{{#Wiki_filter:June 22, 2010  
{{#Wiki_filter:UNITED STATES
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
Mr. Ross T. Ridenoure  
                                                      R E GI ON I V
Senior Vice President and
                                          612 EAST LAMAR BLVD , SU I TE 400
   Chief Nuclear Officer  
                                            AR LI N GTON , TEXAS 76011-4125
Southern California Edison Company  
                                                June 22, 2010
San Onofre Nuclear Generating Station  
Mr. Ross T. Ridenoure
P.O. Box 128  
Senior Vice President and
San Clemente, CA 92674-0128  
   Chief Nuclear Officer
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
SUBJECT:        SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2, AND 3 -
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
                05000361/2010301; 05000362/2010301
Dear Mr. Ridenoure:
In a telephone conversation on June 2, 2010, between Messrs. Bill Arbour and Clyde Osterholtz,
Chief Examiner, arrangements were made for the administration of licensing examinations at
San Onofre Nuclear Generating Station during the week of October 18, 2010.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, and as agreed to in the telephone conversation, it will be
necessary for your staff to furnish the examination outlines by August 16, 2010. The written
examinations, operating tests, and supporting reference materials identified in Attachment 3 to
ES-201 will be due by September 13, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the
Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility
licensee shall approve the outlines, examinations, and tests before they are submitted to the
NRC for review and approval. All materials shall be complete and ready-to-use. We request
that any personal, proprietary, sensitive unclassified, or safeguards information in your response
be contained in a separate enclosure and appropriately marked. Any delay in receiving the
required examinations and reference materials, or the submittal of inadequate or incomplete
materials, may cause the examinations to be rescheduled. In addition, your support for on-site
validation of the examinations is required during the week of September 20, 2010.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402 and to


Southern California Edison Company                  -2-
make the simulation facility available on the dates noted above. In accordance with ES-302,
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2, AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
your staff should retain the original simulator performance data (e.g., system pressures,
05000361/2010301; 05000362/2010301
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Dear Mr. Ridenoure:
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the
applications are not received at least 30 days before the examination date, a postponement may
be necessary. Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.
Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Osterholtz at 817-860-8269, or myself at
817-860-8159.
                                                Sincerely,
                                                /RA/
                                                Mark S. Haire, Chief
                                                Operations Branch
                                                Division of Reactor Safety


Southern California Edison Company    -3-
In a telephone conversation on June 2, 2010, between Me
Dockets: 50-361; 50-362
ssrs. Bill Arbour and Clyde Osterholtz, Chief Examiner, arrangements were made for the administration of licensing examinations at
Licenses: NPF-10; NPF-15
San Onofre Nuclear Generating Station during the week of October 18, 2010.  
cc:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, CA 92101
Gary L. Nolff
Assistant Director-Resources
City of Riverside
3900 Main Street
Riverside, CA 92522
Mark L. Parsons
Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA 92522
Gary H. Yamamoto, P.E., Chief
Division of Drinking Water and
Environmental Management
1616 Capitol Avenue, MS 7400
P.O. Box 997377
Sacramento, CA 95899-7377
Michael L. DeMarco
San Onofre Liaison
San Diego Gas & Electric Company
8315 Century Park Ct. CP21C
San Diego, CA 92123-1548
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
The Mayor of the City of San Clemente
100 Avenida Presidio
San Clemente, CA 92672
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA 95814


Southern California Edison Company            -4-
As agreed during the telephone conversation, your staff will prepare the examinat
Douglas K. Porter, Esquire
ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Southern California Edison Company
Reactors," Revision 9, S
2244 Walnut Grove Avenue
upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revi
Rosemead, CA 91770
sion 2, Supplement 1.  The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
Albert R. Hochevar
administered.
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Steve Hsu
Department of Health Services
Radiologic Health Branch
MS 7610, P.O. Box 997414
Sacramento, CA 95899-7414
R. St. Onge
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA 92674-0128
Chief, Technological Hazards Branch
FEMA Region IX
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Institute of Nuclear Power Operations (INPO)
Records Center
700 Galleria Parkway SE, Suite 100Atlanta, GA 30339


