ML12009A072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 27, 2011 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 NRC Docket Nos. 50-390 and 50-391  
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 27, 2011 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 NRC Docket Nos. 50-390 and 50-391


==Subject:==
==Subject:==
Notification of National Pollutant Discharge Elimination System Permit Modification


==References:==
==References:==
: 1. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (WVA), "Modified NPDES Permit No.
TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee," dated September 1, 2011
: 2. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (TVA), "NPDES Permit No. TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee,"
dated October 11,2011 The purpose of this letter is to notify the NRC that the Watts Bar Nuclear Plant (WBN)
National Pollutant Discharge Elimination System (NPDES) Permit No. TN0020168 has been modified by the state of Tennessee (Reference 1). In accordance with Section 3.2, "Reporting Requirements for Changes to, and Renewal of, the NPDES Permit or State Certification," of Appendix B, "Environmental Protection Plan," (EPP) of the WBN, Unit 1, Facility Operating License No. NPF-90, the Tennessee Valley Authority (TVA) is providing the above referenced NPDES Permit No. TN0020168 to the NRC (Enclosure).
Section 3.2 of the EPP specifies that changes to, and renewals of, the NPDES permits shall be reported to the NRC within 30 days following the date the change or renewal is approved. During the initial 30 day period following receipt of the approved NPDES permit, TVA noticed several errors in the NPDES permit which rendered the modified permit Printed on recycled paper
U.S. Nuclear Regulatory Commission Page 2 December 27, 2011 incomplete. The Tennessee Department of Environment and Conservation (TDEC) was contacted regarding these errors. Revised pages provided by TDEC in a letter dated October 11, 2011 (Reference 2), were numbered incorrectly. On October 20, 2011, TDEC concurred with the correctly numbered pages provided by TVA, as included in the Enclosure.
On November 28, 2011, TDEC provided concurrence to TVA's request for clarification regarding the following additional items. For external outfall number 113, the footnote "(6)"
listed in the "Sample Type" column on page 7 of 33 is a typographical error. There is no
.footnote for this sample type. In the second paragraph on page 29 of 33, comment "(2)"
should not be included in the first sentence. Since comment (2) in the referenced paragraph was incorporated into the permit, its inclusion in this sentence is a typographical error. Based on TVA's receipt of confirmation regarding these two items via electronic mail, neither of these errors have been corrected in the enclosed permit. Additionally, since TVA received concurrence regarding the complete version of modified NPDES Permit No.
TNO020168 on November 28, 2011, this submittal is being provided to the NRC within 30 days of November 28, 2011, which is December 28, 2011.
Section 3.2 of the WBN EPP requires the NRC be provided a copy of the proposed revision to the effective NPDES permit at the same time it is submitted to the permitting agency "...
if the proposed revision is a significant change of waste stream flow rate, concentration, or point of discharge." Since this current revision to the NPDES permit was considered a "Minor Modification" by the TDEC in accordance with 40 CFR 122.63, submittal of the proposed revision to the NRC was not required.
There are no regulatory commitments contained in this submittal. If there are any questions relating to this matter, please contact Kara M. Stacy, Program Manager, Corporate Nuclear Licensing, at 423-751-3489.
Respec u M nage      Corporate Nuclear Licensing E closure:
Modified NPDES Permit No. TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee cc (Enclosure):
NRC Regional Administrator- Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 MODIFIED NPDES PERMIT NO. TN0020168, TVA - WATTS BAR NUCLEAR PLANT, SPRING CITY, RHEA COUNTY, TENNESSEE


Notification of National Pollutant Discharge Elimination System Permit Modification
STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243 SEP 0 1 2011 Mr. Don Grissette, Vice President, Watts Bar Nuclear Plant TVA Watts Bar Nuclear Plant 1260 Hwy 68, Nuclear Plant Rd.
: 1. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (WVA), "Modified NPDES Permit No.TN0020168, TVA -Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee," dated September 1, 2011 2. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (TVA), "NPDES Permit No. TN0020168, TVA -Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee," dated October 11,2011 The purpose of this letter is to notify the NRC that the Watts Bar Nuclear Plant (WBN)National Pollutant Discharge Elimination System (NPDES) Permit No. TN0020168 has been modified by the state of Tennessee (Reference 1). In accordance with Section 3.2,"Reporting Requirements for Changes to, and Renewal of, the NPDES Permit or State Certification," of Appendix B, "Environmental Protection Plan," (EPP) of the WBN, Unit 1, Facility Operating License No. NPF-90, the Tennessee Valley Authority (TVA) is providing the above referenced NPDES Permit No. TN0020168 to the NRC (Enclosure).
Spring City, TN 37381
Section 3.2 of the EPP specifies that changes to, and renewals of, the NPDES permits shall be reported to the NRC within 30 days following the date the change or renewal is approved.
During the initial 30 day period following receipt of the approved NPDES permit, TVA noticed several errors in the NPDES permit which rendered the modified permit Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 December 27, 2011 incomplete.
The Tennessee Department of Environment and Conservation (TDEC) was contacted regarding these errors. Revised pages provided by TDEC in a letter dated October 11, 2011 (Reference 2), were numbered incorrectly.
On October 20, 2011, TDEC concurred with the correctly numbered pages provided by TVA, as included in the Enclosure.
On November 28, 2011, TDEC provided concurrence to TVA's request for clarification regarding the following additional items. For external outfall number 113, the footnote "(6)" listed in the "Sample Type" column on page 7 of 33 is a typographical error. There is no.footnote for this sample type. In the second paragraph on page 29 of 33, comment "(2)" should not be included in the first sentence.
Since comment (2) in the referenced paragraph was incorporated into the permit, its inclusion in this sentence is a typographical error. Based on TVA's receipt of confirmation regarding these two items via electronic mail, neither of these errors have been corrected in the enclosed permit. Additionally, since TVA received concurrence regarding the complete version of modified NPDES Permit No.TNO020168 on November 28, 2011, this submittal is being provided to the NRC within 30 days of November 28, 2011, which is December 28, 2011.Section 3.2 of the WBN EPP requires the NRC be provided a copy of the proposed revision to the effective NPDES permit at the same time it is submitted to the permitting agency "...if the proposed revision is a significant change of waste stream flow rate, concentration, or point of discharge." Since this current revision to the NPDES permit was considered a"Minor Modification" by the TDEC in accordance with 40 CFR 122.63, submittal of the proposed revision to the NRC was not required.There are no regulatory commitments contained in this submittal.
If there are any questions relating to this matter, please contact Kara M. Stacy, Program Manager, Corporate Nuclear Licensing, at 423-751-3489.
Respec u M nage Corporate Nuclear Licensing E closure: Modified NPDES Permit No. TN0020168, TVA -Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee cc (Enclosure):
NRC Regional Administrator-Region II NRC Senior Resident Inspector
-Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector
-Watts Bar Nuclear Plant, Unit 2 ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 MODIFIED NPDES PERMIT NO. TN0020168, TVA -WATTS BAR NUCLEAR PLANT, SPRING CITY, RHEA COUNTY, TENNESSEE STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243 SEP 0 1 2011 Mr. Don Grissette, Vice President, Watts Bar Nuclear Plant TVA Watts Bar Nuclear Plant 1260 Hwy 68, Nuclear Plant Rd.Spring City, TN 37381  


==Subject:==
==Subject:==
Modified NPDES Permit No. TNO020168 TVA -Watts Bar Nuclear Plant Spring City, Rhea County, Tennessee  
Modified NPDES Permit No. TNO020168 TVA - Watts Bar Nuclear Plant Spring City, Rhea County, Tennessee


==Dear Mr. Grissette:==
==Dear Mr. Grissette:==


In accordance with the provisions of "The Tennessee Water Quality Control Act" (Tennessee Code Annotated, Sections 69-3-101 through 69-3-120) your NPDES Permit is hereby modified by the Division of Water Pollution Control. The continuance and/or reissuance of this NPDES Permit is contingent upon your meeting the conditions and requirements as stated therein.This minor modification revises items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft permit comments.Please be advised that a petition for permit appeal may be filed, pursuant to T.C.A. Section 69-3-105, subsection (i), by the permit applicant or by any aggrieved person who participated in the public comment period or gave testimony at a formal public hearing whose appeal is based upon any of the issues that were provided to the commissioner in writing during the public comment period or in testimony at a formal public hearing on the permit application.
In accordance with the provisions of "The Tennessee Water Quality Control Act" (Tennessee Code Annotated, Sections 69-3-101 through 69-3-120) your NPDES Permit is hereby modified by the Division of Water Pollution Control. The continuance and/or reissuance of this NPDES Permit is contingent upon your meeting the conditions and requirements as stated therein.
This minor modification revises items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft permit comments.
Please be advised that a petition for permit appeal may be filed, pursuant to T.C.A. Section 69-3-105, subsection (i), by the permit applicant or by any aggrieved person who participated in the public comment period or gave testimony at a formal public hearing whose appeal is based upon any of the issues that were provided to the commissioner in writing during the public comment period or in testimony at a formal public hearing on the permit application.
Additionally, for those permits for which the department gives public notice of a draft permit, any permit applicant or aggrieved person may base a permit appeal on any material change to conditions in the final permit from those in the draft, unless the material change has been subject to additional opportunity for public comment. Any petition for permit appeal under this subsection (i) shall be filed with the board within thirty (30) days after public notice of the commissioner's decision to issue or deny the permit.
Additionally, for those permits for which the department gives public notice of a draft permit, any permit applicant or aggrieved person may base a permit appeal on any material change to conditions in the final permit from those in the draft, unless the material change has been subject to additional opportunity for public comment. Any petition for permit appeal under this subsection (i) shall be filed with the board within thirty (30) days after public notice of the commissioner's decision to issue or deny the permit.
If you have questions, please contact the Division of Water Pollution Control at your local Environmental Assistance Center at 1-888-891-TDEC; or, at this office, please contact Ms.Souraya Fathi at (615) 532-0485 or by E-mail at Souraya.Fathi@tn.gov.
 
Sincerely, Pojfi n Jan Manager, Permit Section Division of Water Pollution Control PWAT-3 Enclosure cc: DWPC, Permit Section & Chattanooga Environmental Field Office Ms. Jerri L. Phillips, Environmental Scientist, TVA Watts Bar Nuclear Plant, jlphillips@tva.gov Ms. Betsy M. Eiford-Lee, Chemistry/Environmental Manager, bmeiford-lee@tva.gov Mr. Michael D. Skaggs, Site Vice President, mdskaggs@tva.gov Mr. Darrin J. H4tchison, Chemistry/Environmental
If you have questions, please contact the Division of Water Pollution Control at your local Environmental Assistance Center at 1-888-891-TDEC; or, at this office, please contact Ms.
Souraya Fathi at (615) 532-0485 or by E-mail at Souraya.Fathi@tn.gov.
Sincerely, Pojfi n Jan Manager, Permit Section Division of Water Pollution Control PWAT-3 Enclosure cc:      DWPC,
(5) Sampling and analysis required only if discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testing requirements have not already been completed for Outfall 101. See Part III for methodology.
(5) Sampling and analysis required only if discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testing requirements have not already been completed for Outfall 101. See Part III for methodology.
(6) Certification shall be made during any month that a discharge occurs from this outfall.(7) If there Is discharge during 1 or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall then one sample is required from that "batch'discharge in order to report the monthly average limit.* monitoring and limits for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.Note: There shall be no discharge of PCBs.Additional monitoring requirements and conditions applicable to Outfall 102 include: Discharge through Outfall 102 (emergency overflow) is permitted only under emergency situations.
(6) Certification shall be made during any month that a discharge occurs from this outfall.
This includes times when the diffuser pipe system is isolated as a result of diffuser maintenance and other emergency situations to preserve the integrity of the yard holding pond dikes such as in the event of a catastrophic storm event. All reasonable efforts shall be taken to resume normal discharge through Outfall 101 as soon as possible.
(7) If there Is discharge during 1 or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall then one sample is required from that "batch' discharge in order to report the monthly average limit.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 5 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge turbine building sump water, alum sludge supernate, R.O. reject water, drum dewatering water, water purification plant water, and storm water through Ouffall 103, the Low Volume Waste Pond, an internal monitoring point as described in the Rationale and the permit application.
* monitoring and limits for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.
These discharges shall be limited and monitored by the permittee as specified below: Description
Note: There shall be no discharge of PCBs.
: External Outfall, Number :103, Monitoring
Additional monitoring requirements and conditions applicable to Outfall 102 include:
: Effluent Gross, Season : All Year VF01o40w UR Flow (1) Report Mgal/d Recorder Continuous Daily Maximum Flow (1) Report -Mgal/d Recorder Continuous Monthly Average Oil & Grease <= 20 mg/L Grab Monthly Daily Maximum Oil & Grease <= 15 mg/L Grab Monthly Monthly Average Total Suspended Solids (TSS) <= 100 mg/L Grab Monthly Daily Maximum Total Suspended Solids (TSS) <= 30 mg/L Grab Monthly Monthly Average pH (2) >= 6.0 SU Grab Monthly Minimum pH (2) <= 9.0 Su Grab Monthly Maximum (1) Flow shall be reported in Million Gallons per Day (MGD).(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.
Discharge through Outfall 102 (emergency overflow) is permitted only under emergency situations. This includes times when the diffuser pipe system is isolated as a result of diffuser maintenance and other emergency situations to preserve the integrity of the yard holding pond dikes such as in the event of a catastrophic storm event. All reasonable efforts shall be taken to resume normal discharge through Outfall 101 as soon as possible.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 6 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge metal cleaning wastewater, turbine building station sump water, diesel generator coolant, intermittent micro-filtered condenser tube cleaning discharges, and storm water through Outfall 107, the Lined and Unlined Ponds, an internal monitoring point as described in the Rationale and permit application.
 
These discharges shall be limited and monitored by the permittee as specified below: Description
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 5 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge turbine building sump water, alum sludge supernate, R.O. reject water, drum dewatering water, water purification plant water, and storm water through Ouffall 103, the Low Volume Waste Pond, an internal monitoring point as described in the Rationale and the permit application. These discharges shall be limited and monitored by the permittee as specified below:
: External Outfall, Number : 107, Monitoring
Description : External Outfall, Number :103, Monitoring : Effluent Gross, Season : All Year VF01o40w UR Flow (1)                     Report             Mgal/d     Recorder       Continuous Daily Maximum Flow (1)                     Report       -     Mgal/d     Recorder       Continuous Monthly Average Oil & Grease                     <=       20     mg/L         Grab         Monthly   Daily Maximum Oil & Grease                     <=       15     mg/L         Grab         Monthly   Monthly Average Total Suspended Solids (TSS)                           <=       100     mg/L         Grab         Monthly   Daily Maximum Total (TSS)Suspended Solids            <=       30     mg/L         Grab         Monthly   Monthly Average pH (2)                           >=       6.0     SU           Grab         Monthly     Minimum pH (2)                           <=       9.0     Su           Grab         Monthly     Maximum (1) Flow shall be reported in Million Gallons per Day (MGD).
: Effluent Gross, Season : All Year Copper, total (as Cu)Copper, total (as Cu)Flow (1)Flow (1)Iron, total (as Fe)Iron, total (as Fe)Oil & Grease Oil & Grease Phosphorus, total (as P) (3)Phosphorus, total (as P) (3)Total Suspended Solids (TSS)Total Suspended Solids (TSS)pH (2)pH (2)Report Report Report Report 1 1 1 1 20 15 100 30 mgtL mg/L Mgal/d MgaVd mg/L mgtL mg/L mg/L mg/L mg/L mg/L mg/L Su Su Grab Grab Calculated Calculated Grab Grab Grab Grab Grab Grab Grab Grab Grab Grab unce rer Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Once Per Batch Daily Maximum Monthly Average Monthly Average Daily Maximum Monthly Average Daily Maximum Daily Maximum Monthly Average Monthly Average Daily Maximum Daily Maximum Monthly Average Minimum Maximum (1) Flow shall be reported In Million Gallons per Day (MGD) for each batch discharge.
(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.
If a batch discharge extends for more than a 24-hour period, flow measurement shall be obtained and reported for each 24 hour period.(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 6 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge metal cleaning wastewater, turbine building station sump water, diesel generator coolant, intermittent micro-filtered condenser tube cleaning discharges, and storm water through Outfall 107, the Lined and Unlined Ponds, an internal monitoring point as described in the Rationale and permit application.                       These discharges shall be limited and monitored by the permittee as specified below:
Description : External Outfall, Number : 107, Monitoring : Effluent Gross, Season : All Year Copper, total (as Cu)                     1    mgtL        Grab          unce rer        Daily Maximum Batch 1                                Once Per Copper, total (as Cu)                         mg/L        Grab Batch          Monthly Average Flow (1)                     Report            Mgal/d    Calculated      Once Per        Monthly Average Batch Flow (1)                     Report            MgaVd      Calculated Once Per        Daily Maximum Batch Iron, total (as Fe)                       1    mg/L        Grab Once Per Monthly Average Batch Iron, total (as Fe)                       1    mgtL        Grab Once Per        Daily Maximum Batch Oil & Grease                             20    mg/L        Grab          Once Per Daily Maximum Batch Oil & Grease                             15    mg/L        Grab Once Per Monthly Average Batch Phosphorus, total (as P) (3)                   mg/L        Grab Once Per Monthly Average Batch Phosphorus, total (as P) (3)                   mg/L        Grab Once Per Daily Maximum Batch Total Suspended Solids                                                     Once Per (TSS)                                   100    mg/L        Grab                          Daily Maximum Batch Total Suspended Solids                                                     Once Per (TSS) 30    mg/L        Grab                          Monthly Average Batch pH (2)                       Report            Su          Grab          Once Per Minimum Batch pH (2)                       Report             Su         Grab           Once Per Batch             Maximum (1) Flow shall be reported In Million Gallons per Day (MGD) for each batch discharge. If a batch discharge extends for more than a 24-hour period, flow measurement shall be obtained and reported for each 24 hour period.
(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.
(3) Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used.
(3) Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 7 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge supplemental condenser cooling water through Outfall 113 to the Tennessee River at mile 529.2 as described in the Rationale and permit application.
 
These discharges shall be limited and monitored by the permittee as specified below: Description
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 7 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge supplemental condenser cooling water through Outfall 113 to the Tennessee River at mile 529.2 as described in the Rationale and permit application. These discharges shall be limited and monitored by the permittee as specified below:
: External Outfall, Number : 113, Monitoring
Description : External Outfall, Number : 113, Monitoring : Effluent Gross, Season : All Year Chlorine, total residual (TRC) (2, 3, 5)       <=   0.09     mg/L         Grab     Monthly     Monthly Average Chlorine, total residual (TRC) (2, 3, 5)       <=    0.158    mg/L          Grab      Monthly    Daily Maximum Certification of in-stream flow 3,500 cfs or             -                Operation greater when required                       Report                                  Monthly          Total Y=1 ;N=0      Records Flow (1)                                     Report          MgaVd      Recorder (6) Continuous  Monthly Average Flow (1)                                    Report          Mgal/d    Recorder (6) Continuous  Daily Maximum Oxygen, dissolved (DO)                       Report          mg/L          Grab      Monthly        Minimum Tem perature, water deg. C                   Report    -    deg C      Recorder (6)  Hourly    Daily Maximum Total Suspended Solids (TSS)                   <=      30    mg/L          Grab      Monthly    Monthly Average Total Suspended Solids (TSS)                   <=    100    mg/L          Grab      Monthly    Daily Maximum pH (2)                                         >=    6.0      SU          Grab      Monthly        Minimum pH (2)                                         <=     9.0     SU          Grab     Monthly        Maximum Description : External Outfall, Number :113, Monitoring          Instream Monitoring, Season        All Year Li                        V~ I Temperature rise, upstream to downstream                                            3    deg C      Calculated    Hourly    Daily Maximum Temperature rate of change                    <=      2  deg C/hr    Calculated    Hourly     Daily Maximum Temperature, edge of mixing zone              <=    30.5  deg C        Recorder    Hourly    Daily Maximum Description :External Outfall, Number: 113, Monitoring -See Comments, Season : All Year
: Effluent Gross, Season : All Year Chlorine, total residual (TRC) (2, 3, 5) <= 0.09 mg/L Grab Monthly Monthly Average Chlorine, total residual (TRC) (2, 3, 5)Certification of in-stream flow 3,500 cfs or greater when required Flow (1)Flow (1)Oxygen, dissolved (DO)Tem perature, water deg. C Total Suspended Solids (TSS)Total Suspended Solids (TSS)pH (2)pH (2)<= 0.158 Report -Report Report Report Report -<= 30<= 100>= 6.0<= 9.0 mg/L Grab Operation Y=1 ;N=0 Records MgaVd Recorder (6)Mgal/d Recorder (6)mg/L Grab deg C Recorder (6)mg/L Grab mg/L Grab SU Grab SU Grab Monthly Monthly Continuous Continuous Monthly Hourly Monthly Monthly Monthly Monthly Daily Maximum Total Monthly Average Daily Maximum Minimum Daily Maximum Monthly Average Daily Maximum Minimum Maximum Description
            ~
: External Outfall, Number :113, Monitoring Instream Monitoring, Season All Year Li V~ I Temperature rise, upstream to downstream 3 deg C Calculated Hourly Daily Maximum Temperature rate of change Temperature, edge of mixing zone<= 2 deg C/hr Calculated
I"?        itMtet        - :'                              -              eaf  en  ~      _
<= 30.5 deg C Recorder Hourly Daily Maximum Hourly Daily Maximum Description
Temperature, receiving stream bottom                33.5    deg C       Recorder    Hourly   Daily Maximum
:External Outfall, Number: 113, Monitoring -See Comments, Season : All Year~ itMtet I"? -:' af -e en ~ _Temperature, receiving stream bottom 33.5 deg C Recorder Hourly Daily Maximum TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 8 of 33 Description External Outfall, Number :113, Monitoring
 
: Effluent Gross, Season : All Year IC25 Static Renewal 7 Day Chronic Ceriodaphnia (4) 6.7 Composite 2/Year Minimum IC25 Static Renewal 7 Day Chronic Pimephales (4) 6.7 Composite 2/Year Minimum (1) Flow shall be reported in Million Gallons per Day (MGD).(2) pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 8 of 33 Description      External Outfall, Number :113, Monitoring : Effluent Gross, Season : All Year IC25 Static Renewal 7 Day Chronic Ceriodaphnia (4)                                      6.7              Composite        2/Year        Minimum IC25 Static Renewal 7 Day Chronic                                                                              1 Pimephales (4)                                        6.7              Composite        2/Year       Minimum (1) Flow shall be reported in Million Gallons per Day (MGD).
(3) The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR, Part 136 as amended. The method detection level (MDL) for TRC shall not exceed 0.05 mg/I unless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. In cases where the permit limit Is less that the MDL, the reporting of TRC at less than the MDL shall be Interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section B. Monitoring Procedures, subsection
(2) pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
: 3. Test Procedures, paragraph b.(4) See Part III for methodology (5) Sampling for TRC shall be 5/Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.
(3) The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR, Part 136 as amended. The method detection level (MDL) for TRC shall not exceed 0.05 mg/I unless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. In cases where the permit limit Is less that the MDL, the reporting of TRC at less than the MDL shall be Interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section B. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.
1 TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 9 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge SCCW intake screen backwash to surface water through Outfall 114, an internal monitoring point as described in the Rationale and permit application.
(4) See Part III for methodology (5) Sampling for TRC shall be 5/Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.
These discharges shall be limited and monitored by the permittee as specified below: PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.Additional limitations, conditions, and monitoring requirements applicable to Outfalls 101, 102,103,107, and 113 include: There shall be no distinctly visible floating scum, oil or other matter contained in the wastewater discharge.
 
The wastewater discharge must not cause an objectionable color contrast in the receiving stream.The wastewater discharge shall not contain pollutants in quantities that will be hazardous or otherwise detrimental to humans, livestock, wildlife, plant life, or fish and aquatic life in the receiving stream.Sludge or any other material removed by any treatment works must be disposed of in a manner, which prevents its entrance into, or pollution of any surface or subsurface waters.Additionally, the disposal of such sludge or other material must be in compliance with the Tennessee Solid Waste Disposal Act, TCA 68-31-101 et seq. and the Tennessee Hazardous Waste Management Act, TCA 68-46-101 et seq.For the purpose of evaluating Total Residual Chlorine/Total Residual Oxidant (TRC/TRO) as required in this permit, analyses shall include any residual bromine with results reported as chlorine, i.e., one test shall be used for situations where combinations of chlorine and bromine are used. The permittee shall sample the effluent when chemical additives are used resulting in TRC/TRO pollutants in the discharge as stipulated in the preceeding permit limits tables.For batch discharges the monitoring and reporting of measurements of FLOW, the"Monthly Avg." shall be the total flow volume during the reporting period divided by the number of calendar days in that period. The "Daily Max." shall be the total flow volume for the day with the greatest amount of discharge during the reporting period. Example: 3 discharges of 15,000 gallons/day and 1 discharge of 20,000 gallons/day during a 1-month period result in a Monthly Avg. of 65,000 gallons/30 days, or 2,166 gallons/day (to be reported as 0.002166 MGD). The Daily Max to be reported for this example is 20,000 gallons/day or 0.020 MGD.There shall be no discharge of PCB. With regard to PCB sampling, the permittee will have the opportunity to conduct additional tests, as necessary, to establish the existence of any PCBs in the effluent if they exist. The results of these additional tests and any conclusions drawn must be submitted to the Division within fifteen (15) days along with the monthly discharge monitoring report. The Division shall maintain the exclusive determination of the TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 10 of 33 validity of the additional tests and any conclusions to be drawn from them regarding the possibility of matrix interferences, or the need for additional monitoring.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 9 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge SCCW intake screen backwash to surface water through Outfall 114, an internal monitoring point as described in the Rationale and permit application. These discharges shall be limited and monitored by the permittee as specified below:
The decision of the division in this matter shall be final.Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136.The use of water treatment chemicals containing chromium is prohibited under this permit. Chromium monitoring is waived by authority of 40 CFR 122.44 (a)(2)(i), where application sample results demonstrated no Cr pollutant discharged from these outfalls (101 and 102).Discharges are authorized for Outfall 101 only during periods when flow in the receiving stream is at a minimum of 3,500 cfs. All changes to the flow rate of the SCCW discharge (Outfall 113) shall be done during periods when flow in the receiving waters is at a minimum of 3,500 cfs. This includes periods of start-up, shutdown as well as other similar abrupt flow rate changes of the SCCW. When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cfs in the receiving waters.If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements.
PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.
Compliance with flow requirements for 3,500 cfs flow instream for Outfalls 101, 102 and 113 discharges shall be certified monthly with the submission of Discharge Monitoring Reports submitted to the Division for these outfalls.
Additional limitations, conditions, and monitoring requirements applicable to Outfalls 101, 102,103,107, and 113 include:
Records concerning the instream flow shall be maintained and available upon request.The thermal mixing zones for Outfall 113 remain unchanged from the previous permit (see diagram in Appendix 5h). The discharge from Outfall 113 shall be limited and monitored by the permittee as specified below:* In recognition of the dynamic behavior of the thermal effluent in the river, monitoring shall be required for an active mixing zone and a passive mixing zone as described in the permit rationale.
There shall be no distinctly visible floating scum, oil or other matter contained in the wastewater discharge. The wastewater discharge must not cause an objectionable color contrast in the receiving stream.
* The passive mixing zone includes the following dimensions:
The wastewater discharge shall not contain pollutants in quantities that will be hazardous or otherwise detrimental to humans, livestock, wildlife, plant life, or fish and aquatic life in the receiving stream.
(1) a maximum width of from bank to bank in the river, and (2) a maximum length of 1000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer to allow for fish and other species to pass below the thermal plume.* Compliance for the passive mixing zone shall be by two instream temperature surveys, one conducted during winter ambient conditions and one during summer ambient conditions.
Sludge or any other material removed by any treatment works must be disposed of in a manner, which prevents its entrance into, or pollution of any surface or subsurface waters.
The surveys shall be performed while the SCCW system is thermally loaded with low river flow conditions and shall include temperature profiles at a sufficient number of locations across the downstream edge of the passive mixing zone to locate the effluent plume. The measurements shall be compared with the results from the thermal plume model and shall be summarized in a report to the division semiannually.
Additionally, the disposal of such sludge or other material must be in compliance with the Tennessee Solid Waste Disposal Act, TCA 68-31-101 et seq. and the Tennessee Hazardous Waste Management Act, TCA 68-46-101 et seq.
Survey requirements for the passive mixing zone shall be waived if unexpected events do not safely allow the establishment of a zero flow condition in the river (e.g., flood operation)." The active mixing zone includes the following dimensions:
For the purpose of evaluating Total Residual Chlorine/Total Residual Oxidant (TRC/TRO) as required in this permit, analyses shall include any residual bromine with results reported as chlorine, i.e., one test shall be used for situations where combinations of chlorine and bromine are used. The permittee shall sample the effluent when chemical additives are used resulting in TRC/TRO pollutants in the discharge as stipulated in the preceeding permit limits tables.
(1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer and left-TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 11 of 33 hand-side of the river to allow for fish and other species to pass beyond the thermal plume.* Compliance for the active mixing zone is given by the following requirements.
For batch discharges the monitoring and reporting of measurements of FLOW, the "Monthly Avg." shall be the total flow volume during the reporting period divided by the number of calendar days in that period. The "Daily Max." shall be the total flow volume for the day with the greatest amount of discharge during the reporting period. Example: 3 discharges of 15,000 gallons/day and 1 discharge of 20,000 gallons/day during a 1-month period result in a Monthly Avg. of 65,000 gallons/30 days, or 2,166 gallons/day (to be reported as 0.002166 MGD). The Daily Max to be reported for this example is 20,000 gallons/day or 0.020 MGD.
* Compliance with TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be applicable at the edge of the active mixing zone.* Daily maximum temperatures for the TEMPERATURE, effluent; TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be determined from 1-hour average values.The average values shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average.* As demonstrated by monitoring at the edge of the active mixing zone, the maximum temperature shall not exceed 30.5 0 C (except as a result of natural causes), the maximum change in temperature relative to the upstream control point shall not exceed 3 0 C (except as a result of natural causes), and the maximum temperature rate of change shall not exceed 2 0 C per hour (except as a result of natural causes).* The upstream ambient river temperature (control point) for determining the TEMPERATURE, Rise Upstream to Downstream for the active mixing zone shall be determined by sensors positioned in the discharge from the powerhouse at Watts Bar Dam. The upstream ambient river temperature shall be determined by the first sensor at or below a depth of 5 feet. This monitor shall also be used for ambient river temperature for the passive mixing zone surveys.* The river temperature for determining the TEMPERATURE, Edge of Mixing Zone and TEMPERATURE, rate-of-change shall be by two floating water temperature stations at the downstream edge of the active mixing zone. One station shall be located near the right-hand shoreline of the river (facing downstream) and one station shall be located near the center of the river. At each station, the water temperature at the 5-foot depth shall be determined as the average of sensors at three depths-3 feet, 5 feet, and 7 feet. The downstream river temperature and temperature rate of change shall be determined by the average temperature of the two floating water temperature stations.Compliance with TEMPERATURE, Receiving Stream Bottom shall be applicable at the edge of a square mussel relocation zone located on the bottom of the river at the outfall and having a side dimension not less than 150 feet. The temperature shall be determined by a sensor located along the edge of the mussel relocation zone.The daily maximum value for the TEMPERATURE, Receiving Stream Bottom shall be determined from 15-minute values. The 1-hour average value shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average. The temperature shall be reported on the Discharge Monitoring Reports as the daily maximum (highest value for a day) and monthly average value.
There shall be no discharge of PCB. With regard to PCB sampling, the permittee will have the opportunity to conduct additional tests, as necessary, to establish the existence of any PCBs in the effluent if they exist. The results of these additional tests and any conclusions drawn must be submitted to the Division within fifteen (15) days along with the monthly discharge monitoring report. The Division shall maintain the exclusive determination of the
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 10 of 33 validity of the additional tests and any conclusions to be drawn from them regarding the possibility of matrix interferences, or the need for additional monitoring. The decision of the division in this matter shall be final.
Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136.
The use of water treatment chemicals containing chromium is prohibited under this permit. Chromium monitoring is waived by authority of 40 CFR 122.44 (a)(2)(i), where application sample results demonstrated no Cr pollutant discharged from these outfalls (101 and 102).
Discharges are authorized for Outfall 101 only during periods when flow in the receiving stream is at a minimum of 3,500 cfs. All changes to the flow rate of the SCCW discharge (Outfall 113) shall be done during periods when flow in the receiving waters is at a minimum of 3,500 cfs. This includes periods of start-up, shutdown as well as other similar abrupt flow rate changes of the SCCW. When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cfs in the receiving waters.
If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements. Compliance with flow requirements for 3,500 cfs flow instream for Outfalls 101, 102 and 113 discharges shall be certified monthly with the submission of Discharge Monitoring Reports submitted to the Division for these outfalls. Records concerning the instream flow shall be maintained and available upon request.
The thermal mixing zones for Outfall 113 remain unchanged from the previous permit (see diagram in Appendix 5h). The discharge from Outfall 113 shall be limited and monitored by the permittee as specified below:
* In recognition of the dynamic behavior of the thermal effluent in the river, monitoring shall be required for an active mixing zone and a passive mixing zone as described in the permit rationale.
* The passive mixing zone includes the following dimensions: (1) a maximum width of from bank to bank in the river, and (2) a maximum length of 1000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer to allow for fish and other species to pass below the thermal plume.
* Compliance for the passive mixing zone shall be by two instream temperature surveys, one conducted during winter ambient conditions and one during summer ambient conditions. The surveys shall be performed while the SCCW system is thermally loaded with low river flow conditions and shall include temperature profiles at a sufficient number of locations across the downstream edge of the passive mixing zone to locate the effluent plume. The measurements shall be compared with the results from the thermal plume model and shall be summarized in a report to the division semiannually. Survey requirements for the passive mixing zone shall be waived if unexpected events do not safely allow the establishment of a zero flow condition in the river (e.g., flood operation).
        " The active mixing zone includes the following dimensions: (1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer and left-
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 11 of 33 hand-side of the river to allow for fish and other species to pass beyond the thermal plume.
* Compliance for the active mixing zone is given by the following requirements.
* Compliance with TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be applicable at the edge of the active mixing zone.
* Daily maximum temperatures for the TEMPERATURE, effluent; TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be determined from 1-hour average values.
The average values shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average.
* As demonstrated by monitoring at the edge of the active mixing zone, the maximum temperature shall not exceed 30.50 C (except as a result of natural causes), the maximum change in temperature relative to the upstream control point shall not exceed 3 0 C (except as a result of natural causes), and the maximum temperature rate of change shall not exceed 2 0 C per hour (except as a result of natural causes).
* The upstream ambient river temperature (control point) for determining the TEMPERATURE, Rise Upstream to Downstream for the active mixing zone shall be determined by sensors positioned in the discharge from the powerhouse at Watts Bar Dam. The upstream ambient river temperature shall be determined by the first sensor at or below a depth of 5 feet. This monitor shall also be used for ambient river temperature for the passive mixing zone surveys.
* The river temperature for determining the TEMPERATURE, Edge of Mixing Zone and TEMPERATURE, rate-of-change shall be by two floating water temperature stations at the downstream edge of the active mixing zone. One station shall be located near the right-hand shoreline of the river (facing downstream) and one station shall be located near the center of the river. At each station, the water temperature at the 5-foot depth shall be determined as the average of sensors at three depths-3 feet, 5 feet, and 7 feet. The downstream river temperature and temperature rate of change shall be determined by the average temperature of the two floating water temperature stations.
Compliance with TEMPERATURE, Receiving Stream Bottom shall be applicable at the edge of a square mussel relocation zone located on the bottom of the river at the outfall and having a side dimension not less than 150 feet. The temperature shall be determined by a sensor located along the edge of the mussel relocation zone.
The daily maximum value for the TEMPERATURE, Receiving Stream Bottom shall be determined from 15-minute values. The 1-hour average value shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average. The temperature shall be reported on the Discharge Monitoring Reports as the daily maximum (highest value for a day) and monthly average value.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 12 of 33 B. MONITORING PROCEDURES
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 12 of 33 B. MONITORING PROCEDURES
: 1. Representative Sampling Samples and measurements taken in compliance with the monitoring requirements specified herein shall be representative of the volume and nature of the monitored discharge, and shall be taken after treatment and prior to mixing with uncontaminated storm water runoff or the receiving stream.The permittee shall maintain a capability for composite sampling of Outfall 101 discharges.
: 1. Representative Sampling Samples and measurements taken in compliance with the monitoring requirements specified herein shall be representative of the volume and nature of the monitored discharge, and shall be taken after treatment and prior to mixing with uncontaminated storm water runoff or the receiving stream.
Temporary or mobile equipment may be used for this since the sampling protocal instituted does not utilize standard sample collection equipment to collect the samples. TVA shall ensure sampling protocol conforms to 40 CFR 136 procedures.
The permittee shall maintain a capability for composite sampling of Outfall 101 discharges. Temporary or mobile equipment may be used for this since the sampling protocal instituted does not utilize standard sample collection equipment to collect the samples. TVA shall ensure sampling protocol conforms to 40 CFR 136 procedures.
: 2. Sampling Frequency If there is a discharge from a permitted outfall on any given day during the monitoring period, the permittee must sample and report the results of analyses accordingly, and the permittee should not mark the 'No Discharge' box on the Discharge Monitoring Report form.3. Test Procedures
: 2. Sampling Frequency If there is a discharge from a permitted outfall on any given day during the monitoring period, the permittee must sample and report the results of analyses accordingly, and the permittee should not mark the 'No Discharge' box on the Discharge Monitoring Report form.
: a. Test procedures for the analysis of pollutants shall conform to regulations published pursuant to Section 304 (h) of the Clean Water Act (the "Act"), as amended, under which such procedures may be required.b. Unless otherwise noted in the permit, all pollutant parameters shall be determined according to methods prescribed in Title 40, CFR, Part 136, as amended, promulgated pursuant to Section 304 (h) of the Act.4. Recording of Results For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record the following information:
: 3. Test Procedures
: a. The exact place, date and time of sampling;b. The exact person(s) collecting samples;c. The dates and times the analyses were performed;
: a. Test procedures for the analysis of pollutants shall conform to regulations published pursuant to Section 304 (h) of the Clean Water Act (the "Act"), as amended, under which such procedures may be required.
: d. The person(s) or laboratory who performed the analyses;e. The analytical techniques or methods used, and;f. The results of all required analyses.
: b. Unless otherwise noted in the permit, all pollutant parameters shall be determined according to methods prescribed in Title 40, CFR, Part 136, as amended, promulgated pursuant to Section 304 (h) of the Act.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 13 of 33 5. Records Retention All records and information resulting from the monitoring activities required by this permit including all records of analyses performed and calibration and maintenance of instrumentation shall be retained for a minimum of three (3) years, or longer, if requested by the Division of Water Pollution Control.C. DEFINITIONS The Daily Maximum Concentration is a limitation on the average concentration, in milligrams per liter (rag/L), of the discharge during any calendar day. When a proportional-to-flow composite sampling device is used, the daily concentration is the concentration of that 24-hour composite; when other sampling means are used, the daily concentration is the arithmetic mean of the concentrations of equal volume samples collected during any calendar day or sampling period.The Monthly Average Concentration, a limitation on the discharge concentration, in milligrams per liter (mg/L), is the arithmetic mean of all daily concentrations determined in a one-month period. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.The Monthly Average Amount, a discharge limitation measured in pounds per day (lb/day), is the total amount of any pollutant in the discharge by weight during a calendar month divided by the number of days in the month that the production or commercial facility was operating.
: 4. Recording of Results For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record the following information:
Where less than daily sampling is required by a permit, the monthly average amount shall be determined by the summation of all the measured daily discharges by weight divided by the number of days during the calendar month when the measurements were made. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.The Daily Maximum Amount, is a limitation measured in pounds per day (lb/day), on the total amount of any pollutant in the discharge by weight during any calendar day.The Instantaneous Concentration is a limitation on the concentration, in milligrams per liter (mg/L), of any pollutant contained in the discharge determined from a grab sample taken at any point in time.A Composite Sample, for the purposes of this permit, is a sample collected continuously over a period of 24-hours at a rate proportional to the flow. Composite sample should be a combination of at least 8 sample aliquots of at least 100 milliliters, collected at periodic intervals during the operating hours of a facility over a 24-hour period.A Grab Sample, for the purposes of this permit, is defined as a single effluent sample of at least 100 milliliters (sample volumes <100 milliliters are allowed when specified per standard methods, latest edition) collected at a randomly selected time over a period not exceeding 15 minutes. The sample(s) shall be collected at the period(s) most representative of the total discharge.
: a. The exact place, date and time of sampling;
For the purpose of this permit, a Calendar Day is defined as any 24-hour period.
: b. The exact person(s) collecting samples;
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 14 of 33 For the purpose of this permit, a Quarter is defined as any one of the following three month periods: January 1 through March 31, April 1 through June 30, July 1 through September 30, or October 1 through December 31.For the purpose of this permit, Semi-annually means the same as "once every six months." Measurements of the effluent characteristics concentrations may be made anytime during a 6 month period beginning from the issuance date of this permit so long as the second set of measurements for a given 12 month period are made approximately 6 months subsequent to that time, if feasible.For the purpose of this permit, Annually is defined as a monitoring frequency of once every twelve (12) months beginning with the date of issuance of this permit so long as the following set of measurements for a given 12 month period are made approximately 12 months subsequent to that time.D. ACRONYMS AND ABBREVIATIONS 1Q10 day minimum, 1 0-year recurrence interval 30Q20 day minimum, 20-year recurrence interval 7Q10 day minimum, 10-year recurrence interval BAT -best available technology economically achievable BCT -best conventional pollutant control technology BDL -below detection level BOD 5 -five day biochemical oxygen demand BPT -best practicable control technology currently available CBOD 5 -five day carbonaceous biochemical oxygen demand CEI -compliance evaluation inspection CFR -code of federal regulations CFS -cubic feet per second CFU -colony forming units ClU -categorical industrial user CSO -combined sewer overflow DMR -discharge monitoring report D.O. -dissolved oxygen E. coil -Escherichia coli EFO -environmental field office LB(lb) -pound IC25 -inhibition concentration causing 25% reduction in survival, reproduction and growth of the test organisms IU -industrial user IWS -industrial waste survey LC 5 0 -acute test causing 50% lethality MDL -method detection level MGD -million gallons per day MG/L(mg/I)  
: c. The dates and times the analyses were performed;
-milligrams per liter ML -minimum level of quantification ml -milliliter MLSS -mixed liquor suspended solids MOR -monthly operating report NODI -no discharge TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 15 of 33 NOEC -no observed effect concentration NPDES -national pollutant discharge elimination system PL -permit limit POTW -publicly owned treatment works RDL -required detection limit SAR -semi-annual
: d. The person(s) or laboratory who performed the analyses;
[pretreatment program] report SIU -significant industrial user SSO -sanitary sewer overflow STP -sewage treatment plant TCA -Tennessee code annotated TDEC -Tennessee Department of Environment and Conservation TIE/TRE -,toxicity identification evaluation/toxicity reduction evaluation TMDL -total maximum daily load TRC -total residual chlorine TSS -total suspended solids WQBEL -water quality based effluent limit E. REPORTING 1. Monitoring Results Monitoring results shall be recorded monthly and submitted monthly using Discharge Monitoring Report (DMR) forms supplied by the Division of Water Pollution Control or comparable forms provided by the permittee, and approved by the Division of Water Pollution Control. Submittals shall be postmarked no later than 15 days after the completion of the reporting period. The top two copies of each report are to be submitted.
: e. The analytical techniques or methods used, and;
A copy should be retained for the permittee's files. DMRs and any communication regarding compliance with the conditions of this permit must be sent to: TENNESSEE DEPT. OF ENVIRONMENT  
: f. The results of all required analyses.
& CONSERVATION DIVISION OF WATER POLLUTION CONTROL COMPLIANCE REVIEW SECTION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243-1534 A copy of the completed and signed DMR shall be mailed to the Chattanooga Environmental Field Office (EFO) at the following address: TENNESSEE DEPT. OF ENVIRONMENT  
 
& CONSERVATION DIVISION OF WATER POLLUTION CONTROL CHATTANOOGA ENVIRONMENTAL FIELD OFFICE 540 MCCALLIE AVENUE, SUITE 550 CHATTANOOGA TN 37402 The first DMR is due on the fifteenth of the month following permit effectiveness.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 13 of 33
: 5. Records Retention All records and information resulting from the monitoring activities required by this permit including all records of analyses performed and calibration and maintenance of instrumentation shall be retained for a minimum of three (3) years, or longer, if requested by the Division of Water Pollution Control.
C. DEFINITIONS The Daily Maximum Concentrationis a limitation on the average concentration, in milligrams per liter (rag/L), of the discharge during any calendar day. When a proportional-to-flow composite sampling device is used, the daily concentration is the concentration of that 24-hour composite; when other sampling means are used, the daily concentration is the arithmetic mean of the concentrations of equal volume samples collected during any calendar day or sampling period.
The Monthly Average Concentration, a limitation on the discharge concentration, in milligrams per liter (mg/L), is the arithmetic mean of all daily concentrations determined in a one-month period. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.
The Monthly Average Amount, a discharge limitation measured in pounds per day (lb/day), is the total amount of any pollutant in the discharge by weight during a calendar month divided by the number of days in the month that the production or commercial facility was operating.
Where less than daily sampling is required by a permit, the monthly average amount shall be determined by the summation of all the measured daily discharges by weight divided by the number of days during the calendar month when the measurements were made. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.
The Daily Maximum Amount, is a limitation measured in pounds per day (lb/day), on the total amount of any pollutant in the discharge by weight during any calendar day.
The Instantaneous Concentrationis a limitation on the concentration, in milligrams per liter (mg/L), of any pollutant contained in the discharge determined from a grab sample taken at any point in time.
A Composite Sample, for the purposes of this permit, is a sample collected continuously over a period of 24-hours at a rate proportional to the flow. Composite sample should be a combination of at least 8 sample aliquots of at least 100 milliliters, collected at periodic intervals during the operating hours of a facility over a 24-hour period.
A Grab Sample, for the purposes of this permit, is defined as a single effluent sample of at least 100 milliliters (sample volumes <100 milliliters are allowed when specified per standard methods, latest edition) collected at a randomly selected time over a period not exceeding 15 minutes. The sample(s) shall be collected at the period(s) most representative of the total discharge.
For the purpose of this permit, a CalendarDay is defined as any 24-hour period.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 14 of 33 For the purpose of this permit, a Quarteris defined as any one of the following three month periods: January 1 through March 31, April 1 through June 30, July 1 through September 30, or October 1 through December 31.
For the purpose of this permit, Semi-annually means the same as "once every six months."
Measurements of the effluent characteristics concentrations may be made anytime during a 6 month period beginning from the issuance date of this permit so long as the second set of measurements for a given 12 month period are made approximately 6 months subsequent to that time, if feasible.
For the purpose of this permit, Annually is defined as a monitoring frequency of once every twelve (12) months beginning with the date of issuance of this permit so long as the following set of measurements for a given 12 month period are made approximately 12 months subsequent to that time.
D. ACRONYMS AND ABBREVIATIONS 1Q10 day minimum, 10-year recurrence interval 30Q20 day minimum, 20-year recurrence interval 7Q10 day minimum, 10-year recurrence interval BAT - best available technology economically achievable BCT - best conventional pollutant control technology BDL - below detection level BOD5 - five day biochemical oxygen demand BPT - best practicable control technology currently available CBOD5 - five day carbonaceous biochemical oxygen demand CEI - compliance evaluation inspection CFR - code of federal regulations CFS - cubic feet per second CFU - colony forming units ClU - categorical industrial user CSO - combined sewer overflow DMR - discharge monitoring report D.O. - dissolved oxygen E. coil - Escherichiacoli EFO - environmental field office LB(lb) - pound IC25 - inhibition concentration causing 25% reduction in survival, reproduction and growth of the test organisms IU - industrial user IWS - industrial waste survey LC50 - acute test causing 50% lethality MDL - method detection level MGD - million gallons per day MG/L(mg/I) - milligrams per liter ML - minimum level of quantification ml - milliliter MLSS - mixed liquor suspended solids MOR - monthly operating report NODI - no discharge
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 15 of 33 NOEC - no observed effect concentration NPDES - national pollutant discharge elimination system PL - permit limit POTW - publicly owned treatment works RDL - required detection limit SAR - semi-annual [pretreatment program] report SIU - significant industrial user SSO - sanitary sewer overflow STP - sewage treatment plant TCA - Tennessee code annotated TDEC - Tennessee Department of Environment and Conservation TIE/TRE -,toxicity identification evaluation/toxicity reduction evaluation TMDL - total maximum daily load TRC - total residual chlorine TSS - total suspended solids WQBEL - water quality based effluent limit E. REPORTING
: 1. Monitoring Results Monitoring results shall be recorded monthly and submitted monthly using Discharge Monitoring Report (DMR) forms supplied by the Division of Water Pollution Control or comparable forms provided by the permittee, and approved by the Division of Water Pollution Control. Submittals shall be postmarked no later than 15 days after the completion of the reporting period. The top two copies of each report are to be submitted. A copy should be retained for the permittee's files. DMRs and any communication regarding compliance with the conditions of this permit must be sent to:
TENNESSEE DEPT. OF ENVIRONMENT & CONSERVATION DIVISION OF WATER POLLUTION CONTROL COMPLIANCE REVIEW SECTION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243-1534 A copy of the completed and signed DMR shall be mailed to the Chattanooga Environmental Field Office (EFO) at the following address:
TENNESSEE DEPT. OF ENVIRONMENT & CONSERVATION DIVISION OF WATER POLLUTION CONTROL CHATTANOOGA ENVIRONMENTAL FIELD OFFICE 540 MCCALLIE AVENUE, SUITE 550 CHATTANOOGA TN 37402 The first DMR is due on the fifteenth of the month following permit effectiveness.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 16 of 33 DMRs and any other information or report must be signed and certified by a responsible corporate officer as defined in 40 CFR 122.22, a general partner or proprietor, or a principal municipal executive officer or ranking elected official, or his duly authorized representative.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 16 of 33 DMRs and any other information or report must be signed and certified by a responsible corporate officer as defined in 40 CFR 122.22, a general partner or proprietor, or a principal municipal executive officer or ranking elected official, or his duly authorized representative.
Such authorization must be submitted in writing and must explain the duties and responsibilities of the authorized representative.
Such authorization must be submitted in writing and must explain the duties and responsibilities of the authorized representative.
The electronic submission of DMRs shall be accepted only if approved in writing by the division.For purposes of determining compliance with this permit, data submitted in electronic format is legally equivalent to data submitted on signed and certified DMR forms.2. Additional Monitoring by Permittee If the permittee monitors any pollutant specifically limited by this permit more frequently than required at the location(s) designated, using approved analytical methods as specified herein, the results of such monitoring shall be included in the calculation and reporting of the values required in the DMR form. Such increased frequency shall also be indicated on the form.3. Falsifying Results and/or Reports Knowingly making any false statement on any report required by this permit or falsifying any result may result in the imposition of criminal penalties as provided for in Section 309 of the Federal Water Pollution Control Act, as amended, and in Section 69-3-115 of the Tennessee Water Quality Control Act.4. Outlier Data Outlier data include analytical results that are probably false. The validity of results is based on operational knowledge and a properly implemented quality assurance program. False results may include laboratory artifacts, potential sample tampering, broken or suspect sample containers, sample contamination or similar demonstrated quality control flaw.Outlier data are identified through a properly implemented quality assurance program, and according to ASTM standards (e.g. Grubbs Test, 'h' and 'k' statistics).
The electronic submission of DMRs shall be accepted only if approved in writing by the division.
Furthermore, outliers should be verified, corrected, or removed, based on further inquiries into the matter. If an outlier was verified (through repeated testing and/or analysis), it should remain in the preliminary data set. If an outlier resulted from a transcription or similar clerical error, it should be corrected and subsequently reported.Therefore, only if an outlier was associated with problems in the collection or analysis of the samples, and as such does not conform with the Guidelines Establishing Test Procedures for the Analysis of Pollutants (40 CFR &sect;136), it can be removed from the data set and not reported on the Discharge Monitoring Report forms (DMRs). Otherwise, all results (including monitoring of pollutants more frequently than required at the location(s) designated, using approved analytical methods as specified in the permit) should be included in the calculation and reporting of the values required in the DMR form. The permittee is encouraged to use"comment" section of the DMR form (or attach additional pages), in order to explain any potential outliers or dubious results.
For purposes of determining compliance with this permit, data submitted in electronic format is legally equivalent to data submitted on signed and certified DMR forms.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 17 of 33 I PART II A. GENERAL PROVISIONS
: 2. Additional Monitoring by Permittee If the permittee monitors any pollutant specifically limited by this permit more frequently than required at the location(s) designated, using approved analytical methods as specified herein, the results of such monitoring shall be included in the calculation and reporting of the values required in the DMR form. Such increased frequency shall also be indicated on the form.
: 3. Falsifying Results and/or Reports Knowingly making any false statement on any report required by this permit or falsifying any result may result in the imposition of criminal penalties as provided for in Section 309 of the Federal Water Pollution Control Act, as amended, and in Section 69-3-115 of the Tennessee Water Quality Control Act.
: 4. Outlier Data Outlier data include analytical results that are probably false. The validity of results is based on operational knowledge and a properly implemented quality assurance program. False results may include laboratory artifacts, potential sample tampering, broken or suspect sample containers, sample contamination or similar demonstrated quality control flaw.
Outlier data are identified through a properly implemented quality assurance program, and according to ASTM standards (e.g. Grubbs Test, 'h' and 'k' statistics). Furthermore, outliers should be verified, corrected, or removed, based on further inquiries into the matter. If an outlier was verified (through repeated testing and/or analysis), it should remain in the preliminary data set. If an outlier resulted from a transcription or similar clerical error, it should be corrected and subsequently reported.
Therefore, only if an outlier was associated with problems in the collection or analysis of the samples, and as such does not conform with the Guidelines Establishing Test Procedures for the Analysis of Pollutants (40 CFR &sect;136), it can be removed from the data set and not reported on the Discharge Monitoring Report forms (DMRs). Otherwise, all results (including monitoring of pollutants more frequently than required at the location(s) designated, using approved analytical methods as specified in the permit) should be included in the calculation and reporting of the values required in the DMR form. The permittee is encouraged to use "comment" section of the DMR form (or attach additional pages), in order to explain any potential outliers or dubious results.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 17 of 33 I     PART II A. GENERAL PROVISIONS
: 1. Duty to Reapply Permittee is not authorized to discharge after the expiration date of this permit. In order to receive authorization to discharge beyond the expiration date, the permittee shall submit such information and forms as are required to the Director of Water Pollution Control (the "Director")
: 1. Duty to Reapply Permittee is not authorized to discharge after the expiration date of this permit. In order to receive authorization to discharge beyond the expiration date, the permittee shall submit such information and forms as are required to the Director of Water Pollution Control (the "Director")
no later than 180 days prior to the expiration date. Such applications must be properly signed and certified.
no later than 180 days prior to the expiration date. Such applications must be properly signed and certified.
: 2. Right of Entry The permittee shall allow the Director, the Regional Administrator of the U.S. Environmental Protection Agency, or their authorized representatives, upon the presentation of credentials:
: 2. Right of Entry The permittee shall allow the Director, the Regional Administrator of the U.S. Environmental Protection Agency, or their authorized representatives, upon the presentation of credentials:
: a. To enter upon the permittee's premises where an effluent source is located or where records are required to be kept under the terms and conditions of this permit, and at reasonable times to copy these records;b. To inspect at reasonable times any monitoring equipment or method or any collection, treatment, pollution management, or discharge facilities required under this permit; and c. To sample at reasonable times any discharge of pollutants.
: a. To enter upon the permittee's premises where an effluent source is located or where records are required to be kept under the terms and conditions of this permit, and at reasonable times to copy these records;
: b. To inspect at reasonable times any monitoring equipment or method or any collection, treatment, pollution management, or discharge facilities required under this permit; and
: c. To sample at reasonable times any discharge of pollutants.
: 3. Availability of Reports Except for data determined to be confidential under Section 308 of the Federal Water Pollution Control Act, as amended, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Division of Water Pollution Control. As required by the Federal Act, effluent data shall not be considered confidential.
: 3. Availability of Reports Except for data determined to be confidential under Section 308 of the Federal Water Pollution Control Act, as amended, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Division of Water Pollution Control. As required by the Federal Act, effluent data shall not be considered confidential.
: 4. Proper Operation and Maintenance
: 4. Proper Operation and Maintenance
: a. The permittee shall at all times properly operate and maintain all facilities and systems (and related appurtenances) for collection and treatment which are installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Proper operation and maintenance also includes adequate laboratory and process controls and appropriate quality assurance procedures.
: a. The permittee shall at all times properly operate and maintain all facilities and systems (and related appurtenances) for collection and treatment which are installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Proper operation and maintenance also includes adequate laboratory and process controls and appropriate quality assurance procedures. This provision requires the operation of backup or auxiliary facilities or similar systems, which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. Backup continuous pH and flow monitoring equipment are not required.
This provision requires the operation of backup or auxiliary facilities or similar systems, which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. Backup continuous pH and flow monitoring equipment are not required.b. Dilution water shall not be added to comply with effluent requirements to achieve BCT, BPT, BAT and or other technology-based effluent limitations such as those in State of Tennessee Rule 1200-4-5-.03.
: b. Dilution water shall not be added to comply with effluent requirements to achieve BCT, BPT, BAT and or other technology-based effluent limitations such as those in State of Tennessee Rule 1200-4-5-.03.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 18 of 33 5. Treatment Facility Failure The permittee, in order to maintain compliance with this permit, shall control production, all discharges, or both, upon reduction, loss, or failure of the treatment facility, until the facility is restored or an alternative method of treatment is provided.
 
This requirement applies in such situations as the reduction, loss, or failure of the primary source of power.6. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State, or local laws or regulations.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 18 of 33
: 7. Severability The provisions of this permit are severable.
: 5. Treatment Facility Failure The permittee, in order to maintain compliance with this permit, shall control production, all discharges, or both, upon reduction, loss, or failure of the treatment facility, until the facility is restored or an alternative method of treatment is provided. This requirement applies in such situations as the reduction, loss, or failure of the primary source of power.
If any provision of this permit due to any circumstance, is held invalid, then the application of such provision to other circumstances and to the remainder of this permit shall not be affected thereby.8. Other Information If the permittee becomes aware that he failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, then he shall promptly submit such facts or information.
: 6. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State, or local laws or regulations.
B. CHANGES AFFECTING THE PERMIT 1. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility.
: 7. Severability The provisions of this permit are severable. If any provision of this permit due to any circumstance, is held invalid, then the application of such provision to other circumstances and to the remainder of this permit shall not be affected thereby.
Notice is required only when: a. The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 40 CFR 122.29(b);
: 8. Other Information If the permittee becomes aware that he failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, then he shall promptly submit such facts or information.
or b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged.
B. CHANGES AFFECTING THE PERMIT
This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR 122.42(a)(1).
: 1. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:
: a. The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 40 CFR 122.29(b); or
: b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR 122.42(a)(1).
: 2. Permit Modification, Revocation, or Termination
: 2. Permit Modification, Revocation, or Termination
: a. This permit may be modified, revoked and reissued, or terminated for cause as described in 40 CFR 122.62 and 122.64, Federal Register, Volume 49, No. 188 (Wednesday, September 26, 1984), as amended.b. The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this permit.
: a. This permit may be modified, revoked and reissued, or terminated for cause as described in 40 CFR 122.62 and 122.64, Federal Register, Volume 49, No. 188 (Wednesday, September 26, 1984), as amended.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 19 of 33 c. If any applicable effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established for any toxic pollutant under Section 307(a) of the Federal Water Pollution Control Act, as amended, the Director shall modify or revoke and reissue the permit to conform to the prohibition or to the effluent standard, providing that the effluent standard is more stringent than the limitation in the permit on the toxic pollutant.
: b. The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this permit.
The permittee shall comply with these effluent standards or prohibitions within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified or revoked and reissued to incorporate the requirement.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 19 of 33
: c. If any applicable effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established for any toxic pollutant under Section 307(a) of the Federal Water Pollution Control Act, as amended, the Director shall modify or revoke and reissue the permit to conform to the prohibition or to the effluent standard, providing that the effluent standard is more stringent than the limitation in the permit on the toxic pollutant. The permittee shall comply with these effluent standards or prohibitions within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified or revoked and reissued to incorporate the requirement.
: d. The filing of a request by the permittee for a modification, revocation, reissuance, termination, or notification of planned changes or anticipated noncompliance does not halt any permit condition.
: d. The filing of a request by the permittee for a modification, revocation, reissuance, termination, or notification of planned changes or anticipated noncompliance does not halt any permit condition.
: 3. Change of Ownership This permit may be transferred to another party (provided there are neither modifications to the facility or its operations, nor any other changes which might affect the permit limits and conditions contained in the permit) by the permittee if: a. The permittee notifies the Director of the proposed transfer at least 30 days in advance of the proposed transfer date;b. The notice includes a written agreement between the existing and new permittee's containing a specified date for transfer of permit responsibility, coverage, and liability between them; and c. The Director, within 30 days, does not notify the current permittee and the new permittee of his intent to modify, revoke or reissue, or terminate the permit and to require that a new application be filed rather than agreeing to the transfer of the permit.Pursuant to the requirements of 40 CFR 122.61, concerning transfer of ownership, the permittee must provide the following information to the division in their formal notice of intent to transfer ownership:
: 3. Change of Ownership This permit may be transferred to another party (provided there are neither modifications to the facility or its operations, nor any other changes which might affect the permit limits and conditions contained in the permit) by the permittee if:
: 1) the NPDES permit number of the subject permit; 2) the effective date of the proposed transfer;
: a. The permittee notifies the Director of the proposed transfer at least 30 days in advance of the proposed transfer date;
: 3) the name and address of the transferor;
: b. The notice includes a written agreement between the existing and new permittee's containing a specified date for transfer of permit responsibility, coverage, and liability between them; and
: 4) the name and address of the transferee;
: c. The Director, within 30 days, does not notify the current permittee and the new permittee of his intent to modify, revoke or reissue, or terminate the permit and to require that a new application be filed rather than agreeing to the transfer of the permit.
: 5) the names of the responsible parties for both the transferor and transferee; 6)a statement that the transferee assumes responsibility for the subject NPDES permit; 7) a statement that the transferor relinquishes responsibility for the subject NPDES permit; 8) the signatures of the responsible parties for both the transferor and transferee pursuant to the requirements of 40 CFR 122.22(a), "Signatories to permit applications";
Pursuant to the requirements of 40 CFR 122.61, concerning transfer of ownership, the permittee must provide the following information to the division in their formal notice of intent to transfer ownership: 1) the NPDES permit number of the subject permit; 2) the effective date of the proposed transfer; 3) the name and address of the transferor; 4) the name and address of the transferee; 5) the names of the responsible parties for both the transferor and transferee; 6) a statement that the transferee assumes responsibility for the subject NPDES permit; 7) a statement that the transferor relinquishes responsibility for the subject NPDES permit; 8) the signatures of the responsible parties for both the transferor and transferee pursuant to the requirements of 40 CFR 122.22(a), "Signatories to permit applications"; and, 9) a statement regarding any proposed modifications to the facility, it's operations, or any other changes which might affect the permit limits and conditions contained in the permit.
and, 9) a statement regarding any proposed modifications to the facility, it's operations, or any other changes which might affect the permit limits and conditions contained in the permit.4. Change of Mailing Address The permittee shall promptly provide to the Director written notice of any change of mailing address. In the absence of such notice the original address of the permittee shall be assumed to be correct.
: 4. Change of Mailing Address The permittee shall promptly provide to the Director written notice of any change of mailing address. In the absence of such notice the original address of the permittee shall be assumed to be correct.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 20 of 33 C. NONCOMPLIANCE
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 20 of 33 C. NONCOMPLIANCE
: 1. Effect of Noncompliance All discharges shall be consistent with the terms and conditions of this permit. Any permit noncompliance constitutes a violation of applicable State and Federal laws and is grounds for enforcement action, permit termination, permit modification, or denial of permit reissuance.
: 1. Effect of Noncompliance All discharges shall be consistent with the terms and conditions of this permit. Any permit noncompliance constitutes a violation of applicable State and Federal laws and is grounds for enforcement action, permit termination, permit modification, or denial of permit reissuance.
Line 291: Line 293:
A written submission must be provided within five days of the time the permittee becomes aware of the circumstances unless this requirement is waived by the Director on a case-by-case basis. The permittee shall provide the Director with the following information:
A written submission must be provided within five days of the time the permittee becomes aware of the circumstances unless this requirement is waived by the Director on a case-by-case basis. The permittee shall provide the Director with the following information:
I. A description of the discharge and cause of noncompliance; ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and iii. The steps being taken to reduce, eliminate, and prevent recurrence of the noncomplying discharge.
I. A description of the discharge and cause of noncompliance; ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and iii. The steps being taken to reduce, eliminate, and prevent recurrence of the noncomplying discharge.
: b. Scheduled Reporting For instances of noncompliance, which are not reported under subparagraph 2.a.above, the permittee shall report the noncompliance on the Discharge Monitoring Report. The report shall contain all information concerning the steps taken, or planned, to reduce, eliminate, and prevent recurrence of the violation and the anticipated time the violation is expected to continue.3. Overflow a. "Overflow," means the discharge to land or water of wastes from any portion of the collection, transmission, or treatment system other than through permitted outfalls.b. Overflows are prohibited.
: b. Scheduled Reporting For instances of noncompliance, which are not reported under subparagraph 2.a.
: c. The permittee shall operate the collection system so as to avoid overflows.
above, the permittee shall report the noncompliance on the Discharge Monitoring Report. The report shall contain all information concerning the steps taken, or planned, to reduce, eliminate, and prevent recurrence of the violation and the anticipated time the violation is expected to continue.
No new or additional flows shall be added upstream of any point in the collection system, which experiences chronic overflows (greater than 5 events per year) or would otherwise overload any portion of the system.
: 3.     Overflow
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 21 of 33 d. Unless there is specific enforcement action to the contrary, the permittee is relieved of this requirement after: 1) an authorized representative of the Commissioner of the Department of Environment and Conservation has approved an engineering report and construction plans and specifications prepared in accordance with accepted engineering practices for correction of the problem; 2) the correction work is underway; and 3) the cumulative, peak-design, flows potentially added from new connections and line extensions upstream of any chronic overflow point are less than or proportional to the amount of inflow and infiltration removal documented upstream of that point. The inflow and infiltration reduction must be measured by the permittee using practices that are customary in the environmental engineering field and reported in an attachment to a Monthly Operating Report submitted to the local TDEC Environmental Assistance Center. The data measurement period shall be sufficient to account for seasonal rainfall patterns and seasonal groundwater table elevations.
: a. "Overflow," means the discharge to land or water of wastes from any portion of the collection, transmission, or treatment system other than through permitted outfalls.
: e. In the event that more than five (5) overflows have occurred from a single point in the collection system for reasons that may not warrant the self-imposed moratorium or completion of the actions identified in this paragraph, the permittee may request a meeting with the Division of Water Pollution Control EAC staff to petition for a waiver based on mitigating evidence.4. Upset a. "Upset," means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based effluent limitations because of factors beyond the reasonable control of the permittee.
: b. Overflows are prohibited.
An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
: c. The permittee shall operate the collection system so as to avoid overflows. No new or additional flows shall be added upstream of any point in the collection system, which experiences chronic overflows (greater than 5 events per year) or would otherwise overload any portion of the system.
: b. An upset shall constitute an affirmative defense to an action brought for noncompliance with such technology-based permit effluent limitations if the permittee demonstrates, through properly signed, contemporaneous operating logs, or other relevant evidence that: i. An upset occurred and that the permittee can identify the cause(s) of the upset;ii. The permitted facility was at the time being operated in a prudent and workman-like manner and in compliance with proper operation and maintenance procedures; iii. The permittee submitted information required under "Reporting of Noncompliance" within 24-hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days); and iv. The permittee complied with any remedial measures required under"Adverse Impact."
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 22 of 33 5. Adverse Impact The permittee shall take all reasonable steps to minimize any adverse impact to the waters of Tennessee resulting from noncompliance with this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 21 of 33
It shall not be a defense for the permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.6. Bypass a. "Bypass" is the intentional diversion of wastewater away from any portion of a treatment facility. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities, which would cause them to become inoperable, or substantial and permanent loss of natural resources, which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.
: d. Unless there is specific enforcement action to the contrary, the permittee is relieved of this requirement after: 1) an authorized representative of the Commissioner of the Department of Environment and Conservation has approved an engineering report and construction plans and specifications prepared in accordance with accepted engineering practices for correction of the problem; 2) the correction work is underway; and 3) the cumulative, peak-design, flows potentially added from new connections and line extensions upstream of any chronic overflow point are less than or proportional to the amount of inflow and infiltration removal documented upstream of that point. The inflow and infiltration reduction must be measured by the permittee using practices that are customary in the environmental engineering field and reported in an attachment to a Monthly Operating Report submitted to the local TDEC Environmental Assistance Center. The data measurement period shall be sufficient to account for seasonal rainfall patterns and seasonal groundwater table elevations.
: b. Bypasses are prohibited unless the following 3 conditions are met: i. The bypass is unavoidable to prevent loss of life, personal injury, or severe property damage;ii. There are not feasible alternatives to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime.
: e. In the event that more than five (5) overflows have occurred from a single point in the collection system for reasons that may not warrant the self-imposed moratorium or completion of the actions identified in this paragraph, the permittee may request a meeting with the Division of Water Pollution Control EAC staff to petition for a waiver based on mitigating evidence.
This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass, which occurred during normal periods of equipment downtime or preventative maintenance;-
: 4. Upset
iii. The permittee submits notice of an unanticipated bypass to the Division of Water Pollution Control in the appropriate environmental assistance center within 24-hours of becoming aware of the bypass (if this information is provided orally, a written submission must be provided within five days). When the need for the bypass is foreseeable, prior notification shall be submitted to the Director, if possible, at least 10 days before the date of the bypass.c. Bypasses not exceeding limitations are allowed only if the bypass is necessary for essential maintenance to assure efficient operation.
: a. "Upset," means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based effluent limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
All other bypasses are prohibited.
: b. An upset shall constitute an affirmative defense to an action brought for noncompliance with such technology-based permit effluent limitations if the permittee demonstrates, through properly signed, contemporaneous operating logs, or other relevant evidence that:
Allowable bypasses not exceeding limitations are not subject to the reporting requirements of 6.b.iii, above.7. Washout a. For domestic wastewater plants only, a "washout" shall be defined as loss of Mixed Liquor Suspended Solids (MLSS) of 30.00% or more. This refers to the MLSS in the aeration basin(s) only. This does not include MLSS decrease due to solids wasting to the sludge disposal system. A washout can be caused by improper operation or from peak flows due to infiltration and inflow.
: i. An upset occurred and that the permittee can identify the cause(s) of the upset; ii. The permitted facility was at the time being operated in a prudent and workman-like manner and in compliance with proper operation and maintenance procedures; iii. The permittee submitted information required under "Reporting of Noncompliance" within 24-hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days); and iv. The permittee complied with any remedial measures required under "Adverse Impact."
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 23 of 33 b. A washout is prohibited.
 
If a washout occurs, the permittee must report the incident to the Division of Water Pollution Control in the appropriate Environmental Assistance Center within 24-hours by telephone.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 22 of 33
A written submission must be provided within 5 days. The washout must be noted on the discharge monitoring report. Each,, day of a washout is a separate violation.
: 5. Adverse Impact The permittee shall take all reasonable steps to minimize any adverse impact to the waters of Tennessee resulting from noncompliance with this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge. It shall not be a defense for the permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
: 6. Bypass
: a. "Bypass" is the intentional diversion of wastewater away from any portion of a treatment facility. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities, which would cause them to become inoperable, or substantial and permanent loss of natural resources, which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.
: b. Bypasses are prohibited unless the following 3 conditions are met:
: i.       The bypass is unavoidable to prevent loss of life, personal injury, or severe property damage; ii.       There are not feasible alternatives to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass, which occurred during normal periods of equipment downtime or preventative maintenance;-
iii.     The permittee submits notice of an unanticipated bypass to the Division of Water Pollution Control in the appropriate environmental assistance center within 24-hours of becoming aware of the bypass (if this information is provided orally, a written submission must be provided within five days). When the need for the bypass is foreseeable, prior notification shall be submitted to the Director, if possible, at least 10 days before the date of the bypass.
: c. Bypasses not exceeding limitations are allowed only if the bypass is necessary for essential maintenance to assure efficient operation. All other bypasses are prohibited. Allowable bypasses not exceeding limitations are not subject to the reporting requirements of 6.b.iii, above.
: 7. Washout
: a. For domestic wastewater plants only, a "washout" shall be defined as loss of Mixed Liquor Suspended Solids (MLSS) of 30.00% or more. This refers to the MLSS in the aeration basin(s) only. This does not include MLSS decrease due to solids wasting to the sludge disposal system. A washout can be caused by improper operation or from peak flows due to infiltration and inflow.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 23 of 33
: b. A washout is prohibited. If a washout occurs, the permittee must report the incident to the Division of Water Pollution Control in the appropriate Environmental Assistance Center within 24-hours by telephone. A written submission must be provided within 5 days. The washout must be noted on the discharge monitoring report. Each,, day of a washout is a separate violation.
D. LIABILITIES
D. LIABILITIES
: 1. Civil and Criminal Liability Except as provided in permit conditions for "Bypassing," "Overflow," and "Upset," nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance.
: 1. Civil and Criminal Liability Except as provided in permit conditions for "Bypassing," "Overflow," and "Upset," nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance. Notwithstanding this permit, the permittee shall remain liable for any damages sustained by the State of Tennessee, including but not limited to fish kills and losses of aquatic life and/or wildlife, as a result of the discharge of wastewater to any surface or subsurface waters. Additionally, notwithstanding this Permit, it shall be the responsibility of the permittee to conduct its wastewater treatment and/or discharge activities in a manner such that public or private nuisances or health hazards shall not be created.
Notwithstanding this permit, the permittee shall remain liable for any damages sustained by the State of Tennessee, including but not limited to fish kills and losses of aquatic life and/or wildlife, as a result of the discharge of wastewater to any surface or subsurface waters. Additionally, notwithstanding this Permit, it shall be the responsibility of the permittee to conduct its wastewater treatment and/or discharge activities in a manner such that public or private nuisances or health hazards shall not be created.2. Liability Under State Law Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable State law or the Federal Water Pollution Control Act, as amended.I PART III OTHER REQUIREMENTS A. TOXIC POLLUTANTS The permittee shall notify the Division of Water Pollution Control as soon as it knows or has reason to believe: 1. That any activity has occurred or will occur which would result in the discharge on a routine or frequent basis, of any toxic substance(s) (listed at 40 CFR 122, Appendix D, Table II and Ill)which is not limited in the permit, if that discharge will exceed the highest of the following"notification levels": a. One hundred micrograms per liter (100 ug/I);b. Two hundred micrograms per liter (200 ug/I) for acrolein and acrylonitrile; five hundred micrograms per liter (500 ug/I) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/L) for antimony; TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 24 of 33 c. Five (5) times the maximum concentration value reported for that pollutant(s) in the permit application in accordance with 122.21 (g)(7); or d. The level established by the Director in accordance with 122.44(f).
: 2. Liability Under State Law Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable State law or the Federal Water Pollution Control Act, as amended.
: 2. That any activity has occurred or will occur which would result in any discharge, on a non-routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels": a. Five hundred micrograms per liter (500 ug/I);b. One milligram per liter (1 mg/L) for antimony;d. Ten (10) times the maximum concentration value reported for that pollutant in the permit application in accordance with 122.21 (g)(7); or d. The level established by the Director in accordance with 122.44(f).
I       PART III OTHER REQUIREMENTS A. TOXIC POLLUTANTS The permittee shall notify the Division of Water Pollution Control as soon as it knows or has reason to believe:
: 1. That any activity has occurred or will occur which would result in the discharge on a routine or frequent basis, of any toxic substance(s) (listed at 40 CFR 122, Appendix D, Table II and Ill) which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels":
: a. One hundred micrograms per liter (100 ug/I);
: b. Two hundred micrograms per liter (200 ug/I) for acrolein and acrylonitrile; five hundred micrograms per liter (500 ug/I) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/L) for antimony;
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 24 of 33
: c. Five (5) times the maximum concentration value reported for that pollutant(s) in the permit application in accordance with 122.21 (g)(7); or
: d. The level established by the Director in accordance with 122.44(f).
: 2. That any activity has occurred or will occur which would result in any discharge, on a non-routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels":
: a. Five hundred micrograms per liter (500 ug/I);
: b. One milligram per liter (1 mg/L) for antimony;
: d.       Ten (10) times the maximum concentration value reported for that pollutant in the permit application in accordance with 122.21 (g)(7); or
: d. The level established by the Director in accordance with 122.44(f).
B. REOPENER CLAUSE If an applicable standard or limitation is promulgated under Sections 301(b)(2)(C) and (D), 304(B)(2), and 307(a)(2) and that effluent standard or limitation is more stringent than any effluent limitation in the permit or controls a pollutant not limited in the permit, the permit shall be promptly modified or revoked and reissued to conform to that effluent standard or limitation.
B. REOPENER CLAUSE If an applicable standard or limitation is promulgated under Sections 301(b)(2)(C) and (D), 304(B)(2), and 307(a)(2) and that effluent standard or limitation is more stringent than any effluent limitation in the permit or controls a pollutant not limited in the permit, the permit shall be promptly modified or revoked and reissued to conform to that effluent standard or limitation.
C. PLACEMENT OF SIGNS Within sixty (60) days of the effective date of this permit, the permittee shall place and maintain a sign at each outfall and any bypass/overflow point in the collection system. For the purposes of this requirement, any bypass/overflow point that has discharged five (5) or more times in the last year must be so posted. The sign(s) should be clearly visible to the public from the bank and the receiving stream or from the nearest public property/right-of-way, if applicable.
C. PLACEMENT OF SIGNS Within sixty (60) days of the effective date of this permit, the permittee shall place and maintain a sign at each outfall and any bypass/overflow point in the collection system. For the purposes of this requirement, any bypass/overflow point that has discharged five (5) or more times in the last year must be so posted. The sign(s) should be clearly visible to the public from the bank and the receiving stream or from the nearest public property/right-of-way, if applicable.
The minimum sign size should be two feet by two feet (2' x 2') with one-inch (1") letters. The sign should be made of durable material and have a white background with black letters.The sign(s) are to provide notice to the public as to the nature of the discharge and, in the case of the permitted outfalls, that the discharge is regulated by the Tennessee Department of Environment and Conservation, Division of Water Pollution Control. The following is given as an example of the minimal amount of information that must be included on the sign: TREATED INDUSTRIAL WASTEWATER and STORM WATER RUNOFF TVA -Watts Bar Nuclear Plant (Permittee's Phone Number)NPDES Permit NO. TN0020168 TENNESSEE DIVISION OF WATER POLLUTION CONTROL 1-888-891-8332 ENVIRONMENTAL FIELD OFFICE -CHATTANOOGA TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 25 of 33 D. ANTIDEGRADATION Pursuant to the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06, titled "Tennessee Antidegradation Statement," and in consideration of the Department's directive in attaining the greatest degree of effluent reduction achievable in municipal, industrial, and other wastes, the permittee shall further be required, pursuant to the terms and conditions of this permit, to comply with the effluent limitations and schedules of compliance required to implement applicable water quality standards, to comply with a State Water Quality Plan or other State or Federal laws or regulations, or where practicable, to comply with a standard permitting no discharge of pollutants.
The minimum sign size should be two feet by two feet (2' x 2') with one-inch (1") letters. The sign should be made of durable material and have a white background with black letters.
E. BIOMONITORING REQUIREMENTS, CHRONIC The permittee shall conduct a 3-Brood Ceriodaphnia dubia Survival and Reproduction Test and a 7-Day Fathead Minnow (Pimephales promelas)
The sign(s) are to provide notice to the public as to the nature of the discharge and, in the case of the permitted outfalls, that the discharge is regulated by the Tennessee Department of Environment and Conservation, Division of Water Pollution Control. The following is given as an example of the minimal amount of information that must be included on the sign:
Larval Survival and Growth Test on the same samples of final effluent from Outfalls 101, 102, and 113.The measured endpoint for toxicity shall be the inhibition concentration causing 25%reduction (IC25) in survival, reproduction, or growth of the test organisms.
TREATED INDUSTRIAL WASTEWATER and STORM WATER RUNOFF TVA - Watts Bar Nuclear Plant (Permittee's Phone Number)
The IC25 shall be determined based on a 25% reduction as compared to the controls.
NPDES Permit NO. TN0020168 TENNESSEE DIVISION OF WATER POLLUTION CONTROL 1-888-891-8332 ENVIRONMENTAL FIELD OFFICE - CHATTANOOGA
The average reproduction and growth responses shall be determined based on the number of Ceriodaphnia dubia or Pimephales promelas larvae used to initiate the test. A separate statistical analysis based on survival information is not required.Test shall be conducted and its results reported based on appropriate replicates of a total of five serial dilutions and a control, using the percent effluent dilutions as presented in the following table: Outfalls 101 & 102 Serial Dilutions for Whole Effluent Toxicity E) Testing 4 X PL 2 X PL Permit Limit 0.50 X PL 0.25 X PL Control (PL)% effluent 11.2 5.6 2.8 1.4 0.7 0 Outfall 113 Serial Dilutions for Whole Effluent Toxicity WET) Testing Permit Limit 4 X PL 2 X PL (PL) 0.50 X PL 0.25 X PL Control% effluent 26.8 13.4 6.7 3.4 1.68 0 The dilution/control water used shall be a moderately hard water as described in Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013 (or the most current edition).
 
Results from a chronic standard TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 26 of 33 reference toxicant quality assurance test for each species tested shall be submitted with the discharge monitoring report. Reference toxicant tests shall be conducted as required in EPA-821-R-02-013 (or the most current edition).
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 25 of 33 D. ANTIDEGRADATION Pursuant to the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06, titled "Tennessee Antidegradation Statement," and in consideration of the Department's directive in attaining the greatest degree of effluent reduction achievable in municipal, industrial, and other wastes, the permittee shall further be required, pursuant to the terms and conditions of this permit, to comply with the effluent limitations and schedules of compliance required to implement applicable water quality standards, to comply with a State Water Quality Plan or other State or Federal laws or regulations, or where practicable, to comply with a standard permitting no discharge of pollutants.
Additionally, the analysis of this multi-concentration test shall include review of the concentration-response relationship to ensure that calculated test results are interpreted appropriately.
E. BIOMONITORING REQUIREMENTS, CHRONIC The permittee shall conduct a 3-Brood Ceriodaphniadubia Survival and Reproduction Test and a 7-Day Fathead Minnow (Pimephalespromelas) Larval Survival and Growth Test on the same samples of final effluent from Outfalls 101, 102, and 113.
Toxicity will be demonstrated if the IC25 is less than the permit limit indicated for each outfall in the above table(s).
The measured endpoint for toxicity shall be the inhibition concentration causing 25%
Toxicity demonstrated by the tests specified herein constitutes a violation of this permit. However, if raw water intake samples (tested concurrently with the effluent samples) are shown to be toxic enough to represent a test failure (100 percent samples statistically less than controls using t-tests and minnow growth or daphnid reproduction is 25 percent less than controls) and if effluent toxicity is not statistically greater than calculated intake toxicity; the effluent toxicity test in question will be considered invalid. In the event these two above described conditions occur, the toxicity test shall be repeated according to the schedule requirements for test failure. Effluent toxicity that is not consistent with the intake toxicity conditions specified above constitutes a violation of this permit. If pathogens are demonstrated to be the source of toxicity to Pimephales promelas in the intake water, the permittee may be allowed to treat effluent samples for toxicity testing on Pimephales promelas with UV radiation only in accordance with prior written approval from the Division.All tests will be conducted using a minimum of three 24-hour flow-proportionate composite samples of final effluent (e.g., collected on days 1, 3 and 5). If, in any control more than 20% of the test organisms die in 7 days, the test (control and effluent) is considered invalid and the test shall be repeated within 30 days of the date the initial test is invalidated.
reduction (IC25) in survival, reproduction, or growth of the test organisms. The IC25 shall be determined based on a 25% reduction as compared to the controls. The average reproduction and growth responses shall be determined based on the number of Ceriodaphnia dubia or Pimephalespromelas larvae used to initiate the test. A separate statistical analysis based on survival information is not required.
Furthermore, if the results do not meet the acceptability criteria of section 4.9.1, EPA-821-R-02-013 (or the most current edition), or if the required concentration-response review fails to yield a valid relationship per guidance contained in Method Guidance and Recommendations for Whole Effluent Toxicity (WET) Testing, EPA-821-B-00-004 (or the most current edition), that test shall be repeated.
Test shall be conducted and its results reported based on appropriate replicates of a total of five serial dilutions and a control, using the percent effluent dilutions as presented in the following table:
Any test initiated but terminated before completion must also be reported along with a complete explanation for the termination.
Outfalls 101 & 102 Serial Dilutions for Whole Effluent Toxicity       E) Testing 4 X PL             2 X PL         Permit Limit       0.50 X PL       0.25 X PL         Control (PL)
The toxicity tests specified herein shall be conducted twice a year (2/Year) for Outfalls 101, 102, and 113, and frequency and results reporting will be governed by the TDEC-approved Blocide/Corrosion Treatment Plan (B/CTP).In the event of a test failure, the permittee must start a follow-up test within 2 weeks and submit results from a follow-up test within 30 days from obtaining initial WET testing results.The follow-up test must be conducted using the same serial dilutions as presented in the corresponding table(s) above. The follow-up test will not negate an initial failed test. In addition, the failure of a follow-up test will constitute a separate permit violation, which must also be reported.In the event of 2 consecutive test failures or 3 test failures within a 12 month period for the same outfall, the permittee must initiate a Toxicity Identification Evaluation/Toxicity Reduction Evaluation (TIE/TRE) study within 30 days and so notify the Division by letter. This notification shall include a schedule of activities for the initial investigation of that outfall. During the term of the TIE/TRE study, the frequency of biomonitoring shall be once every three months.Additionally, the permittee shall submit progress reports once every three months throughout the term of the TIE/TRE study. The toxicity must be reduced to allowable limits for that outfall within 2 years of initiation of the TIE/TRE study. Subsequent to the results obtained from the TIE/TRE studies, the permittee may request an extension of the TIE/TRE study period if TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 27 of 33 necessary to conduct further analyses.
                                                  % effluent 11.2                 5.6             2.8               1.4             0.7               0 Outfall 113 Serial Dilutions for Whole Effluent Toxicity WET) Testing Permit Limit 4 X PL             2 X PL           (PL)           0.50 X PL       0.25 X PL         Control
The final determination of any extension period will be made at the discretion of the Division.The TIE/TRE study may be terminated at any time upon the completion and submission of 2 consecutive tests (for the same outfall) demonstrating compliance.
                                                  % effluent 26.8               13.4             6.7               3.4             1.68               0 The dilution/control water used shall be a moderately hard water as described in Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013 (or the most current edition). Results from a chronic standard
Following the completion of TIE/TRE study, the frequency of monitoring will return to a regular schedule, as defined previously in this section as well in Part I of the permit. During the course of the TIETRE study, the permittee will continue to conduct toxicity testing of the outfall being investigated at the frequency of once every three months but will not be required to perform follow-up tests for that outfall during the period of TIE/TRE study.Test procedures, quality assurance practices, determinations of effluent survival/reproduction and survival/growth values, and report formats will be made in accordance with Short-Term Methods for Estimatinq the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013, or the most current edition.Results of all tests, reference toxicant information, copies of raw data sheets, statistical analysis and chemical analyses shall be compiled in a report. The report will be written in accordance with Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Orgianisms, EPA-821-R-02-013, or the most current edition.Two copies of biomonitoring reports (including follow-up reports) shall be submitted to the division.
 
One copy of the report shall be submitted along with the discharge monitoring report (DMR). The second copy shall be submitted to the local Division of Water Pollution Control office address: Environmental Field Office- Chattanooga Division of Water Pollution Control 540 McCallie Avenue, Suite 550 Chattanooga, TN 37402-2013 F. BIOCIDE/CORROSION TREATMENT PLAN The permittee shall not conduct treatments of intake or process waters under this permit using biocides, dispersants, surfactants, corrosion inhibiting chemicals, or detoxification chemicals except in accordance with conditions specified under the written B/CTP [plan] which has been given prior approval by the Division of Water Pollution Control (DWPC) prior to the effective date of this permit, or subsequent revisions that are approved by the DWPC. WET frequency and results reporting will be governed by the B/CTP.G. 316(B)EPA published a draft of the revised Phase II 316(b) regulations on April 20, 2011 which is scheduled to be final not later than July 2012. This permit may be reopened to address new 316(b) compliance requirements upon issuance of a final rule or guidance by EPA.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 26 of 33 reference toxicant quality assurance test for each species tested shall be submitted with the discharge monitoring report. Reference toxicant tests shall be conducted as required in EPA-821-R-02-013 (or the most current edition). Additionally, the analysis of this multi-concentration test shall include review of the concentration-response relationship to ensure that calculated test results are interpreted appropriately.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 28 of 33 I PART IV STORM WATER POLLUTION PREVENTION PLAN Storm water runoff associated with industrial activity that is not discharged to the receiving stream through Outfalls 101 and 102 are currently authorized under the Tennessee Storm Water Multi-Sector General permit for Industrial Activities (TMSP), Permit Number TNR051343.
Toxicity will be demonstrated if the IC25 is less than the permit limit indicated for each outfall in the above table(s). Toxicity demonstrated by the tests specified herein constitutes a violation of this permit. However, if raw water intake samples (tested concurrently with the effluent samples) are shown to be toxic enough to represent a test failure (100 percent samples statistically less than controls using t-tests and minnow growth or daphnid reproduction is 25 percent less than controls) and if effluent toxicity is not statistically greater than calculated intake toxicity; the effluent toxicity test in question will be considered invalid. In the event these two above described conditions occur, the toxicity test shall be repeated according to the schedule requirements for test failure. Effluent toxicity that is not consistent with the intake toxicity conditions specified above constitutes a violation of this permit. If pathogens are demonstrated to be the source of toxicity to Pimephales promelas in the intake water, the permittee may be allowed to treat effluent samples for toxicity testing on Pimephales promelas with UV radiation only in accordance with prior written approval from the Division.
The TMSP requires development, implementation, and routine evaluation and ,updating of a storm water pollution prevention plan (SWPPP). The permittee shall ensure that the appropriate pollution prevention measures are identified in the SWPPP to also minimize the discharge of pollutants in storm water or from ancillary activities via Outfalls 101 and 102. Any necessary plan modifications shall be completed in accordance with the schedules set forth in the TMSP.The discharger will develop, document and maintain a storm water pollution prevention plan (SWPPP) pursuant to the requirements as set forth in the Tennessee Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated With Industrial Activity From Steam Electric Power Generating Facilities", Part 3, "Storm Water Pollution Prevention Plan Requirements." The plan shall be signed by either a principal executive officer of a corporation, the owner or proprietor of a sole proprietorship, or a partner or general partner of a partnership.
All tests will be conducted using a minimum of three 24-hour flow-proportionate composite samples of final effluent (e.g., collected on days 1, 3 and 5). If, in any control more than 20% of the test organisms die in 7 days, the test (control and effluent) is considered invalid and the test shall be repeated within 30 days of the date the initial test is invalidated. Furthermore, if the results do not meet the acceptability criteria of section 4.9.1, EPA-821-R-02-013 (or the most current edition), or if the required concentration-response review fails to yield a valid relationship per guidance contained in Method Guidance and Recommendations for Whole Effluent Toxicity (WET) Testing, EPA-821-B-00-004 (or the most current edition), that test shall be repeated. Any test initiated but terminated before completion must also be reported along with a complete explanation for the termination.
SEF TNO020168.00C TVA-Watts-Bar Nuclear Plant NPDES Permit TN0O020168 Page3of 4<August 25, 2011 Addendum prepared by: Ms. Souraya Fathi The facility submitted comments to the division based on their review of the final permit. The requested changes are primarily to address items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft 'permit comments.The division agrees that the following comments were minor, except for comments (1-c.), (2)and (3) regarding pH monitoring reduction.
The toxicity tests specified herein shall be conducted twice a year (2/Year) for Outfalls 101, 102, and 113, and frequency and results reporting will be governed by the TDEC-approved Blocide/Corrosion Treatment Plan (B/CTP).
These two comments are considered a major modification, and after discussing the matter with the facilitythey opted out of their request for pH monitoring reduction.
In the event of a test failure, the permittee must start a follow-up test within 2 weeks and submit results from a follow-up test within 30 days from obtaining initial WET testing results.
The following are the changes to the permit: 1) Page I of 29: a. In the listed authorized wastewaters for Outfall 101, please change"boiler blowdown water"to usteam generator blowdown water" to be consistent with change made to Outfall 102 authorized wastewaters in the draft permit.b. In Outfall 101's permit limits table. WVA requests the sample type for temperature be changed from "operation records" to "recorder" shown in draft permit since monitoring frequency is continuous.
The follow-up test must be conducted using the same serial dilutions as presented in the corresponding table(s) above. The follow-up test will not negate an initial failed test. In addition, the failure of a follow-up test will constitute a separate permit violation, which must also be reported.
This would also be consistent with Footnote (4) which refers to a temperature recorder.c. In Outfall 101's permit limits table, TVA requests that pH sampling frequency be changed from twice per month to monthly to reflect changes made to. the draft permit regarding Turbine Building Station Sump (TBSS) alignment.
In the event of 2 consecutive test failures or 3 test failures within a 12 month period for the same outfall, the permittee must initiate a Toxicity Identification Evaluation/Toxicity Reduction Evaluation (TIE/TRE) study within 30 days and so notify the Division by letter. This notification shall include a schedule of activities for the initial investigation of that outfall. During the term of the TIE/TRE study, the frequency of biomonitoring shall be once every three months.
Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.
Additionally, the permittee shall submit progress reports once every three months throughout the term of the TIE/TRE study. The toxicity must be reduced to allowable limits for that outfall within 2 years of initiation of the TIE/TRE study. Subsequent to the results obtained from the TIE/TRE studies, the permittee may request an extension of the TIE/TRE study period if
TVA-Watts-Bar Nuclear Plant NPDES Permit TN00?0168 Page &#xfd;4 of 3. 2) Page 2 of 29, below Ouffall 101 permit limits table: Due to changes made to the draft permit, TVA requests the asterisked
 
(*) footnote be changed from=monitodng for pH... to "monitoring and limits for pH...". TVA believes this will further avoid any unintended.ambiguity concerning situations that may require monitoring for the. applicable parameters.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 27 of 33 necessary to conduct further analyses. The final determination of any extension period will be made at the discretion of the Division.
: 3) Page 3 of 29, Outfall 102's permit limits-table:
The TIE/TRE study may be terminated at any time upon the completion and submission of 2 consecutive tests (for the same outfall) demonstrating compliance. Following the completion of TIE/TRE study, the frequency of monitoring will return to a regular schedule, as defined previously in this section as well in Part I of the permit. During the course of the TIETRE study, the permittee will continue to conduct toxicity testing of the outfall being investigated at the frequency of once every three months but will not be required to perform follow-up tests for that outfall during the period of TIE/TRE study.
TVA requests that pH sampling frequency be changed from. twice per month to monthly to. reflect changes made to the draft permit regarding TBSS alignment.
Test procedures, quality assurance practices, determinations of effluent survival/reproduction and survival/growth values, and report formats will be made in accordance with Short-Term Methods for Estimatinq the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013, or the most current edition.
Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.
Results of all tests, reference toxicant information, copies of raw data sheets, statistical analysis and chemical analyses shall be compiled in a report. The report will be written in accordance with Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Orgianisms, EPA-821-R-02-013, or the most current edition.
: 4) Page 4 of 29, Below Outfall 102's permit limits table, a. As indicated in comments on the draft permit, Footnote (1) refers to a"continuous flow monitor." WBN does not have a continuous flow monitor for Outfall 102 but determines flow by using readings from the Yard Holding Pond staff gage or Environmental Data System stage recorder (i.e., calculating the flow from the overflow weir head-discharge curve). Please revise the footnote to read: "VIn the event that the yard holding pond staff gages are out of service, flow monitoring shall be estimated by intake pump logs or the .behavior (e.g., the rate of filling and emptying) of the yard holding pond." b. As requested in comments on the draft permit, please remove Footnote (4), which refers to a temperature monitor for Outfall 102. If an overflow occurs at the yard holding pond, temperature monitoring will be by grab sample (as-indicated above).c. As indicated in comments on the draft permit, TVA requests that Footnote (6) from the previous permit be incorporated as a footnote and apply to pH, TSS, O&G, and zinc monitoring parameters.
Two copies of biomonitoring reports (including follow-up reports) shall be submitted to the division. One copy of the report shall be submitted along with the discharge monitoring report (DMR). The second copy shall be submitted to the local Division of Water Pollution Control office address:
The footnote should read: "If there is discharge during 1 or more days from this ouffall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge,.
Environmental Field Office- Chattanooga Division of Water Pollution Control 540 McCallie Avenue, Suite 550 Chattanooga, TN 37402-2013 F. BIOCIDE/CORROSION TREATMENT PLAN The permittee shall not conduct treatments of intake or process waters under this permit using biocides, dispersants, surfactants, corrosion inhibiting chemicals, or detoxification chemicals except in accordance with conditions specified under the written B/CTP [plan] which has been given prior approval by the Division of Water Pollution Control (DWPC) prior to the effective date of this permit, or subsequent revisions that are approved by the DWPC. WET frequency and results reporting will be governed by the B/CTP.
or a continuous discharge during 5 or more consecutive days from the outfall then one sample is required from that 'batch' discharge in order to report the monthly average limit." d. TVA requests that Footnote (5) below Outfall 101's permit limits table (Page 2 of 29) also apply to Outfall 102 to ensure toxicity testing requirements are consistent between both outfalls.
G. 316(B)
The footnote should read: "Sampling and analysis is required only if discharge is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testing TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page- of 4 q requirements have not already been completed for Outfall 101. See Part Ill for methodology." TVA believes this Footnote (5) for Outfall.101 was also intended for Outfall 102 due to its variable and infrequent discharges.
EPA published a draft of the revised Phase II 316(b) regulations on April 20, 2011 which is scheduled to be final not later than July 2012. This permit may be reopened to address new 316(b) compliance requirements upon issuance of a final rule or guidance by EPA.
: e. TWA requests the asterisked
 
(*) footnote be. changed from monitoring for pH..." to "monitoring and limits for pH...". TVA believes&this will further avoid any unintended ambiguity concerning situations that may require monitoring for the applicable parameters.
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 28 of 33 I     PART IV STORM WATER POLLUTION PREVENTION PLAN Storm water runoff associated with industrial activity that is not discharged to the receiving stream through Outfalls 101 and 102 are currently authorized under the Tennessee Storm Water Multi-Sector General permit for Industrial Activities (TMSP), Permit Number TNR051343. The TMSP requires development, implementation, and routine evaluation and
: 5) Page 7 of 29, Outfall 113's permit limits table: a. A typographic error is apparent as Footnote (6) does not apply to the Flow sample type and should be removed.b. TVA requests the temperature rise, upstream to downstream, be changed from "3.0" to "3" for consistency with the draft permit, (reference made on Page 11 of 29), and the rationale.
,updating of a storm water pollution prevention plan (SWPPP). The permittee shall ensure that the appropriate pollution prevention measures are identified in the SWPPP to also minimize the discharge of pollutants in storm water or from ancillary activities via Outfalls 101 and 102. Any necessary plan modifications shall be completed in accordance with the schedules set forth in the TMSP.
The discharger will develop, document and maintain a storm water pollution prevention plan (SWPPP) pursuant to the requirements as set forth in the Tennessee Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated With Industrial Activity From Steam Electric Power Generating Facilities", Part 3, "Storm Water Pollution Prevention Plan Requirements." The plan shall be signed by either a principal executive officer of a corporation, the owner or proprietor of a sole proprietorship, or a partner or general partner of a partnership.
SEF TNO020168.00C
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0O020168 Page3of 4<
August 25, 2011 Addendum prepared by: Ms. Souraya Fathi The facility submitted comments to the division based on their review of the final permit. The requested changes are primarily to address items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft 'permit comments.
The division agrees that the following comments were minor, except for comments (1-c.), (2) and (3) regarding pH monitoring reduction. These two comments are considered a major modification, and after discussing the matter with the facilitythey opted out of their request for pH monitoring reduction.
The following are the changes to the permit:
: 1) Page I of 29:
: a. In the listed authorized wastewaters for Outfall 101, please change "boiler blowdown water"to usteam generator blowdown water" to be consistent with change made to Outfall 102 authorized wastewaters in the draft permit.
: b. In Outfall 101's permit limits table. WVA requests the sample type for temperaturebe changed from "operation records" to "recorder" shown in draft permit since monitoring frequency is continuous. This would also be consistent with Footnote (4) which refers to a temperature recorder.
: c. In Outfall 101's permit limits table, TVA requests that pH sampling frequency be changed from twice per month to monthly to reflect changes made to. the draft permit regarding Turbine Building Station Sump (TBSS) alignment. Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.
 
TVA-Watts-Bar Nuclear Plant NPDES Permit   TN00?0168 Page &#xfd;4 of 3. d*
: 2) Page 2 of 29, below Ouffall 101 permit limits table: Due to changes made to the draft permit, TVA requests the asterisked (*)footnote be changed from
  =monitodng for pH... to "monitoring and limits for pH...". TVA believes this will further avoid any unintended.ambiguity concerning situations that may require monitoring for the. applicable parameters.
: 3) Page 3 of 29, Outfall 102's permit limits-table: TVA requests that pH sampling frequency be changed from. twice per month to monthly to. reflect changes made to the draft permit regarding TBSS alignment. Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.
: 4) Page 4 of 29, Below Outfall 102's permit limits table,
: a. As indicated in comments on the draft permit, Footnote (1) refers to a "continuous flow monitor." WBN does not have a continuous flow monitor for Outfall 102 but determines flow by using readings from the Yard Holding Pond staff gage or Environmental Data System stage recorder (i.e., calculating the flow from the overflow weir head-discharge curve). Please revise the footnote to read: "VIn the event that the yard holdingpond staff gages are out of service, flow monitoringshall be estimatedby intake pump logs or the .behavior (e.g., the rate of filling and emptying) of the yardholding pond."
: b. As requested in comments on the draft permit, please remove Footnote (4), which refers to a temperature monitor for Outfall 102. If an overflow occurs at the yard holding pond, temperature monitoring will be by grab sample (as-indicated above).
: c. As indicated in comments on the draft permit, TVA requests that Footnote (6) from the previous permit be incorporated as a footnote and apply to pH, TSS, O&G, and zinc monitoring parameters. The footnote should read: "Ifthere is dischargeduring 1 or more days from this ouffall, sampling is requiredto comply with the maximum daily limit. If there are two or more separatedays of discharge,.or a continuous dischargeduring 5 or more consecutive days from the outfall then one sample is requiredfrom that 'batch'dischargein orderto report the monthly average limit."
: d. TVA requests that Footnote (5) below Outfall 101's permit limits table (Page 2 of 29) also apply to Outfall 102 to ensure toxicity testing requirements are consistent between both outfalls. The footnote should read: "Sampling and analysis is requiredonly if dischargeis operated30 days or more during the semi-annualperiods January through June or July through Decemberand if all toxicity testing
 
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page- of 4     q requirementshave not already been completed for Outfall 101. See PartIll for methodology." TVA believes this Footnote (5) for Outfall.
101 was also intended for Outfall 102 due to its variable and infrequent discharges.
: e. TWA requests the asterisked (*)footnote be. changed from monitoring for pH..." to "monitoring and limits for pH...". TVA believes&this will further avoid any unintended ambiguity concerning situations that may require monitoring for the applicable parameters.
: 5) Page 7 of 29, Outfall 113's permit limits table:
: a. A typographic error is apparent as Footnote (6) does not apply to the Flow sample type and should be removed.
: b. TVA requests the temperature rise, upstream to downstream, be changed from "3.0" to "3" for consistency with the draft permit, (reference made on Page 11 of 29), and the rationale.
: c. TVA requests the temperature rate of change be changed from "2.0" to "2" for consistency with the draft permit (reference made on Page 11 of 29), and the rationale.
: c. TVA requests the temperature rate of change be changed from "2.0" to "2" for consistency with the draft permit (reference made on Page 11 of 29), and the rationale.
: 6) Page 10 of 29: As indicated in comments on the draft permit, VA requests the, following bullets be'added between the existing third and fourth bullets: The active mixing zone includes the following dimensions:
: 6) Page 10 of 29: As indicated in comments on the draft permit, VA requests the, following bullets be'added between the existing third and fourth bullets:
(1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000 -feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer and left-hand-side of the river to allow for fish and other species to pass.beyond the thermal plume.* Compliance for the active mixing zone is given by the following requirements.
The active mixing zone includes the following dimensions: (1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000-feet downstream of the outfall. It has been documented that there is a zone of (cool water)refuge in the bottom layer and left-hand-side of the river to allow for fish and other species to pass.beyond the thermal plume.
: 7) Page 11 of 29: As a result of the changes made to the draft permit, the last bullet on Page 11 of 29 and the third paragraph of Page R-1 8 of R-57 make it uncertain as to how many sensors are required and what measurement is to be used for compliance.
* Compliance for the active mixing zone is given by the following requirements.
TVA has submitted information to show that the bottom temperature can be monitored with one sensor (the warmest sensor in the plot shown on Page R-19 of R-57). Since TVA believes the intent was to allow monitoring with one sensor and to have this monitoring based on a TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page -34" roiling one hour average, TVA, requests the language be changed tothe following:
: 7) Page 11 of 29: As a result of the changes made to the draft permit, the last bullet on Page 11 of 29 and the third paragraph of Page R-1 8 of R-57 make it uncertain as to how many sensors are required and what measurement is to be used for compliance. TVA has submitted information to show that the bottom temperature can be monitored with one sensor (the warmest sensor in the plot shown on Page R-19 of R-57). Since TVA believes the intent was to allow monitoring with one sensor and to have this monitoring based on a
: a. Last bullet, on Page 11 of 29: The daily maximum value for the TEMPERATURE, Receiving Stream,-Bottom shall bedetermined from 15-minute values. The $-hour average value shall be calculated every 15 minutes using the current and. previous four 15-minute values, thus creating-a-rolling average. The temperature shall be, reported on the Discharge Monitoring Reports as the daily maximum (highest for the day) and monthly average value.b. Third paragraph on Page R-18 of R-57,(or Addendum to Rationale), concerning the- bottom temperature monitoring:
 
The permittee-shall maintain a bottom temperature sensor in the Mussel Relocation Zone to ensure protection of bottom dwelling species and a,-zone of-fish passage. The limit for the monitor in the relocation zone will remain at 33.50C (92.3XF) as the maximum 1-houraverage value, toqprotect those bottom dwelling species. The'permittee shall record data on the DMRs, where. exceedances of the, limit will be considered a permit violation.
TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 8.*of -34" roiling one hour average, TVA, requests the language be changed tothe following:
: 8) Page R-2 of R-57, Rationale:
: a. Last bullet,on Page 11 of 29: The daily maximum value for the TEMPERATURE, Receiving Stream,-Bottom shall bedetermined from 15-minute values. The $-hour average value shall be calculated every 15 minutes using the current and.previous four 15-minute values, thus creating-a-rollingaverage. The temperatureshall be, reported on the Discharge Monitoring Reports as the daily maximum (highest for the day) and monthly average value.
In response.to a verbal request for.additional information from the -Nuclear Regulatory Commission (NRC), TVA updated its intake velocity calculations.
: b. Third paragraph on Page R-18 of R-57,(or Addendum to Rationale),
A-copy ofthe -response to the. NRC dated April -29,2011, regarding, the Intake Pumping Station (IPS) flow calculations is enclosed for your records. IVA requests beginning with the last two sentences .of the third paragraph on'Page R-2-of. R-57 (or Addendum to Rationale) be revised to- reflect the updated calculations:, At.the travelling water screens,., the combined unobstructed through-screen area of the corresponding to the gated openings is reduced to approximately 1f40 ft 2 , producing a winter average through-screen velocity of approximately 0:67 fps; The average flowrate at the IPS for WBN- Unit I is approximately-80 cubic feet per-second, (cfs),..or 0.3% Of the long-term average. river flow.(27,000 cfs) past theplant.With the operation of both Unit I and-proposed Unit 2, intake (infront of screen).and through-screen velocities at winter pool are: projected to beO. 37 fps and 0.67 fps,. respectively.
concerning the-bottom temperature monitoring: The permittee-shall maintain a bottom temperaturesensorin the Mussel Relocation Zone to ensureprotection of bottom dwelling species and a,-zone of-fish passage. The limit for the monitorin the relocation zone will remain at 33.50C (92.3XF) as the maximum 1-houraveragevalue,toqprotect those bottom dwelling species. The'permittee shall recorddata on the DMRs, where.exceedances of the,limit will be considereda permit violation.
The average flowrate at the IPS. during operation of both units is.expected to be approximately 116-cfs, or 0.4.% of the long-term average river flow past the plant of approximately 2?7, 000 -cfs.SEF Permit Addendum TNO020168.DOC TVA-Watts-Bar Nuclear Plant NPDES Permit TNO0201.68 Page34of 34"'~ AD~END~I FIRl ATTON#.LEW,1 AI W, Ud r June 17, 2011 Addendum prepared by: Ms. Souraya Fathi This Rationale has been revised since it was public noticed on April 18, 2011, to incorporate comments received by EPA and TVA -Watts Bar Nuclear Plant.In a letter prepared by Ms. Cynthia M. Anderson, TVA, dated May 9, 2011, TVA -Watts Bar Nuclear Plant submitted comments on the draft NPDES Permit No. TNO020168.
: 8) Page R-2 of R-57, Rationale: In response.to a verbal request for.additional information from the -Nuclear Regulatory Commission (NRC), TVA updated its intake velocity calculations. A-copy ofthe -response to the. NRC dated April -29,2011, regarding, the Intake Pumping Station (IPS) flow calculations is enclosed for your records. IVA requests beginning with the last two sentences .of the third paragraph on'Page R-2-of. R-57 (or Addendum to Rationale) be revised to-reflect the updated calculations:,
These comments have been addressed in the final permit and also been incorporated into the Rationale.
At.the travelling water screens,.,the combined unobstructedthrough-screen areaof the correspondingto the gated openings is reduced to approximately 1f40 ft2, producing a winter average through-screenvelocity of approximately 0:67 fps; The average flowrate at the IPS for WBN-Unit I is approximately-80 cubic feet per-second,(cfs),..or 0.3% Of the long-term average.river flow.
Most all of the comments were minor changes and were either typographical errors or an oversight from the permit writer.EPA's comments on the draft were received electronically on April 19, 2011, and were addressed and incorporated in the final permit.SEF Permit Addendum TNO02016B.DOC TVA-Watts Bar Nuclear Plant (Rationale)
(27,000 cfs) past theplant.
NPDES Permit TN0020168 Page R-1 of R-57 I RATIONALE  
With the operationof both Unit I and-proposedUnit 2, intake (infrontof screen).andthrough-screen velocities at winterpool are:projected to beO.37 fps and 0.67 fps,. respectively. The average flowrate at the IPS.during operationof both units is.expected to be approximately 116-cfs, or 0.4.%of the long-term average riverflow past the plantof approximately 2?7, 000 -cfs.
]TVA -Watts Bar Nuclear Plant NPDES PERMIT NO. TN0020168 Spring City, Rhea County, Tennessee Permit Writers: Ms. Souraya Fathi I. DISCHARGER TVA -Watts Bar Nuclear Plant Hwy 68 Nuclear Plant Road Spring City, Rhea County, Tennessee Official Contact Person: Mr. Don Grissette Vice President  
SEF Permit Addendum TNO020168.DOC
-Watts Bar Nuclear Plant (423) 751-3361 Nature of Business:
 
Production of electric power by thermonuclear fission and other associated operations SIC Code(s): 4911 Industrial Classification:
TVA-Watts-Bar Nuclear Plant NPDES Permit TNO0201.68 Page34of 34"'
Primary Discharger Rating: Major II. PERMIT STATUS Issued: June 04, 2010 Last modified February 08, 2005 Expired: December 31, 2011 Application for Modification Received:
                                        ~ AD~END~I     ATTON#.LEW,1 FIRl AIW, Ud r June 17, 2011 Addendum prepared by: Ms. Souraya Fathi This Rationale has been revised since it was public noticed on April 18, 2011, to incorporate comments received by EPA and TVA - Watts Bar Nuclear Plant.
August 18, 2010 Watershed Scheduling Environmental Assistance Center: Chattanooga Primary Longitude:  
In a letter prepared by Ms. Cynthia M. Anderson, TVA, dated May 9, 2011, TVA - Watts Bar Nuclear Plant submitted comments on the draft NPDES Permit No. TNO020168. These comments have been addressed in the final permit and also been incorporated into the Rationale. Most all of the comments were minor changes and were either typographical errors or an oversight from the permit writer.
-84.785833 Primary Latitude:
EPA's comments on the draft were received electronically on April 19, 2011, and were addressed and incorporated in the final permit.
35.593333 Hydrocode:
SEF Permit Addendum TNO02016B.DOC
6020001 Watershed Group: 3 Watershed Identification:
 
Tennessee River (Meigs & Rhea County)Target Reissuance Year: 2011 TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-2 of R-57 Ill. FACILITY DISCHARGES AND RECEIVING WATERS TVA -Watts Bar Nuclear Plant discharges cooling water, storm water and other treated wastewaters to the Tennessee River ( Chickamauga Reservoir) just downstream of Watts Bar Dam. The facility also discharges treated sanitary wastewater, storm water and other treated wastewaters to the Yellow Creek embayment of Chickamauga Reservoir.
NPDES Permit TN0020168 Page R-1 of R-57 I   RATIONALE         ]
WBN is located on the right descending (west) bank of upper Chickamauga Reservoir at Tennessee River Mile (TRM) 528 approximately 1.9 miles downstream of Watts Bar Hydroelectric Dam (WBH; TRM 529.9) and one mile downstream of the idled Watts Bar Fossil Plant (Figure 1). Commercial operation of WBN Unit 1 began on May 27, 1996 and is designed for a net electrical output of 1,160 megawatts (MW; gross electrical output of 1,218 MW). A startup and operation of Unit 2 is planned in the fall of 2011 with minimal changes to the original plant design.Cooling water flows from Chickamauga Reservoir through the plant intake channel to the intake pumping station (IPS) located approximately 1.9 miles downstream of Watts Bar Dam at TRM 528. WBN Unit 1 and proposed Unit 2 use closed-cycle cooling such that the cooling water withdrawn at the intake pumping station is to make-up for evaporation and cooling tower blowdown.
TVA - Watts Bar Nuclear Plant NPDES PERMIT NO. TN0020168 Spring City, Rhea County, Tennessee Permit Writers: Ms. Souraya Fathi I. DISCHARGER TVA - Watts Bar Nuclear Plant Hwy 68 Nuclear Plant Road Spring City, Rhea County, Tennessee Official Contact Person:
The intake channel leading to the pumping station has a cross-sectional area of approximately 1,650 ft 2 at a Chickamauga Reservoir winter pool elevation of 675 ft mean sea level (msl), and 3,150 ft 2 at a summer pool elevation of 682.5 ft msl. This produces average water velocities between approximately 0.03 feet per second (fps) (high pool) and 0.05 fps (low pool) in the intake channel. The IPS includes four gated openings containing a combined gross flow area of approximately 360 ft 2 , producing an average intake velocity (in front of screen) of about 0.2 fps. At the traveling water screens, the combined unobstructed through-screen area of the flow corresponding to the gated openings is reduced to approximately 140 ft 2 , producing a winter average through-screen velocity of approximately 0.67 fps. The average flowrate at the IPS for WBN Unit 1is approximately 80 cubic feet per second (cfs), or 0.3% of the long-term average river flow (27,000 cfs) past the plant.With the operation of both Unit 1 and proposed Unit 2, intake (in front of screen) and through-screen velocities at winter pool are projected to be 0.37 fps and 0.67 fps, respectively.
Mr. Don Grissette Vice President - Watts Bar Nuclear Plant (423) 751-3361 Nature of Business:     Production of electric power by thermonuclear fission and other associated operations SIC Code(s): 4911 Industrial Classification:   Primary Discharger Rating:           Major II. PERMIT STATUS Issued: June 04, 2010 Last modified February 08, 2005 Expired: December 31, 2011 Application for Modification Received: August 18, 2010 Watershed Scheduling Environmental Assistance Center: Chattanooga Primary Longitude:     -84.785833   Primary Latitude: 35.593333 Hydrocode: 6020001 Watershed Group: 3 Watershed Identification: Tennessee River (Meigs & Rhea County)
The average flowrate at the IPS during operation of both units is expected to be approximately 116 cfs, or 0.4% of the long-term average river flow past the plant of approximately 27,000 cfs.Appendix 1 summarizes facility discharges and the receiving stream information for seven outfalls, numbered 101, 102, 103, 107, 113, and 114. There are three (3) main outfalls (Nos. 101,102, and 113) which discharge directly to waters of the state. Two (2) other outfalls (Nos. 103 and 107) are internal discharges that contribute to the main outfalls, and outfalls 101 and 102 also provide stormwater runoff relief. Internal discharge Outfall 114 is designated as the supplemental condenser cooling water (SCCW) traveling screen backwash outfall. Each of the six (6) outfalls is discussed in more detail as follows: Outfall 101 Outfall 101 receives wastewater from two primary sources, the Cooling Tower Blowdown Line (45.773 MGD) and the Yard Holding Pond (1.371 MGD). The Watts Bar Nuclear facility utilizes natural draft cooling towers, which recirculate cooling water. In TVA-Watts Bar Nuclear Plant (Rationale)
Target Reissuance Year: 2011
NPDES Permit TN0020168 Page R-3 of R-57 order to control build up of dissolved solids, a portion of the recirculated water must be discharged, i.e., cooling tower blowdown.
 
Cooling tower blowdown, at 45.773 MGD, represents the majority of the flow through the Cooling Tower Blowdown Line (due to the nature of the plant operation, this line may also contain once through cooling water from the supplemental condenser cooling water system). The remaining portion (as seen from Appendix 1) is made up of low volume wastes and metal cleaning wastes.The Yard Holding Pond receives low volume wastes and stormwater runoff from numerous sources and is designed to provide oil skimming, neutralization, and sedimentation treatment.
TVA-Watts Bar Nuclear Plant (Rationale)
The pond has a volume of approximately 40 million gallons.However, at times the pond is used as an alternative route to discharge emergency raw cooling water and cooling tower blowdown.The Cooling Tower Blowdown Line and the Yard Holding Pond discharge conduit are combined and discharged through a pipeline feeding a diffuser located in the Tennessee River at approximate mile 527.9. Discharge through the diffuser is only allowed when there is a minimum of 3500 cubic feet per second (cfs) flow from Watts Bar Dam.Outfall 102 This outfall represents the emergency discharge overflow weir for the Yard Holding Pond. The overflow weir operates only in the event of an emergency which prevents the use of the blowdown line and diffuser or in the event that the blowdown line and/or diffuser require maintenance.
NPDES Permit TN0020168 Page R-2 of R-57 Ill. FACILITY DISCHARGES AND RECEIVING WATERS TVA - Watts Bar Nuclear Plant discharges cooling water, storm water and other treated wastewaters to the Tennessee River ( Chickamauga Reservoir) just downstream of Watts Bar Dam. The facility also discharges treated sanitary wastewater, storm water and other treated wastewaters to the Yellow Creek embayment of Chickamauga Reservoir.
Based on information from the plant permit application, this outfall has not been used in the last three years. In the event of a discharge, the flow would enter an unnamed tributary and flow for approximately 3000 feet to the Tennessee River at mile 527.2. Wastewater sources are the same as for Outfall 101.Outfall 103 (Internal Monitoring Point)This outfall represents the discharge from the Low Volume Waste Treatment Pond. The outfall does not discharge directly to waters of the state, but rather discharges to the Yard Holding Pond (Outfall 101). The Low Volume Waste Treatment Pond receives low volume wastes, storm water, and water leakage wastes as described in Appendix 1. This Pond has a total volume of approximately 17 million gallons, but normally is maintained at about 5 million gallons of wastewater.
WBN is located on the right descending (west) bank of upper Chickamauga Reservoir at Tennessee River Mile (TRM) 528 approximately 1.9 miles downstream of Watts Bar Hydroelectric Dam (WBH; TRM 529.9) and one mile downstream of the idled Watts Bar Fossil Plant (Figure 1). Commercial operation of WBN Unit 1 began on May 27, 1996 and is designed for a net electrical output of 1,160 megawatts (MW; gross electrical output of 1,218 MW). A startup and operation of Unit 2 is planned in the fall of 2011 with minimal changes to the original plant design.
Treatment is provided by oil skimming, sedimentation, and neutralization.
Cooling water flows from Chickamauga Reservoir through the plant intake channel to the intake pumping station (IPS) located approximately 1.9 miles downstream of Watts Bar Dam at TRM 528. WBN Unit 1 and proposed Unit 2 use closed-cycle cooling such that the cooling water withdrawn at the intake pumping station is to make-up for evaporation and cooling tower blowdown. The intake channel leading to the pumping station has a cross-sectional area of approximately 1,650 ft2 at a Chickamauga Reservoir winter pool elevation of 675 ft mean sea level (msl), and 3,150 ft2 at a summer pool elevation of 682.5 ft msl. This produces average water velocities between approximately 0.03 feet per second (fps) (high pool) and 0.05 fps (low pool) in the intake channel. The IPS includes four gated openings containing a combined gross flow area of approximately 360 ft2, producing an average intake velocity (in front of screen) of about 0.2 fps. At the traveling water screens, the combined unobstructed through-screen area of the flow corresponding to the gated openings is reduced to approximately 140 ft2, producing a winter average through-screen velocity of approximately 0.67 fps. The average flowrate at the IPS for WBN Unit 1is approximately 80 cubic feet per second (cfs), or 0.3% of the long-term average river flow (27,000 cfs) past the plant.
The outfall has been established as an internal monitoring point to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for low volume wastes.Outfall 107 (Internal Monitoring Point)This outfall represents the combined batch release from two holding/treatment ponds known as the Lined Pond and the Unlined Pond. These ponds are used to collect and treat wastes from periodic metal cleaning operations, and a small portion of storm water, diesel generator coolant, and drum rinsing water. Treatment may be provided by chemical addition (when necessary to meet limits) and recirculation/aeration to reduce concentrations of copper, iron, and/or phosphorus prior to discharge to the Yard Holding Pond (Outfall 101). The Lined Pond has an approximate volume of 0.91 million gallons and the Unlined Pond has an approximate volume of 6.5 million gallons. Following TVA-Watts Bar Nuclear Plant (Rationale)
With the operation of both Unit 1 and proposed Unit 2, intake (in front of screen) and through-screen velocities at winter pool are projected to be 0.37 fps and 0.67 fps, respectively.
NPDES Permit TN0020168 Page R-4 of R-57 treatment, the typical scenario is for the Lined Pond to be pumped to the Unlined Pond and the Unlined Pond discharged through Outfall 101. Batch releases are normally confined to periods of 24 hours or less. Records from February 2006 through February 2011 indicate that about 3 discharges per year occur. The long term average flow from the ponds (including days of zero flow) is 1.94 MGD, however, actual flow during discharge is between 2 and 3 MGD. This internal outfall has been established to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for metal cleaning wastes.Outfall 113 This outfall represents the discharge of Supplemental Condenser Cooling Water, which is primarily non-contact, once through cooling water (due to the nature of the operation of the plant this line can also contain cooling tower blowdown).
The average flowrate at the IPS during operation of both units is expected to be approximately 116 cfs, or 0.4% of the long-term average river flow past the plant of approximately 27,000 cfs.
The flow is the largest discharge from the facility averaging 148.895 MGD. The water is routed to a former discharge point of the TVA -Watts Bar Fossil Plant and discharged at the surface of the Tennessee River at approximate mile 529.2.Current operation of WBN Unit 1 utilizes the SCCW system through constant gravity flow from above WBH. Completion and operation of Unit 2 will not significantly alter or increase the thermal effluent from the SCCW outfall.Two hydrothermal surveys and flow pattern surveys were conducted in the vicinity of WBN during May and August 2010, when there were no releases from upstream WBH through generators or spillways to characterize attributes of the SCCW thermal plume. Water temperatures were recorded upstream and downstream of the SCCW discharge during this test to characterize the thermal aspects of the plume.Drogues, devices designed to drift with surface currents, were deployed at and near the SCCW outfall to track flow patterns and compare flow paths during normal and no generation from Watts Bar Dam.The conclusion was that maximum temperatures recorded during the May and August no-flow surveys were 74.8 0 F and 82.7 0 F, respectively.
Appendix 1 summarizes facility discharges and the receiving stream information for seven outfalls, numbered 101, 102, 103, 107, 113, and 114. There are three (3) main outfalls (Nos. 101,102, and 113) which discharge directly to waters of the state. Two (2) other outfalls (Nos. 103 and 107) are internal discharges that contribute to the main outfalls, and outfalls 101 and 102 also provide stormwater runoff relief. Internal discharge Outfall 114 is designated as the supplemental condenser cooling water (SCCW) traveling screen backwash outfall. Each of the six (6) outfalls is discussed in more detail as follows:
These maximum seasonal temperatures were lower than the Tennessee State WQC for temperature 86.9&deg;F (30.5&deg;C)Outfall 114 (Internal Monitoring Point)This outfall consists of traveling screen backwash from the supplemental condenser cooling water intake. The discharge from the outfall consists only of screen reject and raw water. Flow is estimated at 0.019 MGD.Tennessee River The TVA -Watts Bar Nuclear Plant has three direct discharges to the Tennessee River (Outfalls 101, 102, and 113). The plant withdraws cooling water and most other water used for industrial processes through the Intake Pumping Station located at Tennessee River mile 528.0. However, the Supplemental Condenser Cooling Water (145.0 MGD discharged through Outfall a113) is withdrawn from above Watts Bar Dam and is discharged to the River below the dam, but above the Plant Intake Pumping Station.
Outfall 101 Outfall 101 receives wastewater from two primary sources, the Cooling Tower Blowdown Line (45.773 MGD) and the Yard Holding Pond (1.371 MGD). The Watts Bar Nuclear facility utilizes natural draft cooling towers, which recirculate cooling water. In
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-3 of R-57 order to control build up of dissolved solids, a portion of the recirculated water must be discharged, i.e., cooling tower blowdown. Cooling tower blowdown, at 45.773 MGD, represents the majority of the flow through the Cooling Tower Blowdown Line (due to the nature of the plant operation, this line may also contain once through cooling water from the supplemental condenser cooling water system). The remaining portion (as seen from Appendix 1) is made up of low volume wastes and metal cleaning wastes.
The Yard Holding Pond receives low volume wastes and stormwater runoff from numerous sources and is designed to provide oil skimming, neutralization, and sedimentation treatment. The pond has a volume of approximately 40 million gallons.
However, at times the pond is used as an alternative route to discharge emergency raw cooling water and cooling tower blowdown.
The Cooling Tower Blowdown Line and the Yard Holding Pond discharge conduit are combined and discharged through a pipeline feeding a diffuser located in the Tennessee River at approximate mile 527.9. Discharge through the diffuser is only allowed when there is a minimum of 3500 cubic feet per second (cfs) flow from Watts Bar Dam.
Outfall 102 This outfall represents the emergency discharge overflow weir for the Yard Holding Pond. The overflow weir operates only in the event of an emergency which prevents the use of the blowdown line and diffuser or in the event that the blowdown line and/or diffuser require maintenance. Based on information from the plant permit application, this outfall has not been used in the last three years. In the event of a discharge, the flow would enter an unnamed tributary and flow for approximately 3000 feet to the Tennessee River at mile 527.2. Wastewater sources are the same as for Outfall 101.
Outfall 103 (Internal Monitoring Point)
This outfall represents the discharge from the Low Volume Waste Treatment Pond. The outfall does not discharge directly to waters of the state, but rather discharges to the Yard Holding Pond (Outfall 101). The Low Volume Waste Treatment Pond receives low volume wastes, storm water, and water leakage wastes as described in Appendix 1. This Pond has a total volume of approximately 17 million gallons, but normally is maintained at about 5 million gallons of wastewater. Treatment is provided by oil skimming, sedimentation, and neutralization. The outfall has been established as an internal monitoring point to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for low volume wastes.
Outfall 107 (Internal Monitoring Point)
This outfall represents the combined batch release from two holding/treatment ponds known as the Lined Pond and the Unlined Pond. These ponds are used to collect and treat wastes from periodic metal cleaning operations, and a small portion of storm water, diesel generator coolant, and drum rinsing water. Treatment may be provided by chemical addition (when necessary to meet limits) and recirculation/aeration to reduce concentrations of copper, iron, and/or phosphorus prior to discharge to the Yard Holding Pond (Outfall 101). The Lined Pond has an approximate volume of 0.91 million gallons and the Unlined Pond has an approximate volume of 6.5 million gallons. Following
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-4 of R-57 treatment, the typical scenario is for the Lined Pond to be pumped to the Unlined Pond and the Unlined Pond discharged through Outfall 101. Batch releases are normally confined to periods of 24 hours or less. Records from February 2006 through February 2011 indicate that about 3 discharges per year occur. The long term average flow from the ponds (including days of zero flow) is 1.94 MGD, however, actual flow during discharge is between 2 and 3 MGD. This internal outfall has been established to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for metal cleaning wastes.
Outfall 113 This outfall represents the discharge of Supplemental Condenser Cooling Water, which is primarily non-contact, once through cooling water (due to the nature of the operation of the plant this line can also contain cooling tower blowdown). The flow is the largest discharge from the facility averaging 148.895 MGD. The water is routed to a former discharge point of the TVA - Watts Bar Fossil Plant and discharged at the surface of the Tennessee River at approximate mile 529.2.
Current operation of WBN Unit 1 utilizes the SCCW system through constant gravity flow from above WBH. Completion and operation of Unit 2 will not significantly alter or increase the thermal effluent from the SCCW outfall.
Two hydrothermal surveys and flow pattern surveys were conducted in the vicinity of WBN during May and August 2010, when there were no releases from upstream WBH through generators or spillways to characterize attributes of the SCCW thermal plume. Water temperatures were recorded upstream and downstream of the SCCW discharge during this test to characterize the thermal aspects of the plume.
Drogues, devices designed to drift with surface currents, were deployed at and near the SCCW outfall to track flow patterns and compare flow paths during normal and no generation from Watts Bar Dam.
The conclusion was that maximum temperatures recorded during the May and August no-flow surveys were 74.8 0 F and 82.70 F, respectively.         These maximum seasonal temperatures were lower than the Tennessee State WQC for temperature 86.9&deg;F (30.5&deg;C)
Outfall 114 (Internal Monitoring Point)
This outfall consists of traveling screen backwash from the supplemental condenser cooling water intake. The discharge from the outfall consists only of screen reject and raw water. Flow is estimated at 0.019 MGD.
Tennessee River The TVA - Watts Bar Nuclear Plant has three direct discharges to the Tennessee River (Outfalls 101, 102, and 113). The plant withdraws cooling water and most other water used for industrial processes through the Intake Pumping Station located at Tennessee River mile 528.0. However, the Supplemental Condenser Cooling Water (145.0 MGD discharged through Outfall   a113) is withdrawn from above Watts Bar Dam and is discharged to the River below the dam, but above the Plant Intake Pumping Station.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-5 of R-57 For purposes of protecting water quality, the Tennessee River below Watts Bar Dam is designated for fish and aquatic life use, recreation use, irrigation use, livestock watering and wildlife use, domestic water supply use, industrial water supply use, and navigation use. The flow of the river is controlled by the Tennessee Valley Authority (TVA) Watts Bar Dam and minimum flows at this location have been developed by the USGS as presented in Appendix 1.Yellow Creek The Yellow Creek embayment of Chickamauga Lake is designated for fish and aquatic life use, recreation use, irrigation use, and livestock watering and wildlife use.Low flow conditions in this stream are assumed to be zero.IV. APPLICABLE EFFLUENT LIMITATIONS GUIDELINES The Standard Industrial Classification (SIC) code for TVA -Watts Bar Nuclear Plant is 4911, establishments engaged in generation, transmission, and/or distribution of electric energy for sale. Process wastewater discharged through Outfalls 101, 102, 103, 107, and 113 is regulated by 40 CFR Part 423, Steam Electric Power Generating Point Source Category.
NPDES Permit TN0020168 Page R-5 of R-57 For purposes of protecting water quality, the Tennessee River below Watts Bar Dam is designated for fish and aquatic life use, recreation use, irrigation use, livestock watering and wildlife use, domestic water supply use, industrial water supply use, and navigation use. The flow of the river is controlled by the Tennessee Valley Authority (TVA) Watts Bar Dam and minimum flows at this location have been developed by the USGS as presented in Appendix 1.
This regulation is applicable to discharges resulting from the operation of a generating unit by an establishment primarily engaged in the generation of electricity for distribution or sale which results primarily from a process utilizing fossil-type fuel (coal, oil, or gas) or nuclear fuel in conjunction with a thermal cycle employing the steam water system as the thermodynamic medium.Appendix 2 lists the applicable best available technology (BAT) and best conventional pollution control technology (BPT) effluent limitations guidelines from 40 CFR Part 423.12 and 423.13. The guideline numeric limitations are listed for four specific wastewater sources, low volume wastes, metal cleaning wastes, cooling tower blowdown, and once throughrcooling water. In determining which guideline sources are attributable to each of the seven (7) outfalls, the Part 423.11, Specialized Definitions were used as follows: The term Low Volume Wastes means, taken collectively as if from one source, wastewater from all sources except those for which specific limitations are otherwise established in this part. Low Volume Waste sources include, but are not limited to: wastewaters from wet scrubber air pollution control systems, ion exchange water treatment system, water treatment evaporator blowdown, laboratory and sampling streams, boiler blowdown, floor drains, cooling tower basin cleaning wastes and recirculating house service water systems. Sanitary and air conditioning wastes are not included.The term chemical Metal Cleaning Wastes means any wastewater resulting from cleaning [with or without chemical cleaning compounds]
Yellow Creek The Yellow Creek embayment of Chickamauga Lake is designated for fish and aquatic life use, recreation use, irrigation use, and livestock watering and wildlife use.
any metal process equipment including, but not limited to, boiler tube cleaning.The term Once Throuah Cooling Water means water passed through the main cooling condensers in one or two passes for the purpose of removing waste heat.
Low flow conditions in this stream are assumed to be zero.
IV. APPLICABLE EFFLUENT LIMITATIONS GUIDELINES The Standard Industrial Classification (SIC) code for TVA - Watts Bar Nuclear Plant is 4911, establishments engaged in generation, transmission, and/or distribution of electric energy for sale. Process wastewater discharged through Outfalls 101, 102, 103, 107, and 113 is regulated by 40 CFR Part 423, Steam Electric Power Generating Point Source Category. This regulation is applicable to discharges resulting from the operation of a generating unit by an establishment primarily engaged in the generation of electricity for distribution or sale which results primarily from a process utilizing fossil-type fuel (coal, oil, or gas) or nuclear fuel in conjunction with a thermal cycle employing the steam water system as the thermodynamic medium.
Appendix 2 lists the applicable best available technology (BAT) and best conventional pollution control technology (BPT) effluent limitations guidelines from 40 CFR Part 423.12 and 423.13. The guideline numeric limitations are listed for four specific wastewater sources, low volume wastes, metal cleaning wastes, cooling tower blowdown, and once throughrcooling water. In determining which guideline sources are attributable to each of the seven (7) outfalls, the Part 423.11, Specialized Definitions were used as follows:
The term Low Volume Wastes means, taken collectively as if from one source, wastewater from all sources except those for which specific limitations are otherwise established in this part. Low Volume Waste sources include, but are not limited to:
wastewaters from wet scrubber air pollution control systems, ion exchange water treatment system, water treatment evaporator blowdown, laboratory and sampling streams, boiler blowdown, floor drains, cooling tower basin cleaning wastes and recirculating house service water systems. Sanitary and air conditioning wastes are not included.
The term chemical Metal Cleaning Wastes means any wastewater resulting from cleaning [with or without chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube cleaning.
The term Once Throuah Cooling Water means water passed through the main cooling condensers in one or two passes for the purpose of removing waste heat.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-6 of R-57 The term Recirculating Cooling Water means water that is passed through the main condensers for the purpose of removing waste heat, passed through a cooling device for purpose of removing such heat from the water and then passed again, except for blowdown, through the main condenser.
NPDES Permit TN0020168 Page R-6 of R-57 The term Recirculating Cooling Water means water that is passed through the main condensers for the purpose of removing waste heat, passed through a cooling device for purpose of removing such heat from the water and then passed again, except for blowdown, through the main condenser.
The term Blowdown means the minimum discharge of recirculating water for the purpose of discharging materials contained in the water, the further buildup of which would cause concentration in amounts exceeding limits established by best engineering practices.
The term Blowdown means the minimum discharge of recirculating water for the purpose of discharging materials contained in the water, the further buildup of which would cause concentration in amounts exceeding limits established by best engineering practices.
The above definitions specifically exclude sanitary wastewater and air conditioning wastes. For sanitary wastes, Tennessee Effluent Guidelines from Rule 1200-4-5-03 (1) and/or best professional judgment have been applied.The effluent limitations presented in 40 CFR 423 (see Appendix 2) are normally to be established in the permit as mass limitations by multiplying the flow of the specific waste source times the applicable concentration limit. However, 40 CFR, Part 423.12 (b) (11) and Part 423.13 (g) allow the permitting authority, at its discretion, to substitute concentration limits instead of the mass limitations.
The above definitions specifically exclude sanitary wastewater and air conditioning wastes. For sanitary wastes, Tennessee Effluent Guidelines from Rule 1200-4-5-03 (1) and/or best professional judgment have been applied.
For the TVA-Watts Bar Nuclear Plant permit, only concentration limits will be established.
The effluent limitations presented in 40 CFR 423 (see Appendix 2) are normally to be established in the permit as mass limitations by multiplying the flow of the specific waste source times the applicable concentration limit. However, 40 CFR, Part 423.12 (b) (11) and Part 423.13 (g) allow the permitting authority, at its discretion, to substitute concentration limits instead of the mass limitations. For the TVA-Watts Bar Nuclear Plant permit, only concentration limits will be established.
Also in developing guideline limitations for each outfall, EPA Rule Part 423.12 (12) and Part 423.13(12) is applicable as follows: In the event that waste streams from various sources are combined for treatment or discharge, the quantity of each pollutant or pollutant property controlled in the BPT/BAT limitation tables attributable to each controlled source shall not exceed the specified limitation for that source.Utilizing these definitions and the waste source identification provided in the permit application (see summary tables in Appendix 1), the following waste sources and proportions are applied to each outfall as follows: Guideline Waste Sources and Flows for Two Unit Operations by Outfall Waste Source Flow Outfall No Contributing IPTIBAT Waste Source Flow % Outfall MGD Total Yard Holding Pond (Metal Cleaning Waste} 1 371 2 4%101 Misc Cooling Waters (Low Volume Wates) 10 62 184%Cooling Tower Blowdown 45 773 79 2%Total Outfall Flow 57.764 Yard Holding Pond (Metal Cleaning Waste) 1.371 2A4%102 Misc Cooling Waters (Low Volume Wates) 10 62 10.4%Cooling Tower Blowdown 45 773 79.2%Total Outfall Flow 57.764 103 Low Volume Wastes 0.3619 100 0%107 Metal Cleaning Wastes 0.0310 100.0%113 Once Through Coling Water 148.895 100.0%Supplemental Condenser Cooling Water Intake Screen 114 backwash 0.019 100.0%
Also in developing guideline limitations for each outfall, EPA Rule Part 423.12 (12) and Part 423.13(12) is applicable as follows:
In the event that waste streams from various sources are combined for treatment or discharge, the quantity of each pollutant or pollutant property controlled in the BPT/BAT limitation tables attributable to each controlled source shall not exceed the specified limitation for that source.
Utilizing these definitions and the waste source identification provided in the permit application (see summary tables in Appendix 1), the following waste sources and proportions are applied to each outfall as follows:
Guideline Waste Sources and Flows for Two Unit Operations by Outfall Waste Source Flow Outfall No                 Contributing IPTIBAT Waste Source             Flow           % Outfall MGD             Total Yard Holding Pond (Metal Cleaning Waste}                           1 371           2 4%
101       Misc Cooling Waters (Low Volume Wates)                             10 62         184%
Cooling Tower Blowdown                                           45 773         79 2%
Total Outfall Flow                                               57.764 Yard Holding Pond (Metal Cleaning Waste)                           1.371           2A4%
102       Misc Cooling Waters (Low Volume Wates)                             10 62         10.4%
Cooling Tower Blowdown                                           45 773         79.2%
Total Outfall Flow                                               57.764 103       Low Volume Wastes                                                 0.3619         100 0%
107       Metal Cleaning Wastes                                             0.0310         100.0%
113       Once Through Coling Water                                       148.895         100.0%
Supplemental Condenser Cooling Water Intake Screen 114       backwash                                                           0.019         100.0%
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-7 of R-57 Note: Outfall 114 is backwash water and is not considered in the monitoring requirements for this permit.Where the effluent limitation guideline concentration limits include the same parameter(s) for each source, the allocation of guideline limits by flow is straightforward.
NPDES Permit TN0020168 Page R-7 of R-57 Note: Outfall 114 is backwash water and is not considered in the monitoring requirements for this permit.
However, where a parameter is limited for one source and not limited for another, some judgment must take place. The approach taken has been to assure that each source complies with its parameter guideline concentration without that source being diluted by other wastewater source(s) for which the parameter is not limited. One means to accomplish this is to utilize internal outfalls, which enable monitoring at a location that is source specific.
Where the effluent limitation guideline concentration limits include the same parameter(s) for each source, the allocation of guideline limits by flow is straightforward.
This approach has been utilized at the Watts Bar Nuclear Plant for Outf alls 103, and 107.Using the above guidance, the 40 CFR guidelines have been applied to the plant outfalls as shown in Appendix 2 and described as follows: Outfall 101 Cooling tower blowdown represents approximately 79% of the outfall flow and Low Volume wastes represent 20.8%. Thus the guidelines for Cooling Tower Blowdown and Low Volume Waste will be applied to the total waste stream. The total suspended solids limit and the oil and grease limit applicable to the low volume waste sources is considered applicable to the cooling tower blowdown source as well. Because the metal cleaning wastes represent only 0.1% of the flow, the guideline limits for this source will not be applied to Outfall 101. Rather, compliance with metal cleaning waste limits will be handled by employing an internal monitoring point (Outfall 107). The applicable BPT and BAT limits are given in Appendix 2.The flow from Outfall 101 is monitored at Watts Bar Dam, and includes the instrumentation that River Operations uses to measure the discharge through the hydro turbines.
However, where a parameter is limited for one source and not limited for another, some judgment must take place. The approach taken has been to assure that each source complies with its parameter guideline concentration without that source being diluted by other wastewater source(s) for which the parameter is not limited. One means to accomplish this is to utilize internal outfalls, which enable monitoring at a location that is source specific. This approach has been utilized at the Watts Bar Nuclear Plant for Outf alls 103, and 107.
A control loop between Watts Bar Dam and WBN automatically closes the Outfall 101 diffuser valves when the hydro discharge at Watts Bar Dam drops below 3500 cfs.Outfall 102 Since this is an emergency discharge for Outfall 101, the same guidelines apply as for Outfall 101. The limitations are presented in Appendix 2.Outfall 103 This outfall receives Low Volume Wastes exclusively; therefore, the Low Volume Waste guideline limitations will apply. The limitations are presented in Appendix 2.Outfall 107 This outfall receives 99.9% Metal Cleaning Wastes and 1% Low Volume Wastes.Therefore the Metal Cleaning Waste limitations will be applied as shown in Appendix 2.Outfall 113 TVA-Watts Bar Nuclear Plant (Rationale)
Using the above guidance, the 40 CFR guidelines have been applied to the plant outfalls as shown in Appendix 2 and described as follows:
NPDES Permit TN0020168 Page R-8 of R-57 This outfall receives noncontact supplemental condenser cooling water. The wastewater is defined by 40 CFR 423 as Once Through Cooling Water. Thus Outfall 113 will be subject to the effluent limitations for the Once Through Cooling Water Source given in 40 CFR Part 423.12 (6) and Part 423.13 (b) (1&2) and shown in Appendix 2.Outall 114 This outfall has no monitoring requirements, consists of traveling screen backwash from the supplemental condenser cooling water intake.V. PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS Appendix 3 lists the permit limitations and monitoring requirements as defined in the previous permit for the seven outfalls.VI. HISTORICAL MONITORING AND INSPECTION During the previous permit term, TVA -Watts Bar Nuclear Plant did not have any appreciable difficulty in meeting effluent limitations as outlined in the previous permit. The self monitoring data reported on Discharge Monitoring Report forms during the previous permit term are summarized in Appendix 4.Any violations of permit limitations that occurred are shown in the tables found in Appendix 4. This information is downloaded from the EPA ICIS database, and statistically summarized.
Outfall 101 Cooling tower blowdown represents approximately 79% of the outfall flow and Low Volume wastes represent 20.8%. Thus the guidelines for Cooling Tower Blowdown and Low Volume Waste will be applied to the total waste stream. The total suspended solids limit and the oil and grease limit applicable to the low volume waste sources is considered applicable to the cooling tower blowdown source as well. Because the metal cleaning wastes represent only 0.1% of the flow, the guideline limits for this source will not be applied to Outfall 101. Rather, compliance with metal cleaning waste limits will be handled by employing an internal monitoring point (Outfall 107). The applicable BPT and BAT limits are given in Appendix 2.
VII. NEW PERMIT LIMITS AND MONITORING REQUIREMENTS The proposed new permit limits have been selected by determining a technology-based limit and evaluating if that limit protects the water quality of the receiving stream. If the technology-based limit would cause violations of water quality, the water quality-based limit is chosen. For this facility the technology-based limit is determined from EPA effluent limitations guidelines applicable to the steam electric power generating point source category (see Part IV); or by way of operational and/or treatability data. Furthermore, effluent limitations in this permit must comply with any approved Total Maximum Daily Load (TMDL) studies. Water quality calculation procedures are explained in this section under the heading: Metals and Toxics.Appendix 5a through 5e presents the water quality calculations, Appendix 5f presents a comparison of the different limitations, and Appendix 5g lists all proposed effluent limitations and monitoring requirements to be included in the new permit.The results of the water quality calculations are compared to the effluent guideline limitations in Appendix 5f and the proposed final permit limitations are presented in Appendix 5g. The effluent characteristics limited in the permit and monitoring requirements are discussed TVA-Watts Bar Nuclear Plant (Rationale)
The flow from Outfall 101 is monitored at Watts Bar Dam, and includes the instrumentation that River Operations uses to measure the discharge through the hydro turbines. A control loop between Watts Bar Dam and WBN automatically closes the Outfall 101 diffuser valves when the hydro discharge at Watts Bar Dam drops below 3500 cfs.
NPDES Permit TN0020168 Page R-9 of R-57 individually by outfall as follows as well as certain other permit conditions for the facility that are not outfall specific: Outfall 101 Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD). Measurement frequency shall be continuous by recorder.
Outfall 102 Since this is an emergency discharge for Outfall 101, the same guidelines apply as for Outfall 101. The limitations are presented in Appendix 2.
These requirements are unchanged from the previous permit.Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes. The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).According to the State of Tennessee Water Quality Standards for the protection of Fish& Aquatic Life [Chapter 1200-4-3-.03(3) (c)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream. The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration.
Outfall 103 This outfall receives Low Volume Wastes exclusively; therefore, the Low Volume Waste guideline limitations will apply. The limitations are presented in Appendix 2.
In addition, the permit shall contain language prohibiting visible floating scum, oil or other matter in the wastewater discharge.
Outfall 107 This outfall receives 99.9% Metal Cleaning Wastes and 1% Low Volume Wastes.
Sample type shall be grab. These limits are unchanged from the previous permit. Monitoring frequency in the new permit shall remain at once per month, however, monitoring for oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.
Therefore the Metal Cleaning Waste limitations will be applied as shown in Appendix 2.
Sample type shall be grab.Total Suspended Solids (TSS)Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423, Subpart 423.12 (b) (3), the BPT limitations applicable to low volume wastes.The State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3) (c)] state there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream.The permit writer believes the limit of 30 mg/L monthly average, and 100 mg/L daily maximum concentrations shall provide protection of water quality in the receiving stream. The sampling frequency shall be once per month, however, monitoring for TSS apply only when the turbine building sump is aligned to bypass Internal Monitoring TVA-Watts Bar Nuclear Plant (Rationale)
Outfall 113
NPDES Permit TN0020168 Page R-10 of R-57 Points 103 and 107 where monitoring these parameters is required.
 
