{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257               May 5, 2011  
{{#Wiki_filter:UNITED STATES
 
                                NUCLEAR REGULATORY COMMISSION
Mr. Jon A. Franke  
                                                REGION II
Vice President, Crystal River Nuclear Plant  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Crystal River Nuclear Plant (NA2C)  
                                    ATLANTA, GEORGIA 30303-1257
15760 W. Power Line Street  
                                              May 5, 2011
Crystal River, FL 34428-6708  
Mr. Jon A. Franke
Vice President, Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street
Crystal River, FL 34428-6708
SUBJECT:      CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
              OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Dear Mr. Franke:
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety
inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your on-site resources and to conduct a
productive inspection, we have enclosed a request for documents needed for this inspection. It
is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. The lead inspector has requested that the subject informational material be
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector, George B. Kuzo at (404) 997-4658.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document


FPC                                        2
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Room or from the Publicly Available Records (PARS) component of NRC's document system
Dear Mr. Franke:
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety inspection activities at the Crystal River 3 Nuclear Plant.  The inspection will focus on the Public Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.   
rm/adams.html (the Public Electronic Reading Room).
                                          Sincerely,
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of
                                          /RA/
the inspection.  The lead inspector has requested that the subject informational material be made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming inspection.
                                          Brian Bonser, Chief
We have discussed the schedule for these inspection activities with your staff and understand
                                          Plant Support Branch 1
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658. 
                                          Division of Reactor Safety
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Docket No.: 50-302
enclosure will be available electronically for public inspection in the NRC Public Document
License No.: DPR-72
 
Enclosure:
FPC 2  Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).  
Public Radiation Protection Inspection Document Request
Sincerely, /RA/  
cc w/encl.: (See page 3)
  Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  
Docket No.: 50-302  
License No.: DPR-72  


Enclosure:  Public Radiation Protection Inspection Document Request
FPC                                3
cc w/encl.:  (See page 3) 
cc w/encl:                            Daniel R. Westcott
FPC 3  cc w/encl: Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution  
Kelvin Henderson                     Supervisor
General Manager                       Licensing & Regulatory Programs
Nuclear Fleet Operations             Crystal River Nuclear Plant (NA1B)
Progress Energy                      Electronic Mail Distribution
Electronic Mail Distribution
                                      Joseph W. Donahue
Brian C. McCabe                      Vice President
Manager, Nuclear Oversight            Nuclear Oversight
Shearon Harris Nuclear Power Plant    Progress Energy
Progress Energy                      Electronic Mail Distribution
Electronic Mail Distribution
                                      Jack E. Huegel
James W. Holt                        Manager, Nuclear Oversight
Plant General Manager                Crystal River Nuclear Plant
Crystal River Nuclear Plant (NA2C)    Electronic Mail Distribution
Electronic Mail Distribution
                                      David T. Conley
Stephen J. Cahill                    Senior Counsel
Director - Engineering Nuclear        Legal Department
Crystal River Nuclear Plant (NA2C)    Progress Energy
Electronic Mail Distribution          Electronic Mail Distribution
R. Alexander Glenn                    Mark Rigsby
General Counsel                      Manager, Support Services - Nuclear
Progress Energy                      Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution          Electronic Mail Distribution
Jeffrey R. Swartz                    Senior Resident Inspector
Director Site Operations              U.S. Nuclear Regulatory Commission
Crystal River Nuclear Plant          Crystal River Nuclear Generating Plant
Electronic Mail Distribution          U.S. NRC
                                      6745 N Tallahassee Rd
Donna B. Alexander                    Crystal River, FL 34428
Manager, Nuclear Regulatory Affairs
(interim)                            Attorney General
Progress Energy                       Department of Legal Affairs
Electronic Mail Distribution          The Capitol PL-01
                                      Tallahassee, FL 32399-1050
Thomas Sapporito
Consulting Associate                  Bryan Koon
(Public Correspondence Only)          Director
Post Office Box 8413                  Florida Division of Emergency Management
Jupiter, FL 33468                    Electronic Mail Distribution
William A. Passetti                  Chairman
Chief                                Board of County Commissioners
Florida Bureau of Radiation Control  Citrus County
Department of Health                  110 N. Apopka Avenue
Electronic Mail Distribution         Inverness, FL 36250


Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy
Electronic Mail Distribution
James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
R. Alexander Glenn General Counsel Progress Energy Electronic Mail Distribution
Jeffrey R. Swartz Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) Progress Energy Electronic Mail Distribution


  Thomas Sapporito Consulting Associate (Public Correspondence Only) Post Office Box 8413 Jupiter, FL  33468
  ML111250159                            X SUNSI REVIEW COMPLETE
   
OFFICE            RII: DRS        RII:DRS
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
SIGNATURE          RA              RA
NAME              G. KUZO        B. BONSER
DATE                  05/05/2011      05/05/2011
E-MAIL COPY?        YES        NO  YES        NO YES    NO  YES        NO  YES      NO YES    NO    YES NO
       
                        PUBLIC RADIATION PROTECTION INSPECTION
                                    DOCUMENT REQUEST
SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003
INSPECTION DATES:              June 13 - 17, 2011
NRC INSPECTOR:                George B. Kuzo George.Kuzo@NRC.GOV                (404) 997-4658
PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):    IP 71124.07    Radiological Environmental Monitoring Program
                                              Exposure Controls
Note: This is a broad list of the documents the lead NRC inspector will be interested in
reviewing and obtaining during the pre-inspection visit. The current version of these documents
is expected unless specified otherwise. Electronic media is preferred, if readily available. (The
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.
CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in
the document lists should contain enough information to be easily understood by someone
who has knowledge of the subject. During the inspection, the inspectors may request additional
documents.
                              GENERAL INFORMATION NEEDED
Organization Charts and Contact Phone Numbers for:
    Radiation Protection
    Chemistry
Procedure for issuing Condition Report (CR) documents and assessing issues for risk
    significance and follow-up actions.
  Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
    Radiation Protection.
Current version/revision of the Offsite Dose Calculation Manual (ODCM).
Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)
    2008, CY 2009, and CY 2010.
Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
    and CY 2010.
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
Site and corporate procedures associated with radiological environmental monitoring
    including:
      Collection, preparation, and analysis of environmental samples including air samples,
        TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
                                                                                        Enclosure


Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution
                                              2
     Calibration and maintenance of air/water sampling equipment;
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
    Calibration and QC activities for sample counting instruments;
 
    Sampling and monitoring program to detect leaks from contaminated or potentially
Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution
      contaminated systems, structures, or components;
David T. Conley
    Meteorological instrument calibration, operation, and routine surveillances;
Senior Counsel Legal Department Progress Energy Electronic Mail Distribution
AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information
  Request and do not need to be duplicated].
Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
List of structures, systems, or components that contain or could contain licensed material for
  which there is a credible mechanism for the radioactive material to reach ground water.
Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd
Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.
Crystal River, FL  34428
Calibration and maintenance records for REMP air and composite water samplers since
Attorney General Department of Legal Affairs The Capitol PL-01
  October 1, 2008.
Tallahassee, FL  32399-1050
Inter-laboratory comparison program results for the past two years (in-house or vendor
Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
  laboratory).
Last two calibration /surveillance/maintenance records for the meteorological monitoring
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL  36250
  instruments since October 1, 2008.
 
List of CAP CR and audit documents generated since October 1, 2008, related to
 
  Radiological Environmental Monitoring Program and meteorological monitoring activities.
 
                                                                                      Enclosure
ML111250159   
X  SUNSI REVIEW COMPLETE OFFICE RII: DRS RII:DRS      SIGNATURE
R A R A      NAME G. KUZO B. BONSER      DATE 05/05/2011 05/05/2011      E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO 
Enclosure PUBLIC RADIATION PROTECTION INSPECTION DOCUMENT REQUEST 
  SITE: Crystal River Unit 3 (CR3) Report Number:  05000302/2011003
         
INSPECTION DATES:  June 13 - 17, 2011
NRC INSPECTOR:  George B. Kuzo  George.Kuzo@NRC.GOV        (404) 997-4658
PRELIMINARY LICENSEE CONTACTS:  Radiation Controls - Bryan Akins at (352) 464-7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext. 3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):  IP 71124.07 Radiological Environmental Monitoring Program      Exposure Controls
 
Note:  This is a broad list of the documents the lead NRC inspector will be interested in reviewing and obtaining during the pre-inspection visit.  The current version of these documents
is expected unless specified otherwise.  Electronic media is preferred, if readily available.  (The preferred file format is Word, WordPerfect, or searchable "pdf" files on electronic media, e.g.
CD-ROM.  Please provide 3 copies of each electronic device that is submitted.)  Information in the "document lists" should contain enough information to be easily understood by someone who has knowledge of the subject.  During the inspection, the inspectors may request additional documents.
GENERAL INFORMATION NEEDED
     Organization Charts and Contact Phone Numbers for:      Radiation Protection      Chemistry    Procedure for issuing Condition Report (CR) documents and assessing issues for risk      significance and follow-up actions.    Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12      Radiation Protection.
  Current version/revision of the Offsite Dose Calculation Manual (ODCM).    Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)      2008, CY 2009, and CY 2010.    Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,      and CY 2010.
  RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
    Site and corporate procedures associated with radiological environmental monitoring      including:                      Collection, preparation, and analysis of environmental samples including air samples,                        TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.; 
Enclosure
2                    Calibration and maintenance of air/water sampling equipment;                     Calibration and QC activities for sample counting instruments;                     Sampling and monitoring program to detect leaks from contaminated or potentially                         contaminated systems, structures, or components;                     Meteorological instrument calibration, operation, and routine surveillances;   AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information     Request and do not need to be duplicated].   List of structures, systems, or components that contain or could contain licensed material for       which there is a credible mechanism for the radioactive material to reach ground water.   Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.   Calibration and maintenance records for REMP air and composite water samplers since       October 1, 2008.   Inter-laboratory comparison program results for the past two years (in-house or vendor       laboratory).   Last two calibration /surveillance/maintenance records for the meteorological monitoring       instruments since October 1, 2008.   List of CAP CR and audit documents generated since October 1, 2008, related to       Radiological Environmental Monitoring Program and meteorological monitoring activities.
}}
}}

Revision as of 00:10, 13 November 2019

Notice of Inspection and Request for Information 05000302/2011003
ML111250159
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/05/2011
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
FirstEnergy Nuclear Operating Co, Florida Power & Light Co
References
IR-11-003
Download: ML111250159 (6)


See also: IR 05000302/2011003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 5, 2011

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION

OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003

Dear Mr. Franke:

During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety

inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public

Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to conduct a

productive inspection, we have enclosed a request for documents needed for this inspection. It

is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. The lead inspector has requested that the subject informational material be

made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, George B. Kuzo at (404) 997-4658.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

FPC 2

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No.: 50-302

License No.: DPR-72

Enclosure:

Public Radiation Protection Inspection Document Request

cc w/encl.: (See page 3)

FPC 3

cc w/encl: Daniel R. Westcott

Kelvin Henderson Supervisor

General Manager Licensing & Regulatory Programs

Nuclear Fleet Operations Crystal River Nuclear Plant (NA1B)

