ML18219E097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)CONTROL NO: FILE'ROM American Electric Pwr New York, NY DATE OF DOC 2-26-75 DATE REC'D 3-4-75 LTR TWX RPT OTHE R TO: Mr Giambusso ORIG one signed CC OTHER SENT AEC PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D 1 DOCKET NO: 50-315 DESCRIPTION:
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)
Ltr trans the following; p~)-pm e~-<-+ENCLOSURES:
CONTROL NO:
Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........
FILE'ROM American   Electric   Pwr     DATE OF DOC        DATE REC'D      LTR    TWX          RPT        OTHE R New York,   NY                   2-26-75         3-4-75 TO:                                             ORIG         CC   OTHER       SENT AEC PDR Mr Giambusso                    one signed CLASS     UNCLASS         PROPINFO             INPUT       NO CYS REC'D         DOCKET NO:
(15 cys encl rec'd)PLANT NAME: D C Dook fP1 FOR ACTION/INFORMATION 3-<-75 ehf BUTLER (L)W/Copies CLARK (L)W/Copies PARR (L)W/Copies NIEL (L)W/t Copies SCHWENCER (L)ZIEMANN (L)REGAN (E)W/Copies W/Copies W/Copies STOLZ (L(DICKER (EI LEAR (L(((lJQQQg pppf(p((rr(W/Copies W/Copies W/Copies VASSALLO (L)KNIGHTON (E)SPE LS)y, W/Copies W/Copies PURPLE (L)YOUNGBLOOD (E)g.Sen~J~+"'~r'>':-~'.~5 W/Copies W/Copies W/Copies INTERNAL DISTRIBUTION EG Fl OGC, ROOM P-506A GOSSI CK/STA F F CASE G I AM BUSSO BOYD MOORE (L)DEYOUNG (L)SKOVHOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE REG OPR F I LE 5 R EG ION (2)T.R.WILSON STEE LE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS~IPPOLITO TEDESCO LONG ALAI NAS(Z)BENAROYA VOLLMER DENTON~G R IMESt'a)GAMM ILL KASTNER BALLAR D SPANGLER ENVI RO MULLER DICKER KNIG HTON YOUNG B LOOD REGAN PROJECT LDR HAR LESS LIC ASST R.DIGGS (L)H.GEARIN (L)E.GOULBOURNE (L)P.KREUTZER (E)J.LEE (L)M.MAIGRET (L)S.REED (E)M.SERVICE (L)S.SHEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (F-)V'.WILSON (I.)R.INGRAM (L)A/T IND-BRAITMAN SA LTZMAN ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr).E.COUPE PETERSON HARTFIELD (2)KLECKER EISENHUT W I GG INTO N EXTERNAL DISTRIBUTION
1              50-315 DESCRIPTION:                                                ENCLOSURES:
~1-LOCAL PDR~75$%1-TIC (ABERNATHY)
Ltr trans     the following;                                 Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........
(1)(2)(10)
pm e~          -<-+                          (15 cys encl   rec'd) p ~)-
-NATIONAL LABS 1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rm E-201 GT 1-ASLB 1-CONSULTANTS 1-Newton Anderson NEWMAR K/BLUME/AG BABI AN~+-ACRS HQ4%44i/SENT gO<,A.gZWu(cg 1-P D R-SAN/LA/N Y 1-BROOKHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm B-127 GT 1-J.D.RUNKLES, Rm E-201 GT
PLANT NAME:       D C Dook fP1 FOR ACTION/INFORMATION             3-<-75             ehf BUTLER (L)               SCHWENCER (L) ZIEMANN (L)                 REGAN (E)
~~o~e o~u E AMERICAN ELECTRIC POWER Service Corp o r ati o n CO 2 Broadway, New York, N.Y.10004 ROBERT S.HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4
W/ Copies                W/ Copies           W/ Copies             W/ Copies CLARK (L)                STOLZ (L(           DICKER (EI           LEAR (L(     ((lJQQQg               pppf(p((rr(
~ASCII(atOPj Qlo'PV~~gg St%@JllW Docket No.50-318'PR No.58 February 26, 1975 Mr.A.Giambusso, Deputy Director for Reactor Projects Directorate of Licensing U.S;Nuclear Regulatory Commission Washington, D.C.20555
W/ Copies                W/ Copies           W/ Copies             W/ Copies PARR (L)                  VASSALLO (L)         KNIGHTON (E)         SPE LS         )y, W/ Copies               W/ Copies            W/ Copies                                             "'
NIEL (L)                PURPLE (L)           YOUNGBLOOD (E)         g. Sen~ J~+                         ~r'>':-~'.~5 W/t Copies              W/ Copies           W/ Copies             W/ Copies INTERNAL DISTRIBUTION EG Fl                   TECH REVIEW          DENTON                LIC ASST                      A/T IND-OGC, ROOM P-506A SCHROEDER MACCARY
                                            ~   G R IMESt'a)
GAMM ILL R. DIGGS (L)
H. GEARIN (L)
BRAITMAN SA LTZMAN GOSSI CK/STA F F          KNIGHT              KASTNER          E. GOULBOURNE (L)                 ME LTZ CASE                      PAWLICKI            BALLARD          P. KREUTZER (E)
G I AMBUSSO              SHAO                SPANGLER          J. LEE (L)                         PLANS BOYD                      STE LLO                                M. MAIGRET (L)                     MCDONALD MOORE (L)                HOUSTON              ENVI RO          S. REED (E)                       CHAPMAN DEYOUNG (L)              NOVAK                MULLER            M. SERVICE (L)                     DUBE (Ltr).
SKOVHOLT (L)              ROSS                DICKER            S. SHEPPARD (L)                   E. COUPE GOLLER (L) (Ltr)
P. COLLINS
                        ~  IPPOLITO TEDESCO KNIGHTON YOUNG B LOOD M. SLATER (E)
H. SMITH (L)
PETERSON HARTFIELD (2)
DENISE                    LONG                REGAN            S. TEETS (L)                       KLECKER REG OPR                ALAINAS(Z)            PROJECT LDR      G. WILLIAMS(F-)                   EISENHUT F I LE 5 R EG ION (2)    BENAROYA                              V'. WILSON (I.)                   W I GG INTO N T.R. WILSON              VOLLMER              HAR LESS          R. INGRAM (L)
STEE LE EXTERNAL DISTRIBUTION
~1 LOCAL PDR~75$ %                                                                 P D R-SAN/LA/NY 1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS                                    1 NSIC (BUCHANAN)                 1 W. PENNINGTON,     Rm E-201 GT         1 BROOKHAVEN NAT LAB 1
1 ASLB                           1 CONSULTANTS                             1 G. ULRIKSON, ORNL 1 Newton Anderson                       NEWMARK/BLUME/AGBABIAN                1 AGMED (RUTH GUSSMAN)
Rm B-127 GT
~+ ACRS HQ4%44i/SENT                                                                J.         D. RUNKLES, Rm E-201 gO <,A. gZWu(cg                                                            1 GT


==Dear Mr.Giambusso:==
~ ~ o ~ e o ~ u E


~~'~~g g gg"pygmy QCGCLATOBY GctlBISSIO
AMERICAN ELECTRIC POWER Service Corp o r ati o n CO 2 Broadway, New    York, N. Y. 10004 ROBERT S. HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4
~7(i Contained herein are fifteen (15)copies of the American Electric Power Service Corporation report"Reactor Containment Building Integrated Leak Rate Test (Pre-Operational)" for the Donald C.Cook Nuclear Plant'Unit 1: 'This test was successfully completed on November 24, 1974 by personnel of the Indiana and Michigan Power Company and the American Electric Power'Service Corporation.
                                                                                                              ~~gg St%
By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.Very truly yours, RSH kb cc: Gerald Charnoff Ronald C.Callen Peter Steketee'obert J;Vollen Richard Walsh R.W.Jurgensen-Bridgman R.S.Hunter
Qlo  'PV
~<'~~~1 1 4*l b 1 l1 I II}}
                                                                                                                  @JllW
                                                            ~ASCII(atOPj Docket No.                50-318'PR No. 58                                                                    February 26, 1975 Mr. A. Giambusso,                      Deputy  Director
                                                                              ~~'~                      ~
for    Reactor Projects Directorate of Licensing                                            g g gg"pygmy QCGCLATOBY GctlBISSIO U.S; Nuclear Regulatory Commission Washington, D.C. 20555
                                                                                    ~   7(i
 
==Dear Mr. Giambusso:==
 
Contained herein are                 fifteen   (15) copies of the American Electric       Power Service Corporation                   report "Reactor Containment Building       Integrated Leak Rate Test                   (Pre-Operational)" for the Donald C. Cook Nuclear Plant'Unit 1:                           'This test was successfully completed on November 24, 1974 by personnel                           of the Indiana and Michigan Power Company and the American Electric                           Power'Service Corporation.             By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.
Very   truly yours, R. S.      Hunter RSH   kb cc:     Gerald Charnoff Ronald C. Callen Peter J; Vollen Steketee'obert Richard Walsh R. W. Jurgensen                   - Bridgman
 
      ~
        <'
                        ~
                    ~ ~
1 b
1 4
* l 1
l1 I II}}

Revision as of 18:39, 20 October 2019

Enclosed Report, Reactor Containment Building Integrated Leak Rate Test (Pre-Operational), for Donald C. Cook Nuclear Plant Unit 1
ML18219E097
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/26/1975
From: Hunter R
American Electric Power Service Corp
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
Download: ML18219E097 (4)


Text

NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

FILE'ROM American Electric Pwr DATE OF DOC DATE REC'D LTR TWX RPT OTHE R New York, NY 2-26-75 3-4-75 TO: ORIG CC OTHER SENT AEC PDR Mr Giambusso one signed CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

1 50-315 DESCRIPTION: ENCLOSURES:

Ltr trans the following; Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........

pm e~ -<-+ (15 cys encl rec'd) p ~)-

PLANT NAME: D C Dook fP1 FOR ACTION/INFORMATION 3-<-75 ehf BUTLER (L) SCHWENCER (L) ZIEMANN (L) REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) STOLZ (L( DICKER (EI LEAR (L( ((lJQQQg pppf(p((rr(

W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) KNIGHTON (E) SPE LS )y, W/ Copies W/ Copies W/ Copies "'

NIEL (L) PURPLE (L) YOUNGBLOOD (E) g. Sen~ J~+ ~r'>':-~'.~5 W/t Copies W/ Copies W/ Copies W/ Copies INTERNAL DISTRIBUTION EG Fl TECH REVIEW DENTON LIC ASST A/T IND-OGC, ROOM P-506A SCHROEDER MACCARY

~ G R IMESt'a)

GAMM ILL R. DIGGS (L)

H. GEARIN (L)

BRAITMAN SA LTZMAN GOSSI CK/STA F F KNIGHT KASTNER E. GOULBOURNE (L) ME LTZ CASE PAWLICKI BALLARD P. KREUTZER (E)

G I AMBUSSO SHAO SPANGLER J. LEE (L) PLANS BOYD STE LLO M. MAIGRET (L) MCDONALD MOORE (L) HOUSTON ENVI RO S. REED (E) CHAPMAN DEYOUNG (L) NOVAK MULLER M. SERVICE (L) DUBE (Ltr).

SKOVHOLT (L) ROSS DICKER S. SHEPPARD (L) E. COUPE GOLLER (L) (Ltr)

P. COLLINS

~ IPPOLITO TEDESCO KNIGHTON YOUNG B LOOD M. SLATER (E)

H. SMITH (L)

PETERSON HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L) KLECKER REG OPR ALAINAS(Z) PROJECT LDR G. WILLIAMS(F-) EISENHUT F I LE 5 R EG ION (2) BENAROYA V'. WILSON (I.) W I GG INTO N T.R. WILSON VOLLMER HAR LESS R. INGRAM (L)

STEE LE EXTERNAL DISTRIBUTION

~1 LOCAL PDR~75$ % P D R-SAN/LA/NY 1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 BROOKHAVEN NAT LAB 1

1 ASLB 1 CONSULTANTS 1 G. ULRIKSON, ORNL 1 Newton Anderson NEWMARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

Rm B-127 GT

~+ ACRS HQ4%44i/SENT J. D. RUNKLES, Rm E-201 gO <,A. gZWu(cg 1 GT

~ ~ o ~ e o ~ u E

AMERICAN ELECTRIC POWER Service Corp o r ati o n CO 2 Broadway, New York, N. Y. 10004 ROBERT S. HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4

~~gg St%

Qlo 'PV

@JllW

~ASCII(atOPj Docket No. 50-318'PR No. 58 February 26, 1975 Mr. A. Giambusso, Deputy Director

~~'~ ~

for Reactor Projects Directorate of Licensing g g gg"pygmy QCGCLATOBY GctlBISSIO U.S; Nuclear Regulatory Commission Washington, D.C. 20555

~ 7(i

Dear Mr. Giambusso:

Contained herein are fifteen (15) copies of the American Electric Power Service Corporation report "Reactor Containment Building Integrated Leak Rate Test (Pre-Operational)" for the Donald C. Cook Nuclear Plant'Unit 1: 'This test was successfully completed on November 24, 1974 by personnel of the Indiana and Michigan Power Company and the American Electric Power'Service Corporation. By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.

Very truly yours, R. S. Hunter RSH kb cc: Gerald Charnoff Ronald C. Callen Peter J; Vollen Steketee'obert Richard Walsh R. W. Jurgensen - Bridgman

~

<'

~

~ ~

1 b

1 4

  • l 1

l1 I II