ML070100101: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Fage I ot I Perry Buckberg -Conference Call -12/12/2006  
{{#Wiki_filter:Fage I ot I Perry Buckberg         - Conference Call       - 12/12/2006 @12:30 From:       Perry Buckberg To:         Doug Ellis; Ganesh Cheruvenki; James Davis; James Medoff; Naeem TQBAL; Susan Lane Date:       12/6/2006 1:45:29 PM
@12:30 From: Perry Buckberg To: Doug Ellis; Ganesh Cheruvenki; James Davis; James Medoff; Naeem TQBAL; Susan Lane Date: 12/6/2006 1:45:29 PM  


==Subject:==
==Subject:==
Conference Call -12/12/2006  
Conference Call - 12/12/2006 @12:30 CC:         Jai Rajan; Rajender Auluck; Rodrigo De La Garza Folks, Please support a Pilgrim Conference call on Tuesday, December 12, 2006 between 12:30 and 1:30 to discuss the subjects below.
@12:30 CC: Jai Rajan; Rajender Auluck; Rodrigo De La Garza Folks, Please support a Pilgrim Conference call on Tuesday, December 12, 2006 between 12:30 and 1:30 to discuss the subjects below.Phone access: (800)638-8081 or (301)231-5539  
Phone access: (800)638-8081 or (301)231-5539             - when prompted enter pass code 0550 and then press Location at the NRC is Room T-08C1.
-when prompted enter pass code 0550 and then press Location at the NRC is Room T-08C1.Primary subjects, in brief, are: 1) RAT 2.3.3.9-8  
Primary subjects, in brief, are:
-Appendix A to BTP APCSB 9.5-1 (related 3/9/1977 letter)2) RAI 2.4.3-1 -Trash rack and traveling screen monitoring.
: 1) RAT 2.3.3.9-8   - Appendix A to BTP APCSB 9.5-1 (related 3/9/1977 letter)
: 3) RAI 2.4.3-1 -Justification of jib crane being out of scope of LR.3) RAI 2.4.5-1 -Transmission Towers LRA Table 2.4-1 or Table 2.4-5.5) BWRVIP 94 commitment.
: 2) RAI 2.4.3-1   - Trash rack and traveling screen monitoring.
: 3) RAI 2.4.3-1   - Justification of jib crane being out of scope of LR.
: 3) RAI 2.4.5-1   - Transmission Towers LRA Table 2.4-1 or Table 2.4-5.
: 5) BWRVIP 94 commitment.
: 6) BWRVIP 76 commitment.
: 6) BWRVIP 76 commitment.
: 7) The core shroud tie rod repair upper bracket is made of Alloy X750. SIL from GE addressed issues with this component at Pilgrim. Please address Pilgrims plans to inspect, replace or repair this component.
: 7) The core shroud tie rod repair upper bracket is made of Alloy X750. SIL from GE addressed issues with this component at Pilgrim. Please address Pilgrims plans to inspect, replace or repair this component.
: 8) Validity of using one-time inspections to manage reduction of fracture toughness in Class I components made from cast austenitic stain steels (CASS)Thanks, Perry Buckberg Project Manager -Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb 1 ©irgov file :/C:\temp\GW  
: 8) Validity of using one-time inspections to manage reduction of fracture toughness in Class I components made from cast austenitic stain steels (CASS)
}00001 .HTM 1/920 12/29/2006  
Thanks, Perry Buckberg Project Manager - Division of License Renewal phone: (301)415-1383 fax:     (301)415-3031 phb 1©*irgov file :/C:\temp\GW }00001 .HTM                                                                         12/29/2006 1/920
~c:\temnp\GW}OOOO1 TMP.F Mail Envelope Properties (45770FC9.218
 
:9: 8248)
~c:\temnp\GW}OOOO1 TMP                                                                                     .F Mail Envelope Properties       (45770FC9.218 :9: 8248)


==Subject:==
==Subject:==
Creation Date From: Created By: Conference Call -12/12/2006  
Conference Call - 12/12/2006 @12:30 Creation Date            112/6/2006 1:45:29 PM From:                    Perry Buckberg Created By:              PHB 1@nrc.gov Recipients                                         Action                Date & Time entergy.com                                         Transferred           12/6/2006 1:46:07 PM dellisi (Doug Ellis) nrc.gov OWGWPOOI1.HQGWDOO 1                               Delivered            12/6/2006 1:45:29 PM RCA CC (Rajender Auluck) nrc.gov OWGWPOO2.HQGWDOO 1                               ýDelivered            12/6/2006 1:45:37 PM NXI (Naeem IQBAL) nrc.gov
@ 12:30 112/6/2006 1:45:29 PM Perry Buckberg PHB 1 @nrc.gov Recipients entergy.com PM dellisi (Doug Ellis)Action Transferred Date & Time 12/6/2006 1:46:07 nrc.gov OWGWPOOI1.HQGWDOO 1 PM RCA CC (Rajender Auluck)nrc.gov OWGWPOO2.HQGWDOO 1 PM NXI (Naeem IQBAL)nrc.gov ,,WGWPOO3.HQGWDOOI PM:ýýGSC -(Ganesh Cheruvenki)
                ,,WGWPOO3.HQGWDOOI                                 Delivered            12/6/2006 1:45:39 PM
JAD (James Davis)RXD3 CC (Rodrigo De La Garza)nrc.gov TWGWPO 1 .HQGWDOO 1 PM JXM (James Medoff)SNLI (Susan Lane)Delivered 12/6/2006 1:45:29ýDelivered 12/6/2006 1:45:37 Delivered 12/6/2006 1:45:39 Delivered 12/6/2006 1:45:37 nrc.gov TWGWPOO3 .HQGWDO001 PM JRR CC (Jai Rajan)Delivered 12/6/2006 1:45:37 Post Office Delivered Route entergy.com Inrc.gov OWGWPOOI .HQGWDOO1126061:59RN 12/6/2006 1:45:29 PTV c:\temp\GW}OOOO1 TMP 4 Pg e2 OWGWPO02.HQGWDO0 1 OWGWPO03 .HQG WDO0 1 TWGWPOO 1.HQGWDOO 1 TWGWPOO3 .HQGWDOOI1 12/6/2006 1:45:37 PM 12/6/2006 1:45:39 PM 12/6/2006 1:45:37,PM 12/6/2006 1:45:37 PM Date & Time 12/6/2006 1:45:29 PM nrc .gov nrc.gov nrc.gov nrc.gov Files MES SAGE TEXT..htm Options Auto Delete: Expiration Date: Notify Recipients:
:ýýGSC -(Ganesh Cheruvenki)
Priority: Rep lyRequested:
JAD (James Davis)
Return Notification:
RXD3 CC (Rodrigo De La Garza) nrc.gov TWGWPO 1.HQGWDOO 1                               Delivered            12/6/2006 1:45:37 PM JXM (James Medoff)
Concealed  
SNLI (Susan Lane) nrc.gov TWGWPOO3 .HQGWDO001                              Delivered             12/6/2006 1:45:37 PM JRR CC (Jai Rajan)
Post Office                                         Delivered           Route entergy.com OWGWPOOI .HQGWDOO1126061:59RN                     12/6/2006 1:45:29 PTV     Inrc.gov
 
c:\temp\GW}OOOO1 TMP                                                       Pg e2 4
OWGWPO02.HQGWDO0 1             12/6/2006 1:45:37 PM nrc .gov OWGWPO03 .HQG WDO0 1          12/6/2006 1:45:39 PM nrc.gov TWGWPOO 1.HQGWDOO 1            12/6/2006 1:45:37,PM nrc.gov TWGWPOO3 .HQGWDOOI1            12/6/2006 1:45:37 PM nrc.gov Files                Size      Date & Time MES SAGE            2812      12/6/2006 1:45:29 PM TEXT..htm           2145 Options Auto Delete:         No Expiration Date:     None Notify Recipients:   Yes Priority:           Standard Rep lyRequested:     No Return Notification: None Concealed  


==Subject:==
==Subject:==
Security: To Be Delivered:
No Security:           Standard To Be Delivered:     Immediate Status Tracking:     Delivered}}
Status Tracking: Size 2812 2145 No None Yes Standard No None No Standard Immediate Delivered}}

