ML19052A606: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:___________(x)NRC-R2-92-14-T-0001 x GS06F0641Zcopies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each  
{{#Wiki_filter:1. CONTRACT ID CODE                              PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1              3
: 2. AMENDMENT/MODIFICATION NO.                                3. EFFECTIVE DATE                        4. REQUISITION/PURCHASE REQ. NO.                    5. PROJECT NO. (If applicable)
M0011                                                        02/21/2019
: 6. ISSUED BY                                            CODE NRCHQ                                    7. ADMINISTERED BY (If other than Item 6)        CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001
: 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
OASIS SYSTEMS LLC ATTN MICHAEL MCELWAIN                                                                                      9B. DATED (SEE ITEM 11) 24 HARTWELL                      AVENUE LEXINGTON MA 024213160 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
GS06F0641Z NRC-R2-92-14-T-0001 10B. DATED (SEE ITEM 13)
CODE                                                          FACILITY CODE                                02/28/2014 176018810
: 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers                          is extended,      is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning          ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
: 12. ACCOUNTING AND APPROPRIATION DATA (If required)
See Schedule
: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE        A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X            FAR 52.217-9 Option to extend the term of the contract E. IMPORTANT:          Contractor                  x is not    is required to sign this document and return  __________________ copies to the issuing office.
: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this modification is the following:
: 1) Exercise Option Period 5, 2) Attach WAFs 00001-7B and 00001-008A.
See continuation pages for more details.


letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
==SUMMARY==
See Schedule 176018810 OASIS SYSTEMS LLC NRCHQ WASHINGTON DC 20555-0001 MAIL STOP 3WFN-05-C64MP ACQUISITION MANAGEMENT DIVISION US NRC - HQ 02/21/2019 M0011 3 113. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.
:
is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completingThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONSFACILITY CODE CODE 10B. DATED (SEE ITEM 13)10A. MODIFICATION OF CONTRACT/ORDER NO.9B. DATED (SEE ITEM 11)9A. AMENDMENT OF SOLICITATION NO.
OBLIGATION:                                              (unchanged)
CODE 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)7. ADMINISTERED BY (If other than Item 6)
EXERCISED CEILING:                                            4 (unchanged)
CODE 6. ISSUED BYPAGE  OF  PAGES
OVERALL CEILING:                                              (unchanged)
: 4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION  NO. 5. PROJECT NO. (If applicable)1. CONTRACT ID CODEAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 02/28/2014 ATTN MICHAEL MCELWAIN 24 HARTWELL  AVENUE LEXINGTON MA 024213160 CHECK ONEA. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACTB. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
Period of Performance: 02/26/2014 to 02/20/2020 Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).E. IMPORTANT:
15A. NAME AND TITLE OF SIGNER (Type or print)                                                           16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Contractor is not is required to sign this document and return    __________________
JESSICA CHU 15B. CONTRACTOR/OFFEROR                                                        15C. DATE SIGNED                                                                          16C. DATE SIGNED 02/19/2019 (Signature of person authorized to sign)
copies to the issuing office. ORDER NO. IN ITEM 10A.
Previous edition unusable                                                                                                                                      RD FORM 30 (REV. 11/2016)
FAR 52.217-9 Option to extend the term of the contract x14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Prescribed by GSA FAR (48 CFR) 53.243
)X The purpose of this modification is the following:
: 1) Exercise Option Period 5, 2) Attach WAFs


00001-7B and 00001-008A.
GS06F0641Z NRC-R2-92-14-T-0001 Modification 11 Page 2 of 3 Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:
1.) Exercise Option Year 5: 02/21/2019 - 02/20/2020 Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018, which was acknowledged by the Contractor on November 20, 2018.
2.) The Task Orders total ceiling shall remain the same at $152,176.04.
3.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) 00001-7B, and 00001-008A (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:
Attachment 13 - WAF 00001-7B Attachment 14 - WAF 00001-008A 4.) CLIN 00001 Obligations are added as follows:
WAF 00001-7B: Total is This is to extend the period of performance.
WAF 00001-008A: Total is This is to extend the period of performance.
Therefore, the Total CLIN 00001 Obligations shall be increased as follows:
As a result of the ceiling and obligations changes, CLIN 00001 has a ceiling of a total obligation of                          remains unfunded and available to fund under the CLIN 00001 ceiling.
5.) The Task Orders Total Obligations have therefore been modified as:


See continuation pages for more details.
GS06F0641Z NRC-R2-92-14-T-0001 Modification 11 Page 3 of 3 From:
 