Progress Energy Electronic Mail Distribution

Electronic Mail Distribution

Joseph W. Donahue

Brian C. McCabe Vice President

Manager, Nuclear Oversight Nuclear Oversight

Shearon Harris Nuclear Power Plant Progress Energy

Progress Energy Electronic Mail Distribution

Electronic Mail Distribution

Jack E. Huegel

James W. Holt Manager, Nuclear Oversight

Plant General Manager Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution

Electronic Mail Distribution

David T. Conley

Stephen J. Cahill Senior Counsel

Director - Engineering Nuclear Legal Department

Crystal River Nuclear Plant (NA2C) Progress Energy

Electronic Mail Distribution Electronic Mail Distribution

R. Alexander Glenn Mark Rigsby

General Counsel Manager, Support Services - Nuclear

Progress Energy Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Electronic Mail Distribution

Jeffrey R. Swartz Senior Resident Inspector

Director Site Operations U.S. Nuclear Regulatory Commission

Crystal River Nuclear Plant Crystal River Nuclear Generating Plant

Electronic Mail Distribution U.S. NRC

6745 N Tallahassee Rd

Donna B. Alexander Crystal River, FL 34428

Manager, Nuclear Regulatory Affairs

(interim) Attorney General

Progress Energy Department of Legal Affairs

Electronic Mail Distribution The Capitol PL-01

Tallahassee, FL 32399-1050

Thomas Sapporito

Consulting Associate Bryan Koon

(Public Correspondence Only) Director

Post Office Box 8413 Florida Division of Emergency Management

Jupiter, FL 33468 Electronic Mail Distribution

William A. Passetti Chairman

Chief Board of County Commissioners

Florida Bureau of Radiation Control Citrus County

Department of Health 110 N. Apopka Avenue

Electronic Mail Distribution Inverness, FL 36250

ML111250159 X SUNSI REVIEW COMPLETE

OFFICE RII: DRS RII:DRS

SIGNATURE RA RA

NAME G. KUZO B. BONSER

DATE 05/05/2011 05/05/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

PUBLIC RADIATION PROTECTION INSPECTION

DOCUMENT REQUEST

SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003

INSPECTION DATES: June 13 - 17, 2011

NRC INSPECTOR: George B. Kuzo George.Kuzo@NRC.GOV (404) 997-4658

PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-

7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee

Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.

3141; and Licensing - D. Herrin at (352) 563-4633.

Inspection Procedure (IP): IP 71124.07 Radiological Environmental Monitoring Program

Exposure Controls

Note: This is a broad list of the documents the lead NRC inspector will be interested in

reviewing and obtaining during the pre-inspection visit. The current version of these documents

is expected unless specified otherwise. Electronic media is preferred, if readily available. (The

preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.

CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in

the document lists should contain enough information to be easily understood by someone

who has knowledge of the subject. During the inspection, the inspectors may request additional

documents.

GENERAL INFORMATION NEEDED

Organization Charts and Contact Phone Numbers for:

Radiation Protection

Chemistry

Procedure for issuing Condition Report (CR) documents and assessing issues for risk

significance and follow-up actions.

Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12

Radiation Protection.

Current version/revision of the Offsite Dose Calculation Manual (ODCM).

Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)

2008, CY 2009, and CY 2010.

Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,

and CY 2010.

RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]

Site and corporate procedures associated with radiological environmental monitoring

including:

Collection, preparation, and analysis of environmental samples including air samples,

TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;

Enclosure

2

Calibration and maintenance of air/water sampling equipment;

Calibration and QC activities for sample counting instruments;

Sampling and monitoring program to detect leaks from contaminated or potentially

contaminated systems, structures, or components;

Meteorological instrument calibration, operation, and routine surveillances;

AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information

Request and do not need to be duplicated].

List of structures, systems, or components that contain or could contain licensed material for

which there is a credible mechanism for the radioactive material to reach ground water.

Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.

Calibration and maintenance records for REMP air and composite water samplers since

October 1, 2008.

Inter-laboratory comparison program results for the past two years (in-house or vendor

laboratory).

Last two calibration /surveillance/maintenance records for the meteorological monitoring

instruments since October 1, 2008.

List of CAP CR and audit documents generated since October 1, 2008, related to

Radiological Environmental Monitoring Program and meteorological monitoring activities.

Enclosure