{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION May 30, 2018 | ||
==SUBJECT:== | |||
NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT NOS. 07200031/2018001 AND 05000029/2018001, YANKEE ATOMIC ELECTRIC COMPANY, ROWE, MASSACHUSETTS SITE | |||
==Dear Mr. Smith:== | ==Dear Mr. Smith:== | ||
On May 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a safety inspection of the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspection examined activities under your license as they relate to safety and compliance with the Commission's regulations and the conditions of your license | On May 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a safety inspection of the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspection examined activities under your license as they relate to safety and compliance with the Commission's regulations and the conditions of your license. | ||
The results of the inspection were discussed with you at the conclusion of the inspection. | The inspection consisted of observations by the inspectors, interviews with personnel, and a review of records and procedures. The results of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection. | ||
The enclosed report presents the results of this inspection. | |||
Within the scope of this inspection, no violations were identified. | Within the scope of this inspection, no violations were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. | ||
To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction | |||
Please contact Orysia Masnyk Bailey at 864-427-1032 if you have any questions regarding this matter. | Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Orysia Masnyk Bailey at 864-427-1032 if you have any questions regarding this matter. | ||
Sincerely, Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Inspection Report Nos. 07200031/2018001 and 05000029/2018001 cc w/Encl: Commonwealth of Massachusetts | Sincerely, | ||
~~~ | |||
Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Dockets Nos.; 07200031, 05000029 License Nos.: SFGL-13, DPR-3 Enclosure: | |||
Inspection Report Nos. 07200031/2018001 and 05000029/2018001 cc w/Encl: Commonwealth of Massachusetts | |||
=SUMMARY= | =EXECUTIVE SUMMARY= | ||
Yankee Atomic Electric Company | Yankee Atomic Electric Company | ||
Report Nos. 07200031/2018001 and 05000029/2018001 An announced safety inspection was conducted on May 2, 2018, at the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Yankee Rowe personnel were operating and maintaining ISFSI programs at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Final Safety Analysis Report (FSAR), Safety Evaluation Report (SER), Certificate of Compliance (CoC), Technical Specifications (TS), Quality Assurance (QA) program, Yankee Rowe procedures, and 10 CFR Part 72. The inspector's review was directed toward confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs. | NRC Inspection Report Nos. 07200031/2018001 and 05000029/2018001 An announced safety inspection was conducted on May 2, 2018, at the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Yankee Rowe personnel were operating and maintaining ISFSI programs at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Final Safety Analysis Report (FSAR), Safety Evaluation Report (SER), | ||
Certificate of Compliance (CoC), Technical Specifications (TS), Quality Assurance (QA)program, Yankee Rowe procedures, and 10 CFR Part 72. The inspector's review was directed toward confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs. The inspector observed activities, interviewed personnel, and reviewed records and procedures. Based on the results of this inspection, no findings of significance were identified. | |||
Inspection Report 07200031/2018001 and 05000029/2018001 | |||
Inspection Report 07200031/2018001 and 05000029/2018001 | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
The inspectors | I. Organization and Radiation Safety Program A. Inspection Scope The inspectors assessed whether Yankee Rowe personnel were operating and maintaining ISFSI programs at an AFR ISFSI in conformance with the commitments and requirements contained in the FSAR, SER, Coe, TS, QA program, Yankee Rowe procedures, and 10 CFR Part 72. | ||
The inspectors | AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors' review was directed towards confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs. | ||
The inspectors also reviewed changes made to Yankee Rowe's programs and procedures since the last inspection to verify that changes were consistent with the license or CoC and did not reduce the effectiveness of the program | The inspectors observed activities, interviewed personnel, and reviewed records and procedures. The inspectors also reviewed changes made to Yankee Rowe's programs and procedures since the last inspection to verify that changes were consistent with the license or CoC and did not reduce the effectiveness of the program. | ||
