{{#Wiki_filter:--Omaha Public Power District 444 South 16 th Street Mall Omaha, NE 68102-224 7 July 8,2011 LlC-11-0075 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001  
{{#Wiki_filter:--
Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-224 7 July 8,2011 LlC-11-0075 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==References:==
==References:==
: 1. 2. Docket No. 50-285 NRC Regulatory Issue Summary (RIS) 2011-04 Preparation and Scheduling of Operator Licensing Examinations Subject Response to RIS 2011*04, "Preparation and Scheduling of Operator licensing Examinations" Attached is a completed NRC form 536, "Operator Licensing Examination Data," as discussed in the subject document.
: 1.               Docket No. 50-285
No commitments are made in this letter. If you should have any questions, please contact Tom Gie Ihausen at 402-533-6015. ffrey A. Reinhart Ite Vice President JAR/rda Attachment E. E. Collins, Jr., NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (10*2008)
: 2.      NRC Regulatory Issue Summary (RIS) 2011-04 Preparation and Scheduling of Operator Licensing Examinations Subject             Response to RIS 2011*04, "Preparation and Scheduling of Operator licensing Examinations" Attached is a completed NRC form 536, "Operator Licensing Examination Data," as discussed in the subject document.
OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 Estimated burden per to comply with this voluntary information collection request: 1 hour. his information collection i s used to plan budgets and resources for operator examinat i ons. Send comments regarding burden esUmate to the Records and FOIAIPrivacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Comm i ssion, Washington , DC 20555-0001 , or by internet e-mail to infocollects@nrc
No commitments are made in this letter. If you should have any questions, please contact Tom Gie Ihausen at 402-533-6015 .
'80v , and to the Oesk Officer, Office of Information and Regulatory Affairs, NE B-10202, (3150-0131  
ffrey A. Reinhart Ite Vice President JAR/rda Attachment E. E. Collins, Jr., NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector
), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information I collection does n ot display a currenUy valid OMS control number, the NRC may not conduct or sponsor , and a person is not required to respond to , the information collection. F A CILIT Y Fort Calhoun Station Unit 1 NRC REG I ON IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 --, Cy 2014 --Cy 2015 --Cy 2016 ESTIMATED NUMBER OF L1CENSEE-PR!;PARED EXAMINATIONS I 1 1 1 1 ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0 I 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER I I Cy 2013 --Cy 2014 --Cy 2015 CY 2016 NUMBER OF REACTOR OPERATORS 6 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 4 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS  
 
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/20/2013 07/2712014 I 04/0512015 02/29/2016 ALTERNATE DATE 1 10/27/2013 08/03/2014 04/1212015 03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I PROPOSED NUMBER Cy 2013 ---Cy 2014 --MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED J I NUMBER OF 0 CANDIDATES 12 0 I 12 0 0 12 0 N RC FORM 5 36 (10*2 00 8) PRIN T ED O N REC YC LED P A PER}}
NRC FORM 536                   U.S. NUCLEAR REGULATORY COMMISSION   APPROVED BY OMB: NO. 3150-0131                         EXPIRES: 10/31/2011 (10*2008)
Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations . Send comments regarding burden esUmate to the Records and FOIAIPrivacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                          Nuclear Regulatory Commission, Washington , DC 20555-0001 , or by internet e-mail to infocollects@nrc'80v, and to the Oesk Officer, Office of Information EXAMINATION DATA                          and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503.       If a means used to impose an information Icollection does not display a currenUy valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to , the information collection.
FACILITY                                                                                                          NRC REGION Fort Calhoun Station Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE
                                                        ,
PROPOSED NUMBER                       CY 2013           Cy 2014                        Cy 2015                        Cy 2016
                                              ---               --                               --                             -
ESTIMATED NUMBER OF L1CENSEE-PR!;PARED           I     1                           1                               1                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                     0         I                 0                               0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       Cy 2013             Cy 2014                         Cy 2015                         CY 2016 I        --                  --                              -                            -
NUMBER OF REACTOR                         6                     6                               6                               6 OPERATORS NUMBER OF SENIOR REACTOR                         4                     4                               4                               4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                                                                                               2 2                     2                               2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR                                               0                              0                              0 OPERATORS - LIMITED 0
PROPOSED DATES PRIMARY DATE                   10/20/2013         07/2712014                     04/0512015                     02/29/2016 I
ALTERNATE DATE                 10/27/2013         08/03/2014                     04/1212015                     03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1
Cy   2013                                                   Cy 2014 PROPOSED          I                    - --                                                         - -
NUMBER MARCH       JUNE     SEPTEMBER DECEMBER           MARCH               JUNE         SEPTEMBER DECEMBER ESTIMATED NUMBER OF               0           12         0     I   12               0                   0               12                 0 CANDIDATES        JI NRC FORM 536 (10*2008)                                                                                               PRINTED ON RECYCLED PAPER}}

Revision as of 17:39, 12 November 2019

Submittal of Response to RIS 2011-04, Preparation and Scheduling of Operator Licensing Examinations
ML111890500
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 07/08/2011
From: Reinhart J
Omaha Public Power District
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
LlC-11-0075, RIS 2011-04
Download: ML111890500 (2)


Text

--

Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-224 7 July 8,2011 LlC-11-0075 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

References:

1. Docket No. 50-285
2. NRC Regulatory Issue Summary (RIS) 2011-04 Preparation and Scheduling of Operator Licensing Examinations Subject Response to RIS 2011*04, "Preparation and Scheduling of Operator licensing Examinations" Attached is a completed NRC form 536, "Operator Licensing Examination Data," as discussed in the subject document.

No commitments are made in this letter. If you should have any questions, please contact Tom Gie Ihausen at 402-533-6015 .

ffrey A. Reinhart Ite Vice President JAR/rda Attachment E. E. Collins, Jr., NRC Regional Administrator, Region IV L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10*2008)

Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. his information collection is used to plan budgets and resources for operator examinations . Send comments regarding burden esUmate to the Records and FOIAIPrivacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington , DC 20555-0001 , or by internet e-mail to infocollects@nrc'80v, and to the Oesk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NE B-10202, (3150-0131 ), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information Icollection does not display a currenUy valid OMS control number, the NRC may not conduct or sponsor, and a person is not required to respond to , the information collection.

FACILITY NRC REGION Fort Calhoun Station Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE

,

PROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016

--- -- -- -

ESTIMATED NUMBER OF L1CENSEE-PR!;PARED I 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 I 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2013 Cy 2014 Cy 2015 CY 2016 I -- -- - -

NUMBER OF REACTOR 6 6 6 6 OPERATORS NUMBER OF SENIOR REACTOR 4 4 4 4 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 2 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0

PROPOSED DATES PRIMARY DATE 10/20/2013 07/2712014 04/0512015 02/29/2016 I

ALTERNATE DATE 10/27/2013 08/03/2014 04/1212015 03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1

Cy 2013 Cy 2014 PROPOSED I - -- - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 I 12 0 0 12 0 CANDIDATES JI NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER