ML080700362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, Revision 9 Page 1 of 4 ES-401   Record of Rejected K/As             Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection QID #3 009 Small Break LOCA Generic 2.4.21 - Assessing status of safety functions using parameters and logic. The task of using the logic trees and diagnostic charts to assess safety function during the EOPs is part of the SROs function and not the Reactor Operator. The RO will provide the parameters and indications to the SRO to make this assessment; therefore a credible CFR 41 RO tie can not be developed. Generic 2.4.6 - Knowledge of Symptom based EOP mitigation strategies was randomly selected as a replacement from the required section 2.4 generic K&A statements in accordance with ES-401 Attachment 2 Item 1. QID #7 025 Loss of RHR System AA1.20 - HPI switches, indicators, lights and flow meters. This K&A has an asterisk and is not applicable to ANO since the HPI pumps are normally secured during RHR operations; therefore, a credible and operationally valid question can not be developed on this K&A. AA1.12 - RCS Temperature Indication was randomly selected as a replacement from the other AA1 K&A statements under this category with a RO importance rating of > 2.5. QID #14 055 Station Blackout EK1.02 - Natural Circulation Cooling This KA knowledge was already used in QID #11; therefore, an alternate K&A was chosen to prevent over sampling natural circulation criteria knowledge EK1 - Effect of battery discharge rates on capacity was selected as a replacement as it was the only other EK1 K&A statement under this category.
{{#Wiki_filter:ES-401                       Record of Rejected K/As                             Form ES-401-4 Tier /         Randomly Reason for Rejection Group       Selected K/A QID #3                 The task of using the logic trees and diagnostic charts to assess safety function during the EOPs is part of the SROs function and 009 Small Break        not the Reactor Operator. The RO will provide the parameters and LOCA                  indications to the SRO to make this assessment; therefore a Generic 2.4.21 -      credible CFR 41 RO tie can not be developed.
RO Exam Tier 1 Group 1  QID #15 056 Loss of Off-site Power Generic 2.1.1 - Knowledge of conduct of operations requirements.
Assessing status of    Generic 2.4.6 - Knowledge of Symptom based EOP mitigation safety functions      strategies was randomly selected as a replacement from the using parameters and  required section 2.4 generic K&A statements in accordance with logic.                ES-401 Attachment 2 Item 1.
This Generic K&A statement is not applicable to the requirements for this EOP procedure; therefore a credible CFR 41 RO tie can not be developed. Generic 2.1.28 - Knowledge of the purpose and function of major system components and controls was randomly selected as a replacement from the required section 2.1 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.  
QID #7                 This K&A has an asterisk and is not applicable to ANO since the HPI pumps are normally secured during RHR operations; 025 Loss of RHR therefore, a credible and operationally valid question can not be System developed on this K&A.
AA1.20 - HPI AA1.12 - RCS Temperature Indication was randomly selected as a switches, indicators, RO Exam                          replacement from the other AA1 K&A statements under this lights and flow category with a RO importance rating of > 2.5.
Tier 1 meters.
Group 1                        This KA knowledge was already used in QID #11; therefore, an QID #14                alternate K&A was chosen to prevent over sampling natural circulation criteria knowledge 055 Station Blackout EK1 - Effect of battery discharge rates on capacity was selected as EK1.02 - Natural a replacement as it was the only other EK1 K&A statement under Circulation Cooling this category.
This Generic K&A statement is not applicable to the requirements QID #15                for this EOP procedure; therefore a credible CFR 41 RO tie can not 056 Loss of Off-site  be developed.
Power                  Generic 2.1.28 - Knowledge of the purpose and function of major Generic 2.1.1 -        system components and controls was randomly selected as a Knowledge of          replacement from the required section 2.1 generic K&A statements conduct of            in accordance with ES-401 Attachment 2 Item 1.
operations requirements.
NUREG-1021, Revision 9 Page 1 of 4


