{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-4352 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION
MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2
, UNITS 1 AND 2


==Dear Mr. Paci l i o:==
==Dear Mr. Pacilio:==


On August 7, 20 1 2 , the Nuclear Regulatory Commission (N RC) staff completed its mid-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 201 1 , through June 3 0, 201 2. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, "Operating Reactor Assessment Program."
On August 7, 2012, the Nuclear Regulatory Commission (NRC) staff completed its mid-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
The NRC determined that the performance at Braidwood Station Unit 1 during the most recent quarter, as well as the previous three quarters of the assessment period
The NRC determined that the performance at Braidwood Station Unit 1 during the most recent quarter, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs indicated your performance was within the normal, expected range (i.e., Green).
, was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs indicated your performance was within the normal, expected range (i.e., Green).
The NRC determined that the performance at Braidwood Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix based on all inspection findings being classified as having very low safety significance (i.e., Green) and one PI requiring additional NRC oversight (i.e., White). Specifically, the Mitigating Systems Performance Index for the Cooling Water Systems crossed the Green-White threshold and caused Braidwood Unit 2 to transition from the Licensee Response column to the Regulatory Response column of the ROP Action Matrix in the second quarter of 2012. We notified you in our assessment follow-up letter issued on August 6, 2012, (ADAMS Accession No. ML12220A393) of the increase in our oversight per the ROP Action Matrix.
The NRC determined that the performance at Braidwood Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRC's ROP Action Matrix based on all inspection findings being classified as having very low safety significance (i.e., Green) and one PI requiring additional NRC oversight (i.e., White). Specifically, the Mitigating Systems Performance Index for the Cooling Water Systems crossed the Green
-White threshold and caused Braidwood Unit 2 to transition from the Licensee Response column to the Regulatory Response column of the ROP Action Matrix in the second quarter of 2012. We notified you in our assessment follow
-up letter issued on August 6, 2012
, (ADAMS Accession No. ML12220A393) of the increase in our oversight per the ROP Action Matrix.


M. Pacilio Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," for the White PI.
M. Pacilio                                       Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, for the White PI. We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow-up inspection. These inspections include IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, TI-182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued.
We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
-up inspection. These inspections include IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants
Routine inspections performed by resident inspectors are not included in the inspection plan.
," T I-182, "Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks,"
The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
T I-187, "Inspection of Near
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-Term Task Force Recommendation 2.3 Flooding Walkdowns," and TI-188, "Inspection of Near
-Term Task Force Recommendation 2.3 Seismic Walkdowns.In addition, a follow-up inspection will be conducted using IP 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12
-Month Period," to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued
. The enclosed inspection plan lists the inspections scheduled through December 31, 20 1 3. Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
/RA/
                                              /RA/
Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50
Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77
-456 and 50-457 License Nos. NPF
-72 and NPF-77


==Enclosure:==
==Enclosure:==
Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via ListServ TM


Braidwood Station Inspection/Activity Plan cc w/encl:
M. Pacilio                                                                   Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, for the White PI. We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow-up inspection. These inspections include IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, TI-182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued.
Distribution via ListServ TM M. Pacilio Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," for the White PI
The enclosed inspection plan lists the inspections scheduled through December 31, 2013.
. We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow
Routine inspections performed by resident inspectors are not included in the inspection plan.
-up inspection. These inspections include IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants
The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
," T I-182, "Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks,"
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
TI-187, "Inspection of Near
-Term Task Force Recommendation 2.3 Flooding Walkdowns," and TI-188, "Inspection of Near
-Term Task Force Recommendation 2.3 Seismic Walkdowns.In addition, a follow-up inspection will be conducted using IP 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12
-Month Period," to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued
. The enclosed inspection plan lists the inspections scheduled through December 31, 20 13. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely, /RA/ Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50
Sincerely,
-456 and 50-457 License Nos. NPF
                                                                          /RA/
-72 and NPF-77
Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77


==Enclosure:==
==Enclosure:==
 
Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via ListServ TM DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\2012 MOC Letters\Braidwood 2012 MOC Letter.docx Publicly Available                           Non-Publicly Available                   Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII                           RIII NAME               RNg:dtp                             EDuncan                         GShear DATE               08/20/12                             08/21/12                       08/24/12 OFFICIAL RECORD COPY
Braidwood Station Inspection
/Activity Plan cc w/encl: Distribution via ListServ TM DOCUMENT NAME:
G:\DRPIII\1-Secy\1-Work In Progress
\2012 MOC Letters
\Braidwood 2012 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII   NAME RNg:dtp EDuncan GShear DATE 08/20/12 08/21/12 08/24/12 OFFICIAL RECORD COPY


Letter to M. Pacilio from G. Shear dated September 4, 2012.
Letter to M. Pacilio from G. Shear dated September 4, 2012.


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION
MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION:
: Silas Kennedy RidsNrrDorlLpl3
Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov
 
Page 1 of 2                                                                            Braidwood Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates                                                                                                                                  No. of Staff Start      End      Inspection Activity                                                              Title                                        on Site FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW                                                                                    1 11/01/2012  12/20/2012  IP 92723              Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S TI-187        - TI-187 FLOODING WALKDOWN                                                                                            2 07/01/2012  12/31/2012  IP 2515/187          Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188        - TI-188 SEISMIC WALKDOWN                                                                                              2 07/01/2012  12/31/2012  IP 2515/188          Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns BI OLRQ      - REQUALIFICATION PROGRAM INSPECTION                                                                                  1 09/24/2012  09/28/2012  IP 7111111A          Licensed Operator Requalification Program - Annual Review BI ISI        - INSERVICE INSPECTION - UNIT 2                                                                                        2 10/15/2012  11/02/2012  IP 7111108P          Inservice Inspection Activities - PWR BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                            2 10/22/2012  10/26/2012  IP 71124.01          Radiological Hazard Assessment and Exposure Controls 10/22/2012  10/26/2012  IP 71124.02          Occupational ALARA Planning and Controls TI 182        - TI 182 BURIED PIPE PHASE 2                                                                                          1 01/07/2013  01/11/2013  IP 2515/182          Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI EPR        - EP ROUTINE INSPECTION / PI VERIFICATION                                                                              2 02/11/2013  02/15/2013  IP 7111402            Alert and Notification System Testing 02/11/2013  02/15/2013  IP 7111403            Emergency Preparedness Organization Staffing and Augmentation System 02/11/2013  02/15/2013  IP 7111405            Correction of Emergency Preparedness Weaknesses and Deficiencies 02/11/2013  02/15/2013  IP 71151              Performance Indicator Verification BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                            1 02/25/2013  03/01/2013  IP 71124.02          Occupational ALARA Planning and Controls 02/25/2013  03/01/2013  IP 71124.06          Radioactive Gaseous and Liquid Effluent Treatment 02/25/2013  03/01/2013  IP 71151-PR01        RETS/ODCM Radiological Effluent OL PREP      - BRAIDWOOD INIT PREP 03/2013                                                                                          3 02/25/2013  02/28/2013      W90281            OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI CDBI      - COMPONENT DESIGN BASIS INSPECTION                                                                                    6 05/20/2013  06/21/2013  IP 7111121            Component Design Bases Inspection OL EXAM      - BRAIDWOOD INIT EXAM 03/2013                                                                                          3 03/25/2013  04/05/2013      W90281            OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI RP        - RADIATION PROTECTION BASELINE INSPECTION                                                                            1 04/22/2013  04/26/2013  IP 71124.05          Radiation Monitoring Instrumentation 04/22/2013  04/26/2013  IP 71151-BI02        Reactor Coolant System Leakage