Sample type shall be grab.Technology-based BPT effluent limitations from 40 CFR, Part 423, Subpart 423.12 (b)(1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility.According to the State of Tennessee Water Quality Standards
TVA-Watts Bar Nuclear Plant (Rationale)
[Chapter 1200-4-3-.03(3)(b)], the pH for the protection of Fish and Aquatic Life shall lie within the range of 6.5 to 9.0 and shall not fluctuate more than 1.0 unit in this range over a period of 24-hours.Appendix 5d presents calculations that show that the combined discharge from Outfalls 101 and 113 will not cause the pH of the Tennessee River to fall below the 6.5 minimum pH standard.
NPDES Permit TN0020168 Page R-8 of R-57 This outfall receives noncontact supplemental condenser cooling water. The wastewater is defined by 40 CFR 423 as Once Through Cooling Water. Thus Outfall 113 will be subject to the effluent limitations for the Once Through Cooling Water Source given in 40 CFR Part 423.12 (6) and Part 423.13 (b) (1&2) and shown in Appendix 2.
Considering that the receiving stream will provide pH buffering, effluent limitations for pH shall be retained in a range 6.0 to 9.0. The sampling frequency shall be once per month, however, monitoring for pH apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.
Outall 114 This outfall has no monitoring requirements, consists of traveling screen backwash from the supplemental condenser cooling water intake.
The sample type shall be grab.Total Residual Chlorine Technology-based (BAT) limits of 0.2 mg/L monthly average and 0.5 mg/L daily maximum limits apply to free available chlorine in cooling tower blowdown in accordance with 40 CFR, part 423, Subpart 423.13 (b) (1). The total residual chlorine test includes all chlorine species measured in the free available chlorine test as well as other chlorine compounds such as chloroamines.
V. PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS Appendix 3 lists the permit limitations and monitoring requirements as defined in the previous permit for the seven outfalls.
Thus the permit writer has substituted the total chlorine residual test in place of the free available chlorine test for compliance with the 40 CFR limitations.
VI. HISTORICAL MONITORING AND INSPECTION During the previous permit term, TVA - Watts Bar Nuclear Plant did not have any appreciable difficulty in meeting effluent limitations as outlined in the previous permit. The self monitoring data reported on Discharge Monitoring Report forms during the previous permit term are summarized in Appendix 4.
The previous permit has a limit of 0.1 mg/L monthly average and 0.1 mg/L daily maximum for Outfall 101. The 0.1 mg/I concentration is greater than the acute criteria for TRC at 0.019 mg/I. Because of the large volume of water discharged by TVA there exists the potential for exposure of aquatic life to toxic concentrations of chlorine in the discharge.
Any violations of permit limitations that occurred are shown in the tables found in Appendix 4. This information is downloaded from the EPA ICIS database, and statistically summarized.
However, since chlorine residual reacts and dissipates rapidly upon mixing into the ambient waters, the concentrations above the acute value should not exist for any significant area. Thus the 0.1 mg/I concentration limit for TRC is considered to be protective of water quality in the Tennessee River at a flow from Outfall 113 of 148.958 MGD and from Outfall 101 of 57.76 MGD.The monthly average limit of 0.10 mg/L and the daily maximum limit of 0.10 mg/L for Total Residual Chlorine (TRC) shall be retained in the new permit. The limits are based on the protection of water quality in the Tennessee River during periods when Outfall 101 and Outfall 113 exceed their long term average flow and based on antibacksliding provisions of 40 CFR Part 122.44 (I). These limits are also determined to be appropriate because the facility is discharging TRC in excess of 2 hours per day in accordance with the approved Biocide/Corrosion Treatment Plan.Chromium Outfall 101 is primarily composed of cooling tower blowdown.
VII. NEW PERMIT LIMITS AND MONITORING REQUIREMENTS The proposed new permit limits have been selected by determining a technology-based limit and evaluating if that limit protects the water quality of the receiving stream. If the technology-based limit would cause violations of water quality, the water quality-based limit is chosen. For this facility the technology-based limit is determined from EPA effluent limitations guidelines applicable to the steam electric power generating point source category (see Part IV); or by way of operational and/or treatability data. Furthermore, effluent limitations in this permit must comply with any approved Total Maximum Daily Load (TMDL) studies. Water quality calculation procedures are explained in this section under the heading: Metals and Toxics.
40 CFR Part 423.13 provides BAT effluent limitations for total chromium applicable to the discharge of cooling tower blowdown wastewater discharges.
Appendix 5a through 5e presents the water quality calculations, Appendix 5f presents a comparison of the different limitations, and Appendix 5g lists all proposed effluent limitations and monitoring requirements to be included in the new permit.
The limits are 0.2 mg/L monthly TVA-Watts Bar Nuclear Plant (Rationale)
The results of the water quality calculations are compared to the effluent guideline limitations in Appendix 5f and the proposed final permit limitations are presented in Appendix 5g. The effluent characteristics limited in the permit and monitoring requirements are discussed
NPDES Permit TN0020168 Page R-1 1 of R-57 average and 0.2 mg/L daily maximum. The Watts Bar Nuclear Plant does not use corrosion control chemicals or biocides containing chromium at the facility.
 
Sampling data submitted with the application demonstrated that chromium could not be detected in the effluent at a detection limit of 0.001 mg/L. Thus chromium will be included as a permit limit however, monitoring for chromium is waived per 40 CFR Part 122.44 (a)(2)(i).
TVA-Watts Bar Nuclear Plant (Rationale)
A statement shall be placed in the permit as follows: The use of water treatment chemicals containing chromium is prohibited under this permit.Zinc Outfall 101 is primarily composed of cooling tower blowdown.
NPDES Permit TN0020168 Page R-9 of R-57 individually by outfall as follows as well as certain other permit conditions for the facility that are not outfall specific:
40 CFR Part 423.13 provides BAT effluent limitations for total zinc applicable to cooling tower blowdown wastewater discharges.
Outfall 101 Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD). Measurement frequency shall be continuous by recorder. These requirements are unchanged from the previous permit.
The limits are 1.0 mg/L monthly average and 1.0 mg/L daily maximum. The TVA -Watts Bar Nuclear Plant utilizes zinc in corrosion inhibitors for treatment of raw water. TVA's policy is to control the feed of zinc containing chemicals to limit the discharge concentration to 0.2 mg/L or less.The zinc limit of 1.0 mg/L daily average and 1.0 mg/L daily maximum shall be continued in the new permit. The corrosion inhibiting chemicals are added to the raw water system, and are recirculated through the condensers and the cooling towers. Thus the concentration of zinc is not expected to be highly variable with time. Therefore, a measurement frequency of 2/month and sample type of grab should be adequate to characterize zinc in this outfall.Effluent Temperature Temperature shall be limited according to the State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3)(e)].
Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes. The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).
It is recognized that the temperature of the cooling water discharge will be greater than the temperature of the water prior to its use for cooling or other purposes.
According to the State of Tennessee Water Quality Standards for the protection of Fish
This discharge must not cause the temperature change in the receiving stream to exceed 3WC relative to an upstream control point. Also, this discharge must not cause the temperature of the receiving stream to exceed 30.5 0 C (except as a result of natural causes), and this discharge must not cause the maximum rate of temperature change in the receiving stream to exceed 2 0 C per hour (except as a result of natural causes).The elevated temperature water of outfall 101 is mixed with the Tennessee River receiving water by being discharged through a diffuser.
          & Aquatic Life [Chapter 1200-4-3-.03(3) (c)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream. The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration. In addition, the permit shall contain language prohibiting visible floating scum, oil or other matter in the wastewater discharge. Sample type shall be grab. These limits are unchanged from the previous permit. Monitoring frequency in the new permit shall remain at once per month, however, monitoring for oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required. Sample type shall be grab.
Instream temperature criteria must be met at the edge of the mixing zone. The mixing zone is defined for this discharge as being a maximum width of 240 feet (the width of the diffuser) and extending 240 feet downstream.
Total Suspended Solids (TSS)
An operational requirement of the plant is that the diffuser is only operated when 3500 cubic feet per second (CFS) flow is present from the dam. Mathematical modeling of the temperature during mixing was carried out by TVA and was submitted in a report in June 2007 (Completion and Operation of Watts Bar Nuclear Plant Unit 2. The report was based on the 24-hour average for discharge evaluation as specified in the NPDES permit issued in 1993. The modeling assumed both nuclear units in operation and concluded that a steady-state discharge of 38.3 &deg;C under worst case conditions, which included 1) full thermal load from the fossil plant, 2)the worst meteorology and 3) no operation of Watts Bar Hydro facility, would still protect the water quality based on modeling using daily averaging.
Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423, Subpart 423.12 (b) (3), the BPT limitations applicable to low volume wastes.
A daily average value of 35 0 C was proposed to include a margin of safety. A continuous discharge at the temperature maximum of 35 0 C will not exceed water quality outside of the mixing zone TVA-Watts Bar Nuclear Plant (Rationale)
The State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3) (c)] state there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream.
NPDES Permit TN0020168 Page R-12 of R-57 based on past modeling.
The permit writer believes the limit of 30 mg/L monthly average, and 100 mg/L daily maximum concentrations shall provide protection of water quality in the receiving stream. The sampling frequency shall be once per month, however, monitoring for TSS apply only when the turbine building sump is aligned to bypass Internal Monitoring
The Division approved a one-hour averaging period for evaluating compliance with temperature criteria in the receiving stream.A numeric effluent limitation of 35 0 C shall continue as the daily maximum that can be discharged.
 
Measurement frequency shall be continuous and sample type shall be by recorder.
TVA-Watts Bar Nuclear Plant (Rationale)
These limits are unchanged from the previous permit.The designs of the diffusers and mixing zone were based on the operation of both Unit 1 and Unit 2; therefore, no changes are anticipated for accommodating the operation of Unit 2. However, TVA will perform studies similar to those performed for Unit 1 to confirm the performance of the diffusers with the operation of two units.Toxicity Testing Raw water used at the facility is treated with corrosion inhibitors and biocide products.These products, which can become concentrated in the cooling tower system, are discharged through Outfall 101. The chemical makeup of the products used can change during the permit period and the combined toxicity effect of the chemicals is not known. Thus it is not feasible to control toxicity only by the application of chemical specific effluent limits to the discharge.
NPDES Permit TN0020168 Page R-10 of R-57 Points 103 and 107 where monitoring these parameters is required. Sample type shall be grab.
Toxicity testing of sensitive aquatic species (coupled with evaluation of new chemical products before they are used) is a reasonable method to evaluate the toxicity impacts of the products in the effluent.
Technology-based BPT effluent limitations from 40 CFR, Part 423, Subpart 423.12 (b)
Therefore a whole effluent toxicity testing requirement shall remain in the permit. The calculations of the appropriate dilutions for the test are given in Appendix 5e of the Rationale and Part III of the permit.The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment.
(1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility.
Sample type shall be composite.
According to the State of Tennessee Water Quality Standards [Chapter 1200-4-3-.03(3)
Outfall 102 Outfall 102 is an emergency discharge used when the Outfall 101 diffuser cannot be used. Thus the limits for this outfall shall be the same as for Outfall 101. The new permit limitations for this outfall are unchanged from the previous permit. Sampling frequency and sample type are adjusted for flow and temperature to reflect that continuous monitoring equipment would not be available during an emergency discharge.
(b)], the pH for the protection of Fish and Aquatic Life shall lie within the range of 6.5 to 9.0 and shall not fluctuate more than 1.0 unit in this range over a period of 24-hours.
When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cubic feet per second in the receiving waters. If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements.
Appendix 5d presents calculations that show that the combined discharge from Outfalls 101 and 113 will not cause the pH of the Tennessee River to fall below the 6.5 minimum pH standard. Considering that the receiving stream will provide pH buffering, effluent limitations for pH shall be retained in a range 6.0 to 9.0. The sampling frequency shall be once per month, however, monitoring for pH apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required. The sample type shall be grab.
The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, only if discharge operated a 30 days from Jan. -Jun., or Jul. -Dec. if all toxicity testing has not been completed for Outfall. Sample type shall be composite.
Total Residual Chlorine Technology-based (BAT) limits of 0.2 mg/L monthly average and 0.5 mg/L daily maximum limits apply to free available chlorine in cooling tower blowdown in accordance with 40 CFR, part 423, Subpart 423.13 (b) (1). The total residual chlorine test includes all chlorine species measured in the free available chlorine test as well as other chlorine compounds such as chloroamines. Thus the permit writer has substituted the total chlorine residual test in place of the free available chlorine test for compliance with the 40 CFR limitations.
The previous permit has a limit of 0.1 mg/L monthly average and 0.1 mg/L daily maximum for Outfall 101. The 0.1 mg/I concentration is greater than the acute criteria for TRC at 0.019 mg/I. Because of the large volume of water discharged by TVA there exists the potential for exposure of aquatic life to toxic concentrations of chlorine in the discharge. However, since chlorine residual reacts and dissipates rapidly upon mixing into the ambient waters, the concentrations above the acute value should not exist for any significant area. Thus the 0.1 mg/I concentration limit for TRC is considered to be protective of water quality in the Tennessee River at a flow from Outfall 113 of 148.958 MGD and from Outfall 101 of 57.76 MGD.
The monthly average limit of 0.10 mg/L and the daily maximum limit of 0.10 mg/L for Total Residual Chlorine (TRC) shall be retained in the new permit. The limits are based on the protection of water quality in the Tennessee River during periods when Outfall 101 and Outfall 113 exceed their long term average flow and based on antibacksliding provisions of 40 CFR Part 122.44 (I). These limits are also determined to be appropriate because the facility is discharging TRC in excess of 2 hours per day in accordance with the approved Biocide/Corrosion Treatment Plan.
Chromium Outfall 101 is primarily composed of cooling tower blowdown. 40 CFR Part 423.13 provides BAT effluent limitations for total chromium applicable to the discharge of cooling tower blowdown wastewater discharges. The limits are 0.2 mg/L monthly
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-1 1 of R-57 average and 0.2 mg/L daily maximum. The Watts Bar Nuclear Plant does not use corrosion control chemicals or biocides containing chromium at the facility. Sampling data submitted with the application demonstrated that chromium could not be detected in the effluent at a detection limit of 0.001 mg/L. Thus chromium will be included as a permit limit however, monitoring for chromium is waived per 40 CFR Part 122.44 (a)(2)(i). A statement shall be placed in the permit as follows: The use of water treatment chemicals containing chromium is prohibited under this permit.
Zinc Outfall 101 is primarily composed of cooling tower blowdown. 40 CFR Part 423.13 provides BAT effluent limitations for total zinc applicable to cooling tower blowdown wastewater discharges. The limits are 1.0 mg/L monthly average and 1.0 mg/L daily maximum. The TVA - Watts Bar Nuclear Plant utilizes zinc in corrosion inhibitors for treatment of raw water. TVA's policy is to control the feed of zinc containing chemicals to limit the discharge concentration to 0.2 mg/L or less.
The zinc limit of 1.0 mg/L daily average and 1.0 mg/L daily maximum shall be continued in the new permit. The corrosion inhibiting chemicals are added to the raw water system, and are recirculated through the condensers and the cooling towers. Thus the concentration of zinc is not expected to be highly variable with time. Therefore, a measurement frequency of 2/month and sample type of grab should be adequate to characterize zinc in this outfall.
Effluent Temperature Temperature shall be limited according to the State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3)(e)]. It is recognized that the temperature of the cooling water discharge will be greater than the temperature of the water prior to its use for cooling or other purposes. This discharge must not cause the temperature change in the receiving stream to exceed 3WC relative to an upstream control point. Also, this discharge must not cause the temperature of the receiving stream to exceed 30.5 0 C (except as a result of natural causes), and this discharge must not cause the maximum rate of temperature change in the receiving stream to exceed 2 0 C per hour (except as a result of natural causes).
The elevated temperature water of outfall 101 is mixed with the Tennessee River receiving water by being discharged through a diffuser. Instream temperature criteria must be met at the edge of the mixing zone. The mixing zone is defined for this discharge as being a maximum width of 240 feet (the width of the diffuser) and extending 240 feet downstream. An operational requirement of the plant is that the diffuser is only operated when 3500 cubic feet per second (CFS) flow is present from the dam. Mathematical modeling of the temperature during mixing was carried out by TVA and was submitted in a report in June 2007 (Completion and Operation of Watts Bar Nuclear Plant Unit 2. The report was based on the 24-hour average for discharge evaluation as specified in the NPDES permit issued in 1993. The modeling assumed both nuclear units in operation and concluded that a steady-state discharge of 38.3 &deg;C under worst case conditions, which included 1) full thermal load from the fossil plant, 2) the worst meteorology and 3) no operation of Watts Bar Hydro facility, would still protect the water quality based on modeling using daily averaging. A daily average value of 35 0C was proposed to include a margin of safety. A continuous discharge at the temperature maximum of 35 0 C will not exceed water quality outside of the mixing zone
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-12 of R-57 based on past modeling. The Division approved a one-hour averaging period for evaluating compliance with temperature criteria in the receiving stream.
A numeric effluent limitation of 35 0C shall continue as the daily maximum that can be discharged. Measurement frequency shall be continuous and sample type shall be by recorder. These limits are unchanged from the previous permit.
The designs of the diffusers and mixing zone were based on the operation of both Unit 1 and Unit 2; therefore, no changes are anticipated for accommodating the operation of Unit 2. However, TVA will perform studies similar to those performed for Unit 1 to confirm the performance of the diffusers with the operation of two units.
Toxicity Testing Raw water used at the facility is treated with corrosion inhibitors and biocide products.
These products, which can become concentrated in the cooling tower system, are discharged through Outfall 101. The chemical makeup of the products used can change during the permit period and the combined toxicity effect of the chemicals is not known. Thus it is not feasible to control toxicity only by the application of chemical specific effluent limits to the discharge. Toxicity testing of sensitive aquatic species (coupled with evaluation of new chemical products before they are used) is a reasonable method to evaluate the toxicity impacts of the products in the effluent. Therefore a whole effluent toxicity testing requirement shall remain in the permit. The calculations of the appropriate dilutions for the test are given in Appendix 5e of the Rationale and Part III of the permit.
The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment. Sample type shall be composite.
Outfall 102 Outfall 102 is an emergency discharge used when the Outfall 101 diffuser cannot be used. Thus the limits for this outfall shall be the same as for Outfall 101. The new permit limitations for this outfall are unchanged from the previous permit. Sampling frequency and sample type are adjusted for flow and temperature to reflect that continuous monitoring equipment would not be available during an emergency discharge. When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cubic feet per second in the receiving waters. If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements.
The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, only if discharge operated a 30 days from Jan. - Jun., or Jul. -
Dec. if all toxicity testing has not been completed for Outfall. Sample type shall be composite.
Monitoring for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.
Monitoring for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-13 of R-57 Outfall 103 This outfall is an internal monitoring point receiving low volume wastes. Thus the Low Volume Waste technology-based limitations apply.Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored continuously by recorder.pH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility.
NPDES Permit TN0020168 Page R-13 of R-57 Outfall 103 This outfall is an internal monitoring point receiving low volume wastes. Thus the Low Volume Waste technology-based limitations apply.
Therefore a pH limitation of 6.0 to 9.0 shall apply. Sampling shall be once per month and sample type shall be grab.Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes, which are subject to 40 CFR Part 423 guidelines.
Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored continuously by recorder.
The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration.
pH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility. Therefore a pH limitation of 6.0 to 9.0 shall apply. Sampling shall be once per month and sample type shall be grab.
The mass limits shall not be retained.
Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes, which are subject to 40 CFR Part 423 guidelines. The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).
Sampling shall be once per month and sample type shall be grab.Total Suspended Solids (TSS)Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to Low Volume Wastes. Sampling shall be once per month and sample type shall be grab.Ouffall 107 This outfall is an internal monitoring point incorporated to evaluate compliance with guideline limitations for metal cleaning wastes. These wastes are subject to technology based BPT and BAT guidelines for metal cleaning wastes under 40 CFR Part 423,12(b)(5) and 423.13 (e).Flow The flow from this outfall occurs as a controlled batch discharge from the Lined and Unlined Ponds. Flow duration is typically about 24 hours. Historical batch discharge frequency has been about 4 times per year. The flow is calculated by determining change in stage of the ponds.
The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration. The mass limits shall not be retained. Sampling shall be once per month and sample type shall be grab.
Total Suspended Solids (TSS)
Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to Low Volume Wastes. Sampling shall be once per month and sample type shall be grab.
Ouffall 107 This outfall is an internal monitoring point incorporated to evaluate compliance with guideline limitations for metal cleaning wastes. These wastes are subject to technology based BPT and BAT guidelines for metal cleaning wastes under 40 CFR Part 423,12(b)(5) and 423.13 (e).
Flow The flow from this outfall occurs as a controlled batch discharge from the Lined and Unlined Ponds. Flow duration is typically about 24 hours. Historical batch discharge frequency has been about 4 times per year. The flow is calculated by determining change in stage of the ponds.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-14 of R-57 Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored each time there is a batch discharge from the ponds through the outfall. Flow frequency shall be once per batch and type measurement shall be calculated.
NPDES Permit TN0020168 Page R-14 of R-57 Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored each time there is a batch discharge from the ponds through the outfall. Flow frequency shall be once per batch and type measurement shall be calculated.
DH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility.
DH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility. Ph shall be monitored once per batch and sample type shall be grab.
Ph shall be monitored once per batch and sample type shall be grab.Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of metal cleaning wastes. Concentration limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (5). The previous permit imposed a monthly average limit of 15 mg/L and a daily maximum limit of 15 mg/L.Because the wastewater discharging to this outfall is batch treated, it is the permit writer's judgment that each batch can be treated to meet the 15 mg/L concentration.
Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of metal cleaning wastes. Concentration limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (5). The previous permit imposed a monthly average limit of 15 mg/L and a daily maximum limit of 15 mg/L.
The average of monthly average values and the maximum value reported from the previous permit monitoring data (see Appendix 4) indicate a consistent value of <5.0 mg/I. Thus the 40 CFR guideline daily maximum limit of 20 mg/I shall not apply and the previous permit limit shall be retained at 15 mg/I monthly average and daily maximum.Sampling shall be once per batch discharge, and sample type shall be grab.Total Suspended Solids (TSS)Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to metal cleaning wastes.The previous permit provided a monthly average concentration limit of 30 mg/L and a daily maximum concentration limit of 30 mg/L. Sampling frequency shall be once per batch and sample type shall be grab.Comper, Total Recoverable Technology-based BAT limits are established for copper at 40 CFR Part 423, Subpart 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for copper at 1.0 mg/L as monthly average and as a daily maximum.The new permit shall have a 1.0 mg/L total recoverable copper limit as both the monthly average and daily maximum in accordance with the technology-based guidelines.
Because the wastewater discharging to this outfall is batch treated, it is the permit writer's judgment that each batch can be treated to meet the 15 mg/L concentration.
The mass limits shall not be retained the permit. Sampling frequency shall be once per batch. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration, and to be consistent with other outfall sampling requirements, the sample type shall be grab.
The average of monthly average values and the maximum value reported from the previous permit monitoring data (see Appendix 4) indicate a consistent value of <5.0 mg/I. Thus the 40 CFR guideline daily maximum limit of 20 mg/I shall not apply and the previous permit limit shall be retained at 15 mg/I monthly average and daily maximum.
Sampling shall be once per batch discharge, and sample type shall be grab.
Total Suspended Solids (TSS)
Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to metal cleaning wastes.
The previous permit provided a monthly average concentration limit of 30 mg/L and a daily maximum concentration limit of 30 mg/L. Sampling frequency shall be once per batch and sample type shall be grab.
Comper, Total Recoverable Technology-based BAT limits are established for copper at 40 CFR Part 423, Subpart 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for copper at 1.0 mg/L as monthly average and as a daily maximum.
The new permit shall have a 1.0 mg/L total recoverable copper limit as both the monthly average and daily maximum in accordance with the technology-based guidelines. The mass limits shall not be retained the permit. Sampling frequency shall be once per batch. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration, and to be consistent with other outfall sampling requirements, the sample type shall be grab.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-15 of R-57 Iron. Total Recoverable Technology-based BAT limits are established for iron at 40 CFR Part 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for iron at 1.0 mg/L as monthly average and as a daily maximum.The new permit shall have a 1.0 mg/L total recoverable iron limit as both the monthly average and daily maximum in accordance with the technology-based guidelines.
NPDES Permit TN0020168 Page R-15 of R-57 Iron. Total Recoverable Technology-based BAT limits are established for iron at 40 CFR Part 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for iron at 1.0 mg/L as monthly average and as a daily maximum.
Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.Phosphorus.
The new permit shall have a 1.0 mg/L total recoverable iron limit as both the monthly average and daily maximum in accordance with the technology-based guidelines.
Total Phosphorus is not limited by technology-based guidelines, however it is of water quality concern because of its potential to be used in metal cleaning and its ability to contribute to nuisance aquatic growth in receiving water bodies. The previous permit established a 1.0 mg/L monthly average and a 1.0 mg/L daily maximum concentration and required that phosphorus be monitored once per week only during periods when phosphate cleaning solutions are used. During the past five- year permit period, no phosphorus monitoring was reported at the facility.
Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.
Because phosphate and phosphate chemicals are listed in the permit application as chemicals added to wastewaters reaching Outfall 107 the limits in the previous permit shall be retained.Monitoring frequency shall be once per batch discharge only during periods when phosphate cleaning solutions are added. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.Outfall 113 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water. Once through cooling water is subject to BPT and BAT technology-based limitations under 40 CFR Part 423. A portion of the water discharged through Outfall 113 enters the plant through the intake pumping station (IPS) and is treated with corrosion inhibitors and biocide. The remaining portion is obtained by gravity flow through the intake for the old TVA -Watts Bar Fossil Plant, which withdraws water from Watts Bar Reservoir above Watts Bar Dam. The proportion of flow from the IPS ranges from approximately 50 to 75 MGD and the remaining portion from Watts Bar Reservoir varies from approximately zero to 110 MGD. The water withdrawn from Watts Bar Lake may be passed through the condensers as once through cooling water, or by using a bypass valve arrangement, may be routed directly to Outfall 113.Flow The previous permit required flow to be measured on a continuous basis using a recorder.
Phosphorus. Total Phosphorus is not limited by technology-based guidelines, however it is of water quality concern because of its potential to be used in metal cleaning and its ability to contribute to nuisance aquatic growth in receiving water bodies. The previous permit established a 1.0 mg/L monthly average and a 1.0 mg/L daily maximum concentration and required that phosphorus be monitored once per week only during periods when phosphate cleaning solutions are used. During the past five- year permit period, no phosphorus monitoring was reported at the facility. Because phosphate and phosphate chemicals are listed in the permit application as chemicals added to wastewaters reaching Outfall 107 the limits in the previous permit shall be retained.
This language shall be retained in the new permit. Should the continuous flow monitoring equipment fail or need to be taken off line for repairs or calibration, the flow shall be measured by staff gage as a backup method until the flow monitoring TVA-Watts Bar Nuclear Plant (Rationale)
Monitoring frequency shall be once per batch discharge only during periods when phosphate cleaning solutions are added. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.
NPDES Permit TN0020168 Page R-16 of R-57 system is brought back on line. The permittee shall take reasonable steps to restore the flow monitoring as soon as possible.Sudden changes in thermal loading at the plant, i.e., start-up or shutdown, should not be made unless there is discharge from Watts Bar Dam (the exception being changes necessary due to concern for human safety or the environment).
Outfall 113 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water. Once through cooling water is subject to BPT and BAT technology-based limitations under 40 CFR Part 423. A portion of the water discharged through Outfall 113 enters the plant through the intake pumping station (IPS) and is treated with corrosion inhibitors and biocide. The remaining portion is obtained by gravity flow through the intake for the old TVA - Watts Bar Fossil Plant, which withdraws water from Watts Bar Reservoir above Watts Bar Dam. The proportion of flow from the IPS ranges from approximately 50 to 75 MGD and the remaining portion from Watts Bar Reservoir varies from approximately zero to 110 MGD. The water withdrawn from Watts Bar Lake may be passed through the condensers as once through cooling water, or by using a bypass valve arrangement, may be routed directly to Outfall 113.
pH The discharge is covered under 40 CFR Part 423 guidelines, which require that the pH be maintained between 6.0 and 9.0. Calculations given in Appendix 5d show that pH within this range will protect the water quality of the Tennessee River. Thus pH limitations shall remain 6.0 to 9.0 in the new permit. Sampling frequency shall be once per month and sample type shall be grab.Total Suspended Solids (TSS)TSS was included in the previous permit as a monitoring only requirement on a once per month basis. There are no technology based limits or numeric water quality criteria for this parameter.
Flow The previous permit required flow to be measured on a continuous basis using a recorder. This language shall be retained in the new permit. Should the continuous flow monitoring equipment fail or need to be taken off line for repairs or calibration, the flow shall be measured by staff gage as a backup method until the flow monitoring
According to Tennessee Water Quality Criteria for the protection of fish and aquatic life [Chapter 1200-4-3-.03(3)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to aquatic life in the receiving stream.Monitoring of TSS was required during the previous permit period and the data (see Appendix 4) indicated that the long-term average was 4.0 mg/L. Because the facility is considering adding bentonite to this waste stream as a method of detoxifying biocides, suspended solids monitoring shall remain in the permit. Sampling frequency shall be once per month and sample type shall be grab.Chlorine, Total Residual Total chlorine residual was limited in the previous permit at 0.092 mg/L as a monthly average and 0.158 as a daily maximum. These limits were based on compliance with instream water quality criteria at a previous permit flow of 192 MGD. Water quality calculations (presented in Appendix 5b) were performed using the long-term average combined flow of Outfalls 101 and 113 from the current permit application.
 
These calculations indicate that a monthly average of 0.15 mg/I and a daily maximum of 0.259 mg/L are necessary to comply with water quality criteria.
In the case of the daily maximum value, the 0.2 mg/L BAT limit is more restrictive.
Monitoring data from the previous permit period indicates that the long-term average and the maximum TRC concentration have been well below the permit limit (see Appendix 4). The WBN plant does not add chlorine to the Supplemental Condenser Cooling Water, however chlorine/bromine is potentially present in the outfall due to commingling of cooling tower blowdown.
The previous permit limits shall be retained in the permit to comply with the antibacksliding provisions of 40 CFR Part 122.44 (I) and as part of the justification for the exceedance of the 2 hour per day guideline maximum for discharge of TRC (see discussion in Rationale under Additional Limitations, Conditions and Monitoring Requirements).
Monitoring frequency shall be retained at once per month and sample type shall be grab.Dissolved Oxygen, (DO)
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-17 of R-57 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water to the Tennessee River via a diffuser a mile 529.2. State water quality criteria for this stream requires that dissolved oxygen be 5.0 mg/L or greater. However, because of the high flow of the discharge from this Outfall and the receiving stream the narrative limit to "Report the minimum DO" shall be retained in the new permit. Monitoring frequency shall be once per month and sample type shall be grab.Toxicity Testing The new permit limit calculations indicate required chronic toxicity testing, IC25, at a dilution factor of 14.8 and a new limit of 6.7%. Measurement frequency shall be retained at semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment.
NPDES Permit TN0020168 Page R-16 of R-57 system is brought back on line. The permittee shall take reasonable steps to restore the flow monitoring as soon as possible.
Sample type shall be composite.
Sudden changes in thermal loading at the plant, i.e., start-up or shutdown, should not be made unless there is discharge from Watts Bar Dam (the exception being changes necessary due to concern for human safety or the environment).
Temperature, General Tennessee water quality criteria for temperature contains three parts, (Ql) the discharge shall not cause the temperature of the receiving waters to exceed 30.5 C instream after mixing, (2) the discharge shall not cause an upstream to downstream temperature change of more than 3 C, and (3) the discharge shall not cause a rate of temperature change more than 2 0 C per hour. All of these conditions must be met at the edge of the mixing zone for the discharge.
pH The discharge is covered under 40 CFR Part 423 guidelines, which require that the pH be maintained between 6.0 and 9.0. Calculations given in Appendix 5d show that pH within this range will protect the water quality of the Tennessee River. Thus pH limitations shall remain 6.0 to 9.0 in the new permit. Sampling frequency shall be once per month and sample type shall be grab.
Further the extent of the mixing zone should be such that fish and aquatic life are not harmed by the discharge.
Total Suspended Solids (TSS)
TVA, as part of a previous permit application process, presented dilution model results, which indicated that the mixing zone of this discharge would allow the free passage of fish while avoiding bottom dwelling species. During periods of Watts Bar dam releases, the heated plume is predicted to stay near the right bank (looking downstream) and extend downstream for a distance of approximately 1000 feet. During periods of dam shutoff, the heated plume is predicted to extend across the entire width of the river.Normally a "bank to bank" mixing zone is not allowable; however; in this case, only near the surface does the "passive" mixing zone extend across the width of the river.Temperature and Area of Mixing Zone The dynamic nature of the river operations in the vicinity of the Outfall 113 discharge and the fact that this channel is not a natural stream lead to issues with defining an appropriate mixing zone. It is recognized that the temperatures occurring in the Tennessee River at the location of the discharge are the result of a complex set of variables defining the mixing hydrodynamics and heat balance. Many of the variables, such as meteorological inputs, dam turbine releases, dam leakage, flow direction, and reservoir stage are beyond the control of the Watts Bar Nuclear Plant. It is further recognized that applying instantaneous criteria is problematic because of the dynamic nature of the receiving stream (barge traffic, dam operations, rapidly changing plume location, etc.). For this reason, the Division has determined that compliance with the temperature criteria should not be applied on an instantaneous basis instead compliance will be implemented with the following changes.
TSS was included in the previous permit as a monitoring only requirement on a once per month basis. There are no technology based limits or numeric water quality criteria for this parameter. According to Tennessee Water Quality Criteria for the protection of fish and aquatic life [Chapter 1200-4-3-.03(3)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to aquatic life in the receiving stream.
Monitoring of TSS was required during the previous permit period and the data (see Appendix 4) indicated that the long-term average was 4.0 mg/L. Because the facility is considering adding bentonite to this waste stream as a method of detoxifying biocides, suspended solids monitoring shall remain in the permit. Sampling frequency shall be once per month and sample type shall be grab.
Chlorine, Total Residual Total chlorine residual was limited in the previous permit at 0.092 mg/L as a monthly average and 0.158 as a daily maximum. These limits were based on compliance with instream water quality criteria at a previous permit flow of 192 MGD. Water quality calculations (presented in Appendix 5b) were performed using the long-term average combined flow of Outfalls 101 and 113 from the current permit application. These calculations indicate that a monthly average of 0.15 mg/I and a daily maximum of 0.259 mg/L are necessary to comply with water quality criteria. In the case of the daily maximum value, the 0.2 mg/L BAT limit is more restrictive. Monitoring data from the previous permit period indicates that the long-term average and the maximum TRC concentration have been well below the permit limit (see Appendix 4). The WBN plant does not add chlorine to the Supplemental Condenser Cooling Water, however chlorine/bromine is potentially present in the outfall due to commingling of cooling tower blowdown. The previous permit limits shall be retained in the permit to comply with the antibacksliding provisions of 40 CFR Part 122.44 (I) and as part of the justification for the exceedance of the 2 hour per day guideline maximum for discharge of TRC (see discussion in Rationale under Additional Limitations, Conditions and Monitoring Requirements). Monitoring frequency shall be retained at once per month and sample type shall be grab.
Dissolved Oxygen, (DO)
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-17 of R-57 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water to the Tennessee River via a diffuser a mile 529.2. State water quality criteria for this stream requires that dissolved oxygen be 5.0 mg/L or greater. However, because of the high flow of the discharge from this Outfall and the receiving stream the narrative limit to "Report the minimum DO" shall be retained in the new permit. Monitoring frequency shall be once per month and sample type shall be grab.
Toxicity Testing The new permit limit calculations indicate required chronic toxicity testing, IC25, at a dilution factor of 14.8 and a new limit of 6.7%. Measurement frequency shall be retained at semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment. Sample type shall be composite.
Temperature, General Tennessee water quality criteria for temperature contains three parts, (Ql) the discharge shall not cause the temperature of the receiving waters to exceed 30.5 C instream after mixing, (2) the discharge shall not cause an upstream to downstream temperature change of more than 3 C, and (3) the discharge shall not cause a rate of temperature change more than 2 0C per hour. All of these conditions must be met at the edge of the mixing zone for the discharge. Further the extent of the mixing zone should be such that fish and aquatic life are not harmed by the discharge.
TVA, as part of a previous permit application process, presented dilution model results, which indicated that the mixing zone of this discharge would allow the free passage of fish while avoiding bottom dwelling species. During periods of Watts Bar dam releases, the heated plume is predicted to stay near the right bank (looking downstream) and extend downstream for a distance of approximately 1000 feet. During periods of dam shutoff, the heated plume is predicted to extend across the entire width of the river.
Normally a "bank to bank" mixing zone is not allowable; however; in this case, only near the surface does the "passive" mixing zone extend across the width of the river.
Temperature and Area of Mixing Zone The dynamic nature of the river operations in the vicinity of the Outfall 113 discharge and the fact that this channel is not a natural stream lead to issues with defining an appropriate mixing zone. It is recognized that the temperatures occurring in the Tennessee River at the location of the discharge are the result of a complex set of variables defining the mixing hydrodynamics and heat balance. Many of the variables, such as meteorological inputs, dam turbine releases, dam leakage, flow direction, and reservoir stage are beyond the control of the Watts Bar Nuclear Plant. It is further recognized that applying instantaneous criteria is problematic because of the dynamic nature of the receiving stream (barge traffic, dam operations, rapidly changing plume location, etc.). For this reason, the Division has determined that compliance with the temperature criteria should not be applied on an instantaneous basis instead compliance will be implemented with the following changes.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-18 of R-57 The approach to the mixing zone in this permit will be to define both an active and a passive mixing zone of approximately the same overall size. (See Mixing Zone Diagram, Appendix 5h.) In the passive mixing zone case, corresponding to dam shutoff, the mixing zone geometry will be defined as before. The passive mixing zone extends across the entire width of the river and extends downstream approximately 1000 feet.
The active mixing zone will apply to other conditions where the plume tends to reside in the right hand side of the river (facing downstream). Monitoring to establish compliance for the active mixing zone will occur 2000 feet downstream of Outfall 113 in the right hand side of the river. This monitoring will utilize two stations that will be placed after determining the best locations to capture, as much as possible, the true temperature in the plume. Temperature recorder station #33 and recorder station #34 are shown on the general locations on the mixing zone diagram. The data from the two stations will be reported as the average of the temperatures for the two stations. This average will allow better tracking of the plume.
The modeling that predicted the previously described passive mixing zone will be
[physically] verified by an instream thermal survey conducted semiannually. This passive mixing zone that was described in the previous permit has been verified by instream modeling and instream thermal surveys.
The permittee shall maintain a bottom temperature sensor in the Mussel Relocation Zone to ensure protection of bottom dwelling species and a zone of fish passage. The limit for the monitors in the relocation zone will remain at 33.50 C (92.30 F) as the maximum 1-hour average value to protect those bottom dwelling species. The permittee shall record this data on the DMRs, where exceedences of the limit will be considered a permit violation.
Outfall 113 is a near-surface discharge, and computations and measurements confirm that the effluent dispresses in the surface region of the water column providing ample room for fish passage. TVA is not proposing any changes to the dimensions of the Outfall 113 mixing zones with the completion and startup of Unit 2.
Mussel Relocation Zone Temperature Sensors and Data for Summer 2010
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-19 of R-57 Tc.rnpmturc &#xfd;cns.or ('tp)
                                      "1"N-NL End Adi,,,hurge~iprmi~
Drownrtmam 90 8-75 Jung            July            August            September 2010 Temperature, Effluent
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-18 of R-57 The approach to the mixing zone in this permit will be to define both an active and a passive mixing zone of approximately the same overall size. (See Mixing Zone Diagram, Appendix 5h.) In the passive mixing zone case, corresponding to dam shutoff, the mixing zone geometry will be defined as before. The passive mixing zone extends across the entire width of the river and extends downstream approximately 1000 feet.The active mixing zone will apply to other conditions where the plume tends to reside in the right hand side of the river (facing downstream).
Monitoring to establish compliance for the active mixing zone will occur 2000 feet downstream of Outfall 113 in the right hand side of the river. This monitoring will utilize two stations that will be placed after determining the best locations to capture, as much as possible, the true temperature in the plume. Temperature recorder station #33 and recorder station #34 are shown on the general locations on the mixing zone diagram. The data from the two stations will be reported as the average of the temperatures for the two stations.
This average will allow better tracking of the plume.The modeling that predicted the previously described passive mixing zone will be[physically]
verified by an instream thermal survey conducted semiannually.
This passive mixing zone that was described in the previous permit has been verified by instream modeling and instream thermal surveys.The permittee shall maintain a bottom temperature sensor in the Mussel Relocation Zone to ensure protection of bottom dwelling species and a zone of fish passage. The limit for the monitors in the relocation zone will remain at 33.5 0 C (92.3 0 F) as the maximum 1-hour average value to protect those bottom dwelling species. The permittee shall record this data on the DMRs, where exceedences of the limit will be considered a permit violation.
Outfall 113 is a near-surface discharge, and computations and measurements confirm that the effluent dispresses in the surface region of the water column providing ample room for fish passage. TVA is not proposing any changes to the dimensions of the Outfall 113 mixing zones with the completion and startup of Unit 2.Mussel Relocation Zone Temperature Sensors and Data for Summer 2010 TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-19 of R-57 Tc.rnpmturc
&#xfd;cns.or ('tp)"1"N-NL End Adi,,,hurge~iprmi~
Drownrtmam 90 8-75 September Jung July August 2010 Temperature, Effluent TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-20 of R-57 It is recognized that the temperature of the discharge, after use for cooling purposes, will be higher than that of the intake water. The previous permit did not establish a maximum effluent temperature but rather required reporting of effluent temperature.
NPDES Permit TNO020168 Page R-20 of R-57 It is recognized that the temperature of the discharge, after use for cooling purposes, will be higher than that of the intake water. The previous permit did not establish a maximum effluent temperature but rather required reporting of effluent temperature.
Sampling frequency was hourly and sample type was grab. This sampling requirement shall be retained in the new permit.The temperature at the edge of the mixing zone must not exceed 30.5 0C as a daily maximum. Instream temperature monitors shall be employed at the downstream edge of the active mixing zone to demonstrate compliance.
Sampling frequency was hourly and sample type was grab. This sampling requirement shall be retained in the new permit.
Measurement frequency shall be hourly and sample type shall be recorder.Temperature, Rise Upstream to Downstream In order to demonstrate compliance with the 3 0C maximum rise upstream to downstream, the permittee shall conduct automated instream temperature monitoring.
The temperature at the edge of the mixing zone must not exceed 30.5 0C as a daily maximum. Instream temperature monitors shall be employed at the downstream edge of the active mixing zone to demonstrate compliance. Measurement frequency shall be hourly and sample type shall be recorder.
Monitoring locations shall include an upstream point (just below Watts Bar Dam) and a downstream point at the downstream edge of the mixing zone (as described above).Additional Limitations, Conditions, and Monitoring Requirements In addition to the specific numerical limitations discussed above, there are a number of general requirements that shall apply to outfalls 101, 102, 103, 107, and 113. These requirements are discussed as follows: 40 CFR Part 423.12 (b) (2) (BPT) and Part 423.13 (a) (BAT) specify, "There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid." This requirement was in the previous permit and shall be retained in the new permit.These requirements are potentially applicable to Outfalls 101, 102 and 113. Chlorine is not added to the Supplemental Condenser Cooling Water System (once through cooling water)at the Watts Bar Nuclear Plant; however, it is present in all Outfalls due to commingling of cooling tower blowdown.
Temperature, Rise Upstream to Downstream In order to demonstrate compliance with the 3 0C maximum rise upstream to downstream, the permittee shall conduct automated instream temperature monitoring.
TVA has made a demonstration to the Division that the Watts Bar Nuclear Plant cannot operate under these 'two hour per day" requirements without significant damage to the system potentially jeopardizing operational safety. No limit was placed on the hours of chlorine use in the previous permit and no such limit shall be included in the new permit.40 CFR Part 423.12 (b) (8) (BPT requirements, non wastewater source specific) states that "Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available chlorine or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination." 40 CFR Part 423.13 (b) (2) (BAT requirements, specific to once through cooling water)also states that for plants with a rated electric generating capacity of 25 or more megawatts that"Total residual chlorine may not be discharged from any single generating unit for more than two hours per day unless the discharger demonstrates to the permitting authority that discharge TVA-Watts Bar Nuclear Plant (Rationale)
Monitoring locations shall include an upstream point (just below Watts Bar Dam) and a downstream point at the downstream edge of the mixing zone (as described above).
NPDES Permit TN0020168 Page R-21 of R-57 for more than two hours is required for microinvertebrate control. Simultaneous multi-unit chlorination is permitted." 40 CFR Part 423.13 (d) (2) (BAT requirements, specific to cooling tower blowdown)states "Neither free available nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination." 40 CFR Part 423.13 (d) (1), BAT requirements for cooling tower blowdown, establishes monthly average and daily maximum effluent limitations for the 126 Priority Pollutants.
Additional Limitations, Conditions, and Monitoring Requirements In addition to the specific numerical limitations discussed above, there are a number of general requirements that shall apply to outfalls 101, 102, 103, 107, and 113. These requirements are discussed as follows:
The monthly average limit and the daily maximum limit (except for chromium and zinc) for the 126 Priority Pollutants contained in chemicals added for cooling tower maintenance is "No Detectable Amount." However, Part 423.13 (d) (3) allows the permitting authority, at its discretion, to utilize engineering calculations which demonstrate that the regulated pollutants are not detectable in the final discharge by analytical methods in 40 CFR Part 136. This requirement is potentially applicable to outfall 101. TVA has provided data that demonstrates that priority pollutants will not be added to the system in quantities that will be detectable in cooling tower blowdown.
40 CFR Part 423.12 (b) (2) (BPT) and Part 423.13 (a) (BAT) specify, "There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid." This requirement was in the previous permit and shall be retained in the new permit.
Also the data provided with the Form 2C permit application indicates that the priority pollutants were not present in detectable amounts. The following general statement shall be added to the permit "Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136." Monitoring for the Priority Pollutants shall not be required.Bromine may be used at times in the raw water system. For purposes of measurement of Total Residual Chlorine (TRC) in the permit, analyses shall include residual bromine with the results reported as chlorine.
These requirements are potentially applicable to Outfalls 101, 102 and 113. Chlorine is not added to the Supplemental Condenser Cooling Water System (once through cooling water) at the Watts Bar Nuclear Plant; however, it is present in all Outfalls due to commingling of cooling tower blowdown. TVA has made a demonstration to the Division that the Watts Bar Nuclear Plant cannot operate under these 'two hour per day" requirements without significant damage to the system potentially jeopardizing operational safety. No limit was placed on the hours of chlorine use in the previous permit and no such limit shall be included in the new permit.
Thus there is no separate test for residual bromine, but one test for situations where combinations of chlorine and bromine are being used.The language in the previous permit shall be retained restricting start-up, shutdown and abrupt flow changes when the flow is below 3,500 cubic feet per second.It is recognized that the permittee must use biocides and corrosion inhibitor products to protect plant piping systems and assure safety in the event of a shutdown.
40 CFR Part 423.12 (b) (8) (BPT requirements, non wastewater source specific) states that "Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available chlorine or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination."
Because the chemicals in these products may be detrimental to fish and aquatic life in the receiving stream, there is a need to evaluate the nature of the chemicals, the dosage to be used, the duration of use, the effluent concentration, and the need for treatment prior to discharge.
40 CFR Part 423.13 (b) (2) (BAT requirements, specific to once through cooling water) also states that for plants with a rated electric generating capacity of 25 or more megawatts that "Total residual chlorine may not be discharged from any single generating unit for more than two hours per day unless the discharger demonstrates to the permitting authority that discharge
The previous permit required that a biocide treatment plan be submitted for approval by the Division and that subsequent changes to that plan during the permit period also be submitted for approval.
 
It is also recognized that biocide and corrosion inhibitor products will change during the course of the NPDES permit period and that there is need for a mechanism to evaluate these changes relative to water quality impacts. Thus language has been incorporated into the permit to allow modification of the biocide and corrosion inhibitor plan based on pre-approval of the modifications by the Division.The quantities of chemicals used for treatments of intake or process waters must be conducted in accordance with a TDEC-approved Biocide/Corrosion Treatment Plan (B/CTP).WBN's current B/CTP was approved in 2009. This provision will continue in this permit and TVA must submit a revised B/CTP which addresses the changes in chemical treatments of ERCW and RCW and Towerbrome treatments of CCW for two unit operations at WBN.
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-21 of R-57 for more than two hours is required for microinvertebrate control.           Simultaneous multi-unit chlorination is permitted."
40 CFR Part 423.13 (d) (2) (BAT requirements, specific to cooling tower blowdown) states "Neither free available nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination."
40 CFR Part 423.13 (d) (1), BAT requirements for cooling tower blowdown, establishes monthly average and daily maximum effluent limitations for the 126 Priority Pollutants. The monthly average limit and the daily maximum limit (except for chromium and zinc) for the 126 Priority Pollutants contained in chemicals added for cooling tower maintenance is "No Detectable Amount." However, Part 423.13 (d) (3) allows the permitting authority, at its discretion, to utilize engineering calculations which demonstrate that the regulated pollutants are not detectable in the final discharge by analytical methods in 40 CFR Part 136. This requirement is potentially applicable to outfall 101. TVA has provided data that demonstrates that priority pollutants will not be added to the system in quantities that will be detectable in cooling tower blowdown. Also the data provided with the Form 2C permit application indicates that the priority pollutants were not present in detectable amounts. The following general statement shall be added to the permit "Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136." Monitoring for the Priority Pollutants shall not be required.
Bromine may be used at times in the raw water system. For purposes of measurement of Total Residual Chlorine (TRC) in the permit, analyses shall include residual bromine with the results reported as chlorine. Thus there is no separate test for residual bromine, but one test for situations where combinations of chlorine and bromine are being used.
The language in the previous permit shall be retained restricting start-up, shutdown and abrupt flow changes when the flow is below 3,500 cubic feet per second.
It is recognized that the permittee must use biocides and corrosion inhibitor products to protect plant piping systems and assure safety in the event of a shutdown. Because the chemicals in these products may be detrimental to fish and aquatic life in the receiving stream, there is a need to evaluate the nature of the chemicals, the dosage to be used, the duration of use, the effluent concentration, and the need for treatment prior to discharge. The previous permit required that a biocide treatment plan be submitted for approval by the Division and that subsequent changes to that plan during the permit period also be submitted for approval. It is also recognized that biocide and corrosion inhibitor products will change during the course of the NPDES permit period and that there is need for a mechanism to evaluate these changes relative to water quality impacts. Thus language has been incorporated into the permit to allow modification of the biocide and corrosion inhibitor plan based on pre-approval of the modifications by the Division.
The quantities of chemicals used for treatments of intake or process waters must be conducted in accordance with a TDEC-approved Biocide/Corrosion Treatment Plan (B/CTP).
WBN's current B/CTP was approved in 2009. This provision will continue in this permit and TVA must submit a revised B/CTP which addresses the changes in chemical treatments of ERCW and RCW and Towerbrome treatments of CCW for two unit operations at WBN.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-22 of R-57 VIII. METALS AND TOXICS The following procedure is used to calculate the allowable instream concentrations for permit limitations.
NPDES Permit TN0020168 Page R-22 of R-57 VIII. METALS AND TOXICS The following procedure is used to calculate the allowable instream concentrations for permit limitations. If monitoring for a particular pollutant indicates that the pollutant is not present (i.e., consistently below detection level), then the division may drop the monitoring requirements in the reissued permit.
If monitoring for a particular pollutant indicates that the pollutant is not present (i.e., consistently below detection level), then the division may drop the monitoring requirements in the reissued permit.1. The most recent background conditions of the receiving stream segment are compiled.
: 1. The most recent background conditions of the receiving stream segment are compiled. This information includes:
This information includes:* 7Q10 of receiving stream* Calcium hardness (measured ambient data, or 80.6 mg/L default)* Total suspended solids (measured ambient data, or 8.4 mg/L, default)* Background metals concentrations (measured ambient data, or 1/2 chronic water quality criteria)* Other dischargers impacting this segment* Downstream water supplies, if applicable
* 7Q10 of receiving stream
* Calcium hardness (measured ambient data, or 80.6 mg/L default)
* Total suspended solids (measured ambient data, or 8.4 mg/L, default)
* Background metals concentrations (measured ambient data, or 1/2 chronic water quality criteria)
* Other dischargers impacting this segment
* Downstream water supplies, if applicable
: 2. The chronic water quality criteria are converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel and zinc. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions.
: 2. The chronic water quality criteria are converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel and zinc. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions.
: 3. The acute water quality criteria is converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel, zinc, silver and mercury. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions for the following metals: cadmium, copper, lead, nickel, silver and mercury.4. The chronic criteria for Chromium (T) is given in the total recoverable form and is not converted to a dissolved lab condition or to the total recoverable ambient condition.
: 3. The acute water quality criteria is converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel, zinc, silver and mercury. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions for the following metals: cadmium, copper, lead, nickel, silver and mercury.
: 5. A standard mass balance equation determines the total allowable concentration (permit limit) for each pollutant.
: 4. The chronic criteria for Chromium (T) is given in the total recoverable form and is not converted to a dissolved lab condition or to the total recoverable ambient condition.
This equation also includes a percent stream allocation of 90%.The following formulas are used to evaluate water quality protection:
: 5. A standard mass balance equation determines the total allowable concentration (permit limit) for each pollutant. This equation also includes a percent stream allocation of 90%.
Cm = QsCs + QwCw Qs + Qw TVA-Watts Bar Nuclear Plant (Rationale)
The following formulas are used to evaluate water quality protection:
NPDES Permit TN0020168 Page R-23 of R-57 where: Cm = resulting in-stream concentration after mixing Cw = concentration of pollutant in wastewater Cs = stream background concentration Ow = wastewater flow Os = stream low flow to protect water quality: Cw < (S. rCm (as + Qw) -QsCsl ow where (SA) is the percent "Stream Allocation".
Cm = QsCs + QwCw Qs + Qw
Calculations for this permit have been done using a standardized worksheet, titled "Water Quality Based Effluent Calculations." Division policy dictates the following procedures in establishing these permit limits: 1. The critical low flow values are determined using USGS data: Fish and Aquatic Life Protection 7010 -Low flow under natural conditions 1Q10 -Regulated low flow conditions Other than Fish and Aquatic Life Protection 30Q2 -Low flow under natural conditions
 
: 2. Fish & Aquatic Life water quality criteria for certain Metals are developed through application of hardness dependent equations.
TVA-Watts Bar Nuclear Plant (Rationale)
These criteria are combined with dissolved fraction methodologies in order to formulate the final effluent concentrations.
NPDES Permit TN0020168 Page R-23 of R-57 where:
: 3. For criteria that are hardness dependent, chronic and acute concentrations are based on a Hardness of 25 mg/I and Total Suspended Solids (TSS) of 10 mgAI unless ambient stream data or water supply intake data substantiate a different value. Minimum and maximum limits on the hardness value used for water quality calculations are 25 mg/I and 400 mg/I respectively.
Cm = resulting in-stream concentration after mixing Cw = concentration of pollutant in wastewater Cs = stream background concentration Ow = wastewater flow Os = stream low flow to protect water quality:
The minimum limit on the TSS value used for water quality calculations is 10 mg/l.4. Background concentrations are determined from the division database, results of sampling obtained from the permittee, and/or obtained from nearby stream sampling data. If this background data is not sufficient, one-half of the chronic "In-stream Allowable" water quality criteria for fish and aquatic life is used. If the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, then the measured background concentration is used in lieu of the chronic "In-stream Allowable" water quality criteria for the purpose of calculating the appropriate effluent limitation (Cw). Under these circumstances, and in the event the "stream allocation" is less than 100%, the calculated chronic effluent limitation for fish and aquatic life should be equal to the chronic "In-stream Allowable" water quality criteria.
Cw < (S. rCm (as + Qw) - QsCsl ow where (SA) is the percent "Stream Allocation".
These guidelines should be strictly followed where the industrial source water is not the receiving stream. Where the industrial source water is the receiving stream, and the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, consideration may be given as to the degree to which the permittee should be required TVA-Watts Bar Nuclear Plant (Rationale)
Calculations for this permit have been done using a standardized worksheet, titled "Water Quality Based Effluent Calculations." Division policy dictates the following procedures in establishing these permit limits:
NPDES Permit TN0020168 Page R-24 of R-57 to meet the requirements of the water quality criteria in view of the nature and characteristics of the receiving stream.The spreadsheet has fourteen (14) data columns, all of which may not be applicable to any particular characteristic constituent of the discharge.
: 1. The critical low flow values are determined using USGS data:
A description of each column is as follows: Column 1: The "Stream Background" concentrations of the effluent characteristics.
Fish and Aquatic Life Protection 7010 - Low flow under natural conditions 1Q10 - Regulated low flow conditions Other than Fish and Aquatic Life Protection 30Q2 - Low flow under natural conditions
Column 2: The "Chronic" Fish and Aquatic Life Water Quality criteria.
: 2. Fish & Aquatic Life water quality criteria for certain Metals are developed through application of hardness dependent equations. These criteria are combined with dissolved fraction methodologies in order to formulate the final effluent concentrations.
For Cadmium, Copper, Lead, Nickel, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions.
: 3. For criteria that are hardness dependent, chronic and acute concentrations are based on a Hardness of 25 mg/I and Total Suspended Solids (TSS) of 10 mgAI unless ambient stream data or water supply intake data substantiate a different value. Minimum and maximum limits on the hardness value used for water quality calculations are 25 mg/I and 400 mg/I respectively. The minimum limit on the TSS value used for water quality calculations is 10 mg/l.
The Criteria Continuous Concentration (CCC) is calculated using the equation: CCC = (exp { mc [In (stream hardness)  
: 4. Background concentrations are determined from the division database, results of sampling obtained from the permittee, and/or obtained from nearby stream sampling data. If this background data is not sufficient, one-half of the chronic "In-stream Allowable" water quality criteria for fish and aquatic life is used. If the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, then the measured background concentration is used in lieu of the chronic "In-stream Allowable" water quality criteria for the purpose of calculating the appropriate effluent limitation (Cw). Under these circumstances, and in the event the "stream allocation" is less than 100%, the calculated chronic effluent limitation for fish and aquatic life should be equal to the chronic "In-stream Allowable" water quality criteria. These guidelines should be strictly followed where the industrial source water is not the receiving stream. Where the industrial source water is the receiving stream, and the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, consideration may be given as to the degree to which the permittee should be required
] + bc }) (CCF)CCF = Chronic Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator:
 
Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion (EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no chronic criteria exists for silver.Published criteria are used for non-metal parameters.
TVA-Watts Bar Nuclear Plant (Rationale)
Column 3: The "Acute" Fish and Aquatic Life Water Quality criteria.
NPDES Permit TN0020168 Page R-24 of R-57 to meet the requirements of the water quality criteria in view of the nature and characteristics of the receiving stream.
For Cadmium, Copper, Lead, Nickel, Silver, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions.
The spreadsheet has fourteen (14) data columns, all of which may not be applicable to any particular characteristic constituent of the discharge. A description of each column is as follows:
The Criteria Maximum Concentration (CMC) is calculated using the equation: CMC = (exp { mA [In (stream hardness)
Column 1:       The "Stream Background" concentrations of the effluent characteristics.
] + bA }) (ACF)ACF = Acute Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator:
Column 2:       The "Chronic" Fish and Aquatic Life Water Quality criteria. For Cadmium, Copper, Lead, Nickel, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions. The Criteria Continuous Concentration (CCC) is calculated using the equation:
Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion (EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no acute criteria exists for Total Chromium.
CCC = (exp { mc [In (stream hardness) ] + bc }) (CCF)
CCF = Chronic Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator:
Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion (EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no chronic criteria exists for silver.
Published criteria are used for non-metal parameters.
Published criteria are used for non-metal parameters.
Column 3:      The "Acute" Fish and Aquatic Life Water Quality criteria. For Cadmium, Copper, Lead, Nickel, Silver, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions. The Criteria Maximum Concentration (CMC) is calculated using the equation:
CMC = (exp { mA [In (stream hardness) ] + bA }) (ACF)
ACF = Acute Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator: Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion(EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no acute criteria exists for Total Chromium. Published criteria are used for non-metal parameters.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-25 of R-57 Column 4: The "Fraction Dissolved" converts the value for dissolved metal at laboratory conditions (columns 2 & 3) to total recoverable metal at in-stream ambient conditions (columns 5 & 6). This factor is calculated using the linear partition coefficients found in The Metals Translator:
NPDES Permit TN0020168 Page R-25 of R-57 Column 4:     The "Fraction Dissolved" converts the value for dissolved metal at laboratory conditions (columns 2 & 3) to total recoverable metal at in-stream ambient conditions (columns 5 & 6). This factor is calculated using the linear partition coefficients found in The Metals Translator: Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion(EPA 823-B-96-007, June 1996) and the equation:
Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion (EPA 823-B-96-007, June 1996) and the equation: Cdiss 1 Ctot 1 Column 5: Column 6: Column 7: Column 8: Column 9: al 1 + [ [Kpo] [ss (1+a)] [10-6] )ss = in-stream suspended solids concentration
Cdiss                 1 1
[mg/I]Linear partition coefficients for streams are used for unregulated (7Q10)receiving waters, and linear partition coefficients for lakes are used for regulated (1Q10) receiving waters. For those parameters not in the dissolved form in columns 2 & 3 (and all non-metal parameters), a Translator of 1 is used.The "Chronic" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions.
Ctot al       1 + [ [Kpo] [ss (1+a)] [10-6] )
This criteria is calculated by dividing the value in column 2 by the value in column 4.The "Acute" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions.
ss = in-stream suspended solids concentration [mg/I]
This criteria is calculated by dividing the value in column 3 by the value in column 4.The "Chronic" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the chronic limit.The "Acute" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the acute limit.The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Organism Consumption (Recreation).
Linear partition coefficients for streams are used for unregulated (7Q10) receiving waters, and linear partition coefficients for lakes are used for regulated (1Q10) receiving waters. For those parameters not in the dissolved form in columns 2 & 3 (and all non-metal parameters), a Translator of 1 is used.
The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Water and Organism Consumption.
Column 5:      The "Chronic" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions. This criteria is calculated by dividing the value in column 2 by the value in column 4.
These criteria are only to be applied when the stream use classification for the receiving stream includes both "Recreation" and "Domestic Water Supply." The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Domestic Water Supply.The Calculated Effluent Concentration associated with Organism Consumption.
Column 6:      The "Acute" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions. This criteria is calculated by dividing the value in column 3 by the value in column 4.
The Calculated Effluent Concentration associated with Water and Organism Consumption.
Column 7:      The "Chronic" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the chronic limit.
The Calculated Effluent Concentration associated with Domestic Water Supply.Column 10: Column 11: Column 12: Column 13: Column 14:
Column 8:      The "Acute" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the acute limit.
Column 9:      The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Organism Consumption (Recreation).
Column 10: The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Water and Organism Consumption. These criteria are only to be applied when the stream use classification for the receiving stream includes both "Recreation" and "Domestic Water Supply."
Column 11:      The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Domestic Water Supply.
Column 12:      The Calculated Effluent Concentration associated with Organism Consumption.
Column 13: The Calculated Effluent Concentration associated with Water and Organism Consumption.
Column 14:      The Calculated Effluent Concentration associated with Domestic Water Supply.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-26 of R-57 The most stringent water quality effluent concentration from Columns 7, 8, 12, 13, and 14 is applied if the receiving stream is designated for domestic water supply. Otherwise, the most stringent effluent concentration is chosen from columns 7, 8, and 12 only.
The calculations are presented in Appendix 5b. One calculation has been made for the Tennessee River and one for Yellow Creek. Because of the close proximity of the outfalls and large flow of the discharges, Outfalls 101 and 113 have been combined for purposes of the water quality calculations in the Tennessee River. Background water quality in the Tennessee River has been taken from the Division of Water Pollution Control monitoring station at river mile 529.5. This data is presented in Appendix 5a.
Separate water quality calculations are presented for ammonia and pH in Appendix 5c and 5d respectively. In the case of ammonia, Outfalls 101 and 113 were combined for purposes of determining the discharge concentration allowable for the Tennessee River. Based on the calculations it was determined that limiting ammonia to prevent toxicity was not necessary.
Storm Water The following table gives a summary of storm water discharges at the TVA - Watts Bar Nuclear Plant:
Storm Water Outfall Summary EiSW PPP      Drbin-gll  , ln)rvlous            Pond(s)              O,,uffall        Permit Area No.          Area,    "Area            Included In    #    Designation      Coverage acres      'acres .      Drainage Area 1                42          34              YHP                  101            NPDES 2                49          47              YHP                  101            NPDES 3              144          5              None            To be re-evaluated  for TMSP 4                92          3              None                SW-1            TMSP 5                37          22              YHP                  101            NPDES 6                29          1              None                SW-5            TMSP 7                18          7            LVWP+                  103            NPDES 8                27          8              None                SW-2            TMSP 9                45          11              None                SW-3            TMSP 10               41          4              None            To be covered under TMSP 11               77          18              None            To be covered under TMSP 12               163          1              None                SW-4      I    TMSP 13              166          35              CRHP            To be re-evaluated for TMSP 14                42          30              CRHP            To be re-evaluated for TMSP 15                  8          0              None                No industrial activity Total            980        226                            1_      _        II Outfalls that contain only storm water and other discharges allowed by the TMSP have been permitted under the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities (TMSP). Outfalls SW-1 through SW-5 fall into this category and thus are not addressed in this individual permit. Outfalls that contain storm water commingled with process and/or cooling wastewater are covered under this individual NPDES permit. This includes
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-27 of R-57 Outfall 101(or 102). The total flow from Outfall 101 (and 102 when in use) contains approximately 2.1% storm water based on the average annual flow. Storm runoff pollutants from this discharge shall be controlled via the Storm Water Pollution Prevention Plan (SWPPP) required by this permit (see Part IV of the Permit).
It is the intent of the Division that the permittee institute a Storm Water Pollution Prevention Plan (SWPPP) in order to minimize the discharge of pollutants from storm water outfalls. It is the opinion of the Division that the best method for dealing with potential pollution associated with storm water discharges from the TVA-Watts Bar Nuclear Plant is through implementation of an aggressive SWPPP coupled with discharge monitoring to verify SWPPP effectiveness.
In order to assist the permittee in the evaluation of the effectiveness of the SWPPP, benchmark values developed for the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities are provided herein for comparison. These benchmark values (cut-off concentrations) were developed by the EPA and the State of Tennessee and are based on data submitted by similar industries for the development of the multi-sector general storm water permit. The cut-off concentrations are target values and should not be construed to represent permit limits.
Parameters of Concern                          Cut-Off Concentration [mg/L]
Total Suspended Solids (TSS)                                      200 Oil & Grease                                            15 Iron, TOTAL                                              5.0 pH (range)                                          5.0-9.0 Note: Sample values are from the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities, Rationale, Part Ill, Table Ill-A: ParameterBenchmark Values.
The previous permit contained a requirement that a Storm Water Pollution Prevention Plan (SWPPP) be developed and maintained to regulate storm water runoff. This requirement shall be retained in the new permit. The SWPPP is meant to ensure that runoff from the facility site is not a significant source of pollution to the receiving stream. The discharger shall develop, document and maintain the SWPPP pursuant to the requirements as set forth in the Tennessee's Storm Water Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated with Industrial Activity from Steam Electric Power Generating Facilities, Including Coal Handling Areas", Part 3, "Storm Water Pollution Prevention Plan Requirements", is available at http://www.state.tn.us/environment/wpc/stormh2o/pmt-o.pdf for this permit. The effectiveness of this SWPPP may be investigated by requiring storm water monitoring of the combined process/storm water discharges and requiring that the results of the storm water runoff monitoring be submitted. Should the required monitoring results so dictate, the Division maintains the authority to institute specific numeric limitations for the monitored parameters.
IX.      BIOMONITORING REQUIREMENTS, CHRONIC The discharge of industrial wastewater from Outfall 101, 102, and 113 may contain several different pollutants, the combined effect of which has a reasonable potential to be detrimental to fish and aquatic life. The Tennessee Water Quality Standards criteria stipulate that "The
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-26 of R-57 The most stringent water quality effluent concentration from Columns 7, 8, 12, 13, and 14 is applied if the receiving stream is designated for domestic water supply. Otherwise, the most stringent effluent concentration is chosen from columns 7, 8, and 12 only.The calculations are presented in Appendix 5b. One calculation has been made for the Tennessee River and one for Yellow Creek. Because of the close proximity of the outfalls and large flow of the discharges, Outfalls 101 and 113 have been combined for purposes of the water quality calculations in the Tennessee River. Background water quality in the Tennessee River has been taken from the Division of Water Pollution Control monitoring station at river mile 529.5. This data is presented in Appendix 5a.Separate water quality calculations are presented for ammonia and pH in Appendix 5c and 5d respectively.
In the case of ammonia, Outfalls 101 and 113 were combined for purposes of determining the discharge concentration allowable for the Tennessee River. Based on the calculations it was determined that limiting ammonia to prevent toxicity was not necessary.
Storm Water The following table gives a summary of storm water discharges at the TVA -Watts Bar Nuclear Plant: Storm Water Outfall Summary EiSW PPP Drbin-gl , l ln)rvlous Pond(s) O ,,uffall Permit Area No. Area, "Area Included In # Designation Coverage acres 'acres .Drainage Area 1 42 34 YHP 101 NPDES 2 49 47 YHP 101 NPDES 3 144 5 None To be re-evaluated for TMSP 4 92 3 None SW-1 TMSP 5 37 22 YHP 101 NPDES 6 29 1 None SW-5 TMSP 7 18 7 LVWP+ 103 NPDES 8 27 8 None SW-2 TMSP 9 45 11 None SW-3 TMSP 10 41 4 None To be covered under TMSP 11 77 18 None To be covered under TMSP 12 163 1 None SW-4 I TMSP 13 166 35 CRHP To be re-evaluated for TMSP 14 42 30 CRHP To be re-evaluated for TMSP 15 8 0 None No industrial activity Total 980 226 1 _ _ II Outfalls that contain only storm water and other discharges allowed by the TMSP have been permitted under the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities (TMSP). Outfalls SW-1 through SW-5 fall into this category and thus are not addressed in this individual permit. Outfalls that contain storm water commingled with process and/or cooling wastewater are covered under this individual NPDES permit. This includes TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-27 of R-57 Outfall 101(or 102). The total flow from Outfall 101 (and 102 when in use) contains approximately 2.1% storm water based on the average annual flow. Storm runoff pollutants from this discharge shall be controlled via the Storm Water Pollution Prevention Plan (SWPPP)required by this permit (see Part IV of the Permit).It is the intent of the Division that the permittee institute a Storm Water Pollution Prevention Plan (SWPPP) in order to minimize the discharge of pollutants from storm water outfalls.
It is the opinion of the Division that the best method for dealing with potential pollution associated with storm water discharges from the TVA-Watts Bar Nuclear Plant is through implementation of an aggressive SWPPP coupled with discharge monitoring to verify SWPPP effectiveness.
In order to assist the permittee in the evaluation of the effectiveness of the SWPPP, benchmark values developed for the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities are provided herein for comparison.
These benchmark values (cut-off concentrations) were developed by the EPA and the State of Tennessee and are based on data submitted by similar industries for the development of the multi-sector general storm water permit. The cut-off concentrations are target values and should not be construed to represent permit limits.Parameters of Concern Cut-Off Concentration
[mg/L]Total Suspended Solids (TSS) 200 Oil & Grease 15 Iron, TOTAL 5.0 pH (range) 5.0-9.0 Note: Sample values are from the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities, Rationale, Part Ill, Table Ill-A: Parameter Benchmark Values.The previous permit contained a requirement that a Storm Water Pollution Prevention Plan (SWPPP) be developed and maintained to regulate storm water runoff. This requirement shall be retained in the new permit. The SWPPP is meant to ensure that runoff from the facility site is not a significant source of pollution to the receiving stream. The discharger shall develop, document and maintain the SWPPP pursuant to the requirements as set forth in the Tennessee's Storm Water Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated with Industrial Activity from Steam Electric Power Generating Facilities, Including Coal Handling Areas", Part 3, "Storm Water Pollution Prevention Plan Requirements", is available at http://www.state.tn.us/environment/wpc/stormh2o/pmt-o.pdf for this permit. The effectiveness of this SWPPP may be investigated by requiring storm water monitoring of the combined process/storm water discharges and requiring that the results of the storm water runoff monitoring be submitted.
Should the required monitoring results so dictate, the Division maintains the authority to institute specific numeric limitations for the monitored parameters.
IX. BIOMONITORING REQUIREMENTS, CHRONIC The discharge of industrial wastewater from Outfall 101, 102, and 113 may contain several different pollutants, the combined effect of which has a reasonable potential to be detrimental to fish and aquatic life. The Tennessee Water Quality Standards criteria stipulate that "The TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-28 of R-57 waters shall not contain toxic substances, whether alone or in combination with other substances, which will produce toxic conditions...".
NPDES Permit TNO020168 Page R-28 of R-57 waters shall not contain toxic substances, whether alone or in combination with other substances, which will produce toxic conditions...".
Since the permittee discharges to streams with low critical flow conditions, there is a concern for toxicity effects of the discharge on the receiving stream that is relatively unknown.Biomonitoring will provide information relative to the toxicity of the discharge.
Since the permittee discharges to streams with low critical flow conditions, there is a concern for toxicity effects of the discharge on the receiving stream that is relatively unknown.
Chronic biomonitoring is designed to evaluate extended exposure effects of toxicants to growth and/or reproduction of sensitive aquatic species. Calculations of chronic toxicity limits are as follows: For situations where water is withdrawn from the stream and then discharged back to the stream Qs DF= ---------------------------
Biomonitoring will provide information relative to the toxicity of the discharge. Chronic biomonitoring is designed to evaluate extended exposure effects of toxicants to growth and/or reproduction of sensitive aquatic species. Calculations of chronic toxicity limits are as follows:
Ow and for situations where water is not withdrawn from the stream as + Ow DF = ------------------  
For situations where water is withdrawn from the stream and then discharged back to the stream Qs DF= ---------------------------
= Dilution Factor, Qw Where Ow is the wastewater flow and Qs is a receiving stream low flow (7Q10 or 1Q10),).Please refer to Appendix 5e for details regarding facility wastewater flow and receiving stream low flow. Where the calculated dilution factor is less than 100:1, and assuming immediate and complete mixing, protection .of the stream from chronic effects requires: IWC < 1.0 X IC25; or, INHIBITION CONCENTRATION, 25% > IWC, Where IWC is Instream Waste Concentration and is calculated as a percent of the total flow using the following formula: For situations where water is withdrawn from the stream and then discharged back to the stream Qw IWC =........-----------
Ow and for situations where water is not withdrawn from the stream as + Ow DF = ------------------ = Dilution Factor, Qw Where Ow is the wastewater flow and Qs is a receiving stream low flow (7Q10 or 1Q10),).
x 100 Qs and for situations where water is not withdrawn from the stream Qw IWC= X 100 Qs + Qw The following table gives the calculated chronic test values for the four outfalls:
Please refer to Appendix 5e for details regarding facility wastewater flow and receiving stream low flow. Where the calculated dilution factor is less than 100:1, and assuming immediate and complete mixing, protection .of the stream from chronic effects requires:
IWC < 1.0 X IC25; or, INHIBITION CONCENTRATION, 25% > IWC, Where IWC is Instream Waste Concentration and is calculated as a percent of the total flow using the following formula:
For situations where water is withdrawn from the stream and then discharged back to the stream Qw IWC =........----------- x 100 Qs and for situations where water is not withdrawn from the stream Qw IWC=                         X 100 Qs + Qw The following table gives the calculated chronic test values for the four outfalls:
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-29 of R-57 Calculation of Chronic and Acute Blomonitoring Requirements Watts Bar Nuclear Plant, Outfalls 101,102, and 113 Calculation of Chronic Biornonitorincn Requirements Outfall Receing Rec. Stream Outfall Waste Withdrawing Dilution Factor, DF Instrearn Wastewater Conc. (IWC)Stream Flow, Os Flow, Ow from Withdrawing Not Withdrawing Withdrawing Not Withdrawing mgd mgd Rec. Stim. Os/Ow (Os + Qw)/Qw (Qw/Is) (Qw/(Qw+Qs))
NPDES Permit TN0020168 Page R-29 of R-57 Calculation of Chronic and Acute Blomonitoring Requirements Watts Bar Nuclear Plant, Outfalls 101,102, and 113 Calculation of Chronic Biornonitorincn   Requirements Outfall     Receing     Rec. Stream Outfall Waste Withdrawing       Dilution Factor, DF     Instrearn Wastewater Conc. (IWC)
Chronic Requirements, If DF <100 101 TN RFier 2062 57.76 Yes 35.7 2.80%102 1TN River 2062 57.76 Yes 35.7 2.80%113 TIN Rler 2062 140895 No 14.8 6.73%As seen from the table, WET testing shall be required on all three Outfalls.
Stream       Flow, Os     Flow, Ow       from     Withdrawing Not Withdrawing   Withdrawing   Not Withdrawing mgd           mgd       Rec. Stim. Os/Ow         (Os + Qw)/Qw   (Qw/Is)       (Qw/(Qw+Qs))
If toxicity is demonstrated in any of the effluent samples specified above, this shall constitute a violation of this permit.The toxicity tests specified herein shall be conducted twice a year (2/Year) and begin no later than 90 days from the effective date of this permit for Outfalls 101,102, and 113.X. ANTIDEGRADATION Tennessee's Antidegradation Statement is found in the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06.
Chronic Requirements, IfDF <100 101   TN RFier           2062         57.76         Yes         35.7                         2.80%
It is the purpose of Tennessee's standards to fully protect existing uses of all surface waters as established under the Act.Stream determinations for this permit action are associated with the waterbody segments identified by the division as segment ID# TN06020001020_1000, and TN06010201001_1000.
102 1TN River             2062         57.76         Yes         35.7                         2.80%
The Division has made a stream tier determination of the receiving waters associated with the subject discharge(s) and has found the receiving stream to be neither a Tier 2 nor Tier 3 water.Additionally, this water is fully supporting its designated uses. The Department has maintained, and shall continue to assess, the water quality of the stream to assure that the water quality is adequate to protect the existing uses of the stream fully, and to assure that there shall be achieved the highest statutory and regulatory requirements for all new and existing point sources and all cost-effective and reasonable best management practices for nonpoint source control.Additionally, this water partially support(s) designated uses due to polychlorinated biphenyls (contaminated sediments).
113   TINRler            2062       140895         No                           14.8                         6.73%
The discharge from Outfall 113 does not contain significant amounts of these effluent characteristics (consists only cooling water/storm water runoffand does not represent an increase in flow). The division, therefore, considers the potential for degradation to the receiving stream from these discharges to be negligible.
As seen from the table, WET testing shall be required on all three Outfalls. If toxicity is demonstrated in any of the effluent samples specified above, this shall constitute a violation of this permit.
TMDLs have been developed and approved for this waterbody segment on the following parameters and dates: Parameter TMDL Aporoval Date PCBs 03/18/2010 TVA-Watts Bar Nuclear Plant (Rationale)
The toxicity tests specified herein shall be conducted twice a year (2/Year) and begin no later than 90 days from the effective date of this permit for Outfalls 101,102, and 113.
NPDES Permit TN0020168 Page R-30 of R-57 The proposed terms and conditions of this permit comply with the wasteload allocations of these TMDLs.The withdrawal rate for the intake pumping station located in Chickamauga Reservoir will increase from approximately 52 MGD to approximately 75 MGD and SCCW intake withdrawal rate will remain approximately 174 MGD is consumptive (primarily cooling tower evaporation) with the remainder to the stream via permitted outfalls.
X. ANTIDEGRADATION Tennessee's Antidegradation Statement is found in the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06. It is the purpose of Tennessee's standards to fully protect existing uses of all surface waters as established under the Act.
The consumption amounts to only 1.3%of the 7Q10 stream flow (3173.3 MGD). Therefore, water withdrawal will continue to be de minimus as described in Rule 1200-4-3.04.
Stream determinations for this permit action are associated with the waterbody segments identified by the division as segment ID# TN06020001020_1000, and TN06010201001_1000.
No thermal degradation is proposed or anticipated.
The Division has made a stream tier determination of the receiving waters associated with the subject discharge(s) and has found the receiving stream to be neither a Tier 2 nor Tier 3 water.
TVA has performed an extensive hydrothermal analysis of the WBN heat dissipation system. This analysis indicates that the near-field (and thus far-field) thermal impacts are insignificant and can be managed within the limitations of the current NPDES permit.Xl. PERMIT DURATION The proposed limitations meet the requirements of Section 301(b)(2)(A), (C), (D), (E), and (F)of the Clean Water Act as amended. It is the intent of the division to organize the future issuance and expiration of this particular permit such that other permits located in the same watershed and group within the State of Tennessee shall be set for issuance and expiration at the same time. In order to meet the target reissuance date for the Tennessee River (Meigs &Rhea County) watershed and following the directives for the Watershed Management Program initiated in January 1996. This permit will expire in 2016.
Additionally, this water is fully supporting its designated uses. The Department has maintained, and shall continue to assess, the water quality of the stream to assure that the water quality is adequate to protect the existing uses of the stream fully, and to assure that there shall be achieved the highest statutory and regulatory requirements for all new and existing point sources and all cost-effective and reasonable best management practices for nonpoint source control.
Additionally, this water partially support(s) designated uses due to polychlorinated biphenyls (contaminated sediments). The discharge from Outfall 113 does not contain significant amounts of these effluent characteristics (consists only cooling water/storm water runoffand does not represent an increase in flow). The division, therefore, considers the potential for degradation to the receiving stream from these discharges to be negligible.
TMDLs have been developed and approved for this waterbody segment on the following parameters and dates:
Parameter                                 TMDL Aporoval Date PCBs                                     03/18/2010
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-31 of R-57 APPENDIX 1 -FACILITY DISCHARGES AND RECEIVING WATERS FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL (OSN) 101 I LONGITUDE LATITUDE-84.785833 35.593333 FLOW DISCHARGE (MGD) SOURCE Yard Holding Pond (1.371 MGD) (All variable flows)0.0000 Turbine Building Station Sunp'A'0.0000 Cooling Tower Blowdown 'A'0.0000 Emergency Raw Cooling Water Discharge  
NPDES Permit TN0020168 Page R-30 of R-57 The proposed terms and conditions of this permit comply with the wasteload allocations of these TMDLs.
'A'0.0000 Raw Cooling Water Discharge  
The withdrawal rate for the intake pumping station located in Chickamauga Reservoir will increase from approximately 52 MGD to approximately 75 MGD and SCCW intake withdrawal rate will remain approximately 174 MGD is consumptive (primarily cooling tower evaporation) with the remainder to the stream via permitted outfalls. The consumption amounts to only 1.3%
'A'0.0000 Ice Condenser Chiller/Air Coolers Alternate Parh 0.7373 Miscellaneous Discharges, Includes: 0.0000 Condenser Cleaning, Cooling Tower & Work Decon.0.0010 Trainlng Center Cooling Tower 0.1878 Trash Sluice Water 0.3619 Low Volume Waste Holding Pond (IMP 103)0.0000 ERCW Header Flushes 0.0480 Precipitation, Less Eeaporation 0.0020 Cooling Tower Disilting Basin 0.0330 Discharge from IMP 107 Metal Cleaning Waste Ponds Cooling Tower Eowdown Line (45.773 MGD)0.0040 Uquid Radwaste System 0.3600 Steam Generator Blowdown 0.0010 Condenser Demineralizer Cleanup 45.4080 Cooling Tower Blowdown Weir Misc. Colling Water 10.62 MGD)5.3100 Emerency Raw Cooling Water 4.9100 Raw Cooling Water 0.4000 Ice Condenser Chiller/Various Air Cooler 57.7640 TOTAL DISCHARGE (MGD)RECEIVING STREAM DISCHARGE ROUTE Chickamauga Reserdlor (Tennessee River Mile 527.9)STREAMLOW 7010 1 1010 1 3002 FLOW (CFS) 4910 1 3190 1 85803173 I 2062 1 554 STREAM USE CLASSIFICATIONS (WATER QUALITY)I FISH I RPEEATM I IRIATMJ I LW&W I I x I x I x I XNcUSTnAL X Treatment.
of the 7Q10 stream flow (3173.3 MGD). Therefore, water withdrawal will continue to be de minimus as described in Rule 1200-4-3.04.
Biocide, sedimentation, neutralization, and oil skimming, mi)dng by submerged multiportcdiffuser.
No thermal degradation is proposed or anticipated. TVA has performed an extensive hydrothermal analysis of the WBN heat dissipation system. This analysis indicates that the near-field (and thus far-field) thermal impacts are insignificant and can be managed within the limitations of the current NPDES permit.
Xl. PERMIT DURATION The proposed limitations meet the requirements of Section 301(b)(2)(A), (C), (D), (E), and (F) of the Clean Water Act as amended. It is the intent of the division to organize the future issuance and expiration of this particular permit such that other permits located in the same watershed and group within the State of Tennessee shall be set for issuance and expiration at the same time. In order to meet the target reissuance date for the Tennessee River (Meigs &
Rhea County) watershed and following the directives for the Watershed Management Program initiated in January 1996. This permit will expire in 2016.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-31 of R-57 APPENDIX 1 - FACILITY DISCHARGES AND RECEIVING WATERS FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL (OSN) 101               I LONGITUDE               LATITUDE
                        -84.785833             35.593333 FLOW                               DISCHARGE                                             RECEIVING STREAM (MGD)                               SOURCE                                             DISCHARGE ROUTE Yard Holding Pond (1.371 MGD) (All variable flows)                    Chickamauga Reserdlor (Tennessee River Mile 527.9) 0.0000   Turbine Building Station Sunp'A' 0.0000   Cooling Tower Blowdown 'A'                                   STREAMLOW              7010    1    1010  1 3002 0.0000     Emergency Raw Cooling Water Discharge 'A'                     FLOW (CFS)            4910      1    3190 1 8580 0.0000     Raw Cooling Water Discharge 'A'                                 (MO*D              3173    I    2062  1 554 0.0000     Ice Condenser Chiller/Air Coolers Alternate Parh 0.7373     Miscellaneous Discharges, Includes:                           STREAM USE CLASSIFICATIONS (WATER QUALITY) 0.0000     Condenser Cleaning, Cooling Tower & Work Decon.       I    FISH  I RPEEATM    I IRIATMJ    I    LW&W  I 0.0010     Trainlng Center Cooling Tower                         I      x    I    x      I    x      I 0.1878     Trash Sluice Water                                           XNcUSTnAL 0.3619     Low Volume Waste Holding Pond (IMP 103)                     X 0.0000     ERCW Header Flushes 0.0480     Precipitation, Less Eeaporation 0.0020     Cooling Tower Disilting Basin 0.0330     Discharge from IMP 107 Metal Cleaning Waste Ponds Cooling Tower Eowdown Line (45.773 MGD) 0.0040     Uquid Radwaste System 0.3600     Steam Generator Blowdown 0.0010     Condenser Demineralizer Cleanup 45.4080     Cooling Tower Blowdown Weir Misc. Colling Water 10.62 MGD) 5.3100     Emerency Raw Cooling Water 4.9100     Raw Cooling Water 0.4000     Ice Condenser Chiller/Various Air Cooler 57.7640                     TOTAL DISCHARGE (MGD)
Treatment. Biocide, sedimentation, neutralization, and oil skimming, mi)dng by submerged multiportcdiffuser.
*  
*  


==Reference:==
==Reference:==
Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D.Weaver.
Water Resources investigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.


Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D. Weaver.Water Resources investigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority.
Nashville, Tennessee, 1996, p.57.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-32 of R-57 FACILITY DISCHARGES AND RECEIVING WATERS I OUTFALL (OSI) 102 RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE-84.791667 35.595833 Unnamed tributary entering Chickamauga Reserwor (Tennessee River Mile 527.2)FLOW DISCHARGE STREAM LOW 7010 101 3002 (MGD) SOURCE FLOW (CFS) 4910 3190 8580 Yard Holding Pond Overflow Weir (emergency outfall).  
NPDES Permit TN0020168 Page R-32 of R-57 FACILITY DISCHARGES AND RECEIVING WATERS I             OUTFALL (OSI) 102                                                     RECEIVING STREAM LONGITUDE               LATITUDE                                           DISCHARGE ROUTE
-MGD 3173.3 2061.7 5545.3 0.0000 Provides an alternate discharge path for the diffuser_discharge point (OSN 101) STREAM USE CLASSIFICATIONS (WATER QUALITY)FISH I3EATc* IRWlATIrN LW&W ccNESrE x x x X x INDUSTRIAL NAVGATION 0.0000 TOTAL DISCHARGE X X Treatment Biocide, sedimentation, neutralization, and oil skimming, mi~tng by submerged muttiport diffuser.*  
                          -84.791667             35.595833               Unnamed tributary entering Chickamauga Reserwor (Tennessee River Mile 527.2)
FLOW                             DISCHARGE                             STREAM LOW                   7010           101         3002 (MGD)                               SOURCE                             FLOW (CFS)                   4910         3190         8580 Yard Holding Pond Overflow Weir (emergency outfall). -             MGD                   3173.3       2061.7       5545.3 0.0000   Provides an alternate discharge path for the diffuser
_discharge  point (OSN 101)                                     STREAM USE CLASSIFICATIONS (WATER QUALITY)
FISH         I3EATc*       IRWlATIrN       LW&W       ccNESrE x             x               x           X             x INDUSTRIAL NAVGATION 0.0000                           TOTAL DISCHARGE                         X             X Treatment   Biocide, sedimentation, neutralization, and oil skimming, mi~tng by submerged muttiport diffuser.
  *  


==Reference:==
==Reference:==
Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D. Weaver.
Water Resources bIvestigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.
FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL MP) 103                                                      RECEIVING STREAM LONGITUDE                LATITUDE                                          DISCHARGE ROUTE
                          -83.20694              35.59722              Internal monitoring point that discharges through the Yard Holding Pond FLOW                                DISCHARGE                            STREAM LOW                  7010        1010          300 (MGO)                                SOURCE                              FLOW (CFS)                    0.0    1    0.0 Low Volume Waste Holding Pond                                      MGD                      0.0          0.0            .C 0.0053      Precipitation, Less Evaporation 0.0250    Alum SludI Supernate                                            STREAM USE CLASSIFICATIONS (WATER OUALITY) 0.2600    Vendor Water Ppuritication (RO reject water)                  FISH      RBUF'ATIONII3GATnCN LW&W                    DOME 0.0716    Turbine Building Station Sump                                  X              X                X            X            X I                                                                        riDUSTRtALNAVIA.
0.3619                          TOTAL DISCHARGE                          X Treatment: Oil skimming, sludge thickening, and neutralization
. No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond


Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D. Weaver.Water Resources bIvestigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority.
TVA-Watts Bar Nuclear Plant (Rationale)
Nashville, Tennessee, 1996, p.57.I FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL MP) 103 RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE-83.20694 35.59722 Internal monitoring point that discharges through the Yard Holding Pond FLOW DISCHARGE STREAM LOW 7010 1010 300 (MGO) SOURCE FLOW (CFS) 0.0 1 0.0 Low Volume Waste Holding Pond MGD 0.0 0.0 .C 0.0053 Precipitation, Less Evaporation 0.0250 Alum SludI Supernate STREAM USE CLASSIFICATIONS (WATER OUALITY)0.2600 Vendor Water Ppuritication (RO reject water) FISH RBUF'ATION II3GATnCN LW&W DOME 0.0716 Turbine Building Station Sump X X X X X riDUSTRtAL NAVIA.0.3619 TOTAL DISCHARGE X Treatment:
NPDES Permit TN0020168 Page R-33 of R-57 I   FACILITY DISCHARGES AND RECEIVING WATERS I             OFALL (IMP) 107             I                                         RECEIVING STRE, LONGITUDE           LATITUDE                                               DISCHARGE ROLl ITE
Oil skimming, sludge thickening, and neutralization
                        -84.7955           35.5048                   Internal monitoring point which discharges tt rough the Yard
.No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond TVA-Watts Bar Nuclear Plant (Rationale)
                                                                      /Holding Pond FLOW                                                                                                                 10 10  1  3002 DISCHRE                                 STREAM LOW             1   7010 (MGD)                               SOURCE                               FLOW (CFS)                   0.0     1     0.0    1 0.0 Metal Cleaning Waste Ponds(LP and ULP)                           (/GDO                     0.0   1 0.0003     Metal Cleaning Waste 0.0001     Storm Water Runoff                                             STREAM USE CLASSIFICATIONS ,M        WATER 0 UALTY) 0.0001     Drum Rinsing                                                 FISH       REDRATnoN             TIA'N 0.0001     Drum Dewatering                                               X               X             X            X          X 0.0001     Diesel Generator Coolant                                 NDASTRIAL NAVGATION 0.0303     turbine Station Sump W/Metal Cleaning Waste                   X 0.0310                         TOTAL DISCHARGE Treatment: Oil skimming, sludge thickening, and neutralization
NPDES Permit TN0020168 Page R-33 of R-57 I FACILITY DISCHARGES AND RECEIVING WATERS I OFALL (IMP) 107 I RECEIVING STRE, LONGITUDE LATITUDE DISCHARGE ROLl-84.7955 35.5048 Internal monitoring point which discharges tt/Holding Pond FLOW DISCHRE STREAM LOW 1 7010 (MGD) SOURCE FLOW (CFS) 0.0 1 Metal Cleaning Waste Ponds(LP and ULP) (/GDO 0.0 1 0.0003 Metal Cleaning Waste 0.0001 Storm Water Runoff STREAM USE CLASSIFICATIONS 0.0001 Drum Rinsing FISH REDRATnoN TIA'N 0.0001 Drum Dewatering X X X 0.0001 Diesel Generator Coolant NDASTRIAL NAVGATION 0.0303 turbine Station Sump W/Metal Cleaning Waste X 0.0310 TOTAL DISCHARGE Treatment:
. No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond I     FACILITY DISCHARGES AND RECEIVING WATERS                           I OUTFALL (OS?)113             I                                         RECEIVING STREAM LONGITUDE           LATITUDE                                               DISCHARGE ROUTE
Oil skimming, sludge thickening, and neutralization
                        -84.785833         35.593333                   Discharge Via diffuser to Chickamauga Resermor (Tennessee Rier
.No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond ITE rough the Yard 10 10 1 3002 0.0 1 0.0 ,M WATER 0 UALTY)X X I FACILITY DISCHARGES AND RECEIVING WATERS I OUTFALL (OS?) 113 I RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE-84.785833 35.593333 Discharge Via diffuser to Chickamauga Resermor (Tennessee Rier____________________________________________
____________________________________________        Mile 529.2)
Mile 529.2)FLOW DISCHARGE STREAM LOW 7010 1 1010 1 3002 (MGO) SOURCE FLOW (CFS) 491 U 1 3190 1 8580 148.895 Supplemental Condenser Cooling Water (Noncontact)
FLOW                             DISCHARGE                               STREAM LOW                   7010     1   1010   1   3002 (MGO)                               SOURCE                               FLOW (CFS)                 491U    1     3190   1   8580 148.895     Supplemental Condenser Cooling Water (Noncontact)                   UMGO)                 3173.3   1   2061.7   1   5545.3 STREAM USE CLASSIFICATIONS (WATER QUALITY)
UMGO) 3173.3 1 2061.7 1 5545.3 STREAM USE CLASSIFICATIONS (WATER QUALITY)S1H RMMEATM " RGATION LW&W 00METs'C X X X X X INS.TRIAL NAViGATIM 148.895 TOTAL DISCHARGE X X Treatment.
S1H       RMMEATM "       RGATION         LW&W       00METs'C X               X             X             X           X INS.TRIAL     NAViGATIM 148.895                         TOTAL DISCHARGE                           X               X Treatment. Thermal Miuang
Thermal Miuang  


==Reference:==
==Reference:==
Flow Du ration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.
Weaver. Water Resources Investigations Report95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environment and Conservation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.


Flow Du ration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.Weaver. Water Resources Investigations Report95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environment and Conservation and the Tennessee Valley Authority.
Nashville, Tennessee, 1996, p.57.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-34 of R-57 I FACILITY DISCHARGES AND RECEIVING WATERS I OUTFSLL OS1 114 _LONGITUDE LATITUDE-83.21667 135.62W83 FLOW DISCHARGE (MGD) SOURCE 0.01 9 Supplemental Condenser Cooling Water (SCCW) -(Intake screen backwash)0.019 TOTAL DISCHARGE RECEIVING STREAM DISCHARGE ROUTE Discharge  
NPDES Permit TN0020168 Page R-34 of R-57 I     FACILITY DISCHARGES AND RECEIVING WATERS                       I OUTFSLL   OS1 114         _                                      RECEIVING STREAM LONGITUDE            LATITUDE                                         DISCHARGE ROUTE
&#xfd;ia Tennessee Riwer@ mile 529.8 STREAM LOW 7010 1Q10 1 3002 FLOW (CFS) I 4910 I 3190 I 8580 (MGD 3173 2062 5545 STREAM USE CLASSIFICATIONS (WATER 0UALIT'Y FISH RBWFATION lFrATON LW&W DOESTIC X X X x x NDLS&#xfd;th[AL x x Treatment:
                      -83.21667       135.62W83                     Discharge &#xfd;ia Tennessee Riwer@ mile 529.8 FLOW                            DISCHARGE                              STREAM LOW               7010       1Q10 1 3002 (MGD)                            SOURCE                                FLOW (CFS)         I   4910     I 3190 I 8580 0.01 9    Supplemental Condenser Cooling Water (SCCW) - (Intake          (MGD                 3173       2062     5545 screen backwash)
Screens  
STREAM USE CLASSIFICATIONS (WATER 0UALIT'Y FISH     RBWFATION lFrATON         LW&W   DOESTIC X           X           X           x       x NDLS&#xfd;th[AL NAVE-ATMI*
0.019                        TOTAL DISCHARGE                          x           x Treatment: Screens


==Reference:==
==Reference:==
Flow Duration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.
Weaver. Water Resources Investigations Report 95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environmentand Conservation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-35 of R-57 APPENDIX 2 - APPLICABLE EFFLUENT LIMITATIONS GUIDELINES SIC GROUP 4911,40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES LOW VOLUME WA~T~              ~fliiRC~
                                          -  ..,-PT            -        T..=
                                                                            -*i,      BAT aWQNTHLY",        SI z-DAILY ff        MO1WNTHLY          DiL
                                                                                          ,DAILY
          &#xfd;411FFLUENT~ftkff Total Suspended Solids Oil and Grease pH 4  V &#xb6;C 30 15 C      MA, 6.0-9.0 100 20 AVG.CONC.
                                                                        -C.
                                                                                  ...
                                                                                  ....
                                                                                  ...
1 1
MAX CONG.
Polychlorinated Biphenyl                No Discharge Allowed                  No Discharge Allowed Compounds                                                        ....
METAL CLEANING WASTES N4SUBP T            2".2  ~~SB                    43 "M0!THLY:          'DAILY,,      'MONTHLY            JDAILY:
VG.C~~Ci'    'COA            AVG. CONG.        MAX CONC.
iON1ARACO~          Tilt j  ti            ~L                                        (mJ2LL.
Total Suspended Solids                    30                100                  ....
Oil and Grease                            15                20                    ....
pH                                              6.0-9.0                        --            --
Copper, Total                            1.0                1.0                  1.0          1.0 Iron, Total                              1.0                                                  1.0 Polychlorinated Blphenyl                No Discharge Allowed                  No Discharge Allowed Compounds                                                                                            -III


Flow Duration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.Weaver. Water Resources Investigations Report 95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environmentand Conservation and the Tennessee Valley Authority.
Nashville, Tennessee, 1996, p.57.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-35 of R-57 APPENDIX 2 -APPLICABLE EFFLUENT LIMITATIONS GUIDELINES SIC GROUP 4911,40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES LOW VOLUME WA~T~ ~fliiRC~-..,-PT BAT-T..=aWQNTHLY", SI z-DAILY ff MO1WNTHLY DiL ,DAILY&#xfd;411FFLUENT~ftkff 4 V &#xb6;C C MA, -C. AVG.CONC.
NPDES Permit TN0020168 Page R-36 of R-57 SIC GROUP 4911, 40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES tlffl   IKI^- 'rfVUCn       01 ^1A1rf%   KI BPT,                                     "IBAT SUBPART 423.12                               SUBPART423.13 fMI -                                     lLY       "L PUALY I
MAX CONG.Total Suspended Solids 30 100 ...1 Oil and Grease 15 20 ....pH 6.0-9.0 ...1 Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds
VUNIfILTY       I   IAILY               MV.NI rlLY k: EFFLUE4T.       .         ,.CONNC.C iMAXCONO.                       :*AVG.CONC.        MAX CONC.
.. ..METAL CLEANING WASTES N4SUBP T 2".2 ~~SB 43"M0!THLY:
CHARACTERISTIC           2!   ' (mg/L)                 m)         j;'       (iWQL)         (mg/L)
'DAILY,, 'MONTHLY JDAILY: VG.C~~Ci'
Chlorine, Free Available*                 0.2                   0.5                     0.2             0.5 pH                                               6.0-9.0                               ....
'COA AVG. CONG. MAX CONC.iON1ARACO~
Chromium, Total                           ....                                         0.2             0.2 Zinc, Total                               --                   --                     1.0             1.0 Priority Pollutants (126) contained in chemicals added for cooling tower                                                               No Detectable Amount maintenance, except Chromium and Zinc Polychlorinated Biphenyl                 No Discharge Allowed                         No Discharge Allowed Compounds                                                                   I ONCE THROUGH COOLING WATER "BPT           ':-       '               BAT SUBPART 423.12 , ,                           SUBPART423.13
Tilt j ti ~L (mJ2LL.Total Suspended Solids 30 100 ....Oil and Grease 15 20 ....pH 6.0-9.0 -- --Copper, Total 1.0 1.0 1.0 1.0 Iron, Total 1.0 1.0 Polychlorinated Blphenyl No Discharge Allowed No Discharge Allowed Compounds -III TVA-Watts Bar Nuclear Plant (Rationale)
__ MONTHLY
NPDES Permit TN0020168 Page R-36 of R-57 SIC GROUP 4911, 40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES tlffl IKI^- 'rfVUCn 01 ^1A1rf% KI BPT, "IBAT SUBPART 423.12 SUBPART423.13 fMI -lLY " L I VUNIfILTY I IAILY MV.NI rlLY PUALY k: EFFLUE4T.  
__                   DAILY               MONTHLY           DAILY EFFLUENT'               AVG. CONC:             MAX CONCG'           AVG.GONC.         MAX CONC.
.,.CONNC.C iMAXCONO.
Chlorine, Free Available                 0.2                   0.5                     ....
MAX CONC.CHARACTERISTIC 2! ' (mg/L) m) j;' (iWQL) (mg/L)Chlorine, Free Available*
Chlorine, Total Residual*                 - .....                                                     0.2 pH                                                 6.0-9.0                               ....
0.2 0.5 0.2 0.5 pH 6.0-9.0 ....Chromium, Total .... 0.2 0.2 Zinc, Total -- -- 1.0 1.0 Priority Pollutants (126)contained in chemicals added for cooling tower No Detectable Amount maintenance, except Chromium and Zinc Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds I ONCE THROUGH COOLING WATER" BPT ':- ' BAT SUBPART 423.12 , , SUBPART423.13
Chromium, Total                                                                         0.2             0.2 Zinc, Total                                                                             1.0             1.0 Polychlorinated Biphenyl                 No Discharge Allowed                         No Discharge Allowed Compounds
__ __ MONTHLY DAILY MONTHLY DAILY EFFLUENT' AVG. CONC: MAX CONCG' AVG.GONC.
. Limitation applies to once through cooling water from plants with a total rated electric generating capacity of 25 or more megawatts.
MAX CONC.Chlorine, Free Available 0.2 0.5 ....Chlorine, Total Residual*  
 
-..... 0.2 pH 6.0-9.0 ....Chromium, Total 0.2 0.2 Zinc, Total 1.0 1.0 Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds.Limitation applies to once through cooling water from plants with a total rated electric generating capacity of 25 or more megawatts.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-37 of R-57 APPENDIX 3 -PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS I ~PERMIT' LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Watr, StonmWaterand Process Wastewater EFFLUENT LILITAT~NS MONITORING EFFLUENT LIMITATIONS MONIO~RI~NG MONTHLY DAILY EFFLUENT AVC. CONC. AVC AMrM MAX.CONC.
NPDES Permit TN0020168 Page R-37 of R-57 APPENDIX 3 - PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS I         ~PERMIT' LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Watr, StonmWaterand Process Wastewater LILITAT~NS                               MONITORING EFFLUENT LIMITATIONS EFFLUENT MONIO~RI~NG MONTHLY                             DAILY EFFLUENT                           AVC. CONC.         AVC AMrM         MAX.CONC.       MAX AMNO.     MrM.               s,,,SAMPu CHARACTERISTIC                               (Mal)           (ltday)             (MI)         (Ibky)       FRQNCY.               rPE 1
MAX AMNO. MrM. s,,,SAMPu CHARACTERISTIC (Mal) (ltday) (MI ) (Ibky) FRQNCY. rPE FLOW Report (MGD) 1 Report (MGD) 1 Continuous Recorder 1 Certtflcalon oflnstream Flowof Report as Yes/No 1/Month Operation 3,500 CfS when required Records PH 2 Range 6.0 -9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSS) 30.0 -- 100.0 -1/Month Grab OIL & GREASE 15.0 -- 20.0 -1/Month Grab CHROMIUM, TOTAL 0.2 0.2 WAIVED' Grab ZINCTOTAL 1.0 1.0 -2/Month Grab CHLORINE, TOTAL RESIDUAL (0RC) 2.. 0.10 -- 0.10 -5/Week Grab 2's TEMPERATURE, Effluent -- 35 C -Continuous Recorder IC25 5 25% Ihibition Concentration shall be >3.3% effluent 2/year Composite There shall be no discharge ot PCBs.l Row shall be reported in Million Gallons per Day (MGD). In the ewnt that the continuous flow monitor is out of senice, low monitoring shall be estimated by intake pump logs.2 pH and ntOC analyses shall be performed within fifteen (15) minutes of sample collection.
FLOW                                   Report (MGD) 1                       Report (MGD) 1       Continuous       Recorder Certtflcalon oflnstream Flowof                                                             Report as Yes/No         1/Month         Operation 3,500 CfS when required                                                                                                           Records PH 2                                                   Range 6.0 - 9.0                           2/Month             Grab TOTAL SUSPENDED SOUDS (TSS)                             30.0               --             100.0           -         1/Month             Grab OIL & GREASE                               15.0               --               20.0           -         1/Month             Grab CHROMIUM, TOTAL                                 0.2                                 0.2                     WAIVED'             Grab ZINCTOTAL                                 1.0                                 1.0           -         2/Month             Grab CHLORINE, TOTAL RESIDUAL                                                                                                                     2 (0RC) 2..                             0.10               --               0.10           -         5/Week           Grab 's 4
3 "he acceptable methods for analysis of TRC are any methods specified In 40CFR Part 136.4 When the temperature monitoring equipment fails, monitoring will be done once per day. Reasonable and timely effort will be made to restore the temperature recorder to operation as soon as possible, See Part III for further temperature requirement See Part Ill for methodology.
TEMPERATURE, Effluent                                                 --             35 C             -       Continuous         Recorder IC25 5                           25% Ihibition Concentration shall be >3.3% effluent               2/year       Composite There shall be no discharge ot PCBs.
l shall be reported in Million Gallons per Day (MGD). Inthe ewnt that the continuous flow monitor is out ofsenice, low monitoring shall be Row estimated by intake pump logs.
2   pH and ntOC   analyses shall be performed within fifteen (15) minutes of sample collection.
3 "he acceptable methods for analysis of TRC are any methods specified In40CFR Part 136.
4 When the temperature monitoring equipment fails, monitoring willbe done once per day. Reasonable and timely effort willbe made to restore the temperature recorder to operation as soon as possible, See Part IIIfor further temperature requirement See Part Illfor methodology.
Monitoring for chromium is waived per 40 CFR 122.44 (aX2XI). See Rationale for more comments.
Monitoring for chromium is waived per 40 CFR 122.44 (aX2XI). See Rationale for more comments.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-38 of R-57 I PERMIT LMRTS TVA-Watts Bar Nuclear OUTFALL 102 COoling water, Srriywater runoff and Process Wastewater IMEE~lI I"EIVI 1 1 -II &#xfd;fA I LC IW MONITORING lll Wv u' i tAll W EFFLUENT -AVG.CONC.
NPDES Permit TN0020168 Page R-38 of R-57 I                 PERMIT LMRTS TVA-Watts Bar Nuclear OUTFALL 102 COoling water, Srriywater runoff and Process Wastewater IMEE~lI I"EIVI 1 II 1   -     I  &#xfd;fA LC IW                         MONITORING lll Wv u' i                             tAll W EFFLUENT                     -AVG.CONC.         AVG.,AIMN.       MAXCONC.         MAX AMN,     MWRS4*,.          SAMPLE CHARACTERISTIC                         (1.11)           (Ibd~y)           (.0       1   (,Itdy)   PRONCY.             TY*E 1
AVG.,AIMN.
FLOW                             Report (MGD)                       Report (MGD)             1/Day       hstantaneous Certtflcalon oflnst'uiam Flowof                                                       Report as Yes/No       1/Month'         Operation 3,500 c1S whten required                                               I                                                   Records pH 2                                               Range 6.0 - 9.0                         2/Month             Grab TOTAL SUSPENDED SOLIDS (TSS)                     30.0                 -             100.0               -     1/Month             Grab 6
MAXCONC. MAX AMN, SAMPLE CHARACTERISTIC (1.11) (Ibd~y) (.0 1 (,Itdy) PRONCY. FLOW Report (MGD) Report (MGD) 1/Day hstantaneous Certtflcalon oflnst'uiam Flowof Report as Yes/No 1/Month' Operation 3,500 c1S whten required I Records pH 2 Range 6.0 -9.0 2/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 -100.0 -1/Month Grab OIL & GREASE 15.0 20.0 -- l/Month Grab CHROMiUMTOTAL 2.0 2.0 Waived' Grab ZINC, TOTAL 1.0 -- 1.0 -2/Month Grab CHLORINE, TOTAL RESIDUAL (TRC) 2, 3 0.10 -- 0.10 -5/Week Grab 2 3 TEMPERATURE, Effluent -- 350 C -1/Day Grab IC25 " 25% Ihibition Concentration shall be >3.3% effluent 2/year 4 Composite 4 There shall be no discharge of PCBs.1 Flow shall be reported in Million Gallons per Day (MGD).2 pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
OIL & GREASE                         15.0                               20.0               --     l/Month             Grab CHROMiUMTOTAL                             2.0                                 2.0                     Waived'             Grab ZINC, TOTAL                           1.0               --             1.0               -     2/Month             Grab CHLORINE, TOTAL RESIDUAL                                                                                                               2 3 (TRC) 2, 3
3 The acceptable methods for analysis of TRC are any methods specified In 40 OFR Part 136.4 Sampling and analysis required only If discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testng requirements have not already been completed for Outfall 101. See Pa 5 Certification shall be made during any month that a discharge occurs from this outfall.6 If there Is discharge during I or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during S or more consecutive days from this outfall then one sample Is required from that "batch' discharge In order to report the monthly avergage limit.SMornitoring for chromium Is waived per 40 CFR 122.44 (a)(2XI).
0.10                 --             0.10               -       5/Week           Grab TEMPERATURE, Effluent                                           --           350 C               -         1/Day             Grab 4
See Rationale for more comments.
IC25 "                       25% Ihibition Concentration shall be >3.3% effluent             2/year       Composite 4 There shall be no discharge of PCBs.
1   Flow shall be reported in Million Gallons per Day (MGD).
2   pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
3 The acceptable methods for analysis of TRC are any methods specified In 40 OFR Part 136.
4   Sampling and analysis required only If discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testng requirements have not already been completed for Outfall 101. See Pa 5   Certification shall be made during any month that a discharge occurs from this outfall.
6   If there Is discharge during I or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during S or more consecutive days from this outfall then one sample Is required from that "batch' discharge In order to report the monthly avergage limit.
SMornitoring for chromium Is waived per 40 CFR 122.44 (a)(2XI).See Rationale for more comments.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-39 of R-57 TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REOUIREMENTS EFFLUENT AVA. CONC. AVG. Awa MAX. COF4C. NIA ASIN,. MSHW-. SMPL CHARACTERISTIC  
NPDES Permit TN0020168 Page R-39 of R-57 TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water EFFLUENT LIMITATIONS                                       MONITORING MONTHLY                             DAILY                     REOUIREMENTS EFFLUENT                         AVA. CONC.         AVG. Awa         MAX.COF4C.       NIA   ASIN,. MSHW-.       SMPL CHARACTERISTIC                               =.SAtl         (tt.yl             (e;S)         (I~d.M)           Q.qNCY.     IYPE 1
=.SAtl (tt.yl (e;S) (I~d.M) Q.qNCY. IYPE FLOW Report (MGD)Report (MGD)' Continuous Recorder Certlcfadon oflnstream Flow of .. Report as Yes/No 1/Month Operation 3,500 CfS Waeln req uIred Records 2 Range 6.0 -9.0 I/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 -100.0 -- 1/Month Grab CHLORINE.
FLOW                                   Report (MGD)                       Report (MGD)'         Continuous     Recorder Certlcfadon oflnstream Flow of                                 ..                       Report as Yes/No           1/Month     Operation 3,500 CfS Waeln req uIred                                                                                                     Records 2                                                   Range 6.0 - 9.0                           I/Month       Grab TOTAL SUSPENDED SOLIDS (TSS)                           30.0               -             100.0             --         1/Month       Grab CHLORINE. TOTAL RESIDUAL 2 3 6                                                                                        l/Month 6      Grab (TRC) ' ,                           0.092               --             0.158             --
TOTAL RESIDUAL (TRC) 2 3'6 , 0.092 -- 0.158 -- l/Month 6 Grab DISSOLVED OXYGEN (D.O.) -- .Report Min. -- l/Month Grab TEMPERATURE, Effluent Report Effluent Temperature 4 Hourly Recorder'TEMPERATURE, Edge ofEMPEAUE Eone -30.5 'C -Hourly Recorder 7 of Mixing Zone TEMPERATURE, Rie- -3 C -Hourly Calculated' Upstream to Downstream TEMPERATURE, Rate of Change, 2C/Hour Hourl Calculated OC per hour TEMPERATURE, Receiving  
DISSOLVED OXYGEN (D.O.)                             .
-33.5&deg;C -Hourly Recorded Stream Bottom IC25' 25% Inhibition Concentration shall be >-8% effluent Semi-annual Composite 3 I Row shall be reported in Million GallOn. per Day (MGD).2 pH and "1RC analyses shall be performed within fifteen (15) minutes of sample collection.
                                                          --                           Report Min.           --         l/Month       Grab TEMPERATURE, Effluent                                       Report Effluent Temperature 4                           Hourly     Recorder' TEMPERATURE, Edge ofEMPEAUE Eone                             -                             30.5 'C               -           Hourly     Recorder 7 of Mixing Zone TEMPERATURE, Rie-                                                 -               3 C               -           Hourly   Calculated' Upstream to Downstream TEMPERATURE, Rate of Change,                                                           2C/Hour                           Hourl     Calculated OC per hour TEMPERATURE, Receiving                                               -           33.5&deg;C               -           Hourly     Recorded Stream Bottom 3
STh acceptable metrods for analysis of "Rc are any methods specified In 40 CFR Part 136.See text below table for r"uSrarments.
IC25'                             25% Inhibition Concentration shall be         >-8%effluent     Semi-annual   Composite I     Row shall be reported in Million GallOn. per Day (MGD).
see Part Ill for methodology Sampling for TRC shall be 5/Week during periods when the Supplemental Corndenser Cooling Water (SCCW) system is in operation.
2   pH and "1RC analyses shall be performed within fifteen (15) minutes of sample collection.
STh acceptable metrods for analysis of "Rc are any methods specified In 40 CFR Part 136.
See text below table for r"uSrarments.
see Part Illfor methodology Sampling for TRC shall be 5/Week during periods when the Supplemental Corndenser Cooling Water (SCCW) system is in operation.
'See additional (bulieted) comments in permit. Begins on page 8 of 27.
'See additional (bulieted) comments in permit. Begins on page 8 of 27.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-40 of R-57 I PERMITLIIS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monhitring Poinrt Metal C leaning Was tewater EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT AVC.3CONc.
NPDES Permit TN0020168 Page R-40 of R-57 I                     PERMITLIIS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monhitring Poinrt Metal C leaning Was tewater EFFLUENT LIMITATIONS                                       MONITORING MONTHLY                             DAILY                       REQUIREMENTS EFFLUENT                           AVC.3CONc.     AVC.AMNT.       FAX Co E.           -_ Ahi.           ?MRI.             SAMPLE CHARACTERISTIC                               (0)       1         y)               I)         Iby               FRQNC).             WE FLOW                                 Report (MGD)                       Report (MGD)                 1/Batch         Calculated pH 2                                     Report                             Report                 I/Batch 2           Grab TOTAL SUSPENDED SOLIDS (TSS)                           30.0               --               30.0               -           1/Batch             Grab OIL&GREASE                               15.0             --               15.0               -             1/Batch             Grab COPPER, TOTAL RECOVERABLE                               1.0             -                 1.0               -           1/Batch             Grab IRONJTOTAL RECOVERABLE                               1.0             --               1.0               -           1/Batch             Grab PHOSPHORUS, TOTAL 3                             1.0             --               1.0               -             I/Batch             Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge. If a batch discharge extends for more than a 24-hour period, aow 2   pH analyses shall be performed within fifteen (15) minutes ofsample collection.
AVC.AMNT.
3   Sampling for phosphorus Is required only when metal cleaning chemicals containing phosphorus are being used.
FAX Co E. -_ Ahi. ?MRI. SAMPLE CHARACTERISTIC (0) 1 y) I) Iby FRQNC). WE FLOW Report (MGD) Report (MGD) 1/Batch Calculated pH 2 Report Report I/Batch 2 Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 -- 30.0 -1/Batch Grab OIL&GREASE 15.0 -- 15.0 -1/Batch Grab COPPER, TOTAL RECOVERABLE 1.0 -1.0 -1/Batch Grab IRONJ TOTAL RECOVERABLE 1.0 -- 1.0 -1/Batch Grab PHOSPHORUS, TOTAL 3 1.0 -- 1.0 -I/Batch Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge.
PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplenll           Condenser Cooling Water Infake Screen Backwash vilr 1.) No numerical monitoring limitations are applied to this outfall.
If a batch discharge extends for more than a 24-hour period, aow 2 pH analyses shall be performed within fifteen (15) minutes of sample collection.
 