Southern California Edison Company               -5-
To meet the above sc
Electronic distribution by RIV:
hedule, and as agreed to in the telephone conversation, it will be necessary for your staff to furnish the examination outlines by August 16, 2010.  The written
Regional Administrator (Elmo.Collins@nrc.gov)
examinations, operating tests, and supporting reference materials identified in Attachment 3 to
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
ES-201 will be due by September 13, 2010.  Pursuant to Title
DRP Director (Dwight.Chamberlain@nrc.gov)
10, Section 55.40(b)(3), of the Code of Federal Regulat
DRP Deputy Director (Anton.Vegel@nrc.gov)
ions (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the
DRS Director (Roy.Caniano@nrc.gov)
NRC for review and approval.  All materials shall be complete and ready-to-use.  We request
DRS Deputy Director (Troy.Pruett@nrc.gov)
that any personal, proprietary, sensitive unclassified, or safeguards information in your response
Senior Resident Inspector (Greg.Warnick@nrc.gov)
be contained in a separate enclosure and appropriately marked.  Any delay in receiving the
Resident Inspector (John.Reynoso@nrc.gov)
required examinations and reference materials, or the submittal of inadequate or incomplete
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)
materials, may cause the examinations to be rescheduled.  In addition, your support for on-site
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
validation of the examinations is required during the week of September 20, 2010.
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)
 
Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)
In order to conduct the requested written examinations and
Public Affairs Officer (Victor.Dricks@nrc.gov)
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and to UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Public Affairs Officer (Lara.Uselding@nrc.gov)
Southern California Edison Company - 2 - 
Project Manager (Randy.Hall@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
make the simulation facility av
RITS Coordinator (Marisa.Herrera@nrc.gov)
ailable on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
Regional Counsel (Karla.Fuller@nrc.gov)
temperatures, and levels) generated during the dynamic operating tests until the examination
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
results are final.
OEMail Resource
 
DRS/TSB STA (Dale.Powers@nrc.gov)
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
 
File located:
SUNSI Rev Compl.         Yes     No ADAMS       Yes No     Reviewer Initials   CCO
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
Publicly Avail           Yes     No Sensitive   Yes  No   Sens. Type Initials CCO
senior operator license applications (Office of Management and Budget (OMB) approval number
SOE:OB                   C:OB
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
CCOsterholtz             MSHaire
any)(OMB approval number 3150-0090) at least 30 days before the first examination date.  If the
/RA/                     /RA/
applications are not received at least 30 days before the examination date, a postponement may
6/17/2010               6/22/2010
be necessary.  Signed applications certifying that all training has been completed should be
OFFICIAL RECORD COPY                                 T=Telephone     E=E-mail     F=Fax
submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018.  The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information.  Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
Thank you for your cooperation in this matter.  Mr. Arbour has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Osterholtz at 817-860-8269, or myself at 
817-860-8159.
 
      Sincerely, 
 
      /RA/
      Mark S. Haire, Chief Operations Branch      Division of Reactor Safety 
Southern California Edison Company - 3 - 
Dockets:  50-361; 50-362
Licenses:  NPF-10; NPF-15
 
cc:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, CA  92101
 
Gary L. Nolff
Assistant Director-Resources
City of Riverside
3900 Main Street
Riverside, CA  92522
 
Mark L. Parsons
Deputy City Attorney
City of Riverside
3900 Main Street
Riverside, CA  92522
 
Gary H. Yamamoto, P.E., Chief
Division of Drinking Water and 
  Environmental Management 
1616 Capitol Avenue, MS 7400
P.O. Box 997377
Sacramento, CA  95899-7377
 
Michael L. DeMarco
San Onofre Liaison
San Diego Gas & Electric Company
8315 Century Park Ct. CP21C
San Diego, CA  92123-1548
 
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA  95899-7414
 
The Mayor of the City of San Clemente
100 Avenida Presidio
San Clemente, CA  92672
 
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 34)
Sacramento, CA  95814 
Southern California Edison Company - 4 - 
Douglas K. Porter, Esquire
Southern California Edison Company
2244 Walnut Grove Avenue
Rosemead, CA  91770
 
Albert R. Hochevar
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA  92674-0128
 
Steve Hsu
Department of Health Services
Radiologic Health Branch
MS 7610, P.O. Box 997414
Sacramento, CA  95899-7414
 
R. St. Onge
Southern California Edison Company
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, CA  92674-0128
 
Chief, Technological Hazards Branch
FEMA Region IX
1111 Broadway, Suite 1200
Oakland, CA  94607-4052
 
Institute of Nuclear Power Operations (INPO) 
Records Center
700 Galleria Parkway SE, Suite 100Atlanta, GA  30339 
Southern California Edison Company - 5 - 
Electronic distribution by RIV:  
 
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
DRP Director (Dwight.Chamberlain@nrc.gov)  
DRP Deputy Director (Anton.Vegel@nrc.gov)  
DRS Director (Roy.Caniano@nrc.gov)  
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Resident Inspector (Greg.Warnick@nrc.gov)  
Resident Inspector (John.Reynoso@nrc.gov)  
Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)  
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)  
SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov) Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)  
Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Randy.Hall@nrc.gov)  
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
OEMail Resource  
DRS/TSB STA (Dale.Powers@nrc.gov)  
OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)  
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)  
 