Page 1 of 2 Planned Dates Start          End Inspection Activity Title No. of Staff on Site Braidwood Inspection / Activity Plan 09/01/2012
Page 2 of 2                                                                             Braidwood Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates                                                                                                              No. of Staff Start      End      Inspection Activity                                                          Title                      on Site ISFSI        - ISFSI INSPECTION - SCHEDULE DEPENDENT                                                          2 07/01/2013   09/30/2013   IP 60855.1           Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                                       1 08/12/2013  08/16/2013  IP 71124.01          Radiological Hazard Assessment and Exposure Controls 08/12/2013   08/16/2013   IP 71124.02          Occupational ALARA Planning and Controls 08/12/2013   08/16/2013   IP 71151-OR01        Occupational Exposure Control Effectiveness BI OLRQ       - BIENNIAL REQUAL PROGRAM INSPECTION                                                             2 09/09/2013   09/13/2013   IP 7111111B          Licensed Operator Requalification Program BI ISI       - ISI BASELINE INSPECTION UNIT 1                                                                 2 09/30/2013   10/18/2013   IP 7111108P          Inservice Inspection Activities - PWR}}
-12/31/2013 FOLLOWU P-MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1  IP Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S 92723 11/01/2012 12/20/2012 TI-187-TI-187 FLOODING WALKDOWN 2  IP Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 2515/187 07/01/2012 12/31/2012 TI-188-TI-188 SEISMIC WALKDOWN 2  IP Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns 2515/188 07/01/2012 12/31/2012 BI OLRQ-REQUALIFICATION PROGRAM INSPECTION 1  IP Licensed Operator Requalification Program - Annual Review 7111111A 09/24/2012 09/28/2012 BI ISI-INSERVICE INSPECTION - UNIT 2 2  IP Inservice Inspection Activities - PWR 7111108P 10/15/2012 11/02/2012 BI RP-RADIATION PROTECTION BASELINE INSPECTION 2  IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/22/2012 10/26/2012 IP Occupational ALARA Planning and Controls 71124.02 10/22/2012 10/26/2012 TI 182-TI 182 BURIED PIPE PHASE 2 1  IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 01/07/2013 01/11/2013 BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION 2  IP A lert and Notification System Testing 7111402 02/11/2013 02/15/2013 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 02/11/2013 02/15/2013 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/11/2013 02/15/2013 IP Performance Indicator Verification 71151 02/11/2013 02/15/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1  IP Occupational ALARA Planning and Controls 71124.02 02/25/2013 03/01/2013 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/25/2013 03/01/2013 IP RETS/ODCM Radiological Effluent 71151-PR01 02/25/2013 03/01/2013 OL PREP-BRAIDWOOD INIT PREP 03/2013 3  OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD W90281 02/25/2013 02/28/2013 BI CDBI-COMPONENT DESIGN BASIS INSPECTION 6  IP Component Design Bases Inspection 7111121 05/20/2013 06/21/2013 OL EXAM-BRAIDWOOD INIT EXAM 03/2013 3  OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD W90281 03/25/2013 04/05/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiation Monitoring Instrumentation 71124.05 04/22/2013 04/26/2013 IP Reactor Coolant System Leakage 71151-BI02 04/22/2013 04/26/2013 Page 2 of 2 Planned Dates Start          End Inspection Activity Title No. of Staff on Site Braidwood Inspection / Activity Plan 09/01/2012
-12/31/2013 ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/01/2013 09/30/2013 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/12/2013 08/16/2013 IP Occupational ALARA Planning and Controls 71124.02 08/12/2013 08/16/2013 IP Occupational Exposure Control Effectiveness 71151-OR01 08/12/2013 08/16/2013 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 2 IP Licensed Operator Requalification Program 7111111B 09/09/2013 09/13/2013 BI ISI-ISI BASELINE INSPECTION UNIT 1 2 IP Inservice Inspection Activities - PWR 7111108P 09/30/2013 10/18/2013}}

Revision as of 23:01, 11 November 2019

Mid-Cycle Assessment Letter for Braidwood Station Units 1 and 2
ML12248A306
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/04/2012
From: Shear G
Division Reactor Projects III
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML12248A306 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 4, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

On August 7, 2012, the Nuclear Regulatory Commission (NRC) staff completed its mid-cycle performance review of Braidwood Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This assessment reflects the integration of the Security Cornerstone into Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

The NRC determined that the performance at Braidwood Station Unit 1 during the most recent quarter, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green) and all PIs indicated your performance was within the normal, expected range (i.e., Green).