NUREG-1021, Revision 9 Page 2 of 4 Tier / Group Randomly Selected K/A Reason for Rejection QID #31  005 Residual Heat Removal System K4.08 Line up for "piggy back" mode with HPI. This K&A has an asterisk and is not applicable to ANO since we do not have a "piggy back" mode of RHR with HPI pumps; therefore, a credible and operationally valid question can not be developed on this K&A. K4.07 - System protection logics, including high-pressure interlock, reset controls, and valve interlock, was randomly selected as a replacement from the other K4 K&A statements under this category with a RO importance rating of > 2.5. QID #41 026 Containment Spray A1.05 - Chemical additive tank level and concentration. The Containment Spray Chemical Addition Tank was removed from service at ANO and replace with chemical baskets in the basement of Containment; therefore, a credible and operationally valid question can not be developed on this K&A. A1.06 - Containment spray pump cooling was randomly selected as a replacement from the other A1 K&A statements under this category with a RO importance rating of > 2.5. QID #42 039 Main and Reheat Steam System K3.03 - Loss of MRSS on AFW pump. The Auxiliary Feed Pump (AFW) (non safety) is a motor driven pump and has no interrelated tie with the Main and Reheat Steam System; therefore, a credible and operationally valid question can not be developed on this K&A. K3.05 - RCS was randomly selected as a replacement from the other K3 K&A statements under this category with a RO importance rating of > 2.5.
Tier /         Randomly Reason for Rejection Group       Selected K/A This K&A has an asterisk and is not applicable to ANO since we QID #31 do not have a piggy back mode of RHR with HPI pumps; therefore, a credible and operationally valid question can not be 005 Residual Heat developed on this K&A.
RO Exam Tier 2 Group 1 QID #48 063 DC Electrical Distribution Generic 2.4.43 - Knowledge of emergency communication systems and techniques. It would be difficult to develop a credible exam question with a tie to the DC Electrical Distribution system for this KA since the communication circuits at ANO are normally AC auctioneered powered; therefore, a credible and operationally valid question can not be developed on this K&A. Generic 2.4.31 - Knowledge of annunciators alarms and indications, and use of the response instructions was randomly selected as a replacement from the required section 2.4 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
Removal System K4.07 - System protection logics, including high-pressure K4.08 Line up for  interlock, reset controls, and valve interlock, was randomly piggy back mode  selected as a replacement from the other K4 K&A statements with HPI.          under this category with a RO importance rating of > 2.5.
RO Exam Tier 2 Group 2  
The Containment Spray Chemical Addition Tank was removed QID #41            from service at ANO and replace with chemical baskets in the 026 Containment    basement of Containment; therefore, a credible and operationally Spray              valid question can not be developed on this K&A.
A1.05 - Chemical    A1.06 - Containment spray pump cooling was randomly selected additive tank level as a replacement from the other A1 K&A statements under this and concentration. category with a RO importance rating of > 2.5.
RO Exam The Auxiliary Feed Pump (AFW) (non safety) is a motor driven Tier 2 QID #42 pump and has no interrelated tie with the Main and Reheat Steam Group 1  039 Main and        System; therefore, a credible and operationally valid question can Reheat Steam System not be developed on this K&A.
K3.03 - Loss of    K3.05 - RCS was randomly selected as a replacement from the MRSS on AFW        other K3 K&A statements under this category with a RO pump.              importance rating of > 2.5.
QID #48             It would be difficult to develop a credible exam question with a tie 063 DC Electrical  to the DC Electrical Distribution system for this KA since the Distribution        communication circuits at ANO are normally AC auctioneered powered; therefore, a credible and operationally valid question can Generic 2.4.43 -    not be developed on this K&A.
Knowledge of emergency          Generic 2.4.31 - Knowledge of annunciators alarms and communication      indications, and use of the response instructions was randomly systems and        selected as a replacement from the required section 2.4 generic techniques.        K&A statements in accordance with ES-401 Attachment 2 Item 1.
QID #62            There is no direct tie between the Condensate system and the limitations and conditions for operation in the facility license; RO Exam   056 Condensate      therefore, a credible and operationally valid question can not be Tier 2                       developed on this K&A.
Generic 2.1.10 -
Group 2   Knowledge of        Generic 2.1.27 - Knowledge of system purpose and or function condition and      was randomly selected as a replacement from the required Section limitation in the  2.1 Generic K&A statements in accordance with ES-401 facility license. Attachment 2 Item 1.
NUREG-1021, Revision 9 Page 2 of 4


