{{#Wiki_filter:July 8, 2013
{{#Wiki_filter:UNITED STATES  NUCLEAR REGULATORY COMMISSION REGION I  2100 RENAISSANCE BOULEVARD, SUITE 100  KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 8, 2013 Mr. Eric Site Vice President


==SUBJECT:==
FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Rte 168 Shippingport, PA 15077-0004
BEAVER VALLEY POWER STATION
 
SUBJECT: BEAVER VALLEY POWER STATION
  - NRC SUPPLEMENTAL INSPECTION REPORT 05000334/2013406 AND 05000412/2013406
  - NRC SUPPLEMENTAL INSPECTION REPORT 05000334/2013406 AND 05000412/2013406



Revision as of 04:02, 15 July 2019

IR 05000334-13-406 & 05000412-13-406, 05/28/2013 to 05/31/2013; Beaver Valley Power Station, Units 1 and 2, Supplemental Inspection, Inspection Procedure (IP) 95001 Letter Only
ML13190A417
Person / Time
Site: Beaver Valley
Issue date: 07/08/2013
From: Anthony Dimitriadis
Plant Support Branch 1
To: Emily Larson
FirstEnergy Nuclear Operating Co
References
IR-13-406
Download: ML13190A417 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 8, 2013 Mr. Eric Site Vice President

FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4, Rte 168 Shippingport, PA 15077-0004

SUBJECT: BEAVER VALLEY POWER STATION

- NRC SUPPLEMENTAL INSPECTION REPORT 05000334/2013406 AND 05000412/2013406

Dear Mr. Larson:

On May 31, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection at your Beaver Valley Power Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on May 31, 2013, with you and other members of your staff.

In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue which occurred in the third quarter of 2012. This issue was previously documented and assessed in NRC Baseline Inspection Report 05000334/2012404 and 05000412/2012404 and Final Significance Determination Report 05000334/2012405 and 05000412/2013405. The NRC was informed on April 19, 2013, of your staff's readiness for this inspection.

The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes. The inspection consisted of examination of activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses.

No findings were identified during this inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance

with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. No response to this letter is required. However, if you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii),

the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Anthony Dimitriadis, Chief

Plant Support Branch 1 Division of Reactor Safety

Docket Nos.: 50-334, 50-412 License Nos.: DPR-66, NPF-73

Enclosure: Inspection Report 05000334/2013406 and 05000412/2013406 w/Attachment: Supplemental Information (CONTAINS )

cc w/o encl: Distribution via ListServ cc w/encl: D. Craine, Manager, Site Protection D. Allard, Director, PA DEP M. Bear, State Liaison Officer, State of Ohio

ML13190A417(Cover letter) ADAMS ACCESSION NUMBER: ML13190A420(Cover letter w/encl)

Cover Letter X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRp RI/DRS RI/DRS NAME JCherubini G Hunegs ADimitriadis DATE 7/3/13 7/1/13 7/8/13 E. Larson 3 Distribution w/o encl; w/o OUO-SRI

(via e-mail) W. Dean, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

D. Roberts, DRP (R1DRPMAIL RESOURCE) A. Burritt, DRP (R1DRPMAIL RESOURCE) C. Miller, DRS (R1DRSMAIL RESOURCE)

J. Roge, DRS (R1DRSMAIL RESOURCE) D. Huyck, RI OEDO G. Hunegs, DRP

B. Bickett, DRP

A. Dugandzic, DRP D. Spindler, DRP, SRI A. Bonney, DRP, RI P. Garrett, DRP,

G. Powell, DRS

RidsNrrPMBeaverValley Resource

RidsNrrDorlLpl1-2 Resource ROPreportsResource R. J. Powell, DRP

Distribution w/encl; w/OUO-SRI

(via e-mail)

J. Cherubini, DRS A. Dimitriadis, DRS B. Desai, DRS, RII J. Maynen, DRS, RIII M. Haire, DRS, RIV C. Johnson, NSIR

R. Albert, NSIR