IR 05000277/2007406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ary 24, 2008 | ||
==SUBJECT:== | |||
PEACH BOTTOM ATOMIC POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NOS. 05000277/2007406 AND 05000278/2007406 | |||
==Dear Mr. Pardee:== | ==Dear Mr. Pardee:== | ||
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a | On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 10, 2008, with Mr. James Kovalchick, Acting Site Security Manager. | ||
NAME/TITLE: James M. Trapp, | |||
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY: | |||
Energy Act, Safeguards Information is subject NAME/TITLE: James M. Trapp, Chief to civil and criminal penalties ORGANIZATION: RI/DRS/PSB1 BASIS - DG-SG-1 (300) Physical Protection Program SIGNATURE____/RA/_________ DATE: 1/24/08 Mr. This report documents one finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of human performance because the expectations regarding procedural compliance were not clearly communicated (H.4(b)). | |||
However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) | However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) | ||
consistent with Section VI.A.1 of the NRC enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station.In accordance with 10 CFR 2.390 of the | consistent with Section VI.A.1 of the NRC enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely, | Sincerely, | ||
/RA/James M. Trapp, | /RA/ | ||
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Enclosure: NRC Inspection Report Nos. 05000277/2007406 and 05000278/2007406 w/Attachment: Supplemental Information (CONTAINS (SGI) M | |||
}} | }} | ||
Revision as of 20:14, 14 November 2019
| ML080240415 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/24/2008 |
| From: | James Trapp Plant Support Branch 1 |
| To: | Pardee C Exelon Generation Co |
| References | |
| IR-07-406 | |
| Download: ML080240415 (5) | |
Text
ary 24, 2008
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT NOS. 05000277/2007406 AND 05000278/2007406
Dear Mr. Pardee:
On January 11, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Peach Bottom Atomic Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 10, 2008, with Mr. James Kovalchick, Acting Site Security Manager.
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. DETERMINATION Warning: Violation of section 147 of the Atomic MADE BY:
Energy Act, Safeguards Information is subject NAME/TITLE: James M. Trapp, Chief to civil and criminal penalties ORGANIZATION: RI/DRS/PSB1 BASIS - DG-SG-1 (300) Physical Protection Program SIGNATURE____/RA/_________ DATE: 1/24/08 Mr. This report documents one finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of human performance because the expectations regarding procedural compliance were not clearly communicated (H.4(b)).
However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV)
consistent with Section VI.A.1 of the NRC enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-277, 50-278 License Nos. DPR-44, DPR-56 Enclosure: NRC Inspection Report Nos. 05000277/2007406 and 05000278/2007406 w/Attachment: Supplemental Information (CONTAINS (SGI) M