{{#Wiki_filter:April 3, 2007MEMORANDUM TO:David Terao, ChiefPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationFROM:Mel B. Fields, Senior Project Manager     /RA/Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
{{#Wiki_filter:April 3, 2007 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   Mel B. Fields, Senior Project Manager /RA/
Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
Line 22: Line 23:


==SUMMARY==
==SUMMARY==
OFMEETING HELD ON MARCH 22, 2007, RE: STEAM GENERATOR BATWING DEGRADATION ISSUEOn March 22, 2007, Entergy Operations, Inc. (Entergy), the licensee for Waterford SteamElectric Station, Unit 3, met with the Nuclear Regulatory Commission (NRC) staff at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Entergy's investigation of the batwing degradation condition, to review analysis supporting safe plant operation, to review the mitigation actions taken, and to discuss Entergy's plans for a mid-cycle outage to inspect the steam generator batwings and their support structures. Based on its assessment of the potential impact of the degraded batwing condition on tube integrity, Entergy concluded that inspections on the secondary side of the steam generators should be sufficient to assure plant safety. Entergy will be prepared to conduct eddy current inspections of the steam generator tubes from the primary side if unexpected conditions are observed on the secondary side of the steam generator. At the meeting, the NRC staff inquired about the criteria for determining when primary side tube inspections would be performed and the capabilities of the visual techniques for inspecting the tubes in the vicinity of the batwings. The staff plans to have additional discussions with the licensee once it has developed strategies for deciding when primary side inspections will be needed.A list of attendees is provided as an enclosure to this memorandum. There were no membersof the public represented at the meeting. The slides used during the meeting by Entergy contained proprietary information that is withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations, Part 2, Section 2.390. A non-proprietary version of the slidesis available in the Agencywide Documents Access and Management System (ADAMS) under Accession Number ML070870675.Docket No. 50-382
OF MEETING HELD ON MARCH 22, 2007, RE: STEAM GENERATOR BATWING DEGRADATION ISSUE On March 22, 2007, Entergy Operations, Inc. (Entergy), the licensee for Waterford Steam Electric Station, Unit 3, met with the Nuclear Regulatory Commission (NRC) staff at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Entergys investigation of the batwing degradation condition, to review analysis supporting safe plant operation, to review the mitigation actions taken, and to discuss Entergys plans for a mid-cycle outage to inspect the steam generator batwings and their support structures. Based on its assessment of the potential impact of the degraded batwing condition on tube integrity, Entergy concluded that inspections on the secondary side of the steam generators should be sufficient to assure plant safety. Entergy will be prepared to conduct eddy current inspections of the steam generator tubes from the primary side if unexpected conditions are observed on the secondary side of the steam generator. At the meeting, the NRC staff inquired about the criteria for determining when primary side tube inspections would be performed and the capabilities of the visual techniques for inspecting the tubes in the vicinity of the batwings. The staff plans to have additional discussions with the licensee once it has developed strategies for deciding when primary side inspections will be needed.
A list of attendees is provided as an enclosure to this memorandum. There were no members of the public represented at the meeting. The slides used during the meeting by Entergy contained proprietary information that is withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations, Part 2, Section 2.390. A non-proprietary version of the slides is available in the Agencywide Documents Access and Management System (ADAMS) under Accession Number ML070870675.
Docket No. 50-382


==Enclosure:==
==Enclosure:==
As stated cc w/encl: See next page
As stated cc w/encl: See next page


