ML082750585: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-401 Written Examination Review Worksheet Form ES-401-9 AN1-2008-09 Instructions [Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.] 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level. 2. Enter the level of difficulty (LOD) of each question using a 1 B 5 (easy B difficult) rating scale (questions in the 2 B 4 range are acceptable). 3. Check the appropriate box if a psychometric flaw is identified:
{{#Wiki_filter:ES-401               AN1-2008-09                                            Written Examination Review Worksheet                                                                           Form ES-401-9
$ The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much ne edless information).
: 1.     2.           3. Psychometric Flaws              4. Job Content Flaws        5. Other      6.      7.                                              8.
$ The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
Q#    LOK     LOD (F/H)   (1-5)   Stem Cues T/F        Cred. Partial Job- Minutia #/ Back-            Q= SRO B/M/N U/E/S                                                Explanation Focus                Dist.           Link            units ward    K/A Only 1      F      3                                                                                         B      S 2      H      3                                                                                          N      S 3      H      3                                                                                          B      S    Change CBOT to ATC in stem. Accept as is 4      H      3                                                                                          N      S    Need to walk through procedure to get to throttling criteria. Done. Ok as is.
$ The answer choices are a collection of unrelated true/false statements.  
5      H      3                                                                                          N      S Repeat from 2005 retake; appears to be a collection of T/F statements (no need for 6      H      3                      X                                                    X            B      E    stem); only B & C deal with reasons per the KA; remove name from History Not T/F statements as stem is required. Added reasons to A & D.
$ The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
C could also be considered correct; doesnt really test knowledge of the operational 7      H      3                                      X                                    X            B      U    implications of a loss of DHR per KA (this question just asks for actions to prevent possible loss of DHR); reworded stem 8      H      3                                      X                                    X            N      S    Should C be select LT-1002 on C04? No. Is 40 a clear indication of a failed Instructions
$ One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem). 4. Check the appropriate box if a job content error is identified:
[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]
$ The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
: 1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
$ The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
: 2. Enter the level of difficulty (LOD) of each question using a 1 B 5 (easy B difficult) rating scale (questions in the 2 B 4 range are acceptable).
$ The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with ques tion in gallons).  
: 3. Check the appropriate box if a psychometric flaw is identified:
$ The question requires reverse logic or application compared to the job requirements. 5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable). 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f. 7. Based on the reviewer
      $    The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).
=s judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory? 8. At a minimum, explain any A U@ ratings (e.g., how the Appendix B psychometric attributes are not being met).
      $    The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).
Attachment 8 Page 1 of 8 OBDI 202 - IOLE Process
      $    The answer choices are a collection of unrelated true/false statements.
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other  Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred. Dist. Partial Job-Link Minutia#/ units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation 1 F 3            B S  2 H 3            N S  3 H 3            B S Change CBOT to ATC in stem. Accept as is 4 H 3            N S Need to walk through procedure to get to throttling criteria. Done. Ok as is.
      $    The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.
5 H 3            N S  6 H 3  X      X  B E Repeat from 2005 retake;  appears to be a collection of T/F statements (no need for stem); only B & C deal with "reasons" per the KA; remove name from History Not T/F statements as stem is required. Added "reasons" to A & D.
      $    One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
7 H 3    X    X  B U 'C' could also be considered correct; doesn't really test knowledge of the "operational implications of a loss of DHR" per KA (this question just asks for actions to prevent possible loss of DHR); reworded stem 8 H 3    X    X  N S Should 'C' be "select LT-1002 on C04"?
: 4. Check the appropriate box if a job content error is identified:
No. Is 40" a clear indication of a failed ES-401 2 Form ES-401-9 AN1-2008-09 Attachment 8 Page 2 of 8
      $ The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other OBDI 202 - IOLE Process Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
      $ The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).
Dist. Partial Job-LinkMinutia#/
      $ The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation channel?  Yes  doesn't test ability to determine Pzr Level during Pzr Pressure Malfunctions per KA; accept as is 9 H 2            B S Repeat from 2007; 10 F* 2 X          N E change stem to "...EOP, the fourth RCP must be secured before what specified temperature and why?" References not sufficient to justify answer accept as is 11 H 3   X        B* S changes are not sufficient to warrant "modified" label; changed to Bank change question to address knowledge, not action; accept as is C is not credible since the stem already indicates that there is EFW flow to both OTSGs.
      $ The question requires reverse logic or application compared to the job requirements.
Accept as is 12 H 3      X     N U this is not RO-level (55.43(b)(2)); new question 13 H 3            N 14 H 3            N S  15 F 3            N E In the question, 'B' says "...causing excessive RCS makeup," but in the "answer" section it says "...minimizing the impact to RCS makeup."  And the Notes says the result is swapping inventory control to HPI block valve- Which is correct? Rewrote question to include position of both valves and updated notes 16 H 3         X B U doesn't test knowledge of REASONS for use of dc control power for D/G's per KA; added reasons 17 F 3  X  X      X  M U This answer is obvious and cued from the stem; doesn't test ability to monitor/operate components served by IA to minimize drain on system per KA. Rewrote stem 18 H 3           N E Should the stem say "RCS pressure has increased to 120 psig..."?
: 5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
Fixed Change the stem to say "Under these conditions, what is the preferred..." Done 19 H 3           B E procedure says power must be <40% for rod transfer, but stem says power is at 40%;
: 6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
is this a problem? Changed to 39%
: 7. Based on the reviewer=s judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
20 F 2            N S  21 F 3            B* S changes are not sufficient to warrant "modified" label;  Changed to Bank 22 F 3           B S  23 H 3            N S  24 H 3      X   X B S This is really an SRO-level question (55.43(b)(5)); entry condition to procedure is RO knowledge  doesn't test knowledge of REASONS per KA; accept as is 25 F* 3 X          B E The answer is keyed to procedure entry condit ions, not "level at which consideration would be given to commencing a shutdown;" stem should be modified to refer to ES-401 3 Form ES-401-9 AN1-2008-09 Attachment 8 Page 3 of 8 OBDI 202 - IOLE Process
: 8. At a minimum, explain any AU@ ratings (e.g., how the Appendix B psychometric attributes are not being met).                                                                                       Page 1 of 8                                                        OBDI 202 - IOLE Process
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
 