The inspectors also verified that special nuclear material (SNM) stored at the ISFSI was properly accounted for. Dosimetry records and environmental monitoring reports were reviewed. | B. Observations The inspectors determined that Yankee Rowe's plans and preparations for controlling radiological activities were effective at meeting 1O CFR Part 20 requirements. The inspectors also verified that special nuclear material (SNM) stored at the ISFSI was properly accounted for. Dosimetry records and environmental monitoring reports were reviewed. All employees were below the regulatory dose limits and dose to members of the public at the nearest accessible location to the ISFSI were within limits prescribed by 10 CFR 72.104. | ||
Yankee Rowe's emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies (LLEAs). | |||
All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response (NSIR) | The emergency call list was current and checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response (NSIR). | ||
The inspectors performed a tour of the ISFSI pad and did not note any significant material condition issues that would impact the performance of the pad and loaded VCCs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the VCCs and confirmed vehicle entry onto the ISFSI pad was controlled in accordance with site procedures. | Daily temperature monitoring of the vertical concrete casks (VCCs) was performed by Yankee Rowe personnel in accordance with surveillance requirements in the TS. Yankee Rowe's procedures contain backup plans if the primary surveillance method was unavailable. The inspectors performed a tour of the ISFSI pad and did not note any significant material condition issues that would impact the performance of the pad and loaded VCCs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the VCCs and confirmed vehicle entry onto the ISFSI pad was controlled in accordance with site procedures. | ||
Yankee Rowe has a training program which consists of classroom, and on-the-job training, as well as briefings performed by supervisors. | Yankee Rowe has a training program which consists of classroom, and on-the-job training, as well as briefings performed by supervisors. Refresher training was given on a regular basis and retraining was given as necessary if human performance issues were identified. | ||
All employees have been trained and qualified to perform their assigned ISFSl-related functions. | |||
Inspection Report 07200031/2018001 and 05000029/2018001 The inspectors reviewed the most recent independent audit of the ISFSI program. The inspectors determined that issues were entered into the corrective action program, prioritized, and evaluated commensurate with their safety significance. Corrective actions were implemented to address identified issues and were tracked to closure. The QA program evaluated changes in the ISFSI program to ensure that any changes that were implemented would not decrease the overall effectiveness of the program. The inspectors also reviewed Yankee Rowe's 10 CFR 72.212 evaluation report and ensured it was being appropriately updated. | |||
C. Findings Based on the results of this inspection, no findings of significance were identified. | |||
II. | |||
=====Exit Meeting Summary===== | |||
On May 2, 2018, the inspectors presented the inspection results to Brian Smith, Yankee Rowe Site Manager and other Yankee Rowe personnel. | |||
Inspection Report 07200031/2018001 and 05000029/2018001 | Inspection Report 07200031/2018001 and 05000029/2018001 | ||
=SUPPLEMENTAL | =SUPPLEMENTAL INFORMATION= | ||
INFORMATION= | |||
PARTIAL UST OF PERSONS CONTACTED | PARTIAL UST OF PERSONS CONTACTED | ||
Licensee | Licensee | ||
: [[contact::J. Bourassa]], RPM/QA Representative | : [[contact::J. Bourassa]], RPM/QA Representative | ||
: [[contact::S. Day]], Licensing | : [[contact::S. Day]], Licensing Engineer | ||
Engineer | : [[contact::J. Kenneday]], ISFSI Shift Supervisor | ||
: [[contact::J. Kenneday]], ISFSI Shift Supervisor | : [[contact::K. Kuzontkoski]], G4S Project Manager | ||
: [[contact::K. Kuzontkoski]], G4S Project Manager | : [[contact::C. Lannon]], G4S Assistant Project Manager | ||
: [[contact::C. Lannon]], G4S Assistant | : [[contact::J. Lenois]], Security Program Manager | ||
Project Manager | : [[contact::K. Shea]], ISFSI Technical Specialist | ||
: [[contact::J. Lenois]], Security Program Manager | : [[contact::B. Smith]], Site Manager | ||
: [[contact::K. Shea]], ISFSI Technical | : [[contact::D. Yorke]], Operations Specialist | ||
Specialist | |||
: [[contact::B. Smith]], Site Manager | |||
: [[contact::D. Yorke]], Operations | |||
Specialist | |||
ITEMS OPEN, CLOSED, AND DISCUSSED | ITEMS OPEN, CLOSED, AND DISCUSSED | ||
None UST OF DOCUMENTS | None | ||
UST OF DOCUMENTS REVIEWED | |||
of the Completion | Audits and Reports | ||
of the Integrated | CFR 72.212 Report, Rev. 11 | ||