File located:   SUNSI Rev Compl. Yes  No ADAMS Yes No Reviewer Initials CCO Publicly Avail Yes  No Sensitive Yes  No Sens. Type Initials CCO SOE:OB C:OB   CCOsterholtz MSHaire   /RA/ /RA/   6/17/2010 6/22/2010   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax
}}
}}

Revision as of 16:49, 13 November 2019

Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301
ML101740212
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/22/2010
From: Mark Haire
Division of Reactor Safety IV
To: Ridenoure R
Southern California Edison Co
References
50-361/10-301, 50-362/10-301
Download: ML101740212 (5)


See also: IR 05000361/2010301

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

June 22, 2010

Mr. Ross T. Ridenoure

Senior Vice President and

Chief Nuclear Officer

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2, AND 3 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000361/2010301; 05000362/2010301

Dear Mr. Ridenoure:

In a telephone conversation on June 2, 2010, between Messrs. Bill Arbour and Clyde Osterholtz,

Chief Examiner, arrangements were made for the administration of licensing examinations at

San Onofre Nuclear Generating Station during the week of October 18, 2010.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, and as agreed to in the telephone conversation, it will be

necessary for your staff to furnish the examination outlines by August 16, 2010. The written

examinations, operating tests, and supporting reference materials identified in Attachment 3 to

ES-201 will be due by September 13, 2010. Pursuant to Title 10, Section 55.40(b)(3), of the

Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility

licensee shall approve the outlines, examinations, and tests before they are submitted to the

NRC for review and approval. All materials shall be complete and ready-to-use. We request

that any personal, proprietary, sensitive unclassified, or safeguards information in your response

be contained in a separate enclosure and appropriately marked. Any delay in receiving the

required examinations and reference materials, or the submittal of inadequate or incomplete

materials, may cause the examinations to be rescheduled. In addition, your support for on-site

validation of the examinations is required during the week of September 20, 2010.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and to

Southern California Edison Company -2-

make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the

applications are not received at least 30 days before the examination date, a postponement may

be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Thank you for your cooperation in this matter. Mr. Arbour has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Osterholtz at 817-860-8269, or myself at

817-860-8159.

Sincerely,

/RA/

Mark S. Haire, Chief

Operations Branch

Division of Reactor Safety

Southern California Edison Company -3-

Dockets: 50-361; 50-362

Licenses: NPF-10; NPF-15

cc:

Chairman, Board of Supervisors

County of San Diego

1600 Pacific Highway, Room 335

San Diego, CA 92101

Gary L. Nolff

Assistant Director-Resources

City of Riverside

3900 Main Street

Riverside, CA 92522

Mark L. Parsons

Deputy City Attorney

City of Riverside

3900 Main Street

Riverside, CA 92522

Gary H. Yamamoto, P.E., Chief

Division of Drinking Water and

Environmental Management

1616 Capitol Avenue, MS 7400

P.O. Box 997377

Sacramento, CA 95899-7377

Michael L. DeMarco

San Onofre Liaison

San Diego Gas & Electric Company

8315 Century Park Ct. CP21C

San Diego, CA 92123-1548

Director, Radiological Health Branch

State Department of Health Services

P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

The Mayor of the City of San Clemente

100 Avenida Presidio

San Clemente, CA 92672

James D. Boyd, Commissioner

California Energy Commission

1516 Ninth Street (MS 34)

Sacramento, CA 95814

Southern California Edison Company -4-

Douglas K. Porter, Esquire

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, CA 91770

Albert R. Hochevar

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Steve Hsu

Department of Health Services

Radiologic Health Branch

MS 7610, P.O. Box 997414

Sacramento, CA 95899-7414

R. St. Onge

Southern California Edison Company

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, CA 92674-0128

Chief, Technological Hazards Branch

FEMA Region IX

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Institute of Nuclear Power Operations (INPO)

Records Center

700 Galleria Parkway SE, Suite 100Atlanta, GA 30339

Southern California Edison Company -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Greg.Warnick@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

SONGS Administrative Assistant (Heather.Hutchinson@nrc.gov)

Project Engineer, DRP/D (Peter.Jayroe@nrc.gov)

Project Engineer, DRP/D (Zachary.Hollcraft@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

DRS/TSB STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

File located:

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials CCO

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials CCO

SOE:OB C:OB

CCOsterholtz MSHaire

/RA/ /RA/

6/17/2010 6/22/2010

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax