{{#Wiki_filter:August 31, 2007Mr. Gene F. St. Pierre, Site Vice Presidentc/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
{{#Wiki_filter:August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1631)
SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==


The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006,response (Agencywide Documents Access and Management System (ADAMS) Accession No.
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No.
ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process. If you have any questions regarding this response, please contact me at (301) 415-2481. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443 cc: See next page August 31, 2007Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874
Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.
If you have any questions regarding this response, please contact me at (301) 415-2481.
Sincerely,
                                              /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page
 
August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1631)
SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)


==Dear Mr. St. Pierre:==
==Dear Mr. St. Pierre:==


The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006,response (Agencywide Documents Access and Management System (ADAMS) Accession No.
The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No.
ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.
Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process. If you have any questions regarding this response, please contact me at (301) 415-2481. Sincerely,/ra/G. Edward Miller, Project ManagerPlant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-443 cc: See next pageDISTRIBUTION
Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.
:PUBLICCJackson, NRRRidsOgcRp LPLI-2 R/FRidsNrrDorlLpl1-2(HChernoff)
If you have any questions regarding this response, please contact me at (301) 415-2481.
RidsNrrPMGMillerRidsNrrLAABaxter RidsAcrsAcnwMailCenterRidsRgn1MailCenter(GMatakas)
Sincerely,
TDinh, NRRSWeerakkody, NRR Accession Number: ML072010149OFFICELPLI-2/PMLPL1-2/LAitLPLI-2/LADRA/AFPB/BCLPLI-2/BCNAMEGEMillerABaxterMO'BrienAKleinHchernoff(JLamb for)DATE8/22/078/22/078/30/078/27/078/31/07OFFICIAL RECORD COPY
                                                      /ra/
G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page DISTRIBUTION:
PUBLIC                                  CJackson, NRR                      RidsOgcRp LPLI-2 R/F                              RidsNrrDorlLpl1-2(HChernoff)
RidsNrrPMGMiller                        RidsNrrLAABaxter RidsAcrsAcnwMailCenter                  RidsRgn1MailCenter(GMatakas)
TDinh, NRR                              SWeerakkody, NRR Accession Number: ML072010149 OFFICE LPLI-2/PM          LPL1-2/LAit      LPLI-2/LA            DRA/AFPB/BC        LPLI-2/BC NAME  GEMiller          ABaxter          MOBrien              AKlein              Hchernoff (JLamb for)
DATE  8/22/07            8/22/07          8/30/07              8/27/07            8/31/07 OFFICIAL RECORD COPY


Seabrook Station, Unit No. 1 cc:
Seabrook Station, Unit No. 1 cc:
Mr. J. A. StallSenior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Peter BrannAssistant Attorney General State House, Station #6 Augusta, ME 04333Resident InspectorU.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874Town of Exeter10 Front Street Exeter, NH 03823Regional Administrator, Region IU.S. Nuclear Regulatory Commission
Mr. J. A. Stall                    John Giarrusso Senior Vice President, Nuclear and Massachusetts Emergency Management Agency Chief Nuclear Officer               400 Worcester Road Florida Power & Light Company       Framingham, MA 01702-5399 P.O. Box 14000 Juno Beach, FL 33408-0420          Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General Mr. Peter Brann                    33 Capitol Street Assistant Attorney General         Concord, NH 03301 State House, Station #6 Augusta, ME 04333                  Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.
Resident Inspector                  New Hampshire Department of Safety U.S. Nuclear Regulatory Commission Bureau of Emergency Management Seabrook Nuclear Power Station     33 Hazen Drive P.O. Box 1149                       Concord, NH 03301 Seabrook, NH 03874 Mr. M. S. Ross, Managing Attorney Town of Exeter                      Florida Power & Light Company 10 Front Street                     P.O. Box 14000 Exeter, NH 03823                    Juno Beach, FL 33408-0420 Regional Administrator, Region I    Mr. Rajiv S. Kundalkar U.S. Nuclear Regulatory Commission Vice President - Nuclear Technical Services 475 Allendale Road                  Florida Power & Light Company King of Prussia, PA 19406          P.O. Box 14000 Juno Beach, FL 33408-0420 Office of the Attorney General One Ashburton Place, 20th Floor    James M. Peschel Boston, MA 02108                    Regulatory Programs Manager FPL Energy Seabrook, LLC Board of Selectmen                  PO Box 300 Town of Amesbury                    Seabrook, NH 03874 Town Hall Amesbury, MA 01913                  Ms. Marjan Mashhadi Senior Attorney Mr. Robert Poole                    Florida Power & Light Company Federal Emergency Management Agency 801 Pennsylvania Ave., NW Suite 220 Region I                            Washington, DC 20004 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019