Revision as of 10:45, 23 November 2019

2006/12/06-E-mail: (PD) Conference Call - 12/02/06
ML070100101
Person / Time
Site: Pilgrim
Issue date: 12/06/2006
From: Perry Buckberg
NRC/NRR/ADRO/DLR
To: Ganesh Cheruvenki, Jennifer Davis, Ellis D, Naeem Iqbal, Lane S, James Medoff
Office of Nuclear Reactor Regulation
References
%dam200701, TAC 3698
Download: ML070100101 (3)


Text

Fage I ot I Perry Buckberg - Conference Call - 12/12/2006 @12:30 From: Perry Buckberg To: Doug Ellis; Ganesh Cheruvenki; James Davis; James Medoff; Naeem TQBAL; Susan Lane Date: 12/6/2006 1:45:29 PM

Subject:

Conference Call - 12/12/2006 @12:30 CC: Jai Rajan; Rajender Auluck; Rodrigo De La Garza Folks, Please support a Pilgrim Conference call on Tuesday, December 12, 2006 between 12:30 and 1:30 to discuss the subjects below.

Phone access: (800)638-8081 or (301)231-5539 - when prompted enter pass code 0550 and then press Location at the NRC is Room T-08C1.

Primary subjects, in brief, are:

1) RAT 2.3.3.9-8 - Appendix A to BTP APCSB 9.5-1 (related 3/9/1977 letter)
2) RAI 2.4.3-1 - Trash rack and traveling screen monitoring.
3) RAI 2.4.3-1 - Justification of jib crane being out of scope of LR.
3) RAI 2.4.5-1 - Transmission Towers LRA Table 2.4-1 or Table 2.4-5.
5) BWRVIP 94 commitment.
6) BWRVIP 76 commitment.
7) The core shroud tie rod repair upper bracket is made of Alloy X750. SIL from GE addressed issues with this component at Pilgrim. Please address Pilgrims plans to inspect, replace or repair this component.
8) Validity of using one-time inspections to manage reduction of fracture toughness in Class I components made from cast austenitic stain steels (CASS)

Thanks, Perry Buckberg Project Manager - Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb 1©*irgov file :/C:\temp\GW }00001 .HTM 12/29/2006 1/920

~c:\temnp\GW}OOOO1 TMP .F Mail Envelope Properties (45770FC9.218 :9: 8248)

Subject:

Conference Call - 12/12/2006 @12:30 Creation Date 112/6/2006 1:45:29 PM From: Perry Buckberg Created By: PHB 1@nrc.gov Recipients Action Date & Time entergy.com Transferred 12/6/2006 1:46:07 PM dellisi (Doug Ellis) nrc.gov OWGWPOOI1.HQGWDOO 1 Delivered 12/6/2006 1:45:29 PM RCA CC (Rajender Auluck) nrc.gov OWGWPOO2.HQGWDOO 1 ýDelivered 12/6/2006 1:45:37 PM NXI (Naeem IQBAL) nrc.gov

,,WGWPOO3.HQGWDOOI Delivered 12/6/2006 1:45:39 PM

ýýGSC -(Ganesh Cheruvenki)

JAD (James Davis)

RXD3 CC (Rodrigo De La Garza) nrc.gov TWGWPO 1.HQGWDOO 1 Delivered 12/6/2006 1:45:37 PM JXM (James Medoff)

SNLI (Susan Lane) nrc.gov TWGWPOO3 .HQGWDO001 Delivered 12/6/2006 1:45:37 PM JRR CC (Jai Rajan)

Post Office Delivered Route entergy.com OWGWPOOI .HQGWDOO1126061:59RN 12/6/2006 1:45:29 PTV Inrc.gov

c:\temp\GW}OOOO1 TMP Pg e2 4

OWGWPO02.HQGWDO0 1 12/6/2006 1:45:37 PM nrc .gov OWGWPO03 .HQG WDO0 1 12/6/2006 1:45:39 PM nrc.gov TWGWPOO 1.HQGWDOO 1 12/6/2006 1:45:37,PM nrc.gov TWGWPOO3 .HQGWDOOI1 12/6/2006 1:45:37 PM nrc.gov Files Size Date & Time MES SAGE 2812 12/6/2006 1:45:29 PM TEXT..htm 2145 Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Rep lyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered