{{#Wiki_filter:September 11, 2009 | {{#Wiki_filter:NUCLEAR REGULATORY COMMISSION | ||
Docket No. | REGION I | ||
1 | 475 ALLENDALE ROAD | ||
Mr. Charles G. Pardee | KING OF PRUSSIA, PENNSYLVANIA 19406-1415 | ||
Senior Vice President, Exelon Generation Company LLC | September 11, 2009 | ||
President and Chief Nuclear Officer, Exelon Nuclear | Docket No. 05000171 License No.DPR-1 | ||
4300 Winfield Rd. | Mr. Charles G. Pardee | ||
Warrenville, IL | Senior Vice President, Exelon Generation Company LLC | ||
President and Chief Nuclear Officer, Exelon Nuclear | |||
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1, | 4300 Winfield Rd. | ||
DELTA, PENNSYLVANIA | Warrenville, IL 60555 | ||
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION | |||
Dear Mr. Pardee: | COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1, | ||
DELTA, PENNSYLVANIA | |||
Dear Mr. Pardee: | |||
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety | |||
inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the | |||
above listed NRC license. The inspection was an examination of your licensed activities as they | |||
relate to radiation safety and to compliance with the Commission's regulations and the license | |||
conditions. The inspection consisted of observations by the inspector, interviews with personnel, | |||
and a selective examination of representative records. The findings of the inspection were | |||
discussed with William Maguire of your organization, and members of the Exelon management | |||
and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents | |||
the results of this inspection. | |||
Within the scope of this inspection, no violations were identified. | |||
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its | |||
enclosure, and your response (if any) will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records component of the NRCs | |||
document system (ADAMS). ADAMS is accessible from the NRC Web Site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or | |||
laurie.kauffman@nrc.gov if you have any questions regarding this matter. | |||
Sincerely, | |||
Original signed by Kathy Modes For | |||
Judith A. Joustra, Chief | |||
Decommissioning Branch | |||
Division of Nuclear Materials Safety | |||
Enclosure: NRC Inspection Report No. 05000171/2009007 | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
see next page | |||
C. Pardee 2 | |||
cc w/encl: | |||
C. Crane, President and Chief Operating Officer, Exelon Corporation | |||
M. Pacilio, Chief Operating Officer, Exelon Nuclear | |||
W. Maguire, Site Vice President, Peach Bottom | |||
J. Grimes, Senior Vice President, Mid-Atlantic | |||
R. Hovey, Senior Vice President, Nuclear Oversight | |||
G. Stathes, Plant Manager, Peach Bottom | |||
J. Armstrong, Regulatory Assurance Manager, Peach Bottom | |||
J. Bardurski, Manager, Financial Control & Co-Owner Affairs | |||
R. Franssen, Director, Operations | |||
P. Cowan, Director, Licensing | |||
D. Helker, Licensing | |||
K. Jury, Vice President, Licensing and Regulatory Affairs | |||
J. Bradley Fewell, Associate General Counsel, Exelon | |||
T. Wasong, Director, Training | |||
Correspondence Control Desk | |||
D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection | |||
S. Gray, Administrator, Maryland Power Plant Research Program | |||
S. Pattison, Secretary, SLO, Maryland Department of the Environment | |||
M. Griffen, Maryland Department of Environment | |||
Public Service Commission of Maryland, Engineering Division | |||
Board of Supervisors, Peach Bottom Township | |||
B. OConnor, Council Administrator of Harford County Council | |||
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance | |||
E. Epstein, TMI - Alert | |||
J. Johnsrud, National Energy Committee, Sierra Club | |||
Mr. & Mrs. Kip Adams | |||
R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program | |||
Director, Nuclear Safety Project, Union of Concerned Scientists | |||
R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations | |||
E. Crist, Harford County Div of Emergency Operations | |||
S. Ayers, Emergency Planner, Harford County Div of Emergency Operations | |||
R. Brooks, Cecil County Dept of Emergency Services | |||
Commonwealth of Pennsylvania | |||
September 11, 2009 | |||
Within the scope of this inspection, no violations were identified. | Docket No. 05000171 License No. DPR-12 | ||
Mr. Charles G. Pardee | |||
Senior Vice President, Exelon Generation Company LLC | |||
President and Chief Nuclear Officer, Exelon Nuclear | |||
4300 Winfield Rd. | |||
Warrenville, IL 60555 | |||
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION | |||
COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1, | |||
DELTA, PENNSYLVANIA | |||
Dear Mr. Pardee: | |||
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety | |||
inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the | |||
above listed NRC license. The inspection was an examination of your licensed activities as they | |||
relate to radiation safety and to compliance with the Commission's regulations and the license | |||
conditions. The inspection consisted of observations by the inspector, interviews with personnel, | |||
and a selective examination of representative records. The findings of the inspection were | |||
discussed with William Maguire of your organization, and members of the Exelon management | |||
and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents | |||
the results of this inspection. | |||
Within the scope of this inspection, no violations were identified. | |||
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its | |||
enclosure, and your response (if any) will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records component of the NRCs | |||
document system (ADAMS). ADAMS is accessible from the NRC Web Site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or | |||
laurie.kauffman@nrc.gov if you have any questions regarding this matter. | |||
Sincerely, | |||
Original signed by Kathy Modes For | |||
Judith A. Joustra, Chief | |||
Decommissioning Branch | |||
Division of Nuclear Materials Safety | |||
Enclosure: NRC Inspection Report No. 05000171/2009007 | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
see next page | |||
Distribution | |||
See next page | |||
DOCUMENT NAME: G:\WordDocs\Current\Insp Letter\LDPR-12.2009007.doc | |||
SUNSI Review Complete: JJoustra | |||
After declaring this document AAn Official Agency Record@ it will be released to the Public. | |||
To receive a copy of this document, indicate in the box: AC@ = Copy w/o attach/encl AE@ = Copy w/ attach/encl AN@ = No copy ML092540134 | |||
OFFICE DNMS/RI N DNMS/RI DNMS/RI | |||
NAME LKauffman/LKauffman JJoustra/KDM f JAJ/ | |||
DATE 09/10/2009 09/11/2009 | |||
OFFICIAL RECORD COPY | |||
C. Pardee 2 | |||
Distribution: | |||
S. Collins, RA | |||
M. Dapas, DRA | |||
D. Lew, DRP | |||
J. Clifford, DRP | |||
J. Kinneman, DNMS | |||
D. Collins, DNMS | |||
J. Joustra, DNMS | |||
L. Kauffman, DNMS | |||
P. Krohn, DRP | |||
R. Fuhrmeister, DRP | |||
A. Rosebrook, DRP | |||
E. Torres, DRP | |||
J. Bream, DRP | |||
F. Bower, DRP, SRI | |||
M. Brown, DRP, RI | |||
S. Schmitt, DRP, OA | |||
L. Trocine, RI OEDO | |||
H. Chernoff, NRR | |||
R. Nelson, NRR | |||
J. Hughey, PM NRR | |||
P. Bamford, Backup NRR | |||
K. Banovac, FSME | |||
D. Persinko, FSME | |||
C. Pardee | |||
M. Dapas, DRA | |||
D. Lew, DRP | |||
J. Clifford, DRP | |||
J. Kinneman, DNMS | |||
D. Collins, DNMS | |||
J. Joustra, DNMS | |||
L. Kauffman, DNMS | |||
P. Krohn, DRP | |||
R. Fuhrmeister, DRP | |||
A. Rosebrook, DRP | |||
E. Torres, DRP | |||
J. Bream, DRP | |||
F. Bower, DRP, SRI | |||
M. Brown, DRP, RI | |||
S. Schmitt, DRP, OA | |||
L. Trocine, RI OEDO | |||
H. Chernoff, NRR | |||
R. Nelson, NRR | |||
J. Hughey, PM NRR | |||
P. Bamford, Backup NRR | |||
K. Banovac, FSME | |||
D. Persinko, FSME | |||
ROPreports@nrc.gov | ROPreports@nrc.gov | ||
}} | }} | ||
Revision as of 02:19, 14 November 2019
| ML092540134 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/11/2009 |
| From: | Joustra J Division of Nuclear Materials Safety I |
| To: | Pardee C Exelon Generation Co |
| References | |
| IR-09-007 | |
| Download: ML092540134 (4) | |
See also: IR 05000171/2009007
Text
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
September 11, 2009
Docket No. 05000171 License No.DPR-1
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION
COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,
DELTA, PENNSYLVANIA
Dear Mr. Pardee:
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety
inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the
above listed NRC license. The inspection was an examination of your licensed activities as they
relate to radiation safety and to compliance with the Commission's regulations and the license
conditions. The inspection consisted of observations by the inspector, interviews with personnel,
and a selective examination of representative records. The findings of the inspection were
discussed with William Maguire of your organization, and members of the Exelon management
and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents
the results of this inspection.