By:
==SUMMARY==
To: $
: OBLIGATION:  (unchanged)
other terms and conditions remain the same.}}
EXERCISED CEILING:
4 (unchanged)
OVERALL CEILING: (unchanged)
Period of Performance: 02/26/2014 to 02/20/202016A. NAME  AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)15C. DATE SIGNED15B. CONTRACTOR/OFFEROR16C. DATE SIGNED (Signature of person authorized to sign)
JESSICA CHURD FORM 30 (REV. 11/2016)Prescribed by GSA FAR (48 CFR) 53.243 Previous edition unusableExcept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
02/19/2019 GS06F0641Z NRC-R2-92-14-T-0001Modification 11 Page 2 of 3Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:1.)Exercise Option Year 5: 02/21/2019 - 02/20/2020Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018, which was acknowledged by the Contractor on November 20, 2018.2.)The Task Order's total ceiling shall remain the same at $152,176.04.3.)Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) 00001-7B, and 00001-008A (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:Attachment 13 - WAF 00001-7BAttachment 14 - WAF 00001-008A4.)CLIN 00001 Obligations are added as follows:
WAF 00001-7B: Total is  This is to extend the period of performance.WAF 00001-008A: Total is This is to extend the period of performance.
Therefore, the Total CLIN 00001 Obligations shall be increased as follows:As a result of the ceiling and obligations changes, CLIN 00001 has a ceiling of  a total obligation of  remains unfunded and available to fund under the CLIN 00001 ceiling. 5.)The Task Order's Total Obligations have therefore been modified as:
GS06F0641Z NRC-R2-92-14-T-0001Modification 11 Page 3 of 3 From: By:
To: $ other terms and conditions remain the same.}}

Revision as of 00:28, 20 October 2019

Modification No. 011 to Task Order No. NRC-R2-92-14-T-0001 Under Contract No. GS06F0641Z
ML19052A606
Person / Time
Issue date: 02/19/2019
From: Jessica Chu
Acquisition Management Division
To: Mcelwain M
Oasis Systems
References
GS06F0641Z
Download: ML19052A606 (3)


Text

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

M0011 02/21/2019

6. ISSUED BY CODE NRCHQ 7. ADMINISTERED BY (If other than Item 6) CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP 3WFN-05-C64MP WASHINGTON DC 20555-0001
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

(x) 9A. AMENDMENT OF SOLICITATION NO.

OASIS SYSTEMS LLC ATTN MICHAEL MCELWAIN 9B. DATED (SEE ITEM 11) 24 HARTWELL AVENUE LEXINGTON MA 024213160 x 10A. MODIFICATION OF CONTRACT/ORDER NO.

GS06F0641Z NRC-R2-92-14-T-0001 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE 02/28/2014 176018810

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

See Schedule

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

X FAR 52.217-9 Option to extend the term of the contract E. IMPORTANT: Contractor x is not is required to sign this document and return __________________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this modification is the following:

1) Exercise Option Period 5, 2) Attach WAFs 00001-7B and 00001-008A.

See continuation pages for more details.

SUMMARY

OBLIGATION: (unchanged)

EXERCISED CEILING: 4 (unchanged)

OVERALL CEILING: (unchanged)

Period of Performance: 02/26/2014 to 02/20/2020 Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JESSICA CHU 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16C. DATE SIGNED 02/19/2019 (Signature of person authorized to sign)

Previous edition unusable RD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

GS06F0641Z NRC-R2-92-14-T-0001 Modification 11 Page 2 of 3 Unilaterally, FAR 52.217-9 -- Option to Extend the Term, this modification shall:

1.) Exercise Option Year 5: 02/21/2019 - 02/20/2020 Per FAR 52.217-9 -- Option to Extend the Term of the Contract, NRC provided a Notice of Intent to the Contractor on November 20, 2018, which was acknowledged by the Contractor on November 20, 2018.

2.) The Task Orders total ceiling shall remain the same at $152,176.04.

3.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s) 00001-7B, and 00001-008A (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows:

Attachment 13 - WAF 00001-7B Attachment 14 - WAF 00001-008A 4.) CLIN 00001 Obligations are added as follows:

WAF 00001-7B: Total is This is to extend the period of performance.

WAF 00001-008A: Total is This is to extend the period of performance.

Therefore, the Total CLIN 00001 Obligations shall be increased as follows:

As a result of the ceiling and obligations changes, CLIN 00001 has a ceiling of a total obligation of remains unfunded and available to fund under the CLIN 00001 ceiling.

5.) The Task Orders Total Obligations have therefore been modified as:

GS06F0641Z NRC-R2-92-14-T-0001 Modification 11 Page 3 of 3 From:

By:

To: $

other terms and conditions remain the same.