Yankees Annual Radiation | Documentation of the Completion of the Integrated 3 Yankees Annual Radiation | ||
Protection | Protection Program Review | ||
Program Review 6/28/2016 | 6/28/2016 Annual Survey and REMP TLD Annual Change Out | ||
Annual Survey and REMP TLD Annual Change Out June RP Survey ISFSI Pad Repair Survey Special CY VCC Outlet Vent Survey CY 16-0292016 | June RP Survey | ||
SNM Inventory | ISFSI Pad Repair Survey | ||
to Standish Technologies | Special CY VCC Outlet Vent Survey | ||
CY 16-0292016 SNM Inventory to Standish Technologies | |||
CY 2016 SNM Inventory | CY 2016 SNM Inventory | ||
CY 2017 SNM Inventory | CY 2017 SNM Inventory | ||
ISFSI 16-093, Documentation | ISFSI 16-093, Documentation of the Completed Integrated 3 Yankees Annual Radiation | ||
of the Completed | Protection Program Review | ||
Integrated | ISFSI 17-088 Self-Assessment for the Radiation Protection Program | ||
Yankees Annual Radiation | 2017 Pad Inspection | ||
Protection | |||
Program Review ISFSI 17-088 Self-Assessment | |||
for the Radiation | |||
Protection | |||
2017 VCC Inspection | 2017 VCC Inspection | ||
2017 CY ISFSI management | 2017 CY ISFSI management Assessment | ||
Assessment | Emergency Plan, Rev. 13 | ||
Emergency | Miscellaneous | ||
Plan, Rev. 13 Miscellaneous | 2018 Radiation Work Perm it, December 21, 2017 | ||
2018 Radiation | Offsite Dose Calculation, Rev. 25, December 11, 2014 | ||
Work Perm it, December 21, 2017 Offsite Dose Calculation, Rev. 25, December 11, 2014 Procedures | Procedures | ||
EF-3, Rev. 9, Special Nuclear Material and Greater than Class C Waste Control, Accountability, and Reporting | EF-3, Rev. 9, Special Nuclear Material and Greater than Class C Waste Control, | ||
Program, September | Accountability, and Reporting Program, September 2, 2018 | ||
2, 2018 CY-RCM-0082, Rev. 2, Fire Protection | CY- RCM-0082, Rev. 2, Fire Protection Program | ||
E0-1, Rev. 15, Emergency Planning Implementation | |||
Planning Implementation | Inspection Report 07200031/2018001 and 05000029/2018001 | ||
Inspection | FP-1, Rev. 5, ISFSI Fire Protection Program | ||
Report 07200031/2018001 | FP-2, Rev. 5, Fire Hazard Analysis | ||
and 05000029/2018001 | FP-3, Rev. 10, Fire Fighting Pre-Plans | ||
FP-1, Rev. 5, ISFSI Fire Protection | FP-4, Rev. 8, ISFSI Fires and Fire Alarms | ||
OP-1, Rev. 11, Concrete Cask Removal System Surveillance Program | |||
FP-4, Rev. 8, ISFSI Fires and Fire Alarms OP-1, Rev. 11, Concrete Cask Removal System Surveillance | OP-2, Rev. 12, Routine Surveillances | ||
OP-7, Rev. 5, ISFSI Annual Inspection Program | |||
OP-7, Rev. 5, ISFSI Annual Inspection | RP-1, Rev. 5, Conduct of Radiation Protection | ||
RP-2, Rev. 14, Radiological Surveys and Postings | |||
Protection | RP-4, Rev. 11, Personal Radiation Monitoring | ||
RP-2, Rev. 14, Radiological | RP-5, Rev. 7, Radiation Work Permits | ||
Surveys and Postings RP-4, Rev. 11, Personal Radiation | LIST OF ACRONYMS USED | ||
Monitoring | AFR Away-From-Reactor | ||
RP-5, Rev. 7, Radiation | CFR Code of Federal Regulations | ||
Work Permits LIST OF ACRONYMS USED AFR | CoC Certificate of Compliance | ||
Code of Federal Regulations | FSAR Final Safety Analysis Report | ||
Certificate | IP Inspection Procedure | ||
of Compliance | ISFSI Independent Spent Fuel Storage Installation | ||
Final Safety Analysis Report Inspection | LLEA Local Law Enforcement Agencies | ||
Procedure | NSIR Office of Nuclear Security and Incident Response | ||
Independent | QA Quality Assurance | ||
Spent Fuel Storage Installation | SER Safety Evaluation Report | ||
Local Law Enforcement | SNM Special Nuclear Material | ||
TS Technical Specification | |||
Safety Evaluation Report | vcc Vertical Concrete Cask | ||
Special Nuclear Material Technical | YAEC Yankee Atomic Electric Company | ||
Specification | YR Yankee Rowe | ||
Vertical Concrete Cask Yankee Atomic Electric Company Yankee Rowe Inspection | Inspection Report 07200031/2018001 and 05000029/2018001 | ||
Report 07200031/2018001 | |||
and 05000029/2018001 | |||
}} | }} | ||
Revision as of 22:37, 20 October 2019
| ML18159A469 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 05/30/2018 |
| From: | Racquel Powell Division of Nuclear Materials Safety I |
| To: | Beverly Smith Yankee Atomic Electric Co |
| References | |
| IR 2018001 | |
| Download: ML18159A469 (9) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION May 30, 2018
SUBJECT:
NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION REPORT NOS. 07200031/2018001 AND 05000029/2018001, YANKEE ATOMIC ELECTRIC COMPANY, ROWE, MASSACHUSETTS SITE
Dear Mr. Smith:
On May 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a safety inspection of the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspection examined activities under your license as they relate to safety and compliance with the Commission's regulations and the conditions of your license.