QID #62 056 Condensate Generic 2.1.10 - Knowledge of condition and limitation in the facility license.  
Tier /        Randomly Reason for Rejection Group        Selected K/A The Containment Purge System was sampled in QIDs 22 and 59, QID #73 therefore, an alternate K&A was chosen to prevent over sampling RO Exam  Generic 2.3.09 -  this system.
Tier 3 Knowledge of the Generic 2.3.10 - Ability to perform procedures to reduce excessive process for levels of radiation and guard against personnel exposure was performing a randomly selected as a replacement from Section 2.3 Generic Containment Purge K&A statements with a RO importance rating of > 2.5.
A Loss of Main Feedwater while shutdown would not be an event QID #77            for the SRO candidate and there is no credible tie between the K&A statement and the Loss of Feedwater EOP. Also the Major 054 Loss of Main  event in one of the scenarios in the operating exam is very similar Feedwater          to this subject category; therefore this subject category was SRO Exam                    rejected.
Generic 2.2.18 -
Tier 1 Knowledge of      Generic 2.2.22 - Knowledge of limiting conditions for operations Group 1  maintenance        and safety limits was randomly selected as a replacement from the activities during  required section 2.2 generic K&A statements in accordance with shutdown          ES-401 Attachment 2 Item 1. The 017 RCP Malfunction (Loss of operations.        RC Flow) was randomly selected as a replacement subject category.
QID #82            This K&A knowledge was sampled on the RO sample plan Tier 3 QID #71 and since the SRO candidates will be taking the RO 024 Emergency section of the exam, there is no justification or operationally valid Boration reason to generate another question on this K&A statement.
Generic 2.3.01 -
Generic 2.4.6 - Knowledge of symptom based EOP mitigation Knowledge of 10 strategies was randomly selected as a replacement from the CFR 20 and related required section 2 generic K&A statements in accordance with ES-facility radiation 401 Attachment 2 Item 1.
control requirements.
QID #84            This K&A knowledge was sampled on the RO sample plan Tier 3 068 Control Room  QID #71 and since the SRO candidates will be taking the RO Evacuation        section of the exam, there is no justification or operationally valid SRO Exam                    reason to generate another question on this K&A statement.
Tier 1 Generic 2.3.01 -
Knowledge of 10    Generic 2.4.4 - Ability to recognize abnormal indications for Group 2                    system operating parameters which are entry-level conditions for CFR 20 and related facility radiation emergency and abnormal operating procedures was randomly control            selected as a replacement from the required section 2 generic K&A requirements.      statements in accordance with ES-401 Attachment 2 Item 1.
This K&A knowledge will be sampled on one of the Admin JPMs QID #88            and a dynamic scenario on the operating Test and thus was rejected 059 Main Feedwater due to over sampling this K&A. Based on discussions with the Lead NRC Examiner, this system was also rejected.
Generic 2.4.30 System 026, Containment Spray and generic K&A 2.4.6, Knowledge of the   Knowledge of symptom Based EOP mitigation strategies, was Emergency Plan    randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
NUREG-1021, Revision 9 Page 3 of 4


There is no direct tie between the Condensate system and the limitations and conditions for operation in the facility license; therefore, a credible and operationally valid question can not be developed on this K&A. Generic 2.1.27 - Knowledge of system purpose and or function was randomly selected as a replacement from the required Section 2.1 Generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
There is no credible 10 CFR 43 SRO tie between this K&A QID #91               statement and the originally selected Station Air System; therefore, 079 Station Air        a credible and operationally valid question can not be developed on System                this K&A statement or any others Station Air K&A statements.
 