Pkg ML070870732, Summary ML070870718 [Mtg Notice ML070530458, Non-Proprietary Slides ML070870675, Proprietary Slides ML070870634]OFFICENRR/LPL4/PMNRR/LPL4/LANRR/LPL4/BCNAMEMFieldsJBurkhardtDTerao DATE4/3/074/3/074/3/07 MARCH 22, 2007MEETING WITH ENTERGY OPERATIONS, INC.WATERFORD STEAM ELECTRIC STATION, UNIT 3STEAM GENERATOR BATWING DEGRADATION ISSUELIST OF ATTENDEESEntergy Operations, Inc.Joe KowalewskiGary Payne Robert Murillo Rex Putnam Jerry Hulman Robert O'Quinn Jerry BurfordWestinghouseJeffrey Hall Bill Cullen Peter Nelson Bill HeilkerU.S. Nuclear Regulatory CommissionMichele EvansKen Karwoski Emmett Murphy Matt Yoder David Terao Jeff Clark Dwight Chamberlain George Gerond Mel Fields
Pkg ML070870732, Summary ML070870718 [Mtg Notice ML070530458, Non-Proprietary Slides ML070870675, Proprietary Slides ML070870634]
OFFICE      NRR/LPL4/PM            NRR/LPL4/LA              NRR/LPL4/BC NAME        MFields                JBurkhardt                DTerao DATE        4/3/07                  4/3/07                    4/3/07


Waterford Steam Electric Station, Unit 3 cc:Mr. Michael E. Henry, State Liaison OfficerDepartment of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313Vice President Operations Support Entergy Operations, Inc.
MARCH 22, 2007 MEETING WITH ENTERGY OPERATIONS, INC.
P. O. Box 31995 Jackson, MS 39286-1995DirectorNuclear Safety Assurance Entergy Operations, Inc.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 STEAM GENERATOR BATWING DEGRADATION ISSUE LIST OF ATTENDEES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751Wise, Carter, Child & CarawayP. O. Box 651 Jackson, MS 39205 General Manager Plant OperationsWaterford 3 SES Entergy Operations, Inc.
Joe Kowalewski Gary Payne Robert Murillo Rex Putnam Jerry Hulman Robert OQuinn Jerry Burford Westinghouse Jeffrey Hall Bill Cullen Peter Nelson Bill Heilker U.S. Nuclear Regulatory Commission Michele Evans Ken Karwoski Emmett Murphy Matt Yoder David Terao Jeff Clark Dwight Chamberlain George Gerond Mel Fields
17265 River Road Killona, LA 70066-0751Licensing ManagerEntergy Operations, Inc.
 
17265 River Road Killona, LA 70066-0751Winston & Strawn 1700 K Street, N.W.
Waterford Steam Electric Station, Unit 3 cc:
Washington, DC 20006-3817Resident Inspector/Waterford NPSP. O. Box 822 Killona, LA 70066-0751Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA  70057Executive Vice President  & Chief Operating Officer Entergy Operations, Inc.
Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality         U.S. Nuclear Regulatory Commission Permits Division                           611 Ryan Plaza Drive, Suite 400 P.O. Box 4313                               Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support           St. Charles Parish Entergy Operations, Inc.                   P. O. Box 302 P. O. Box 31995                             Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director                                    & Chief Operating Officer Nuclear Safety Assurance                   Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS  39286-1995Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA  70825-1697Mr. Joseph E. VenableVice President Operations Entergy Operations, Inc.
Entergy Operations, Inc.                    P. O. Box 31995 17265 River Road                           Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway              Louisiana Public Services Commission P. O. Box 651                               P. O. Box 91154 Jackson, MS 39205                           Baton Rouge, LA 70825-1697 General Manager Plant Operations            Mr. Joseph E. Venable Waterford 3 SES                             Vice President Operations Entergy Operations, Inc.                    Entergy Operations, Inc.
17265 River Road Killona, LA  70066-0751}}
17265 River Road                           17265 River Road Killona, LA 70066-0751                      Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.
Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751}}

Revision as of 07:55, 23 November 2019

03/22/2007 Summary of Meeting with Entergy Operations, Inc. Re Steam Generator Batwing Degradation Issue Entergy'S Investigation of the Batwing Degradation Condition, to Review Analysis Supporting Safe Plant Operation, to Review the Mitigat
ML070870718
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/03/2007
From: Fields M
NRC/NRR/ADRO/DORL/LPLIV
To: Terao D
NRC/NRR/ADRO/DORL/LPLIV
Fields M, NRR/DORL/LP4, 415-3062
Shared Package
ML070870732 List:
References
Download: ML070870718 (5)


Text

April 3, 2007 MEMORANDUM TO: David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Mel B. Fields, Senior Project Manager /RA/

Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

WATERFORD STEAM ELECTRIC STATION, UNIT 3 -

SUMMARY

OF MEETING HELD ON MARCH 22, 2007, RE: STEAM GENERATOR BATWING DEGRADATION ISSUE On March 22, 2007, Entergy Operations, Inc. (Entergy), the licensee for Waterford Steam Electric Station, Unit 3, met with the Nuclear Regulatory Commission (NRC) staff at NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss Entergys investigation of the batwing degradation condition, to review analysis supporting safe plant operation, to review the mitigation actions taken, and to discuss Entergys plans for a mid-cycle outage to inspect the steam generator batwings and their support structures. Based on its assessment of the potential impact of the degraded batwing condition on tube integrity, Entergy concluded that inspections on the secondary side of the steam generators should be sufficient to assure plant safety. Entergy will be prepared to conduct eddy current inspections of the steam generator tubes from the primary side if unexpected conditions are observed on the secondary side of the steam generator. At the meeting, the NRC staff inquired about the criteria for determining when primary side tube inspections would be performed and the capabilities of the visual techniques for inspecting the tubes in the vicinity of the batwings. The staff plans to have additional discussions with the licensee once it has developed strategies for deciding when primary side inspections will be needed.

A list of attendees is provided as an enclosure to this memorandum. There were no members of the public represented at the meeting. The slides used during the meeting by Entergy contained proprietary information that is withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations, Part 2, Section 2.390. A non-proprietary version of the slides is available in the Agencywide Documents Access and Management System (ADAMS) under Accession Number ML070870675.

Docket No. 50-382

Enclosure:

As stated cc w/encl: See next page

Pkg ML070870732, Summary ML070870718 [Mtg Notice ML070530458, Non-Proprietary Slides ML070870675, Proprietary Slides ML070870634]

OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME MFields JBurkhardt DTerao DATE 4/3/07 4/3/07 4/3/07

MARCH 22, 2007 MEETING WITH ENTERGY OPERATIONS, INC.

WATERFORD STEAM ELECTRIC STATION, UNIT 3 STEAM GENERATOR BATWING DEGRADATION ISSUE LIST OF ATTENDEES Entergy Operations, Inc.

Joe Kowalewski Gary Payne Robert Murillo Rex Putnam Jerry Hulman Robert OQuinn Jerry Burford Westinghouse Jeffrey Hall Bill Cullen Peter Nelson Bill Heilker U.S. Nuclear Regulatory Commission Michele Evans Ken Karwoski Emmett Murphy Matt Yoder David Terao Jeff Clark Dwight Chamberlain George Gerond Mel Fields

Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Regional Administrator, Region IV Department of Environmental Quality U.S. Nuclear Regulatory Commission Permits Division 611 Ryan Plaza Drive, Suite 400 P.O. Box 4313 Arlington, TX 76011 Baton Rouge, Louisiana 70821-4313 Parish President Council Vice President Operations Support St. Charles Parish Entergy Operations, Inc. P. O. Box 302 P. O. Box 31995 Hahnville, LA 70057 Jackson, MS 39286-1995 Executive Vice President Director & Chief Operating Officer Nuclear Safety Assurance Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 17265 River Road Jackson, MS 39286-1995 Killona, LA 70066-0751 Chairman Wise, Carter, Child & Caraway Louisiana Public Services Commission P. O. Box 651 P. O. Box 91154 Jackson, MS 39205 Baton Rouge, LA 70825-1697 General Manager Plant Operations Mr. Joseph E. Venable Waterford 3 SES Vice President Operations Entergy Operations, Inc. Entergy Operations, Inc.

17265 River Road 17265 River Road Killona, LA 70066-0751 Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751