The inspection consisted of observations by the inspectors, interviews with personnel, and a review of records and procedures. The results of the inspection were discussed with you at the conclusion of the inspection. The enclosed report presents the results of this inspection.
Within the scope of this inspection, no violations were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Nuclear Materials; Med, Ind, & Academic Uses; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays). No reply to this letter is required. Please contact Orysia Masnyk Bailey at 864-427-1032 if you have any questions regarding this matter.
Sincerely,
~~~
Raymond J. Powell, Chief Decommissioning, ISFSI, and Reactor HP Branch Division of Nuclear Materials Safety Dockets Nos.; 07200031, 05000029 License Nos.: SFGL-13, DPR-3 Enclosure:
Inspection Report Nos. 07200031/2018001 and 05000029/2018001 cc w/Encl: Commonwealth of Massachusetts
EXECUTIVE SUMMARY
Yankee Atomic Electric Company
NRC Inspection Report Nos. 07200031/2018001 and 05000029/2018001 An announced safety inspection was conducted on May 2, 2018, at the Yankee Atomic Electric Company (Yankee Rowe) Independent Spent Fuel Storage Installation (ISFSI). The inspector assessed whether Yankee Rowe personnel were operating and maintaining ISFSI programs at an away-from-reactor (AFR) ISFSI in conformance with the commitments and requirements contained in the Final Safety Analysis Report (FSAR), Safety Evaluation Report (SER),
Certificate of Compliance (CoC), Technical Specifications (TS), Quality Assurance (QA)program, Yankee Rowe procedures, and 10 CFR Part 72. The inspector's review was directed toward confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs. The inspector observed activities, interviewed personnel, and reviewed records and procedures. Based on the results of this inspection, no findings of significance were identified.
Inspection Report 07200031/2018001 and 05000029/2018001
REPORT DETAILS
I. Organization and Radiation Safety Program A. Inspection Scope The inspectors assessed whether Yankee Rowe personnel were operating and maintaining ISFSI programs at an AFR ISFSI in conformance with the commitments and requirements contained in the FSAR, SER, Coe, TS, QA program, Yankee Rowe procedures, and 10 CFR Part 72.
AFR ISFSI facilities, located at sites where loading operations have been completed, are essentially passive operating facilities. The inspectors' review was directed towards confirming the ongoing adequacy of the radiation protection, fire protection, emergency preparedness, surveillance, maintenance, environmental monitoring, training, QA, and corrective action programs.
The inspectors observed activities, interviewed personnel, and reviewed records and procedures. The inspectors also reviewed changes made to Yankee Rowe's programs and procedures since the last inspection to verify that changes were consistent with the license or CoC and did not reduce the effectiveness of the program.
B. Observations The inspectors determined that Yankee Rowe's plans and preparations for controlling radiological activities were effective at meeting 1O CFR Part 20 requirements. The inspectors also verified that special nuclear material (SNM) stored at the ISFSI was properly accounted for. Dosimetry records and environmental monitoring reports were reviewed. All employees were below the regulatory dose limits and dose to members of the public at the nearest accessible location to the ISFSI were within limits prescribed by 10 CFR 72.104.
Yankee Rowe's emergency preparedness program properly coordinated with the appropriate offsite support groups, agencies, and local law enforcement agencies (LLEAs).
The emergency call list was current and checked periodically for accuracy. All revisions to the emergency plan have been submitted to the NRC and reviewed by the Office of Nuclear Security and Incident Response (NSIR).
