ML12129A430: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420


==SUBJECT:==
==SUBJECT:==
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098  
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
Line 27: Line 27:
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
Sincerely,       /RA/       Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects  
Sincerely,
                                              /RA/
Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects


==Enclosure:==
==Enclosure:==
Investigative Synopsis,     OI Case No. 2-2011-049 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420  
Investigative Synopsis, OI Case No. 2-2011-049
 
May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420


==SUBJECT:==
==SUBJECT:==
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098  
ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==


Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC) Office of Investigations (OI) completed report regarding discriminatory employment practices.
Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)
Office of Investigations (OI) completed report regarding discriminatory employment practices.
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
 
Sincerely,
Sincerely,       /RA/
                                                    /RA/
Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects  
Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects


==Enclosure:==
==Enclosure:==
Investigative Synopsis, OI Case No. 2-2011-049
Investigative Synopsis, OI Case No. 2-2011-049 X PUBLICLY AVAILABLE              G NON-PUBLICLY AVAILABLE                G SENSITIVE X NON-SENSITIVE ADAMS: X Yes    ACCESSION NUMBER:_ ML12129A430 ______________ X SUNSI REVIEW COMPLETE OFFICE            `              RII: EICS        RII: RPB3 SIGNATURE        /RA/            /RA/            /RA/
NAME              MDonithan      ODeMiranda      SRose DATE                  5/8/2012        5/8/2012        5/8/2012 E-MAIL COPY?      ( ) YES ( ) NO    ( ) YES ( ) NO  ( ) YES ( ) NO


X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ ML12129A430 ______________ X SUNSI REVIEW COMPLETE  OFFICE ` RII:  EICS RII:  RPB3    SIGNATURE /RA/ /RA/ /RA/    NAME MDonithan ODeMiranda SRose    DATE 5/8/2012 5/8/2012 5/8/2012    E-MAIL COPY? ( ) YES ( ) NO        ( ) YES ( ) NO      ( ) YES ( ) NO Official Use Only
Official Use Only - OI Investigation Information SYNOPSIS This investigation was initiated by the U. S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on July 29, 2011, to determine whether a Former Contracted General Foreman at the Saint Lucie Nuclear Plant (SLNP) was discriminated against for participating in a protected activity.
- OI Investigation Information NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION I I  Official Use Only  
Based upon the evidence developed during this investigation, OI:RII did not substantiate that the former contracted General Foreman at the SLNP was discriminated against for participating in a protected activity.
- OI Investigation Information Case No.:  2-2011-049 Enclosure SYNOPSIS   This investigation was initiated by the U. S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on July 29, 2011, to determine whether a Former Contracted General Foreman at the Saint Lucie Nuclear Plant (SLNP) was discriminated against for participating in a protected activity.
NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No.: 2-2011-049 Enclosure}}
Based upon the evidence developed during this investigation, OI:RII did not substantiate that the former contracted General Foreman at the SLNP was discriminated against for participating in a protected activity.}}

Revision as of 03:49, 12 November 2019

Investigative Synopsis, Office of Investigations Case Number 2-2011-049, Allegation No. RII-2011-A-0098
ML12129A430
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/08/2012
From: Steven Rose
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
RII-2011-A-0098
Download: ML12129A430 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098

Dear Mr. Nazar:

Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)

Office of Investigations (OI) completed report regarding discriminatory employment practices.

OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure:

Investigative Synopsis, OI Case No. 2-2011-049

May 8, 2012 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

ST. LUCIE - INVESTIGATIVE SYNOPSIS, OFFICE OF INVESTIGATIONS CASE NUMBER 2-2011-049, ALLEGTION NO. RII-2011-A-0098

Dear Mr. Nazar:

Enclosed for your information is the synopsis of the Nuclear Regulatory Commission (NRC)

Office of Investigations (OI) completed report regarding discriminatory employment practices.

OI determined that there was insufficient evidence to substantiate the allegation that a former contractor general foreman was discriminated against by being laid off in June of 2009 in retaliation for cooperating with an NRC OI investigation in August of 2007. We plan no further action with regard to this matter. Should you have any questions concerning this letter, please contact us.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven D. Rose, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects

Enclosure:

Investigative Synopsis, OI Case No. 2-2011-049 X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ ML12129A430 ______________ X SUNSI REVIEW COMPLETE OFFICE ` RII: EICS RII: RPB3 SIGNATURE /RA/ /RA/ /RA/

NAME MDonithan ODeMiranda SRose DATE 5/8/2012 5/8/2012 5/8/2012 E-MAIL COPY? ( ) YES ( ) NO ( ) YES ( ) NO ( ) YES ( ) NO

Official Use Only - OI Investigation Information SYNOPSIS This investigation was initiated by the U. S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI), Region II (RII), on July 29, 2011, to determine whether a Former Contracted General Foreman at the Saint Lucie Nuclear Plant (SLNP) was discriminated against for participating in a protected activity.

Based upon the evidence developed during this investigation, OI:RII did not substantiate that the former contracted General Foreman at the SLNP was discriminated against for participating in a protected activity.

NOT FOR PUBLIC DISCLOSURE WITHOUT APPROVAL OF FIELD OFFICE DIRECTOR, OFFICE OF INVESTIGATIONS, REGION II Official Use Only - OI Investigation Information Case No.: 2-2011-049 Enclosure