475 Allendale Road King of Prussia, PA  19406Office of the Attorney GeneralOne Ashburton Place, 20th Floor Boston, MA  02108Board of SelectmenTown of Amesbury Town Hall Amesbury, MA  01913Mr. Robert PooleFederal Emergency Management Agency Region I 99 High Street, 6 th FloorBoston, MA  02110Mr. Tom CrimminsPolestar Applied Technology One First Street, Suite 4 Los Altos, CA  94019John GiarrussoMassachusetts Emergency Management Agency 400 Worcester Road Framingham, MA  01702-5399Ms. Kelly Ayotte, Attorney GeneralMr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH  03301Mr. Christopher M. Pope, DirectorHomeland Security & Emergency Mgmt.
Seabrook Station, Unit No. 1 cc:
New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH  03301Mr. M. S. Ross, Managing AttorneyFlorida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420James M. PeschelRegulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH  03874Ms. Marjan MashhadiSenior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC  20004 Updated 7.16.07 Seabrook Station, Unit No. 1 cc:
Mr. Mark E. Warner                  Mr. Don E. Grissette Vice President, Nuclear Operations, Vice President, Nuclear Training and North Region                       Performance Improvement (Seabrook & Duane Arnold Plants)   Florida Power & Light Company Florida Power & Light Company       P.O. Box 14000 P.O. Box 14000                     Juno Beach, FL 3340 Juno Beach, FL 33408-0420 Mr. Michael W. Kiley Mr. Gene F. St. Pierre              Plant General Manager Site Vice President                 FPL Energy Seabrook, LLC FPL Energy Seabrook, LLC            P.O. Box 300 P.O. Box 300                        Seabrook, NH 03874 Seabrook, NH 03874 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056 Updated 7.16.07}}
Mr. Mark E. WarnerVice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)
Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Gene F. St. PierreSite Vice President FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874Mr. Joseph RoyDirector of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056Mr. Don E. GrissetteVice President, Nuclear Training and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 3340Mr. Michael W. KileyPlant General Manager FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874}}

Revision as of 04:28, 23 November 2019

Closeout of Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations
ML072010149
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/31/2007
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller G, NRR/DORL, 415-2481
References
GL-06-003, TAC MD1631
Download: ML072010149 (4)


Text

August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page

August 31, 2007 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - CLOSEOUT OF GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS (TAC NO. MD1631)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) acknowledges the receipt of your June 9, 2006, response (Agencywide Documents Access and Management System (ADAMS) Accession No.

ML061640269) to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." This letter was supplemented by letter dated July 10, 2007 (ADAMS Accession No. ML071990101) in response to NRC staff questions. Under oath or affirmation, you have submitted documentation that Seabrook Station, Unit No. 1 does not rely on either the Hemyc or MT fire barrier system. You have submitted documentation under oath or affirmation that other 1- or 3-hour fire barriers that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance.

Therefore, the NRC staff finds your June 9, 2006, letter and July 10, 2007, supplement to be responsive to GL 2006-03. The basis for stating that this other fire barrier has been designed and installed in accordance with NRC guidance should be maintained on site and will be subject to inspection during the normal NRC inspection process.

If you have any questions regarding this response, please contact me at (301) 415-2481.

Sincerely,

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: See next page DISTRIBUTION:

PUBLIC CJackson, NRR RidsOgcRp LPLI-2 R/F RidsNrrDorlLpl1-2(HChernoff)

RidsNrrPMGMiller RidsNrrLAABaxter RidsAcrsAcnwMailCenter RidsRgn1MailCenter(GMatakas)

TDinh, NRR SWeerakkody, NRR Accession Number: ML072010149 OFFICE LPLI-2/PM LPL1-2/LAit LPLI-2/LA DRA/AFPB/BC LPLI-2/BC NAME GEMiller ABaxter MOBrien AKlein Hchernoff (JLamb for)

DATE 8/22/07 8/22/07 8/30/07 8/27/07 8/31/07 OFFICIAL RECORD COPY

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall John Giarrusso Senior Vice President, Nuclear and Massachusetts Emergency Management Agency Chief Nuclear Officer 400 Worcester Road Florida Power & Light Company Framingham, MA 01702-5399 P.O. Box 14000 Juno Beach, FL 33408-0420 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General Mr. Peter Brann 33 Capitol Street Assistant Attorney General Concord, NH 03301 State House, Station #6 Augusta, ME 04333 Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.

Resident Inspector New Hampshire Department of Safety U.S. Nuclear Regulatory Commission Bureau of Emergency Management Seabrook Nuclear Power Station 33 Hazen Drive P.O. Box 1149 Concord, NH 03301 Seabrook, NH 03874 Mr. M. S. Ross, Managing Attorney Town of Exeter Florida Power & Light Company 10 Front Street P.O. Box 14000 Exeter, NH 03823 Juno Beach, FL 33408-0420 Regional Administrator, Region I Mr. Rajiv S. Kundalkar U.S. Nuclear Regulatory Commission Vice President - Nuclear Technical Services 475 Allendale Road Florida Power & Light Company King of Prussia, PA 19406 P.O. Box 14000 Juno Beach, FL 33408-0420 Office of the Attorney General One Ashburton Place, 20th Floor James M. Peschel Boston, MA 02108 Regulatory Programs Manager FPL Energy Seabrook, LLC Board of Selectmen PO Box 300 Town of Amesbury Seabrook, NH 03874 Town Hall Amesbury, MA 01913 Ms. Marjan Mashhadi Senior Attorney Mr. Robert Poole Florida Power & Light Company Federal Emergency Management Agency 801 Pennsylvania Ave., NW Suite 220 Region I Washington, DC 20004 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019

Seabrook Station, Unit No. 1 cc:

Mr. Mark E. Warner Mr. Don E. Grissette Vice President, Nuclear Operations, Vice President, Nuclear Training and North Region Performance Improvement (Seabrook & Duane Arnold Plants) Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 3340 Juno Beach, FL 33408-0420 Mr. Michael W. Kiley Mr. Gene F. St. Pierre Plant General Manager Site Vice President FPL Energy Seabrook, LLC FPL Energy Seabrook, LLC P.O. Box 300 P.O. Box 300 Seabrook, NH 03874 Seabrook, NH 03874 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056 Updated 7.16.07