{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS | {{#Wiki_filter:UNITED STATES | ||
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018 SUBJECT: | NUCLEAR REGULATORY COMMISSION | ||
REGION III | |||
2443 WARRENVILLE RD. SUITE 210 | |||
LISLE, ILLINOIS 60532-4352 | |||
February 27, 2018 | |||
EA-18-013 | |||
Mr. Charles Arnone | |||
Vice President, Operations | |||
Entergy Nuclear Operations, Inc. | |||
Palisades Nuclear Plant | |||
27780 Blue Star Memorial Highway | |||
Covert, MI 49043-9530 | |||
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION | |||
OF NRC INSPECTION REPORT 05000255/2017007 | |||
Dear Mr. Arnone: | |||
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), | |||
dated January 29, 2018, that provided a response to our Inspection Report issued on | |||
December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The | |||
letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection | |||
Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency | |||
Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads. | |||
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be | |||
thorough and timely in the review of licensee responses. Accordingly, we will inform you as | |||
soon as we complete our evaluation. | |||
This letter will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Mark Jeffers, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50-255 | |||
License No. DPR-20 | |||
cc: Distribution via LISTSERV | |||
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018 | |||
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION | |||
OF NRC INSPECTION REPORT 05000255/2017007 | |||
DISTRIBUTION: | |||
Jeremy Bowen | |||
RidsNrrPMPalisades Resource | |||
RidsNrrDorlLpl3 | |||
RidsNrrDirsIrib Resource | |||
Steven West | |||
Darrell Roberts | |||
Richard Skokowski | |||
Allan Barker | |||
DRPIII | |||
DRSIII | |||
ADAMS Accession Number ML: 18058B725 | |||
OFFICE RIII RIII RIII RIII | |||
NAME JGilliam:cl RSkosowski MJeffers | |||
DATE 02/26/18 02/26/18 02/27/18 | |||
OFFICIAL RECORD COPY | |||
}} | }} | ||
Revision as of 18:00, 21 October 2019
| ML18058B725 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/27/2018 |
| From: | Jeffers M NRC/RGN-III/DRS/EB2 |
| To: | Arnone C Entergy Nuclear Operations |
| References | |
| EA-18-013 IR 2017007 | |
| Download: ML18058B725 (2) | |
See also: IR 05000255/2017007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, ILLINOIS 60532-4352
February 27, 2018
Mr. Charles Arnone
Vice President, Operations
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION
OF NRC INSPECTION REPORT 05000255/2017007
Dear Mr. Arnone:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated January 29, 2018, that provided a response to our Inspection Report issued on
December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The
letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection
Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency
Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses. Accordingly, we will inform you as
soon as we complete our evaluation.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mark Jeffers, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
cc: Distribution via LISTSERV
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION
OF NRC INSPECTION REPORT 05000255/2017007
DISTRIBUTION:
RidsNrrPMPalisades Resource
RidsNrrDorlLpl3
RidsNrrDirsIrib Resource
DRPIII
DRSIII
ADAMS Accession Number ML: 18058B725
OFFICE RIII RIII RIII RIII
NAME JGilliam:cl RSkosowski MJeffers
DATE 02/26/18 02/26/18 02/27/18
OFFICIAL RECORD COPY