1.16.1 of the license renewal application (LRA), the applicant stated: "CII inspections during RFO 15 (April 2005) did not reveal evidence of loss of material. Absence of degradation provides evidence that the program is effective for managing the aging effect." In addition, in the LRA, Amendment 2 (ML061710422) under, "Ongoing Actions to Prevent Drywell Corrosion", PNPS stated, "Functional checks are performed each refueling outage on the flow switch associated with the bellows seal leakage monitoring system."

However, the recent NRC Region I inspection team bbservations indicated that:

a. The flow switch in the bellows rupture drain had failed its surveillance in December 2005, and has not been fixed or evaluated. In addition, the flow switch also had been failed in 1999.
b. Monitoring of other drains has been inconclusive and not well documented.
c. The torus room floor has had water on the floor on multiple occasions.

Please provide a detailed discussion, including record, corrective actions taken, and<*','-.

.preventive action in response to this plant specific operating experienGe and discuss .its&

impadt: 'on the aging management of potential loss of material due to corrosion in the>'..-,;

inaccessible area of the Mark I steel containment drywell shell; including the sand

-pocket region for the periOd of'.extended operation. .- ,

ENCLOSURE