{{#Wiki_filter:September 7, 2012 | {{#Wiki_filter:UNITE D S TATE S | ||
NUC LEAR RE GULATOR Y C OMMI S SI ON | |||
Mr. Mark E. Reddemann | R E G IO N I V | ||
1600 EAST LAMAR BLVD | |||
AR L I NGTON , TEXAS 7 601 1- 4511 | |||
September 7, 2012 | |||
Mr. Mark E. Reddemann | |||
Chief, Executive Officer | |||
Energy Northwest | |||
P.O. Box 968 (Mail Drop 1023) | |||
Richland, WA 99352- | |||
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC INITIAL | |||
OPERATOR LICENSING EXAMINATION 05000397/2013301 | |||
Dear Mr. Reddemann: | |||
In a telephone conversation on September 6, 2012 between Messrs. Ron Hayden, Senior | |||
Training Instructor and Steve Garchow, Chief Examiner, arrangements were made for the | |||
administration of licensing examinations at Columbia Generating Station during the weeks of | |||
February 4 and February 11, 2013. | |||
As agreed during the telephone conversation, your staff will prepare the examinations based on | |||
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power | |||
Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for | |||
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will | |||
discuss with your staff any changes that might be necessary before the examinations are | |||
administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination | |||
outlines by November 16, 2012. The written examinations, operating tests, and supporting | |||
reference materials identified in Attachment 3 to ES-201 will be due by December 14, 2012. | |||
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR | |||
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, | |||
examinations, and tests before they are submitted to the NRC for review and approval. All | |||
materials shall be complete and ready-to-use. We request that any personal, proprietary, | |||
sensitive unclassified, or safeguards information in your response be contained in a separate | |||
enclosure and appropriately marked. Any delay in receiving the required examinations and | |||
reference materials, or the submittal of inadequate or incomplete materials, may cause the | |||
examinations to be rescheduled. In addition, your support for on-site validation of the | |||
examinations is required during the week of January 14, 2013. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
Chief | M. Reddemann -2- | ||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval number | |||
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if | |||
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If | |||
the applications are not received at least 30 days before the examination date, a postponement | |||
may be necessary. Signed applications certifying that all training has been completed should | |||
be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden | |||
for this collection of information is estimated to average 50 hours per response, including the | |||
time for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | |||
other aspect of these information collections, including suggestions for reducing the burden, to | |||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | |||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | |||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Thank you for your cooperation in this matter. Mr. Hayden has been advised of the policies and | |||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200- | |||
1159. | |||
Sincerely, | |||
/RA/ | |||
Mark S. Haire, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No.: 397 | |||
License No.: NPF-21 | |||
ML12254A090 | |||
ADAMS: No : Yes : SUNSI Review Complete Reviewer Initials: MSH | |||
: Publicly Available : Non-Sensitive | |||
Non-publicly Available Sensitive | |||
RIV/OB RIV/Chief OB | |||
SGarchow MHaire | |||
/RA/ /RA/ | |||
9/06/2012 9/07/2012 | |||
}} | }} | ||
Revision as of 22:54, 11 November 2019
| ML12254A090 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/07/2012 |
| From: | Mark Haire Operations Branch IV |
| To: | Reddemann M Energy Northwest |
| Haire M | |
| References | |
| 50-397/13-301 | |
| Download: ML12254A090 (3) | |
See also: IR 05000397/2013301
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
R E G IO N I V
1600 EAST LAMAR BLVD
AR L I NGTON , TEXAS 7 601 1- 4511
September 7, 2012
Mr. Mark E. Reddemann
Chief, Executive Officer
Energy Northwest
P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-
SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000397/2013301
Dear Mr. Reddemann:
In a telephone conversation on September 6, 2012 between Messrs. Ron Hayden, Senior
Training Instructor and Steve Garchow, Chief Examiner, arrangements were made for the
administration of licensing examinations at Columbia Generating Station during the weeks of
February 4 and February 11, 2013.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1123, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by November 16, 2012. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by December 14, 2012.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of January 14, 2013.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
M. Reddemann -2-
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should
be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on February 28, 2013. The public reporting burden
for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Hayden has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 817-200-
1159.
Sincerely,
/RA/
Mark S. Haire, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 397
License No.: NPF-21
ADAMS: No : Yes : SUNSI Review Complete Reviewer Initials: MSH
- Publicly Available : Non-Sensitive
Non-publicly Available Sensitive
RIV/OB RIV/Chief OB
SGarchow MHaire
/RA/ /RA/
9/06/2012 9/07/2012