Dist. Partial Job-LinkMinutia#/
ES-401                AN1-2008-09                                                    2                                                                            Form ES-401-9
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation entry conditions.
: 1. 2.      3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                            8.
Accept as is 26 H 3 X          N E shouldn't the stem say "Cooldown rate is 70 degrees F/hr..." ? fixed 27 H 3          B U doesn't test knowledge of the REASONS per KA; added reasons 28 F 3         N U doesn't test knowledge of affects of RCP coastdown on RCS parameters per KA;  also, couldn't validate correct answer; procedure says "if no RCPs are operating, use lowest."  Lowest what?  The procedure also says "when both DHR systems are in service, use the lower DH cooler outlet temperature for plotting cooldown rate; however, we only have one DHR system in operation for this question, and it is not explicitly stated that the DH cooler outlet is used for cooldown in this condition. Also, TS 3.4.3 Figures 1 & 2 both indicate in their respective Note-2 that the DHR RETURN temperature is to be used for HUR/CDR calculations. New question 29 H 3           B S  30 H 3            B S  31 F 3            B S  32 H* 2            N E change stem to "...loss of Decay Heat Re moval..." or simila r phrasing (strictly speaking, a "loss of Decay Heat" would eliminate the need for the DHR system and make this question moot);  fixed 33 F 2            N S  34 F 2            N E Eliminate first sentence of stem; fixed 35 F 3           N E is 'D' supposed to read "C-28A &B" or "E-28A &B"? (see "notes" explaining answer) fixed notes 36 H 2            B E this is a very easy question and a missed opportunity to ask a more substantive question on the KA; I recommend rewriting with more meat; revised notes and reworded stem 37 H 3    X      X  B U 'B' and 'C' are not very credible; doesn't test knowledge of effect of Loss/Malfunction of bypass block circuits per KA; changed stem 38 H 3           B S Repeat from 2005 retake; 39 F 2            N S  40 F 2            N S  41 H 3           N S ES-401 4 Form ES-401-9 AN1-2008-09 Attachment 8 Page 4 of 8 OBDI 202 - IOLE Process
Q#  LOK  LOD (F/H) (1-5) Stem Cues T/F     Cred. Partial Job- Minutia #/ Back-    Q= SRO B/M/N U/E/S                                          Explanation Focus              Dist.         Link          units ward K/A Only channel? Yes doesnt test ability to determine Pzr Level during Pzr Pressure Malfunctions per KA; accept as is 9    H     2                                                                        B    Repeat from 2007; change stem to ...EOP, the fourth RCP must be secured before what specified 10    F*    2    X                                                                  N    E temperature and why? References not sufficient to justify answer accept as is changes are not sufficient to warrant modified label; changed to Bank change 11    H     3                       X                                               B*    S  question to address knowledge, not action; accept as is C is not credible since the stem already indicates that there is EFW flow to both OTSGs. Accept as is 12    H     3                                     X                                  N     U this is not RO-level (55.43(b)(2)); new question 13    H    3                                                                        N    S 14    H     3                                                                         N    S In the question, B says ...causing excessive RCS makeup, but in the answer section it says ...minimizing the impact to RCS makeup. And the Notes says the 15    F     3                                                                        N     E result is swapping inventory control to HPI block valve Which is correct? Rewrote question to include position of both valves and updated notes doesnt test knowledge of REASONS for use of dc control power for D/Gs per KA; 16    H    3                                                             X          B     U added reasons This answer is obvious and cued from the stem; doesnt test ability to monitor/operate 17    F    3            X           X                                    X         M    U components served by IA to minimize drain on system per KA. Rewrote stem Should the stem say RCS pressure has increased to 120 psig...? Fixed Change 18    H    3                                                                         N    E the stem to say Under these conditions, what is the preferred... Done procedure says power must be <40% for rod transfer, but stem says power is at 40%;
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
19    H    3                                                                         B    E is this a problem? Changed to 39%
Dist. Partial Job-LinkMinutia#/
20    F     2                                                                         N    S 21    F    3                                                                        B*    S changes are not sufficient to warrant modified label; Changed to Bank 22    F    3                                                                        B    S 23    H     3                                                                         N     S This is really an SRO-level question (55.43(b)(5)); entry condition to procedure is RO 24    H     3                                     X                        X         B     S knowledge doesnt test knowledge of REASONS per KA; accept as is 25    F*    3     X                                                                   B    E The answer is keyed to procedure entry conditions, not level at which consideration would be given to commencing a shutdown; stem should be modified to refer to                                                                      Page 2 of 8                                                  OBDI 202 - IOLE Process
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation 42 H 3            N* E The "source" says "direct" but question "history" says it's new. Fixed history.
 
43 H 4            B S 44 H* 3   X        B E 'A' is not credible;  MFPs have setback feature - revised notes - accept as is 45 H 3     X     X  N U doesn't test knowledge of the effect of a loss/malfunction of AFW has on SG per KA; revised stem also, it's not clear from the references provided why the feed rate on A SG should be 6"/minute - how is that determined? Revised answers based on calculation 46 H* 2            N S explanations for 'B' and 'C' don't make sense to me.
ES-401                AN1-2008-09                                                    3                                                                             Form ES-401-9
Accept as is 47 H 4            N 48 F* 3     X X  X  B U this question doesn't really test what the KA is asking for and, based on the procedure, it looks like a new KA is needed to test something more operationally relevant; rewrote question 49 F 3     X      N S is this really RO knowledge (55.43(b)(2))? RO lesson plan - accept as is 50 H 3    X        B E 'A' is not credible when the stem gives the discharge pressure of 20 psig; accept as is 51 H 3           B S Repeat from 2005; doesn't count 52 H* 3            B S 53 F 3            B S 54 F 2            N S  55 F 2     X       N U 'B', 'C', & 'D' are all correct for the way the question is worded; should change stem question to "Under these conditions, what actions shoul d be considered to help protect..." and should replace 'D'; revised stem 56 H 3           B S  57 F 3            N S  58 F* 3            B S  59 F 2            N S 60 F 3            N S  61 H 3     X      M E I do not see a procedural direction to place the assembly in the storage rack and I do not see a prohibition to putting it back in the SFP; revised answers ES-401 5 Form ES-401-9 AN1-2008-09 Attachment 8 Page 5 of 8 OBDI 202 - IOLE Process
: 1. 2.       3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                             8.
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
Q#  LOK  LOD (F/H) (1-5) Stem Cues T/F     Cred. Partial Job- Minutia #/ Back-    Q= SRO B/M/N U/E/S                                          Explanation Focus              Dist.        Link          units ward K/A Only entry conditions. Accept as is 26    H    3     X                                                                  N     E shouldnt the stem say Cooldown rate is 70 degrees F/hr... ? fixed 27    H     3                                                              X          B     U  doesnt test knowledge of the REASONS per KA; added reasons doesnt test knowledge of affects of RCP coastdown on RCS parameters per KA; also, couldnt validate correct answer; procedure says if no RCPs are operating, use lowest. Lowest what? The procedure also says when both DHR systems are in service, use the lower DH cooler outlet temperature for plotting cooldown rate; 28    F    3                                                             X          N    U however, we only have one DHR system in operation for this question, and it is not explicitly stated that the DH cooler outlet is used for cooldown in this condition. Also, TS 3.4.3 Figures 1 & 2 both indicate in their respective Note-2 that the DHR RETURN temperature is to be used for HUR/CDR calculations. New question 29    H    3                                                                        B    S 30    H    3                                                                        B    S 31    F    3                                                                        B    S change stem to ...loss of Decay Heat Removal... or similar phrasing (strictly 32  H*    2                                                                        N     speaking, a loss of Decay Heat would eliminate the need for the DHR system and make this question moot); fixed 33    F    2                                                                        N    S 34   F    2                                                                        N    E Eliminate first sentence of stem; fixed is D supposed to read C-28A &B or E-28A &B? (see notes explaining answer) 35    F     3                                                                        N     E fixed notes this is a very easy question and a missed opportunity to ask a more substantive 36    H    2                                                                        B    E  question on the KA; I recommend rewriting with more meat; revised notes and reworded stem B and C are not very credible; doesnt test knowledge of effect of Loss/Malfunction 37    H     3                        X                                    X          B     U of bypass block circuits per KA; changed stem 38    H     3                                                                        B    Repeat from 2005 retake; 39    F     2                                                                        N    S 40    F    2                                                                        N    S 41    H    3                                                                        N    S                                                                      Page 3 of 8                                                    OBDI 202 - IOLE Process
Dist. Partial Job-LinkMinutia#/
 