Daily temperature monitoring of the vertical concrete casks (VCCs) was performed by Yankee Rowe personnel in accordance with surveillance requirements in the TS. Yankee Rowe's procedures contain backup plans if the primary surveillance method was unavailable. The inspectors performed a tour of the ISFSI pad and did not note any significant material condition issues that would impact the performance of the pad and loaded VCCs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the VCCs and confirmed vehicle entry onto the ISFSI pad was controlled in accordance with site procedures.
Yankee Rowe has a training program which consists of classroom, and on-the-job training, as well as briefings performed by supervisors. Refresher training was given on a regular basis and retraining was given as necessary if human performance issues were identified.
All employees have been trained and qualified to perform their assigned ISFSl-related functions.
Inspection Report 07200031/2018001 and 05000029/2018001 The inspectors reviewed the most recent independent audit of the ISFSI program. The inspectors determined that issues were entered into the corrective action program, prioritized, and evaluated commensurate with their safety significance. Corrective actions were implemented to address identified issues and were tracked to closure. The QA program evaluated changes in the ISFSI program to ensure that any changes that were implemented would not decrease the overall effectiveness of the program. The inspectors also reviewed Yankee Rowe's 10 CFR 72.212 evaluation report and ensured it was being appropriately updated.
C. Findings Based on the results of this inspection, no findings of significance were identified.
II.
Exit Meeting Summary
On May 2, 2018, the inspectors presented the inspection results to Brian Smith, Yankee Rowe Site Manager and other Yankee Rowe personnel.
Inspection Report 07200031/2018001 and 05000029/2018001
SUPPLEMENTAL INFORMATION
PARTIAL UST OF PERSONS CONTACTED
Licensee
- J. Bourassa, RPM/QA Representative
- S. Day, Licensing Engineer
- J. Kenneday, ISFSI Shift Supervisor
- K. Kuzontkoski, G4S Project Manager
- C. Lannon, G4S Assistant Project Manager
- J. Lenois, Security Program Manager
- B. Smith, Site Manager
- D. Yorke, Operations Specialist
ITEMS OPEN, CLOSED, AND DISCUSSED
None
UST OF DOCUMENTS REVIEWED
Audits and Reports
CFR 72.212 Report, Rev. 11
Documentation of the Completion of the Integrated 3 Yankees Annual Radiation
Protection Program Review
6/28/2016 Annual Survey and REMP TLD Annual Change Out
June RP Survey
ISFSI Pad Repair Survey
Special CY VCC Outlet Vent Survey
CY 16-0292016 SNM Inventory to Standish Technologies
ISFSI 16-093, Documentation of the Completed Integrated 3 Yankees Annual Radiation
Protection Program Review
ISFSI 17-088 Self-Assessment for the Radiation Protection Program
2017 Pad Inspection
2017 VCC Inspection
2017 CY ISFSI management Assessment
Emergency Plan, Rev. 13
Miscellaneous
2018 Radiation Work Perm it, December 21, 2017
Offsite Dose Calculation, Rev. 25, December 11, 2014
Procedures
EF-3, Rev. 9, Special Nuclear Material and Greater than Class C Waste Control,
Accountability, and Reporting Program, September 2, 2018
CY- RCM-0082, Rev. 2, Fire Protection Program
E0-1, Rev. 15, Emergency Planning Implementation
Inspection Report 07200031/2018001 and 05000029/2018001
FP-1, Rev. 5, ISFSI Fire Protection Program
FP-2, Rev. 5, Fire Hazard Analysis
FP-3, Rev. 10, Fire Fighting Pre-Plans
FP-4, Rev. 8, ISFSI Fires and Fire Alarms
OP-1, Rev. 11, Concrete Cask Removal System Surveillance Program
OP-2, Rev. 12, Routine Surveillances
OP-7, Rev. 5, ISFSI Annual Inspection Program
RP-1, Rev. 5, Conduct of Radiation Protection
RP-2, Rev. 14, Radiological Surveys and Postings
RP-4, Rev. 11, Personal Radiation Monitoring
RP-5, Rev. 7, Radiation Work Permits
LIST OF ACRONYMS USED
AFR Away-From-Reactor
CFR Code of Federal Regulations
CoC Certificate of Compliance
FSAR Final Safety Analysis Report
IP Inspection Procedure
ISFSI Independent Spent Fuel Storage Installation
LLEA Local Law Enforcement Agencies
NSIR Office of Nuclear Security and Incident Response
QA Quality Assurance
SER Safety Evaluation Report
TS Technical Specification
vcc Vertical Concrete Cask
YAEC Yankee Atomic Electric Company
YR Yankee Rowe
Inspection Report 07200031/2018001 and 05000029/2018001