{{#Wiki_filter:Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Ventilation Filter Testinq Progqram (VFTP) (continued)
{{#Wiki_filter:Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9   Ventilation Filter Testinq Progqram (VFTP) (continued)
ESF Ventilation System Face Velocity (fpm) Penetration
ESF Ventilation System     Face Velocity (fpm) Penetration (%) RH CREV System                           NA                  1            95 ESF Ventilation System               45.5                 5            95 FHAEV System                        46.8                 5           95 In addition, the carbon samples not obtained from test canisters shall be prepared by either:
(%) RH CREV System ESF Ventilation System FHAEV System NA 1 45.5 46.8 5 5 95 95 95 In addition, the carbon samples not obtained from test canisters shall be prepared by either: 1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or 2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below: ESF Ventilation System CREV System ESF Ventilation System FHAEV System Delta P (inches water .qaugqe)Flowrate (cfm)4 4 4_>5,400 and _<6,60022,500 and <27,500_27,000 and _<33,000.Cook Nuclear Plant Unit 1 5.5-9 Amendment No. 287, 2-98, 305 Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Ventilation Filter Testing Program (VFTP) (continued)
: 1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or
ESF Ventilation System Face Velocity (fpm) Penetration
: 2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.
(%) RH (%)CREV System ESF Ventilation System FHAEV System NA 1 45.5 46.8 5 5 95 95 95 In addition, the carbon samples not obtained from test canisters shall be prepared by either: 1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or 2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below: ESF Ventilation System CREV System ESF Ventilation System FHAEV System Delta P (inches water gauge)Flowrate (cfm)4 4 4_>5,400 and _<6,600_22,500 and <27,500->27,000 and <33,000 Cook Nuclear Plant Unit 2 5.5-9 Amendment No. 269, 2-7-9, 288}}
: d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below:
Delta P ESF Ventilation System   (inches water .qaugqe)       Flowrate (cfm)
CREV System                          4             _>5,400 and _<6,600 ESF Ventilation System                4            &#x17d;22,500 and <27,500 FHAEV System                          4            _27,000 and _<33,000
. Cook Nuclear Plant Unit 1                     5.5-9                   Amendment No. 287, 2-98, 305
 
Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9   Ventilation Filter Testing Program (VFTP) (continued)
ESF Ventilation System     Face Velocity (fpm) Penetration (%) RH (%)
CREV System                           NA                    1            95 ESF Ventilation System               45.5                   5            95 FHAEV System                          46.8                   5           95 In addition, the carbon samples not obtained from test canisters shall be prepared by either:
: 1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or
: 2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.
: d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below:
Delta P ESF Ventilation System     (inches water gauge)         Flowrate (cfm)
CREV System                          4             _>5,400 and _<6,600 ESF Ventilation System                4            &#x17d;_22,500 and <27,500 FHAEV System                          4            ->27,000and <33,000 Cook Nuclear Plant Unit 2                     5.5-9                   Amendment No. 269, 2-7-9, 288}}

Revision as of 17:14, 14 November 2019

Tech Spec Pages for Amendments 305 and 288 Regarding Maximum Ventilation System Filter Pressure Drop
ML081230269
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/28/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/DORL, 415-1451
References
TAC MD5931, TAC MD5932
Download: ML081230269 (2)


Text

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Ventilation Filter Testinq Progqram (VFTP) (continued)

ESF Ventilation System Face Velocity (fpm) Penetration (%) RH CREV System NA 1 95 ESF Ventilation System 45.5 5 95 FHAEV System 46.8 5 95 In addition, the carbon samples not obtained from test canisters shall be prepared by either:

1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or
2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.
d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below:

Delta P ESF Ventilation System (inches water .qaugqe) Flowrate (cfm)

CREV System 4 _>5,400 and _<6,600 ESF Ventilation System 4 Ž22,500 and <27,500 FHAEV System 4 _27,000 and _<33,000

. Cook Nuclear Plant Unit 1 5.5-9 Amendment No. 287, 2-98, 305

Programs and Manuals 5.5 5.5 Programs and Manuals 5.5.9 Ventilation Filter Testing Program (VFTP) (continued)

ESF Ventilation System Face Velocity (fpm) Penetration (%) RH (%)

CREV System NA 1 95 ESF Ventilation System 45.5 5 95 FHAEV System 46.8 5 95 In addition, the carbon samples not obtained from test canisters shall be prepared by either:

1. Emptying one entire bed from a removed adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed; or
2. Emptying a longitudinal sample from an adsorber tray, mixing the adsorbent thoroughly, and obtaining samples at least two inches in diameter and with a length equal to the thickness of the bed.
d. Demonstrate for each of the ESF systems that the pressure drop across the combined HEPA filters and the charcoal adsorbers is less than the value specified below when tested at the system flowrate specified below:

Delta P ESF Ventilation System (inches water gauge) Flowrate (cfm)

CREV System 4 _>5,400 and _<6,600 ESF Ventilation System 4 Ž_22,500 and <27,500 FHAEV System 4 ->27,000and <33,000 Cook Nuclear Plant Unit 2 5.5-9 Amendment No. 269, 2-7-9, 288