3 Sampling for phosphorus Is required only when metal cleaning chemicals containing phosphorus are being used.PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplenll Condenser Cooling Water Infake Screen Backwash vilr 1.) No numerical monitoring limitations are applied to this outfall.
f       DiOcharge     Flow       TotalSuspended            O&G       Zinc, total (as Zn) Whole Effluent Toxidly TotalResidual Chlor*neTemperature,         p evem                           Solids         -WET)                                       Testing     Toa l RsdlCoi           Effluent           p r  obation mT-         Effluent   MAve DM             MAve 0 Max       M Ave 0 Max                                                                     oDtay Daily Monthly Oiay Effluent Effluent Efufeet Efluant       Effluent Effluent Cerilodhrdu *Pnephute. DeilMoo.           Mu,                 Miny Ma..
f DiOcharge Flow Total Suspended O&G Zinc, total (as Zn) Whole Effluent Toxidly Total Residual Temperature, p evem Solids -WET) Testing Toa l RsdlCoi Effluent p mT- r obation Effluent M Ave DM M Ave 0 Max M Ave 0 Max oDtay Daily Monthly Oiay Effluent Effluent Efufeet Efluant Effluent Effluent Cerilodhrdu Deil Moo. Miny Mu, Min. Ma..Date E Ceft Aveoug. Mu.. Con&#xa2;. Corn. Cone. Cor. Con .C.o" n 00. C Dal. Oal m Ma. Cor-. Cone.MGD MGO mg/ m mg/L mgVI {n_ _ mg.L migL C 02120"2006 I 43.1 o :097 4.0 4 0 50 6.0 0.02 003 005 016 10 79 8 03131/2006 1 4132 66.46 8.0 5.0 5.0 001 0.01 04U302006 11 1 37 2a 8296 1 00 80 50 5 0 0.01 0.01 05/3172006 1 1 1 31,37 52,72 6120 70.65 42 fil 19 18 17 9605 0.00 01 i 80 0713110 Ii 003 006 ___013 01 ____0.02 1003 1 =0 05 005 0.05 o05 0 05 9005 005 0 05 a 09 0.09 0 07 22 24 20-28..4 8 4 69 a5 83 1 a4 76 82 9 08/112006 100 130 50 87 09(3012006 1 37.21 O.osi 30 [79 84 11113112001 71.95 0.0 1 0 5.0 5.0 0 10 0.19 60.69 4.0 54.. 0 005 0.05 0 05 0 08 24 74 7.4 0 06 7,0 78 1 132.s 50 74 5.0 50 9.0 5.0 0 05 76 1 78 028/2007 013121007 04130(2007 0513112007 1 1-1 4854 7924 80 8 0 50 44 74 7 50 002 50 0 65!0 0 01 N. 0.02 0.02 0 05 23 70 77 25.56 1 003 1 1 005 0.05 0.05 0 05 0 05 006 0.05 006 19 77 78 2924 56.03 6 0 0.0 1 35 33j 57.64 1 3.0 3.0 5.0 5 0 0 03 0.03 27 061301200 1 34 13 56.49 50 5.0 5.3 5.3 0.09 014 07131/2007 1 2713 5101 60 60 5 5 5.61 003 004 7.7 [70 7.7 I70 0.05 006 0.0T 0B031207 0913013007 1013112007 11,3012007 1253112007 01131/200S 02129I2008 031311,200 04r30m28 05131/2008 0613012008 0713112008 0383132008 09130/2008 1013112008 11,30/2000 121311200M 0113112009 02/2812009 0313112809 0,13013009 05131/2009 0813032009 1 2920 9329 1 60 60 54 1 94 1 007 1 009 26.26 61.97 1 6.0 6.0 56 265 1 53.57 1 8.0 8.0 0.05 7.8 1 27.72 55.74 8,0 1 30.11 1 20 57 1 4307 1 4363 68.59 150 6891 30 71-09 9.0 83.77 7 1 00 5,6 5.6 0.04 004 150 583 5.3 -3.0 50 s0 0.01 001 90 1.9 1.9 002 002 243 7&#xfd; 1 70 78 79 76 0 05 7.1 9.1 1 37.11 B4.78 9.1 50 5.0 0.01 001 5.0 s0 0.03 003 55 5.5 011 0.10 5.3 5.3 006 0.07 50 56 006 010 005 0.05 26 77 01 005 005 007 28 0 7.6 7 0.01 R 0 32 8 8 1 6057 8248 99 9.6 0561 10294 7.3 7.3 0304 10811 110 110 48.74 92.13 4.4 44 3665 0377 8.1 8.1 30 00 73.52 4.0 4.0 2369 65 15 74 74 1911 36.31 8.2 02 2099 40.50 7 3 7.3 24 33 5045 8 1 8 1 14 79 6050 8.4 84 0 06 6655 007 0 07-35 79 1 005 ] 0.07 ] 31 1 1 1 1 1 1 53 50 0.14 50 004 T5. 6.54 513 0 01 5.3 0 09 53 a 10 5.6 0 13 5.3 1 0.08 020 0.05 0 13 0.10 02T 0.10 005 005 23 8 3 0.05 005 23ffl 4 000 005 20 19.2 192 005 0.05 0 05 0 05 005 20 21 23 T33 32 29 0 0 79 01 81 04 0.8 87 5.3 07I31/2009 1 123101 55.97 10 7 10.7 55 56 0 020 19.2 0013112009 1 2915 5434 6.4 04 5.6 5.6 1 4 0 P4 09/3012009 101312009 l 32.02 6741 11.0 11.0 5.5 55 010'q3 T070 11 0 11 0a 5 5 5 5_ 0 0 ,;330 8.9 89 52 52 009 2982 .542 92 92 53 53 005 017 005 005 0.05 005 22 74 81 18 76 84 26 j 7 82 S1 3N.8 67.3S 7.6 1 35.16 62.21 6.6 TVA-Watts Bar Nuclear Plant (Rationale)
Min.
NPDES Permit TN0020168 Page R-42 of R-57 OUTFALL 103 Flow Total Suspended O&G PH Solids Effluent M Ave D Max M Ave D Max Dally Dally Monthly IE1fluent Effluent IEfluent Effluent Max. MIn.Date Average Dally Max. Conc. Conc. Conc. Conc. Conc. Conc.MGD MGD mg/L mg/L mg/L mg/L 02/28/2006 0.17 0.64 12 19 5 5 7.3 8.8 03/31/2006 0.02 0.02 18 65 5 5 7.5 8.9 04/30/2006 0.02 0.02 9 12 5 5 7.7 8.4 0o/31/2006 0.02 0.02 8 11 5 5 7.1 8 06/30/2006 0.02 0.02 7 9 5 5 7.2 8.8 07/31/2006 0.02 0.02 4 5 5 5 7 8.1 08/31/2006 0.02 0.02 8 10 5 5 8.2 8.6 09/30/2006 0.02 0.02 11 14 5 5 7 8.7 10/31/2006 0.01 0.01 7 8 5 5 7.4 8.6 11/30/2006 0.01 0.01 4 6 5 5 7.9 8.5 12/31/2006 0.01 0.01 3 4 5 5 7.7 8.3 01/31/2007 0.12 0.36 2 3 6 6 7.6 8.3 02/28/2007 0.02 0.02 6 10 5 5 7 8.2 03/31/2007 0.1 0.71 4 4 6 6 8.3 8.4 04/30/2007 0.02 0.02 6 7 5 6 8.2 8.5 05/31/2007 0.02 0.02 14 18 5 6 8.7 8.7 06/30/2007 0.02 0.02 7 8 5.4 5.6 7.9 8.5 07/31/2007 0.02 0.02 6 6 6.5 7.4 7.3 8.7 08/31/2007 0.02 0.02 9 12 5.2 5.3 7 8.8 09/30/2007 0.02 0.02 5 5 5.6 5.6 7.7 8.6 10/31/2007 0.02 0.02 5 5 5.9 5.9 7.3 7.8 11/30/2007 0.02 0.02 4 4 5.6 5.6 8.6 8.6 12/31/2007 0.01 0.02 6 6 5.3 5.3 8.7 8.7 01/31/2008 0.02 0.02 4 4 5.3 5.6 8.2 8.9 02/29/2008 0.02 0.02 7 7 3.6 5 7.2 8.6 03/31/2008 0.52 1-04 5.9 6.2 5 5 8.6 8.9 04/30/2008 0.38 1.32 9.8 14 5 5 7.3 8.8 05/31/2008 0.3 0.36 5.6 7.2 5.3 5.6 7.1 8.6 06/30/2008 0.31 0.37 5.7 6.4 5.5 5.6 7.6 8.3 07/31/2008 0.19 1.25 6:5 3 5.5 5.6 7.4 8.8 03/31/2008 0.23 0.63 7.5 10 5.3 5.3 7.6 8.4 09/30/2008 0.3 0.62 7.2 8.1 5.3 5.3 7.5 8.7 10/31/2008 0.27 0347 6 6.2 5 5 8.3 8.8 11/30/2008 0.24 0.34 8 9.7 5.2 5.3 7.9 8.9 12/31/2008 0.24 0.4 7.2 9.2 5 5 8.2 8.9 01/31/2009 0.17 0.25 5.4 5.8 5 5 7.4 8.7 02/28/2009 0.24 0.287 8 8.2 5 5 8.6 8.7 03/31/2009 0.47 0.87 7.5 4.5 5.2 5.3 8.5 8.5 04/30/2009 0.32 0.71 10.3 11 5.2 5.3 8 8.7 01/31/2009 0.42 1.04 11.4 13 5.3 5.3 7.6 8.7 06/30/2009 0.35 0.5 6.3 6.4 5.5 5.6 7.3 8.5 07/31/2009 0.23 1.49 10.8 14 5.6 5.6 7.2 8.8 08/31/2009 0.8 0.39 5.7 6.8 5.3 5.3 7-2 8.7 09/30/2009 0.46 1 7.2 7.4 5.6 5.6 7.1 8.7 1 Q/31/2009 0.29 0.66 8 10 5.2 5.3 7.6 8.6 11130/2009 0.3 0.94 6.9 9.3 5.2 5.3 7.5 8 12/31/2009 0.39 0.98 5.9 6.4 5.3 5.3 8.1 8.8 01/31/2010 0.38 1.42 5.6 5.7 5.5 5.6 7.9 8.8 02/28(2010 0.36 1.24 3 3 5.2 5.3 7.6 8.8 03e31/2010 0.27 0.35 4.3 4.5 5.2 203 7.5 8.5 04/3012010 0.21 0.37 3.9 5 5.6 5.9 7.5 8.9 05/31/2010 0.44 1.03 9.9 15 5.3 5.3 7.9 8.9 06/30/2010 0.31 0.84 6.9 7.5 5.3 5.6 8.3 18.8 07/31/2010 0.26 0.29 7.4 7.4 5.3 5.3 8.6 8.5 06/31/2010 0.24 0.29 5.7 5.7 15.6 5.6 8.3 8.3 09/30/2010 0.19 0.23 7.9 7.9 5.6 5.6 8.8 8.8'10/31/2010
Date 02120"2006 Ceft E
: 0. 19 0.22 4.8 4.8 5.6 5.6 8.5 8.5 11/3012010
I Aveoug. Mu..
: 0. 16 0.24 11 11 5.3 5.3 8.7 8.7 12/31/2010 0.46 1.44 6.8 6.8 5.3 5-3 8.9 8.9 01131/2011 02/28/2011 0-44 1.68 -3.B 3.8 5.6 5.6 8.7 8.7 M inim um 0.01 0.01 2.0 3.0 3.6 5.0 7.0 7.8E Maxim um 0.52 1.68 18.0 65-0 6.5 7.4 8.9 8.9 Average 0.19 0.44 7.0 9.0 5.3 5.4 7.6 8.6 Permit Limit -- -- 30 100 .15 20 6.0 9-0 lCount1 601 601 801 601 G 60 I 60 601 TVA-Watts Bar Nuclear Plant (Rationale)
MGD MGO mg/ m 43.1      o:097 Con&#xa2;. Corn.
NPDES Permit TN0020168 Page R-43 of R-57 OUTFALL 107'V 4 Flow Total Suspended Solids O&G Iron, total (as Fe)Phosphorus, total (as P)pH Effluent M Ave D Mae MAyO I OMax IMAVOIDMaAtI MAyo I OMax Etti tent Effluent Effluent Effluent Effluent Effluent Date Uonthly A-rg Daily M-s MGD MGD Coto mo]L Con'..mnt/L Elque"l mq/Conm.n  Cone.mal/L Cm s.rna/L Efflienm Con&#xa9;..mu/L Effluent Cone.monL Daily Mae.Cone.Daily MI.Cone.02128/2006 2-.36 2.36 4 03131f2006 1 1 1 1 04/30/2006 1 1 1 1 vzf~~) I 01 0513112006 0613012006 0713112006 08/3112006 10131f2006 11/30/2006 1213112006 01/31M2007 02/28F2007 0313112007 04130/2007 0513112007 06130t2007 0713112007 08/31/2007 09/30/2007 10/3112007 11130/2007 1213112007 01131/2008 02F2912008 0313112008 04/30f2008 05/3112008 0613012008 07/31 2008 08/3112008 09/30/2008 1013112008 1113012008 1213112008 01131/2009 0212812009 0313112009 04130/2009 05/3112009 0613012009 0713112009 08/3112009 0913012009 1013112009 11/30/2009 1213112009 01/31/2010 0212812010 03/3112010 04/30/2010 0513112010 06/30/2010 07/3112010 08131/2010 09130/2010 1013112010 11/30/2010 12131/2010 01/3112011 02128/2011 Mainimon.Averatos Permit Limit Count 81 01 a84 85 8.4 8.4 (I !I 8.1 8.1 1611 6.3 I 53 0_2&#xfd; 02 0 03 7,9_0.001 3.15 0.00 3.15 1.94 11 1.0i 7.21 30.0 41.15.0 7.2 30.4 4'5.0 5.3 15.3 5.0 5-9 5.3 15.0 U.0 0-3 0.2 t.u 0.3 0.2 1.8 0.1 5.5 0.7 1.0 0.1 5.5 0.7 1.0 8.61 8.21 4.1 7.2 8.1 8.2.14 1. 1 ____ ... ..I Outfall 107 discharges as a batch discharge.
4.0        40 Cone. Cor.
All data presented as historical data. Additional intermittent discharge from condenser tube cleaning wastewater.
                                                        ]L* mg/L 50 mgVI 6.0
Filtered to 5 microns for asbestos.
{n_
Con.
0.02 C.o" n
003
_mg.L 00.
005 C
migL 016 Oal Ma.
Dal.
C 10 m     Cor-. Cone.
79        8 03131/2006      1      4132    66.46                8.0    5.0     5.0    001        0.01                            0 05        0 05        22          76        82 04U302006    11      1 37 2a    8296 1 00            80    50        50      0.01      0.01                            005         a 09        24            4.. 8 4 05/3172006      1       31,37 52,72                                          0.00       01 i                            0.05        0.09        20          83 1 a4 6120     70.65   80                                  003                                        o05        0 07      -28          69        a5 1                                                                        006 _______
0713110        1      42       fil 19             Ii                      013        01                              0 05                                          9 08/112006              18 17   9605   100        130    50              0.02 1003 1 =                              9005                                          87 09(3012006      1      37.21                                                                                            005         O.osi      30      [79          84 71.95    0.0 1        0    5.0      5.0    0 10      0.19                            005        0 08        24         74        7.4 60.69    4.0                54..
0                                                          0.05        006                    7,0      78 11113112001     1    132.s      50 74    5.0         50    9.0     5.0                                                 0 05        0 05                    76 1 78 1      4854    7924    80          80    50      50      002        0.02                                        0 05       23          70        77 028/2007        1      44 74   7                                   50          0                                                               19            77      78 005        0 05 013121007        -1     25.56    1                                    65!0    0 01                                        0.05       006 04130(2007             2924    56.03    60          0.0            N.      0.02      003 1             1             0.05        0.05 005 0513112007      1      35 33j  57.64 1 3.0         3.0   5.0     50      0 03      0.03                                        006        27          7.7 7.7 I70
[70 061301200        1      34 13    56.49    50          5.0   5.3     5.3    0.09      014                                          0.05 07131/2007       1     2713     5101     60         60     5       5.61 003           004                                         006 0B031207        1      2920    9329 1 60            60    54    1  94 1 007 1 009 0913013007              26.26    61.97 1 6.0         6.0    56                                                          0.05        0.0T                   7.8 1013112007             2651    53.57 1 8.0          8.0                                                                                                              70 78 11,3012007       1      27.72    55.74  8,0         00    5,6     5.6    0.04      004 1253112007      1     30.11    68.59  150        150    583      5.3      -
243        7&#xfd;1       79 01131/200S      1     20 57   6891     30         3.0   50      s0      0.01       001                                          0 05                              76 02129I2008      1      4307    71-09    9.0         90    1.9      1.9    002        002 1      4363    83.77    71          7.1    50      5.0     0.01       001 031311,200                                                                                                                005 04r30m28        1     37.11    B4.78    9.1        9.1   5.0       s0    0.03      003                              0.05        005        26          77        01 05131/2008                                                  55       5.5     011       0.10                             005        007          0 28          7.6      7 0613012008                                                  5.3     5.3     006       0.07                             0.01 R         0         32           8         8 0713112008      1     6057     8248     99         9.6   50      56      006        010                              0 06        007 0383132008              0561   10294   7.3         7.3                                                                 6655        0 07-      35                    79 09130/2008              0304    10811   110         110                                                               1 005    ]    0.07  ]    31 1013112008              48.74   92.13   4.4         44             50      0.14      020                              000        005        20 11,30/2000              3665     0377     8.1         8.1             50      004        0.05                            005        005        23          8          3 121311200M              3000    73.52   4.0         4.0           T5.      6.54                                        0.05        005        23ffl              4 0113112009      1      2369     65 15   74         74     53      513    0 01                19.2        192      005        0 05        20 02/2812009      1      1911    36.31   8.2         02             5.3    0 09      0 13                                                                  0        0 0.05        005        21 0313112809      1      2099     40.50   73          7.3             53      a 10      0.10                            0 05                    23          79        01 0,13013009      1      24 33   5045     81          81              5.6    0 13      02T 05131/2009      1 0813032009      1     1479    6050     8.4         84     5.3      5.3 1 0.08        0.10                                                    T33        81        04 07I31/2009      1    123101    55.97  10 7        10.7    55      56      0         020      19.2                                                      0.8      87 0013112009      1    2915      5434    6.4        04    5.6     5.6 1         4    0     P4                                                32 09/3012009      l      32.02    6741    11.0       11.0   5.5     55      010        017                              005        005         29 101312009                                110        11 0a  55      5 5_    00      ,
                                'q3 T070 33*    ;330    8.9        89    52      52      009                                        0.05       005         22          74        81 2982    .542    92          92    53      53      005                                                                 18          76        84 26      j 7            82 3N.8 S1    67.3S    7.6 1     35.16 62.21      6.6
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-44 of R-57 OUTFALL 113 1 lhuege Flow Total Suspended Disnole Ma ole Effluent Taxicity Tota Residual Chlorine Temperature, Temperature, Temperature, Temperature.
NPDES Permit TN0020168 Page R-42 of R-57 OUTFALL 103 Flow               Total     Suspended Solids                        O&G                      PH Effluent               M Ave           D Max           M Ave      D Max      Dally          Dally Monthly                      IE1fluent        Effluent        IEfluent    Effluent    Max.           MIn.
PH evem Solids O0ygtn (W0ET) Testing Effluent Effluent Effluent Effluent Oblnro.OOe Effluent M Ave 0 Max oe1l Daily M ar it y t/ aruen / I t O D lly M in. Cetiodaphnia pi mphale. D ei-lely .BO Y P lA X , M a .11 .Date Event A reJage Daily Mao. Conc. / Coar. Cenc- Con. C, o. Dily Ue". Dily M a_. Doily M.o. Dnly Plax. Co n. Com.MGD MGO mgIL mgfL. mg/L _ i mgIL mg/L C C C IC 02018r2006 1 96 95 133 75 6 6 03 0.05 005 107 98 1 2 a 0 0313112006 1 102 32 12803 5 6 9 0 06 0 06 132 13.1 1 1 82 8.2 0(3012006 1 11237 13766 4 A 76 1 08/ 005 199 19 2 1 73 73 D513112006 1 10040 148 74 3 3 7.9 214 21 1 1 1 7 8 7 8% W/3 /2006 1 rA 426 117.31 5 OR 7. 0 05 0 .1 26 7 26 3 1 1 8 4 8 4 0713112018 1 155 86 222 97 4 4 72 0 S6 28 1 1 1 8 3 83 041311M00 1 21929 21A5i7 3 3 65 905 1 0 06 252 28 7 1 0 8 4 84 0 / /0 1 98 1 6 233 68 3 3 6 0805 a C5 284 279 0 0 82 8 2 10/31/2006 1 71 16 2899 1 2 1 872 ... 0 05 229 228 0 0 76 7 01/3010 1 14651 12073 1 3 3 1 7 005 006 1739 17 1 0 761 76 120312I0M 1 15623 16940 4 4 9 005 1 07 n 1 126 2 1 76 7.5 01131N2010 1 13565 0 1920 4 2 10 3 005 005 121 113 1 1 74 74[NI 1 1 165 137 2 8.1 005 005 10 1 78 1 1 77 7 7 08(31)2010 1 1002 )535 313971 01(31/2007 1 165 19 128 17 4 43 77 0 05 007 144 138 2 1 75 7 7 04,13012007 1 129 95 189 71 5 5 9 2 0 05 0 06 16 7 16 1 1 74 7 4 0513112007 1 19693 20598 5 5 74 005 00a 21.9 219 1 1 77 78 11)30)28 1 21243 21374 4 4 60 4 005 0.0 264 263 1 1 78 98 0123112007 1 20696 22048 0 6 7 3 140 05 0 05 27 267 1 1 7 9 7 9 08/31)2007 1 2122 222 11 3 3 72 285 28 3 1 1 7 1 7 9 09/30/2007 1 203 57 216 97 2 02 7 7 0 as a 05 27 9 27 9 1 0 8 I 10`/3112007 1 19763 21144 1 .4 26 1 26 7 1 1 7 72 77 1 1 /3 0 /2 0 0 1 ,0 1 3 6 2 1 23 9 7 8 .6 0 0 5 0 .2 0 88 1 6 1 1 7 6 7 6 12`31007 1 .58 174 73 5 5 9 1 9. 7 14.1 1 1 a a Coun4t7.9 0 05 0 05 10 2 1 60 2 1 7 6 7 6 I N2/2 0 1 63 86 1756 51 4 8 ,4 0 05 0 05 8 4 f 10 6 7 1 6 7 6 0 3131 /'2008 1 29 65 1676 8 5 85 7.9 005 0 as 14 9 12 3 1 1 7 2 7 2 U430/2008 1 15801 1166.35 3G 3 6 7 8 10nn 0 05 1T.2 182 1 1 a 8 0513 1/20 0 176 9j 194 86 3 2 3 2 1 7T6 0.05 0,05 211I 20.9 1 1 a a S6'3012008 1 164 5; 1931H 2 9 29 7 6 0 05 0 05 26.3 263 1 2 179 7 ?9 0 7 13 1 / 2 0 0 1 1 8 1 6 3 1 9 0 0 1 2 5 2 5 8 00 0 5 2 7 "3 2 7 2 1 G ' a 1 6 1 0 81/311r 0 0 1 16 7 F , 18 5 68 N ; 217;40 06 0 0 28 2 2 8.3 1 0 7 9 7 .9 0 9 13 0 / '20 0 8 1 1 7 5 1a 1 8 7 ,0 3 5 4 5 5 a 0 .0 5 1 a 0 5 2 6 2 2 8 5 1 1 a a 1 0 I/3 1 '2 1 1 6 9 9 6 1 3 4 5 7 5 5 5 5 8 1 O 0 0 9 2 4 8 2 6 1 1 0 7 9 7 9 I1I/3 0,'r 0 I r 122 02 1 74 19 5 4 5 4 9 2 0 05 0 05 , is 3 26 1 0 8 4 8 4 12t3112008 1 151 09 162 1`+ 3 9 3 9 9 005 0 as- 11.6 26 1 1 84 84 0113112009 1 1 151 32 1171 2E 5 4 5 4 9 a 30 4 304 0 05 0 05 8.9 10 1 1 -0 a 6 02ra8/'209-1 135 72 174 54 6 6 66 10 005 0 05 5 a5 26 1 0 a 6 0313 1/200 1 140 4 1565 65 6 5 6 5 1 6.6 0 05 0 05 12.6 28 L1 0 6 1 a.1 04/0/'rm 1 161 15 1ES 56 4 9 4 9 81 005 0 05 16 29 1 1 8 2 8 2 W 531 /200 1 172 51 18445 7 7 8 8 214 90 1 1 84 8 4 06130712M9 1 179.39 166 8 4 4 76 26 9 26 4 2 1 8 2 8 2 07131 r2009 1 18292 191 N 59 a g 7 5 100 100 259 27 1 1 1 659 66 011131/009 1 177 1&#xfd; 16a 84 2 6 2 6 7 3 27'3 28 7 1 a 82 8 2 0913012009 1 126 06 1 07 5z 4 2 1 .2 5 4 0.05 0 05 2 5 1 26 7 1 0 8 6 10831f2009 1 5226 182 21 693 63 6 2 23 22 8 1 0 To 7 8 1113012009 1 38 83 18193 1 1 8 5 00 OE a05 160a 24 0 a 7 3 7 3 12031,r2009 1 9142 169 so 86 5 a5 1 8 7 131 24 0 1 0 76 7 6 015131/01
Average        Dally Max. Conc.           Conc.         Conc.       Conc.     Conc.       Conc.
! 13761 171 92 3 6 3 5 a 7 304 504 005 0 06 7 6 23 2 1 a 3 a 3 02/28r2010 1 138 84 166545 8 6 85 98 ... 2 23 3 8 0313 1/2010 1 127 33 143 6 ...4,2 .42 7 7 110 a 29 1 1 8 4 8 8 0 ,3012010 1 150 51 16a 15 2 1 2 1 a 15 7 15 9 1 1 5 1 a 1 M I/312010 1 160 14 19 0 15 6 2 62 7 3 222 31 2 1 78 7 58 06130/2010 1 1S4 78 119a OS5 4 1 4 1 7 6 2, 3 33 1 1 7 9 7 9 07,'3112010
Date MGD              MGD        mg/L              mg/L          mg/L       mg/L 02/28/2006    0.17            0.64            12            19              5          5       7.3          8.8 03/31/2006    0.02            0.02            18            65              5          5        7.5          8.9 04/30/2006     0.02            0.02              9            12              5          5       7.7          8.4 0o/31/2006    0.02            0.02              8            11              5          5        7.1             8 06/30/2006    0.02            0.02              7             9              5          5        7.2          8.8 07/31/2006     0.02            0.02              4              5              5          5          7          8.1 08/31/2006    0.02            0.02              8            10              5          5        8.2          8.6 09/30/2006    0.02            0.02            11            14              5          5          7           8.7 10/31/2006    0.01            0.01            7               8              5          5        7.4          8.6 11/30/2006    0.01             0.01            4              6              5           5       7.9           8.5 12/31/2006    0.01            0.01            3              4             5           5       7.7          8.3 01/31/2007    0.12            0.36            2              3              6          6       7.6          8.3 02/28/2007    0.02            0.02            6              10              5          5          7           8.2 03/31/2007       0.1           0.71            4              4              6          6        8.3           8.4 04/30/2007     0.02            0.02             6              7             5          6        8.2          8.5 05/31/2007    0.02            0.02            14            18              5          6        8.7           8.7 06/30/2007    0.02            0.02              7             8             5.4        5.6       7.9           8.5 07/31/2007    0.02            0.02              6              6            6.5        7.4       7.3          8.7 08/31/2007    0.02            0.02              9            12            5.2        5.3          7          8.8 09/30/2007      0.02            0.02              5              5            5.6        5.6       7.7           8.6 10/31/2007    0.02            0.02              5              5            5.9       5.9       7.3           7.8 11/30/2007    0.02            0.02              4              4            5.6        5.6       8.6          8.6 12/31/2007    0.01            0.02              6              6             5.3       5.3        8.7           8.7 01/31/2008      0.02            0.02              4              4            5.3        5.6        8.2           8.9 02/29/2008      0.02            0.02              7             7           3.6          5        7.2          8.6 03/31/2008      0.52            1-04          5.9            6.2              5           5       8.6           8.9 04/30/2008      0.38            1.32          9.8              14              5          5       7.3          8.8 05/31/2008        0.3            0.36          5.6            7.2             5.3        5.6       7.1           8.6 06/30/2008    0.31            0.37          5.7            6.4             5.5        5.6        7.6          8.3 07/31/2008      0.19              1.25          6:5              3            5.5       5.6        7.4           8.8 03/31/2008    0.23            0.63          7.5             10            5.3        5.3        7.6           8.4 09/30/2008        0.3            0.62          7.2            8.1             5.3        5.3        7.5          8.7 10/31/2008    0.27            0347              6            6.2             5          5        8.3          8.8 11/30/2008    0.24            0.34              8           9.7            5.2       5.3        7.9          8.9 12/31/2008    0.24              0.4          7.2             9.2             5          5       8.2          8.9 01/31/2009    0.17            0.25          5.4            5.8              5          5       7.4          8.7 02/28/2009    0.24            0.287            8           8.2              5          5        8.6           8.7 03/31/2009    0.47            0.87          7.5            4.5            5.2        5.3       8.5           8.5 04/30/2009    0.32            0.71          10.3             11            5.2       5.3         8          8.7 01/31/2009    0.42            1.04          11.4              13            5.3         5.3        7.6          8.7 06/30/2009    0.35              0.5          6.3            6.4             5.5        5.6        7.3          8.5 07/31/2009    0.23              1.49        10.8              14            5.6       5.6        7.2          8.8 08/31/2009    0.8              0.39          5.7             6.8            5.3        5.3        7-2           8.7 09/30/2009    0.46                1           7.2            7.4            5.6        5.6        7.1           8.7 1 Q/31/2009    0.29            0.66              8             10            5.2       5.3        7.6          8.6 11130/2009      0.3            0.94          6.9            9.3            5.2        5.3        7.5              8 12/31/2009    0.39            0.98          5.9             6.4            5.3        5.3        8.1          8.8 01/31/2010    0.38            1.42          5.6            5.7            5.5        5.6        7.9          8.8 02/28(2010    0.36              1.24            3              3            5.2       5.3        7.6          8.8 03e31/2010    0.27            0.35          4.3            4.5            5.2             203  7.5           8.5 04/3012010    0.21            0.37          3.9              5            5.6        5.9        7.5          8.9 05/31/2010    0.44              1.03          9.9              15            5.3        5.3        7.9          8.9 06/30/2010    0.31            0.84          6.9            7.5            5.3        5.6        8.3      18.8 07/31/2010    0.26            0.29          7.4            7.4            5.3        5.3       8.6           8.5 06/31/2010    0.24            0.29          5.7            5.7      15.6              5.6        8.3           8.3 09/30/2010    0.19            0.23          7.9            7.9            5.6        5.6        8.8          8.8
.. 1 1a2 75 192 84 1 2 6 2 6 72 0 05 0 05 28 8 27 7 1 0 79 7 9 0873112010 1 186 1 208 36 3 3 7 1 29 7 28 5 2 1 7 8 7 8 0913 0,J2010 I M6549 200 17 1 3 8 3 8 74 005 0 as 278 26.7 1 1 8 2 1 8 2 10131 .12010 1 151 16 193 39 56 5 5 a1 0 05 0 05 24 9 24 1 1 1 7 8 7 98 11130 /0110 1 15B897 192 08 6 1 651 91 20 1 10 7 9 0 79 7 9 17,'3112010 1 148 5 181 29 5 4 5 4 10 1 1J 2 13 2 1 0 a 01!3112011
'10/31/2010    0. 19            0.22          4.8            4.8            5.6        5.6        8.5          8.5 11/3012010    0. 16            0.24            11            11            5.3        5.3        8.7          8.7 12/31/2010    0.46              1.44          6.8            6.8            5.3        5-3        8.9          8.9 01131/2011 02/28/2011    0-44              1.68 -        3.B            3.8            5.6        5.6        8.7          8.7 M inim um          0.01            0.01            2.0            3.0            3.6        5.0        7.0            7.8E Maxim um            0.52            1.68          18.0          65-0            6.5        7.4        8.9            8.9 Average            0.19            0.44            7.0            9.0            5.3        5.4        7.6            8.6 Permit Limit            --            --            30            100            .15        20        6.0            9-0 lCount1                601            601            801            601          G    60    I          60              601
,.rm.., 0.0 7.18i 28.99 1.0; 1t.0 5.4 30.4. 30.4 0.05i o.o; .2 7.8!= 0.0:1 0.0 7.21 5.6 M a x n i m u m 1 ,0 2 1 9 .2 9 1 2 3 5 .7 7 U r5 8 .8 1 1 .9 110 0 .0 i 1 0 0.0 0 .0 5 i 0 .0 7 2 9 .7 j 3 3 .0 r, 2 .0 ,; 2 .0 ,6 8 .8 A,,,,,q, 1.0 145.75, 179.,1. 4.4! 1.1 53.61 533.6 0 i 1.71 22.2i 1.11i 1., 1.01 7.9 P +, ..-i L- 30 100 _mg .8.01 8. 0+ .158 33.5" l 30.,5'C 3, i 2o*C 6.oi 9.0 count 6 0 60 ... 3o1 3 + 42, 41 ++;+= .
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-45 of R-57 APPENDIX 5a -AMBIENT MONITORING DATA 7EINESSEE Z6 MiE1,3 1 NC PSIM70l8ID 1EllE295 pirallel Uts ______m Dite Avg.0 &d.~ WS T? 23 7.8 7.9 7,71 718 73 77 171 3 7 DO %1 B3 1H8 H."68 11.74 K6 129 84 642 712 853 ECcI C9.11 13 10 10 1Q 103I O 10 1 C3 10 1O 133I TAI aI0ess I 80 29 2 ',1 44 107 73 12 80 183 74 912 73 Awna5NmaeJ 1 0,03 0333 0.030U 6O 0 .30 0833 IO J 80 L' 830 MU 23 008N M3 U0 P03 W ;. ... I :00 -I. I1 .. 01 -- 0. 1 -.885! 4 7Mh1a N13 0.150 01 .115 U 1 052 01Q 8lU 153U 023 H1 012U 826 021 027 ow* ai , i Ii 10 10&#xfd; A. aL V I8 013 1 100 Cop4 10 U L 3 2 3 22 3 2 2 10 21 H t IOU 183 U 0IN IOU lOU 103 1H3 IOU 130 10U 183 10N 110 ,, &#xfd;F. If ~ .~ ~ ' ~-t 4 19 !.!-0 : RE-4 d dq me U : Aa71e r~IesgWrd ddai~edge J :EsfvA4m aIii les 32 s~1* 9 p~teiion IinW bi 0Uatan1 Zet TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-43 of R-57 OUTFALL 107 Total Suspended                                        Iron, total            Phosphorus, Flow                    Solids O&G                                                                        pH (as  Fe)            total    (as  P)
NPDES Permit TNO020168 Page R-46 of R-57 APPENDIX 5b -WATER QUALITY BASED EFFLUENT CALCULATIONS WATER QUALITY BASED CALCULATIONS FOR METALS AND OTHER TOXIC SUBSTANCES OUTFALL, 101 and 113 Combined FACILIIY:
            'V 4          Effluent              M Ave      D Mae        MAyO Etti  tent  I OMax IMAVOIDMaAtI Effluent  Effluent Effluent        MAyo I Effluent Effluent        OMax      Daily        Daily Uonthly                                              Elque"l                              Effluel*nt  Efflienm Effluent          Mae.         MI.
Wags Bar Nuclear Plant PERMIT#: TN0020168 Stream Stream Waste Tel u 1 Hardness 1 Stream 17010) I30Q61 Flow Solid, , s CaC03I Allocation I MG0] I rG1O] fMGD! Imm t I I m [m ] I%!1 2062 00 5545 001 206.6 8.4 1806 1 90 1 2 1 3 4 1 I 1 7 9 [ o0 1 11 12 1 13 14 Stream FisahAqua Life Effluent Fish &Aquatic L e'ate" Quality CnreiT0aQt Human Health Water Qualtry Cnteria 00061 Bckgmd Water Criteia Ffaction In-Stream Allowable Calc Efluent Concentration In-Stream Crienria I Calc Effluent Coecentration Conc -;hronic Acues Diasaed Chroec I Acute Chronic Acute Orlan sI eOrgasms Ims DWS Organisms
A-rg          Daily M-s      Coto        Con'..                                           Cm s.       Con&#xa9;..         Cone. Cone.         Cone.
;WaterOrfganisms, n VS EFFLUENT CHARACTERISTIC lugl , lug"] I [gi] IFraction]
Conm.     Cone.
[u;,1 I lut] i I ug/I I [M id 111911I W411][uoil] lugill Murill luvrll Antimony 0000 1 NA NA 1. 000 NA NA NA NA 6400 5.6 6.0 16031.0 140.3 150.3 Arsenic 5T000 150.000 340.000 1.000 150.000 340,000 1437,1 3314.3 100 100 110.0 129.7 129.7 129.7 Cadmium" 0106 0212 1633 0248 0 853 6.578 7.5 64.0 NA NA 50 NA NA 122.7 Chlorine IT. Res.) 0.000 11.000 19000 1.000 11.000 19.000 120.8 208.6 NA NA NA NA NA NA Chrromlum III 1 006 62.114 477.511 0.204 304140 2338 2996.9 23091 NA NA 1000 NA NA 2480.7 Chromium V1 5500 11000 16000 1.0100 11000 1600 59.3 109 NA NA 1000 NA NA 2372.0 Copper' 1600 7.448 10.968 0.358 20817 30653 191.3 288.5 NA, N.,A NA NA NA NA Cyanide (T) 2 60 5.200 22.000 1.0010 5.200 22.000 28.0 194.0 140.0 1400 200.0 3444.0 3444.0 4946.9 Lead 0994 1.988 51.026 0.189 10510 269.705 94.9 2665.7 NA NA 50 NA NA 101.2 MresCUry (1) 0025 0770 1400 1 000 0770 1400 7.38 13.6 0051 005 20 0.7 0.6 49.5 Nicker 10.000 43.333 390.143 0.451 96,141 805592 860.1 8462.2 4600.0 610.0 1000 114981,0 15038.0 2263.4 Selenium 2.500 5.000 20.000 1.000 5,000 20.000 26.9 176.1 NA NA 50.0 NA NA 1192.0 Silver 0.000 NA 2.220 1.000 NA 2.220 NIA 21.9 NA NA NA NA NA NA Thallium 0 000 NA NA 1000 NA NA NA NA 047 02 20 11.773 6.0 60.1 Zinc, 10.000 98.408 97610 0.299 329.462 326788 1 3165.3 3130.9 NA NA NA NA NA NA*Denotes metals for which Fish & Aquatic Life Criteria are expressed as a function of total hardness The Fish & Aquatic Life cnteria f'or this metal are in mhe dissolved form al laboratory conditions The tn-stream allowable cntena and caicated effluent concetrations are in the total recoverable form The citeria for these parameters are in the total form."'Background corncentratons are established from ambient stream data. I!rere ambient data is unavatlaoLe or insuffictien the Oackground concentration is established as 12 of the chronic waler quality crttera or 1.,2 of lihe human health cnmena, whfichever is smaller (1) Expected flow rate for Oufalls 101 and 113 for two unt operations (57 76 + 148 895 = 20660 MGDi NOTE Water Quality criterta for stream use classifications other than Fish & Aquatic Life are based on the 3005 floa.
Date                                                              mq/
mnt/L                    n *q/L      mal/L                    mu/L MGD            MGD          mo]L                                                          rna/L                       monL 02128/2006          2-.36        2.36          4                                       vzf~~                               ) I            01 03131f2006    1             1             1           1 04/30/2006    1             1             1           1 0513112006 0613012006 0713112006 08/3112006 10131f2006 11/30/2006 1213112006 01/31M2007 02/28F2007 0313112007 04130/2007 0513112007 06130t2007 0713112007 08/31/2007 09/30/2007 10/3112007 11130/2007                                                                                                                                                        81 1213112007 01131/2008 02F2912008 0313112008                                                                                                                                  01                    85 a84 04/30f2008 05/3112008 0613012008 07/31 2008 08/3112008 09/30/2008 1013112008 1113012008 1213112008 01131/2009 0212812009 0313112009                                                                                                                                            8.4        8.4 04130/2009 05/3112009 0613012009 0713112009 08/3112009 0913012009                                                                                                      (I !
1013112009 11/30/2009 1213112009 01/31/2010                                              I 0212812010 03/3112010 04/30/2010 0513112010                                                                                                                                            8.1         8.1 06/30/2010 07/3112010 08131/2010 09130/2010 1013112010 11/30/2010 12131/2010 01/3112011 02128/2011 0.001        0.00 1611          6.3    I  53          0_2&#xfd; U.0 0               02 03        7,9_
Mainimon.
3.15          1.0i        15.0 5.0 5.3 5.0 5-9        0-3 t.u 0.3 0.1 5.5 0.1 5.5 8.61        7.2 8.1 Averatos                              1.94          7.21                                                0.2 3.15                                    7.2         15.3          5.3                    0.2            0.7          0.7        8.21 15.0                     1.8          1.0         1.0 Permit Limit Count                                  11 30.0 41.
30.4 4'                                                                                      4.1       8.2
____      ...       ..         I
                            .14          1.                         1 Outfall 107 discharges as a batch discharge. All data presented as historical data. Additional intermittent discharge from condenser tube cleaning wastewater. Filtered to 5 microns for asbestos.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-47 of R-57 APPENDIX 5c -AMMONIA WATER QUALITY BASED CALCULATIONS Watts Bar Nuclear Plant OuVallI 101 and 113 Combined Ammonia as Nitrocen Calculations ThI e State utilizes thea EPA document, 1999 Update to Ambient Water Quadity Criteria for Ammonia and assumed temperatures of 25'C and 15 C an d ste~mamp'H o~fi18zto derive an allowable inetreamn protection value A mass balance with plant and stream flows and this allowable value determines the F-onthly average permit limit, Seasonal limits may also be allowed due to ambient temperature variations between the summer and winter seasons Winter Summer Temp (&deg;C)= 16 Temp (=C)= 25 pH= 8 pH= 8 Min (2.85, 1 45'10't 028'(25-T))
NPDES Permit TNO020168 Page R-44 of R-57 OUTFALL 113 1 lhuege evem Flow        TotalSuspended Disnole Solids            O0ygtn MaoleEffluentTaxicity TotaResidual Chlorine Temperature, Temperature, Temperature, Temperature.
2.76 2-85 276 Min (2-85. 1 45'l(P 0-028'(25-T))
(W0ET)Testing                                        Effluent        Effluent      Effluent        Effluent PH Oblnro.OOe        Effluent      M Ave 0 Max                                                                                                                                                      oe1l Daily Mar  it y          t/ aruen/  I        t D lly Min. Cetiodaphnia O                              pi mphale.      D    ei-lely
1.45 285 1.45 CC( 0,0577 2.487........ -) ' Min 1.2.85.. 1.45"10^ 0.028"(25-T')).
                                                                                                                                  . BOYP lA  X,                                                                 Ma.      11 .
1+10A" (7.688-pH) 1&#xfd;101 (pH-? 688)CCC= 2.38 CCC= 1.24 CCC -Contionuous Chronic Criterion Allowable instream NH3 concentration
Date        Event    A reJageDaily    Mao. Conc. / Coar.            Cenc-                                       Con.            C,o.        DilyUe".        DilyM a_.      Doily  M.o. DnlyPlax. Co n.Com.
[mgol](Cnital Low Flow [MGD] 'Background Ammonnia [MgJL]) + (Design Flow [MGD)' Effluent Concentration
MGD        MGO    mgIL        mgfL.        mg/L        _                  i        mgIL            mg/L            C                C             C         IC 02018r2006          1        96 95      13375      6            6          03                                        0.05            005          107              98              1              2          a        0 0313112006          1      10232      12803      5            6            9                                        0 06            006          132              13.1            1                1        82      8.2 0(3012006          1      11237      13766      4            A 1        76                                        08/            005          199              19                  2             1      73        73
[mg/L])FC (Ctitiad Low Flow [MGD] + (Dlesignr Flow [MGD])where. 3173.0 Critial Low Flow [MGD] (typically, a 7Q10 value)0.1 BackgroJnd Ammonnia Concentration
%  W/3/2006 D513112006          1      10040 rA426      14874 117.31    35          3          7.9                                                                    214              21
[rngi"l 206.7 Discharge long-term average flow [(57.76 + 148.895 )MG01 For the case where the discharger withdraws water from the stream, The Allowable Effluent Concentrations and corresponding Amounts in winter and summer are: Winter Summer Concentration
: 7.                                        0OR05          0 .1       267              26 13            1 1
[mgL] ,i-. 'Concentration
1 1
[mg/Lj 59957.8 Amount [lbiday] 30290.7 Amount Vb/day]Calculation of the Criterion Maximum Concentration where salmanoid fish are absent: Note 1 -the CMC is independent of temperature and is based on a one hour average exposure concentration.
78 84 78 84 041311M00 0713112018          1      15586 21929      22297 21A5i7    34          34          72 65                                                        00 06 905 1                    252S6            28 71 28              11            10          8 834      83 84 0 / /0            1      198 6 23368            3            3            6                                            0805        a C5        284              279              0              0        82        82 10/31/2006          1        71 16 2899            1          21            872                      ...                0            05        229              228              0              0          76      7 01/3010              1      14651 120731            3            3      1      7                                    005              006      1739                17                1              0          761      76 120312I0M            1      15623      16940      1 4            4            9                                        005              07          n1              126              2             1          76      7.5 01131N2010 1        1      165 13565 0137  1920 4    2        [NI 2           10 8.13                                      005              005 005        121 101              113 78              11            11        74      74 77      77 04,13012007 01(31/2007            1      16519 129  95    12871 189 17      54          543        9772                                      000505          007          1447            138                2             1          75      77 0 06        16                16                1            1          74      74 0513112007            1      19693 20598              5            5          74                                        005            00a          21.9              219                1             1          77      78 11)30)28              1       21243 21374              4            4          604                                        005            0.0          264              263                1            1        78          98 0123112007            1      20696 22048          0              6          73                                            05          0 05        140 27              267                1            1          79      79 08/31)20071                    2122      22211        3            3          72                                                                    285               28 3              1            1        7 1      79 09/30/2007            1      203 57 21697            2        02            77                                        0 as            a 05        279              27 9              1            0          8 I 10`/3112007          1      19763 21144                1.4                                                                                        26 1              26 7              1            1          772      77 11/30 /200            1,0 1 36 21239 7                8            . 6                                                005            0     . 2088              16                1            1        76        76 12`31007              1 .       58      1749.
East TN- 25&deg;C. 15'Middle TN- 27'C I West TN- 30'C 2C CMC = [0.4111 (1 + 10 (7 204 -pHI)] + [(58.4 ;1(1 + 10 (PH- 7 2041)]pH= B CMC= 8.4 mg,1 as N Allowable effluent Concentration is: '_ mg/i as N 220014.3 Amount Dbs!dayl A pH value of 8 (instead of historically used I 7.was chosen for two reasons 1) ambient monitoring in west TN showed that a pH often exceeds 7 5, and is up to 8 sometimes 2 ) this assumption is more conservative Note 2 -Where the source of ammonia is a biological treatment plant, the permit writer may establish the maximum daily concentration at 2 times the 30 day average instead of the value calculated from the CMC The factor of 2 is a ratio of daily maximum to monthly average considered typical for a well operated biological treatment plant.
73      5            5          91                                                                        7              14.1              1            1          a        a Coun4t7.9 I N2/2 0        1                                                                                                  0005 05          00 05        10                      60                                            76 6386      175651        4                    8 ,4                                                        05        842f        1 106 2              1 1
76 76      76 0 3131  /'2008        1        2965        1676        85        85            7.9                                        005            0 as        149              12 3              1              1        72        72 U430/2008            1      15801 1166.35 3G                  36            7 8 10nn                                                  0 05        1T.2              182                1              1        a        8 05131/20            0        1769j      19486    32          32 1            7T6                                      0.05          0,05        211I              20.9              1            1          a        a S6'3012008            1       1645; 1931H 2 9                    29            76                                          005            0 05        26.3              263                1            2        179        ?97 0713 1/ 200          1      18163 190 01          25          2 5            8                                                        00 05        27 "3            27 2               1              G'      a1      61 0 81/311r 00          1      167 F , 185 68                                                                              N 06;          0217;40 0        282              28.3              1            0          79      7.9 09130 / '20 08          1        175 1a 187,03      54          55            a                                          0.05    1     a 05        26 2              2 85              1            1          a        a 10 I/3 1 '2            1      169 96 134 57        55          55            81                                          O0            0 9        24 8              26 1              1            0          79      79 I1I/3  0,'r 0 08(31)2010            I    r 12202 1 7419          5  4        54            92                                          005 1        1002        )535                                                                                          0 05 ,      is3                26                1            0          84      84 12t3112008            1      15109 162      1`+ 3313971 9        39            9                                          005            0 as-        11.6              26                1              1        84      84 0113112009 1          1      15132 11712E          54          54            9a            304            304          005            0 05        8.9              10 1              1          -0          a        6 02ra8/'209-          1      13572 17454          66          66            10                                          005            0 05          5 a5                26                1            0          a        6 03131/200            1        1404      156565 6 5            65 1          6.6                                        005            0 05        12.6              28                L1            0          61      a.1 04/0/'rm              1      16115        1ES56    49          49            81                                          005            0 05        16                29                1            1          82      82 W531 /200            1      17251 18445              7            7         88                                                                    214                90              1            1          84      84 06130712M9            1      179.39 1668              4            4          76                                                                    269              26 4            2                1          82      82 07131r2009            1      18292      191N      59  a        g            75            100            100                                      259              27 1              1            1            659    66 011131/009            1       1771&#xfd; 16a84          26          26            73                                                                    27'3              28 7              1            a          82      82 0913012009            1      12606 1 075z          42          1 .2          54                                        0.05            0 05        2 51              26 7              1            0          86      BE*
10831f2009          1        5226        18221    693          63            62                                                                      23              22 8              1            0          To      78 1113012009          1        3883      18193        1            1          85                                          00OE          a05        160a              24            0                a          73      73 12031,r2009          1        9142      169so    86  5        a5 1          87                                                                      131              24                0      1      0          76      76 015131/01            !      13761      17192    36          35            a7            304              504          005            0 06        76                23            2                1          a3      a3 02/28r2010      1      13884 166545 8 6                  85            98 03131/2010                                                                                                                              ...              2              23                                            3 1      12733        1436 ...4,2          . 42          77                    110                                                                                                                      8 a              29                1            1          84      88 0 ,3012010          1      15051 16a15          21          21            a                                                                      157              15 9              1            1          51      a1 M I/312010            1      16014        19015    62          62            73                                                                    222                31            2                1          78      7 58 06130/2010            1      1S478 119a      OS5 4 1            41            76                                                                    2,3                33                1            1          79      79 07,'3112010  ..      1      1a275 19284 1 2 6                  26            72                                        0 05            0 05        288              27 7              1            0          79        79 0873112010          1        1861 20836              3            3          71                                                                    29 7              285            2                1          78      78 09130,J2010          I      M6549 20017 1 3 8                  38           74                                          005            0 as        278              26.7              1            1        82 1     82 10131.12010          1      15116 19339              56        55            a1                                        0 05            0 05        249              24 1              1            1          78      7 98 11130/0110            1      15B897 19208          61          651          91                                                                    20 1              107            9              0          79      79 17,'3112010          1        148 5 18129          54          54          101                                                                    1J2              132                1            0          a 01!3112011
,.rm..,                  0.0     7.18i 28.99            1.0;        1t.0          5.4          30.4.          30.4          0.05i          o.o;            .2              7.8!=          0.0:1          0.0    7.21      5.6 Max ni mum              1 ,0 219.29 1 235.77            U r5        8.8          11.9          110 0.0i          100.0          0.05 i         0.07        29 .7 j          33.0r,          2.0,;          2.0        ,6    8.8 A,,,,,q,                1.0 145.75, 179.,1. 4.4! 4.4*
P+,
count iL-..-                           6 0      ...
30 100                    1.1
_mg  . 8.01  53.61          533.6 0i
: 8.                        0+.15833.5"    1.71 l++;+=30.,5'C22.2i            1.11i 3, i                   6.oi 1., 1.01 7.9 2o*C              9.0 60                +          3o1            3            42, 41                                                                                  .
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TNO020168 Page R-48 of R-57 APPENDIX 5d -WATER QUALITY CALCULATIONS FOR pH Calculation of Instream pH Resulting From the Combined Discharges of Outfall 101 and 113 (This spreadsheet may be used to calculate allowable discharge pH by trial and error)Note: WPCIEPA policy requires all discharges to be within the range of 6.0 to 9.0 TN fish and aquatic life criteria require the stream pH to be within 6.5 to 9.0 This calculation is to determine if a discharge pH at 6.0 can cause the stream pH to fall below 6.5 The calculation is only applicable to cases where the discharge flow is significant relative to the stream flow Enter stream background pH --->Enter stream flow in MGD Enter discharger minimum pH --->Enter discharger flow. MGD --->Combined strm.;discharge pH -Combined strrrVdisch flow. MGD minimum from ambient data (see Appendix 5a)use 1Q10 Unknown 1 2268.71 pH = -log [H+], where [H+] is the hydrogen ion concentration in moles per liter[H+] = 10^(-pH)=
NPDES Permit TN0020168 Page R-45 of R-57 APPENDIX 5a - AMBIENT MONITORING DATA 7EINESSEE Z6MiE1,3 1 NCPSIM70l8ID 1EllE295 pirallel  Uts                                      ______m                            Dite                                              Avg.
moles per liter of H+ (1 gram mole per liter of H+ is 1.0080 grams of hydrogenrliter)
0         &d.~
Moles H+ (Combined)
WS T?                23          7.8    7.9         7,71        718                      73      77    171            3    7 DO        %1      B3          1H8                    H."68      11.74        K6                      129      84    642    712          853 ECcI C9.11                                      13        10                      10          1Q        103I O      10      1C3  10      1O  133I TAI aI0ess I        80            29            2      ',1        44        107          73        12      80    183    74    912  73 Awna5NmaeJ  1      0,03          0333        0.030U 6O      0     0833
= Moles H+ (Background)
                                                                    .30        IO J        80 L'      830    MU23    008N          M3 U0  P03 W                                    ;. . .. I      -   :00I. I1..                       --           01    - 0.
+ Moles H+ (Discharge)
1   .885!    4 7Mh1aN13                0.150          01    .115 U      1         052        01Q          8lU 153U      023    H1      012U  826    021  027 ow*          ai        ,        i                    10 Ii      10&#xfd;        A.aLV                    I8    013                    1   100 Cop4                        10U          L       3          2            3          22                3      2    2      10  21 H   t      IOU          183U          0IN      IOU        lOU        103          1H3        IOU      130    10U    183    10N  110
Note that this is a simple conservation of H + mass formula that does not account for any rections or buffering that might occur when the discharge and stream mix.Stream background MolesL Discharger MoleslLiter Hi =Combined moles/L H+ =Combined molestL H+ =iter H+ =1 ^(-pH)10^(-pH)1.OpE-06j (Strm molesiL H+)*(Strm MGD) + (Disch moles.L H)*(Disch MGD1 (Stream MGD + Discharge MGD)1 1.366E-07J Combined Stream pH = F 6.864 If this pH is below 6 5, the discharger minimum pH must be raised, therefore recaluate until 6.5 is reached Because the calculated pH is above 6.5, a minimum discharge pH limit of 6.0 for Outfall 101 and 113 will allow compliance with water quality criteria in the Tennessee River.
                                ,,        &#xfd;F. If         ~        .     ~              ~        '    ~-t                  4      19  !.!-
0: RE-4 d dqme U: Aa71e r~IesgWrd ddai~edge J:EsfvA4m aIii les      p~teiion IinW 32 9s~1*          bi 0Uatan1Zet
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-49 of R-57 APPENDIX 5e -BIOMONITORING DILUTION FACTORS Watts Bar Nuclear Plant Calculation of Dilution Factors for Biomonitoring Diolution factor when receiving stream is the source of water at the facility Outfall 101 and 102 Stream Flow Wastewater Flow Total Flow 1Q10 MGD] [MGD]1 [MGD]2062.0 57.76 2062 Dilution Factor 35.7 LC50 > 9.3 % Conc.IC 25 > 2-8 % Conc.Dilution factor when receiving stream is not the source of water at the facility Outfall 113 Stream Flow Wastewater Flow Total Flow 1Q10 [MGD] [MGD][MGD]20820 148.895 2210.9 Dilution Factor 14.8 LC50 > 22.4 % Conc.IC 25 > 6.7 % Conc.1 Because of the large volume of flow from these Outfalls and the criteria that chronic toxicity not exist instream during any 30 day period, the maximun historic 30 day average discharge flow was used to calculate dilution.
NPDES Permit TNO020168 Page R-46 of R-57 APPENDIX 5b - WATER QUALITY BASED EFFLUENT CALCULATIONS WATER QUALITY    BASED CALCULATIONS FOR METALS AND OTHER TOXIC                    SUBSTANCES OUTFALL, 101 and 113 Combined FACILIIY: Wags Bar Nuclear Plant PERMIT#: TN0020168 Stream 17010)
Stream I30Q61 Waste Flow Tel u Solid,
                                                                                                                              ,
1          1 Hardness Stream s CaC03I Allocation IMG0] I        rG1O] fMGD!            Imm t    I I [m m]          I%!
1 2062 00      5545 001 206.6              8.4 1806 1 90 1
Stream 2      1 FisahAqua 3
Life 4
Effluent
[1I Fish&Aquatic 1    7 L e'ate" QualityCnreiT0aQt 9              o0      1    11          12        1 13            14 Human HealthWater      Cnteria00061 Qualtry Bckgmd          WaterQua*ltyCriteia      Ffaction      In-StreamAllowable CalcEfluentConcentration              In-Stream Crienria        I        CalcEffluent Coecentration EFFLUENT                              Conc -        ;hronic        Acues      Diasaed      Chroec I Acute            Chronic      Acute Orlan sI          eOrgasms Ims DWS                                    n Organisms ;WaterOrfganisms,        VS CHARACTERISTIC                          lugl        lug"]
                                                        ,    I    [gi]       IFraction] [u;,1 I lut]i              I    ug/I I [M    id      111911I        W411]        [uoil]     lugill          Murill        luvrll Antimony                              0000      1    NA            NA          1.000          NA          NA          NA          NA        6400            5.6            6.0      16031.0          140.3          150.3 Arsenic                                5T000 150.000              340.000        1.000      150.000      340,000      1437,1      3314.3      100            100            110.0    129.7          129.7          129.7 Cadmium"                                0106        0212          1633          0248        0 853        6.578        7.5        64.0        NA            NA            50          NA            NA            122.7 Chlorine IT.Res.)                      0.000      11.000        19000          1.000      11.000        19.000      120.8      208.6        NA            NA            NA          NA            NA            NA Chrromlum III                          1006        62.114        477.511        0.204      304140          2338      2996.9     23091        NA            NA          1000          NA            NA          2480.7 Chromium V1                            5500        11000          16000          1.0100      11000          1600        59.3         109        NA            NA          1000          NA            NA          2372.0 Copper'                                1600        7.448        10.968        0.358      20817        30653        191.3      288.5        NA,          N.,A          NA          NA            NA            NA Cyanide (T)                            2 60          5.200        22.000        1.0010      5.200      22.000        28.0        194.0      140.0        1400          200.0      3444.0        3444.0        4946.9 Lead                                  0994          1.988        51.026        0.189      10510        269.705      94.9      2665.7        NA            NA            50          NA            NA            101.2 MresCUry (1)                          0025          0770          1400          1000        0770          1400        7.38        13.6      0051            005            20          0.7            0.6          49.5 Nicker                                10.000      43.333        390.143        0.451      96,141      805592      860.1      8462.2      4600.0        610.0        1000      114981,0        15038.0        2263.4 Selenium                              2.500        5.000        20.000        1.000        5,000      20.000        26.9       176.1        NA            NA            50.0        NA            NA          1192.0 Silver                                  0.000          NA          2.220        1.000          NA        2.220        NIA        21.9        NA            NA            NA          NA            NA            NA Thallium                              0 000          NA            NA          1000          NA            NA          NA          NA        047            02            20        11.773          6.0          60.1 Zinc,                                  10.000      98.408        97610          0.299      329.462      326788 1 3165.3          3130.9        NA            NA            NA          NA              NA            NA
  *Denotes metals forwhich Fish &Aquatic LifeCriteria are expressed as a function oftotal hardness The Fish &Aquatic Lifecnteria f'orthis metal are inmhe        dissolved formal laboratory conditions The tn-streamallowable cntena and caicated effluent        concetrations are inthe totalrecoverable form The citeria for these parameters are inthe total form.
"'Background corncentratons are established from ambient stream data. I!rere ambient data isunavatlaoLe            orinsuffictien the Oackground concentration is established as 12 ofthe chronic waler quality crttera or 1.,2of lihehuman health cnmena,   whfichever  is smaller (1) Expected flowrate forOufalls 101and 113 fortwo unt operations (57 76 +148 895 =20660 MGDi NOTE Water Quality    criterta for stream use classifications other than Fish &Aquatic Lifeare based onthe 3005 floa.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-50 of R-57 APPENDIX 5f -COMPARISON OF DISCHARGE LIMITATIONS COMPARISON OF DISCHARGE LIMITATIONS OutfalI 101 Monthly Average FffitrAnt EflenJudeie Previous Water Quality PermitI Fish I Hum. Heal.New Permit EFFLUENT CHARACTERISTIC BPT*BAT'II ~(mg/L)(mOL)(malL) I (mg/I)(mqlL)(malL)TSS 30 30 NA NA 30 OIL & GREASE 15 -- 15 NA NA 15 pH 6.0-9.0 .... 6.5-9.0 6.0-9.0 6.0-9.0 Chromium, Total -- 0.2 99 2.48 Zinc, Total -- 1.0 -- 3_16 NA 1.0 Total Chlorine Residual --- 0.1 0.120 NA 0.10 Free Available Chlorine 0.2 0.2 -- 0.120 NA --Daily Maximum Effluent Guidelines' Previous Water Quality New EFFLUENT BPT BAT Permit Fish Hum. Heal. Permit CHARACTERISTIC mgL) ([_ L) (m IL) I[ (mg/L) (mgiL (mg/L)TSS 100 -100 NA NA 100 OIL & GREASE 20 -- 20 NA NA 20 pH 6.0-9.0 -6.0-9.0 6.5-9.0 6_5-9.0 6.0-9.0 Chromium, Total -- 0.2 NA NA _ _Zinc, Total -1.0 -- 3.14 NA I Total Chlorine Residual -- 0.2 0.1 0.208 1 NA 0.10 Free Available Chlorine 0.5 005 -0208 NA NA.Outfall 101 primarily receives wastes characterized as low volume wastes and cooling tower blowdown.
NPDES Permit TN0020168 Page R-47 of R-57 APPENDIX 5c - AMMONIA WATER QUALITY BASED CALCULATIONS Watts Bar Nuclear Plant OuVallI 101 and 113 Combined Ammonia as Nitrocen Calculations e State utilizestheaEPA document, 1999 Update to Ambient Water Quadity Criteria for Ammonia and assumed temperatures of 25'C and 15 C an d ThI ste~mamp'H o~fi18zto derive an allowable inetreamnprotection value A mass balance with plant and stream flows and this allowable value determines the F-onthly average permit limit, Seasonal limits may also be allowed due to ambient temperature variations between the summer and winter seasons Winter                                                                    Summer Temp (&deg;C)=          16                                                    Temp (=C)=          25                          East TN- 25&deg;C. 15' pH=        8                                                              pH=          8                          Middle TN- 27'C I Min (2.85, 1 45'10't 028'(25-T))           2.76            2-85  276        Min (2-85. 1 45'l(P 0-028'(25-T))        1.45          285        1.45 West TN- 30'C 2C CC(      0,0577                      2.487
Thus this discharge is subject BPTIBAT limitations for all parameters applicable to these waste sources as presented in Appendix 2-The use of water treatment chemicals containing chromium is probihited.
                    . .......     -)                        ' Min1.2.85..1.45"10^ 0.028"(25-T')).
1+10A"  (7.688-pH)        1&#xfd;101 (pH-? 688)
CCC=        2.38                                                          CCC=          1.24 CCC -Contionuous Chronic Criterion Allowable instream NH3 concentration [mgol]
(Cnital Low Flow [MGD] 'Background Ammonnia[MgJL]) + (Design Flow[MGD)' Effluent Concentration [mg/L])
FC                              (CtitiadLow Flow [MGD] +  (Dlesignr Flow [MGD])
where.           3173.0 Critial Low Flow [MGD] (typically, a 7Q10 value) 0.1    BackgroJnd Ammonnia Concentration [rngi"l 206.7 Discharge long-term average flow [(57.76 + 148.895 )MG01 For the case where the discharger withdraws water from the stream, The Allowable Effluent Concentrations and corresponding Amounts in winter and summer are:
Winter                                                                    Summer Concentration [mgL]                                        ,i-.         'Concentration [mg/Lj 59957.8    Amount [lbiday]                                                30290.7  Amount Vb/day]
Calculation of the Criterion Maximum Concentration where salmanoid fish are absent:
Note 1 -the CMC is independent of temperature and is based on a one hour average exposure concentration.
CMC = [0.4111 (1 + 10 (7204 -pHI)] + [(58.4 ;1(1 + 10 (PH-7 2041)]                                    A pH value of 8 (instead of historically used I 7.was chosen for two reasons 1) ambient pH=        B                                                    monitoring in west TN showed that a pH often exceeds 7 5, and is up to 8 sometimes CMC=          8.4      mg,1 as N                                    2 ) this assumption is more conservative Allowable effluent Concentration is:      '_          mg/i as N 220014.3 Amount Dbs!dayl Note 2 - Where the source of ammonia is a biological treatment plant, the permit writer may establish the maximum daily concentration at 2 times the 30 day average instead of the value calculated from the CMC The factor of 2 is a ratio of daily maximum to monthly average considered typical for a well operated biological treatment plant.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-51 of R-57 COMPARISON OF DISCHARGE LIMITATIONS Outfall 113 Monthly Averace Previous Water Quality New FffhII~nt CI=tr=linov*
NPDES Permit TNO020168 Page R-48 of R-57 APPENDIX 5d - WATER QUALITY CALCULATIONS FOR pH Calculation of Instream pH Resulting From the Combined Discharges of Outfall 101 and 113 (This spreadsheet may be used to calculate allowable discharge pH by trial and error)
'I Effluent Guidelines*
Note:    WPCIEPA policy requires all discharges to be within the range of 6.0 to 9.0 TN fish and aquatic life criteria require the stream pH to be within 6.5 to 9.0 This calculation is to determine if a discharge pH at 6.0 can cause the stream pH to fall below 6.5 The calculation is only applicable to cases where the discharge flow is significant relative to the stream flow Enter stream background pH          --- >                    minimum from ambient data (see Appendix 5a)
Previous Permit Water Quality Fish I Hum- Heal.New Permit EFFLUENT CHARACTERISTIC BPT I BAT Permit Fish [Hum. Heal. Permit (mglL) (m~/L) (malL) I (m~IL)(mq/L)I (mq/L)I(mQUL (mq/L)(rnoIL) I (mo,/L)TSS NA NA Report NA NA Report OIL & GREASE 15 -- 15 NA NA 15 pH 6.0-9.0 -- 6.5-9.0 6.0-9.0 6.0-9.0 Dissolved Oxygen (D.O.) ---NA NA Report Min.Total Chlorine Residual --0.092 0.120 NA 0.092 Free Available Chlorine 0.2 -0.12 NA --Daily Maximum Effluent Guidelines Previous Water Quality New EFFLUENT BPT BAT Permit Fish [Hum Heal. Permit CHARACTERISTIC (mJIL) (mg/L) (mrg/L) (r [ (mgiL)TSS NA NA 100 NA NA 100 OIL & GREASE NA NA 20 NA NA 20 pH 6.0-90 --6.5-9.0 6-0-90 6.0-9.0 Total Chlorine Residual -0.2 0-158 0.208 NA 0.168 Free Available Chlorine 1 0.5 0.208 NA Outfall 113 receives wastes characterized as once through cooling water. Thus this discharge is subject BPT!BAT limitations for all parameters applicable to once through cooling water sources as presented in Appendix 2 TVA-Watts Bar Nuclear Plant (Rationale)
Enter stream flow in MGD                                        use 1Q10 Enter discharger minimum pH        --->
NPDES Permit TN0020168 Page R-52 of R-57 APPENDIX 5g -New Permit Limits I PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Water, Storm Water and Process Wastewater EFFLUENT LIMITATIONS MONITORING EFFLUEN T LIMITATIONS MONITORING REOUIREMENTS MONTHLY DAILY EFFLUENT m.c. cOYCA.Q- .- COYC. 1&.U.tT. i.u.-C SA.3l..CHARACTERISTIC (WI (l'r (.0') r(mday) I RNY '11?FLOW Report (MGD) 1 Report (MGD) Continuous Recorder 1 Certification of Instream Flow of ._ Report as Yes/No 1/Month Operation 3,500 cfs whe n required Records pH 2 Range 6.0 -9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSSJ 30.0 -. 100.0 -- 1,Month Grab OIL & GREASE 15.0 20.0 -- 1;Month Grab CHROMIUM, TOTAL 2.0 2.0 WAIVED' Grab ZINC, TOTAL 10 10 -- 2/Month Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3 0.10 -- 0.10 -- 5!Week Grab2.2 TEMPERATURE, Effluent .... 35 'C -Continuous Recorder IC25 25% Inhibition Concentration shall be >2.8% effluent 2Year Composite There shall be no discharge of PCBs.Flow shall be reported in Million Gallons per Day (MGD0 In the event that the continuous flow monitor is out of service flow monitoring shall be estimated by intake pump logs pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection
Enter discharger flow. MGD              --->
-The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR. Part 136 as amended. The method detection level RMDL)for TRC shall not exceed 0 05 mgin unless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. In cases where the permit lima is less that (he MDL. the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part 1. Section B Monitoring Procedures.
Combined strm.;discharge pH -                    Unknown Combined strrrVdisch flow. MGD                    1 2268.71 pH = -log [H+], where [H+] is the hydrogen ion concentration in moles per liter
subsection 3 Test Procedures paragraph b When the temperature monitoring equipment fails monitoring will be done once per day Reasonable and timely effort will be made to restore the temperature recorder to operation as soon as possible See Part III for further temperature requirements
[H+] = 10^(-pH)= moles per liter of H+ (1 gram mole per liter of H+ is 1.0080 grams of hydrogenrliter)
* See Part III for methodology Monitoring for chromium is waived per 40 CFR 122 44 (al(2o{I)
Moles H+ (Combined) = Moles H+ (Background) + Moles H+ (Discharge)
See Rationale for more comments Monitoring for pHt, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Moniloring Points 103 and 107 where moNtoring these parameters is required.
Note that this is a simple conservationof H + mass formula that does not account for any rections or buffering that might occur when the dischargeandstream mix.
Stream background MolesL iter H+ =              1 ^(-pH)
Discharger MoleslLiter Hi =                    10^(-pH)                          1.OpE-06j Combined moles/L H+ =            (Strm molesiL H+)*(Strm MGD) + (Disch moles.L H)*(Disch MGD1 (Stream MGD + Discharge MGD) 1 1.366E-07J Combined molestL H+ =
Combined Stream pH = F                    6.864 Ifthis pH is below 6 5, the discharger minimum pH must be raised, therefore recaluate until 6.5 is reached Because the calculated pH is above 6.5, a minimum discharge pH limit of 6.0 for Outfall 101 and 113 will allow compliance with water quality criteria in the Tennessee River.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-49 of R-57 APPENDIX 5e - BIOMONITORING DILUTION FACTORS Watts Bar Nuclear Plant Calculation of Dilution Factors for Biomonitoring Diolution factor when receiving stream is the source of water at the facility Outfall 101 and 102 Stream Flow              Wastewater Flow              Total Flow 1Q10 MGD]                      [MGD]1                  [MGD]
2062.0                      57.76                    2062 Dilution Factor                          35.7 LC50 >                                  9.3          % Conc.
IC25 >                                  2-8          % Conc.
Dilution factor when receiving stream is not the source of water at the facility Outfall 113 Stream Flow              Wastewater Flow            Total Flow 1Q10 [MGD]                    [MGD]1                  [MGD]
20820                      148.895                  2210.9 Dilution Factor                          14.8 LC50 >                                  22.4          % Conc.
IC 25 >                                  6.7          % Conc.
1  Because of the large volume of flow from these Outfalls and the criteria that chronic toxicity not exist instream during any 30 day period, the maximun historic 30 day average discharge flow was used to calculate dilution.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-50 of R-57 APPENDIX 5f - COMPARISON OF DISCHARGE LIMITATIONS COMPARISON OF DISCHARGE LIMITATIONS OutfalI 101 Monthly Average FffitrAnt Guid*linp*
EflenJudeie Previous            Water Quality                New EFFLUENT                      BPT*            BAT'          PermitI          Fish      I Hum. Heal.        Permit II                                          ~
CHARACTERISTIC                      (mg/L)          (mOL)          (malL)    I    (mg/I)        (mqlL)          (malL)
TSS                          30                            30            NA            NA              30 OIL & GREASE                        15              --            15            NA            NA              15 pH                      6.0-9.0            ....                      6.5-9.0        6.0-9.0          6.0-9.0 Chromium, Total                        --            0.2              -          2-99          2.48 Zinc, Total                      --            1.0              --          3_16            NA              1.0 Total Chlorine Residual                  -              --            0.1          0.120            NA              0.10 Free Available Chlorine                0.2            0.2              --          0.120            NA                --
Daily Maximum Effluent Guidelines'          Previous            Water Quality                New EFFLUENT                      BPT              BAT          Permit          Fish        Hum. Heal.        Permit CHARACTERISTIC                      mgL)          ([_L)          (m IL)    I[  (mg/L)        (mgiL            (mg/L)
TSS                        100              -            100            NA            NA              100 OIL & GREASE                        20              --            20            NA            NA              20 pH                      6.0-9.0              -          6.0-9.0        6.5-9.0        6_5-9.0        6.0-9.0 Chromium, Total                      --            0.2                            NA            NA        _        _
Zinc, Total                      -            1.0              --          3.14            NA                I Total Chlorine Residual                  --            0.2            0.1          0.208        1 NA                0.10 Free Available Chlorine                0.5            005                            -0208          NA              NA
  . Outfall 101 primarily receives wastes characterized as low volume wastes and cooling tower blowdown. Thus this discharge is subject BPTIBAT limitations for all parameters applicable to these waste sources as presented in Appendix 2
- The use of water treatment chemicals containing chromium is probihited.
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-51 of R-57 COMPARISON OF DISCHARGE LIMITATIONS Outfall 113 Monthly Averace Water Quality               New FffhII~nt CI=tr=linov*
Effluent Guidelines*
Previous           Water   Quality             New
                                  'I                                   Permit EFFLUENT                     BPT       I BAT                               Fish (malL)      I HumHeal.     Permit CHARACTERISTIC                    (mglL)
(mq/L)I         (m~/L)
(mq/L)
I (m~IL)
Permit          Fish (mq/L)
[Hum. Heal.        Permit (rnoIL) I (mo,/L)
I(mQUL TSS                       NA               NA           Report         NA               NA         Report OIL & GREASE                       15               --             15           NA               NA             15 pH                     6.0-9.0             --                         6.5-9.0         6.0-9.0         6.0-9.0 Dissolved Oxygen (D.O.)                   -               -               -           NA               NA       Report Min.
Total Chlorine Residual                 -               -             0.092         0.120             NA           0.092 Free Available Chlorine                 0.2               -                           0.12             NA             --
Daily Maximum Effluent Guidelines           Previous           Water Quality               New EFFLUENT                     BPT             BAT           Permit         Fish     [Hum Heal.         Permit CHARACTERISTIC                     (mJIL)         (mg/L)           (mrg/L)                       (r         [   (mgiL)
TSS                       NA               NA             100           NA               NA             100 OIL & GREASE                     NA               NA             20           NA               NA             20 pH                     6.0-90               -               -         6.5-9.0         6-0-90         6.0-9.0 Total Chlorine Residual                 -               0.2           0-158         0.208             NA           0.168 Free Available Chlorine 1               0.5                                           0.208             NA Outfall 113 receives wastes characterized as once through cooling water. Thus this discharge is subject BPT!BAT limitations for all parameters applicable to once through cooling water sources as presented in Appendix 2
 
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-52 of R-57 APPENDIX 5g - New Permit Limits I                 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Water, Storm Water and Process Wastewater MONITORING EFFLUENTTLIMITATIONS EFFLUEN                                                       MONITORING MONTHLY                               DAILY                         REOUIREMENTS EFFLUENT                           m.c. cOYCA.Q-           .-        *.i.u.-CCOYC. 1&.U.tT.                                 SA.3l..
CHARACTERISTIC                             (WI               (l'r               (.0')           r(mday)     I     RNY                 '11?
1 FLOW                                 Report (MGD)           1             Report (MGD)               Continuous         Recorder 1 Certification of Instream Flow of                               ._                         Report as Yes/No               1/Month           Operation 3,500 cfs whe n required                                                                                                                 Records pH 2                                                   Range 6.0 - 9.0                                 2/Month               Grab TOTAL SUSPENDED SOUDS (TSSJ                           30.0                 -.             100.0               --             1,Month               Grab OIL & GREASE                             15.0                               20.0               --             1;Month               Grab CHROMIUM, TOTAL                             2.0                                 2.0                           WAIVED'                 Grab ZINC, TOTAL                             10                                   10               --             2/Month               Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3                           0.10                 --             0.10               --             5!Week             Grab2.2 4
TEMPERATURE, Effluent                             ....                             35 'C               -           Continuous           Recorder IC25                             25% Inhibition Concentration shall be >2.8% effluent                     2Year           Composite There shall be no discharge of PCBs.
Flow shall be reported in Million Gallons per Day (MGD0 Inthe event that the continuous flow monitor is out of service flow monitoring shall be estimated by intake pump logs pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection
-         The acceptable methods for analysis ofTRC are any methods specified in Title 40 CFR. Part 136 as amended. The method detection level RMDL) for TRC shall not exceed 0 05 mginunless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. Incases where the permit lima is less that (he MDL. the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part 1.Section B Monitoring Procedures. subsection 3 Test Procedures paragraph b When the temperature monitoring equipment fails monitoring will be done once per day Reasonable and timely effort will be made to restore the temperature recorder to operation as soon as possible See Part IIIfor further temperature requirements
* See Part IIIfor methodology Monitoring for chromium is waived per 40 CFR 122 44 (al(2o{I)See Rationale for more comments Monitoring for pHt,total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Moniloring Points 103 and 107 where moNtoring these parameters is required.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-53 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 102 Cooling water, Stormwater runoff and Process Wastewater EFFLUENT LIMITATIONS MONITORING REQUIREMENTS MONTHLY DAILY EFFLUENT A.GCONC.
NPDES Permit TN0020168 Page R-53 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 102 Cooling water, Stormwater runoff and Process Wastewater EFFLUENT LIMITATIONS                                           MONITORING MONTHLY                               DAILY                         REQUIREMENTS EFFLUENT                         A.GCONC.       IAVG.Ml*c.          xr             I* Awr.unm  ,        Msco.Nc:.
xr Msco.Nc:. Awr.unm , s -ir. s."21.CHARACTERISTIC
s   -ir.         s."21.
(=_1) (tbday) =(_R1) ,; QCY. nflp FLOW Report (MGD) 1 Report (MGD) 1 1/Day Instantaneous Certification of Instream Flow of Report as Yes/No liMonth Operation 3,500 R e when required Records pH 2 Range 6.0 -9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSS) 30.0 -- 100.0 -lWMonth Grab OIL & GREASE 15.0 20.0 -1/Month' Grab CHROMIUM, TOTAL 2.0 2.0 WAIVED 7 Grab ZINC, TOTAL 1.0 1.0 -- 2/Monthe Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3 0.10 0.10 y5Week Grab 2 TEMPERATURE, Effluent 35c C -/Day Grab IC26 4.25% Inhibition Concentration shall be >2.8% effluent 2Near 4 Composite' There shall be no discharge of PCBs.Flow shall be reported in Million Gallons per Day (MGD).pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
CHARACTERISTIC                             (=_1)           (tbday)               =(_R1)         ,;               QCY.               nflp FLOW                                 Report (MGD) 1                     Report (MGD) 1                 1/Day         Instantaneous Certification of Instream Flow of                                                           Report as Yes/No               liMonth           Operation 3,500         when required                                                          R           e                                     Records pH 2                                                 Range 6.0 - 9.0                                 2/Month               Grab TOTAL SUSPENDED SOUDS (TSS)                           30.0                                                                           0
*" The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR. Part 136 as amended- The method detection level (MDL)for TRC shall not exceed 0 05 mg/I unless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL, the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I. Section 8. Monitoring Procedures, subsection
                                                                              --             100.0               -           lWMonth               Grab OIL & GREASE                             15.0                               20.0               -             1/Month'             Grab CHROMIUM, TOTAL                             2.0                                 2.0                           WAIVED       7         Grab ZINC, TOTAL                             1.0                                 1.0               --         2/Monthe               Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3                           0.10                                 0.10                                   y5WeekGrab 2 TEMPERATURE, Effluent                                                               35c C               -                 /Day             Grab 4
: 3. Test Procedures, paragraph b.Sampling and analysis required only if discharge is operated 30 days or more during the semi-annual periods January through June or July through Decemberand if all toxicity testing requirements have not already been completed for Outfall 101. See Part III for methodology.
IC26 4 .                       25% Inhibition Concentration shall be >2.8% effluent                     2Near           Composite' There shall be no discharge of PCBs.
-Certification shalt be made during any month that a discharge occurs from this outfall.If there is discharge during 1 or more days from this outfall, sampling is required to comply with the maximum daily limit Ifthere are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall. 2 samples are required to comply with the measurement Monitoring for chromium is waived per 40 CFR 122.44 (a)(2)01.
Flow shall be reported inMillion Gallons per Day (MGD).
See Rationale for more comments.Monttorng for pH, total suspended soWids and oil and grease apply only wthenthe turbine bujlclng sump is aligned to bypass tnternaT Morntoring Points 103 and 107 where moruonng these parameters is required.
pH and TRC analyses shall be performed within fifteen (15)minutes of sample collection.
    *" The acceptable methods for analysis of TRC are any methods specified inTitle 40 CFR. Part 136 as amended- The method detection level (MDL) for TRC shall not exceed 0 05 mg/I unless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL, the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit The acceptable methods for detection and reporting of total residual chlorine are referenced inPart I. Section 8. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.
Sampling and analysis required only ifdischarge is operated 30 days or more during the semi-annual periods January through June or July through Decemberand ifall toxicity testing requirements have not already been completed for Outfall 101. See Part IIIfor methodology.
-   Certification shalt be made during any month that a discharge occurs from this outfall.
Ifthere is discharge during 1or more days from this outfall, sampling is required to comply with the maximum daily limit Ifthere are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall. 2 samples are required to comply with the measurement Monitoring for chromium is waived per 40 CFR 122.44 (a)(2)01. See Rationale for more comments.
Monttorng for pH,total suspended soWids   and oil and grease apply only wthenthe turbine bujlclng sump is aligned to bypass tnternaT Morntoring Points 103 and 107 where moruonng these parameters is required.
 
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-54 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 103 (Internal Monitoring Point)Low Volume Waste Holding Pond EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT AVG. CONC. AVG..,-am.
NPDES Permit TN0020168 Page R-54 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 103 (Internal Monitoring Point)
umX. CONC. x.., -avr. 3st ,-r. s.A.uI, CHARACTERISTIC
Low Volume Waste Holding Pond EFFLUENT LIMITATIONS                               MONITORING MONTHLY                       DAILY                 REQUIREMENTS EFFLUENT                           AVG. CONC. AVG..,-am. umX.CONC. x.., -avr. 3st ,-r.       s.A.uI, CHARACTERISTIC                           (.1)         (]W.ey)       =.0)   1b      e,.)     IQ.Ycy.         nI FLOW                               Report (MGD) 1       _   Report (MGD)i         Continuous 1     Recorder pH 2                                         Range 6 9.0                       1 TMonth         Grab TOTAL SUSPENDED SOLIDS                           3G (TSS) TS)30.0                                     --       100.0           --       liMonth         Grab OIL & GREASE                           15.0           -         20.0           -       1l/Month         Grab Flow shall be reported in Million Gallons per Day (MGD) pH analyses shall be performed within fifteen (151 minutes of sample collection I               PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monitoring Point)
(.1) (]W.ey) =.0) 1 b e,.) IQ.Ycy. nI FLOW Report (MGD)1 _ Report (MGD)i Continuous 1 Recorder pH 2 Range 6-0 -9.0 1 TMonth Grab TOTAL SUSPENDED SOLIDS 3G TS)30.0 -- 100.0 -- liMonth Grab (TSS)OIL & GREASE 15.0 -20.0 -1 l/Month Grab Flow shall be reported in Million Gallons per Day (MGD)pH analyses shall be performed within fifteen (151 minutes of sample collection I PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monitoring Point)Metal Cleaning Wastewater EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT .vo.co.c. .AV.A-r.
Metal Cleaning Wastewater EFFLUENT LIMITATIONS                               MONITORING MONTHLY                       DAILY                 REQUIREMENTS EFFLUENT                         .vo.co.c.       .AV.A-r. U.XcoN*c.      XX*X*.AM'.      ItsaWNT-r. s.-UtU' CHARACTERISTIC                             (u..1)       (]t.da:-     (rl)       (IObedy)       M.QNC'.         Tin-FLOW                               Report (MGD)               Report (MGD)           l/Batch       Calculated pH 2                                   Report                     Report             1/Batch 2         Grab TOTAL SUSPENDED SOLIDS                           30.0                       100.0                       1/Batch       Grab (TSS)
ItsaWNT-r.
OIL & GREASE                             15.0           --         20.0             -         liBatch         Grab COPPER, TOTAL RECOVERABLE                           1.0               -         10                      VOW&~tc         Grab IRON, TOTAL RECOVERABLE                             1.0             --         1.0           -         I/Batch         Grab 3
s.-UtU'CHARACTERISTIC (u..1) (]t.da:- (rl) (IObedy) M.QNC'. Tin-FLOW Report (MGD) Report (MGD) l/Batch Calculated pH 2 Report Report 1/Batch 2 Grab TOTAL SUSPENDED SOLIDS 30.0 1 00.0 1 /Batch Grab (TSS)OIL & GREASE 15.0 -- 20.0 -liBatch Grab COPPER, TOTAL RECOVERABLE 1.0 -1 0 VOW&~tc Grab IRON, TOTAL RECOVERABLE 1.0 -- 1.0 -I/Batch Grab PHOSPHORUS, TOTAL 1.0 -1.0 -1/Batch Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge If a batch discharge extends for more than a 24-pH analyses shall be performed within fifteen (15) minutes of sample collection Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used TVA-Watts Bar Nuclear Plant (Rationale)
PHOSPHORUS, TOTAL                               1.0             -           1.0           -         1/Batch         Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge Ifa batch discharge extends for more than a 24-pH analyses shall be performed within fifteen (15) minutes of sample collection Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used
NPDES Permit TN0020168 Page R-55 of R-57 I PERMIT LIMITS I TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water EFFLUENT LIMITATIONS MONITORING EFFLUENT LIMITATIONS MONITORING REQUIREMENTS MONTHLY DAILY EFFLUENT wcG. coc. o... -L XJAX CONC, IISMMr. S.k.M CHARACTERISTIC (m,1) (tb.1).yl)I.
 
RN,) VQ.Ncy. nV FLOW Report (MGO)' Report (MGD) 1 Continuous Recorder Certification of Instream Flow of .. Report as Yes;No 1/Month Operation 3,600 cfs when required Records pH 2 Range 6.0 -90 1/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 -100.0 1/Month Grab CHLORINE, TOTAL RESIDUAL (TRC)', 6 0.092 -- 0.158 -- l/Month Grab DISSOLVED OXYGEN (D.O.) -- -Report Min, -/Month Grab TEMPERATURE, Effluent Report Effluent Temperature Hourly Recorder 7 TEMPERATURE, Edge R of MiigZn 30.5 oC -Hourly Recorder':
TVA-Watts Bar Nuclear Plant (Rationale)
of Mixing Zone TEMPERATURE, Rise Upstream to Downstream 3 0 C -Hourly Calculated' TEMPERATURE, Rate of Change,'C pe 2 OC/Hour -- Hourly Calculated' 0 C per hour TEMPERATURE, Receiving  
NPDES Permit TN0020168 Page R-55 of R-57 I                       PERMIT LIMITS                                 I TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water LIMITATIONS                                 MONITORING EFFLUENT LIMITATIONS EFFLUENT                                                    MONITORING MONTHLY                               DAILY                         REQUIREMENTS EFFLUENT                           wcG.coc.               o...-           L CONC, XJAX          MAX*0L*T.            IISMMr.             S.k.M CHARACTERISTIC                             (m,1)             (tb.1).yl)I.                                         RN,) VQ.Ncy.         nV FLOW                                 Report (MGO)'                         Report (MGD) 1             Continuous           Recorder Certification of Instream Flow of                                 ..                       Report as Yes;No               1/Month           Operation 3,600 cfs when required                                                                                                                   Records pH 2                                                     Range 6.0 - 90                                 1/Month             Grab TOTAL SUSPENDED SOLIDS (TSS)                           30.0                 -             100.0                             1/Month             Grab CHLORINE, TOTAL RESIDUAL 6                       0.092                 --             0.158             --             l/Month             Grab (TRC)',
-335'C Hourly Recorded Stream Bottom I -IC25 25% Inhibition Concentration shall be _>67% effluent Semi-annual Composite Flow shall be reported in Million Gallons per Day (MGD).* pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
DISSOLVED OXYGEN (D.O.)                             --                 -           Report Min,         -                 /Month             Grab TEMPERATURE, Effluent                                         Report Effluent Temperature                               Hourly         Recorder 7 TEMPERATURE, Edge                                                                 30.5 oC             -               Hourly         R Recorder':
The acceptable methods for analysis af TRC are any methods specified in Title 40 CFR. Part 136 as amended. The method detection le,'el (MDL) for TRC shall not exceed 0 05 mgin unless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL_ the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section 8. Monitoring Procedures.
of MixingofZoneMiigZn TEMPERATURE, Rise Upstream to Downstream                                                                 3 0C            -                 Hourly         Calculated' TEMPERATURE, Rate of Change, 0
subsection 3 Test Procedures, paragraph b 4 See text below table for requirements
C per hour                            'C pe                             2 OC/Hour           --               Hourly         Calculated' TEMPERATURE, Receiving                                       -                       335'C                               Hourly         Recorded Stream Bottom                                         I       -
* See Part III for methodology
IC25                             25%Inhibition Concentration shall be _>67% effluent                 Semi-annual         Composite Flow shall be reported in Million Gallons per Day (MGD).
* pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
The acceptable methods for analysis af TRC areany methods specified in Title 40 CFR. Part 136 as amended. The method detection le,'el (MDL) for TRC shall not exceed 0 05 mginunless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL_the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section 8. Monitoring Procedures. subsection 3 Test Procedures, paragraph b 4   See text below table for requirements
* See Part IIIfor methodology
* Sampling for TRC shall be 5!Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.
* Sampling for TRC shall be 5!Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.
7 See additional (bulleted) comments in permit.
7 See additional (bulleted) comments in permit.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-56 of R-57 PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.
NPDES Permit TN0020168 Page R-56 of R-57 PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.
TVA-Watts Bar Nuclear Plant (Rationale)
TVA-Watts Bar Nuclear Plant (Rationale)
NPDES Permit TN0020168 Page R-57 of R-57 APPENDIX 5h -MRZ WATTS BAR DAM Shoreline of river Qkfr&#xfd;finn M riw&#xfd;r Tennessee River Lock and docking structure.
NPDES Permit TN0020168 Page R-57 of R-57 APPENDIX 5h - MRZ WATTS BAR DAM Shoreline of river                                                                       Qkfr&#xfd;finn M riw&#xfd;r Tennessee River                                         Lock and docking structure.
TVA-Watts Bar Nuclear Power Generating Facility, TNO020168 Flov v Original Zone of Mixing.0 Oft Datum SCCW (113)Discharge flow 148.895 MGD.MRZ Current location recorder station 0 33...................
TVA-Watts Bar Nuclear                                                                                                               Original Zone of Power Generating Facility,                                                                                                           Mixing.
..................
TNO020168 Flovv 0Oft Datum
...................
                                                                                        ...................
..................
                                                                                        ..................
....................................
                                                                                        ...................
.....................................
                                                                                        ..................
.....................................
                                                                                        ..........
...................
                                                                                        ..................
...........I .........................
                                                                                                          . . . . . . . .
..................
                                                                                        ........   . . . . . . . . . . .
..........  
                                                                                        ..................
.................
                                                                                        ........                                   low-Flow "Passive" SCCW (113)                      MRZ                                                ..................
...................
                                                                                                    . . . . . . . . . . .
..................
                                                                                        ...................                         Mixing Zone (extends
.................  
                                                                                        ...........I......
...............  
                                                                                        ...................
...................
                                                                                        ..................                         to edge). Cool water
..............
                                                                                          ................
...............
                                                                                                  ..........           .
..........
                                                                                        ...................
...................
                                                                                          .................. .
..................
                                                                                        .................
..................
refuge-zone in the Discharge flow                                                                    ..............
..................
                                                                                        .................         ..               bottom layer. Model
...................
                                                                                          ..............
..................
                                                                                        ...............
...................
148.895 MGD.                                                                                                                checked with
..................
                                                                                                      ..........
...I ...............................
                                                                                        ...................                         temperature profile
..................
                                                                                          ..................
..................
                                                                                          ..................
...................
                                                                                          ..................
..................
                                                                                        ...................                         under these
...................
                                                                                          ..................
..................
                                                                                        ...................
...........I .................  
                                                                                          ..................
.... ................
                                                                                        ...I   ...............                     conditions.
low-Flow "Passive" Mixing Zone (extends to edge). Cool water refuge-zone in the bottom layer. Model checked with temperature profile under these conditions.
                                                                                          ................
V loft 1 tfl.~,. -I .... .. I ,flflflflflfl,",,flflflfl,,,,,, High-Flow "Active" Mixing Zone.Typical moniting for compliance using (continuous) 24-hour, 7 day per week data recorders.
Current location                    ..................
Recorder station number 33 will be moved from present location to new location and new recorder station number 34 to be established at end-edge of mixing zone.I NOTTOSCALE
recorder station                    ..................
]I I ,flfl,.,fl,,,,,,,,,fl.,.
                                                                                        ...................
flflWfl,,,,,,,%
                                                                                        ..................
Lii,,,,,.I UVY %IVLLIU V New recorder recorder station # 34 Note: This diagram is a general Exact location to description of how the mixing zone be established, and temperature recorders are being relocated.
                                                                                        ...................
It is not intended to be an actual, or physical representation of the shape or dynamics of the thermal plume.}}
V loft 1 0 33                                  ..................
                                                                                        ...........I       .......
                                                                                          .......... ....
                                                                                        ..............             ..
                                                                                                                            -
I .... .. Itfl.~,.
High-Flow "Active" Mixing Zone.
Typical moniting for compliance
                                ,flflflflflfl,",,flflflfl,,,,,,
using (continuous) 24-hour, 7 day per week data recorders. Recorder station number 33 will be moved from present location to new location and new recorder station number 34 to be established at flflWfl,,,,,,,%
end-edge of mixing zone.
I I ,flfl,.,fl,,,,,,,,,fl.,.
I NOTTOSCALE ]
Lii,,,,,.
I UVY %IVLLIU V
New recorder     # 34                                recorder station                         Note: This diagram is a general Exact location to                                                                               description of how the mixing zone be established,                                                                                 and temperature recorders are being relocated. It is not intended to be an actual, or physical representation of the shape or dynamics of the thermal plume.}}

Revision as of 09:55, 12 November 2019

Notification of National Pollutant Discharge Elimination System Permit Modification
ML12009A072
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 12/27/2011
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TN0020168
Download: ML12009A072 (98)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 27, 2011 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License No. NPF-90 NRC Docket Nos. 50-390 and 50-391

Subject:

Notification of National Pollutant Discharge Elimination System Permit Modification

References:

1. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (WVA), "Modified NPDES Permit No.

TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee," dated September 1, 2011

2. Letter from Vojin Janjic (Tennessee Department of Environment and Conservation) to Don Grissette (TVA), "NPDES Permit No. TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee,"

dated October 11,2011 The purpose of this letter is to notify the NRC that the Watts Bar Nuclear Plant (WBN)

National Pollutant Discharge Elimination System (NPDES) Permit No. TN0020168 has been modified by the state of Tennessee (Reference 1). In accordance with Section 3.2, "Reporting Requirements for Changes to, and Renewal of, the NPDES Permit or State Certification," of Appendix B, "Environmental Protection Plan," (EPP) of the WBN, Unit 1, Facility Operating License No. NPF-90, the Tennessee Valley Authority (TVA) is providing the above referenced NPDES Permit No. TN0020168 to the NRC (Enclosure).

Section 3.2 of the EPP specifies that changes to, and renewals of, the NPDES permits shall be reported to the NRC within 30 days following the date the change or renewal is approved. During the initial 30 day period following receipt of the approved NPDES permit, TVA noticed several errors in the NPDES permit which rendered the modified permit Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 December 27, 2011 incomplete. The Tennessee Department of Environment and Conservation (TDEC) was contacted regarding these errors. Revised pages provided by TDEC in a letter dated October 11, 2011 (Reference 2), were numbered incorrectly. On October 20, 2011, TDEC concurred with the correctly numbered pages provided by TVA, as included in the Enclosure.

On November 28, 2011, TDEC provided concurrence to TVA's request for clarification regarding the following additional items. For external outfall number 113, the footnote "(6)"

listed in the "Sample Type" column on page 7 of 33 is a typographical error. There is no

.footnote for this sample type. In the second paragraph on page 29 of 33, comment "(2)"

should not be included in the first sentence. Since comment (2) in the referenced paragraph was incorporated into the permit, its inclusion in this sentence is a typographical error. Based on TVA's receipt of confirmation regarding these two items via electronic mail, neither of these errors have been corrected in the enclosed permit. Additionally, since TVA received concurrence regarding the complete version of modified NPDES Permit No.

TNO020168 on November 28, 2011, this submittal is being provided to the NRC within 30 days of November 28, 2011, which is December 28, 2011.

Section 3.2 of the WBN EPP requires the NRC be provided a copy of the proposed revision to the effective NPDES permit at the same time it is submitted to the permitting agency "...

if the proposed revision is a significant change of waste stream flow rate, concentration, or point of discharge." Since this current revision to the NPDES permit was considered a "Minor Modification" by the TDEC in accordance with 40 CFR 122.63, submittal of the proposed revision to the NRC was not required.

There are no regulatory commitments contained in this submittal. If there are any questions relating to this matter, please contact Kara M. Stacy, Program Manager, Corporate Nuclear Licensing, at 423-751-3489.

Respec u M nage Corporate Nuclear Licensing E closure:

Modified NPDES Permit No. TN0020168, TVA - Watts Bar Nuclear Plant, Spring City, Rhea County, Tennessee cc (Enclosure):

NRC Regional Administrator- Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 1 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 MODIFIED NPDES PERMIT NO. TN0020168, TVA - WATTS BAR NUCLEAR PLANT, SPRING CITY, RHEA COUNTY, TENNESSEE

STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243 SEP 0 1 2011 Mr. Don Grissette, Vice President, Watts Bar Nuclear Plant TVA Watts Bar Nuclear Plant 1260 Hwy 68, Nuclear Plant Rd.

Spring City, TN 37381

Subject:

Modified NPDES Permit No. TNO020168 TVA - Watts Bar Nuclear Plant Spring City, Rhea County, Tennessee

Dear Mr. Grissette:

In accordance with the provisions of "The Tennessee Water Quality Control Act" (Tennessee Code Annotated, Sections 69-3-101 through 69-3-120) your NPDES Permit is hereby modified by the Division of Water Pollution Control. The continuance and/or reissuance of this NPDES Permit is contingent upon your meeting the conditions and requirements as stated therein.

This minor modification revises items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft permit comments.

Please be advised that a petition for permit appeal may be filed, pursuant to T.C.A. Section 69-3-105, subsection (i), by the permit applicant or by any aggrieved person who participated in the public comment period or gave testimony at a formal public hearing whose appeal is based upon any of the issues that were provided to the commissioner in writing during the public comment period or in testimony at a formal public hearing on the permit application.

Additionally, for those permits for which the department gives public notice of a draft permit, any permit applicant or aggrieved person may base a permit appeal on any material change to conditions in the final permit from those in the draft, unless the material change has been subject to additional opportunity for public comment. Any petition for permit appeal under this subsection (i) shall be filed with the board within thirty (30) days after public notice of the commissioner's decision to issue or deny the permit.

If you have questions, please contact the Division of Water Pollution Control at your local Environmental Assistance Center at 1-888-891-TDEC; or, at this office, please contact Ms.

Souraya Fathi at (615) 532-0485 or by E-mail at Souraya.Fathi@tn.gov.

Sincerely, Pojfi n Jan Manager, Permit Section Division of Water Pollution Control PWAT-3 Enclosure cc: DWPC, Permit Section & Chattanooga Environmental Field Office Ms. Jerri L. Phillips, Environmental Scientist, TVA Watts Bar Nuclear Plant, jlphillips@tva.gov Ms. Betsy M. Eiford-Lee, Chemistry/Environmental Manager, bmeiford-lee@tva.gov Mr. Michael D. Skaggs, Site Vice President, mdskaggs@tva.gov Mr. Darrin J. H4tchison, Chemistry/Environmental Technical Support Manager, DJHutchi@tva.gov Ms. Connie A. ciigey, NPDES Permit Section, Kagey.Connie@epamail.epa.gov Mr. Gordon G Park, Manager of Environmental Compliance, ggpark@tva.gov Ms. Karrie-Jo Robinson Shell, Environmental Engineer, shell.karrie-jo@epa.gov Mr. Brian Paddock, Attorney, bpaddock@twlakes.net Mr. Barry W. Sulkin, Consultant, 4443 Pecan Valley Road, Nashville, TN 37218 Ms. Linden (Lindy) P. Johnson, Manager - Water Permitting & Compliance, lpjohnson@tva.gov Ms. Leslie Nale, Plant Manager, lwnale@tva.gov Mr. Mike Stiefel, Environmental Permitting and Compliance, TVA, mbstiefel@tva.gov Mr. Travis R Markum, Water Permits & Compliance Specialist, TVA, trmarkum@tva.gov

NPDES PERMIT No. TNO020168 Minor Modification Authorization to discharge under the National Pollutant Discharge Elimination System (NPDES)

Issued By Tennessee Department of Environment and Conservation Division of Water Pollution Control 401 Church Street 6th Floor, L & C Annex Nashville, Tennessee 37243-1534 Under authority of the Tennessee Water Quality Control Act of 1977 (T.C.A. 69-3-101 et seg.) and the delegation of authority from the United States Environmental Protection Agency under the Federal Water Pollution Control Act, as amended by the Clean Water Act of 1977 (33 U.S.C. 1251, et sea.)

Discharger: TVA- Watts Bar Nuclear Plant is authorized to discharge: process wastewater, cooling water and storm water runoff from Outfalls 101 and 102, turbine building sump water, alum sludge supernatant, reverse osmosis reject water, drum dewatering water, water purification plant water, and Supplemental Condenser Cooling Water (noncontact) from Outfall 113 from a facility located: in Spring City, Rhea County, Tennessee to receiving waters named: Tennessee River at mile 527.9 (Outfall 101), Tennessee River at mile 527.2 (Outfall 102), and Tennessee River at mile 529.2 (Outfall 113) in accordance with effluent limitations, monitoring requirements and other conditions set forth herein.

This permit shall become effective on: October 1,2011 This permit shall expire on: June 31, 2016 Issuance date: August 31, 2011 Yl E. Davis, Director Division of Water Pollution Control CN-0759 RDAs 2352 and 2356

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 TABLE OF CONTENTS Paae PART I ......................................................... ..... ................................................ 1 A. EFFLUENTLIMITATIONS AND MONITORING REQUIREMENTS .......................................................... 1 B. M O NITO RING PRO CEDU RES ................................................................................................................................... 12

1. Representative Sampling.......................................................... 12
2. Sam pling Frequency............................................................................................................................................ 12
3. Test Procedures............................................................................................................... ........................ 12
4. Recordingof Results ........................................................................................................ 12
5. Records Retention ................................................................. ........ ........ 13 C. DEFINITIONS ........................................................................................ ......... ..... ........................ 13 D. ACRO NYM S AND ABBREVIATIO NS ......................................................................................................................... 14 E. REPORTING ................................................ ................................... ............. 15
1. MonitoringResults .......................................................................................... ....... I5
2. Additional Monitoring by Permittee.................................................................................................. 16
3. Falsifying Results and/orReports ..... ..................................................................... .............. ........ ...... 16
4. Outlier Data... .................................................................................................... ....... .......... ..................... 16 PART II .................................................... ..... ................................. ............... 17 A. GENERAI PROVISIONS ........................................................................................................ 17
1. Duty to Reapply .................................................................................................................................................. 17
2. R ight of En try ....................................................................................................................................................... 17
3. Availability of Reports.......................................................................................... 17
4. Proper Operationand Maintenance................................................................... 17
5. Treatment Facility Failure......................................................................................... 18
6. PropertyRights ............................................................................................... ............ . ....... 18
7. Severability........................................................................................................................ 18
8. OtherInformation .................................................................................................. ....... 18 B. CHANGES AFFECTING THE PERM IT.......................................................................................................................... 18
1. PlannedChanges ........................................................................................................ ......... 18
2. PermitModification, Revocation, or Termination............................................................................................. 18
3. Change of Ownership ............................................................................ .........................- 19
4. Change of M ailingAddress............................................................................ ..... ............. .............. 19 C. NONCOMPLIANCE ........................................................................... ............ 20
1. Effect o Noncompliance f 1. ffctofNocoplane..............................

...................................................................................... ..... * ........... 20

2. Reporting o Noncom pliance.................................................................................... ....... ..... .......... ........ 20
3. overflow .................................................................................................... ........ ........... ........... 20 4 , Upse t .................................................................................................................................................................... 25
5. A dverse Impact..................................................................................................................................... .............. 22
6. Byp ass ...................................... ........................... ............................................................................................ 22 D. Washout IES........................................................................................ 22 D. LIA BILITIES ............................................................................. .. .. . ... ... . ... . .. .. ........ *..............*........*......... 2 3
1. Civil and Criminal Liability......................................................................... . ......................... ............. 23
2. Liability Under State Law ................................................................................................................. ............. 23 PART III .................................. .......................................................... ............ 23 A . TO XIC PO LLU TA NTS ................................................................................................................................................. 23 B. REOPENER CLAUSE ................................................................................................. 24

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 C. PLACEM ENT OF SIGNS .............................................................................................................................................. 24 D. ANTIDEGRADATION ............................................................................................................................................... 25 E. BIOM ONITORING REQUIREM ENTS, CHRONIC ...................................................................................................... 25 F. BIOCIDE/CORROSION TREATM ENT PLAN .................................................................................................................. 27 G. 316(B) ...................................................................................................................................................................... 27 PART IV....................................................................................................................................................................... 28 STORM WATER POLLUTION PREVENTION PLAN ............................................................................................................ 28 RATIONALE ................................................................................................................................................................... 1 I. DISCHARGER .............................................................................................................................................................. 1 II. PERM ITSTATUS ......................................................................................................................................................... 1 III. FACILITY DISCHARGES AND RECEIVING WATERS ............................................................................................... 2 IV. APPLICABLE EFFLUENT LIM ITATIONS GUIDELINES ............................................................................................. 5 V. PREVIOUS PERM IT LIM ITS AND M ONITORING REQUIREM ENTS ........................................................................... 8 VI. HISTORICAL M ONITORING AND INSPECTION ................................................................................................... 8 VII. NEW PERM IT LIM ITS AND M ONITORING REQUIREM ENTS .................................................................................. 8 VIII. M ETALSANDTOXICS ............................................................................................................................................ 22 IX. BIOM ONITORING REQUIREM ENTS, CHRONIC ........................................................................................................ 27

x. ANTIDEGRADATION ........................................... ...................................................................................................... 29 xl. PERM ITDURATION ................................................................................................................................................. 30 APPENDIX 1 - FACILITY DISCHARGES AND RECEIVING W ATERS ............................................................................. 31 APPENDIX 2- APPLICABLE EFFLUENT LIM ITATIONS GUIDELINES ........................................................................... 35 APPENDIX 3 - PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS ....................................................... 37 APPENDIX 4- HISTORICAL M ONITORING DATA .......................................................................................................... 41 APPENDIX SA -AM BIENT M ONITORING DATA ........................................................................................................... 45 APPENDIX 5B - WATER QUALITY BASED EFFLUENT CALCULATIONS ........................................................................ 46 APPENDIX SC - AMMONIA WATER QUALITY BASED CALCULATIONS ..................................................................... 47 APPENDIX SD - W ATER QUALITY CALCULATIONS FOR PH ...................................................................................... 48 APPENDIX SE - BIOM ONITORING DILUTION FACTORS ............................................................................................ 49 APPENDIX SF- COM PARISON OF DISCHARGE LIM ITATIONS ....................................................................................... s0 APPENDIX SG - NEW PERM IT LIM ITS .......................................................................................................................... 52 APPENDIX SH - M RZ ................................................................................................................................................... 57

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 1 of 33 I PART I A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS TVA - Watts Bar Nuclear (WBN) Plant is authorized to discharge process wastewater, cooling water and storm water to the Tennessee River (Outfalls 101,102, and 113) associated with nuclear electric power generation as described in the Rationale and permit application.

These discharges and three internal discharge locations (Outfalls 103, 107, and 114) shall be limited and monitored by the permittee as follows.

This TN-NPDES permit also constitutes the State's certification under Section 401 of the Clean Water Act for the purpose of obtaining any federal license for activities resulting in the discharges covered under the TN-NPDES permit.

TVA Watts Bar Nuclear Plant is authorized to discharge low volume wastewater, noncontact-cooling water, cooling tower blowdown, steam generator blowdown water, storm water, and other process and nonprocess wastewater as described in the permit Rationale and application. Outfall 101 discharges through a dual-pipe diffuser to the Tennessee River at mile 527.9.

These discharges shall be limited and monitored as specified below:

Description : External Outfall, Number : 101, Monitoring : Effluent Gross, Season : All Year Chlorine, total residual (TRC) (2,3) <= 0.1 mg/L Grab (2,3) wive Week ter Monthly Average Five Per Chlorine, total residual (TRC) (2,3) <= 0.1 mg/L Grab (2,3) Week Daily Maximum Chromium, total (as Cr) 2 mg/L Grab Waived (6) Daily Maximum Chromium, total (as Cr) 2 mg/L Grab Waived (6) Monthly Average Operation Certification of in-stream flow 3,500 cfs or Report Y=1 ;N=0 Monthly Total greater when required (7) Records Flow (1) Report Mgal/d Recorder Continuous Monthly Average Flow (1) Report Mgal/d Recorder Continuous Daily Maximum Oil & Grease

  • 20 mg/L Grab Monthly Daily Maximum Oil & Grease
  • 15 mg/L Grab Monthly Monthly Average Temperature, water deg. C (4) 35 deg C Recorder Continuous Daily Maximum Total Suspended Solids (TSS)
  • 100 mg/L Grab Monthly Daily Maximum Total Suspended Solids (TSS)
  • 30 mg/L Grab Monthly Monthly Average Twice Per Zinc, total (as Zn) <= 1 mg/L Grab Month Monthly Average Twice Per Daily Maximum Zinc, total (as Zn) <= 1 mg/L Grab Month Twice Per Minimum pH (2) * >= 6.0 su Grab Month Twice Per pH (2)* <= 9.0 Su Grab Month Maximum

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 2 of 33 Description : External Outfall, Number :101, Monitoring : Effluent Gross, Season : All Year IC25 Static Renewal 7 Day Chronic 2.8 Composite 2/Year Minimum Ceriodaphnia (5)

IC25 Static Renewal 7 Day Chronic >= 2.8  % Composite 2/ear Minimum Pimephales (5)

1) Flow shall be reported in Million Gallons per Day (MGD). In the event that the continuous flow monitor is out of service, flow monitoring shall be estimated by intake pump logs or the behavior (e.g., the rate of filling and emptying) of the yard holding pond.
2) pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.
3) The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR, Part 136 as amended. The method detection level (MDL) for TRC shall not exceed 0.05 mg/I unless the permittee demonstrates that Its MDL Is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. In cases where the permit limit is less that the MDL, the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section B. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.
4) When the temperature monitoring equipment fails, monitoring will be done once per day. Reasonable and timely effort will be made to restore the temperature recorder to operation as soon as possible. See Part III for further temperature requirements.
5) Sampling and analysis required only if discharge is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testing requirements have not already been completed for Outfall 101. See Part III for methodology.
6) Monitoring for chromium is waived per 40 CFR 122.44 (a)(2)(1). See Rationale for more comments.
7) Certification shall be made during any month that a discharge occurs from this outfall.
  • monitoring and limits for pH, total suspended solids, and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.

Note: There shall be no discharge of PCBs.

Discharges from Outfall 101 are authorized only during periods when the flow in the receiving stream is at a minimum of 3,500 cubic feet per second (cfs) or greater. Compliance with the minimum in-stream flow requirement of 3,500 cubic feet per second shall be certified monthly with the submission of Discharge Monitoring Reports submitted to the Division for this outfall.

Records concerning the instream flow shall be maintained and available upon request.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 3 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge low volume wastewater, once through condenser cooling water, noncontact cooling water, steam generator blowdown water, storm water, and other process and nonprocess wastewater as described in the permit Rationale and application. Discharge is authorized through Outfall 102 to the Tennessee River at mile 527.2.

These discharges shall be limited and monitored by the permittee as specified below:

Description : External Outfall, Number : 102, Monitoring : Effluent Gross, Season : All Year Monthly Chlorine, total residual (TRC) (2,3) 0.1 mg/L Grab Five Per Week Average Daily Chlorine, total residual (TRC) (2,3) <= 0.1 mg/L Grab Five Per Week Maximum Daily Chromium, total (as Cr) <= 2 mg/L Grab Waived (6)

Maximum Monthly Chromium, total (as Cr) <= 2 mg/L Grab Waived (6)

Average Certification of in-stream flow 3,500 Operation Monthly Total Report - Y=1;N=0 cfs or greater when required (7) Records Monthly Flow (1) Report Mgal/d Instantaneous Daily Average Daily Flow (1) Report Mgal/d Instantaneous Daily Maximum Daily Oil & Grease* <= 20 mg1L Grab Monthly (7)

Maximum Monthly Oil & Grease * <= 15 mg/L Grab Monthly (7) Average Daily Temperature, water deg. C (4) <= 35 deg C Grab Daily Maximum Daily Total Suspended Solids (TSS) * <= 100 mg/L Grab Monthly (7)

Maximum Monthly Total Suspended Solids (TSS) * <= 30 mg/L Grab Monthly (7) Average Twice Per Month Monthly Zinc, total (as Zn) <= 1 mg/L Grab Average (7)

Twice Per Month Daily Zinc, total (as Zn) mg/L Grab Maximum (7)

Twice Per Month Minimum pH (2)* >= 6.0 Su Grab (7)

Twice Per Month Maximum pH (2)* <= 9.0 su Grab (7)

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 4 of 33 Description External Outfall, Number :102, Monitoring : Effluent Gross, Season All Year IC25 Static Renewal 7 Day 2.8  % Composite 2/Year Minimum Chronic Ceriodaphnia (5)

IC25 Static Renewal 7 Day 2.8  % Composite 2/Year Minimum Chronic Pimephales (5)

(1) Flow shall be reported in Million Gallons per Day (MGD). In the event that the yard holding pond staff gages are out of service, flow monitoring shall be estimated by intake pump logs or the behavior (e.g.,

the rate of filling and emptying) of the yard holding pond.

(2) pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.

(3) The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR, Part 136 as amended. The method detection level (MDL) for TRC shall not exceed 0.05 mg/I unless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have It available for review upon request. In cases where the permit limit is less that the MDL, the reporting of TRC at less than the MDL shall be Interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section B. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.

(4) See Part III for methodology.

(5) Sampling and analysis required only if discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testing requirements have not already been completed for Outfall 101. See Part III for methodology.

(6) Certification shall be made during any month that a discharge occurs from this outfall.

(7) If there Is discharge during 1 or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall then one sample is required from that "batch' discharge in order to report the monthly average limit.

  • monitoring and limits for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.

Note: There shall be no discharge of PCBs.

Additional monitoring requirements and conditions applicable to Outfall 102 include:

Discharge through Outfall 102 (emergency overflow) is permitted only under emergency situations. This includes times when the diffuser pipe system is isolated as a result of diffuser maintenance and other emergency situations to preserve the integrity of the yard holding pond dikes such as in the event of a catastrophic storm event. All reasonable efforts shall be taken to resume normal discharge through Outfall 101 as soon as possible.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 5 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge turbine building sump water, alum sludge supernate, R.O. reject water, drum dewatering water, water purification plant water, and storm water through Ouffall 103, the Low Volume Waste Pond, an internal monitoring point as described in the Rationale and the permit application. These discharges shall be limited and monitored by the permittee as specified below:

Description : External Outfall, Number :103, Monitoring : Effluent Gross, Season : All Year VF01o40w UR Flow (1) Report Mgal/d Recorder Continuous Daily Maximum Flow (1) Report - Mgal/d Recorder Continuous Monthly Average Oil & Grease <= 20 mg/L Grab Monthly Daily Maximum Oil & Grease <= 15 mg/L Grab Monthly Monthly Average Total Suspended Solids (TSS) <= 100 mg/L Grab Monthly Daily Maximum Total (TSS)Suspended Solids <= 30 mg/L Grab Monthly Monthly Average pH (2) >= 6.0 SU Grab Monthly Minimum pH (2) <= 9.0 Su Grab Monthly Maximum (1) Flow shall be reported in Million Gallons per Day (MGD).

(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 6 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge metal cleaning wastewater, turbine building station sump water, diesel generator coolant, intermittent micro-filtered condenser tube cleaning discharges, and storm water through Outfall 107, the Lined and Unlined Ponds, an internal monitoring point as described in the Rationale and permit application. These discharges shall be limited and monitored by the permittee as specified below:

Description : External Outfall, Number : 107, Monitoring : Effluent Gross, Season : All Year Copper, total (as Cu) 1 mgtL Grab unce rer Daily Maximum Batch 1 Once Per Copper, total (as Cu) mg/L Grab Batch Monthly Average Flow (1) Report Mgal/d Calculated Once Per Monthly Average Batch Flow (1) Report MgaVd Calculated Once Per Daily Maximum Batch Iron, total (as Fe) 1 mg/L Grab Once Per Monthly Average Batch Iron, total (as Fe) 1 mgtL Grab Once Per Daily Maximum Batch Oil & Grease 20 mg/L Grab Once Per Daily Maximum Batch Oil & Grease 15 mg/L Grab Once Per Monthly Average Batch Phosphorus, total (as P) (3) mg/L Grab Once Per Monthly Average Batch Phosphorus, total (as P) (3) mg/L Grab Once Per Daily Maximum Batch Total Suspended Solids Once Per (TSS) 100 mg/L Grab Daily Maximum Batch Total Suspended Solids Once Per (TSS) 30 mg/L Grab Monthly Average Batch pH (2) Report Su Grab Once Per Minimum Batch pH (2) Report Su Grab Once Per Batch Maximum (1) Flow shall be reported In Million Gallons per Day (MGD) for each batch discharge. If a batch discharge extends for more than a 24-hour period, flow measurement shall be obtained and reported for each 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period.

(2) pH analyses shall be performed within fifteen (15) minutes of sample collection.

(3) Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 7 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge supplemental condenser cooling water through Outfall 113 to the Tennessee River at mile 529.2 as described in the Rationale and permit application. These discharges shall be limited and monitored by the permittee as specified below:

Description : External Outfall, Number : 113, Monitoring : Effluent Gross, Season : All Year Chlorine, total residual (TRC) (2, 3, 5) <= 0.09 mg/L Grab Monthly Monthly Average Chlorine, total residual (TRC) (2, 3, 5) <= 0.158 mg/L Grab Monthly Daily Maximum Certification of in-stream flow 3,500 cfs or - Operation greater when required Report Monthly Total Y=1 ;N=0 Records Flow (1) Report MgaVd Recorder (6) Continuous Monthly Average Flow (1) Report Mgal/d Recorder (6) Continuous Daily Maximum Oxygen, dissolved (DO) Report mg/L Grab Monthly Minimum Tem perature, water deg. C Report - deg C Recorder (6) Hourly Daily Maximum Total Suspended Solids (TSS) <= 30 mg/L Grab Monthly Monthly Average Total Suspended Solids (TSS) <= 100 mg/L Grab Monthly Daily Maximum pH (2) >= 6.0 SU Grab Monthly Minimum pH (2) <= 9.0 SU Grab Monthly Maximum Description : External Outfall, Number :113, Monitoring Instream Monitoring, Season All Year Li V~ I Temperature rise, upstream to downstream 3 deg C Calculated Hourly Daily Maximum Temperature rate of change <= 2 deg C/hr Calculated Hourly Daily Maximum Temperature, edge of mixing zone <= 30.5 deg C Recorder Hourly Daily Maximum Description :External Outfall, Number: 113, Monitoring -See Comments, Season : All Year

~

I"? itMtet - :' - eaf en ~ _

Temperature, receiving stream bottom 33.5 deg C Recorder Hourly Daily Maximum

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 8 of 33 Description External Outfall, Number :113, Monitoring : Effluent Gross, Season : All Year IC25 Static Renewal 7 Day Chronic Ceriodaphnia (4) 6.7 Composite 2/Year Minimum IC25 Static Renewal 7 Day Chronic 1 Pimephales (4) 6.7 Composite 2/Year Minimum (1) Flow shall be reported in Million Gallons per Day (MGD).

(2) pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.

(3) The acceptable methods for analysis of TRC are any methods specified in Title 40 CFR, Part 136 as amended. The method detection level (MDL) for TRC shall not exceed 0.05 mg/I unless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. In cases where the permit limit Is less that the MDL, the reporting of TRC at less than the MDL shall be Interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section B. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.

(4) See Part III for methodology (5) Sampling for TRC shall be 5/Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 9 of 33 TVA Watts Bar Nuclear Plant is authorized to discharge SCCW intake screen backwash to surface water through Outfall 114, an internal monitoring point as described in the Rationale and permit application. These discharges shall be limited and monitored by the permittee as specified below:

PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.

Additional limitations, conditions, and monitoring requirements applicable to Outfalls 101, 102,103,107, and 113 include:

There shall be no distinctly visible floating scum, oil or other matter contained in the wastewater discharge. The wastewater discharge must not cause an objectionable color contrast in the receiving stream.

The wastewater discharge shall not contain pollutants in quantities that will be hazardous or otherwise detrimental to humans, livestock, wildlife, plant life, or fish and aquatic life in the receiving stream.

Sludge or any other material removed by any treatment works must be disposed of in a manner, which prevents its entrance into, or pollution of any surface or subsurface waters.

Additionally, the disposal of such sludge or other material must be in compliance with the Tennessee Solid Waste Disposal Act, TCA 68-31-101 et seq. and the Tennessee Hazardous Waste Management Act, TCA 68-46-101 et seq.

For the purpose of evaluating Total Residual Chlorine/Total Residual Oxidant (TRC/TRO) as required in this permit, analyses shall include any residual bromine with results reported as chlorine, i.e., one test shall be used for situations where combinations of chlorine and bromine are used. The permittee shall sample the effluent when chemical additives are used resulting in TRC/TRO pollutants in the discharge as stipulated in the preceeding permit limits tables.

For batch discharges the monitoring and reporting of measurements of FLOW, the "Monthly Avg." shall be the total flow volume during the reporting period divided by the number of calendar days in that period. The "Daily Max." shall be the total flow volume for the day with the greatest amount of discharge during the reporting period. Example: 3 discharges of 15,000 gallons/day and 1 discharge of 20,000 gallons/day during a 1-month period result in a Monthly Avg. of 65,000 gallons/30 days, or 2,166 gallons/day (to be reported as 0.002166 MGD). The Daily Max to be reported for this example is 20,000 gallons/day or 0.020 MGD.

There shall be no discharge of PCB. With regard to PCB sampling, the permittee will have the opportunity to conduct additional tests, as necessary, to establish the existence of any PCBs in the effluent if they exist. The results of these additional tests and any conclusions drawn must be submitted to the Division within fifteen (15) days along with the monthly discharge monitoring report. The Division shall maintain the exclusive determination of the

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 10 of 33 validity of the additional tests and any conclusions to be drawn from them regarding the possibility of matrix interferences, or the need for additional monitoring. The decision of the division in this matter shall be final.

Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136.

The use of water treatment chemicals containing chromium is prohibited under this permit. Chromium monitoring is waived by authority of 40 CFR 122.44 (a)(2)(i), where application sample results demonstrated no Cr pollutant discharged from these outfalls (101 and 102).

Discharges are authorized for Outfall 101 only during periods when flow in the receiving stream is at a minimum of 3,500 cfs. All changes to the flow rate of the SCCW discharge (Outfall 113) shall be done during periods when flow in the receiving waters is at a minimum of 3,500 cfs. This includes periods of start-up, shutdown as well as other similar abrupt flow rate changes of the SCCW. When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cfs in the receiving waters.

If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements. Compliance with flow requirements for 3,500 cfs flow instream for Outfalls 101, 102 and 113 discharges shall be certified monthly with the submission of Discharge Monitoring Reports submitted to the Division for these outfalls. Records concerning the instream flow shall be maintained and available upon request.

The thermal mixing zones for Outfall 113 remain unchanged from the previous permit (see diagram in Appendix 5h). The discharge from Outfall 113 shall be limited and monitored by the permittee as specified below:

  • In recognition of the dynamic behavior of the thermal effluent in the river, monitoring shall be required for an active mixing zone and a passive mixing zone as described in the permit rationale.
  • The passive mixing zone includes the following dimensions: (1) a maximum width of from bank to bank in the river, and (2) a maximum length of 1000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer to allow for fish and other species to pass below the thermal plume.
  • Compliance for the passive mixing zone shall be by two instream temperature surveys, one conducted during winter ambient conditions and one during summer ambient conditions. The surveys shall be performed while the SCCW system is thermally loaded with low river flow conditions and shall include temperature profiles at a sufficient number of locations across the downstream edge of the passive mixing zone to locate the effluent plume. The measurements shall be compared with the results from the thermal plume model and shall be summarized in a report to the division semiannually. Survey requirements for the passive mixing zone shall be waived if unexpected events do not safely allow the establishment of a zero flow condition in the river (e.g., flood operation).

" The active mixing zone includes the following dimensions: (1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000 feet downstream of the outfall. It has been documented that there is a zone of (cool water) refuge in the bottom layer and left-

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 11 of 33 hand-side of the river to allow for fish and other species to pass beyond the thermal plume.

  • Compliance for the active mixing zone is given by the following requirements.
  • Compliance with TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be applicable at the edge of the active mixing zone.
  • Daily maximum temperatures for the TEMPERATURE, effluent; TEMPERATURE, Edge of Mixing zone; TEMPERATURE, Rise Upstream to Downstream; and TEMPERATURE, Rate of Change shall be determined from 1-hour average values.

The average values shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average.

  • As demonstrated by monitoring at the edge of the active mixing zone, the maximum temperature shall not exceed 30.50 C (except as a result of natural causes), the maximum change in temperature relative to the upstream control point shall not exceed 3 0 C (except as a result of natural causes), and the maximum temperature rate of change shall not exceed 2 0 C per hour (except as a result of natural causes).
  • The upstream ambient river temperature (control point) for determining the TEMPERATURE, Rise Upstream to Downstream for the active mixing zone shall be determined by sensors positioned in the discharge from the powerhouse at Watts Bar Dam. The upstream ambient river temperature shall be determined by the first sensor at or below a depth of 5 feet. This monitor shall also be used for ambient river temperature for the passive mixing zone surveys.
  • The river temperature for determining the TEMPERATURE, Edge of Mixing Zone and TEMPERATURE, rate-of-change shall be by two floating water temperature stations at the downstream edge of the active mixing zone. One station shall be located near the right-hand shoreline of the river (facing downstream) and one station shall be located near the center of the river. At each station, the water temperature at the 5-foot depth shall be determined as the average of sensors at three depths-3 feet, 5 feet, and 7 feet. The downstream river temperature and temperature rate of change shall be determined by the average temperature of the two floating water temperature stations.

Compliance with TEMPERATURE, Receiving Stream Bottom shall be applicable at the edge of a square mussel relocation zone located on the bottom of the river at the outfall and having a side dimension not less than 150 feet. The temperature shall be determined by a sensor located along the edge of the mussel relocation zone.

The daily maximum value for the TEMPERATURE, Receiving Stream Bottom shall be determined from 15-minute values. The 1-hour average value shall be calculated every 15 minutes using the current and previous four 15-minute values, thus creating a rolling average. The temperature shall be reported on the Discharge Monitoring Reports as the daily maximum (highest value for a day) and monthly average value.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 12 of 33 B. MONITORING PROCEDURES

1. Representative Sampling Samples and measurements taken in compliance with the monitoring requirements specified herein shall be representative of the volume and nature of the monitored discharge, and shall be taken after treatment and prior to mixing with uncontaminated storm water runoff or the receiving stream.

The permittee shall maintain a capability for composite sampling of Outfall 101 discharges. Temporary or mobile equipment may be used for this since the sampling protocal instituted does not utilize standard sample collection equipment to collect the samples. TVA shall ensure sampling protocol conforms to 40 CFR 136 procedures.

2. Sampling Frequency If there is a discharge from a permitted outfall on any given day during the monitoring period, the permittee must sample and report the results of analyses accordingly, and the permittee should not mark the 'No Discharge' box on the Discharge Monitoring Report form.
3. Test Procedures
a. Test procedures for the analysis of pollutants shall conform to regulations published pursuant to Section 304 (h) of the Clean Water Act (the "Act"), as amended, under which such procedures may be required.
b. Unless otherwise noted in the permit, all pollutant parameters shall be determined according to methods prescribed in Title 40, CFR, Part 136, as amended, promulgated pursuant to Section 304 (h) of the Act.
4. Recording of Results For each measurement or sample taken pursuant to the requirements of this permit, the permittee shall record the following information:
a. The exact place, date and time of sampling;
b. The exact person(s) collecting samples;
c. The dates and times the analyses were performed;
d. The person(s) or laboratory who performed the analyses;
e. The analytical techniques or methods used, and;
f. The results of all required analyses.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 13 of 33

5. Records Retention All records and information resulting from the monitoring activities required by this permit including all records of analyses performed and calibration and maintenance of instrumentation shall be retained for a minimum of three (3) years, or longer, if requested by the Division of Water Pollution Control.

C. DEFINITIONS The Daily Maximum Concentrationis a limitation on the average concentration, in milligrams per liter (rag/L), of the discharge during any calendar day. When a proportional-to-flow composite sampling device is used, the daily concentration is the concentration of that 24-hour composite; when other sampling means are used, the daily concentration is the arithmetic mean of the concentrations of equal volume samples collected during any calendar day or sampling period.

The Monthly Average Concentration, a limitation on the discharge concentration, in milligrams per liter (mg/L), is the arithmetic mean of all daily concentrations determined in a one-month period. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.

The Monthly Average Amount, a discharge limitation measured in pounds per day (lb/day), is the total amount of any pollutant in the discharge by weight during a calendar month divided by the number of days in the month that the production or commercial facility was operating.

Where less than daily sampling is required by a permit, the monthly average amount shall be determined by the summation of all the measured daily discharges by weight divided by the number of days during the calendar month when the measurements were made. For the purpose of this definition, a frequency of 2/Month is representative of 2 separate daily samples, each sample having been collected on a separate day during the monitoring period.

The Daily Maximum Amount, is a limitation measured in pounds per day (lb/day), on the total amount of any pollutant in the discharge by weight during any calendar day.

The Instantaneous Concentrationis a limitation on the concentration, in milligrams per liter (mg/L), of any pollutant contained in the discharge determined from a grab sample taken at any point in time.

A Composite Sample, for the purposes of this permit, is a sample collected continuously over a period of 24-hours at a rate proportional to the flow. Composite sample should be a combination of at least 8 sample aliquots of at least 100 milliliters, collected at periodic intervals during the operating hours of a facility over a 24-hour period.

A Grab Sample, for the purposes of this permit, is defined as a single effluent sample of at least 100 milliliters (sample volumes <100 milliliters are allowed when specified per standard methods, latest edition) collected at a randomly selected time over a period not exceeding 15 minutes. The sample(s) shall be collected at the period(s) most representative of the total discharge.

For the purpose of this permit, a CalendarDay is defined as any 24-hour period.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 14 of 33 For the purpose of this permit, a Quarteris defined as any one of the following three month periods: January 1 through March 31, April 1 through June 30, July 1 through September 30, or October 1 through December 31.

For the purpose of this permit, Semi-annually means the same as "once every six months."

Measurements of the effluent characteristics concentrations may be made anytime during a 6 month period beginning from the issuance date of this permit so long as the second set of measurements for a given 12 month period are made approximately 6 months subsequent to that time, if feasible.

For the purpose of this permit, Annually is defined as a monitoring frequency of once every twelve (12) months beginning with the date of issuance of this permit so long as the following set of measurements for a given 12 month period are made approximately 12 months subsequent to that time.

D. ACRONYMS AND ABBREVIATIONS 1Q10 day minimum, 10-year recurrence interval 30Q20 day minimum, 20-year recurrence interval 7Q10 day minimum, 10-year recurrence interval BAT - best available technology economically achievable BCT - best conventional pollutant control technology BDL - below detection level BOD5 - five day biochemical oxygen demand BPT - best practicable control technology currently available CBOD5 - five day carbonaceous biochemical oxygen demand CEI - compliance evaluation inspection CFR - code of federal regulations CFS - cubic feet per second CFU - colony forming units ClU - categorical industrial user CSO - combined sewer overflow DMR - discharge monitoring report D.O. - dissolved oxygen E. coil - Escherichiacoli EFO - environmental field office LB(lb) - pound IC25 - inhibition concentration causing 25% reduction in survival, reproduction and growth of the test organisms IU - industrial user IWS - industrial waste survey LC50 - acute test causing 50% lethality MDL - method detection level MGD - million gallons per day MG/L(mg/I) - milligrams per liter ML - minimum level of quantification ml - milliliter MLSS - mixed liquor suspended solids MOR - monthly operating report NODI - no discharge

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 15 of 33 NOEC - no observed effect concentration NPDES - national pollutant discharge elimination system PL - permit limit POTW - publicly owned treatment works RDL - required detection limit SAR - semi-annual [pretreatment program] report SIU - significant industrial user SSO - sanitary sewer overflow STP - sewage treatment plant TCA - Tennessee code annotated TDEC - Tennessee Department of Environment and Conservation TIE/TRE -,toxicity identification evaluation/toxicity reduction evaluation TMDL - total maximum daily load TRC - total residual chlorine TSS - total suspended solids WQBEL - water quality based effluent limit E. REPORTING

1. Monitoring Results Monitoring results shall be recorded monthly and submitted monthly using Discharge Monitoring Report (DMR) forms supplied by the Division of Water Pollution Control or comparable forms provided by the permittee, and approved by the Division of Water Pollution Control. Submittals shall be postmarked no later than 15 days after the completion of the reporting period. The top two copies of each report are to be submitted. A copy should be retained for the permittee's files. DMRs and any communication regarding compliance with the conditions of this permit must be sent to:

TENNESSEE DEPT. OF ENVIRONMENT & CONSERVATION DIVISION OF WATER POLLUTION CONTROL COMPLIANCE REVIEW SECTION 401 CHURCH STREET L & C ANNEX 6TH FLOOR NASHVILLE TN 37243-1534 A copy of the completed and signed DMR shall be mailed to the Chattanooga Environmental Field Office (EFO) at the following address:

TENNESSEE DEPT. OF ENVIRONMENT & CONSERVATION DIVISION OF WATER POLLUTION CONTROL CHATTANOOGA ENVIRONMENTAL FIELD OFFICE 540 MCCALLIE AVENUE, SUITE 550 CHATTANOOGA TN 37402 The first DMR is due on the fifteenth of the month following permit effectiveness.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 16 of 33 DMRs and any other information or report must be signed and certified by a responsible corporate officer as defined in 40 CFR 122.22, a general partner or proprietor, or a principal municipal executive officer or ranking elected official, or his duly authorized representative.

Such authorization must be submitted in writing and must explain the duties and responsibilities of the authorized representative.

The electronic submission of DMRs shall be accepted only if approved in writing by the division.

For purposes of determining compliance with this permit, data submitted in electronic format is legally equivalent to data submitted on signed and certified DMR forms.

2. Additional Monitoring by Permittee If the permittee monitors any pollutant specifically limited by this permit more frequently than required at the location(s) designated, using approved analytical methods as specified herein, the results of such monitoring shall be included in the calculation and reporting of the values required in the DMR form. Such increased frequency shall also be indicated on the form.
3. Falsifying Results and/or Reports Knowingly making any false statement on any report required by this permit or falsifying any result may result in the imposition of criminal penalties as provided for in Section 309 of the Federal Water Pollution Control Act, as amended, and in Section 69-3-115 of the Tennessee Water Quality Control Act.
4. Outlier Data Outlier data include analytical results that are probably false. The validity of results is based on operational knowledge and a properly implemented quality assurance program. False results may include laboratory artifacts, potential sample tampering, broken or suspect sample containers, sample contamination or similar demonstrated quality control flaw.

Outlier data are identified through a properly implemented quality assurance program, and according to ASTM standards (e.g. Grubbs Test, 'h' and 'k' statistics). Furthermore, outliers should be verified, corrected, or removed, based on further inquiries into the matter. If an outlier was verified (through repeated testing and/or analysis), it should remain in the preliminary data set. If an outlier resulted from a transcription or similar clerical error, it should be corrected and subsequently reported.

Therefore, only if an outlier was associated with problems in the collection or analysis of the samples, and as such does not conform with the Guidelines Establishing Test Procedures for the Analysis of Pollutants (40 CFR §136), it can be removed from the data set and not reported on the Discharge Monitoring Report forms (DMRs). Otherwise, all results (including monitoring of pollutants more frequently than required at the location(s) designated, using approved analytical methods as specified in the permit) should be included in the calculation and reporting of the values required in the DMR form. The permittee is encouraged to use "comment" section of the DMR form (or attach additional pages), in order to explain any potential outliers or dubious results.

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 17 of 33 I PART II A. GENERAL PROVISIONS

1. Duty to Reapply Permittee is not authorized to discharge after the expiration date of this permit. In order to receive authorization to discharge beyond the expiration date, the permittee shall submit such information and forms as are required to the Director of Water Pollution Control (the "Director")

no later than 180 days prior to the expiration date. Such applications must be properly signed and certified.

2. Right of Entry The permittee shall allow the Director, the Regional Administrator of the U.S. Environmental Protection Agency, or their authorized representatives, upon the presentation of credentials:
a. To enter upon the permittee's premises where an effluent source is located or where records are required to be kept under the terms and conditions of this permit, and at reasonable times to copy these records;
b. To inspect at reasonable times any monitoring equipment or method or any collection, treatment, pollution management, or discharge facilities required under this permit; and
c. To sample at reasonable times any discharge of pollutants.
3. Availability of Reports Except for data determined to be confidential under Section 308 of the Federal Water Pollution Control Act, as amended, all reports prepared in accordance with the terms of this permit shall be available for public inspection at the offices of the Division of Water Pollution Control. As required by the Federal Act, effluent data shall not be considered confidential.
4. Proper Operation and Maintenance
a. The permittee shall at all times properly operate and maintain all facilities and systems (and related appurtenances) for collection and treatment which are installed or used by the permittee to achieve compliance with the terms and conditions of this permit. Proper operation and maintenance also includes adequate laboratory and process controls and appropriate quality assurance procedures. This provision requires the operation of backup or auxiliary facilities or similar systems, which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of the permit. Backup continuous pH and flow monitoring equipment are not required.
b. Dilution water shall not be added to comply with effluent requirements to achieve BCT, BPT, BAT and or other technology-based effluent limitations such as those in State of Tennessee Rule 1200-4-5-.03.

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 18 of 33

5. Treatment Facility Failure The permittee, in order to maintain compliance with this permit, shall control production, all discharges, or both, upon reduction, loss, or failure of the treatment facility, until the facility is restored or an alternative method of treatment is provided. This requirement applies in such situations as the reduction, loss, or failure of the primary source of power.
6. Property Rights The issuance of this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State, or local laws or regulations.
7. Severability The provisions of this permit are severable. If any provision of this permit due to any circumstance, is held invalid, then the application of such provision to other circumstances and to the remainder of this permit shall not be affected thereby.
8. Other Information If the permittee becomes aware that he failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit application or in any report to the Director, then he shall promptly submit such facts or information.

B. CHANGES AFFECTING THE PERMIT

1. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:
a. The alteration or addition to a permitted facility may meet one of the criteria for determining whether a facility is a new source in 40 CFR 122.29(b); or
b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants which are subject neither to effluent limitations in the permit, nor to notification requirements under 40 CFR 122.42(a)(1).
2. Permit Modification, Revocation, or Termination
a. This permit may be modified, revoked and reissued, or terminated for cause as described in 40 CFR 122.62 and 122.64, Federal Register, Volume 49, No. 188 (Wednesday, September 26, 1984), as amended.
b. The permittee shall furnish to the Director, within a reasonable time, any information which the Director may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit, or to determine compliance with this permit. The permittee shall also furnish to the Director, upon request, copies of records required to be kept by this permit.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 19 of 33

c. If any applicable effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohibition) is established for any toxic pollutant under Section 307(a) of the Federal Water Pollution Control Act, as amended, the Director shall modify or revoke and reissue the permit to conform to the prohibition or to the effluent standard, providing that the effluent standard is more stringent than the limitation in the permit on the toxic pollutant. The permittee shall comply with these effluent standards or prohibitions within the time provided in the regulations that establish these standards or prohibitions, even if the permit has not yet been modified or revoked and reissued to incorporate the requirement.
d. The filing of a request by the permittee for a modification, revocation, reissuance, termination, or notification of planned changes or anticipated noncompliance does not halt any permit condition.
3. Change of Ownership This permit may be transferred to another party (provided there are neither modifications to the facility or its operations, nor any other changes which might affect the permit limits and conditions contained in the permit) by the permittee if:
a. The permittee notifies the Director of the proposed transfer at least 30 days in advance of the proposed transfer date;
b. The notice includes a written agreement between the existing and new permittee's containing a specified date for transfer of permit responsibility, coverage, and liability between them; and
c. The Director, within 30 days, does not notify the current permittee and the new permittee of his intent to modify, revoke or reissue, or terminate the permit and to require that a new application be filed rather than agreeing to the transfer of the permit.

Pursuant to the requirements of 40 CFR 122.61, concerning transfer of ownership, the permittee must provide the following information to the division in their formal notice of intent to transfer ownership: 1) the NPDES permit number of the subject permit; 2) the effective date of the proposed transfer; 3) the name and address of the transferor; 4) the name and address of the transferee; 5) the names of the responsible parties for both the transferor and transferee; 6) a statement that the transferee assumes responsibility for the subject NPDES permit; 7) a statement that the transferor relinquishes responsibility for the subject NPDES permit; 8) the signatures of the responsible parties for both the transferor and transferee pursuant to the requirements of 40 CFR 122.22(a), "Signatories to permit applications"; and, 9) a statement regarding any proposed modifications to the facility, it's operations, or any other changes which might affect the permit limits and conditions contained in the permit.

4. Change of Mailing Address The permittee shall promptly provide to the Director written notice of any change of mailing address. In the absence of such notice the original address of the permittee shall be assumed to be correct.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 20 of 33 C. NONCOMPLIANCE

1. Effect of Noncompliance All discharges shall be consistent with the terms and conditions of this permit. Any permit noncompliance constitutes a violation of applicable State and Federal laws and is grounds for enforcement action, permit termination, permit modification, or denial of permit reissuance.
2. Reporting of Noncompliance
a. 24-Hour Reporting In the case of any noncompliance which could cause a threat to public drinking supplies, or any other discharge which could constitute a threat to human health or the environment, the required notice of non-compliance shall be provided to the Division of Water Pollution Control in the appropriate Environmental Assistance Center within 24-hours from the time the permittee becomes aware of the circumstances. (The Environmental Assistance Center should be contacted for names and phone numbers of environmental response personnel).

A written submission must be provided within five days of the time the permittee becomes aware of the circumstances unless this requirement is waived by the Director on a case-by-case basis. The permittee shall provide the Director with the following information:

I. A description of the discharge and cause of noncompliance; ii. The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and iii. The steps being taken to reduce, eliminate, and prevent recurrence of the noncomplying discharge.

b. Scheduled Reporting For instances of noncompliance, which are not reported under subparagraph 2.a.

above, the permittee shall report the noncompliance on the Discharge Monitoring Report. The report shall contain all information concerning the steps taken, or planned, to reduce, eliminate, and prevent recurrence of the violation and the anticipated time the violation is expected to continue.

3. Overflow
a. "Overflow," means the discharge to land or water of wastes from any portion of the collection, transmission, or treatment system other than through permitted outfalls.
b. Overflows are prohibited.
c. The permittee shall operate the collection system so as to avoid overflows. No new or additional flows shall be added upstream of any point in the collection system, which experiences chronic overflows (greater than 5 events per year) or would otherwise overload any portion of the system.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 21 of 33

d. Unless there is specific enforcement action to the contrary, the permittee is relieved of this requirement after: 1) an authorized representative of the Commissioner of the Department of Environment and Conservation has approved an engineering report and construction plans and specifications prepared in accordance with accepted engineering practices for correction of the problem; 2) the correction work is underway; and 3) the cumulative, peak-design, flows potentially added from new connections and line extensions upstream of any chronic overflow point are less than or proportional to the amount of inflow and infiltration removal documented upstream of that point. The inflow and infiltration reduction must be measured by the permittee using practices that are customary in the environmental engineering field and reported in an attachment to a Monthly Operating Report submitted to the local TDEC Environmental Assistance Center. The data measurement period shall be sufficient to account for seasonal rainfall patterns and seasonal groundwater table elevations.
e. In the event that more than five (5) overflows have occurred from a single point in the collection system for reasons that may not warrant the self-imposed moratorium or completion of the actions identified in this paragraph, the permittee may request a meeting with the Division of Water Pollution Control EAC staff to petition for a waiver based on mitigating evidence.
4. Upset
a. "Upset," means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based effluent limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
b. An upset shall constitute an affirmative defense to an action brought for noncompliance with such technology-based permit effluent limitations if the permittee demonstrates, through properly signed, contemporaneous operating logs, or other relevant evidence that:
i. An upset occurred and that the permittee can identify the cause(s) of the upset; ii. The permitted facility was at the time being operated in a prudent and workman-like manner and in compliance with proper operation and maintenance procedures; iii. The permittee submitted information required under "Reporting of Noncompliance" within 24-hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days); and iv. The permittee complied with any remedial measures required under "Adverse Impact."

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 22 of 33

5. Adverse Impact The permittee shall take all reasonable steps to minimize any adverse impact to the waters of Tennessee resulting from noncompliance with this permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the noncomplying discharge. It shall not be a defense for the permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.
6. Bypass
a. "Bypass" is the intentional diversion of wastewater away from any portion of a treatment facility. "Severe property damage" means substantial physical damage to property, damage to the treatment facilities, which would cause them to become inoperable, or substantial and permanent loss of natural resources, which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.
b. Bypasses are prohibited unless the following 3 conditions are met:
i. The bypass is unavoidable to prevent loss of life, personal injury, or severe property damage; ii. There are not feasible alternatives to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass, which occurred during normal periods of equipment downtime or preventative maintenance;-

iii. The permittee submits notice of an unanticipated bypass to the Division of Water Pollution Control in the appropriate environmental assistance center within 24-hours of becoming aware of the bypass (if this information is provided orally, a written submission must be provided within five days). When the need for the bypass is foreseeable, prior notification shall be submitted to the Director, if possible, at least 10 days before the date of the bypass.

c. Bypasses not exceeding limitations are allowed only if the bypass is necessary for essential maintenance to assure efficient operation. All other bypasses are prohibited. Allowable bypasses not exceeding limitations are not subject to the reporting requirements of 6.b.iii, above.
7. Washout
a. For domestic wastewater plants only, a "washout" shall be defined as loss of Mixed Liquor Suspended Solids (MLSS) of 30.00% or more. This refers to the MLSS in the aeration basin(s) only. This does not include MLSS decrease due to solids wasting to the sludge disposal system. A washout can be caused by improper operation or from peak flows due to infiltration and inflow.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 23 of 33

b. A washout is prohibited. If a washout occurs, the permittee must report the incident to the Division of Water Pollution Control in the appropriate Environmental Assistance Center within 24-hours by telephone. A written submission must be provided within 5 days. The washout must be noted on the discharge monitoring report. Each,, day of a washout is a separate violation.

D. LIABILITIES

1. Civil and Criminal Liability Except as provided in permit conditions for "Bypassing," "Overflow," and "Upset," nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance. Notwithstanding this permit, the permittee shall remain liable for any damages sustained by the State of Tennessee, including but not limited to fish kills and losses of aquatic life and/or wildlife, as a result of the discharge of wastewater to any surface or subsurface waters. Additionally, notwithstanding this Permit, it shall be the responsibility of the permittee to conduct its wastewater treatment and/or discharge activities in a manner such that public or private nuisances or health hazards shall not be created.
2. Liability Under State Law Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable State law or the Federal Water Pollution Control Act, as amended.

I PART III OTHER REQUIREMENTS A. TOXIC POLLUTANTS The permittee shall notify the Division of Water Pollution Control as soon as it knows or has reason to believe:

1. That any activity has occurred or will occur which would result in the discharge on a routine or frequent basis, of any toxic substance(s) (listed at 40 CFR 122, Appendix D, Table II and Ill) which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels":
a. One hundred micrograms per liter (100 ug/I);
b. Two hundred micrograms per liter (200 ug/I) for acrolein and acrylonitrile; five hundred micrograms per liter (500 ug/I) for 2,4-dinitrophenol and for 2-methyl-4,6-dinitrophenol; and one milligram per liter (1 mg/L) for antimony;

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 24 of 33

c. Five (5) times the maximum concentration value reported for that pollutant(s) in the permit application in accordance with 122.21 (g)(7); or
d. The level established by the Director in accordance with 122.44(f).
2. That any activity has occurred or will occur which would result in any discharge, on a non-routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification levels":
a. Five hundred micrograms per liter (500 ug/I);
b. One milligram per liter (1 mg/L) for antimony;
d. Ten (10) times the maximum concentration value reported for that pollutant in the permit application in accordance with 122.21 (g)(7); or
d. The level established by the Director in accordance with 122.44(f).

B. REOPENER CLAUSE If an applicable standard or limitation is promulgated under Sections 301(b)(2)(C) and (D), 304(B)(2), and 307(a)(2) and that effluent standard or limitation is more stringent than any effluent limitation in the permit or controls a pollutant not limited in the permit, the permit shall be promptly modified or revoked and reissued to conform to that effluent standard or limitation.

C. PLACEMENT OF SIGNS Within sixty (60) days of the effective date of this permit, the permittee shall place and maintain a sign at each outfall and any bypass/overflow point in the collection system. For the purposes of this requirement, any bypass/overflow point that has discharged five (5) or more times in the last year must be so posted. The sign(s) should be clearly visible to the public from the bank and the receiving stream or from the nearest public property/right-of-way, if applicable.

The minimum sign size should be two feet by two feet (2' x 2') with one-inch (1") letters. The sign should be made of durable material and have a white background with black letters.

The sign(s) are to provide notice to the public as to the nature of the discharge and, in the case of the permitted outfalls, that the discharge is regulated by the Tennessee Department of Environment and Conservation, Division of Water Pollution Control. The following is given as an example of the minimal amount of information that must be included on the sign:

TREATED INDUSTRIAL WASTEWATER and STORM WATER RUNOFF TVA - Watts Bar Nuclear Plant (Permittee's Phone Number)

NPDES Permit NO. TN0020168 TENNESSEE DIVISION OF WATER POLLUTION CONTROL 1-888-891-8332 ENVIRONMENTAL FIELD OFFICE - CHATTANOOGA

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 25 of 33 D. ANTIDEGRADATION Pursuant to the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06, titled "Tennessee Antidegradation Statement," and in consideration of the Department's directive in attaining the greatest degree of effluent reduction achievable in municipal, industrial, and other wastes, the permittee shall further be required, pursuant to the terms and conditions of this permit, to comply with the effluent limitations and schedules of compliance required to implement applicable water quality standards, to comply with a State Water Quality Plan or other State or Federal laws or regulations, or where practicable, to comply with a standard permitting no discharge of pollutants.

E. BIOMONITORING REQUIREMENTS, CHRONIC The permittee shall conduct a 3-Brood Ceriodaphniadubia Survival and Reproduction Test and a 7-Day Fathead Minnow (Pimephalespromelas) Larval Survival and Growth Test on the same samples of final effluent from Outfalls 101, 102, and 113.

The measured endpoint for toxicity shall be the inhibition concentration causing 25%

reduction (IC25) in survival, reproduction, or growth of the test organisms. The IC25 shall be determined based on a 25% reduction as compared to the controls. The average reproduction and growth responses shall be determined based on the number of Ceriodaphnia dubia or Pimephalespromelas larvae used to initiate the test. A separate statistical analysis based on survival information is not required.

Test shall be conducted and its results reported based on appropriate replicates of a total of five serial dilutions and a control, using the percent effluent dilutions as presented in the following table:

Outfalls 101 & 102 Serial Dilutions for Whole Effluent Toxicity E) Testing 4 X PL 2 X PL Permit Limit 0.50 X PL 0.25 X PL Control (PL)

% effluent 11.2 5.6 2.8 1.4 0.7 0 Outfall 113 Serial Dilutions for Whole Effluent Toxicity WET) Testing Permit Limit 4 X PL 2 X PL (PL) 0.50 X PL 0.25 X PL Control

% effluent 26.8 13.4 6.7 3.4 1.68 0 The dilution/control water used shall be a moderately hard water as described in Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013 (or the most current edition). Results from a chronic standard

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 26 of 33 reference toxicant quality assurance test for each species tested shall be submitted with the discharge monitoring report. Reference toxicant tests shall be conducted as required in EPA-821-R-02-013 (or the most current edition). Additionally, the analysis of this multi-concentration test shall include review of the concentration-response relationship to ensure that calculated test results are interpreted appropriately.