SRO Exam                        (most have an importance rating of less than 2.5)
NUREG-1021, Revision 9 Page 3 of 4 Tier / Group Randomly Selected K/A Reason for Rejection RO Exam Tier 3  QID #73 Generic 2.3.09 - Knowledge of the process for performing a Containment Purge The Containment Purge System was sampled in QIDs 22 and 59, therefore, an alternate K&A was chosen to prevent over sampling this system. Generic 2.3.10 - Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure was randomly selected as a replacement from Section 2.3 Generic K&A statements with a RO importance rating of > 2.5. SRO Exam Tier 1 Group 1 QID #77 054 Loss of Main Feedwater Generic 2.2.18 - Knowledge of maintenance activities during shutdown operations. A Loss of Main Feedwater while shutdown would not be an event for the SRO candidate and there is no credible tie between the K&A statement and the Loss of Feedwater EOP. Also the Major event in one of the scenarios in the operating exam is very similar to this subject category; therefore this subject category was rejected. Generic 2.2.22 - Knowledge of limiting conditions for operations and safety limits was randomly selected as a replacement from the required section 2.2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1. The 017 RCP Malfunction (Loss of RC Flow) was randomly selected as a replacement subject category. QID #82 024 Emergency Boration Generic 2.3.01 - Knowledge of 10 CFR 20 and related facility radiation control requirements. This K&A knowledge was sampled on the RO sample plan Tier 3 QID #71 and since the SRO candidates will be taking the RO section of the exam, there is no justification or operationally valid reason to generate another question on this K&A statement. Generic 2.4.6 - Knowledge of symptom based EOP mitigation strategies was randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
Generic 2.4.38 -
QID #84 068 Control Room Evacuation Generic 2.3.01 - Knowledge of 10 CFR 20 and related facility radiation control requirements.
Tier 2 Ability to take action Based on this selection, the Control Rod Drive System was Group 2 in the E-Plan          randomly selected from the Tier 2 Group 2 systems and the procedure acting as    originally selected K&A statement: Ability to take actions called the emergency          for in the facility emergency plan, including (if required) coordinator.          supporting or acting as emergency coordinator was retained for question generation.
This K&A knowledge was sampled on the RO sample plan Tier 3 QID #71 and since the SRO candidates will be taking the RO section of the exam, there is no justification or operationally valid reason to generate another question on this K&A statement. Generic 2.4.4 - Ability to recognize abnormal indications for system operating parameters which are entry-level conditions for emergency and abnormal operating procedures was randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
QID #100               This K&A is also RO knowledge and does not allow an SRO only question to be developed thus this K&A was rejected.
SRO Exam Tier 1 Group 2 QID #88 059 Main Feedwater Generic 2.4.30 Knowledge of the Emergency Plan This K&A knowledge will be sampled on one of the Admin JPMs and a dynamic scenario on the operating Test and thus was rejected due to over sampling this K&A. Based on discussions with the Lead NRC Examiner, this system was also rejected. System 026, Containment Spray and generic K&A 2.4.6, Knowledge of symptom Based EOP mitigation strategies , was randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.
Generic 2.4.34 Knowledge of RO task performed        Generic K&A 2.4.4, Ability to recognize abnormal indications for SRO Exam outside the main      system operating parameters which are entry level conditions for Tier 1 control room during    emergency and abnormal operating procedures, was randomly emergency              selected as a replacement from the required section 2 generic K&A operations including  statements in accordance with ES-401 Attachment 2 Item 1.
NUREG-1021, Revision 9 Page 4 of 4 SRO Exam Tier 2 Group 2 QID #91 079 Station Air System Generic 2.4.38 - Ability to take action in the E-Plan procedure acting as the emergency coordinator. There is no credible 10 CFR 43 SRO tie between this K&A statement and the originally selected Station Air System; therefore, a credible and operationally valid question can not be developed on this K&A statement or any others Station Air K&A statements.
system geography and system implications.
(most have an importance rating of less than 2.5) Based on this selection, the Control Rod Drive System was randomly selected from the Tier 2 Group 2 systems and the originally selected K&A statement:
NUREG-1021, Revision 9 Page 4 of 4}}
Ability to take actions called for in the facility emergency plan, including (if required) supporting or acting as emergency coordinator was retained for question generation
. SRO Exam Tier 1  QID #100 Generic 2.4.34 Knowledge of RO task performed outside the main control room during emergency operations including system geography and system implications.
This K&A is also RO knowledge and does not allow an SRO only question to be developed thus this K&A was rejected.
Generic K&A 2.4.4, Ability to recognize abnormal indications for system operating parameters which are entry level conditions for emergency and abnormal operating procedures, was randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.}}

Revision as of 18:49, 14 November 2019

2008-02-Final Written Exam Rejected KA
ML080700362
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/29/2008
From: Garchow S
Operations Branch IV
To:
Entergy Operations
References
50-313/08-301, 50-368/08-301, ES-401-4 50-313/08-301, 50-368/08-301
Download: ML080700362 (4)


Text

ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected K/A QID #3 The task of using the logic trees and diagnostic charts to assess safety function during the EOPs is part of the SROs function and 009 Small Break not the Reactor Operator. The RO will provide the parameters and LOCA indications to the SRO to make this assessment; therefore a Generic 2.4.21 - credible CFR 41 RO tie can not be developed.

Assessing status of Generic 2.4.6 - Knowledge of Symptom based EOP mitigation safety functions strategies was randomly selected as a replacement from the using parameters and required section 2.4 generic K&A statements in accordance with logic. ES-401 Attachment 2 Item 1.

QID #7 This K&A has an asterisk and is not applicable to ANO since the HPI pumps are normally secured during RHR operations; 025 Loss of RHR therefore, a credible and operationally valid question can not be System developed on this K&A.

AA1.20 - HPI AA1.12 - RCS Temperature Indication was randomly selected as a switches, indicators, RO Exam replacement from the other AA1 K&A statements under this lights and flow category with a RO importance rating of > 2.5.

Tier 1 meters.

Group 1 This KA knowledge was already used in QID #11; therefore, an QID #14 alternate K&A was chosen to prevent over sampling natural circulation criteria knowledge 055 Station Blackout EK1 - Effect of battery discharge rates on capacity was selected as EK1.02 - Natural a replacement as it was the only other EK1 K&A statement under Circulation Cooling this category.

This Generic K&A statement is not applicable to the requirements QID #15 for this EOP procedure; therefore a credible CFR 41 RO tie can not 056 Loss of Off-site be developed.

Power Generic 2.1.28 - Knowledge of the purpose and function of major Generic 2.1.1 - system components and controls was randomly selected as a Knowledge of replacement from the required section 2.1 generic K&A statements conduct of in accordance with ES-401 Attachment 2 Item 1.

operations requirements.

NUREG-1021, Revision 9 Page 1 of 4

Tier / Randomly Reason for Rejection Group Selected K/A This K&A has an asterisk and is not applicable to ANO since we QID #31 do not have a piggy back mode of RHR with HPI pumps; therefore, a credible and operationally valid question can not be 005 Residual Heat developed on this K&A.

Removal System K4.07 - System protection logics, including high-pressure K4.08 Line up for interlock, reset controls, and valve interlock, was randomly piggy back mode selected as a replacement from the other K4 K&A statements with HPI. under this category with a RO importance rating of > 2.5.

The Containment Spray Chemical Addition Tank was removed QID #41 from service at ANO and replace with chemical baskets in the 026 Containment basement of Containment; therefore, a credible and operationally Spray valid question can not be developed on this K&A.

A1.05 - Chemical A1.06 - Containment spray pump cooling was randomly selected additive tank level as a replacement from the other A1 K&A statements under this and concentration. category with a RO importance rating of > 2.5.

RO Exam The Auxiliary Feed Pump (AFW) (non safety) is a motor driven Tier 2 QID #42 pump and has no interrelated tie with the Main and Reheat Steam Group 1 039 Main and System; therefore, a credible and operationally valid question can Reheat Steam System not be developed on this K&A.

K3.03 - Loss of K3.05 - RCS was randomly selected as a replacement from the MRSS on AFW other K3 K&A statements under this category with a RO pump. importance rating of > 2.5.

QID #48 It would be difficult to develop a credible exam question with a tie 063 DC Electrical to the DC Electrical Distribution system for this KA since the Distribution communication circuits at ANO are normally AC auctioneered powered; therefore, a credible and operationally valid question can Generic 2.4.43 - not be developed on this K&A.

Knowledge of emergency Generic 2.4.31 - Knowledge of annunciators alarms and communication indications, and use of the response instructions was randomly systems and selected as a replacement from the required section 2.4 generic techniques. K&A statements in accordance with ES-401 Attachment 2 Item 1.

QID #62 There is no direct tie between the Condensate system and the limitations and conditions for operation in the facility license; RO Exam 056 Condensate therefore, a credible and operationally valid question can not be Tier 2 developed on this K&A.

Generic 2.1.10 -

Group 2 Knowledge of Generic 2.1.27 - Knowledge of system purpose and or function condition and was randomly selected as a replacement from the required Section limitation in the 2.1 Generic K&A statements in accordance with ES-401 facility license. Attachment 2 Item 1.