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation 62 F 2   X       N S neither 'A' or 'B' are credible; accept as is 63 H 4            B S 64 H 3           N S 65 H 2         X  B S doesn't test ability to predict/monitor rad levels associated with ARM system controls per KA. Background levels have changed - accept as is.
ES-401                AN1-2008-09                                                    4                                                                              Form ES-401-9
66 F 2            B E what is "eB change number"?  It is not mentioned in the reference provided; electronic database - common language at AN1 67 F 3           B S Repeat from 2007; 68 F 2     X      N E do Work Order Instructions often refer to the procedure lineup section for restoration?
: 1. 2.      3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                                8.
If so, 'C' would be a reasonable correct answer. Operators are trained to use op procedures - accept as is 69 F 2           B S  70 F 2            B S 71 F 2            N E only need to know the TEDE value to get this correct; recommend having two options with 2000mrem and two with 5000mrem; fixed 72 F 3            N S  73 H 3            B S Repeat from 2005; doesn't count 74 H 3            N S 75 F 2           N S  76 H 2          X N E recognizing reactor trip criteria does not discriminate at the SRO level; changed  power level - 43.b.5 77 H 3    X  X    N U are SRO's supposed to know all these action times by memory? If they are only supposed to know the 1-hour actions from memory, then none of the other distractors are credible (since they all have more than 1-hour actions).
Q#  LOK  LOD (F/H) (1-5) Stem Cues T/F      Cred. Partial Job- Minutia #/ Back-    Q= SRO B/M/N U/E/S                                            Explanation Focus              Dist.        Link          units ward K/A Only 42    H    3                                                                         N*   E The source says direct but question history says its new. Fixed history.
Removed time from all answers 78 F 3 X          X N U it is not clear from the references what is meant by "exceeding the facilities' licensed limit for PTS;"  I see where the procedure talks of "invoking" PTS limits, but I do not see where it says what those "invoked" limits will be; also, isn't knowledge of CDR limits in the RTs RO-level knowledge? Revised to include both PTS limits and TS 79 H 2   X        B U with the TS provided, anyone who can read can eliminate 'A' and 'B' as not credible ES-401 6 Form ES-401-9 AN1-2008-09 Attachment 8 Page 6 of 8 OBDI 202 - IOLE Process
43    H    4                                                                        B     S 44  H*     3                        X                                               B     E  A is not credible; MFPs have setback feature - revised notes - accept as is doesnt test knowledge of the effect of a loss/malfunction of AFW has on SG per KA; revised stem also, its not clear from the references provided why the feed rate on A 45    H     3                             X                              X          N    U SG should be 6/minute - how is that determined? Revised answers based on calculation 46  H*    2                                                                        N     explanations for B and C dont make sense to me. Accept as is 47    H    4                                                                        N     S this question doesnt really test what the KA is asking for and, based on the 48    F*    3                                     X      X                X          B    U  procedure, it looks like a new KA is needed to test something more operationally relevant; rewrote question 49    F    3                                    X                                  N    S  is this really RO knowledge (55.43(b)(2))? RO lesson plan - accept as is 50    H    3                       X                                                B    E  A is not credible when the stem gives the discharge pressure of 20 psig; accept as is 51    H    3                                                                        B    S  Repeat from 2005; doesnt count 52  H*    3                                                                        B    S 53    F    3                                                                        B    S 54    F    2                                                                         N    S B, C, & D are all correct for the way the question is worded; should change stem 55    F     2                             X                                         N     U  question to Under these conditions, what actions should be considered to help protect... and should replace D; revised stem 56    H     3                                                                        B     S 57    F    3                                                                         N     S 58    F*    3                                                                        B    S 59    F    2                                                                         N    S 60    F    3                                                                        N    S I do not see a procedural direction to place the assembly in the storage rack and I do 61    H    3                             X                                          M     E not see a prohibition to putting it back in the SFP; revised answers                                                                      Page 4 of 8                                                      OBDI 202 - IOLE Process
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
 
Dist. Partial Job-LinkMinutia#/
ES-401                AN1-2008-09                                                    5                                                                              Form ES-401-9
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation (since they do not match any action in the TS); also, 'B' grammar needs to be cleaned up; also, the correct answer probably should also include the "and" part of action E. Revised A & B, added the "and" part to C & D 80 H 4 X         X N E change "...have actions to..." to "...should be used to..."; revised stem doesn't test ability to verify alarms are consistent with plant conditions per KA; accept as is 81 H 3 X           N E change "...contains specific steps to..." to "...should be used to..." fixed 82 H 3          X N S this is testing an understanding of thermodynamic plant response and knowledge of trip setpoints - that's RO-level knowledge. TS bases - accept as is 83 H 3            M E "notes" section was not updated to reflect the Modifi ed version of the question. fixed 84 H 3            B E Repeat from 2005; change "...contains mitigating actions..." to "...should be used..."
: 1. 2.      3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                              8.
fixed History section states this question was used on the 2005 RO exam - if so, is it SRO only knowledge?
Q# LOK  LOD (F/H) (1-5) Stem Cues T/F     Cred. Partial Job- Minutia #/ Back-    Q= SRO B/M/N U/E/S                                           Explanation Focus              Dist.        Link          units ward K/A Only 62    F     2                       X                                                N     neither A or B are credible; accept as is 63    H    4                                                                        B    S 64    H     3                                                                        N     S doesnt test ability to predict/monitor rad levels associated with ARM system controls 65    H     2                                                              X         B     S per KA. Background levels have changed - accept as is.
History was wrong - corrected to reflect SRO exam 85 H 3    X       N U 'B' (establish 40-60) satisfies the procedure (establish <100) and therefore could also be considered correct; Accept as is with enhancements 86 H 3           N S 87 H 4            B E Repeat from 2005;  it would be better to include the action in the choices rather than give the action and just ask for the correct procedure; accept as is 88 H 3    X      X  N E answer is obvious (none of the distractors address the RB pressure); doesn't test knowledge of immediate actions per KA; should probably add an action to the choices (along with procedure selection) and then do two answers with ESAS and two with some other credible procedure; accept as is - applicant must use given info to eliminate distractors change  "...contains specific actions to mitigate..." to "...should be used to mitigate..."
what is eB change number? It is not mentioned in the reference provided; 66    F    2                                                                        B    E electronic database - common language at AN1 67    F    3                                                                        B    S  Repeat from 2007; do Work Order Instructions often refer to the procedure lineup section for restoration?
fixed 89 H 3           X N E since one only has recognize the cause of the condition, this really seems like RO knowledge; should probably 2 causes and 2 procedures in the choices instead of both being different in all 4 options; fixed 90 H 3          X N U same comment as #89; RO system knowledge (recognizing how the valves fail) is all that is needed to answer this. Added procedure strategy 91 H* 3           N S  92 F 2  X         X N U if SRO's (and RO's) are only required to know 1-hour TS from memory, then none of the other distractors are credible and this might really be just RO knowledge; revised to eliminate "times" - changed D ES-401 7 Form ES-401-9 AN1-2008-09 Attachment 8 Page 7 of 8 OBDI 202 - IOLE Process
68    F     2                              X                                         N     E  If so, C would be a reasonable correct answer. Operators are trained to use op procedures - accept as is 69    F    2                                                                        B    S 70    F    2                                                                        B    S only need to know the TEDE value to get this correct; recommend having two options 71    F    2                                                                         N    E with 2000mrem and two with 5000mrem; fixed 72    F    3                                                                        N    S 73    H    3                                                                        B     S  Repeat from 2005; doesnt count 74    H    3                                                                         N    S 75    F     2                                                                        N    S recognizing reactor trip criteria does not discriminate at the SRO level; changed 76    H     2                                                                   X    N    E power level - 43.b.5 are SROs supposed to know all these action times by memory? If they are only supposed to know the 1-hour actions from memory, then none of the other distractors 77    H    3                        X                    X                          N     U are credible (since they all have more than 1-hour actions). Removed time from all answers it is not clear from the references what is meant by exceeding the facilities licensed limit for PTS; I see where the procedure talks of invoking PTS limits, but I do not 78    F    3    X                                                             X   N     U see where it says what those invoked limits will be; also, isnt knowledge of CDR limits in the RTs RO-level knowledge? Revised to include both PTS limits and TS 79    H     2                        X                                               B    U  with the TS provided, anyone who can read can eliminate A and B as not credible                                                                      Page 5 of 8                                                    OBDI 202 - IOLE Process
: 3. Psychometric Flaws 4. Job Content Flaws 5. Other Q# 1. LOK (F/H) 2. LOD (1-5) Stem Focus Cues T/F Cred.
 
Dist. Partial Job-LinkMinutia#/
ES-401                AN1-2008-09                                                    6                                                                              Form ES-401-9
units Back-wardQ= K/A SROOnly 6. B/M/N 7. U/E/S 8. Explanation 93 H 3            N E change "...contains actions for..." to "...should be used for..."
: 1. 2.       3. Psychometric Flaws          4. Job Content Flaws  5. Other  6. 7.                                             8.
done 94 F 2   X       N E 'A' & 'C' are not credible because they include 'B' (i.e., if 'A' or 'C' were correct, 'B' would also be correct, therefore neither 'A' nor 'C' could logically be the correct answer - believing that either were correct would be believing that there are 2 correct answers) revised stem and corrected D 95 H 3         X B U doesn't test knowledge of SRO's responsibilities during fuel handling per KA; added actions required to stem 96 F 2          X  N U doesn't test knowledge of work order requirements per KA; revised question 97 F 2            M S  98 F 3            M S 99 H 3          X B S reactor trip criteria = RO-knowledge; accept as is 100 H 3   X        N E 'B' & 'C' are not credible for this circumstance; Revised B, accept C as is B= 35 F=33 (44%) E=18 M= 2 H=42 (56%) U=10 RO TOTALS:
Q#  LOK  LOD (F/H) (1-5) Stem Cues T/F      Cred. Partial Job- Minutia #/ Back-   Q= SRO B/M/N U/E/S                                          Explanation Focus              Dist.        Link          units ward K/A Only (since they do not match any action in the TS); also, B grammar needs to be cleaned up; also, the correct answer probably should also include the and part of action E. Revised A & B, added the and part to C & D change ...have actions to... to ...should be used to...; revised stem doesnt test 80    H    4    X                                                              X   N     E ability to verify alarms are consistent with plant conditions per KA; accept as is 81    H     3     X                                                                  N     E change ...contains specific steps to... to ...should be used to... fixed this is testing an understanding of thermodynamic plant response and knowledge of 82    H     3                                                                   X   N     S trip setpoints - thats RO-level knowledge. TS bases - accept as is 83    H    3                                                                        M    E  notes section was not updated to reflect the Modified version of the question. fixed Repeat from 2005; change ...contains mitigating actions... to ...should be used...
N= 38  S=47  B= 5 F=6 (24%) E=11 M= 3 H=19 (76%) U=8 SRO TOTALS:
84    H    3                                                                        B    E fixed History section states this question was used on the 2005 RO exam - if so, is it SRO only knowledge? History was wrong - corrected to reflect SRO exam B (establish 40-60) satisfies the procedure (establish <100) and therefore could also 85    H     3                             X                                         N     U be considered correct; Accept as is with enhancements 86    H    3                                                                        N    S Repeat from 2005; it would be better to include the action in the choices rather than 87    H    4                                                                         B    E give the action and just ask for the correct procedure; accept as is answer is obvious (none of the distractors address the RB pressure); doesnt test knowledge of immediate actions per KA; should probably add an action to the choices (along with procedure selection) and then do two answers with ESAS and 88    H     3                       X                                     X         N     E two with some other credible procedure; accept as is - applicant must use given info to eliminate distractors change ...contains specific actions to mitigate... to ...should be used to mitigate... fixed since one only has recognize the cause of the condition, this really seems like RO 89   H    3                                                                    X   N     E knowledge; should probably 2 causes and 2 procedures in the choices instead of both being different in all 4 options; fixed same comment as #89; RO system knowledge (recognizing how the valves fail) is all 90    H     3                                                                   X   N    U that is needed to answer this. Added procedure strategy 91  H*    3                                                                        N     S if SROs (and ROs) are only required to know 1-hour TS from memory, then none of 92    F     2            X                                                      X    N    U the other distractors are credible and this might really be just RO knowledge; revised to eliminate times - changed D                                                                      Page 6 of 8                                                    OBDI 202 - IOLE Process
N= 17 S=6  
 
ES-401                    AN1-2008-09                                                      7                                                                                Form ES-401-9
: 1. 2.        3. Psychometric Flaws          4. Job Content Flaws      5. Other  6. 7.                                              8.
Q#    LOK    LOD (F/H)  (1-5)  Stem Cues T/F      Cred. Partial Job- Minutia #/ Back-        Q= SRO B/M/N U/E/S                                          Explanation Focus                Dist.        Link          units ward    K/A Only 93      H      3                                                                              N    E  change ...contains actions for... to ...should be used for... done A & C are not credible because they include B (i.e., if A or C were correct, B would also be correct, therefore neither A nor C could logically be the correct 94      F      2                          X                                                  N    E answer - believing that either were correct would be believing that there are 2 correct answers) revised stem and corrected D doesnt test knowledge of SROs responsibilities during fuel handling per KA; added 95      H      3                                                                  X          B    U actions required to stem 96      F      2                                                                  X          N    U  doesnt test knowledge of work order requirements per KA; revised question 97      F      2                                                                              M    S 98      F      3                                                                              M    S 99      H      3                                                                        X    B    S  reactor trip criteria = RO-knowledge; accept as is 100    H      3                          X                                                  N    E  B & C are not credible for this circumstance; Revised B, accept C as is B= 35              F= 33 (44%)          E= 18 RO TOTALS:                M= 2                H= 42 (56%)          U= 10 N= 38                                    S= 47 B= 5                F= 6 (24%)            E= 11 SRO TOTALS:                M= 3                H= 19 (76%)          U= 8 N= 17                                     S= 6


==GENERAL COMMENT==
==GENERAL COMMENT==
S:
S:
: 1. Bank questions are indicated by B; Modified are indicated by M; New questions are indicated by N.
: 1. Bank questions are indicated by B; Modified are indicated by M; New questions are indicated by N.
: 2. Chief Examiner comments are indicated in blue. 3. Average difficulty is __
: 2. Chief Examiner comments are indicated in blue.
2.73 ___   on the RO exam and
: 3. Average difficulty is __ 2.73 ___ on the RO exam and           ___     on the SRO exam.
___
: 4. The 10CFR55.41/43 distribution is: RO / SRO 41.1 =                   43.1 =
on the SRO exam.
41.2 =                   43.2 =
: 4. The 10CFR55.41/43 distribution is: RO / SRO 41.1 =   43.1 =   41.2 =   43.2 =   41.3 =   43.3 =   41.4 =   43.4 =   41.5 =   43.5 =
41.3 =                   43.3 =
ES-401 8 Form ES-401-9 AN1-2008-09 Attachment 8 Page 8 of 8 OBDI 202 - IOLE Process 41.6 =   43.6 =   41.7 =   43.7 =   41.8 =     41.9 =   41.10 =   41.11 =   41.12 =   41.13 =   41.14 =
41.4 =                   43.4 =
: 5. The answer distribution is: RO / SRO A = B = C = D =   6. There are   3   questions with attachments provided.}}
41.5 =                   43.5 =                                                                             Page 7 of 8                                                    OBDI 202 - IOLE Process
 
ES-401                 AN1-2008-09                              8                     Form ES-401-9 41.6 =                 43.6 =
41.7 =                 43.7 =
41.8 =
41.9 =
41.10 =
41.11 =
41.12 =
41.13 =
41.14 =
: 5.       The answer distribution is: RO / SRO A=
B=
C=
D=
: 6.       There are 3   questions with attachments provided.                                                 Page 8 of 8 OBDI 202 - IOLE Process}}

Revision as of 12:24, 14 November 2019

09-Draft Written Exam Comments
ML082750585
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/05/2008
From: Brian Larson
NRC Region 4
To:
References
Download: ML082750585 (8)


Text

ES-401 AN1-2008-09 Written Examination Review Worksheet Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1 F 3 B S 2 H 3 N S 3 H 3 B S Change CBOT to ATC in stem. Accept as is 4 H 3 N S Need to walk through procedure to get to throttling criteria. Done. Ok as is.

5 H 3 N S Repeat from 2005 retake; appears to be a collection of T/F statements (no need for 6 H 3 X X B E stem); only B & C deal with reasons per the KA; remove name from History Not T/F statements as stem is required. Added reasons to A & D.

C could also be considered correct; doesnt really test knowledge of the operational 7 H 3 X X B U implications of a loss of DHR per KA (this question just asks for actions to prevent possible loss of DHR); reworded stem 8 H 3 X X N S Should C be select LT-1002 on C04? No. Is 40 a clear indication of a failed Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 B 5 (easy B difficult) rating scale (questions in the 2 B 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:

$ The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

$ The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

$ The answer choices are a collection of unrelated true/false statements.

$ The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.

$ One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4. Check the appropriate box if a job content error is identified:

$ The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).

$ The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

$ The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

$ The question requires reverse logic or application compared to the job requirements.

5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewer=s judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any AU@ ratings (e.g., how the Appendix B psychometric attributes are not being met). Page 1 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only channel? Yes doesnt test ability to determine Pzr Level during Pzr Pressure Malfunctions per KA; accept as is 9 H 2 B S Repeat from 2007; change stem to ...EOP, the fourth RCP must be secured before what specified 10 F* 2 X N E temperature and why? References not sufficient to justify answer accept as is changes are not sufficient to warrant modified label; changed to Bank change 11 H 3 X B* S question to address knowledge, not action; accept as is C is not credible since the stem already indicates that there is EFW flow to both OTSGs. Accept as is 12 H 3 X N U this is not RO-level (55.43(b)(2)); new question 13 H 3 N S 14 H 3 N S In the question, B says ...causing excessive RCS makeup, but in the answer section it says ...minimizing the impact to RCS makeup. And the Notes says the 15 F 3 N E result is swapping inventory control to HPI block valve Which is correct? Rewrote question to include position of both valves and updated notes doesnt test knowledge of REASONS for use of dc control power for D/Gs per KA; 16 H 3 X B U added reasons This answer is obvious and cued from the stem; doesnt test ability to monitor/operate 17 F 3 X X X M U components served by IA to minimize drain on system per KA. Rewrote stem Should the stem say RCS pressure has increased to 120 psig...? Fixed Change 18 H 3 N E the stem to say Under these conditions, what is the preferred... Done procedure says power must be <40% for rod transfer, but stem says power is at 40%;

19 H 3 B E is this a problem? Changed to 39%

20 F 2 N S 21 F 3 B* S changes are not sufficient to warrant modified label; Changed to Bank 22 F 3 B S 23 H 3 N S This is really an SRO-level question (55.43(b)(5)); entry condition to procedure is RO 24 H 3 X X B S knowledge doesnt test knowledge of REASONS per KA; accept as is 25 F* 3 X B E The answer is keyed to procedure entry conditions, not level at which consideration would be given to commencing a shutdown; stem should be modified to refer to Page 2 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 3 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only entry conditions. Accept as is 26 H 3 X N E shouldnt the stem say Cooldown rate is 70 degrees F/hr... ? fixed 27 H 3 X B U doesnt test knowledge of the REASONS per KA; added reasons doesnt test knowledge of affects of RCP coastdown on RCS parameters per KA; also, couldnt validate correct answer; procedure says if no RCPs are operating, use lowest. Lowest what? The procedure also says when both DHR systems are in service, use the lower DH cooler outlet temperature for plotting cooldown rate; 28 F 3 X N U however, we only have one DHR system in operation for this question, and it is not explicitly stated that the DH cooler outlet is used for cooldown in this condition. Also, TS 3.4.3 Figures 1 & 2 both indicate in their respective Note-2 that the DHR RETURN temperature is to be used for HUR/CDR calculations. New question 29 H 3 B S 30 H 3 B S 31 F 3 B S change stem to ...loss of Decay Heat Removal... or similar phrasing (strictly 32 H* 2 N E speaking, a loss of Decay Heat would eliminate the need for the DHR system and make this question moot); fixed 33 F 2 N S 34 F 2 N E Eliminate first sentence of stem; fixed is D supposed to read C-28A &B or E-28A &B? (see notes explaining answer) 35 F 3 N E fixed notes this is a very easy question and a missed opportunity to ask a more substantive 36 H 2 B E question on the KA; I recommend rewriting with more meat; revised notes and reworded stem B and C are not very credible; doesnt test knowledge of effect of Loss/Malfunction 37 H 3 X X B U of bypass block circuits per KA; changed stem 38 H 3 B S Repeat from 2005 retake; 39 F 2 N S 40 F 2 N S 41 H 3 N S Page 3 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 4 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 42 H 3 N* E The source says direct but question history says its new. Fixed history.

43 H 4 B S 44 H* 3 X B E A is not credible; MFPs have setback feature - revised notes - accept as is doesnt test knowledge of the effect of a loss/malfunction of AFW has on SG per KA; revised stem also, its not clear from the references provided why the feed rate on A 45 H 3 X X N U SG should be 6/minute - how is that determined? Revised answers based on calculation 46 H* 2 N S explanations for B and C dont make sense to me. Accept as is 47 H 4 N S this question doesnt really test what the KA is asking for and, based on the 48 F* 3 X X X B U procedure, it looks like a new KA is needed to test something more operationally relevant; rewrote question 49 F 3 X N S is this really RO knowledge (55.43(b)(2))? RO lesson plan - accept as is 50 H 3 X B E A is not credible when the stem gives the discharge pressure of 20 psig; accept as is 51 H 3 B S Repeat from 2005; doesnt count 52 H* 3 B S 53 F 3 B S 54 F 2 N S B, C, & D are all correct for the way the question is worded; should change stem 55 F 2 X N U question to Under these conditions, what actions should be considered to help protect... and should replace D; revised stem 56 H 3 B S 57 F 3 N S 58 F* 3 B S 59 F 2 N S 60 F 3 N S I do not see a procedural direction to place the assembly in the storage rack and I do 61 H 3 X M E not see a prohibition to putting it back in the SFP; revised answers Page 4 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 5 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 62 F 2 X N S neither A or B are credible; accept as is 63 H 4 B S 64 H 3 N S doesnt test ability to predict/monitor rad levels associated with ARM system controls 65 H 2 X B S per KA. Background levels have changed - accept as is.

what is eB change number? It is not mentioned in the reference provided; 66 F 2 B E electronic database - common language at AN1 67 F 3 B S Repeat from 2007; do Work Order Instructions often refer to the procedure lineup section for restoration?

68 F 2 X N E If so, C would be a reasonable correct answer. Operators are trained to use op procedures - accept as is 69 F 2 B S 70 F 2 B S only need to know the TEDE value to get this correct; recommend having two options 71 F 2 N E with 2000mrem and two with 5000mrem; fixed 72 F 3 N S 73 H 3 B S Repeat from 2005; doesnt count 74 H 3 N S 75 F 2 N S recognizing reactor trip criteria does not discriminate at the SRO level; changed 76 H 2 X N E power level - 43.b.5 are SROs supposed to know all these action times by memory? If they are only supposed to know the 1-hour actions from memory, then none of the other distractors 77 H 3 X X N U are credible (since they all have more than 1-hour actions). Removed time from all answers it is not clear from the references what is meant by exceeding the facilities licensed limit for PTS; I see where the procedure talks of invoking PTS limits, but I do not 78 F 3 X X N U see where it says what those invoked limits will be; also, isnt knowledge of CDR limits in the RTs RO-level knowledge? Revised to include both PTS limits and TS 79 H 2 X B U with the TS provided, anyone who can read can eliminate A and B as not credible Page 5 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 6 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only (since they do not match any action in the TS); also, B grammar needs to be cleaned up; also, the correct answer probably should also include the and part of action E. Revised A & B, added the and part to C & D change ...have actions to... to ...should be used to...; revised stem doesnt test 80 H 4 X X N E ability to verify alarms are consistent with plant conditions per KA; accept as is 81 H 3 X N E change ...contains specific steps to... to ...should be used to... fixed this is testing an understanding of thermodynamic plant response and knowledge of 82 H 3 X N S trip setpoints - thats RO-level knowledge. TS bases - accept as is 83 H 3 M E notes section was not updated to reflect the Modified version of the question. fixed Repeat from 2005; change ...contains mitigating actions... to ...should be used...

84 H 3 B E fixed History section states this question was used on the 2005 RO exam - if so, is it SRO only knowledge? History was wrong - corrected to reflect SRO exam B (establish 40-60) satisfies the procedure (establish <100) and therefore could also 85 H 3 X N U be considered correct; Accept as is with enhancements 86 H 3 N S Repeat from 2005; it would be better to include the action in the choices rather than 87 H 4 B E give the action and just ask for the correct procedure; accept as is answer is obvious (none of the distractors address the RB pressure); doesnt test knowledge of immediate actions per KA; should probably add an action to the choices (along with procedure selection) and then do two answers with ESAS and 88 H 3 X X N E two with some other credible procedure; accept as is - applicant must use given info to eliminate distractors change ...contains specific actions to mitigate... to ...should be used to mitigate... fixed since one only has recognize the cause of the condition, this really seems like RO 89 H 3 X N E knowledge; should probably 2 causes and 2 procedures in the choices instead of both being different in all 4 options; fixed same comment as #89; RO system knowledge (recognizing how the valves fail) is all 90 H 3 X N U that is needed to answer this. Added procedure strategy 91 H* 3 N S if SROs (and ROs) are only required to know 1-hour TS from memory, then none of 92 F 2 X X N U the other distractors are credible and this might really be just RO knowledge; revised to eliminate times - changed D Page 6 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 7 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 93 H 3 N E change ...contains actions for... to ...should be used for... done A & C are not credible because they include B (i.e., if A or C were correct, B would also be correct, therefore neither A nor C could logically be the correct 94 F 2 X N E answer - believing that either were correct would be believing that there are 2 correct answers) revised stem and corrected D doesnt test knowledge of SROs responsibilities during fuel handling per KA; added 95 H 3 X B U actions required to stem 96 F 2 X N U doesnt test knowledge of work order requirements per KA; revised question 97 F 2 M S 98 F 3 M S 99 H 3 X B S reactor trip criteria = RO-knowledge; accept as is 100 H 3 X N E B & C are not credible for this circumstance; Revised B, accept C as is B= 35 F= 33 (44%) E= 18 RO TOTALS: M= 2 H= 42 (56%) U= 10 N= 38 S= 47 B= 5 F= 6 (24%) E= 11 SRO TOTALS: M= 3 H= 19 (76%) U= 8 N= 17 S= 6

GENERAL COMMENT

S:

1. Bank questions are indicated by B; Modified are indicated by M; New questions are indicated by N.
2. Chief Examiner comments are indicated in blue.
3. Average difficulty is __ 2.73 ___ on the RO exam and ___ on the SRO exam.
4. The 10CFR55.41/43 distribution is: RO / SRO 41.1 = 43.1 =

41.2 = 43.2 =

41.3 = 43.3 =

41.4 = 43.4 =

41.5 = 43.5 = Page 7 of 8 OBDI 202 - IOLE Process

ES-401 AN1-2008-09 8 Form ES-401-9 41.6 = 43.6 =

41.7 = 43.7 =

41.8 =

41.9 =

41.10 =

41.11 =

41.12 =

41.13 =

41.14 =

5. The answer distribution is: RO / SRO A=

B=

C=

D=

6. There are 3 questions with attachments provided. Page 8 of 8 OBDI 202 - IOLE Process