Toxicity will be demonstrated if the IC25 is less than the permit limit indicated for each outfall in the above table(s). Toxicity demonstrated by the tests specified herein constitutes a violation of this permit. However, if raw water intake samples (tested concurrently with the effluent samples) are shown to be toxic enough to represent a test failure (100 percent samples statistically less than controls using t-tests and minnow growth or daphnid reproduction is 25 percent less than controls) and if effluent toxicity is not statistically greater than calculated intake toxicity; the effluent toxicity test in question will be considered invalid. In the event these two above described conditions occur, the toxicity test shall be repeated according to the schedule requirements for test failure. Effluent toxicity that is not consistent with the intake toxicity conditions specified above constitutes a violation of this permit. If pathogens are demonstrated to be the source of toxicity to Pimephales promelas in the intake water, the permittee may be allowed to treat effluent samples for toxicity testing on Pimephales promelas with UV radiation only in accordance with prior written approval from the Division.

All tests will be conducted using a minimum of three 24-hour flow-proportionate composite samples of final effluent (e.g., collected on days 1, 3 and 5). If, in any control more than 20% of the test organisms die in 7 days, the test (control and effluent) is considered invalid and the test shall be repeated within 30 days of the date the initial test is invalidated. Furthermore, if the results do not meet the acceptability criteria of section 4.9.1, EPA-821-R-02-013 (or the most current edition), or if the required concentration-response review fails to yield a valid relationship per guidance contained in Method Guidance and Recommendations for Whole Effluent Toxicity (WET) Testing, EPA-821-B-00-004 (or the most current edition), that test shall be repeated. Any test initiated but terminated before completion must also be reported along with a complete explanation for the termination.

The toxicity tests specified herein shall be conducted twice a year (2/Year) for Outfalls 101, 102, and 113, and frequency and results reporting will be governed by the TDEC-approved Blocide/Corrosion Treatment Plan (B/CTP).

In the event of a test failure, the permittee must start a follow-up test within 2 weeks and submit results from a follow-up test within 30 days from obtaining initial WET testing results.

The follow-up test must be conducted using the same serial dilutions as presented in the corresponding table(s) above. The follow-up test will not negate an initial failed test. In addition, the failure of a follow-up test will constitute a separate permit violation, which must also be reported.

In the event of 2 consecutive test failures or 3 test failures within a 12 month period for the same outfall, the permittee must initiate a Toxicity Identification Evaluation/Toxicity Reduction Evaluation (TIE/TRE) study within 30 days and so notify the Division by letter. This notification shall include a schedule of activities for the initial investigation of that outfall. During the term of the TIE/TRE study, the frequency of biomonitoring shall be once every three months.

Additionally, the permittee shall submit progress reports once every three months throughout the term of the TIE/TRE study. The toxicity must be reduced to allowable limits for that outfall within 2 years of initiation of the TIE/TRE study. Subsequent to the results obtained from the TIE/TRE studies, the permittee may request an extension of the TIE/TRE study period if

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 27 of 33 necessary to conduct further analyses. The final determination of any extension period will be made at the discretion of the Division.

The TIE/TRE study may be terminated at any time upon the completion and submission of 2 consecutive tests (for the same outfall) demonstrating compliance. Following the completion of TIE/TRE study, the frequency of monitoring will return to a regular schedule, as defined previously in this section as well in Part I of the permit. During the course of the TIETRE study, the permittee will continue to conduct toxicity testing of the outfall being investigated at the frequency of once every three months but will not be required to perform follow-up tests for that outfall during the period of TIE/TRE study.

Test procedures, quality assurance practices, determinations of effluent survival/reproduction and survival/growth values, and report formats will be made in accordance with Short-Term Methods for Estimatinq the Chronic Toxicity of Effluents and Receiving Water to Freshwater Organisms, EPA-821-R-02-013, or the most current edition.

Results of all tests, reference toxicant information, copies of raw data sheets, statistical analysis and chemical analyses shall be compiled in a report. The report will be written in accordance with Short-Term Methods for Estimating the Chronic Toxicity of Effluents and Receiving Water to Freshwater Orgianisms, EPA-821-R-02-013, or the most current edition.

Two copies of biomonitoring reports (including follow-up reports) shall be submitted to the division. One copy of the report shall be submitted along with the discharge monitoring report (DMR). The second copy shall be submitted to the local Division of Water Pollution Control office address:

Environmental Field Office- Chattanooga Division of Water Pollution Control 540 McCallie Avenue, Suite 550 Chattanooga, TN 37402-2013 F. BIOCIDE/CORROSION TREATMENT PLAN The permittee shall not conduct treatments of intake or process waters under this permit using biocides, dispersants, surfactants, corrosion inhibiting chemicals, or detoxification chemicals except in accordance with conditions specified under the written B/CTP [plan] which has been given prior approval by the Division of Water Pollution Control (DWPC) prior to the effective date of this permit, or subsequent revisions that are approved by the DWPC. WET frequency and results reporting will be governed by the B/CTP.

G. 316(B)

EPA published a draft of the revised Phase II 316(b) regulations on April 20, 2011 which is scheduled to be final not later than July 2012. This permit may be reopened to address new 316(b) compliance requirements upon issuance of a final rule or guidance by EPA.

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page 28 of 33 I PART IV STORM WATER POLLUTION PREVENTION PLAN Storm water runoff associated with industrial activity that is not discharged to the receiving stream through Outfalls 101 and 102 are currently authorized under the Tennessee Storm Water Multi-Sector General permit for Industrial Activities (TMSP), Permit Number TNR051343. The TMSP requires development, implementation, and routine evaluation and

,updating of a storm water pollution prevention plan (SWPPP). The permittee shall ensure that the appropriate pollution prevention measures are identified in the SWPPP to also minimize the discharge of pollutants in storm water or from ancillary activities via Outfalls 101 and 102. Any necessary plan modifications shall be completed in accordance with the schedules set forth in the TMSP.

The discharger will develop, document and maintain a storm water pollution prevention plan (SWPPP) pursuant to the requirements as set forth in the Tennessee Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated With Industrial Activity From Steam Electric Power Generating Facilities", Part 3, "Storm Water Pollution Prevention Plan Requirements." The plan shall be signed by either a principal executive officer of a corporation, the owner or proprietor of a sole proprietorship, or a partner or general partner of a partnership.

SEF TNO020168.00C

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0O020168 Page3of 4<

August 25, 2011 Addendum prepared by: Ms. Souraya Fathi The facility submitted comments to the division based on their review of the final permit. The requested changes are primarily to address items that either resulted from implemented draft permit comments or were inadvertently not incorporated from the original draft 'permit comments.

The division agrees that the following comments were minor, except for comments (1-c.), (2) and (3) regarding pH monitoring reduction. These two comments are considered a major modification, and after discussing the matter with the facilitythey opted out of their request for pH monitoring reduction.

The following are the changes to the permit:

1) Page I of 29:
a. In the listed authorized wastewaters for Outfall 101, please change "boiler blowdown water"to usteam generator blowdown water" to be consistent with change made to Outfall 102 authorized wastewaters in the draft permit.
b. In Outfall 101's permit limits table. WVA requests the sample type for temperaturebe changed from "operation records" to "recorder" shown in draft permit since monitoring frequency is continuous. This would also be consistent with Footnote (4) which refers to a temperature recorder.
c. In Outfall 101's permit limits table, TVA requests that pH sampling frequency be changed from twice per month to monthly to reflect changes made to. the draft permit regarding Turbine Building Station Sump (TBSS) alignment. Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.

TVA-Watts-Bar Nuclear Plant NPDES Permit TN00?0168 Page ý4 of 3. d*

2) Page 2 of 29, below Ouffall 101 permit limits table: Due to changes made to the draft permit, TVA requests the asterisked (*)footnote be changed from

=monitodng for pH... to "monitoring and limits for pH...". TVA believes this will further avoid any unintended.ambiguity concerning situations that may require monitoring for the. applicable parameters.

3) Page 3 of 29, Outfall 102's permit limits-table: TVA requests that pH sampling frequency be changed from. twice per month to monthly to. reflect changes made to the draft permit regarding TBSS alignment. Monthly monitoring would be consistent with the frequency at Outfalls 103 and 107 for this parameter when the TBSS is aligned accordingly.
4) Page 4 of 29, Below Outfall 102's permit limits table,
a. As indicated in comments on the draft permit, Footnote (1) refers to a "continuous flow monitor." WBN does not have a continuous flow monitor for Outfall 102 but determines flow by using readings from the Yard Holding Pond staff gage or Environmental Data System stage recorder (i.e., calculating the flow from the overflow weir head-discharge curve). Please revise the footnote to read: "VIn the event that the yard holdingpond staff gages are out of service, flow monitoringshall be estimatedby intake pump logs or the .behavior (e.g., the rate of filling and emptying) of the yardholding pond."
b. As requested in comments on the draft permit, please remove Footnote (4), which refers to a temperature monitor for Outfall 102. If an overflow occurs at the yard holding pond, temperature monitoring will be by grab sample (as-indicated above).
c. As indicated in comments on the draft permit, TVA requests that Footnote (6) from the previous permit be incorporated as a footnote and apply to pH, TSS, O&G, and zinc monitoring parameters. The footnote should read: "Ifthere is dischargeduring 1 or more days from this ouffall, sampling is requiredto comply with the maximum daily limit. If there are two or more separatedays of discharge,.or a continuous dischargeduring 5 or more consecutive days from the outfall then one sample is requiredfrom that 'batch'dischargein orderto report the monthly average limit."
d. TVA requests that Footnote (5) below Outfall 101's permit limits table (Page 2 of 29) also apply to Outfall 102 to ensure toxicity testing requirements are consistent between both outfalls. The footnote should read: "Sampling and analysis is requiredonly if dischargeis operated30 days or more during the semi-annualperiods January through June or July through Decemberand if all toxicity testing

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO020168 Page- of 4 q requirementshave not already been completed for Outfall 101. See PartIll for methodology." TVA believes this Footnote (5) for Outfall.

101 was also intended for Outfall 102 due to its variable and infrequent discharges.

e. TWA requests the asterisked (*)footnote be. changed from monitoring for pH..." to "monitoring and limits for pH...". TVA believes&this will further avoid any unintended ambiguity concerning situations that may require monitoring for the applicable parameters.
5) Page 7 of 29, Outfall 113's permit limits table:
a. A typographic error is apparent as Footnote (6) does not apply to the Flow sample type and should be removed.
b. TVA requests the temperature rise, upstream to downstream, be changed from "3.0" to "3" for consistency with the draft permit, (reference made on Page 11 of 29), and the rationale.
c. TVA requests the temperature rate of change be changed from "2.0" to "2" for consistency with the draft permit (reference made on Page 11 of 29), and the rationale.
6) Page 10 of 29: As indicated in comments on the draft permit, VA requests the, following bullets be'added between the existing third and fourth bullets:

The active mixing zone includes the following dimensions: (1) a maximum width of from the right-bank to the approximate middle of the river (facing downstream), and (2) a maximum length of 2000-feet downstream of the outfall. It has been documented that there is a zone of (cool water)refuge in the bottom layer and left-hand-side of the river to allow for fish and other species to pass.beyond the thermal plume.

  • Compliance for the active mixing zone is given by the following requirements.
7) Page 11 of 29: As a result of the changes made to the draft permit, the last bullet on Page 11 of 29 and the third paragraph of Page R-1 8 of R-57 make it uncertain as to how many sensors are required and what measurement is to be used for compliance. TVA has submitted information to show that the bottom temperature can be monitored with one sensor (the warmest sensor in the plot shown on Page R-19 of R-57). Since TVA believes the intent was to allow monitoring with one sensor and to have this monitoring based on a

TVA-Watts-Bar Nuclear Plant NPDES Permit TN0020168 Page 8.*of -34" roiling one hour average, TVA, requests the language be changed tothe following:

a. Last bullet,on Page 11 of 29: The daily maximum value for the TEMPERATURE, Receiving Stream,-Bottom shall bedetermined from 15-minute values. The $-hour average value shall be calculated every 15 minutes using the current and.previous four 15-minute values, thus creating-a-rollingaverage. The temperatureshall be, reported on the Discharge Monitoring Reports as the daily maximum (highest for the day) and monthly average value.
b. Third paragraph on Page R-18 of R-57,(or Addendum to Rationale),

concerning the-bottom temperature monitoring: The permittee-shall maintain a bottom temperaturesensorin the Mussel Relocation Zone to ensureprotection of bottom dwelling species and a,-zone of-fish passage. The limit for the monitorin the relocation zone will remain at 33.50C (92.3XF) as the maximum 1-houraveragevalue,toqprotect those bottom dwelling species. The'permittee shall recorddata on the DMRs, where.exceedances of the,limit will be considereda permit violation.

8) Page R-2 of R-57, Rationale: In response.to a verbal request for.additional information from the -Nuclear Regulatory Commission (NRC), TVA updated its intake velocity calculations. A-copy ofthe -response to the. NRC dated April -29,2011, regarding, the Intake Pumping Station (IPS) flow calculations is enclosed for your records. IVA requests beginning with the last two sentences .of the third paragraph on'Page R-2-of. R-57 (or Addendum to Rationale) be revised to-reflect the updated calculations:,

At.the travelling water screens,.,the combined unobstructedthrough-screen areaof the correspondingto the gated openings is reduced to approximately 1f40 ft2, producing a winter average through-screenvelocity of approximately 0:67 fps; The average flowrate at the IPS for WBN-Unit I is approximately-80 cubic feet per-second,(cfs),..or 0.3% Of the long-term average.river flow.

(27,000 cfs) past theplant.

With the operationof both Unit I and-proposedUnit 2, intake (infrontof screen).andthrough-screen velocities at winterpool are:projected to beO.37 fps and 0.67 fps,. respectively. The average flowrate at the IPS.during operationof both units is.expected to be approximately 116-cfs, or 0.4.%of the long-term average riverflow past the plantof approximately 2?7, 000 -cfs.

SEF Permit Addendum TNO020168.DOC

TVA-Watts-Bar Nuclear Plant NPDES Permit TNO0201.68 Page34of 34"'

~ AD~END~I ATTON#.LEW,1 FIRl AIW, Ud r June 17, 2011 Addendum prepared by: Ms. Souraya Fathi This Rationale has been revised since it was public noticed on April 18, 2011, to incorporate comments received by EPA and TVA - Watts Bar Nuclear Plant.

In a letter prepared by Ms. Cynthia M. Anderson, TVA, dated May 9, 2011, TVA - Watts Bar Nuclear Plant submitted comments on the draft NPDES Permit No. TNO020168. These comments have been addressed in the final permit and also been incorporated into the Rationale. Most all of the comments were minor changes and were either typographical errors or an oversight from the permit writer.

EPA's comments on the draft were received electronically on April 19, 2011, and were addressed and incorporated in the final permit.

SEF Permit Addendum TNO02016B.DOC

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-1 of R-57 I RATIONALE ]

TVA - Watts Bar Nuclear Plant NPDES PERMIT NO. TN0020168 Spring City, Rhea County, Tennessee Permit Writers: Ms. Souraya Fathi I. DISCHARGER TVA - Watts Bar Nuclear Plant Hwy 68 Nuclear Plant Road Spring City, Rhea County, Tennessee Official Contact Person:

Mr. Don Grissette Vice President - Watts Bar Nuclear Plant (423) 751-3361 Nature of Business: Production of electric power by thermonuclear fission and other associated operations SIC Code(s): 4911 Industrial Classification: Primary Discharger Rating: Major II. PERMIT STATUS Issued: June 04, 2010 Last modified February 08, 2005 Expired: December 31, 2011 Application for Modification Received: August 18, 2010 Watershed Scheduling Environmental Assistance Center: Chattanooga Primary Longitude: -84.785833 Primary Latitude: 35.593333 Hydrocode: 6020001 Watershed Group: 3 Watershed Identification: Tennessee River (Meigs & Rhea County)

Target Reissuance Year: 2011

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-2 of R-57 Ill. FACILITY DISCHARGES AND RECEIVING WATERS TVA - Watts Bar Nuclear Plant discharges cooling water, storm water and other treated wastewaters to the Tennessee River ( Chickamauga Reservoir) just downstream of Watts Bar Dam. The facility also discharges treated sanitary wastewater, storm water and other treated wastewaters to the Yellow Creek embayment of Chickamauga Reservoir.

WBN is located on the right descending (west) bank of upper Chickamauga Reservoir at Tennessee River Mile (TRM) 528 approximately 1.9 miles downstream of Watts Bar Hydroelectric Dam (WBH; TRM 529.9) and one mile downstream of the idled Watts Bar Fossil Plant (Figure 1). Commercial operation of WBN Unit 1 began on May 27, 1996 and is designed for a net electrical output of 1,160 megawatts (MW; gross electrical output of 1,218 MW). A startup and operation of Unit 2 is planned in the fall of 2011 with minimal changes to the original plant design.

Cooling water flows from Chickamauga Reservoir through the plant intake channel to the intake pumping station (IPS) located approximately 1.9 miles downstream of Watts Bar Dam at TRM 528. WBN Unit 1 and proposed Unit 2 use closed-cycle cooling such that the cooling water withdrawn at the intake pumping station is to make-up for evaporation and cooling tower blowdown. The intake channel leading to the pumping station has a cross-sectional area of approximately 1,650 ft2 at a Chickamauga Reservoir winter pool elevation of 675 ft mean sea level (msl), and 3,150 ft2 at a summer pool elevation of 682.5 ft msl. This produces average water velocities between approximately 0.03 feet per second (fps) (high pool) and 0.05 fps (low pool) in the intake channel. The IPS includes four gated openings containing a combined gross flow area of approximately 360 ft2, producing an average intake velocity (in front of screen) of about 0.2 fps. At the traveling water screens, the combined unobstructed through-screen area of the flow corresponding to the gated openings is reduced to approximately 140 ft2, producing a winter average through-screen velocity of approximately 0.67 fps. The average flowrate at the IPS for WBN Unit 1is approximately 80 cubic feet per second (cfs), or 0.3% of the long-term average river flow (27,000 cfs) past the plant.

With the operation of both Unit 1 and proposed Unit 2, intake (in front of screen) and through-screen velocities at winter pool are projected to be 0.37 fps and 0.67 fps, respectively.

The average flowrate at the IPS during operation of both units is expected to be approximately 116 cfs, or 0.4% of the long-term average river flow past the plant of approximately 27,000 cfs.

Appendix 1 summarizes facility discharges and the receiving stream information for seven outfalls, numbered 101, 102, 103, 107, 113, and 114. There are three (3) main outfalls (Nos. 101,102, and 113) which discharge directly to waters of the state. Two (2) other outfalls (Nos. 103 and 107) are internal discharges that contribute to the main outfalls, and outfalls 101 and 102 also provide stormwater runoff relief. Internal discharge Outfall 114 is designated as the supplemental condenser cooling water (SCCW) traveling screen backwash outfall. Each of the six (6) outfalls is discussed in more detail as follows:

Outfall 101 Outfall 101 receives wastewater from two primary sources, the Cooling Tower Blowdown Line (45.773 MGD) and the Yard Holding Pond (1.371 MGD). The Watts Bar Nuclear facility utilizes natural draft cooling towers, which recirculate cooling water. In

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-3 of R-57 order to control build up of dissolved solids, a portion of the recirculated water must be discharged, i.e., cooling tower blowdown. Cooling tower blowdown, at 45.773 MGD, represents the majority of the flow through the Cooling Tower Blowdown Line (due to the nature of the plant operation, this line may also contain once through cooling water from the supplemental condenser cooling water system). The remaining portion (as seen from Appendix 1) is made up of low volume wastes and metal cleaning wastes.

The Yard Holding Pond receives low volume wastes and stormwater runoff from numerous sources and is designed to provide oil skimming, neutralization, and sedimentation treatment. The pond has a volume of approximately 40 million gallons.

However, at times the pond is used as an alternative route to discharge emergency raw cooling water and cooling tower blowdown.

The Cooling Tower Blowdown Line and the Yard Holding Pond discharge conduit are combined and discharged through a pipeline feeding a diffuser located in the Tennessee River at approximate mile 527.9. Discharge through the diffuser is only allowed when there is a minimum of 3500 cubic feet per second (cfs) flow from Watts Bar Dam.

Outfall 102 This outfall represents the emergency discharge overflow weir for the Yard Holding Pond. The overflow weir operates only in the event of an emergency which prevents the use of the blowdown line and diffuser or in the event that the blowdown line and/or diffuser require maintenance. Based on information from the plant permit application, this outfall has not been used in the last three years. In the event of a discharge, the flow would enter an unnamed tributary and flow for approximately 3000 feet to the Tennessee River at mile 527.2. Wastewater sources are the same as for Outfall 101.

Outfall 103 (Internal Monitoring Point)

This outfall represents the discharge from the Low Volume Waste Treatment Pond. The outfall does not discharge directly to waters of the state, but rather discharges to the Yard Holding Pond (Outfall 101). The Low Volume Waste Treatment Pond receives low volume wastes, storm water, and water leakage wastes as described in Appendix 1. This Pond has a total volume of approximately 17 million gallons, but normally is maintained at about 5 million gallons of wastewater. Treatment is provided by oil skimming, sedimentation, and neutralization. The outfall has been established as an internal monitoring point to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for low volume wastes.

Outfall 107 (Internal Monitoring Point)

This outfall represents the combined batch release from two holding/treatment ponds known as the Lined Pond and the Unlined Pond. These ponds are used to collect and treat wastes from periodic metal cleaning operations, and a small portion of storm water, diesel generator coolant, and drum rinsing water. Treatment may be provided by chemical addition (when necessary to meet limits) and recirculation/aeration to reduce concentrations of copper, iron, and/or phosphorus prior to discharge to the Yard Holding Pond (Outfall 101). The Lined Pond has an approximate volume of 0.91 million gallons and the Unlined Pond has an approximate volume of 6.5 million gallons. Following

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-4 of R-57 treatment, the typical scenario is for the Lined Pond to be pumped to the Unlined Pond and the Unlined Pond discharged through Outfall 101. Batch releases are normally confined to periods of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or less. Records from February 2006 through February 2011 indicate that about 3 discharges per year occur. The long term average flow from the ponds (including days of zero flow) is 1.94 MGD, however, actual flow during discharge is between 2 and 3 MGD. This internal outfall has been established to verify treatment effectiveness and compliance with 40 CFR Part 423 effluent guidelines for metal cleaning wastes.

Outfall 113 This outfall represents the discharge of Supplemental Condenser Cooling Water, which is primarily non-contact, once through cooling water (due to the nature of the operation of the plant this line can also contain cooling tower blowdown). The flow is the largest discharge from the facility averaging 148.895 MGD. The water is routed to a former discharge point of the TVA - Watts Bar Fossil Plant and discharged at the surface of the Tennessee River at approximate mile 529.2.

Current operation of WBN Unit 1 utilizes the SCCW system through constant gravity flow from above WBH. Completion and operation of Unit 2 will not significantly alter or increase the thermal effluent from the SCCW outfall.

Two hydrothermal surveys and flow pattern surveys were conducted in the vicinity of WBN during May and August 2010, when there were no releases from upstream WBH through generators or spillways to characterize attributes of the SCCW thermal plume. Water temperatures were recorded upstream and downstream of the SCCW discharge during this test to characterize the thermal aspects of the plume.

Drogues, devices designed to drift with surface currents, were deployed at and near the SCCW outfall to track flow patterns and compare flow paths during normal and no generation from Watts Bar Dam.

The conclusion was that maximum temperatures recorded during the May and August no-flow surveys were 74.8 0 F and 82.70 F, respectively. These maximum seasonal temperatures were lower than the Tennessee State WQC for temperature 86.9°F (30.5°C)

Outfall 114 (Internal Monitoring Point)

This outfall consists of traveling screen backwash from the supplemental condenser cooling water intake. The discharge from the outfall consists only of screen reject and raw water. Flow is estimated at 0.019 MGD.

Tennessee River The TVA - Watts Bar Nuclear Plant has three direct discharges to the Tennessee River (Outfalls 101, 102, and 113). The plant withdraws cooling water and most other water used for industrial processes through the Intake Pumping Station located at Tennessee River mile 528.0. However, the Supplemental Condenser Cooling Water (145.0 MGD discharged through Outfall a113) is withdrawn from above Watts Bar Dam and is discharged to the River below the dam, but above the Plant Intake Pumping Station.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-5 of R-57 For purposes of protecting water quality, the Tennessee River below Watts Bar Dam is designated for fish and aquatic life use, recreation use, irrigation use, livestock watering and wildlife use, domestic water supply use, industrial water supply use, and navigation use. The flow of the river is controlled by the Tennessee Valley Authority (TVA) Watts Bar Dam and minimum flows at this location have been developed by the USGS as presented in Appendix 1.

Yellow Creek The Yellow Creek embayment of Chickamauga Lake is designated for fish and aquatic life use, recreation use, irrigation use, and livestock watering and wildlife use.

Low flow conditions in this stream are assumed to be zero.

IV. APPLICABLE EFFLUENT LIMITATIONS GUIDELINES The Standard Industrial Classification (SIC) code for TVA - Watts Bar Nuclear Plant is 4911, establishments engaged in generation, transmission, and/or distribution of electric energy for sale. Process wastewater discharged through Outfalls 101, 102, 103, 107, and 113 is regulated by 40 CFR Part 423, Steam Electric Power Generating Point Source Category. This regulation is applicable to discharges resulting from the operation of a generating unit by an establishment primarily engaged in the generation of electricity for distribution or sale which results primarily from a process utilizing fossil-type fuel (coal, oil, or gas) or nuclear fuel in conjunction with a thermal cycle employing the steam water system as the thermodynamic medium.

Appendix 2 lists the applicable best available technology (BAT) and best conventional pollution control technology (BPT) effluent limitations guidelines from 40 CFR Part 423.12 and 423.13. The guideline numeric limitations are listed for four specific wastewater sources, low volume wastes, metal cleaning wastes, cooling tower blowdown, and once throughrcooling water. In determining which guideline sources are attributable to each of the seven (7) outfalls, the Part 423.11, Specialized Definitions were used as follows:

The term Low Volume Wastes means, taken collectively as if from one source, wastewater from all sources except those for which specific limitations are otherwise established in this part. Low Volume Waste sources include, but are not limited to:

wastewaters from wet scrubber air pollution control systems, ion exchange water treatment system, water treatment evaporator blowdown, laboratory and sampling streams, boiler blowdown, floor drains, cooling tower basin cleaning wastes and recirculating house service water systems. Sanitary and air conditioning wastes are not included.

The term chemical Metal Cleaning Wastes means any wastewater resulting from cleaning [with or without chemical cleaning compounds] any metal process equipment including, but not limited to, boiler tube cleaning.

The term Once Throuah Cooling Water means water passed through the main cooling condensers in one or two passes for the purpose of removing waste heat.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-6 of R-57 The term Recirculating Cooling Water means water that is passed through the main condensers for the purpose of removing waste heat, passed through a cooling device for purpose of removing such heat from the water and then passed again, except for blowdown, through the main condenser.

The term Blowdown means the minimum discharge of recirculating water for the purpose of discharging materials contained in the water, the further buildup of which would cause concentration in amounts exceeding limits established by best engineering practices.

The above definitions specifically exclude sanitary wastewater and air conditioning wastes. For sanitary wastes, Tennessee Effluent Guidelines from Rule 1200-4-5-03 (1) and/or best professional judgment have been applied.

The effluent limitations presented in 40 CFR 423 (see Appendix 2) are normally to be established in the permit as mass limitations by multiplying the flow of the specific waste source times the applicable concentration limit. However, 40 CFR, Part 423.12 (b) (11) and Part 423.13 (g) allow the permitting authority, at its discretion, to substitute concentration limits instead of the mass limitations. For the TVA-Watts Bar Nuclear Plant permit, only concentration limits will be established.

Also in developing guideline limitations for each outfall, EPA Rule Part 423.12 (12) and Part 423.13(12) is applicable as follows:

In the event that waste streams from various sources are combined for treatment or discharge, the quantity of each pollutant or pollutant property controlled in the BPT/BAT limitation tables attributable to each controlled source shall not exceed the specified limitation for that source.

Utilizing these definitions and the waste source identification provided in the permit application (see summary tables in Appendix 1), the following waste sources and proportions are applied to each outfall as follows:

Guideline Waste Sources and Flows for Two Unit Operations by Outfall Waste Source Flow Outfall No Contributing IPTIBAT Waste Source Flow  % Outfall MGD Total Yard Holding Pond (Metal Cleaning Waste} 1 371 2 4%

101 Misc Cooling Waters (Low Volume Wates) 10 62 184%

Cooling Tower Blowdown 45 773 79 2%

Total Outfall Flow 57.764 Yard Holding Pond (Metal Cleaning Waste) 1.371 2A4%

102 Misc Cooling Waters (Low Volume Wates) 10 62 10.4%

Cooling Tower Blowdown 45 773 79.2%

Total Outfall Flow 57.764 103 Low Volume Wastes 0.3619 100 0%

107 Metal Cleaning Wastes 0.0310 100.0%

113 Once Through Coling Water 148.895 100.0%

Supplemental Condenser Cooling Water Intake Screen 114 backwash 0.019 100.0%

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-7 of R-57 Note: Outfall 114 is backwash water and is not considered in the monitoring requirements for this permit.

Where the effluent limitation guideline concentration limits include the same parameter(s) for each source, the allocation of guideline limits by flow is straightforward.

However, where a parameter is limited for one source and not limited for another, some judgment must take place. The approach taken has been to assure that each source complies with its parameter guideline concentration without that source being diluted by other wastewater source(s) for which the parameter is not limited. One means to accomplish this is to utilize internal outfalls, which enable monitoring at a location that is source specific. This approach has been utilized at the Watts Bar Nuclear Plant for Outf alls 103, and 107.

Using the above guidance, the 40 CFR guidelines have been applied to the plant outfalls as shown in Appendix 2 and described as follows:

Outfall 101 Cooling tower blowdown represents approximately 79% of the outfall flow and Low Volume wastes represent 20.8%. Thus the guidelines for Cooling Tower Blowdown and Low Volume Waste will be applied to the total waste stream. The total suspended solids limit and the oil and grease limit applicable to the low volume waste sources is considered applicable to the cooling tower blowdown source as well. Because the metal cleaning wastes represent only 0.1% of the flow, the guideline limits for this source will not be applied to Outfall 101. Rather, compliance with metal cleaning waste limits will be handled by employing an internal monitoring point (Outfall 107). The applicable BPT and BAT limits are given in Appendix 2.

The flow from Outfall 101 is monitored at Watts Bar Dam, and includes the instrumentation that River Operations uses to measure the discharge through the hydro turbines. A control loop between Watts Bar Dam and WBN automatically closes the Outfall 101 diffuser valves when the hydro discharge at Watts Bar Dam drops below 3500 cfs.

Outfall 102 Since this is an emergency discharge for Outfall 101, the same guidelines apply as for Outfall 101. The limitations are presented in Appendix 2.

Outfall 103 This outfall receives Low Volume Wastes exclusively; therefore, the Low Volume Waste guideline limitations will apply. The limitations are presented in Appendix 2.

Outfall 107 This outfall receives 99.9% Metal Cleaning Wastes and 1% Low Volume Wastes.

Therefore the Metal Cleaning Waste limitations will be applied as shown in Appendix 2.

Outfall 113

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-8 of R-57 This outfall receives noncontact supplemental condenser cooling water. The wastewater is defined by 40 CFR 423 as Once Through Cooling Water. Thus Outfall 113 will be subject to the effluent limitations for the Once Through Cooling Water Source given in 40 CFR Part 423.12 (6) and Part 423.13 (b) (1&2) and shown in Appendix 2.

Outall 114 This outfall has no monitoring requirements, consists of traveling screen backwash from the supplemental condenser cooling water intake.

V. PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS Appendix 3 lists the permit limitations and monitoring requirements as defined in the previous permit for the seven outfalls.

VI. HISTORICAL MONITORING AND INSPECTION During the previous permit term, TVA - Watts Bar Nuclear Plant did not have any appreciable difficulty in meeting effluent limitations as outlined in the previous permit. The self monitoring data reported on Discharge Monitoring Report forms during the previous permit term are summarized in Appendix 4.

Any violations of permit limitations that occurred are shown in the tables found in Appendix 4. This information is downloaded from the EPA ICIS database, and statistically summarized.

VII. NEW PERMIT LIMITS AND MONITORING REQUIREMENTS The proposed new permit limits have been selected by determining a technology-based limit and evaluating if that limit protects the water quality of the receiving stream. If the technology-based limit would cause violations of water quality, the water quality-based limit is chosen. For this facility the technology-based limit is determined from EPA effluent limitations guidelines applicable to the steam electric power generating point source category (see Part IV); or by way of operational and/or treatability data. Furthermore, effluent limitations in this permit must comply with any approved Total Maximum Daily Load (TMDL) studies. Water quality calculation procedures are explained in this section under the heading: Metals and Toxics.

Appendix 5a through 5e presents the water quality calculations, Appendix 5f presents a comparison of the different limitations, and Appendix 5g lists all proposed effluent limitations and monitoring requirements to be included in the new permit.

The results of the water quality calculations are compared to the effluent guideline limitations in Appendix 5f and the proposed final permit limitations are presented in Appendix 5g. The effluent characteristics limited in the permit and monitoring requirements are discussed

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-9 of R-57 individually by outfall as follows as well as certain other permit conditions for the facility that are not outfall specific:

Outfall 101 Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD). Measurement frequency shall be continuous by recorder. These requirements are unchanged from the previous permit.

Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes. The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).

According to the State of Tennessee Water Quality Standards for the protection of Fish

& Aquatic Life [Chapter 1200-4-3-.03(3) (c)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream. The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration. In addition, the permit shall contain language prohibiting visible floating scum, oil or other matter in the wastewater discharge. Sample type shall be grab. These limits are unchanged from the previous permit. Monitoring frequency in the new permit shall remain at once per month, however, monitoring for oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required. Sample type shall be grab.

Total Suspended Solids (TSS)

Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423, Subpart 423.12 (b) (3), the BPT limitations applicable to low volume wastes.

The State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3) (c)] state there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to fish and aquatic life in the receiving stream.

The permit writer believes the limit of 30 mg/L monthly average, and 100 mg/L daily maximum concentrations shall provide protection of water quality in the receiving stream. The sampling frequency shall be once per month, however, monitoring for TSS apply only when the turbine building sump is aligned to bypass Internal Monitoring

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-10 of R-57 Points 103 and 107 where monitoring these parameters is required. Sample type shall be grab.

Technology-based BPT effluent limitations from 40 CFR, Part 423, Subpart 423.12 (b)

(1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility.

According to the State of Tennessee Water Quality Standards [Chapter 1200-4-3-.03(3)

(b)], the pH for the protection of Fish and Aquatic Life shall lie within the range of 6.5 to 9.0 and shall not fluctuate more than 1.0 unit in this range over a period of 24-hours.

Appendix 5d presents calculations that show that the combined discharge from Outfalls 101 and 113 will not cause the pH of the Tennessee River to fall below the 6.5 minimum pH standard. Considering that the receiving stream will provide pH buffering, effluent limitations for pH shall be retained in a range 6.0 to 9.0. The sampling frequency shall be once per month, however, monitoring for pH apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required. The sample type shall be grab.

Total Residual Chlorine Technology-based (BAT) limits of 0.2 mg/L monthly average and 0.5 mg/L daily maximum limits apply to free available chlorine in cooling tower blowdown in accordance with 40 CFR, part 423, Subpart 423.13 (b) (1). The total residual chlorine test includes all chlorine species measured in the free available chlorine test as well as other chlorine compounds such as chloroamines. Thus the permit writer has substituted the total chlorine residual test in place of the free available chlorine test for compliance with the 40 CFR limitations.

The previous permit has a limit of 0.1 mg/L monthly average and 0.1 mg/L daily maximum for Outfall 101. The 0.1 mg/I concentration is greater than the acute criteria for TRC at 0.019 mg/I. Because of the large volume of water discharged by TVA there exists the potential for exposure of aquatic life to toxic concentrations of chlorine in the discharge. However, since chlorine residual reacts and dissipates rapidly upon mixing into the ambient waters, the concentrations above the acute value should not exist for any significant area. Thus the 0.1 mg/I concentration limit for TRC is considered to be protective of water quality in the Tennessee River at a flow from Outfall 113 of 148.958 MGD and from Outfall 101 of 57.76 MGD.

The monthly average limit of 0.10 mg/L and the daily maximum limit of 0.10 mg/L for Total Residual Chlorine (TRC) shall be retained in the new permit. The limits are based on the protection of water quality in the Tennessee River during periods when Outfall 101 and Outfall 113 exceed their long term average flow and based on antibacksliding provisions of 40 CFR Part 122.44 (I). These limits are also determined to be appropriate because the facility is discharging TRC in excess of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per day in accordance with the approved Biocide/Corrosion Treatment Plan.

Chromium Outfall 101 is primarily composed of cooling tower blowdown. 40 CFR Part 423.13 provides BAT effluent limitations for total chromium applicable to the discharge of cooling tower blowdown wastewater discharges. The limits are 0.2 mg/L monthly

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-1 1 of R-57 average and 0.2 mg/L daily maximum. The Watts Bar Nuclear Plant does not use corrosion control chemicals or biocides containing chromium at the facility. Sampling data submitted with the application demonstrated that chromium could not be detected in the effluent at a detection limit of 0.001 mg/L. Thus chromium will be included as a permit limit however, monitoring for chromium is waived per 40 CFR Part 122.44 (a)(2)(i). A statement shall be placed in the permit as follows: The use of water treatment chemicals containing chromium is prohibited under this permit.

Zinc Outfall 101 is primarily composed of cooling tower blowdown. 40 CFR Part 423.13 provides BAT effluent limitations for total zinc applicable to cooling tower blowdown wastewater discharges. The limits are 1.0 mg/L monthly average and 1.0 mg/L daily maximum. The TVA - Watts Bar Nuclear Plant utilizes zinc in corrosion inhibitors for treatment of raw water. TVA's policy is to control the feed of zinc containing chemicals to limit the discharge concentration to 0.2 mg/L or less.

The zinc limit of 1.0 mg/L daily average and 1.0 mg/L daily maximum shall be continued in the new permit. The corrosion inhibiting chemicals are added to the raw water system, and are recirculated through the condensers and the cooling towers. Thus the concentration of zinc is not expected to be highly variable with time. Therefore, a measurement frequency of 2/month and sample type of grab should be adequate to characterize zinc in this outfall.

Effluent Temperature Temperature shall be limited according to the State of Tennessee Water Quality Standards for the protection of Fish & Aquatic Life [Chapter 1200-4-3-.03(3)(e)]. It is recognized that the temperature of the cooling water discharge will be greater than the temperature of the water prior to its use for cooling or other purposes. This discharge must not cause the temperature change in the receiving stream to exceed 3WC relative to an upstream control point. Also, this discharge must not cause the temperature of the receiving stream to exceed 30.5 0 C (except as a result of natural causes), and this discharge must not cause the maximum rate of temperature change in the receiving stream to exceed 2 0 C per hour (except as a result of natural causes).

The elevated temperature water of outfall 101 is mixed with the Tennessee River receiving water by being discharged through a diffuser. Instream temperature criteria must be met at the edge of the mixing zone. The mixing zone is defined for this discharge as being a maximum width of 240 feet (the width of the diffuser) and extending 240 feet downstream. An operational requirement of the plant is that the diffuser is only operated when 3500 cubic feet per second (CFS) flow is present from the dam. Mathematical modeling of the temperature during mixing was carried out by TVA and was submitted in a report in June 2007 (Completion and Operation of Watts Bar Nuclear Plant Unit 2. The report was based on the 24-hour average for discharge evaluation as specified in the NPDES permit issued in 1993. The modeling assumed both nuclear units in operation and concluded that a steady-state discharge of 38.3 °C under worst case conditions, which included 1) full thermal load from the fossil plant, 2) the worst meteorology and 3) no operation of Watts Bar Hydro facility, would still protect the water quality based on modeling using daily averaging. A daily average value of 35 0C was proposed to include a margin of safety. A continuous discharge at the temperature maximum of 35 0 C will not exceed water quality outside of the mixing zone

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-12 of R-57 based on past modeling. The Division approved a one-hour averaging period for evaluating compliance with temperature criteria in the receiving stream.

A numeric effluent limitation of 35 0C shall continue as the daily maximum that can be discharged. Measurement frequency shall be continuous and sample type shall be by recorder. These limits are unchanged from the previous permit.

The designs of the diffusers and mixing zone were based on the operation of both Unit 1 and Unit 2; therefore, no changes are anticipated for accommodating the operation of Unit 2. However, TVA will perform studies similar to those performed for Unit 1 to confirm the performance of the diffusers with the operation of two units.

Toxicity Testing Raw water used at the facility is treated with corrosion inhibitors and biocide products.

These products, which can become concentrated in the cooling tower system, are discharged through Outfall 101. The chemical makeup of the products used can change during the permit period and the combined toxicity effect of the chemicals is not known. Thus it is not feasible to control toxicity only by the application of chemical specific effluent limits to the discharge. Toxicity testing of sensitive aquatic species (coupled with evaluation of new chemical products before they are used) is a reasonable method to evaluate the toxicity impacts of the products in the effluent. Therefore a whole effluent toxicity testing requirement shall remain in the permit. The calculations of the appropriate dilutions for the test are given in Appendix 5e of the Rationale and Part III of the permit.

The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment. Sample type shall be composite.

Outfall 102 Outfall 102 is an emergency discharge used when the Outfall 101 diffuser cannot be used. Thus the limits for this outfall shall be the same as for Outfall 101. The new permit limitations for this outfall are unchanged from the previous permit. Sampling frequency and sample type are adjusted for flow and temperature to reflect that continuous monitoring equipment would not be available during an emergency discharge. When thermally loaded effluent is discharged through Outfall 102, all reasonable efforts shall be made to keep flow to a minimum of 3500 cubic feet per second in the receiving waters. If such flow is absent, the permittee shall verify protection of water quality by taking instream temperature measurements.

The new permit shall require IC25 testing at a wastewater dilution of 2.8%. Monitoring frequency shall be semi-annual, only if discharge operated a 30 days from Jan. - Jun., or Jul. -

Dec. if all toxicity testing has not been completed for Outfall. Sample type shall be composite.

Monitoring for pH, total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Monitoring Points 103 and 107 where monitoring these parameters is required.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-13 of R-57 Outfall 103 This outfall is an internal monitoring point receiving low volume wastes. Thus the Low Volume Waste technology-based limitations apply.

Flow Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored continuously by recorder.

pH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility. Therefore a pH limitation of 6.0 to 9.0 shall apply. Sampling shall be once per month and sample type shall be grab.

Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of low volume wastes, which are subject to 40 CFR Part 423 guidelines. The limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (3).

The permit writer is selecting technology-based limits for oil and grease of 15 mg/L as a monthly average concentration and 20 mg/L as a daily maximum concentration. The mass limits shall not be retained. Sampling shall be once per month and sample type shall be grab.

Total Suspended Solids (TSS)

Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to Low Volume Wastes. Sampling shall be once per month and sample type shall be grab.

Ouffall 107 This outfall is an internal monitoring point incorporated to evaluate compliance with guideline limitations for metal cleaning wastes. These wastes are subject to technology based BPT and BAT guidelines for metal cleaning wastes under 40 CFR Part 423,12(b)(5) and 423.13 (e).

Flow The flow from this outfall occurs as a controlled batch discharge from the Lined and Unlined Ponds. Flow duration is typically about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Historical batch discharge frequency has been about 4 times per year. The flow is calculated by determining change in stage of the ponds.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-14 of R-57 Monitoring of flow quantifies the load of pollutants to the stream. Flow shall be reported in Million Gallons per Day (MGD) and monitored each time there is a batch discharge from the ponds through the outfall. Flow frequency shall be once per batch and type measurement shall be calculated.

DH Technology-based BPT effluent limitations from 40 CFR, Part 423.12 (b) (1) establish a pH limitation of 6.0 to 9.0 for all discharges from this facility. Ph shall be monitored once per batch and sample type shall be grab.

Oil and Grease An oil and grease limitation is applied to this outfall because of the significant presence of metal cleaning wastes. Concentration limits are established at 15 mg/I monthly average and 20 mg/I daily maximum in accordance with BPT technology-based limits from 40 CFR Part 423.12 (b) (5). The previous permit imposed a monthly average limit of 15 mg/L and a daily maximum limit of 15 mg/L.

Because the wastewater discharging to this outfall is batch treated, it is the permit writer's judgment that each batch can be treated to meet the 15 mg/L concentration.

The average of monthly average values and the maximum value reported from the previous permit monitoring data (see Appendix 4) indicate a consistent value of <5.0 mg/I. Thus the 40 CFR guideline daily maximum limit of 20 mg/I shall not apply and the previous permit limit shall be retained at 15 mg/I monthly average and daily maximum.

Sampling shall be once per batch discharge, and sample type shall be grab.

Total Suspended Solids (TSS)

Total Suspended Solids is a general indicator of the quality of a wastewater and shall be limited in this permit. The technology-based limit of 30 mg/I monthly average and 100 mg/I daily maximum is taken from 40 CFR Part 423.12 (b) (3), the BPT limitations applicable to metal cleaning wastes.

The previous permit provided a monthly average concentration limit of 30 mg/L and a daily maximum concentration limit of 30 mg/L. Sampling frequency shall be once per batch and sample type shall be grab.

Comper, Total Recoverable Technology-based BAT limits are established for copper at 40 CFR Part 423, Subpart 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for copper at 1.0 mg/L as monthly average and as a daily maximum.

The new permit shall have a 1.0 mg/L total recoverable copper limit as both the monthly average and daily maximum in accordance with the technology-based guidelines. The mass limits shall not be retained the permit. Sampling frequency shall be once per batch. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration, and to be consistent with other outfall sampling requirements, the sample type shall be grab.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-15 of R-57 Iron. Total Recoverable Technology-based BAT limits are established for iron at 40 CFR Part 423.13 (e). The limits are 1.0 mg/L as a monthly average and 1.0 mg/L as a daily maximum. The previous permit contained concentration limits for iron at 1.0 mg/L as monthly average and as a daily maximum.

The new permit shall have a 1.0 mg/L total recoverable iron limit as both the monthly average and daily maximum in accordance with the technology-based guidelines.

Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.

Phosphorus. Total Phosphorus is not limited by technology-based guidelines, however it is of water quality concern because of its potential to be used in metal cleaning and its ability to contribute to nuisance aquatic growth in receiving water bodies. The previous permit established a 1.0 mg/L monthly average and a 1.0 mg/L daily maximum concentration and required that phosphorus be monitored once per week only during periods when phosphate cleaning solutions are used. During the past five- year permit period, no phosphorus monitoring was reported at the facility. Because phosphate and phosphate chemicals are listed in the permit application as chemicals added to wastewaters reaching Outfall 107 the limits in the previous permit shall be retained.

Monitoring frequency shall be once per batch discharge only during periods when phosphate cleaning solutions are added. Because the wastewater comes from large ponds, which should have relatively good equalization of concentration and to be consistent with other outfall sampling requirements, the sample type shall be grab.

Outfall 113 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water. Once through cooling water is subject to BPT and BAT technology-based limitations under 40 CFR Part 423. A portion of the water discharged through Outfall 113 enters the plant through the intake pumping station (IPS) and is treated with corrosion inhibitors and biocide. The remaining portion is obtained by gravity flow through the intake for the old TVA - Watts Bar Fossil Plant, which withdraws water from Watts Bar Reservoir above Watts Bar Dam. The proportion of flow from the IPS ranges from approximately 50 to 75 MGD and the remaining portion from Watts Bar Reservoir varies from approximately zero to 110 MGD. The water withdrawn from Watts Bar Lake may be passed through the condensers as once through cooling water, or by using a bypass valve arrangement, may be routed directly to Outfall 113.

Flow The previous permit required flow to be measured on a continuous basis using a recorder. This language shall be retained in the new permit. Should the continuous flow monitoring equipment fail or need to be taken off line for repairs or calibration, the flow shall be measured by staff gage as a backup method until the flow monitoring

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-16 of R-57 system is brought back on line. The permittee shall take reasonable steps to restore the flow monitoring as soon as possible.

Sudden changes in thermal loading at the plant, i.e., start-up or shutdown, should not be made unless there is discharge from Watts Bar Dam (the exception being changes necessary due to concern for human safety or the environment).

pH The discharge is covered under 40 CFR Part 423 guidelines, which require that the pH be maintained between 6.0 and 9.0. Calculations given in Appendix 5d show that pH within this range will protect the water quality of the Tennessee River. Thus pH limitations shall remain 6.0 to 9.0 in the new permit. Sampling frequency shall be once per month and sample type shall be grab.

Total Suspended Solids (TSS)

TSS was included in the previous permit as a monitoring only requirement on a once per month basis. There are no technology based limits or numeric water quality criteria for this parameter. According to Tennessee Water Quality Criteria for the protection of fish and aquatic life [Chapter 1200-4-3-.03(3)], there shall be no distinctly visible solids, scum, foam, oily slick, or the formation of slimes, bottom deposits or sludge banks of such size or character that may be detrimental to aquatic life in the receiving stream.

Monitoring of TSS was required during the previous permit period and the data (see Appendix 4) indicated that the long-term average was 4.0 mg/L. Because the facility is considering adding bentonite to this waste stream as a method of detoxifying biocides, suspended solids monitoring shall remain in the permit. Sampling frequency shall be once per month and sample type shall be grab.

Chlorine, Total Residual Total chlorine residual was limited in the previous permit at 0.092 mg/L as a monthly average and 0.158 as a daily maximum. These limits were based on compliance with instream water quality criteria at a previous permit flow of 192 MGD. Water quality calculations (presented in Appendix 5b) were performed using the long-term average combined flow of Outfalls 101 and 113 from the current permit application. These calculations indicate that a monthly average of 0.15 mg/I and a daily maximum of 0.259 mg/L are necessary to comply with water quality criteria. In the case of the daily maximum value, the 0.2 mg/L BAT limit is more restrictive. Monitoring data from the previous permit period indicates that the long-term average and the maximum TRC concentration have been well below the permit limit (see Appendix 4). The WBN plant does not add chlorine to the Supplemental Condenser Cooling Water, however chlorine/bromine is potentially present in the outfall due to commingling of cooling tower blowdown. The previous permit limits shall be retained in the permit to comply with the antibacksliding provisions of 40 CFR Part 122.44 (I) and as part of the justification for the exceedance of the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per day guideline maximum for discharge of TRC (see discussion in Rationale under Additional Limitations, Conditions and Monitoring Requirements). Monitoring frequency shall be retained at once per month and sample type shall be grab.

Dissolved Oxygen, (DO)

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-17 of R-57 Outfall 113 discharges Supplemental Condenser Cooling Water (SCCW), which is noncontact, once through cooling water to the Tennessee River via a diffuser a mile 529.2. State water quality criteria for this stream requires that dissolved oxygen be 5.0 mg/L or greater. However, because of the high flow of the discharge from this Outfall and the receiving stream the narrative limit to "Report the minimum DO" shall be retained in the new permit. Monitoring frequency shall be once per month and sample type shall be grab.

Toxicity Testing The new permit limit calculations indicate required chronic toxicity testing, IC25, at a dilution factor of 14.8 and a new limit of 6.7%. Measurement frequency shall be retained at semi-annual, one during oxidizing biocide treatment and one during non-oxidizing biocide treatment. Sample type shall be composite.

Temperature, General Tennessee water quality criteria for temperature contains three parts, (Ql) the discharge shall not cause the temperature of the receiving waters to exceed 30.5 C instream after mixing, (2) the discharge shall not cause an upstream to downstream temperature change of more than 3 C, and (3) the discharge shall not cause a rate of temperature change more than 2 0C per hour. All of these conditions must be met at the edge of the mixing zone for the discharge. Further the extent of the mixing zone should be such that fish and aquatic life are not harmed by the discharge.

TVA, as part of a previous permit application process, presented dilution model results, which indicated that the mixing zone of this discharge would allow the free passage of fish while avoiding bottom dwelling species. During periods of Watts Bar dam releases, the heated plume is predicted to stay near the right bank (looking downstream) and extend downstream for a distance of approximately 1000 feet. During periods of dam shutoff, the heated plume is predicted to extend across the entire width of the river.

Normally a "bank to bank" mixing zone is not allowable; however; in this case, only near the surface does the "passive" mixing zone extend across the width of the river.

Temperature and Area of Mixing Zone The dynamic nature of the river operations in the vicinity of the Outfall 113 discharge and the fact that this channel is not a natural stream lead to issues with defining an appropriate mixing zone. It is recognized that the temperatures occurring in the Tennessee River at the location of the discharge are the result of a complex set of variables defining the mixing hydrodynamics and heat balance. Many of the variables, such as meteorological inputs, dam turbine releases, dam leakage, flow direction, and reservoir stage are beyond the control of the Watts Bar Nuclear Plant. It is further recognized that applying instantaneous criteria is problematic because of the dynamic nature of the receiving stream (barge traffic, dam operations, rapidly changing plume location, etc.). For this reason, the Division has determined that compliance with the temperature criteria should not be applied on an instantaneous basis instead compliance will be implemented with the following changes.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-18 of R-57 The approach to the mixing zone in this permit will be to define both an active and a passive mixing zone of approximately the same overall size. (See Mixing Zone Diagram, Appendix 5h.) In the passive mixing zone case, corresponding to dam shutoff, the mixing zone geometry will be defined as before. The passive mixing zone extends across the entire width of the river and extends downstream approximately 1000 feet.

The active mixing zone will apply to other conditions where the plume tends to reside in the right hand side of the river (facing downstream). Monitoring to establish compliance for the active mixing zone will occur 2000 feet downstream of Outfall 113 in the right hand side of the river. This monitoring will utilize two stations that will be placed after determining the best locations to capture, as much as possible, the true temperature in the plume. Temperature recorder station #33 and recorder station #34 are shown on the general locations on the mixing zone diagram. The data from the two stations will be reported as the average of the temperatures for the two stations. This average will allow better tracking of the plume.

The modeling that predicted the previously described passive mixing zone will be

[physically] verified by an instream thermal survey conducted semiannually. This passive mixing zone that was described in the previous permit has been verified by instream modeling and instream thermal surveys.

The permittee shall maintain a bottom temperature sensor in the Mussel Relocation Zone to ensure protection of bottom dwelling species and a zone of fish passage. The limit for the monitors in the relocation zone will remain at 33.50 C (92.30 F) as the maximum 1-hour average value to protect those bottom dwelling species. The permittee shall record this data on the DMRs, where exceedences of the limit will be considered a permit violation.

Outfall 113 is a near-surface discharge, and computations and measurements confirm that the effluent dispresses in the surface region of the water column providing ample room for fish passage. TVA is not proposing any changes to the dimensions of the Outfall 113 mixing zones with the completion and startup of Unit 2.

Mussel Relocation Zone Temperature Sensors and Data for Summer 2010

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-19 of R-57 Tc.rnpmturc ýcns.or ('tp)

"1"N-NL End Adi,,,hurge~iprmi~

Drownrtmam 90 8-75 Jung July August September 2010 Temperature, Effluent

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-20 of R-57 It is recognized that the temperature of the discharge, after use for cooling purposes, will be higher than that of the intake water. The previous permit did not establish a maximum effluent temperature but rather required reporting of effluent temperature.

Sampling frequency was hourly and sample type was grab. This sampling requirement shall be retained in the new permit.

The temperature at the edge of the mixing zone must not exceed 30.5 0C as a daily maximum. Instream temperature monitors shall be employed at the downstream edge of the active mixing zone to demonstrate compliance. Measurement frequency shall be hourly and sample type shall be recorder.

Temperature, Rise Upstream to Downstream In order to demonstrate compliance with the 3 0C maximum rise upstream to downstream, the permittee shall conduct automated instream temperature monitoring.

Monitoring locations shall include an upstream point (just below Watts Bar Dam) and a downstream point at the downstream edge of the mixing zone (as described above).

Additional Limitations, Conditions, and Monitoring Requirements In addition to the specific numerical limitations discussed above, there are a number of general requirements that shall apply to outfalls 101, 102, 103, 107, and 113. These requirements are discussed as follows:

40 CFR Part 423.12 (b) (2) (BPT) and Part 423.13 (a) (BAT) specify, "There shall be no discharge of polychlorinated biphenyl compounds such as those commonly used for transformer fluid." This requirement was in the previous permit and shall be retained in the new permit.

These requirements are potentially applicable to Outfalls 101, 102 and 113. Chlorine is not added to the Supplemental Condenser Cooling Water System (once through cooling water) at the Watts Bar Nuclear Plant; however, it is present in all Outfalls due to commingling of cooling tower blowdown. TVA has made a demonstration to the Division that the Watts Bar Nuclear Plant cannot operate under these 'two hour per day" requirements without significant damage to the system potentially jeopardizing operational safety. No limit was placed on the hours of chlorine use in the previous permit and no such limit shall be included in the new permit.

40 CFR Part 423.12 (b) (8) (BPT requirements, non wastewater source specific) states that "Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available chlorine or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination."

40 CFR Part 423.13 (b) (2) (BAT requirements, specific to once through cooling water) also states that for plants with a rated electric generating capacity of 25 or more megawatts that "Total residual chlorine may not be discharged from any single generating unit for more than two hours per day unless the discharger demonstrates to the permitting authority that discharge

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-21 of R-57 for more than two hours is required for microinvertebrate control. Simultaneous multi-unit chlorination is permitted."

40 CFR Part 423.13 (d) (2) (BAT requirements, specific to cooling tower blowdown) states "Neither free available nor total residual chlorine may be discharged from any unit for more than two hours in any one day and not more than one unit in any plant may discharge free available or total residual chlorine at any one time unless the utility can demonstrate to the Regional Administrator or State, if the State has NPDES permit issuing authority, that the units in a particular location cannot operate at or below this level of chlorination."

40 CFR Part 423.13 (d) (1), BAT requirements for cooling tower blowdown, establishes monthly average and daily maximum effluent limitations for the 126 Priority Pollutants. The monthly average limit and the daily maximum limit (except for chromium and zinc) for the 126 Priority Pollutants contained in chemicals added for cooling tower maintenance is "No Detectable Amount." However, Part 423.13 (d) (3) allows the permitting authority, at its discretion, to utilize engineering calculations which demonstrate that the regulated pollutants are not detectable in the final discharge by analytical methods in 40 CFR Part 136. This requirement is potentially applicable to outfall 101. TVA has provided data that demonstrates that priority pollutants will not be added to the system in quantities that will be detectable in cooling tower blowdown. Also the data provided with the Form 2C permit application indicates that the priority pollutants were not present in detectable amounts. The following general statement shall be added to the permit "Priority Pollutants contained in chemicals added for cooling tower maintenance except for zinc, shall not be discharged in cooling tower blowdown in amounts that are detectable by analytical methods in 40 CFR Part 136." Monitoring for the Priority Pollutants shall not be required.

Bromine may be used at times in the raw water system. For purposes of measurement of Total Residual Chlorine (TRC) in the permit, analyses shall include residual bromine with the results reported as chlorine. Thus there is no separate test for residual bromine, but one test for situations where combinations of chlorine and bromine are being used.

The language in the previous permit shall be retained restricting start-up, shutdown and abrupt flow changes when the flow is below 3,500 cubic feet per second.

It is recognized that the permittee must use biocides and corrosion inhibitor products to protect plant piping systems and assure safety in the event of a shutdown. Because the chemicals in these products may be detrimental to fish and aquatic life in the receiving stream, there is a need to evaluate the nature of the chemicals, the dosage to be used, the duration of use, the effluent concentration, and the need for treatment prior to discharge. The previous permit required that a biocide treatment plan be submitted for approval by the Division and that subsequent changes to that plan during the permit period also be submitted for approval. It is also recognized that biocide and corrosion inhibitor products will change during the course of the NPDES permit period and that there is need for a mechanism to evaluate these changes relative to water quality impacts. Thus language has been incorporated into the permit to allow modification of the biocide and corrosion inhibitor plan based on pre-approval of the modifications by the Division.

The quantities of chemicals used for treatments of intake or process waters must be conducted in accordance with a TDEC-approved Biocide/Corrosion Treatment Plan (B/CTP).

WBN's current B/CTP was approved in 2009. This provision will continue in this permit and TVA must submit a revised B/CTP which addresses the changes in chemical treatments of ERCW and RCW and Towerbrome treatments of CCW for two unit operations at WBN.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-22 of R-57 VIII. METALS AND TOXICS The following procedure is used to calculate the allowable instream concentrations for permit limitations. If monitoring for a particular pollutant indicates that the pollutant is not present (i.e., consistently below detection level), then the division may drop the monitoring requirements in the reissued permit.

1. The most recent background conditions of the receiving stream segment are compiled. This information includes:
  • 7Q10 of receiving stream
  • Calcium hardness (measured ambient data, or 80.6 mg/L default)
  • Total suspended solids (measured ambient data, or 8.4 mg/L, default)
  • Background metals concentrations (measured ambient data, or 1/2 chronic water quality criteria)
  • Other dischargers impacting this segment
  • Downstream water supplies, if applicable
2. The chronic water quality criteria are converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel and zinc. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions.
3. The acute water quality criteria is converted from total recoverable metal at lab conditions to dissolved lab conditions for the following metals: cadmium, copper, lead, nickel, zinc, silver and mercury. Then translators are used to convert the dissolved lab conditions to total recoverable metal at ambient conditions for the following metals: cadmium, copper, lead, nickel, silver and mercury.
4. The chronic criteria for Chromium (T) is given in the total recoverable form and is not converted to a dissolved lab condition or to the total recoverable ambient condition.
5. A standard mass balance equation determines the total allowable concentration (permit limit) for each pollutant. This equation also includes a percent stream allocation of 90%.

The following formulas are used to evaluate water quality protection:

Cm = QsCs + QwCw Qs + Qw

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-23 of R-57 where:

Cm = resulting in-stream concentration after mixing Cw = concentration of pollutant in wastewater Cs = stream background concentration Ow = wastewater flow Os = stream low flow to protect water quality:

Cw < (S. rCm (as + Qw) - QsCsl ow where (SA) is the percent "Stream Allocation".

Calculations for this permit have been done using a standardized worksheet, titled "Water Quality Based Effluent Calculations." Division policy dictates the following procedures in establishing these permit limits:

1. The critical low flow values are determined using USGS data:

Fish and Aquatic Life Protection 7010 - Low flow under natural conditions 1Q10 - Regulated low flow conditions Other than Fish and Aquatic Life Protection 30Q2 - Low flow under natural conditions

2. Fish & Aquatic Life water quality criteria for certain Metals are developed through application of hardness dependent equations. These criteria are combined with dissolved fraction methodologies in order to formulate the final effluent concentrations.
3. For criteria that are hardness dependent, chronic and acute concentrations are based on a Hardness of 25 mg/I and Total Suspended Solids (TSS) of 10 mgAI unless ambient stream data or water supply intake data substantiate a different value. Minimum and maximum limits on the hardness value used for water quality calculations are 25 mg/I and 400 mg/I respectively. The minimum limit on the TSS value used for water quality calculations is 10 mg/l.
4. Background concentrations are determined from the division database, results of sampling obtained from the permittee, and/or obtained from nearby stream sampling data. If this background data is not sufficient, one-half of the chronic "In-stream Allowable" water quality criteria for fish and aquatic life is used. If the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, then the measured background concentration is used in lieu of the chronic "In-stream Allowable" water quality criteria for the purpose of calculating the appropriate effluent limitation (Cw). Under these circumstances, and in the event the "stream allocation" is less than 100%, the calculated chronic effluent limitation for fish and aquatic life should be equal to the chronic "In-stream Allowable" water quality criteria. These guidelines should be strictly followed where the industrial source water is not the receiving stream. Where the industrial source water is the receiving stream, and the measured background concentration is greater than the chronic "In-stream Allowable" water quality criteria, consideration may be given as to the degree to which the permittee should be required

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-24 of R-57 to meet the requirements of the water quality criteria in view of the nature and characteristics of the receiving stream.

The spreadsheet has fourteen (14) data columns, all of which may not be applicable to any particular characteristic constituent of the discharge. A description of each column is as follows:

Column 1: The "Stream Background" concentrations of the effluent characteristics.

Column 2: The "Chronic" Fish and Aquatic Life Water Quality criteria. For Cadmium, Copper, Lead, Nickel, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions. The Criteria Continuous Concentration (CCC) is calculated using the equation:

CCC = (exp { mc [In (stream hardness) ] + bc }) (CCF)

CCF = Chronic Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator:

Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion (EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no chronic criteria exists for silver.

Published criteria are used for non-metal parameters.

Column 3: The "Acute" Fish and Aquatic Life Water Quality criteria. For Cadmium, Copper, Lead, Nickel, Silver, and Zinc, this value represents the criteria for the dissolved form at laboratory conditions. The Criteria Maximum Concentration (CMC) is calculated using the equation:

CMC = (exp { mA [In (stream hardness) ] + bA }) (ACF)

ACF = Acute Conversion Factor This equation and the appropriate coefficients for each metal are from Tennessee Rule 1200-4-3-.03 and the EPA guidance contained in The Metals Translator: Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion(EPA 823-B-96-007, June 1996). Values for other metals are in the total form and are not hardness dependent; no acute criteria exists for Total Chromium. Published criteria are used for non-metal parameters.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-25 of R-57 Column 4: The "Fraction Dissolved" converts the value for dissolved metal at laboratory conditions (columns 2 & 3) to total recoverable metal at in-stream ambient conditions (columns 5 & 6). This factor is calculated using the linear partition coefficients found in The Metals Translator: Guidance For Calculating A Total Recoverable Permit Limit From a Dissolved Criterion(EPA 823-B-96-007, June 1996) and the equation:

Cdiss 1 1

Ctot al 1 + [ [Kpo] [ss (1+a)] [10-6] )

ss = in-stream suspended solids concentration [mg/I]

Linear partition coefficients for streams are used for unregulated (7Q10) receiving waters, and linear partition coefficients for lakes are used for regulated (1Q10) receiving waters. For those parameters not in the dissolved form in columns 2 & 3 (and all non-metal parameters), a Translator of 1 is used.

Column 5: The "Chronic" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions. This criteria is calculated by dividing the value in column 2 by the value in column 4.

Column 6: The "Acute" Fish and Aquatic Life Water Quality criteria at in-stream ambient conditions. This criteria is calculated by dividing the value in column 3 by the value in column 4.

Column 7: The "Chronic" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the chronic limit.

Column 8: The "Acute" Calculated Effluent Concentration for the protection of fish and aquatic life. This is the acute limit.

Column 9: The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Organism Consumption (Recreation).

Column 10: The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Water and Organism Consumption. These criteria are only to be applied when the stream use classification for the receiving stream includes both "Recreation" and "Domestic Water Supply."

Column 11: The In-Stream Water Quality criteria for the protection of Human Health associated with the stream use classification of Domestic Water Supply.

Column 12: The Calculated Effluent Concentration associated with Organism Consumption.

Column 13: The Calculated Effluent Concentration associated with Water and Organism Consumption.

Column 14: The Calculated Effluent Concentration associated with Domestic Water Supply.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-26 of R-57 The most stringent water quality effluent concentration from Columns 7, 8, 12, 13, and 14 is applied if the receiving stream is designated for domestic water supply. Otherwise, the most stringent effluent concentration is chosen from columns 7, 8, and 12 only.

The calculations are presented in Appendix 5b. One calculation has been made for the Tennessee River and one for Yellow Creek. Because of the close proximity of the outfalls and large flow of the discharges, Outfalls 101 and 113 have been combined for purposes of the water quality calculations in the Tennessee River. Background water quality in the Tennessee River has been taken from the Division of Water Pollution Control monitoring station at river mile 529.5. This data is presented in Appendix 5a.

Separate water quality calculations are presented for ammonia and pH in Appendix 5c and 5d respectively. In the case of ammonia, Outfalls 101 and 113 were combined for purposes of determining the discharge concentration allowable for the Tennessee River. Based on the calculations it was determined that limiting ammonia to prevent toxicity was not necessary.

Storm Water The following table gives a summary of storm water discharges at the TVA - Watts Bar Nuclear Plant:

Storm Water Outfall Summary EiSW PPP Drbin-gll , ln)rvlous Pond(s) O,,uffall Permit Area No. Area, "Area Included In # Designation Coverage acres 'acres . Drainage Area 1 42 34 YHP 101 NPDES 2 49 47 YHP 101 NPDES 3 144 5 None To be re-evaluated for TMSP 4 92 3 None SW-1 TMSP 5 37 22 YHP 101 NPDES 6 29 1 None SW-5 TMSP 7 18 7 LVWP+ 103 NPDES 8 27 8 None SW-2 TMSP 9 45 11 None SW-3 TMSP 10 41 4 None To be covered under TMSP 11 77 18 None To be covered under TMSP 12 163 1 None SW-4 I TMSP 13 166 35 CRHP To be re-evaluated for TMSP 14 42 30 CRHP To be re-evaluated for TMSP 15 8 0 None No industrial activity Total 980 226 1_ _ II Outfalls that contain only storm water and other discharges allowed by the TMSP have been permitted under the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities (TMSP). Outfalls SW-1 through SW-5 fall into this category and thus are not addressed in this individual permit. Outfalls that contain storm water commingled with process and/or cooling wastewater are covered under this individual NPDES permit. This includes

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-27 of R-57 Outfall 101(or 102). The total flow from Outfall 101 (and 102 when in use) contains approximately 2.1% storm water based on the average annual flow. Storm runoff pollutants from this discharge shall be controlled via the Storm Water Pollution Prevention Plan (SWPPP) required by this permit (see Part IV of the Permit).

It is the intent of the Division that the permittee institute a Storm Water Pollution Prevention Plan (SWPPP) in order to minimize the discharge of pollutants from storm water outfalls. It is the opinion of the Division that the best method for dealing with potential pollution associated with storm water discharges from the TVA-Watts Bar Nuclear Plant is through implementation of an aggressive SWPPP coupled with discharge monitoring to verify SWPPP effectiveness.

In order to assist the permittee in the evaluation of the effectiveness of the SWPPP, benchmark values developed for the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities are provided herein for comparison. These benchmark values (cut-off concentrations) were developed by the EPA and the State of Tennessee and are based on data submitted by similar industries for the development of the multi-sector general storm water permit. The cut-off concentrations are target values and should not be construed to represent permit limits.

Parameters of Concern Cut-Off Concentration [mg/L]

Total Suspended Solids (TSS) 200 Oil & Grease 15 Iron, TOTAL 5.0 pH (range) 5.0-9.0 Note: Sample values are from the Tennessee Storm Water Multi-Sector General Permit for Industrial Activities, Rationale, Part Ill, Table Ill-A: ParameterBenchmark Values.

The previous permit contained a requirement that a Storm Water Pollution Prevention Plan (SWPPP) be developed and maintained to regulate storm water runoff. This requirement shall be retained in the new permit. The SWPPP is meant to ensure that runoff from the facility site is not a significant source of pollution to the receiving stream. The discharger shall develop, document and maintain the SWPPP pursuant to the requirements as set forth in the Tennessee's Storm Water Multi-Sector General Permit for Industrial Activities, Sector 0, "Storm Water Discharges Associated with Industrial Activity from Steam Electric Power Generating Facilities, Including Coal Handling Areas", Part 3, "Storm Water Pollution Prevention Plan Requirements", is available at http://www.state.tn.us/environment/wpc/stormh2o/pmt-o.pdf for this permit. The effectiveness of this SWPPP may be investigated by requiring storm water monitoring of the combined process/storm water discharges and requiring that the results of the storm water runoff monitoring be submitted. Should the required monitoring results so dictate, the Division maintains the authority to institute specific numeric limitations for the monitored parameters.

IX. BIOMONITORING REQUIREMENTS, CHRONIC The discharge of industrial wastewater from Outfall 101, 102, and 113 may contain several different pollutants, the combined effect of which has a reasonable potential to be detrimental to fish and aquatic life. The Tennessee Water Quality Standards criteria stipulate that "The

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-28 of R-57 waters shall not contain toxic substances, whether alone or in combination with other substances, which will produce toxic conditions...".

Since the permittee discharges to streams with low critical flow conditions, there is a concern for toxicity effects of the discharge on the receiving stream that is relatively unknown.

Biomonitoring will provide information relative to the toxicity of the discharge. Chronic biomonitoring is designed to evaluate extended exposure effects of toxicants to growth and/or reproduction of sensitive aquatic species. Calculations of chronic toxicity limits are as follows:

For situations where water is withdrawn from the stream and then discharged back to the stream Qs DF= ---------------------------

Ow and for situations where water is not withdrawn from the stream as + Ow DF = ------------------ = Dilution Factor, Qw Where Ow is the wastewater flow and Qs is a receiving stream low flow (7Q10 or 1Q10),).

Please refer to Appendix 5e for details regarding facility wastewater flow and receiving stream low flow. Where the calculated dilution factor is less than 100:1, and assuming immediate and complete mixing, protection .of the stream from chronic effects requires:

IWC < 1.0 X IC25; or, INHIBITION CONCENTRATION, 25% > IWC, Where IWC is Instream Waste Concentration and is calculated as a percent of the total flow using the following formula:

For situations where water is withdrawn from the stream and then discharged back to the stream Qw IWC =........----------- x 100 Qs and for situations where water is not withdrawn from the stream Qw IWC= X 100 Qs + Qw The following table gives the calculated chronic test values for the four outfalls:

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-29 of R-57 Calculation of Chronic and Acute Blomonitoring Requirements Watts Bar Nuclear Plant, Outfalls 101,102, and 113 Calculation of Chronic Biornonitorincn Requirements Outfall Receing Rec. Stream Outfall Waste Withdrawing Dilution Factor, DF Instrearn Wastewater Conc. (IWC)

Stream Flow, Os Flow, Ow from Withdrawing Not Withdrawing Withdrawing Not Withdrawing mgd mgd Rec. Stim. Os/Ow (Os + Qw)/Qw (Qw/Is) (Qw/(Qw+Qs))

Chronic Requirements, IfDF <100 101 TN RFier 2062 57.76 Yes 35.7 2.80%

102 1TN River 2062 57.76 Yes 35.7 2.80%

113 TINRler 2062 140895 No 14.8 6.73%

As seen from the table, WET testing shall be required on all three Outfalls. If toxicity is demonstrated in any of the effluent samples specified above, this shall constitute a violation of this permit.

The toxicity tests specified herein shall be conducted twice a year (2/Year) and begin no later than 90 days from the effective date of this permit for Outfalls 101,102, and 113.

X. ANTIDEGRADATION Tennessee's Antidegradation Statement is found in the Rules of the Tennessee Department of Environment and Conservation, Chapter 1200-4-3-.06. It is the purpose of Tennessee's standards to fully protect existing uses of all surface waters as established under the Act.

Stream determinations for this permit action are associated with the waterbody segments identified by the division as segment ID# TN06020001020_1000, and TN06010201001_1000.

The Division has made a stream tier determination of the receiving waters associated with the subject discharge(s) and has found the receiving stream to be neither a Tier 2 nor Tier 3 water.

Additionally, this water is fully supporting its designated uses. The Department has maintained, and shall continue to assess, the water quality of the stream to assure that the water quality is adequate to protect the existing uses of the stream fully, and to assure that there shall be achieved the highest statutory and regulatory requirements for all new and existing point sources and all cost-effective and reasonable best management practices for nonpoint source control.

Additionally, this water partially support(s) designated uses due to polychlorinated biphenyls (contaminated sediments). The discharge from Outfall 113 does not contain significant amounts of these effluent characteristics (consists only cooling water/storm water runoffand does not represent an increase in flow). The division, therefore, considers the potential for degradation to the receiving stream from these discharges to be negligible.

TMDLs have been developed and approved for this waterbody segment on the following parameters and dates:

Parameter TMDL Aporoval Date PCBs 03/18/2010

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-30 of R-57 The proposed terms and conditions of this permit comply with the wasteload allocations of these TMDLs.

The withdrawal rate for the intake pumping station located in Chickamauga Reservoir will increase from approximately 52 MGD to approximately 75 MGD and SCCW intake withdrawal rate will remain approximately 174 MGD is consumptive (primarily cooling tower evaporation) with the remainder to the stream via permitted outfalls. The consumption amounts to only 1.3%

of the 7Q10 stream flow (3173.3 MGD). Therefore, water withdrawal will continue to be de minimus as described in Rule 1200-4-3.04.

No thermal degradation is proposed or anticipated. TVA has performed an extensive hydrothermal analysis of the WBN heat dissipation system. This analysis indicates that the near-field (and thus far-field) thermal impacts are insignificant and can be managed within the limitations of the current NPDES permit.

Xl. PERMIT DURATION The proposed limitations meet the requirements of Section 301(b)(2)(A), (C), (D), (E), and (F) of the Clean Water Act as amended. It is the intent of the division to organize the future issuance and expiration of this particular permit such that other permits located in the same watershed and group within the State of Tennessee shall be set for issuance and expiration at the same time. In order to meet the target reissuance date for the Tennessee River (Meigs &

Rhea County) watershed and following the directives for the Watershed Management Program initiated in January 1996. This permit will expire in 2016.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-31 of R-57 APPENDIX 1 - FACILITY DISCHARGES AND RECEIVING WATERS FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL (OSN) 101 I LONGITUDE LATITUDE

-84.785833 35.593333 FLOW DISCHARGE RECEIVING STREAM (MGD) SOURCE DISCHARGE ROUTE Yard Holding Pond (1.371 MGD) (All variable flows) Chickamauga Reserdlor (Tennessee River Mile 527.9) 0.0000 Turbine Building Station Sunp'A' 0.0000 Cooling Tower Blowdown 'A' STREAMLOW 7010 1 1010 1 3002 0.0000 Emergency Raw Cooling Water Discharge 'A' FLOW (CFS) 4910 1 3190 1 8580 0.0000 Raw Cooling Water Discharge 'A' (MO*D 3173 I 2062 1 554 0.0000 Ice Condenser Chiller/Air Coolers Alternate Parh 0.7373 Miscellaneous Discharges, Includes: STREAM USE CLASSIFICATIONS (WATER QUALITY) 0.0000 Condenser Cleaning, Cooling Tower & Work Decon. I FISH I RPEEATM I IRIATMJ I LW&W I 0.0010 Trainlng Center Cooling Tower I x I x I x I 0.1878 Trash Sluice Water XNcUSTnAL 0.3619 Low Volume Waste Holding Pond (IMP 103) X 0.0000 ERCW Header Flushes 0.0480 Precipitation, Less Eeaporation 0.0020 Cooling Tower Disilting Basin 0.0330 Discharge from IMP 107 Metal Cleaning Waste Ponds Cooling Tower Eowdown Line (45.773 MGD) 0.0040 Uquid Radwaste System 0.3600 Steam Generator Blowdown 0.0010 Condenser Demineralizer Cleanup 45.4080 Cooling Tower Blowdown Weir Misc. Colling Water 10.62 MGD) 5.3100 Emerency Raw Cooling Water 4.9100 Raw Cooling Water 0.4000 Ice Condenser Chiller/Various Air Cooler 57.7640 TOTAL DISCHARGE (MGD)

Treatment. Biocide, sedimentation, neutralization, and oil skimming, mi)dng by submerged multiportcdiffuser.

Reference:

Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D.Weaver.

Water Resources investigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-32 of R-57 FACILITY DISCHARGES AND RECEIVING WATERS I OUTFALL (OSI) 102 RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE

-84.791667 35.595833 Unnamed tributary entering Chickamauga Reserwor (Tennessee River Mile 527.2)

FLOW DISCHARGE STREAM LOW 7010 101 3002 (MGD) SOURCE FLOW (CFS) 4910 3190 8580 Yard Holding Pond Overflow Weir (emergency outfall). - MGD 3173.3 2061.7 5545.3 0.0000 Provides an alternate discharge path for the diffuser

_discharge point (OSN 101) STREAM USE CLASSIFICATIONS (WATER QUALITY)

FISH I3EATc* IRWlATIrN LW&W ccNESrE x x x X x INDUSTRIAL NAVGATION 0.0000 TOTAL DISCHARGE X X Treatment Biocide, sedimentation, neutralization, and oil skimming, mi~tng by submerged muttiport diffuser.

Reference:

Flow Duration and Low Flows of Tennessee Streams through 1992 by George S. Law ans Jess D. Weaver.

Water Resources bIvestigations Report 95-4293 prepared by the U.S. Geological Survey in Cooperation with the Tennessee Department of Environment and Concervation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.

FACILITY DISCHARGES AND RECEIVING WATERS OUTFALL MP) 103 RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE

-83.20694 35.59722 Internal monitoring point that discharges through the Yard Holding Pond FLOW DISCHARGE STREAM LOW 7010 1010 300 (MGO) SOURCE FLOW (CFS) 0.0 1 0.0 Low Volume Waste Holding Pond MGD 0.0 0.0 .C 0.0053 Precipitation, Less Evaporation 0.0250 Alum SludI Supernate STREAM USE CLASSIFICATIONS (WATER OUALITY) 0.2600 Vendor Water Ppuritication (RO reject water) FISH RBUF'ATIONII3GATnCN LW&W DOME 0.0716 Turbine Building Station Sump X X X X X I riDUSTRtALNAVIA.

0.3619 TOTAL DISCHARGE X Treatment: Oil skimming, sludge thickening, and neutralization

. No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-33 of R-57 I FACILITY DISCHARGES AND RECEIVING WATERS I OFALL (IMP) 107 I RECEIVING STRE, LONGITUDE LATITUDE DISCHARGE ROLl ITE

-84.7955 35.5048 Internal monitoring point which discharges tt rough the Yard

/Holding Pond FLOW 10 10 1 3002 DISCHRE STREAM LOW 1 7010 (MGD) SOURCE FLOW (CFS) 0.0 1 0.0 1 0.0 Metal Cleaning Waste Ponds(LP and ULP) (/GDO 0.0 1 0.0003 Metal Cleaning Waste 0.0001 Storm Water Runoff STREAM USE CLASSIFICATIONS ,M WATER 0 UALTY) 0.0001 Drum Rinsing FISH REDRATnoN TIA'N 0.0001 Drum Dewatering X X X X X 0.0001 Diesel Generator Coolant NDASTRIAL NAVGATION 0.0303 turbine Station Sump W/Metal Cleaning Waste X 0.0310 TOTAL DISCHARGE Treatment: Oil skimming, sludge thickening, and neutralization

. No low stream flow assigned to the internal monitoring point which discharges to the Yard Holding Pond I FACILITY DISCHARGES AND RECEIVING WATERS I OUTFALL (OS?)113 I RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE

-84.785833 35.593333 Discharge Via diffuser to Chickamauga Resermor (Tennessee Rier

____________________________________________ Mile 529.2)

FLOW DISCHARGE STREAM LOW 7010 1 1010 1 3002 (MGO) SOURCE FLOW (CFS) 491U 1 3190 1 8580 148.895 Supplemental Condenser Cooling Water (Noncontact) UMGO) 3173.3 1 2061.7 1 5545.3 STREAM USE CLASSIFICATIONS (WATER QUALITY)

S1H RMMEATM " RGATION LW&W 00METs'C X X X X X INS.TRIAL NAViGATIM 148.895 TOTAL DISCHARGE X X Treatment. Thermal Miuang

Reference:

Flow Du ration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.

Weaver. Water Resources Investigations Report95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environment and Conservation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-34 of R-57 I FACILITY DISCHARGES AND RECEIVING WATERS I OUTFSLL OS1 114 _ RECEIVING STREAM LONGITUDE LATITUDE DISCHARGE ROUTE

-83.21667 135.62W83 Discharge ýia Tennessee Riwer@ mile 529.8 FLOW DISCHARGE STREAM LOW 7010 1Q10 1 3002 (MGD) SOURCE FLOW (CFS) I 4910 I 3190 I 8580 0.01 9 Supplemental Condenser Cooling Water (SCCW) - (Intake (MGD 3173 2062 5545 screen backwash)

STREAM USE CLASSIFICATIONS (WATER 0UALIT'Y FISH RBWFATION lFrATON LW&W DOESTIC X X X x x NDLSýth[AL NAVE-ATMI*

0.019 TOTAL DISCHARGE x x Treatment: Screens

Reference:

Flow Duration and Low Flows of Tennessee Streams th rough 1992 by George S. Law and Jess D.

Weaver. Water Resources Investigations Report 95-4293 prepared by the U.S. Geological Surveyin Cooperation with the Tennessee Departmentof Environmentand Conservation and the Tennessee Valley Authority. Nashville, Tennessee, 1996, p.57.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-35 of R-57 APPENDIX 2 - APPLICABLE EFFLUENT LIMITATIONS GUIDELINES SIC GROUP 4911,40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES LOW VOLUME WA~T~ ~fliiRC~

- ..,-PT - T..=

-*i, BAT aWQNTHLY", SI z-DAILY ff MO1WNTHLY DiL

,DAILY

ý411FFLUENT~ftkff Total Suspended Solids Oil and Grease pH 4 V ¶C 30 15 C MA, 6.0-9.0 100 20 AVG.CONC.

-C.

...

....

...

1 1

MAX CONG.

Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds ....

METAL CLEANING WASTES N4SUBP T 2".2 ~~SB 43 "M0!THLY: 'DAILY,, 'MONTHLY JDAILY:

VG.C~~Ci' 'COA AVG. CONG. MAX CONC.

iON1ARACO~ Tilt j ti ~L (mJ2LL.

Total Suspended Solids 30 100 ....

Oil and Grease 15 20 ....

pH 6.0-9.0 -- --

Copper, Total 1.0 1.0 1.0 1.0 Iron, Total 1.0 1.0 Polychlorinated Blphenyl No Discharge Allowed No Discharge Allowed Compounds -III

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-36 of R-57 SIC GROUP 4911, 40 CFR PART 423 STEAM ELECTRIC POWER GENERATING CATEGORY GUIDELINES tlffl IKI^- 'rfVUCn 01 ^1A1rf% KI BPT, "IBAT SUBPART 423.12 SUBPART423.13 fMI - lLY "L PUALY I

VUNIfILTY I IAILY MV.NI rlLY k: EFFLUE4T. . ,.CONNC.C iMAXCONO.  :*AVG.CONC. MAX CONC.

CHARACTERISTIC 2! ' (mg/L) m) j;' (iWQL) (mg/L)

Chlorine, Free Available* 0.2 0.5 0.2 0.5 pH 6.0-9.0 ....

Chromium, Total .... 0.2 0.2 Zinc, Total -- -- 1.0 1.0 Priority Pollutants (126) contained in chemicals added for cooling tower No Detectable Amount maintenance, except Chromium and Zinc Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds I ONCE THROUGH COOLING WATER "BPT ':- ' BAT SUBPART 423.12 , , SUBPART423.13

__ MONTHLY

__ DAILY MONTHLY DAILY EFFLUENT' AVG. CONC: MAX CONCG' AVG.GONC. MAX CONC.

Chlorine, Free Available 0.2 0.5 ....

Chlorine, Total Residual* - ..... 0.2 pH 6.0-9.0 ....

Chromium, Total 0.2 0.2 Zinc, Total 1.0 1.0 Polychlorinated Biphenyl No Discharge Allowed No Discharge Allowed Compounds

. Limitation applies to once through cooling water from plants with a total rated electric generating capacity of 25 or more megawatts.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-37 of R-57 APPENDIX 3 - PREVIOUS PERMIT LIMITS AND MONITORING REQUIREMENTS I ~PERMIT' LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Watr, StonmWaterand Process Wastewater LILITAT~NS MONITORING EFFLUENT LIMITATIONS EFFLUENT MONIO~RI~NG MONTHLY DAILY EFFLUENT AVC. CONC. AVC AMrM MAX.CONC. MAX AMNO. MrM. s,,,SAMPu CHARACTERISTIC (Mal) (ltday) (MI) (Ibky) FRQNCY. rPE 1

FLOW Report (MGD) 1 Report (MGD) 1 Continuous Recorder Certtflcalon oflnstream Flowof Report as Yes/No 1/Month Operation 3,500 CfS when required Records PH 2 Range 6.0 - 9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSS) 30.0 -- 100.0 - 1/Month Grab OIL & GREASE 15.0 -- 20.0 - 1/Month Grab CHROMIUM, TOTAL 0.2 0.2 WAIVED' Grab ZINCTOTAL 1.0 1.0 - 2/Month Grab CHLORINE, TOTAL RESIDUAL 2 (0RC) 2.. 0.10 -- 0.10 - 5/Week Grab 's 4

TEMPERATURE, Effluent -- 35 C - Continuous Recorder IC25 5 25% Ihibition Concentration shall be >3.3% effluent 2/year Composite There shall be no discharge ot PCBs.

l shall be reported in Million Gallons per Day (MGD). Inthe ewnt that the continuous flow monitor is out ofsenice, low monitoring shall be Row estimated by intake pump logs.

2 pH and ntOC analyses shall be performed within fifteen (15) minutes of sample collection.

3 "he acceptable methods for analysis of TRC are any methods specified In40CFR Part 136.

4 When the temperature monitoring equipment fails, monitoring willbe done once per day. Reasonable and timely effort willbe made to restore the temperature recorder to operation as soon as possible, See Part IIIfor further temperature requirement See Part Illfor methodology.

Monitoring for chromium is waived per 40 CFR 122.44 (aX2XI). See Rationale for more comments.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-38 of R-57 I PERMIT LMRTS TVA-Watts Bar Nuclear OUTFALL 102 COoling water, Srriywater runoff and Process Wastewater IMEE~lI I"EIVI 1 II 1 - I ýfA LC IW MONITORING lll Wv u' i tAll W EFFLUENT -AVG.CONC. AVG.,AIMN. MAXCONC. MAX AMN, MWRS4*,. SAMPLE CHARACTERISTIC (1.11) (Ibd~y) (.0 1 (,Itdy) PRONCY. TY*E 1

FLOW Report (MGD) Report (MGD) 1/Day hstantaneous Certtflcalon oflnst'uiam Flowof Report as Yes/No 1/Month' Operation 3,500 c1S whten required I Records pH 2 Range 6.0 - 9.0 2/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 - 100.0 - 1/Month Grab 6

OIL & GREASE 15.0 20.0 -- l/Month Grab CHROMiUMTOTAL 2.0 2.0 Waived' Grab ZINC, TOTAL 1.0 -- 1.0 - 2/Month Grab CHLORINE, TOTAL RESIDUAL 2 3 (TRC) 2, 3

0.10 -- 0.10 - 5/Week Grab TEMPERATURE, Effluent -- 350 C - 1/Day Grab 4

IC25 " 25% Ihibition Concentration shall be >3.3% effluent 2/year Composite 4 There shall be no discharge of PCBs.

1 Flow shall be reported in Million Gallons per Day (MGD).

2 pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.

3 The acceptable methods for analysis of TRC are any methods specified In 40 OFR Part 136.

4 Sampling and analysis required only If discharge Is operated 30 days or more during the semi-annual periods January through June or July through December and if all toxicity testng requirements have not already been completed for Outfall 101. See Pa 5 Certification shall be made during any month that a discharge occurs from this outfall.

6 If there Is discharge during I or more days from this outfall, sampling is required to comply with the maximum daily limit. If there are two or more separate days of discharge, or a continuous discharge during S or more consecutive days from this outfall then one sample Is required from that "batch' discharge In order to report the monthly avergage limit.

SMornitoring for chromium Is waived per 40 CFR 122.44 (a)(2XI).See Rationale for more comments.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-39 of R-57 TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REOUIREMENTS EFFLUENT AVA. CONC. AVG. Awa MAX.COF4C. NIA ASIN,. MSHW-. SMPL CHARACTERISTIC =.SAtl (tt.yl (e;S) (I~d.M) Q.qNCY. IYPE 1

FLOW Report (MGD) Report (MGD)' Continuous Recorder Certlcfadon oflnstream Flow of .. Report as Yes/No 1/Month Operation 3,500 CfS Waeln req uIred Records 2 Range 6.0 - 9.0 I/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 - 100.0 -- 1/Month Grab CHLORINE. TOTAL RESIDUAL 2 3 6 l/Month 6 Grab (TRC) ' , 0.092 -- 0.158 --

DISSOLVED OXYGEN (D.O.) .

-- Report Min. -- l/Month Grab TEMPERATURE, Effluent Report Effluent Temperature 4 Hourly Recorder' TEMPERATURE, Edge ofEMPEAUE Eone - 30.5 'C - Hourly Recorder 7 of Mixing Zone TEMPERATURE, Rie- - 3 C - Hourly Calculated' Upstream to Downstream TEMPERATURE, Rate of Change, 2C/Hour Hourl Calculated OC per hour TEMPERATURE, Receiving - 33.5°C - Hourly Recorded Stream Bottom 3

IC25' 25% Inhibition Concentration shall be >-8%effluent Semi-annual Composite I Row shall be reported in Million GallOn. per Day (MGD).

2 pH and "1RC analyses shall be performed within fifteen (15) minutes of sample collection.

STh acceptable metrods for analysis of "Rc are any methods specified In 40 CFR Part 136.

See text below table for r"uSrarments.

see Part Illfor methodology Sampling for TRC shall be 5/Week during periods when the Supplemental Corndenser Cooling Water (SCCW) system is in operation.

'See additional (bulieted) comments in permit. Begins on page 8 of 27.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-40 of R-57 I PERMITLIIS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monhitring Poinrt Metal C leaning Was tewater EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT AVC.3CONc. AVC.AMNT. FAX Co E. -_ Ahi. ?MRI. SAMPLE CHARACTERISTIC (0) 1 y) I) Iby FRQNC). WE FLOW Report (MGD) Report (MGD) 1/Batch Calculated pH 2 Report Report I/Batch 2 Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 -- 30.0 - 1/Batch Grab OIL&GREASE 15.0 -- 15.0 - 1/Batch Grab COPPER, TOTAL RECOVERABLE 1.0 - 1.0 - 1/Batch Grab IRONJTOTAL RECOVERABLE 1.0 -- 1.0 - 1/Batch Grab PHOSPHORUS, TOTAL 3 1.0 -- 1.0 - I/Batch Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge. If a batch discharge extends for more than a 24-hour period, aow 2 pH analyses shall be performed within fifteen (15) minutes ofsample collection.

3 Sampling for phosphorus Is required only when metal cleaning chemicals containing phosphorus are being used.

PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplenll Condenser Cooling Water Infake Screen Backwash vilr 1.) No numerical monitoring limitations are applied to this outfall.

f DiOcharge Flow TotalSuspended O&G Zinc, total (as Zn) Whole Effluent Toxidly TotalResidual Chlor*neTemperature, p evem Solids -WET) Testing Toa l RsdlCoi Effluent p r obation mT- Effluent MAve DM MAve 0 Max M Ave 0 Max oDtay Daily Monthly Oiay Effluent Effluent Efufeet Efluant Effluent Effluent Cerilodhrdu *Pnephute. DeilMoo. Mu, Miny Ma..

Min.

Date 02120"2006 Ceft E

I Aveoug. Mu..

MGD MGO mg/ m 43.1 o:097 Con¢. Corn.

4.0 40 Cone. Cor.

]L* mg/L 50 mgVI 6.0

{n_

Con.

0.02 C.o" n

003

_mg.L 00.

005 C

migL 016 Oal Ma.

Dal.

C 10 m Cor-. Cone.

79 8 03131/2006 1 4132 66.46 8.0 5.0 5.0 001 0.01 0 05 0 05 22 76 82 04U302006 11 1 37 2a 8296 1 00 80 50 50 0.01 0.01 005 a 09 24 4.. 8 4 05/3172006 1 31,37 52,72 0.00 01 i 0.05 0.09 20 83 1 a4 6120 70.65 80 003 o05 0 07 -28 69 a5 1 006 _______

0713110 1 42 fil 19 Ii 013 01 0 05 9 08/112006 18 17 9605 100 130 50 0.02 1003 1 = 9005 87 09(3012006 1 37.21 005 O.osi 30 [79 84 71.95 0.0 1 0 5.0 5.0 0 10 0.19 005 0 08 24 74 7.4 60.69 4.0 54..

0 0.05 006 7,0 78 11113112001 1 132.s 50 74 5.0 50 9.0 5.0 0 05 0 05 76 1 78 1 4854 7924 80 80 50 50 002 0.02 0 05 23 70 77 028/2007 1 44 74 7 50 0 19 77 78 005 0 05 013121007 -1 25.56 1 65!0 0 01 0.05 006 04130(2007 2924 56.03 60 0.0 N. 0.02 003 1 1 0.05 0.05 005 0513112007 1 35 33j 57.64 1 3.0 3.0 5.0 50 0 03 0.03 006 27 7.7 7.7 I70

[70 061301200 1 34 13 56.49 50 5.0 5.3 5.3 0.09 014 0.05 07131/2007 1 2713 5101 60 60 5 5.61 003 004 006 0B031207 1 2920 9329 1 60 60 54 1 94 1 007 1 009 0913013007 26.26 61.97 1 6.0 6.0 56 0.05 0.0T 7.8 1013112007 2651 53.57 1 8.0 8.0 70 78 11,3012007 1 27.72 55.74 8,0 00 5,6 5.6 0.04 004 1253112007 1 30.11 68.59 150 150 583 5.3 -

243 7ý1 79 01131/200S 1 20 57 6891 30 3.0 50 s0 0.01 001 0 05 76 02129I2008 1 4307 71-09 9.0 90 1.9 1.9 002 002 1 4363 83.77 71 7.1 50 5.0 0.01 001 031311,200 005 04r30m28 1 37.11 B4.78 9.1 9.1 5.0 s0 0.03 003 0.05 005 26 77 01 05131/2008 55 5.5 011 0.10 005 007 0 28 7.6 7 0613012008 5.3 5.3 006 0.07 0.01 R 0 32 8 8 0713112008 1 6057 8248 99 9.6 50 56 006 010 0 06 007 0383132008 0561 10294 7.3 7.3 6655 0 07- 35 79 09130/2008 0304 10811 110 110 1 005 ] 0.07 ] 31 1013112008 48.74 92.13 4.4 44 50 0.14 020 000 005 20 11,30/2000 3665 0377 8.1 8.1 50 004 0.05 005 005 23 8 3 121311200M 3000 73.52 4.0 4.0 T5. 6.54 0.05 005 23ffl 4 0113112009 1 2369 65 15 74 74 53 513 0 01 19.2 192 005 0 05 20 02/2812009 1 1911 36.31 8.2 02 5.3 0 09 0 13 0 0 0.05 005 21 0313112809 1 2099 40.50 73 7.3 53 a 10 0.10 0 05 23 79 01 0,13013009 1 24 33 5045 81 81 5.6 0 13 02T 05131/2009 1 0813032009 1 1479 6050 8.4 84 5.3 5.3 1 0.08 0.10 T33 81 04 07I31/2009 1 123101 55.97 10 7 10.7 55 56 0 020 19.2 0.8 87 0013112009 1 2915 5434 6.4 04 5.6 5.6 1 4 0 P4 32 09/3012009 l 32.02 6741 11.0 11.0 5.5 55 010 017 005 005 29 101312009 110 11 0a 55 5 5_ 00 ,

'q3 T070 33* ;330 8.9 89 52 52 009 0.05 005 22 74 81 2982 .542 92 92 53 53 005 18 76 84 26 j 7 82 3N.8 S1 67.3S 7.6 1 35.16 62.21 6.6

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-42 of R-57 OUTFALL 103 Flow Total Suspended Solids O&G PH Effluent M Ave D Max M Ave D Max Dally Dally Monthly IE1fluent Effluent IEfluent Effluent Max. MIn.

Average Dally Max. Conc. Conc. Conc. Conc. Conc. Conc.

Date MGD MGD mg/L mg/L mg/L mg/L 02/28/2006 0.17 0.64 12 19 5 5 7.3 8.8 03/31/2006 0.02 0.02 18 65 5 5 7.5 8.9 04/30/2006 0.02 0.02 9 12 5 5 7.7 8.4 0o/31/2006 0.02 0.02 8 11 5 5 7.1 8 06/30/2006 0.02 0.02 7 9 5 5 7.2 8.8 07/31/2006 0.02 0.02 4 5 5 5 7 8.1 08/31/2006 0.02 0.02 8 10 5 5 8.2 8.6 09/30/2006 0.02 0.02 11 14 5 5 7 8.7 10/31/2006 0.01 0.01 7 8 5 5 7.4 8.6 11/30/2006 0.01 0.01 4 6 5 5 7.9 8.5 12/31/2006 0.01 0.01 3 4 5 5 7.7 8.3 01/31/2007 0.12 0.36 2 3 6 6 7.6 8.3 02/28/2007 0.02 0.02 6 10 5 5 7 8.2 03/31/2007 0.1 0.71 4 4 6 6 8.3 8.4 04/30/2007 0.02 0.02 6 7 5 6 8.2 8.5 05/31/2007 0.02 0.02 14 18 5 6 8.7 8.7 06/30/2007 0.02 0.02 7 8 5.4 5.6 7.9 8.5 07/31/2007 0.02 0.02 6 6 6.5 7.4 7.3 8.7 08/31/2007 0.02 0.02 9 12 5.2 5.3 7 8.8 09/30/2007 0.02 0.02 5 5 5.6 5.6 7.7 8.6 10/31/2007 0.02 0.02 5 5 5.9 5.9 7.3 7.8 11/30/2007 0.02 0.02 4 4 5.6 5.6 8.6 8.6 12/31/2007 0.01 0.02 6 6 5.3 5.3 8.7 8.7 01/31/2008 0.02 0.02 4 4 5.3 5.6 8.2 8.9 02/29/2008 0.02 0.02 7 7 3.6 5 7.2 8.6 03/31/2008 0.52 1-04 5.9 6.2 5 5 8.6 8.9 04/30/2008 0.38 1.32 9.8 14 5 5 7.3 8.8 05/31/2008 0.3 0.36 5.6 7.2 5.3 5.6 7.1 8.6 06/30/2008 0.31 0.37 5.7 6.4 5.5 5.6 7.6 8.3 07/31/2008 0.19 1.25 6:5 3 5.5 5.6 7.4 8.8 03/31/2008 0.23 0.63 7.5 10 5.3 5.3 7.6 8.4 09/30/2008 0.3 0.62 7.2 8.1 5.3 5.3 7.5 8.7 10/31/2008 0.27 0347 6 6.2 5 5 8.3 8.8 11/30/2008 0.24 0.34 8 9.7 5.2 5.3 7.9 8.9 12/31/2008 0.24 0.4 7.2 9.2 5 5 8.2 8.9 01/31/2009 0.17 0.25 5.4 5.8 5 5 7.4 8.7 02/28/2009 0.24 0.287 8 8.2 5 5 8.6 8.7 03/31/2009 0.47 0.87 7.5 4.5 5.2 5.3 8.5 8.5 04/30/2009 0.32 0.71 10.3 11 5.2 5.3 8 8.7 01/31/2009 0.42 1.04 11.4 13 5.3 5.3 7.6 8.7 06/30/2009 0.35 0.5 6.3 6.4 5.5 5.6 7.3 8.5 07/31/2009 0.23 1.49 10.8 14 5.6 5.6 7.2 8.8 08/31/2009 0.8 0.39 5.7 6.8 5.3 5.3 7-2 8.7 09/30/2009 0.46 1 7.2 7.4 5.6 5.6 7.1 8.7 1 Q/31/2009 0.29 0.66 8 10 5.2 5.3 7.6 8.6 11130/2009 0.3 0.94 6.9 9.3 5.2 5.3 7.5 8 12/31/2009 0.39 0.98 5.9 6.4 5.3 5.3 8.1 8.8 01/31/2010 0.38 1.42 5.6 5.7 5.5 5.6 7.9 8.8 02/28(2010 0.36 1.24 3 3 5.2 5.3 7.6 8.8 03e31/2010 0.27 0.35 4.3 4.5 5.2 203 7.5 8.5 04/3012010 0.21 0.37 3.9 5 5.6 5.9 7.5 8.9 05/31/2010 0.44 1.03 9.9 15 5.3 5.3 7.9 8.9 06/30/2010 0.31 0.84 6.9 7.5 5.3 5.6 8.3 18.8 07/31/2010 0.26 0.29 7.4 7.4 5.3 5.3 8.6 8.5 06/31/2010 0.24 0.29 5.7 5.7 15.6 5.6 8.3 8.3 09/30/2010 0.19 0.23 7.9 7.9 5.6 5.6 8.8 8.8

'10/31/2010 0. 19 0.22 4.8 4.8 5.6 5.6 8.5 8.5 11/3012010 0. 16 0.24 11 11 5.3 5.3 8.7 8.7 12/31/2010 0.46 1.44 6.8 6.8 5.3 5-3 8.9 8.9 01131/2011 02/28/2011 0-44 1.68 - 3.B 3.8 5.6 5.6 8.7 8.7 M inim um 0.01 0.01 2.0 3.0 3.6 5.0 7.0 7.8E Maxim um 0.52 1.68 18.0 65-0 6.5 7.4 8.9 8.9 Average 0.19 0.44 7.0 9.0 5.3 5.4 7.6 8.6 Permit Limit -- -- 30 100 .15 20 6.0 9-0 lCount1 601 601 801 601 G 60 I 60 601

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-43 of R-57 OUTFALL 107 Total Suspended Iron, total Phosphorus, Flow Solids O&G pH (as Fe) total (as P)

'V 4 Effluent M Ave D Mae MAyO Etti tent I OMax IMAVOIDMaAtI Effluent Effluent Effluent MAyo I Effluent Effluent OMax Daily Daily Uonthly Elque"l Effluel*nt Efflienm Effluent Mae. MI.

A-rg Daily M-s Coto Con'.. Cm s. Con©.. Cone. Cone. Cone.

Conm. Cone.

Date mq/

mnt/L n *q/L mal/L mu/L MGD MGD mo]L rna/L monL 02128/2006 2-.36 2.36 4 vzf~~ ) I 01 03131f2006 1 1 1 1 04/30/2006 1 1 1 1 0513112006 0613012006 0713112006 08/3112006 10131f2006 11/30/2006 1213112006 01/31M2007 02/28F2007 0313112007 04130/2007 0513112007 06130t2007 0713112007 08/31/2007 09/30/2007 10/3112007 11130/2007 81 1213112007 01131/2008 02F2912008 0313112008 01 85 a84 04/30f2008 05/3112008 0613012008 07/31 2008 08/3112008 09/30/2008 1013112008 1113012008 1213112008 01131/2009 0212812009 0313112009 8.4 8.4 04130/2009 05/3112009 0613012009 0713112009 08/3112009 0913012009 (I !

1013112009 11/30/2009 1213112009 01/31/2010 I 0212812010 03/3112010 04/30/2010 0513112010 8.1 8.1 06/30/2010 07/3112010 08131/2010 09130/2010 1013112010 11/30/2010 12131/2010 01/3112011 02128/2011 0.001 0.00 1611 6.3 I 53 0_2ý U.0 0 02 03 7,9_

Mainimon.

3.15 1.0i 15.0 5.0 5.3 5.0 5-9 0-3 t.u 0.3 0.1 5.5 0.1 5.5 8.61 7.2 8.1 Averatos 1.94 7.21 0.2 3.15 7.2 15.3 5.3 0.2 0.7 0.7 8.21 15.0 1.8 1.0 1.0 Permit Limit Count 11 30.0 41.

30.4 4' 4.1 8.2

____ ... .. I

.14 1. 1 Outfall 107 discharges as a batch discharge. All data presented as historical data. Additional intermittent discharge from condenser tube cleaning wastewater. Filtered to 5 microns for asbestos.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-44 of R-57 OUTFALL 113 1 lhuege evem Flow TotalSuspended Disnole Solids O0ygtn MaoleEffluentTaxicity TotaResidual Chlorine Temperature, Temperature, Temperature, Temperature.

(W0ET)Testing Effluent Effluent Effluent Effluent PH Oblnro.OOe Effluent M Ave 0 Max oe1l Daily Mar it y t/ aruen/ I t D lly Min. Cetiodaphnia O pi mphale. D ei-lely

. BOYP lA X, Ma. 11 .

Date Event A reJageDaily Mao. Conc. / Coar. Cenc- Con. C,o. DilyUe". DilyM a_. Doily M.o. DnlyPlax. Co n.Com.

MGD MGO mgIL mgfL. mg/L _ i mgIL mg/L C C C IC 02018r2006 1 96 95 13375 6 6 03 0.05 005 107 98 1 2 a 0 0313112006 1 10232 12803 5 6 9 0 06 006 132 13.1 1 1 82 8.2 0(3012006 1 11237 13766 4 A 1 76 08/ 005 199 19 2 1 73 73

% W/3/2006 D513112006 1 10040 rA426 14874 117.31 35 3 7.9 214 21

7. 0OR05 0 .1 267 26 13 1 1

1 1

78 84 78 84 041311M00 0713112018 1 15586 21929 22297 21A5i7 34 34 72 65 00 06 905 1 252S6 28 71 28 11 10 8 834 83 84 0 / /0 1 198 6 23368 3 3 6 0805 a C5 284 279 0 0 82 82 10/31/2006 1 71 16 2899 1 21 872 ... 0 05 229 228 0 0 76 7 01/3010 1 14651 120731 3 3 1 7 005 006 1739 17 1 0 761 76 120312I0M 1 15623 16940 1 4 4 9 005 07 n1 126 2 1 76 7.5 01131N2010 1 1 165 13565 0137 1920 4 2 [NI 2 10 8.13 005 005 005 121 101 113 78 11 11 74 74 77 77 04,13012007 01(31/2007 1 16519 129 95 12871 189 17 54 543 9772 000505 007 1447 138 2 1 75 77 0 06 16 16 1 1 74 74 0513112007 1 19693 20598 5 5 74 005 00a 21.9 219 1 1 77 78 11)30)28 1 21243 21374 4 4 604 005 0.0 264 263 1 1 78 98 0123112007 1 20696 22048 0 6 73 05 0 05 140 27 267 1 1 79 79 08/31)20071 2122 22211 3 3 72 285 28 3 1 1 7 1 79 09/30/2007 1 203 57 21697 2 02 77 0 as a 05 279 27 9 1 0 8 I 10`/3112007 1 19763 21144 1.4 26 1 26 7 1 1 772 77 11/30 /200 1,0 1 36 21239 7 8 . 6 005 0 . 2088 16 1 1 76 76 12`31007 1 . 58 1749.

73 5 5 91 7 14.1 1 1 a a Coun4t7.9 I N2/2 0 1 0005 05 00 05 10 60 76 6386 175651 4 8 ,4 05 842f 1 106 2 1 1

76 76 76 0 3131 /'2008 1 2965 1676 85 85 7.9 005 0 as 149 12 3 1 1 72 72 U430/2008 1 15801 1166.35 3G 36 7 8 10nn 0 05 1T.2 182 1 1 a 8 05131/20 0 1769j 19486 32 32 1 7T6 0.05 0,05 211I 20.9 1 1 a a S6'3012008 1 1645; 1931H 2 9 29 76 005 0 05 26.3 263 1 2 179 ?97 0713 1/ 200 1 18163 190 01 25 2 5 8 00 05 27 "3 27 2 1 G' a1 61 0 81/311r 00 1 167 F , 185 68 N 06; 0217;40 0 282 28.3 1 0 79 7.9 09130 / '20 08 1 175 1a 187,03 54 55 a 0.05 1 a 05 26 2 2 85 1 1 a a 10 I/3 1 '2 1 169 96 134 57 55 55 81 O0 0 9 24 8 26 1 1 0 79 79 I1I/3 0,'r 0 08(31)2010 I r 12202 1 7419 5 4 54 92 005 1 1002 )535 0 05 , is3 26 1 0 84 84 12t3112008 1 15109 162 1`+ 3313971 9 39 9 005 0 as- 11.6 26 1 1 84 84 0113112009 1 1 15132 11712E 54 54 9a 304 304 005 0 05 8.9 10 1 1 -0 a 6 02ra8/'209- 1 13572 17454 66 66 10 005 0 05 5 a5 26 1 0 a 6 03131/200 1 1404 156565 6 5 65 1 6.6 005 0 05 12.6 28 L1 0 61 a.1 04/0/'rm 1 16115 1ES56 49 49 81 005 0 05 16 29 1 1 82 82 W531 /200 1 17251 18445 7 7 88 214 90 1 1 84 84 06130712M9 1 179.39 1668 4 4 76 269 26 4 2 1 82 82 07131r2009 1 18292 191N 59 a g 75 100 100 259 27 1 1 1 659 66 011131/009 1 1771ý 16a84 26 26 73 27'3 28 7 1 a 82 82 0913012009 1 12606 1 075z 42 1 .2 54 0.05 0 05 2 51 26 7 1 0 86 BE*

10831f2009 1 5226 18221 693 63 62 23 22 8 1 0 To 78 1113012009 1 3883 18193 1 1 85 00OE a05 160a 24 0 a 73 73 12031,r2009 1 9142 169so 86 5 a5 1 87 131 24 0 1 0 76 76 015131/01  ! 13761 17192 36 35 a7 304 504 005 0 06 76 23 2 1 a3 a3 02/28r2010 1 13884 166545 8 6 85 98 03131/2010 ... 2 23 3 1 12733 1436 ...4,2 . 42 77 110 8 a 29 1 1 84 88 0 ,3012010 1 15051 16a15 21 21 a 157 15 9 1 1 51 a1 M I/312010 1 16014 19015 62 62 73 222 31 2 1 78 7 58 06130/2010 1 1S478 119a OS5 4 1 41 76 2,3 33 1 1 79 79 07,'3112010 .. 1 1a275 19284 1 2 6 26 72 0 05 0 05 288 27 7 1 0 79 79 0873112010 1 1861 20836 3 3 71 29 7 285 2 1 78 78 09130,J2010 I M6549 20017 1 3 8 38 74 005 0 as 278 26.7 1 1 82 1 82 10131.12010 1 15116 19339 56 55 a1 0 05 0 05 249 24 1 1 1 78 7 98 11130/0110 1 15B897 19208 61 651 91 20 1 107 9 0 79 79 17,'3112010 1 148 5 18129 54 54 101 1J2 132 1 0 a 01!3112011

,.rm.., 0.0 7.18i 28.99 1.0; 1t.0 5.4 30.4. 30.4 0.05i o.o; .2 7.8!= 0.0:1 0.0 7.21 5.6 Max ni mum 1 ,0 219.29 1 235.77 U r5 8.8 11.9 110 0.0i 100.0 0.05 i 0.07 29 .7 j 33.0r, 2.0,; 2.0 ,6 8.8 A,,,,,q, 1.0 145.75, 179.,1. 4.4! 4.4*

P+,

count iL-..- 6 0 ...

30 100 1.1

_mg . 8.01 53.61 533.6 0i

8. 0+.15833.5" 1.71 l++;+=30.,5'C22.2i 1.11i 3, i 6.oi 1., 1.01 7.9 2o*C 9.0 60 + 3o1 3 42, 41 .

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-45 of R-57 APPENDIX 5a - AMBIENT MONITORING DATA 7EINESSEE Z6MiE1,3 1 NCPSIM70l8ID 1EllE295 pirallel Uts ______m Dite Avg.

0 &d.~

WS T? 23 7.8 7.9 7,71 718 73 77 171 3 7 DO %1 B3 1H8 H."68 11.74 K6 129 84 642 712 853 ECcI C9.11 13 10 10 1Q 103I O 10 1C3 10 1O 133I TAI aI0ess I 80 29 2 ',1 44 107 73 12 80 183 74 912 73 Awna5NmaeJ 1 0,03 0333 0.030U 6O 0 0833

.30 IO J 80 L' 830 MU23 008N M3 U0 P03 W  ;. . .. I - :00I. I1.. -- 01 - 0.

1 .885! 4 7Mh1aN13 0.150 01 .115 U 1 052 01Q 8lU 153U 023 H1 012U 826 021 027 ow* ai , i 10 Ii 10ý A.aLV I8 013 1 100 Cop4 10U L 3 2 3 22 3 2 2 10 21 H t IOU 183U 0IN IOU lOU 103 1H3 IOU 130 10U 183 10N 110

,, ýF. If ~ . ~ ~ ' ~-t 4 19  !.!-

0: RE-4 d dqme U: Aa71e r~IesgWrd ddai~edge J:EsfvA4m aIii les p~teiion IinW 32 9s~1* bi 0Uatan1Zet

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-46 of R-57 APPENDIX 5b - WATER QUALITY BASED EFFLUENT CALCULATIONS WATER QUALITY BASED CALCULATIONS FOR METALS AND OTHER TOXIC SUBSTANCES OUTFALL, 101 and 113 Combined FACILIIY: Wags Bar Nuclear Plant PERMIT#: TN0020168 Stream 17010)

Stream I30Q61 Waste Flow Tel u Solid,

,

1 1 Hardness Stream s CaC03I Allocation IMG0] I rG1O] fMGD! Imm t I I [m m] I%!

1 2062 00 5545 001 206.6 8.4 1806 1 90 1

Stream 2 1 FisahAqua 3

Life 4

Effluent

[1I Fish&Aquatic 1 7 L e'ate" QualityCnreiT0aQt 9 o0 1 11 12 1 13 14 Human HealthWater Cnteria00061 Qualtry Bckgmd WaterQua*ltyCriteia Ffaction In-StreamAllowable CalcEfluentConcentration In-Stream Crienria I CalcEffluent Coecentration EFFLUENT Conc - ;hronic Acues Diasaed Chroec I Acute Chronic Acute Orlan sI eOrgasms Ims DWS n Organisms ;WaterOrfganisms, VS CHARACTERISTIC lugl lug"]

, I [gi] IFraction] [u;,1 I lut]i I ug/I I [M id 111911I W411] [uoil] lugill Murill luvrll Antimony 0000 1 NA NA 1.000 NA NA NA NA 6400 5.6 6.0 16031.0 140.3 150.3 Arsenic 5T000 150.000 340.000 1.000 150.000 340,000 1437,1 3314.3 100 100 110.0 129.7 129.7 129.7 Cadmium" 0106 0212 1633 0248 0 853 6.578 7.5 64.0 NA NA 50 NA NA 122.7 Chlorine IT.Res.) 0.000 11.000 19000 1.000 11.000 19.000 120.8 208.6 NA NA NA NA NA NA Chrromlum III 1006 62.114 477.511 0.204 304140 2338 2996.9 23091 NA NA 1000 NA NA 2480.7 Chromium V1 5500 11000 16000 1.0100 11000 1600 59.3 109 NA NA 1000 NA NA 2372.0 Copper' 1600 7.448 10.968 0.358 20817 30653 191.3 288.5 NA, N.,A NA NA NA NA Cyanide (T) 2 60 5.200 22.000 1.0010 5.200 22.000 28.0 194.0 140.0 1400 200.0 3444.0 3444.0 4946.9 Lead 0994 1.988 51.026 0.189 10510 269.705 94.9 2665.7 NA NA 50 NA NA 101.2 MresCUry (1) 0025 0770 1400 1000 0770 1400 7.38 13.6 0051 005 20 0.7 0.6 49.5 Nicker 10.000 43.333 390.143 0.451 96,141 805592 860.1 8462.2 4600.0 610.0 1000 114981,0 15038.0 2263.4 Selenium 2.500 5.000 20.000 1.000 5,000 20.000 26.9 176.1 NA NA 50.0 NA NA 1192.0 Silver 0.000 NA 2.220 1.000 NA 2.220 NIA 21.9 NA NA NA NA NA NA Thallium 0 000 NA NA 1000 NA NA NA NA 047 02 20 11.773 6.0 60.1 Zinc, 10.000 98.408 97610 0.299 329.462 326788 1 3165.3 3130.9 NA NA NA NA NA NA

  • Denotes metals forwhich Fish &Aquatic LifeCriteria are expressed as a function oftotal hardness The Fish &Aquatic Lifecnteria f'orthis metal are inmhe dissolved formal laboratory conditions The tn-streamallowable cntena and caicated effluent concetrations are inthe totalrecoverable form The citeria for these parameters are inthe total form.

"'Background corncentratons are established from ambient stream data. I!rere ambient data isunavatlaoLe orinsuffictien the Oackground concentration is established as 12 ofthe chronic waler quality crttera or 1.,2of lihehuman health cnmena, whfichever is smaller (1) Expected flowrate forOufalls 101and 113 fortwo unt operations (57 76 +148 895 =20660 MGDi NOTE Water Quality criterta for stream use classifications other than Fish &Aquatic Lifeare based onthe 3005 floa.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-47 of R-57 APPENDIX 5c - AMMONIA WATER QUALITY BASED CALCULATIONS Watts Bar Nuclear Plant OuVallI 101 and 113 Combined Ammonia as Nitrocen Calculations e State utilizestheaEPA document, 1999 Update to Ambient Water Quadity Criteria for Ammonia and assumed temperatures of 25'C and 15 C an d ThI ste~mamp'H o~fi18zto derive an allowable inetreamnprotection value A mass balance with plant and stream flows and this allowable value determines the F-onthly average permit limit, Seasonal limits may also be allowed due to ambient temperature variations between the summer and winter seasons Winter Summer Temp (°C)= 16 Temp (=C)= 25 East TN- 25°C. 15' pH= 8 pH= 8 Middle TN- 27'C I Min (2.85, 1 45'10't 028'(25-T)) 2.76 2-85 276 Min (2-85. 1 45'l(P 0-028'(25-T)) 1.45 285 1.45 West TN- 30'C 2C CC( 0,0577 2.487

. ....... -) ' Min1.2.85..1.45"10^ 0.028"(25-T')).

1+10A" (7.688-pH) 1ý101 (pH-? 688)

CCC= 2.38 CCC= 1.24 CCC -Contionuous Chronic Criterion Allowable instream NH3 concentration [mgol]

(Cnital Low Flow [MGD] 'Background Ammonnia[MgJL]) + (Design Flow[MGD)' Effluent Concentration [mg/L])

FC (CtitiadLow Flow [MGD] + (Dlesignr Flow [MGD])

where. 3173.0 Critial Low Flow [MGD] (typically, a 7Q10 value) 0.1 BackgroJnd Ammonnia Concentration [rngi"l 206.7 Discharge long-term average flow [(57.76 + 148.895 )MG01 For the case where the discharger withdraws water from the stream, The Allowable Effluent Concentrations and corresponding Amounts in winter and summer are:

Winter Summer Concentration [mgL] ,i-. 'Concentration [mg/Lj 59957.8 Amount [lbiday] 30290.7 Amount Vb/day]

Calculation of the Criterion Maximum Concentration where salmanoid fish are absent:

Note 1 -the CMC is independent of temperature and is based on a one hour average exposure concentration.

CMC = [0.4111 (1 + 10 (7204 -pHI)] + [(58.4 ;1(1 + 10 (PH-7 2041)] A pH value of 8 (instead of historically used I 7.was chosen for two reasons 1) ambient pH= B monitoring in west TN showed that a pH often exceeds 7 5, and is up to 8 sometimes CMC= 8.4 mg,1 as N 2 ) this assumption is more conservative Allowable effluent Concentration is: '_ mg/i as N 220014.3 Amount Dbs!dayl Note 2 - Where the source of ammonia is a biological treatment plant, the permit writer may establish the maximum daily concentration at 2 times the 30 day average instead of the value calculated from the CMC The factor of 2 is a ratio of daily maximum to monthly average considered typical for a well operated biological treatment plant.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TNO020168 Page R-48 of R-57 APPENDIX 5d - WATER QUALITY CALCULATIONS FOR pH Calculation of Instream pH Resulting From the Combined Discharges of Outfall 101 and 113 (This spreadsheet may be used to calculate allowable discharge pH by trial and error)

Note: WPCIEPA policy requires all discharges to be within the range of 6.0 to 9.0 TN fish and aquatic life criteria require the stream pH to be within 6.5 to 9.0 This calculation is to determine if a discharge pH at 6.0 can cause the stream pH to fall below 6.5 The calculation is only applicable to cases where the discharge flow is significant relative to the stream flow Enter stream background pH --- > minimum from ambient data (see Appendix 5a)

Enter stream flow in MGD use 1Q10 Enter discharger minimum pH --->

Enter discharger flow. MGD --->

Combined strm.;discharge pH - Unknown Combined strrrVdisch flow. MGD 1 2268.71 pH = -log [H+], where [H+] is the hydrogen ion concentration in moles per liter

[H+] = 10^(-pH)= moles per liter of H+ (1 gram mole per liter of H+ is 1.0080 grams of hydrogenrliter)

Moles H+ (Combined) = Moles H+ (Background) + Moles H+ (Discharge)

Note that this is a simple conservationof H + mass formula that does not account for any rections or buffering that might occur when the dischargeandstream mix.

Stream background MolesL iter H+ = 1 ^(-pH)

Discharger MoleslLiter Hi = 10^(-pH) 1.OpE-06j Combined moles/L H+ = (Strm molesiL H+)*(Strm MGD) + (Disch moles.L H)*(Disch MGD1 (Stream MGD + Discharge MGD) 1 1.366E-07J Combined molestL H+ =

Combined Stream pH = F 6.864 Ifthis pH is below 6 5, the discharger minimum pH must be raised, therefore recaluate until 6.5 is reached Because the calculated pH is above 6.5, a minimum discharge pH limit of 6.0 for Outfall 101 and 113 will allow compliance with water quality criteria in the Tennessee River.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-49 of R-57 APPENDIX 5e - BIOMONITORING DILUTION FACTORS Watts Bar Nuclear Plant Calculation of Dilution Factors for Biomonitoring Diolution factor when receiving stream is the source of water at the facility Outfall 101 and 102 Stream Flow Wastewater Flow Total Flow 1Q10 MGD] [MGD]1 [MGD]

2062.0 57.76 2062 Dilution Factor 35.7 LC50 > 9.3  % Conc.

IC25 > 2-8  % Conc.

Dilution factor when receiving stream is not the source of water at the facility Outfall 113 Stream Flow Wastewater Flow Total Flow 1Q10 [MGD] [MGD]1 [MGD]

20820 148.895 2210.9 Dilution Factor 14.8 LC50 > 22.4  % Conc.

IC 25 > 6.7  % Conc.

1 Because of the large volume of flow from these Outfalls and the criteria that chronic toxicity not exist instream during any 30 day period, the maximun historic 30 day average discharge flow was used to calculate dilution.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-50 of R-57 APPENDIX 5f - COMPARISON OF DISCHARGE LIMITATIONS COMPARISON OF DISCHARGE LIMITATIONS OutfalI 101 Monthly Average FffitrAnt Guid*linp*

EflenJudeie Previous Water Quality New EFFLUENT BPT* BAT' PermitI Fish I Hum. Heal. Permit II ~

CHARACTERISTIC (mg/L) (mOL) (malL) I (mg/I) (mqlL) (malL)

TSS 30 30 NA NA 30 OIL & GREASE 15 -- 15 NA NA 15 pH 6.0-9.0 .... 6.5-9.0 6.0-9.0 6.0-9.0 Chromium, Total -- 0.2 - 2-99 2.48 Zinc, Total -- 1.0 -- 3_16 NA 1.0 Total Chlorine Residual - -- 0.1 0.120 NA 0.10 Free Available Chlorine 0.2 0.2 -- 0.120 NA --

Daily Maximum Effluent Guidelines' Previous Water Quality New EFFLUENT BPT BAT Permit Fish Hum. Heal. Permit CHARACTERISTIC mgL) ([_L) (m IL) I[ (mg/L) (mgiL (mg/L)

TSS 100 - 100 NA NA 100 OIL & GREASE 20 -- 20 NA NA 20 pH 6.0-9.0 - 6.0-9.0 6.5-9.0 6_5-9.0 6.0-9.0 Chromium, Total -- 0.2 NA NA _ _

Zinc, Total - 1.0 -- 3.14 NA I Total Chlorine Residual -- 0.2 0.1 0.208 1 NA 0.10 Free Available Chlorine 0.5 005 -0208 NA NA

. Outfall 101 primarily receives wastes characterized as low volume wastes and cooling tower blowdown. Thus this discharge is subject BPTIBAT limitations for all parameters applicable to these waste sources as presented in Appendix 2

- The use of water treatment chemicals containing chromium is probihited.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-51 of R-57 COMPARISON OF DISCHARGE LIMITATIONS Outfall 113 Monthly Averace Water Quality New FffhII~nt CI=tr=linov*

Effluent Guidelines*

Previous Water Quality New

'I Permit EFFLUENT BPT I BAT Fish (malL) I Hum- Heal. Permit CHARACTERISTIC (mglL)

(mq/L)I (m~/L)

(mq/L)

I (m~IL)

Permit Fish (mq/L)

[Hum. Heal. Permit (rnoIL) I (mo,/L)

I(mQUL TSS NA NA Report NA NA Report OIL & GREASE 15 -- 15 NA NA 15 pH 6.0-9.0 -- 6.5-9.0 6.0-9.0 6.0-9.0 Dissolved Oxygen (D.O.) - - - NA NA Report Min.

Total Chlorine Residual - - 0.092 0.120 NA 0.092 Free Available Chlorine 0.2 - 0.12 NA --

Daily Maximum Effluent Guidelines Previous Water Quality New EFFLUENT BPT BAT Permit Fish [Hum Heal. Permit CHARACTERISTIC (mJIL) (mg/L) (mrg/L) (r [ (mgiL)

TSS NA NA 100 NA NA 100 OIL & GREASE NA NA 20 NA NA 20 pH 6.0-90 - - 6.5-9.0 6-0-90 6.0-9.0 Total Chlorine Residual - 0.2 0-158 0.208 NA 0.168 Free Available Chlorine 1 0.5 0.208 NA Outfall 113 receives wastes characterized as once through cooling water. Thus this discharge is subject BPT!BAT limitations for all parameters applicable to once through cooling water sources as presented in Appendix 2

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-52 of R-57 APPENDIX 5g - New Permit Limits I PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 101 Cooling Water, Storm Water and Process Wastewater MONITORING EFFLUENTTLIMITATIONS EFFLUEN MONITORING MONTHLY DAILY REOUIREMENTS EFFLUENT m.c. cOYCA.Q- .- *.i.u.-CCOYC. 1&.U.tT. SA.3l..

CHARACTERISTIC (WI (l'r (.0') r(mday) I RNY '11?

1 FLOW Report (MGD) 1 Report (MGD) Continuous Recorder 1 Certification of Instream Flow of ._ Report as Yes/No 1/Month Operation 3,500 cfs whe n required Records pH 2 Range 6.0 - 9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSSJ 30.0 -. 100.0 -- 1,Month Grab OIL & GREASE 15.0 20.0 -- 1;Month Grab CHROMIUM, TOTAL 2.0 2.0 WAIVED' Grab ZINC, TOTAL 10 10 -- 2/Month Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3 0.10 -- 0.10 -- 5!Week Grab2.2 4

TEMPERATURE, Effluent .... 35 'C - Continuous Recorder IC25 25% Inhibition Concentration shall be >2.8% effluent 2Year Composite There shall be no discharge of PCBs.

Flow shall be reported in Million Gallons per Day (MGD0 Inthe event that the continuous flow monitor is out of service flow monitoring shall be estimated by intake pump logs pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection

- The acceptable methods for analysis ofTRC are any methods specified in Title 40 CFR. Part 136 as amended. The method detection level RMDL) for TRC shall not exceed 0 05 mginunless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request. Incases where the permit lima is less that (he MDL. the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part 1.Section B Monitoring Procedures. subsection 3 Test Procedures paragraph b When the temperature monitoring equipment fails monitoring will be done once per day Reasonable and timely effort will be made to restore the temperature recorder to operation as soon as possible See Part IIIfor further temperature requirements

  • See Part IIIfor methodology Monitoring for chromium is waived per 40 CFR 122 44 (al(2o{I)See Rationale for more comments Monitoring for pHt,total suspended solids and oil and grease apply only when the turbine building sump is aligned to bypass Internal Moniloring Points 103 and 107 where moNtoring these parameters is required.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-53 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 102 Cooling water, Stormwater runoff and Process Wastewater EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT A.GCONC. IAVG.Ml*c. xr I* Awr.unm , Msco.Nc:.

s -ir. s."21.

CHARACTERISTIC (=_1) (tbday) =(_R1) ,; QCY. nflp FLOW Report (MGD) 1 Report (MGD) 1 1/Day Instantaneous Certification of Instream Flow of Report as Yes/No liMonth Operation 3,500 when required R e Records pH 2 Range 6.0 - 9.0 2/Month Grab TOTAL SUSPENDED SOUDS (TSS) 30.0 0

-- 100.0 - lWMonth Grab OIL & GREASE 15.0 20.0 - 1/Month' Grab CHROMIUM, TOTAL 2.0 2.0 WAIVED 7 Grab ZINC, TOTAL 1.0 1.0 -- 2/Monthe Grab CHLORINE, TOTAL RESIDUAL (TRC) 2,3 0.10 0.10 y5WeekGrab 2 TEMPERATURE, Effluent 35c C - /Day Grab 4

IC26 4 . 25% Inhibition Concentration shall be >2.8% effluent 2Near Composite' There shall be no discharge of PCBs.

Flow shall be reported inMillion Gallons per Day (MGD).

pH and TRC analyses shall be performed within fifteen (15)minutes of sample collection.

  • " The acceptable methods for analysis of TRC are any methods specified inTitle 40 CFR. Part 136 as amended- The method detection level (MDL) for TRC shall not exceed 0 05 mg/I unless the permittee demonstrates that its MDL is higher The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL, the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit The acceptable methods for detection and reporting of total residual chlorine are referenced inPart I. Section 8. Monitoring Procedures, subsection 3. Test Procedures, paragraph b.

Sampling and analysis required only ifdischarge is operated 30 days or more during the semi-annual periods January through June or July through Decemberand ifall toxicity testing requirements have not already been completed for Outfall 101. See Part IIIfor methodology.

- Certification shalt be made during any month that a discharge occurs from this outfall.

Ifthere is discharge during 1or more days from this outfall, sampling is required to comply with the maximum daily limit Ifthere are two or more separate days of discharge, or a continuous discharge during 5 or more consecutive days from this outfall. 2 samples are required to comply with the measurement Monitoring for chromium is waived per 40 CFR 122.44 (a)(2)01. See Rationale for more comments.

Monttorng for pH,total suspended soWids and oil and grease apply only wthenthe turbine bujlclng sump is aligned to bypass tnternaT Morntoring Points 103 and 107 where moruonng these parameters is required.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-54 of R-57 PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 103 (Internal Monitoring Point)

Low Volume Waste Holding Pond EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT AVG. CONC. AVG..,-am. umX.CONC. x.., -avr. 3st ,-r. s.A.uI, CHARACTERISTIC (.1) (]W.ey) =.0) 1b e,.) IQ.Ycy. nI FLOW Report (MGD) 1 _ Report (MGD)i Continuous 1 Recorder pH 2 Range 6 9.0 1 TMonth Grab TOTAL SUSPENDED SOLIDS 3G (TSS) TS)30.0 -- 100.0 -- liMonth Grab OIL & GREASE 15.0 - 20.0 - 1l/Month Grab Flow shall be reported in Million Gallons per Day (MGD) pH analyses shall be performed within fifteen (151 minutes of sample collection I PERMIT LIMITS TVA-Watts Bar Nuclear OUTFALL 107 (Internal Monitoring Point)

Metal Cleaning Wastewater EFFLUENT LIMITATIONS MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT .vo.co.c. .AV.A-r. U.XcoN*c. XX*X*.AM'. ItsaWNT-r. s.-UtU' CHARACTERISTIC (u..1) (]t.da:- (rl) (IObedy) M.QNC'. Tin-FLOW Report (MGD) Report (MGD) l/Batch Calculated pH 2 Report Report 1/Batch 2 Grab TOTAL SUSPENDED SOLIDS 30.0 100.0 1/Batch Grab (TSS)

OIL & GREASE 15.0 -- 20.0 - liBatch Grab COPPER, TOTAL RECOVERABLE 1.0 - 10 VOW&~tc Grab IRON, TOTAL RECOVERABLE 1.0 -- 1.0 - I/Batch Grab 3

PHOSPHORUS, TOTAL 1.0 - 1.0 - 1/Batch Grab Flow shall be reported in Million Gallons per Day (MGD) for each batch discharge Ifa batch discharge extends for more than a 24-pH analyses shall be performed within fifteen (15) minutes of sample collection Sampling for phosphorus is required only when metal cleaning chemicals containing phosphorus are being used

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-55 of R-57 I PERMIT LIMITS I TVA-Watts Bar Nuclear OUTFALL 113 Supplemental Condenser Cooling Water LIMITATIONS MONITORING EFFLUENT LIMITATIONS EFFLUENT MONITORING MONTHLY DAILY REQUIREMENTS EFFLUENT wcG.coc. o...- L CONC, XJAX MAX*0L*T. IISMMr. S.k.M CHARACTERISTIC (m,1) (tb.1).yl)I. RN,) VQ.Ncy. nV FLOW Report (MGO)' Report (MGD) 1 Continuous Recorder Certification of Instream Flow of .. Report as Yes;No 1/Month Operation 3,600 cfs when required Records pH 2 Range 6.0 - 90 1/Month Grab TOTAL SUSPENDED SOLIDS (TSS) 30.0 - 100.0 1/Month Grab CHLORINE, TOTAL RESIDUAL 6 0.092 -- 0.158 -- l/Month Grab (TRC)',

DISSOLVED OXYGEN (D.O.) -- - Report Min, - /Month Grab TEMPERATURE, Effluent Report Effluent Temperature Hourly Recorder 7 TEMPERATURE, Edge 30.5 oC - Hourly R Recorder':

of MixingofZoneMiigZn TEMPERATURE, Rise Upstream to Downstream 3 0C - Hourly Calculated' TEMPERATURE, Rate of Change, 0

C per hour 'C pe 2 OC/Hour -- Hourly Calculated' TEMPERATURE, Receiving - 335'C Hourly Recorded Stream Bottom I -

IC25 25%Inhibition Concentration shall be _>67% effluent Semi-annual Composite Flow shall be reported in Million Gallons per Day (MGD).

  • pH and TRC analyses shall be performed within fifteen (15) minutes of sample collection.

The acceptable methods for analysis af TRC areany methods specified in Title 40 CFR. Part 136 as amended. The method detection le,'el (MDL) for TRC shall not exceed 0 05 mginunless the permittee demonstrates that its MDL is higher. The permittee shall retain the documentation that justifies the higher MDL and have it available for review upon request In cases where the permit limit is less that the MDL_the reporting of TRC at less than the MDL shall be interpreted to constitute compliance with the permit limit. The acceptable methods for detection and reporting of total residual chlorine are referenced in Part I, Section 8. Monitoring Procedures. subsection 3 Test Procedures, paragraph b 4 See text below table for requirements

  • See Part IIIfor methodology
  • Sampling for TRC shall be 5!Week during periods when the Supplemental Condenser Cooling Water (SCCW) system is in operation.

7 See additional (bulleted) comments in permit.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-56 of R-57 PERMIT LIMITS FOR OUTFALL 114 TVA-Watts Bar Nuclear Supplemental Condenser Cooling Water Intake Screen Backwash water 1.) No numerical monitoring limitations are applied to this outfall.

TVA-Watts Bar Nuclear Plant (Rationale)

NPDES Permit TN0020168 Page R-57 of R-57 APPENDIX 5h - MRZ WATTS BAR DAM Shoreline of river Qkfrýfinn M riwýr Tennessee River Lock and docking structure.

TVA-Watts Bar Nuclear Original Zone of Power Generating Facility, Mixing.

TNO020168 Flovv 0Oft Datum

...................

..................

...................

..................

..........

..................

. . . . . . . .

........ . . . . . . . . . . .

..................

........ low-Flow "Passive" SCCW (113) MRZ ..................

. . . . . . . . . . .

................... Mixing Zone (extends

...........I......

...................

.................. to edge). Cool water

................

.......... .

...................

.................. .

.................

refuge-zone in the Discharge flow ..............

................. .. bottom layer. Model

..............

...............

148.895 MGD. checked with

..........

................... temperature profile

..................

..................

..................

................... under these

..................

...................

..................

...I ............... conditions.

................

Current location ..................

recorder station ..................

...................

..................

...................

V loft 1 0 33 ..................

...........I .......

.......... ....

.............. ..

-

I .... .. Itfl.~,.

High-Flow "Active" Mixing Zone.

Typical moniting for compliance

,flflflflflfl,",,flflflfl,,,,,,

using (continuous) 24-hour, 7 day per week data recorders. Recorder station number 33 will be moved from present location to new location and new recorder station number 34 to be established at flflWfl,,,,,,,%

end-edge of mixing zone.

I I ,flfl,.,fl,,,,,,,,,fl.,.

I NOTTOSCALE ]

Lii,,,,,.

I UVY %IVLLIU V

New recorder # 34 recorder station Note: This diagram is a general Exact location to description of how the mixing zone be established, and temperature recorders are being relocated. It is not intended to be an actual, or physical representation of the shape or dynamics of the thermal plume.