NUREG-1021, Revision 9 Page 2 of 4

Tier / Randomly Reason for Rejection Group Selected K/A The Containment Purge System was sampled in QIDs 22 and 59, QID #73 therefore, an alternate K&A was chosen to prevent over sampling RO Exam Generic 2.3.09 - this system.

Tier 3 Knowledge of the Generic 2.3.10 - Ability to perform procedures to reduce excessive process for levels of radiation and guard against personnel exposure was performing a randomly selected as a replacement from Section 2.3 Generic Containment Purge K&A statements with a RO importance rating of > 2.5.

A Loss of Main Feedwater while shutdown would not be an event QID #77 for the SRO candidate and there is no credible tie between the K&A statement and the Loss of Feedwater EOP. Also the Major 054 Loss of Main event in one of the scenarios in the operating exam is very similar Feedwater to this subject category; therefore this subject category was SRO Exam rejected.

Generic 2.2.18 -

Tier 1 Knowledge of Generic 2.2.22 - Knowledge of limiting conditions for operations Group 1 maintenance and safety limits was randomly selected as a replacement from the activities during required section 2.2 generic K&A statements in accordance with shutdown ES-401 Attachment 2 Item 1. The 017 RCP Malfunction (Loss of operations. RC Flow) was randomly selected as a replacement subject category.

QID #82 This K&A knowledge was sampled on the RO sample plan Tier 3 QID #71 and since the SRO candidates will be taking the RO 024 Emergency section of the exam, there is no justification or operationally valid Boration reason to generate another question on this K&A statement.

Generic 2.3.01 -

Generic 2.4.6 - Knowledge of symptom based EOP mitigation Knowledge of 10 strategies was randomly selected as a replacement from the CFR 20 and related required section 2 generic K&A statements in accordance with ES-facility radiation 401 Attachment 2 Item 1.

control requirements.

QID #84 This K&A knowledge was sampled on the RO sample plan Tier 3 068 Control Room QID #71 and since the SRO candidates will be taking the RO Evacuation section of the exam, there is no justification or operationally valid SRO Exam reason to generate another question on this K&A statement.

Tier 1 Generic 2.3.01 -

Knowledge of 10 Generic 2.4.4 - Ability to recognize abnormal indications for Group 2 system operating parameters which are entry-level conditions for CFR 20 and related facility radiation emergency and abnormal operating procedures was randomly control selected as a replacement from the required section 2 generic K&A requirements. statements in accordance with ES-401 Attachment 2 Item 1.

This K&A knowledge will be sampled on one of the Admin JPMs QID #88 and a dynamic scenario on the operating Test and thus was rejected 059 Main Feedwater due to over sampling this K&A. Based on discussions with the Lead NRC Examiner, this system was also rejected.

Generic 2.4.30 System 026, Containment Spray and generic K&A 2.4.6, Knowledge of the Knowledge of symptom Based EOP mitigation strategies, was Emergency Plan randomly selected as a replacement from the required section 2 generic K&A statements in accordance with ES-401 Attachment 2 Item 1.

NUREG-1021, Revision 9 Page 3 of 4

There is no credible 10 CFR 43 SRO tie between this K&A QID #91 statement and the originally selected Station Air System; therefore, 079 Station Air a credible and operationally valid question can not be developed on System this K&A statement or any others Station Air K&A statements.

SRO Exam (most have an importance rating of less than 2.5)

Generic 2.4.38 -

Tier 2 Ability to take action Based on this selection, the Control Rod Drive System was Group 2 in the E-Plan randomly selected from the Tier 2 Group 2 systems and the procedure acting as originally selected K&A statement: Ability to take actions called the emergency for in the facility emergency plan, including (if required) coordinator. supporting or acting as emergency coordinator was retained for question generation.

QID #100 This K&A is also RO knowledge and does not allow an SRO only question to be developed thus this K&A was rejected.

Generic 2.4.34 Knowledge of RO task performed Generic K&A 2.4.4, Ability to recognize abnormal indications for SRO Exam outside the main system operating parameters which are entry level conditions for Tier 1 control room during emergency and abnormal operating procedures, was randomly emergency selected as a replacement from the required section 2 generic K&A operations including statements in accordance with ES-401 Attachment 2 Item 1.

system geography and system implications.

NUREG-1021, Revision 9 Page 4 of 4