Within the scope of this inspection, no violations were identified.
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records component of the NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web Site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or
laurie.kauffman@nrc.gov if you have any questions regarding this matter.
Sincerely,
Original signed by Kathy Modes For
Judith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure: NRC Inspection Report No. 05000171/2009007
w/Attachment: Supplemental Information
cc w/encl:
see next page
C. Pardee 2
cc w/encl:
C. Crane, President and Chief Operating Officer, Exelon Corporation
M. Pacilio, Chief Operating Officer, Exelon Nuclear
W. Maguire, Site Vice President, Peach Bottom
J. Grimes, Senior Vice President, Mid-Atlantic
R. Hovey, Senior Vice President, Nuclear Oversight
G. Stathes, Plant Manager, Peach Bottom
J. Armstrong, Regulatory Assurance Manager, Peach Bottom
J. Bardurski, Manager, Financial Control & Co-Owner Affairs
R. Franssen, Director, Operations
P. Cowan, Director, Licensing
D. Helker, Licensing
K. Jury, Vice President, Licensing and Regulatory Affairs
J. Bradley Fewell, Associate General Counsel, Exelon
T. Wasong, Director, Training
Correspondence Control Desk
D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection
S. Gray, Administrator, Maryland Power Plant Research Program
S. Pattison, Secretary, SLO, Maryland Department of the Environment
M. Griffen, Maryland Department of Environment
Public Service Commission of Maryland, Engineering Division
Board of Supervisors, Peach Bottom Township
B. OConnor, Council Administrator of Harford County Council
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
E. Epstein, TMI - Alert
J. Johnsrud, National Energy Committee, Sierra Club
Mr. & Mrs. Kip Adams
R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program
Director, Nuclear Safety Project, Union of Concerned Scientists
R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations
E. Crist, Harford County Div of Emergency Operations
S. Ayers, Emergency Planner, Harford County Div of Emergency Operations
R. Brooks, Cecil County Dept of Emergency Services
Commonwealth of Pennsylvania
September 11, 2009
Docket No. 05000171 License No. DPR-12
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company LLC
President and Chief Nuclear Officer, Exelon Nuclear
4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION
COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,
DELTA, PENNSYLVANIA
Dear Mr. Pardee:
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety
inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the
above listed NRC license. The inspection was an examination of your licensed activities as they
relate to radiation safety and to compliance with the Commission's regulations and the license
conditions. The inspection consisted of observations by the inspector, interviews with personnel,
and a selective examination of representative records. The findings of the inspection were
discussed with William Maguire of your organization, and members of the Exelon management
and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents
the results of this inspection.
Within the scope of this inspection, no violations were identified.
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its
enclosure, and your response (if any) will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records component of the NRCs
document system (ADAMS). ADAMS is accessible from the NRC Web Site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or
laurie.kauffman@nrc.gov if you have any questions regarding this matter.
Sincerely,
Original signed by Kathy Modes For
Judith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure: NRC Inspection Report No. 05000171/2009007
w/Attachment: Supplemental Information
cc w/encl:
see next page
Distribution
See next page
DOCUMENT NAME: G:\WordDocs\Current\Insp Letter\LDPR-12.2009007.doc
SUNSI Review Complete: JJoustra
After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: AC@ = Copy w/o attach/encl AE@ = Copy w/ attach/encl AN@ = No copy ML092540134
OFFICE DNMS/RI N DNMS/RI DNMS/RI
NAME LKauffman/LKauffman JJoustra/KDM f JAJ/
DATE 09/10/2009 09/11/2009
OFFICIAL RECORD COPY
C. Pardee 2
Distribution:
S. Collins, RA
M. Dapas, DRA
D. Lew, DRP
J. Clifford, DRP
J. Kinneman, DNMS
D. Collins, DNMS
J. Joustra, DNMS
L. Kauffman, DNMS
P. Krohn, DRP
R. Fuhrmeister, DRP
A. Rosebrook, DRP
E. Torres, DRP
J. Bream, DRP
M. Brown, DRP, RI
S. Schmitt, DRP, OA
L. Trocine, RI OEDO
H. Chernoff, NRR
R. Nelson, NRR
P. Bamford, Backup NRR
K. Banovac, FSME
D. Persinko, FSME
ROPreports@nrc.gov