The NRC determined that the performance at Braidwood Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix based on all inspection findings being classified as having very low safety significance (i.e., Green) and one PI requiring additional NRC oversight (i.e., White). Specifically, the Mitigating Systems Performance Index for the Cooling Water Systems crossed the Green-White threshold and caused Braidwood Unit 2 to transition from the Licensee Response column to the Regulatory Response column of the ROP Action Matrix in the second quarter of 2012. We notified you in our assessment follow-up letter issued on August 6, 2012, (ADAMS Accession No. ML12220A393) of the increase in our oversight per the ROP Action Matrix.

M. Pacilio Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, for the White PI. We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow-up inspection. These inspections include IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, TI-182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77

Enclosure:

Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via ListServ TM

M. Pacilio Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure (IP) 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, for the White PI. We also plan to conduct several special and infrequently performed inspections related to the operation of the Independent Spent Fuel Storage Installation, Temporary Instructions (TIs), and a follow-up inspection. These inspections include IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, TI-182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Compliance Backfit [ML11181A030] that was issued.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Eric Duncan at (630) 829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Gary L. Shear, Acting Director Division of Reactor Projects Docket Nos. 50-456 and 50-457 License Nos. NPF-72 and NPF-77

Enclosure:

Braidwood Station Inspection/Activity Plan cc w/encl: Distribution via ListServ TM DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\2012 MOC Letters\Braidwood 2012 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME RNg:dtp EDuncan GShear DATE 08/20/12 08/21/12 08/24/12 OFFICIAL RECORD COPY

Letter to M. Pacilio from G. Shear dated September 4, 2012.

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR BRAIDWOOD STATION, UNITS 1 AND 2 DISTRIBUTION:

Silas Kennedy RidsNrrDorlLpl3-2 Resource RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Christine Lipa Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov

Page 1 of 2 Braidwood Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1 11/01/2012 12/20/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S TI-187 - TI-187 FLOODING WALKDOWN 2 07/01/2012 12/31/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns TI-188 - TI-188 SEISMIC WALKDOWN 2 07/01/2012 12/31/2012 IP 2515/188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns BI OLRQ - REQUALIFICATION PROGRAM INSPECTION 1 09/24/2012 09/28/2012 IP 7111111A Licensed Operator Requalification Program - Annual Review BI ISI - INSERVICE INSPECTION - UNIT 2 2 10/15/2012 11/02/2012 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 10/22/2012 10/26/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 10/22/2012 10/26/2012 IP 71124.02 Occupational ALARA Planning and Controls TI 182 - TI 182 BURIED PIPE PHASE 2 1 01/07/2013 01/11/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 2 02/11/2013 02/15/2013 IP 7111402 Alert and Notification System Testing 02/11/2013 02/15/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 02/11/2013 02/15/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/11/2013 02/15/2013 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/25/2013 03/01/2013 IP 71124.02 Occupational ALARA Planning and Controls 02/25/2013 03/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 02/25/2013 03/01/2013 IP 71151-PR01 RETS/ODCM Radiological Effluent OL PREP - BRAIDWOOD INIT PREP 03/2013 3 02/25/2013 02/28/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI CDBI - COMPONENT DESIGN BASIS INSPECTION 6 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection OL EXAM - BRAIDWOOD INIT EXAM 03/2013 3 03/25/2013 04/05/2013 W90281 OL - INITIAL EXAM - 2013 MAR-APR - BRAIDWOOD BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/22/2013 04/26/2013 IP 71124.05 Radiation Monitoring Instrumentation 04/22/2013 04/26/2013 IP 71151-BI02 Reactor Coolant System Leakage

Page 2 of 2 Braidwood Inspection / Activity Plan 09/01/2012 - 12/31/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 07/01/2013 09/30/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 08/12/2013 08/16/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 08/12/2013 08/16/2013 IP 71124.02 Occupational ALARA Planning and Controls 08/12/2013 08/16/2013 IP 71151-OR01 Occupational Exposure Control Effectiveness BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 09/09/2013 09/13/2013 IP 7111111B Licensed Operator Requalification Program BI ISI - ISI BASELINE INSPECTION UNIT 1 2 09/30/2013 10/18/2013 IP 7111108P Inservice Inspection Activities - PWR