{{#Wiki_filter:February 18, 2010 | {{#Wiki_filter:February 18, 2010 Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280 | ||
Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280 | |||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009 | APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009 | ||
==Dear Mr. Curley:== | ==Dear Mr. Curley:== | ||
By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory | By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor. | ||
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable. | |||
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable. | In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | ||
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. | |||
In accordance with 10 CFR 2.390 of the NRC | Sincerely, | ||
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC | /RA/ | ||
=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61 | ||
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. Sincerely, | |||
Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280 | |||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009 | APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009 | ||
==Dear Mr. Curley:== | ==Dear Mr. Curley:== | ||
By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory | By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor. | ||
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable. | |||
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable. | In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | ||
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. | |||
In accordance with 10 CFR 2.390 of the NRC | Sincerely, Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61 DISTRIBUTION: | ||
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC | RidsRgn4MailCenter ML100350070 OFFICE MDB/PM MDB/LA MDB/HP NAME TCarter SMichonski RTadesse DATE 1/17/2010 2/17/2010 2/18/2010 OFFICIAL RECORD COPY}} | ||
=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). | |||
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. Sincerely, | |||
Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs | |||
Docket No.: | |||
DISTRIBUTION | |||
Revision as of 22:05, 13 November 2019
| ML100350070 | |
| Person / Time | |
|---|---|
| Site: | 05000134 |
| Issue date: | 02/18/2010 |
| From: | Tadesse R NRC/FSME/DWMEP/DURLD/MDB |
| To: | Curley M Worcester Polytechnic Institute |
| Ted Carter, 415-5543 | |
| References | |
| Download: ML100350070 (2) | |
Text
February 18, 2010 Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280
SUBJECT:
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009
Dear Mr. Curley:
By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.
Sincerely,
/RA/
Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61
Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280
SUBJECT:
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009
Dear Mr. Curley:
By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.
Sincerely, Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61 DISTRIBUTION:
RidsRgn4MailCenter ML100350070 OFFICE MDB/PM MDB/LA MDB/HP NAME TCarter SMichonski RTadesse DATE 1/17/2010 2/17/2010 2/18/2010 OFFICIAL RECORD COPY