ML11136A184: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Boyle, Patrick Sent: Monday, May 16, 2011 10:13 AM To: Ajluni, Mark J.; Stringfellow, N. Jack; Hill, Lesa P. | ||
Cc: Martin, Robert; Boyle, Patrick | Cc: Martin, Robert; Boyle, Patrick | ||
==Subject:== | ==Subject:== | ||
Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675) | Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675) | ||
Mr.Ajluni: | Mr. Ajluni: | ||
By letter dated April 29, 2011, (ML111220091), the Southern Nuclear Operating Company, Inc. (SNC) submitted a request (NL110675) to revise the Technical Specifications (TS), in Appendix A to Facility Operating License Number NPF2 and NPF8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2 respectively and NPF68 and NPF81 for the Vogtle Electric Generating Plant, Units 1 and 2 respectively. The changes would revise TS section 3.4.15 for the Reactor Coolant System (RCS) Leakage Detection Instrumentation consistent with Technical Specification Task Force traveler TSTF513A, Revision 3 titled Revise PWR Operability Requirements and Actions for RCS Leakage instrumentation. | |||
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to conduct a detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | |||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of SNCs request in terms of regulatory requirements. | |||
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. | |||
Patrick G. Boyle LPL21 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: 301-415-3936 Docket Nos: 50348, 50365, 50424, and 50425 TAC Nos: ME6142 through ME6145 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 27 Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C95FF35F9917) | |||
==Subject:== | ==Subject:== | ||
Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675) | Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675) | ||
Tracking Status: None | Sent Date: 5/16/2011 10:12:48 AM Received Date: 5/16/2011 10:12:50 AM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov Recipients: | ||
"Martin, Robert" <Robert.Martin@nrc.gov> | |||
Post Office: | Tracking Status: None "Boyle, Patrick" <Patrick.Boyle@nrc.gov> | ||
Tracking Status: None "Ajluni, Mark J." <MJAJLUNI@southernco.com> | |||
Options | Tracking Status: None "Stringfellow, N. Jack" <NJSTRING@southernco.com> | ||
Tracking Status: None "Hill, Lesa P." <LPHILL@southernco.com> | |||
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1965 5/16/2011 10:12:50 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} | |||
Revision as of 19:29, 12 November 2019
| ML11136A184 | |
| Person / Time | |
|---|---|
| Site: | Vogtle, Farley, 05000365 |
| Issue date: | 05/16/2011 |
| From: | Patrick Boyle Plant Licensing Branch II |
| To: | Ajluni M Southern Nuclear Operating Co |
| References | |
| Download: ML11136A184 (2) | |
Text
NRR-PMDAPEm Resource From: Boyle, Patrick Sent: Monday, May 16, 2011 10:13 AM To: Ajluni, Mark J.; Stringfellow, N. Jack; Hill, Lesa P.
Cc: Martin, Robert; Boyle, Patrick
Subject:
Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675)
Mr. Ajluni:
By letter dated April 29, 2011, (ML111220091), the Southern Nuclear Operating Company, Inc. (SNC) submitted a request (NL110675) to revise the Technical Specifications (TS), in Appendix A to Facility Operating License Number NPF2 and NPF8 for the Joseph M. Farley Nuclear Plant, Units 1 and 2 respectively and NPF68 and NPF81 for the Vogtle Electric Generating Plant, Units 1 and 2 respectively. The changes would revise TS section 3.4.15 for the Reactor Coolant System (RCS) Leakage Detection Instrumentation consistent with Technical Specification Task Force traveler TSTF513A, Revision 3 titled Revise PWR Operability Requirements and Actions for RCS Leakage instrumentation.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to conduct a detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of SNCs request in terms of regulatory requirements.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Patrick G. Boyle LPL21 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: 301-415-3936 Docket Nos: 50348, 50365, 50424, and 50425 TAC Nos: ME6142 through ME6145 1
Hearing Identifier: NRR_PMDA Email Number: 27 Mail Envelope Properties (C070F82E831E1C44879BFA258CF960C95FF35F9917)
Subject:
Acceptance review for Vogtle and Farley TSTF-513 RCS leakage instrumentation operability requirements (NL-11-0675)
Sent Date: 5/16/2011 10:12:48 AM Received Date: 5/16/2011 10:12:50 AM From: Boyle, Patrick Created By: Patrick.Boyle@nrc.gov Recipients:
"Martin, Robert" <Robert.Martin@nrc.gov>
Tracking Status: None "Boyle, Patrick" <Patrick.Boyle@nrc.gov>
Tracking Status: None "Ajluni, Mark J." <MJAJLUNI@southernco.com>
Tracking Status: None "Stringfellow, N. Jack" <NJSTRING@southernco.com>
Tracking Status: None "Hill, Lesa P." <LPHILL@southernco.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1965 5/16/2011 10:12:50 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: